T-RPT-2300986-TrafficStudy
TRAFFIC STUDY
Proposed Car Dealership
171 King Street (Massachusetts Route 10 / US Route 5)
Northampton, MA
PREPARED BY:
BL Companies
355 Research Parkway
Meriden, CT 06450
October 2023
SITE
TABLE OF CONTENTS
EXECUTIVE SUMMARY i
I. INTRODUCTION 1
II. EXISTING CONDITIONS 3
Access Network 3
Intersection Characteristics 6
Existing Traffic Volumes 9
Crash Data Review 11
Intersection Sight Distance 13
Pedestrians and Bicyclists 14
Public Transit 14
III. PROJECTED TRAFFIC CONDITIONS 15
No Build Traffic Volumes 15
Assigned Site Generated Traffic Volumes 22
Build Traffic Volumes 24
IV. ROADWAY ADEQUACY 26
Signalized Intersections 27
Unsignalized Intersections 28
Analysis Results 28
V. CONCLUSIONS AND RECOMMENDATIONS 32
TABLE OF CONTENTS
ILLUSTRATIONS
FIGURE 1 – LOCATION MAP ....................................................................................................... 2
FIGURE 2 – 2023 EXISTING TRAFFIC VOLUMES ......................................................................... 10
FIGURE 3 – 2030 NO BUILD TRAFFIC VOLUMES ....................................................................... 17
FIGURE 4 – TRIP DISTRIBUTION ................................................................................................... 21
FIGURE 5 – SITE GENERATED TRAFFIC VOLUMES ..................................................................... 23
FIGURE 6 – 2030 BUILD TRAFFIC VOLUMES .............................................................................. 25
TABLES
TABLE 1 – CRASH DATA SUMMARY .......................................................................................... 12
TABLE 2 – INTERSECTION SIGHT DISTANCE ............................................................................... 13
TABLE 3 – OUTSIDE DEVELOPMENT TRIP DISTRIBUTION ............................................................ 16
TABLE 4 – PEAK HOUR TRIP GENERATION ................................................................................ 19
TABLE 5 – SIGNALIZED INTERSECTION – LEVEL OF SERVICE .................................................... 27
TABLE 6 – UNSIGNALIZED INTERSECTION – LEVEL OF SERVICE ............................................... 28
TABLE 7 – PEAK HOUR TRAFFIC OPERATIONS .......................................................................... 29
APPENDIX
TRAFFIC COUNTS
CAPACITY ANALYSES
OUTSIDE DEVELOPMENT TRIP GENERATION
i
EXECUTIVE SUMMARY
EXECUTIVE SUMMARY
This traffic study has been prepared for a new car dealership at 171 King Street
(Massachusetts Route 10 / US Route 5) in Northampton, Massachusetts. The focus of this
study was to evaluate the traffic flows and operating conditions on the roadways and
intersections projected to be used by motorists traveling to and from the proposed
development. The goal of the study is to quantify the potential traffic impacts on these
roadways and intersections. The study area contains primarily commercial
developments along King Street (Massachusetts Route 10 / US Route 5). The existing site
is located on a ± 2.3-acre parcel on the easterly side of King Street (Massachusetts
Route 10 / US Route 5). The site is currently vacant, but was formerly a Honda Car
Dealership. Access to the Site will be via two curb cuts on King Street (Massachusetts
Route 10). These include an existing curb cut at the intersection with Finn Street and a
proposed right-out driveway.
This study investigated the potential traffic impacts of the proposed development
during the weekday morning, weekday evening, and Saturday midday traffic periods.
To assess existing traffic conditions in the vicinity of the Site, peak hour manual turning
movement traffic volumes, vehicle classification, and pedestrian counts were recorded
at key intersections within the study area.
The level of traffic likely generated by the proposed development has been estimated
by using the ITE Trip Generation Manual, 11th Edition, to determine the potential traffic
impact on the study intersections. It is projected that the proposed development will
generate approximately 28 (20 in / enter, 8 out / exit), 36 (15 in / enter, 21 out / exit),
and 60 (30 in / enter, 30 out / exit) trips in the AM peak hour, PM peak hour, and
Saturday midday peak hour, respectively.
A detailed traffic analysis was also conducted at key intersections and roadways in the
general vicinity of the Site, in accordance with methodologies outlined in the Highway
ii
EXECUTIVE SUMMARY
Capacity Manual 2010, published by the Transportation Research Board. Based on the
analysis performed at the intersections around the Site development, traffic operations
for the overall intersection Level of Service (LOS) during the AM, PM, and Saturday
midday peak hours are projected to perform at an adequate LOS during all three
scenarios analyzed in this study. Any movements that are projected to perform at
undesirable Levels of Service are a result of projected traffic growth between the
Existing and No Build Condition or are addressed below.
A summation of all recommendations is outlined below:
➢ Install mast arm assembly and appropriate traffic signal equipment at the
intersection of King Street (Massachusetts Route 10 / US Route 5) with Finn Street
and Site Driveway #1 to support access / egress to the Site. Modify controller as
needed.
➢ Restripe Finn Street to support access to Site Driveway #1. It is recommended that
Finn Street be restriped to one exclusive left turn lane and one shared right turn /
through lane.
➢ It is recommended King Street (Massachusetts Route 10 / US Route 5) Southbound
be restriped to one exclusive right turn lane and one shared through / left turn
lane.
➢ Optimize signal timings at the intersection of King Street (Massachusetts Route 10
/ US Route 5) with Finn Street and Site Driveway #1 to improve operations for
vehicles entering the Site, and vehicles making left hand turns from Finn Street onto
King Street (Massachusetts Route 10 / US Route 5).
➢ Add “No Left Turn” Sign (R3-2) at Site Driveway #2.
1
REPORT
I. INTRODUCTION
This traffic study has been prepared for a new car dealership at 171 King Street
(Massachusetts Route 10 / US Route 5) in Northampton, Massachusetts. The focus of this
study was to evaluate the traffic flows and operating conditions on the roadways and
intersections projected to be used by motorists traveling to and from the proposed
development. The goal of the study is to quantify the potential traffic impacts on these
roadways and intersections. The study area contains primarily commercial
developments along King Street (Massachusetts Route 10 / US Route 5). The existing site
is located on a ± 2.3 acre parcel on the easterly side of King Street (Massachusetts
Route 10 / US Route 5). The site is currently vacant, but was formerly a Honda Car
Dealership. Access to the Site will be via two curb cuts on King Street (Massachusetts
Route 10). These include an existing curb cut at the intersection with Finn Street and a
proposed right-out driveway. See Figure 1 for a location map.
The study investigated the potential traffic impacts associated with the development in
the weekday morning, weekday evening, and Saturday midday peak periods. The
greatest cumulative impacts of project related traffic are likely to occur during these
times when traffic consists mostly of commuters and/or shoppers. Also, due to the
commercial nature of King Street (Massachusetts Route 10 / US Route 5) in the Site
vicinity, the Saturday midday peak period is significant. As such, traffic operating
conditions at the study intersections were analyzed during these peak periods.
FIGURE 1
LOCATION MAP
SITE
Xref (s): ; TBD_2300986
Project No.
SCHEMATIC, NOT TO SCALE
KING STREET, NORTHAMPTON, MA
PROPOSED CAR DEALERSHIP
CAD File
Date
2300986
OCTOBER 2023
TFLO_2300986
LAND SURVEYING
ENVIRONMENTAL
ENGINEERING
ARCHITECTURE
3
REPORT
II. EXISTING CONDITIONS
An investigation of the existing traffic conditions on the adjacent roadway network
formed the basis for assessing any traffic issues associated with the proposed
development. This investigation included traffic counting, and research of pertinent
planning and traffic data available with Massachusetts Department of Transportation
(MassDOT) and the City of Northampton.
Access Network
The project study area consists of the signalized intersections (except as noted) at the
following locations:
• King Street (Massachusetts Route 10 / US Route 5) at Stop and Shop Plaza
Driveway / Walgreens Plaza Driveway
• King Street (Massachusetts Route 10 / US Route 5) at Northampton Bikeway
Pedestrian Crossing
• King Street (Massachusetts Route 10 / US Route 5) at Site Driveway #2
(unsignalized)
• King Street (Massachusetts Route 10 / US Route 5) at Finn Street / Site Driveway
#1
• King Street (Massachusetts Route 10 / US Route 5) at Summer Street / North Street
Major roadways in the vicinity of the project include King Street (Massachusetts Route
10 / US Route 5), Finn Street, and State Street. Other roadways relevant to the project
include North Street and Summer Street.
King Street (Massachusetts Route 10 / US Route 5) is a north-south oriented urban minor
arterial that originates at the intersection with Main Street (Massachusetts Route 10) and
Pleasant Street (US Route 5) in Northampton. King Street (Massachusetts Route 10 / US
Route 5) extends to the intersection with Bridge Road and Damon Road in
Northampton. King Street is designated as both Massachusetts Route 10 and US Route
4
REPORT
5 in the Study Area. Within the Study Area, King Street (Massachusetts Route 10 / US
Route 5) varies between one and two travel lanes in both directions, with auxiliary turn
lanes at key intersections. There is a raised median along King Street (Massachusetts
Route 10 / US Route 5) between its intersections with Stop and Shop and Walgreens
Plaza Driveways and the Northampton Bikeway Pedestrian Crossing. The speed limit is
30 miles per hour (mph). There is illumination present, and sidewalks available on both
sides of the roadway. The average daily traffic (ADT), provided by the MassDOT Road
Inventory GIS Database, was last collected in 2021 and was approximately 17,000
vehicles per day (vpd). Between the intersections of Summer Street / North Avenue and
the Northampton Bikeway Crossing, King Street (Massachusetts Route 10 / US Route 5)
has marked bike lanes in either direction. At the intersection with Finn Street / Site
Driveway #1, the northbound bike lane transitions from King Street (Massachusetts
Route 10 / US Route 5) to a separated path.
Finn Street is an east-west oriented urban minor arterial, that originates at the
intersection with Prospect Street and extends to the intersection with King Street
(Massachusetts Route 10 / US Route 5). Within the Study Area, Finn Street has one travel
lane in both directions, with an exclusive left-turn and exclusive right-turn lane at its
intersection with King Street (Massachusetts Route 10 / US Route 5). The speed limit is 30
mph. There is illumination present, and sidewalks available on both sides of the
roadway. The ADT, provided by the MassDOT Road Inventory GIS database, was last
collected in 2021 and was approximately 9,500 vpd.
State Street is a north-south oriented urban minor arterial that originates at the
intersection with Stoddard Street and extends approximately 0.75 miles south,
concluding at the intersection with Main Street. Within the study area, State Street has
one travel lane in either direction. State Street has a posted speed limit of 25 miles per
hour, sidewalks available on either side of the road, and illumination is present.
5
REPORT
North Street is a local road that originates at the intersection with King Street and
extends to the intersection with Bates Street and Day Avenue. Within the study area,
North Street has one travel lane in both directions. The speed limit is 25 mph, there is
illumination present, and sidewalks available on both sides of the roadway. The ADT,
provided by the MassDOT Road Inventory GIS database, was last collected in 2021 and
was approximately 900 vpd. Approximately 250’ east of the intersection with King Street
(Massachusetts Route 10 / US Route 5) there is a rail overpass.
Summer Street is an east-west oriented local road that originates at the intersection with
State Street and extends to the intersection with King Street (Massachusetts Route 10 /
US Route 5). Within the study area, Summer Street is one-way with an exclusive left-turn
and exclusive right-turn at its intersection with King Street (Massachusetts Route 10 / US
Route 5). The speed limit is 25 miles per hour, there is illumination present, and sidewalks
available on both sides of the roadway. The ADT, provided by the MassDOT Road
Inventory GIS database, was last collected in 2021 and was approximately 900 vpd.
6
REPORT
Intersection Characteristics
Several key intersections were reviewed in this study to determine if they would be
impacted by the expected Site traffic volumes. They are as follows:
King Street (Massachusetts Route 10 / US Route 5) at Stop and Shop Plaza Driveway /
Walgreens Plaza Driveway – Located approximately 1,500 feet north of the proposed
car dealership, this signalized intersection operates with 6 phases including an exclusive
pedestrian phase. King Street (Massachusetts Route 10 / US Route 5) has two through
travel lanes and one exclusive left turn lane in the northbound and southbound
direction. The eastbound approach (Stop and Shop Plaza driveway) provides access to
a commercial plaza. This approach has one shared left / through lane and one
exclusive right turn lane. The westbound approach (Walgreens Plaza Driveway)
provides access to a commercial plaza. This approach has one shared lane for all
movements. There are crosswalks, ramps, and pedestrian push buttons at the eastern,
western, and southern legs of this intersection.
King Street (Massachusetts Route 10 / US Route 5) at Northampton Bikeway Pedestrian
Crossing – Located approximately 800 feet north of the proposed car dealership, this
intersection is a signalized pedestrian crossing that allows users of the Northampton
Bikeway to cross King Street (Massachusetts Route 10 / US Route 5). The eastern and
western legs of this intersection are segments of the Bikeway and are exclusive to
pedestrians / bicyclists. The northern and southern legs (King Street – Massachusetts
Route 10 / US Route 5) of this intersection each have two through travel lanes. Just south
of the intersection, King Street (Massachusetts Route 10 / US Route 5) drops from two
through travel lanes to one. There is a marked crosswalk across King Street
(Massachusetts Route 10 / US Route 5) that connects the eastern and western legs of
the intersection. The exclusive pedestrian phase is activated by push buttons located
on the eastern and western approaches of the intersection.
7
REPORT
King Street (Massachusetts Route 10 / US Route 5) at Site Driveway #2– This proposed
curb cut along King Street (Massachusetts Route 10 / US Route 5) provides right-out
egress from the Site to King Street (Massachusetts Route 10 / US Route 5). King Street
(Massachusetts Route 10 / US Route 10) has one through travel lane in each direction.
There is a bike lane in the southbound direction and a separated bike path in the
northbound direction.
King Street (Massachusetts Route 10 / US Route 5) at Finn Street / Site Driveway #1– This
existing curb cut provides access to and from the Site. This signalized intersection
operates with 4 phases including an exclusive pedestrian phase. The northbound
approach (King Street – Massachusetts Route 10 / US Route 5) has an exclusive left turn
lane and one through travel lane. The southbound approach (King Street –
Massachusetts Route 10 / US Route 5) of this intersection has one exclusive right turn
lane and one through travel lane. Previously, there was an additional lane in the
southbound direction, this lane was converted into a painted median. The eastbound
approach (Finn Street) has one exclusive left turn and one exclusive right turn lane. The
westbound approach of this intersection is the Site Driveway #1, and has one proposed
exclusive left, and one proposed shared right / through lane. There are crosswalks,
ramps, and pedestrian push buttons at all four legs of the intersection. This signalized
intersection is coordinated with the intersection of King Street (Massachusetts Route 10 /
US Route 5) with Summer Street / North Street.
8
REPORT
King Street (Massachusetts Route 10 / US Route 5) at Summer Street / North Street –
Located approximately 650 feet south of the proposed car dealership, this signalized
intersection operates with 3 phases, with leading pedestrian intervals. The northbound
approach (King Street – Massachusetts Route 10 / US Route 5) has one shared through /
left turn lane. The southbound approach (King Street – Massachusetts Route 10 / US
Route 5) has one through lane and one exclusive left turn lane. The eastbound
approach (Summer Street) is one-way with one exclusive left and one exclusive right
turn lane. The westbound approach (North Street) has a shared exclusive left / right turn
lane. There are crosswalks, ramps, and pedestrian push buttons at all four legs of the
intersection. This signalized intersection is coordinated with the intersection of King Street
(Massachusetts Route 10 / US Route 5) with Finn Street / Site Driveway #1.
9
REPORT
Existing Traffic Volumes
To assess existing traffic conditions in the vicinity of the Site, peak hour manual turning
movement traffic volumes, vehicle classification and pedestrian counts were recorded
at the intersections above. The counts were recorded during typical weekday morning
(7am-9am), evening (4pm-6pm) and Saturday midday (11am-1pm) peak traffic periods
in June of 2023. The existing peak hour traffic volumes for the intersections within the
Study Area are illustrated in Figure 2.
440(565)[505]20(20)[20]80(140)[165]5(5)[5]
5(50)[40]
15(40)[30]
5(5)[5]
30(75)[85]
60(105)[140]455(585)[540]105(155)[160]35(45)[25]545(805)[665]590(790)[765]0(0)[0]
0(0)[0]
0(0)[0]
235(340)[170]
95(105)[65]445(565)[505]190(235)[130]0(0)[0]0(0)[0]
130(150)[110]
165(225)[245]365(530)[445]0(0)[0]195(290)[240]105(110)[50]
40(25)[20]
45(50)[45]385(495)[420]115(220)[125]375(430)[430]35(35)[35]590(790)[765]0(0)[0]545(805)[665]0(0)[0]
0(0)[0]
FIGURE 2
EXISTING TRAFFIC VOLUMES (2023)
Xref (s): ; TBD_2300986
Project No.
SCHEMATIC, NOT TO SCALE
KING STREET, NORTHAMPTON, MA
PROPOSED CAR DEALERSHIP
CAD File
Date
2300986
OCTOBER 2023
TFLO_2300986
LAND SURVEYING
ENVIRONMENTAL
ENGINEERING
ARCHITECTURE
11
REPORT
Crash Data Review
Crash data for this study and included intersections were obtained from the MassDOT
IMPACT Crash Database for the most recent complete five-year period, 2018 to 2022.
Eighty-three (83) crashes in the study area were reported. The most common crash
types were “Rear-End” at thirty-three percent (33%) and “Angle” at twenty-five percent
(25%). The majority of crashes resulted in “Property Damage Only” at seventy-two
percent (72%) and “Non-Fatal Injury” at twenty-seven percent (27%). During the five-
year period, there were no fatalities or suspected serious injuries. Twenty-four percent
(24%) of the crashes occurred at the intersection of King Street (Massachusetts Route 10
/ US Route 5) at Summer Street / North Street. Twenty-three percent (23%) of the crashes
occurred along the segment of King Street (Massachusetts Route 10 / US Route 5)
between Finn Street / Site Driveway #1 and Summer Street / North Street. Table 1,
below, summarizes the crash data.
12
REPORT
Table 1 – Crash Data Summary
Proposed Development, Northampton, MA
King Street Segment
between Carlon Drive
and Stop and Shop /
Walgreens Driveways
King Street at
Stop and Shop /
Walgreens
Driveway
King Street Segment
between Stop and Shop
/ Walgreens Driveways
and Northampton
Bikeway Crossing
King Street at
Northampton
Bikeway
Crossing
King Street Segment
between Northampton
Bikeway Crossing and
Finn Street / Site
Driveway #1
King Street at
Finn Street / Site
Driveway #1
King Street Segment
between Finn Street
/ Site Driveway #1
and Summer Street /
North Street
King
Street at
Summer
Street /
North
Street
King Street
Segment
between
Summer
Street / North
Street and
Bright Street
Total
Year
2018 0 1 3 0 5 3 5 0 0 17
2019 1 0 2 1 2 4 3 4 1 18
2020 2 1 2 0 1 1 1 4 0 12
2021 0 1 3 0 2 4 4 4 0 18
2022 0 1 0 0 1 2 6 8 0 18
Total 3 4 10 1 11 14 19 20 1 83
Crash Type
Angle 1 1 0 0 2 3 10 4 0 21
Front to Front 0 0 0 0 0 0 0 1 0 1
Front to Rear 0 0 0 0 0 1 0 2 0 3
Head-On 0 0 0 0 0 1 1 0 0 2
Not Applicable 0 0 0 0 0 0 0 0 0 0
Not Reported 0 0 1 0 0 0 0 0 0 1
Other 0 0 0 0 0 0 0 0 0 0
Read-End 0 2 4 1 8 4 4 4 0 27
Rear to Rear 0 0 0 0 0 0 0 0 0 0
Rear to Side 0 0 0 0 0 0 0 1 0 1
Sideswipe, Opposite Direction 1 0 1 0 0 0 0 0 0 2
Sideswipe, Same Direction 1 1 0 0 0 3 3 6 0 14
Single Vehicle Crash 0 0 4 0 1 2 1 2 1 11
Unknown 0 0 0 0 0 0 0 0 0 0
Total 3 4 10 1 11 14 19 20 1 83
Severity
Fatal Injury 0 0 0 0 0 0 0 0 0 0
Suspected Serious Injury 0 0 0 0 0 0 0 0 0 0
Suspected Minor Injury 0 0 0 0 0 0 0 0 0 0
Possible Injury 0 0 0 0 0 0 0 0 0 0
No Apparent Injury 0 0 0 0 0 0 0 0 0 0
Not Reported 0 0 0 0 0 0 0 0 0 0
Non-Fatal Injury 2 1 2 0 4 6 3 3 1 22
Property Damage Only (None Injured) 1 3 8 1 7 7 16 17 0 60
Unknown 0 0 0 0 0 1 0 0 0 1
Total 3 4 10 1 11 14 19 20 1 83
Note: Data collected from Massachusetts Department of Transportation, IMPACT Crash Data Query and Visualization Tool
13
REPORT
Intersection Sight Distance
Using guidelines provided by the Massachusetts Highway Department Project
Development and Design Guide and AASHTO’s A Policy on Geometric Design of
Highways and Streets, 2018, intersection sight distance and stopping sight distance
were calculated and evaluated. They were evaluated for the Site Driveways’ access to
King Street (Massachusetts Route 10 / US Route 5). See Table 2 below for intersection
sight distance information.
Table 2 – Intersection Sight Distance
Stopping Sight Distance Intersection Sight
Distance
Approach Minimum
Required Provided Minimum
Required Provided
Site Driveway #1 at King
Street (Massachusetts Route
10 / US Route 5) (Left Turn)1
250 ft >450 ft 390 ft >450 ft
Site Driveway #1 at King
Street (Massachusetts Route
10 / US Route 5) (Right Turn)1
250 ft >520 ft 335 ft >520 ft
Site Driveway #2 (Right-out)
at King Street (Massachusetts
Route 10 / US Route 5) (Right
Turn)1
250 ft >360 ft 335 ft >360 ft
1 – 35 mph 85th Percentile Speed
The actual sight distances exiting the Site Driveways onto King Street (Massachusetts
Route 10 / US Route 5) meet the requirements set by the Massachusetts Highway
Department Project Development and Design Guide.
14
REPORT
Pedestrians and Bicyclists
Sidewalks are present along the entire length of King Street (Massachusetts Route 10 /
US Route 5) in both directions. Pedestrian signals are present at all signalized
intersections within the study area. In the vicinity of the project there are several types
of bicycle facilities. A cycle track is a lane separated from the road used exclusively by
bicyclists. The cycle track originates at the intersection of King Street (Massachusetts
Route 10 / US Route 5) with Finn Street / Site Driveway #1 and continues in the
northbound direction. There is a striped bike lane on King Street (Massachusetts Route
10 / US Route 5) Southbound used exclusively by cyclists, between the intersections of
King Street (Massachusetts Route 10 / US Route 5) with Stop and Shop Plaza and King
Street (Massachusetts Route 10 / US Route 5) with Summer Street / North Street. In the
vicinity of the project area, the Northampton Bikeway Crossing runs in an east – west
direction. This bikeway is a paved path used by bicyclists and pedestrians, independent
of any roadway. The Northampton Bikeway is a part of the Norwottuck Branch Rail Trail,
which runs between Northampton and Belchertown.
Public Transit
In the vicinity of the study area, Massachusetts Bay Transportation Authority (MBTA) bus
line R44 operates seven days a week providing service to 26 different stops throughout
Northampton. The bus line runs along King Street (Massachusetts Route 10 / US Route 5),
past the Site. There are several rail lines that provide service to Northampton. These
include the Valley Flyer, operated by Amtrak, that provides service from Greenfield to
New Haven, Connecticut, with stops in Northampton, Holyoke, and Springfield. The
Vermonter, operated by Amtrak, provides service from St. Albans, Vermont to New
Haven, Connecticut, with stops in Northampton, Holyoke, Springfield, and Hartford,
Connecticut.
15
REPORT
III. PROJECTED TRAFFIC CONDITIONS
In order to evaluate traffic conditions when the proposed development is completed,
future traffic volumes were forecasted under the 2030 No Build condition. The projected
traffic volumes on the roadway network under the 2030 No Build condition were
assumed to include all existing traffic and new traffic resulting from background sources
of traffic growth, independent of the proposed development. The projected traffic
volumes on the roadway network under the 2030 Build condition were assumed to
include the anticipated project site-generated traffic volumes in addition to the
assumed background traffic growth.
No Build Traffic Volumes
Based on MassDOT Transportation Impact Assessment Guidelines, a 1% annual growth
rate was applied to the existing traffic volumes to develop the 2030 No Build traffic
volumes. In addition to applying this growth rate, any approved or pending
developments in the area that may add substantial traffic volume to the study
intersections were considered. In discussions with the City of Northampton, there are
two developments adjacent to the study area that may impact traffic operations. The
development at 79 King Street is a residential building and the development at 303 King
Street is a mixed-use development consisting of medical office, retail, and restaurant
land uses. The trips generated from these developments were distributed in
accordance with the Traffic Impact Assessment dated April, 24th, 2019 and added to
the Existing Traffic Volumes to determine the 2030 No Build Traffic Volumes. See
Appendix for detailed information regarding this trip generation and distribution. Table 3
displays trip generation for these outside developments. See Appendix for more
information regarding outside development trip generation. Figure 3 graphically
illustrates the 2030 No Build Traffic Volumes.
16
REPORT
Table 3 – Outside Development Trip Distribution
Trips
AM Peak Hour PM Peak Hour SAT Peak Hour
Address Land Use Size
(KSF) Total In Out Total In Out Total In Out
303 King Street
Medical / Dental Office* 9.840 50 25 25 50 25 25 50 25 25
Retail* 19.724 240 120 120 240 120 120 240 120 120
Restaurant* 2.007 200 100 100 200 100 100 200 100 100
Gross Trips Generated 490 245 245 490 245 245 490 245 245
Traffic Volume Reductions*** 190 95 95 270 135 135 260 130 130
Net Trips Generated 300 150 150 220 110 110 230 115 115
79 King Street Mid-rise Residential** 70 units 26 6 20 27 17 10 27 14 13
Total Trips from Outside Developments 326 156 170 247 127 120 257 129 128
*- Ref: Traffic Impact Assessment dated 04/24/2019 performed by VHB
** - Ref: Trip Generation developed by ITE Trip Generation Manual, 11th Edition
*** - Traffic volume reductions based on integrated land use trip reduction and pass-by trip reduction. See Appendix for more
information regarding traffic volume reductions.
590(710)[630]20(20)[20]85(150)[175]5(5)[5]
5(55)[45]
15(45)[30]
5(5)[5]
30(80)[90]
65(115)[150]600(715)[655]115(165)[170]40(50)[25]705(965)[800]745(935)[895]0(0)[0]
0(0)[0]
0(0)[0]
250(365)[180]
100(115)[70]585(695)[620]205(250)[140]0(0)[0]0(0)[0]
140(160)[120]
175(240)[265]510(670)[565]0(0)[0]210(310)[255]115(120)[55]
45(25)[20]
50(55)[50]530(635)[535]125(235)[135]510(550)[540]40(40)[40]0(0)[0]745(935)[895]705(965)[800]0(0)[0]
0(0)[0]
NO BUILD TRAFFIC VOLUMES (2030)
FIGURE 3
Xref (s): ; TBD_2300986
Project No.
SCHEMATIC, NOT TO SCALE
KING STREET, NORTHAMPTON, MA
PROPOSED CAR DEALERSHIP
CAD File
Date
2300986
OCTOBER 2023
TFLO_2300986
LAND SURVEYING
ENVIRONMENTAL
ENGINEERING
ARCHITECTURE
18
REPORT
Trip Generation
As currently envisioned, the proposed development will have two curb cuts along King
Street (Massachusetts Route 10 / US Route 5). These include an existing curb cut at the
intersection with Finn Street and a proposed right-out driveway. The anticipated traffic
volumes generated by the proposed development were projected based upon
guidelines set forth by data provided by the ITE Trip Generation Manual 11th Edition. This
widely used reference manual provided trip generation rates for various land uses
based on traffic count data collected at similar sites. The following table shows
projected trip generation for an Automobile Sales development (Land Use Code 840).
Table 4 illustrates the trip generation for the proposed development scenario. It is
projected that the proposed development will have a gross generation of
approximately 28 trips in the AM peak hour (20 in/ enter, 8 out/ exit), 36 trips in the PM
peak hour (15 in / enter, 21 out/ exit), and 60 trips in the Saturday midday peak hour (30
in/ enter, 30 out/ exit).
19
REPORT
Table 4 – Peak Hour Trip Generation
Trips
AM Peak Hour PM Peak Hour SAT Peak Hour
Land Use ITE Land Use Code Size
(KSF) Total In Out Total In Out Total In Out
Retail Automobile Sales (840) 15.00 28 20 8 36 15 21 60 30 30
Total Trips 28 20 8 36 15 21 60 30 30
Ref: Trip Generation developed by ITE Trip Generation Manual, 11th Edition
20
REPORT
Trip Distribution
The directional distribution of traffic is typically a function of population densities,
competing opportunities, existing travel patterns adjacent to the Site, and the
efficiency and limitations of the existing roadway system. The distribution of the
anticipated traffic volumes was based on arrival/departure patterns shown in Figure 4.
The directional distribution of traffic was estimated primarily on adjacent roadway
volumes.
45%(45%)45%(45%)(50%)
(30%)
20%55%45%5%(30%)(20%)30%(15%)(30%)45%(5%)
TRIP DISTRIBUTION
FIGURE 4
Xref (s): ; TBD_2300986
Project No.
SCHEMATIC, NOT TO SCALE
KING STREET, NORTHAMPTON, MA
PROPOSED CAR DEALERSHIP
CAD File
Date
2300986
OCTOBER 2023
TFLO_2300986
LAND SURVEYING
ENVIRONMENTAL
ENGINEERING
ARCHITECTURE
22
REPORT
Assigned Site Generated Traffic Volumes
The generated trips are multiplied by the corresponding proportions to ascertain the
Site-generated traffic volumes. Figure 5 shows the Site generated peak hour traffic
assigned to the nearby roadway network.
9(7)[14]3(9)[14]4(11)[15]
2(6)[9]
4(3)[6]11(8)[16]1(1)[1]2(7)[9]2(4)[6]6(4)[9]1(3)[5]2(6)[9]1(1)[1]9(7)[14]9(7)[14]3(9)[14]9(7)[14]SITE GENERATED TRAFFIC
FIGURE 5
Xref (s): ; TBD_2300986
Project No.
SCHEMATIC, NOT TO SCALE
KING STREET, NORTHAMPTON, MA
PROPOSED CAR DEALERSHIP
CAD File
Date
2300986
OCTOBER 2023
TFLO_2300986
LAND SURVEYING
ENVIRONMENTAL
ENGINEERING
ARCHITECTURE
24
REPORT
Build Traffic Volumes
The assigned Site-generated traffic volumes were superimposed onto the 2030 No Build
traffic volumes to establish the future Build traffic volumes, as illustrated in Figure 6.
599(717)[644]20(20)[20]85(150)[175]5(5)[5]
5(55)[45]
15(45)[30]
5(5)[5]
30(80)[90]
65(115)[150]603(724)[669]115(165)[170]40(50)[25]714(972)[814]748(944)[909]254(368)[186]
100(115)[70]585(695)[620]205(250)[140]11(8)[16]0(0)[0]
140(160)[120]
175(240)[265]510(670)[565]9(7)[14]210(310)[255]115(120)[55]
45(25)[20]
51(56)[51]532(642)[544]127(239)[141]516(554)[549]40(40)[40]1(3)[5]747(941)[904]714(972)[814]4(11)[15]
2(6)[9]
1(1)[1]
0(0)[0]
0(0)[0]
BUILD TRAFFIC VOLUMES (2030)
FIGURE 6
Xref (s): ; TBD_2300986
Project No.
SCHEMATIC, NOT TO SCALE
KING STREET, NORTHAMPTON, MA
PROPOSED CAR DEALERSHIP
CAD File
Date
2300986
OCTOBER 2023
TFLO_2300986
LAND SURVEYING
ENVIRONMENTAL
ENGINEERING
ARCHITECTURE
26
REPORT
IV. ROADWAY ADEQUACY
The intersection capacity analyses were prepared using the methodology described in
the Highway Capacity Manual (HCM), published by the Transportation Research Board
(TRB) for the existing and build traffic volume scenarios to simulate the traffic impact of
a proposed Automobile Sales development on the adjacent roadway network. As
documented in the HCM, intersection performance is influenced by a number of
factors, including traffic demand; lane configurations; lane widths; turning restrictions;
roadway grades; and signal phasing. The existing physical roadway characteristics and
signal phasing and timing settings were determined by reviewing the current traffic
control signal plans provided by the City of Northampton.
SynchroTM software (Version 11) was used to model the study intersections based on the
parameters mentioned above. The Synchro software is widely utilized by the traffic
engineering industry and is consistent with the procedures in the HCM.
27
REPORT
Signalized Intersections
Signalized intersections are analyzed in terms of vehicle capacity and motorist delay.
Capacity is the maximum rate of vehicle flow through an intersection given typical
operating conditions. The number of vehicles traveling through an intersection is
divided by the capacity of the intersection to determine an overall volume to capacity
ratio (v/c). A v/c value under 1.00 indicates that the number of vehicles traveling
through an intersection is less than capacity.
As stated in the HCM, level of service for signalized intersections is defined in terms of
control delay. Control delay measures the increase in delay a motorist experiences
while encountering a traffic control signal. These factors include initial deceleration
delay, queue move-up time, stopped delay, and final acceleration delay. This delay is
measured per vehicle for a 15-minute analysis period and is associated with the levels
of service, which are summarized in Table 5 below:
Table 5 – Signalized Intersection – Level of Service
Level of Service1 Average Control Delay
(seconds per vehicle)
A ≤ 10
B > 10 and 20
C > 20 and 35
D > 35 and 55
E > 55 and 80
F > 80
1If volume-to-capacity ratio is over 1.0 for a lane group,
LOS F. Intersection and approach-based LOS is based
solely on control delay.
Level of service A represents the optimum level where most motorists arrive at the
subject intersection during the green phase and thus experience virtually no delay.
Conversely, level of service F indicates that motorists are delayed over 80 seconds while
traveling through the intersection, and can often imply a complete breakdown of that
28
REPORT
location. Level of service D is generally considered the limit of acceptable motorist
delay.
Unsignalized Intersections
Unsignalized intersections are generally evaluated in terms of average side street delay,
as well as the capacity of the roadway approach. This analysis is based on the random
arrival of vehicles and the associated gaps generated by this random arrival within the
traffic stream. There is no overall level of service for unsignalized intersections. The
relationship between levels of service and average side street delay are summarized in
Table 6 below:
Table 6 – Unsignalized Intersection – Level of Service
Level of Service1 Average Control Delay
(seconds per vehicle)
A ≤ 10
B > 10 and 15
C > 15 and 25
D > 25 and 35
E > 35 and 50
F > 50
1If volume-to-capacity ratio is over 1.0 for a lane group,
LOS F. Intersection and approach-based LOS is based
solely on control delay.
It should be noted that unsignalized levels of service do not correspond to those for
signalized intersections, nor do they constitute warrants for the installation of traffic
control signals. It is also recognized that the methodology is overly conservative and that
computations can indicate operations at poor levels of service (E or F) with even very low
side street volumes, although they often function without serious problems in the real
world.
Analysis Results
Table 7 below shows the levels of service (LOS) and other operational parameters at the
subject intersections.
Overall Intersection – X/XX.X - Level of Service/Intersection Signal Delay in sec
Approaches - X/X.XX/XXX/XXX – Level of Service/Volume to Capacity Ratio/Average Delay in Seconds per Vehicle/95% Queue Length in ft
# – 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m – Volume for 95th percentile queue is metered by upstream signal.
29
REPORT
Table 7 – Peak Hour Traffic Operations
AM PM SAT
Existing 2023 No Build 2030 Build 2030 Existing 2023 No Build 2030 Build 2030 Existing 2023 No Build 2030 Build 2030
King Street (Massachusetts Route 10 / US Route 5) at
Stop and Shop Driveway / Walgreens Driveway B/16 B/16 B/16 C/21 C/22 C/22 C/20 C/22 C/22
Stop and Shop Driveway EB Left / Through D/0.41/39/85 D/0.42/38/90 D/0.42/38/90 D/0.56/42/135 D/0.60/44/145 D/0.60/44/145 D/0.63/42/#200 D/0.67/44/#220 D/0.67/44/#220
Stop and Shop Driveway EB Right A/0.09/1/25 A/0.09/1/25 A/0.09/1/25 A/0.20/1/25 A/0.21/1/25 A/0.21/1/25 A/0.20/1/25 A/0.21/1/25 A/0.21/1/25
Walgreens Driveway WB Left / Through / Right C/0.13/21/35 C/0.12/21/35 C/0.12/21/35 C/0.42/29/95 C/0.46/30/110 C/0.46/30/110 C/0.33/24/75 C/0.36/26/80 C/0.36/26/80
King Street (Massachusetts Route 10 / US Route 5) NB Left D/0.51/39/125 D/0.53/39/135 D/0.53/39/135 D/0.65/45/180 D/0.67/46/190 D/0.67/46/190 D/0.65/42/#195 D/0.67/43/#215 D/0.67/43/#215
King Street (Massachusetts Route 10 / US Route 5) NB Through / Right A/0.21/8/165 A/0.28/9/225 A/0.28/9/225 B/0.32/11/240 B/0.39/12/300 B/0.39/12/305 B/0.29/10/190 B/0.35/11/235 B/0.36/11/240
King Street (Massachusetts Route 10 / US Route 5) SB Left D/0.20/42/40 D/0.20/42/40 D/0.20/42/40 D/0.21/46/45 D/0.21/47/45 D/0.21/47/45 D/0.20/40/40 D/0.21/40/40 D/0.21/40/40
King Street (Massachusetts Route 10 / US Route 5) SB Through / Right B/0.29/15/210 B/0.38/16/290 B/0.39/17/295 C/0.51/21/330 C/0.63/23/#475 C/0.63/23/#480 C/0.55/20/270 C/0.67/23/#370 C/0.68/22/#380
King Street (Massachusetts Route 10 / US Route 5) at
Northampton Bikeway Crossing A/3 A/3 A/3 A/3 A/3 A/3 A/3 A/3 A/3
King Street (Massachusetts Route 10 / US Route 5) NB Through A/0.20/3/110 A/0.25/3/145 A/0.25/3/145 A/0.25/3/145 A/0.29/3/175 A/0.30/3/175 A/0.25/3/140 A/0.29/3/170 A/0.29/3/170
King Street (Massachusetts Route 10 / US Route 5) SB Through A/0.19/3/105 A/0.24/3/135 A/0.24/3/135 A/0.25/3/145 A/0.30/3/180 A/0.30/3/180 A/0.22/3/120 A/0.26/3/145 A/0.26/3/150
King Street (Massachusetts Route 10 / US Route 5) at
Site Driveway #2 - - - - - - - - -
Site Driveway #2 WB Right - - B/0.03/15/25 - - C/0.01/18/25 - - C/0.02/17/25
King Street (Massachusetts Route 10 / US Route 5) NB Through - - - - - - - - -
King Street (Massachusetts Route 10 / US Route 5) SB Through - - - - - - - - -
King Street (Massachusetts Route 10 / US Route 5) at
Finn Street / Site Driveway #1 B/15 B/17 B/19 C/20 C/22 C/27 B/17 B/20 C/24
Finn Street EB Left D/0.57/43/165 D/0.61/44/175 D/0.63/45/180 E/0.84/76/#305 F/0.87/81/#335 F/0.86/79/#325 D/0.78/53/#255 E/0.84/59/#285 E/0.91/72/#310
Finn Street EB Right A/0.24/4/25 A/0.26/4/25 A/0.26/4/25 A/0.28/4/30 A/0.27/4/35 A/0.26/3/30 A/0.20/4/25 A/0.22/4/25 A/0.21/3/25
Site Driveway #1 WB Left - - D/0.04/42/25 - - E/0.17/64/35 - - D/0.17/46/30
Site Driveway #1 WB Through / Right - - D/0.03/33/25 - - D/0.11/38/25 - - C/0.11/27/25
King Street (Massachusetts Route 10 / US Route 5) NB Left B/0.38/11/115 B/0.54/16/m#145 B/0.66/23/m#195 B/0.47/12/m125 B/0.61/21/m125 C/0.74/35/m205 A/0.29/9/55 B/0.40/13/95 B/0.50/18/#115
King Street (Massachusetts Route 10 / US Route 5) NB Through / Right B/0.41/11/235 B/0.55/13/#415 B/0.57/16/#610 B/0.44/12/275 B/0.55/12/m530 B/0.58/14/m575 A/0.45/9/340 B/0.55/13/#410 B/0.60/14/#635
King Street (Massachusetts Route 10 / US Route 5) SB Left / Through B/0.44/20/#355 C/0.62/24/#570 C/0.63/25/#655 C/0.52/22/#610 C/0.69/29/#870 D/0.73/33/#995 C/0.50/21/#440 C/0.64/25/#610 C/0.69/28/#705
King Street (Massachusetts Route 10 / US Route 5) SB Right A/0.17/2/35 A/0.19/2/50 A/0.19/4/70 A/0.24/3/95 A/0.26/4/120 A/0.27/6/155 A/0.20/2/40 A/0.22/3/60 A/0.23/4/85
King Street (Massachusetts Route 10 / US Route 5) at
Summer Street / North Street C/22 C/25.0 C/25 C/20 D/40 D/37 B/15 B/16 B/17
Summer Street EB Left C/0.32/33/50 C/0.33/32/55 C/0.34/32/55 D/0.31/39/65 D/0.29/36/70 D/0.30/36/75 D/0.41/46/60 D/0.45/47/65 D/0.46/48/65
Summer Street EB Through / Right C/0.38/27/110 C/0.39/26/115 C/0.39/26/115 C/0.28/33/125 C/0.27/31/135 C/0.27/31/135 C/0.25/27/65 C/0.25/27/65 C/0.25/27/65
North Street WB Left / Right D/0.88/42/210 D/0.91/46/230 D/0.91/46/230 E/0.96/62/385 E/0.96/62/#480 E/0.96/60/#485 C/0.67/24/120 C/0.70/26/135 C/0.71/25/135
King Street (Massachusetts Route 10 / US Route 5) NB Through / Right B/0.48/18/320 C/0.67/25/#530 C/0.68/25/#540 C/0.50/25/420 C/0.70/34/580 C/0.71/35/585 B/0.45/13/260 B/0.57/16/365 B/0.58/16/375
King Street (Massachusetts Route 10 / US Route 5) SB Left B/0.24/11/40 B/0.36/15/65 B/0.37/17/m113 B/0.45/19/200 C/0.66/31/265 D/0.68/23/m245 A/0.23/9/95 A/0.30/10/95 B/0.32/12/m105
King Street (Massachusetts Route 10 / US Route 5) SB Through B/0.35/10/105 B/0.50/13/185 B/0.50/15/365 B/0.42/17/375 C/0.57/34/655 C/0.58/19/505 A/0.32/9/255 A/0.42/9/270 B/0.42/11/350
30
REPORT
As illustrated in Table 7, traffic operations for the overall intersection Level of Service
(LOS) during the AM, PM and Saturday midday Peak Hours are projected to perform at
an adequate LOS between all scenarios analyzed in this study for most of the study
area.
During the AM Peak Hour, traffic operations at the signalized intersections and
unsignalized intersections perform at desirable Levels of Service. All overall intersection
and individual movement LOS perform at acceptable values for all three scenarios.
Signal timings at the intersection of King Street (Massachusetts Route 10 / US Route 5)
were optimized to accommodate the addition of Site Driveway #1.
During the PM Peak Hour, overall intersection LOS are acceptable, though there are
individual movements that perform at inadequate LOS. Between the Existing and No
Build Conditions, at the intersection of King Street (Massachusetts Route 10 / US Route 5)
with Finn Street and Site Driveway #1, the Finn Street EB left turn movement decreases
from E to F. This is a result of projected growth in traffic over the 7-year period between
the Existing and No Build conditions. Based on this, we can conclude this degradation
of LOS is not a result of the Site. When optimizing this intersection under the Build
scenario, delay decreased by 2 seconds at this approach. The WB left turn exiting Site
Driveway #1 also performs at LOS E during this peak hour. Despite this movement
experiencing an undesirable delay value, 95th percentile queue length is 35 feet, less
than the length of 2 vehicles, and there is more than sufficient capacity. The WB left /
right approach of North Street performs at LOS E in all three scenarios. Therefore, we
can conclude that this is not a result of our site.
During the Saturday midday Peak Hour, all overall intersection LOS are acceptable,
though there is one individual movement with an undesirable LOS. At the intersection of
King Street (Massachusetts Route 10 / US Route 5) with Finn Street and Site Driveway #1,
the Finn Street EB left turn movement decreases from D to E between the Existing and
No Build Scenarios. This is a result of projected growth in traffic over the 7-year period
between the Existing and No Build conditions. Based on this, we can conclude this
31
REPORT
degradation of LOS is not a result of the Site. Signal timings at the intersection of King
Street (Massachusetts Route 10 / US Route 5) were optimized to accommodate the
addition of Site Driveway #1.
32
REPORT
V. CONCLUSIONS AND RECOMMENDATIONS
This traffic study has been prepared for a new car dealership at 171 King Street
(Massachusetts Route 10 / US Route 5) in Northampton, Massachusetts. The focus of this
study was to evaluate the traffic flows and operating conditions on the roadways and
intersections projected to be used by motorists traveling to and from the proposed
development. The goal of the study is to quantify the potential traffic impacts on these
roadways and intersections. The study area primarily contains commercial
developments along King Street (Massachusetts Route 10 / US Route 5). The existing site
is located on a ± 2.3 acre parcel on the easterly side of King Street (Massachusetts
Route 10 / US Route 5). The site is currently vacant but was formerly a Honda Car
Dealership. Access to the Site will be via two curb cuts on King Street (Massachusetts
Route 10). These include an existing curb cut at the intersection with Finn Street and a
proposed right-out driveway.
This study investigated the potential traffic impacts of the proposed development
during the weekday morning, weekday evening, and Saturday midday traffic periods.
To assess existing traffic conditions in the vicinity of the Site, peak hour manual turning
movement traffic volumes, vehicle classification, and pedestrian counts were recorded
at key intersections within the study area.
The level of traffic likely generated by the proposed development has been estimated
by using the ITE Trip Generation Manual, 11th Edition, to determine the potential traffic
impact on the study intersections. It is projected that the proposed development will
generate approximately 26 (19 in / enter, 7 out / exit), 34 (14 in / enter, 20 out / exit),
and 56 (28 in / enter, 28 out / exit) net new trips in the AM peak hour, PM peak hour,
and Saturday midday peak hour, respectively.
A detailed traffic analysis was also conducted at key intersections and roadways in the
general vicinity of the Site, in accordance with methodologies outlined in the Highway
33
REPORT
Capacity Manual 2010, published by the Transportation Research Board. Based on the
analysis performed at the intersections around the Site development, traffic operations
for the overall intersection Level of Service (LOS) during the AM, PM, and Saturday
midday peak hours are projected to perform at an adequate LOS between all three
scenarios analyzed in this study. Any movements that are projected to perform at
undesirable Levels of Service are a result of projected traffic growth between the
Existing and No Build Condition or are addressed below.
A summation of all recommendations is outlined below:
➢ Install mast arm assembly and appropriate traffic signal equipment at the
intersection of King Street (Massachusetts Route 10 / US Route 5) with Finn Street
and Site Driveway #1 to support access / egress to the Site. Modify controller as
needed.
➢ Restripe Finn Street to support access to Site Driveway #1. It is recommended that
Finn Street be restriped to one exclusive left turn lane and one shared right turn /
through lane.
➢ It is recommended King Street (Massachusetts Route 10 / US Route 5) Southbound
be restriped to one exclusive right turn lane and one shared through / left turn
lane.
➢ Optimize signal timings at the intersection of King Street (Massachusetts Route 10
/ US Route 5) with Finn Street and Site Driveway #1 to improve operations for
vehicles entering the Site, and vehicles making left hand turns from Finn Street onto
King Street (Massachusetts Route 10 / US Route 5).
➢ Add “No Left Turn” Sign (R3-2) at Site Driveway #2.
APPENDIX
APPENDIX
APPENDIX
TRAFFIC COUNTS
New EnglandCOUNTS
PO Box 1723Framingham, MA 01701
North Hampton, MA
Contact: Michael Dion, P.E., PTOE, Principal
# of TMC’s: 04ID: 1281_2_BL Client: BL Companies
# of ATR’s: 00
1
2
N
Collected on June 1 & 3, 2023
New EnglandCOUNTS
PO Box 1723Framingham, MA 01701
North Hampton, MA
Contact: Michael Dion, P.E., PTOE, Principal
# of TMC’s: 04ID: 1281_2_BL Client: BL Companies
# of ATR’s: 00
3
4
N
Collected on June 1 & 3, 2023
Client:
Project #:
BTD #:
Location:
Street 1:
Street 2:
Count Date:
Day of Week:
Weather:
Start Time U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
7:00 AM 0 0 52 4 0 8 36 0 0 12 9 9 0 7 0 19
7:15 AM 0 0 81 3 0 14 51 0 0 16 8 2 0 9 0 29
7:30 AM 0 0 76 2 0 30 62 0 0 13 20 5 0 23 0 38
7:45 AM 0 0 104 11 0 37 79 0 0 11 28 8 0 16 0 64
8:00 AM 0 0 86 7 0 29 93 0 0 6 24 8 0 23 0 61
8:15 AM 0 0 89 16 0 24 95 0 0 9 20 10 0 21 0 42
8:30 AM 0 0 105 8 0 33 99 0 0 17 31 7 0 28 0 64
8:45 AM 0 0 95 6 0 31 96 1 0 11 28 14 0 22 0 67
9:00 AM
Start Time U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
4:00 PM 0 0 119 11 0 51 115 0 0 11 45 3 0 23 0 74
4:15 PM 0 0 117 8 0 51 104 0 0 15 28 6 0 25 0 84
4:30 PM 0 0 104 8 0 60 141 0 0 12 23 6 0 21 0 86
4:45 PM 0 0 97 6 0 51 119 0 0 16 29 5 0 33 0 97
5:00 PM 0 0 110 14 0 57 131 0 0 6 32 6 0 27 0 71
5:15 PM 0 0 101 13 0 55 101 0 0 7 23 3 0 16 0 59
5:30 PM 0 0 87 7 0 27 90 0 0 11 23 2 0 15 0 83
5:45 PM 0 0 89 6 0 39 78 0 0 4 16 1 0 23 0 51
6:00 PM
AM PEAK HOUR
8:00 AM
to U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
9:00 AM 0 0 375 37 0 117 383 1 0 43 103 39 0 94 0 234
PHF
HV %0.0%0.0%3.7%0.0%0.0%0.0%3.9%0.0%0.0%0.0%1.0%0.0%0.0%1.1%0.0%0.4%
PM PEAK HOUR
4:15 PM
to U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
5:15 PM 0 0 428 36 0 219 495 0 0 49 112 23 0 106 0 338
PHF
HV %0.0%0.0%1.2%0.0%0.0%0.0%0.2%0.0%0.0%2.0%0.0%0.0%0.0%0.0%0.0%0.0%
Summer St / North St
Eastbound
King St King St Summer St
6/1/2023
Thursday
Clouds & Sun, 60°F
Michael Dion, P.E., PTOE
1281_2_BL
Location 1
North Hampton, MA
King St
0.93 0.89 0.85
King St King St Summer St North St
Northbound Westbound
0.92
King St Summer St North St
Southbound Eastbound
King St
Northbound Southbound Eastbound
Northbound
0.89
Westbound
0.91 0.95 0.84
Southbound Eastbound
North St
Westbound
PASSENGER CARS & HEAVY VEHICLES COMBINED
Westbound
Northbound Southbound
King St King St Summer St North St
New EnglandCOUNTS
PO Box 1723
Framingham, MA 01701
6/14/2023, 9:49 AM, 1281_TMC_1 (June 1)
Client:
Project #:
BTD #:
Location:
Street 1:
Street 2:
Count Date:
Day of Week:
Weather:
Start Time U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
7:00 AM 0 0 1 0 0 0 2 0 0 0 0 1 0 0 0 0
7:15 AM 0 0 4 0 0 0 2 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 3 0 0 1 2 0 0 0 0 0 0 1 0 0
7:45 AM 0 0 3 0 0 0 3 0 0 0 0 1 0 0 0 2
8:00 AM 0 0 3 0 0 0 2 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 7 0 0 0 7 0 0 0 1 0 0 1 0 0
8:30 AM 0 0 4 0 0 0 4 0 0 0 0 0 0 0 0 1
8:45 AM 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0
9:00 AM
Start Time U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
4:00 PM 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 PM 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0
4:45 PM 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0
5:30 PM 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 4 0 0 0 1 0 0 0 0 0 0 0 0 0
6:00 PM
AM PEAK HOUR
7:45 AM
to U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
8:45 AM 0 0 17 0 0 0 16 0 0 0 1 1 0 1 0 3
PHF
PM PEAK HOUR
5:00 PM
to U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
6:00 PM 0 0 6 0 0 0 3 0 0 1 0 0 0 0 0 0
PHF
Northbound Southbound Eastbound Westbound
0.38 0.75
0.61 0.57 0.50 0.50
0.25
King St King St Summer St North St
King St King St Summer St North St
Northbound Southbound Eastbound Westbound
King St King St Summer St North St
Northbound Southbound Eastbound Westbound
Northbound Southbound Eastbound Westbound
North Hampton, MA
HEAVY VEHICLES
King St King St Summer St North St
Location 1
1281_2_BL
Michael Dion, P.E., PTOE
Clouds & Sun, 60°F
Thursday
6/1/2023
Summer St / North St
King St
New EnglandCOUNTS
PO Box 1723
Framingham, MA 01701
6/14/2023, 9:49 AM, 1281_TMC_1 (June 1)
Client:
Project #:
BTD #:
Location:
Street 1:
Street 2:
Count Date:
Day of Week:
Weather:
Start Time Left Thru Right PED Left Thru Right PED Left Thru Right PED Left Thru Right PED
7:00 AM 0 0 0 0 0 0 0 1 0 0 0 3 0 0 1 1
7:15 AM 0 0 0 5 0 0 0 2 0 2 0 4 0 0 0 1
7:30 AM 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 2
7:45 AM 0 0 0 1 0 1 0 0 0 0 0 2 0 0 0 3
8:00 AM 0 0 0 0 0 2 0 3 0 0 0 4 0 0 0 3
8:15 AM 0 1 0 1 0 1 0 1 0 0 0 0 1 0 0 7
8:30 AM 0 0 0 1 0 1 0 1 0 0 0 6 1 0 0 2
8:45 AM 0 0 0 4 0 0 0 4 0 0 0 5 0 0 1 1
Start Time Left Thru Right PED Left Thru Right PED Left Thru Right PED Left Thru Right PED
4:00 PM 0 0 0 3 0 2 0 0 0 0 0 2 0 0 0 1
4:15 PM 0 0 0 3 0 0 0 1 1 1 1 6 0 0 1 1
4:30 PM 0 2 0 1 0 0 0 1 1 0 0 3 0 0 1 0
4:45 PM 0 1 0 3 0 1 0 1 0 0 0 3 0 0 0 2
5:00 PM 0 3 0 3 0 1 0 0 0 2 0 5 1 0 0 1
5:15 PM 0 0 0 5 0 2 0 2 0 1 0 5 1 0 0 1
5:30 PM 0 0 0 1 0 2 0 1 0 1 0 2 1 0 0 1
5:45 PM 0 0 0 6 1 2 0 1 0 0 1 9 3 0 0 2
AM PEAK HOUR1
8:00 AM
to Left Thru Right PED Left Thru Right PED Left Thru Right PED Left Thru Right PED
9:00 AM 0 1 0 6 0 4 0 9 0 0 0 15 2 0 1 13
PM PEAK HOUR1
4:15 PM
to Left Thru Right PED Left Thru Right PED Left Thru Right PED Left Thru Right PED
5:15 PM 0 6 0 10 0 2 0 3 2 3 1 17 1 0 2 4
1NOTE: Peak hour summaries here correspond to peak hours identified for passenger cars and heavy vehicles combined.
Michael Dion, P.E., PTOE
1281_2_BL
Location 1
North Hampton, MA
King St
King St
PEDESTRIANS & BICYCLES
Northbound
King St
Summer St / North St
6/1/2023
Thursday
Clouds & Sun, 60°F
King St Summer St North St
King St Summer St North St
Eastbound WestboundSouthbound
King St King St Summer St North St
Eastbound WestboundSouthboundNorthbound
Southbound Eastbound Westbound
Northbound Southbound Eastbound Westbound
King St King St Summer St
Northbound
North St
New EnglandCOUNTS
PO Box 1723
Framingham, MA 01701
6/14/2023, 9:49 AM, 1281_TMC_1 (June 1)
Client:
Project #:
BTD #:
Location:
Street 1:
Street 2:
Count Date:
Day of Week:
Weather:
Start Time U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
11:00 AM 0 0 92 11 0 23 101 0 0 18 15 3 0 13 0 38
11:15 AM 0 0 108 5 0 32 107 0 0 6 7 2 0 14 0 52
11:30 AM 0 0 105 7 0 30 114 0 0 14 20 5 0 11 0 46
11:45 AM 0 0 113 13 0 34 91 0 0 12 12 7 0 19 0 38
12:00 PM 0 0 102 9 0 27 107 0 0 13 12 6 0 20 0 35
12:15 PM 0 0 87 5 0 33 106 0 0 14 11 2 0 6 0 44
12:30 PM 0 0 87 9 0 28 110 0 0 9 25 2 0 10 0 42
12:45 PM 0 0 92 3 0 34 96 0 0 13 10 6 0 13 0 49
1:00 PM
MID PEAK HOUR
11:15 AM
to U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
12:15 PM 0 0 428 34 0 123 419 0 0 45 51 20 0 64 0 171
PHF
HV %0.0%0.0%0.9%0.0%0.0%0.0%1.7%0.0%0.0%2.2%0.0%0.0%0.0%0.0%0.0%0.6%
Northbound Southbound Eastbound Westbound
King St King St Summer St North St
King St Summer St North St
EastboundNorthbound
King St
0.92 0.94
Westbound
PASSENGER CARS & HEAVY VEHICLES COMBINED
0.74 0.89
Southbound
6/3/2023
Saturday
Cloudy, 60°F
Michael Dion, P.E., PTOE
1281_2_BL
Location 1
North Hampton, MA
King St
Summer St / North St
New EnglandCOUNTS
PO Box 1723
Framingham, MA 01701
6/14/2023, 9:53 AM, 1281_TMC_1 (June 3)
Client:
Project #:
BTD #:
Location:
Street 1:
Street 2:
Count Date:
Day of Week:
Weather:
Start Time U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
11:00 AM 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 1 0 0 0 2 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 1 0 0 0 3 0 0 1 0 0 0 0 0 0
12:00 PM 0 0 2 0 0 0 1 0 0 0 0 0 0 0 0 1
12:15 PM 0 0 2 0 0 1 1 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 1 0 0 2 2 0 0 0 0 0 0 1 0 0
12:45 PM 0 0 2 0 0 0 1 0 0 0 0 0 0 0 0 0
1:00 PM
MID PEAK HOUR
11:45 AM
to U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
12:45 PM 0 0 6 0 0 3 7 0 0 1 0 0 0 1 0 1
PHF
Southbound Eastbound Westbound
Michael Dion, P.E., PTOE
1281_2_BL
Location 1
North Hampton, MA
HEAVY VEHICLES
King St
Summer St / North St
6/3/2023
Saturday
Cloudy, 60°F
King St King St Summer St North St
Northbound
King St Summer St North St
Northbound Southbound Eastbound Westbound
King St
0.63 0.25 0.500.75
New EnglandCOUNTS
PO Box 1723
Framingham, MA 01701
6/14/2023, 9:53 AM, 1281_TMC_1 (June 3)
Client:
Project #:
BTD #:
Location:
Street 1:
Street 2:
Count Date:
Day of Week:
Weather:
Start Time Left Thru Right PED Left Thru Right PED Left Thru Right PED Left Thru Right PED
11:00 AM 0 0 0 3 0 0 0 1 0 1 0 3 0 0 0 1
11:15 AM 0 2 1 3 0 0 0 3 0 0 0 4 1 0 0 2
11:30 AM 0 1 0 5 0 1 0 1 0 1 0 4 1 0 0 0
11:45 AM 0 1 0 1 1 2 0 4 0 1 0 4 0 0 0 8
12:00 PM 0 1 0 3 0 0 0 1 0 0 0 1 0 0 0 3
12:15 PM 0 0 0 3 0 0 0 2 0 0 0 2 0 0 0 1
12:30 PM 0 0 0 3 0 0 0 0 0 0 0 3 0 0 0 1
12:45 PM 0 1 0 2 0 0 0 1 0 0 0 6 0 0 0 2
1:00 PM
MID PEAK HOUR
11:15 AM
to Left Thru Right PED Left Thru Right PED Left Thru Right PED Left Thru Right PED
12:15 PM 0 5 1 12 1 3 0 9 0 2 0 13 2 0 0 13
NOTE: Peak hour summaries here correspond to peak hours identified for passenger car and heavy vehicles combined.
Northbound Southbound Eastbound Westbound
King St King St Summer St North St
King St King St Summer St North St
Eastbound Westbound
Michael Dion, P.E., PTOE
1281_2_BL
Location 1
North Hampton, MA
King St
Summer St / North St
6/3/2023
Saturday
Cloudy, 60°F
Northbound Southbound
PEDESTRIANS & BICYCLES
New EnglandCOUNTS
PO Box 1723
Framingham, MA 01701
6/14/2023, 9:53 AM, 1281_TMC_1 (June 3)
Client:
Project #:
BTD #:
Location:
Street 1:
Street 2:
Count Date:
Day of Week:
Weather:
Start Time U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
7:00 AM 0 18 61 0 0 0 35 19 0 19 0 10 0 0 0 0
7:15 AM 0 36 81 0 0 0 47 22 0 40 0 18 0 0 0 0
7:30 AM 0 41 87 0 0 0 53 27 0 43 0 31 0 0 0 0
7:45 AM 0 35 116 0 0 0 91 35 0 43 0 31 0 0 0 0
8:00 AM 0 48 99 0 0 0 82 46 0 39 0 37 0 0 0 0
8:15 AM 0 35 94 0 0 0 91 50 0 44 0 23 0 0 0 0
8:30 AM 0 52 131 0 0 0 92 46 0 37 0 38 0 0 0 0
8:45 AM 0 57 122 0 0 0 101 51 0 45 0 34 0 0 0 0
9:00 AM
Start Time U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
4:00 PM 0 54 130 0 0 0 134 73 0 61 0 32 0 0 0 0
4:15 PM 0 53 164 0 0 0 123 69 0 50 0 35 0 0 0 0
4:30 PM 0 52 125 0 0 0 148 75 0 58 0 45 0 0 0 0
4:45 PM 0 78 148 0 0 0 126 75 0 57 0 40 0 0 0 0
5:00 PM 0 52 125 0 0 0 140 81 0 47 0 38 0 0 0 1
5:15 PM 0 53 103 0 0 0 102 64 0 71 0 30 0 0 0 0
5:30 PM 0 57 116 0 0 0 85 70 0 41 0 25 0 0 0 0
5:45 PM 0 39 99 0 0 0 94 56 0 44 0 27 0 0 0 0
6:00 PM
AM PEAK HOUR
8:00 AM
to U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
9:00 AM 0 192 446 0 0 0 366 193 0 165 0 132 0 0 0 0
PHF
HV %0.0%0.5%3.8%0.0%0.0%0.0%3.8%2.6%0.0%0.6%0.0%0.8%0.0%0.0%0.0%0.0%
PM PEAK HOUR
4:00 PM
to U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
5:00 PM 0 237 567 0 0 0 531 292 0 226 0 152 0 0 0 0
PHF
HV %0.0%0.0%1.1%0.0%0.0%0.0%0.6%0.7%0.0%0.9%0.0%0.0%0.0%0.0%0.0%0.0%
Site Drive
Westbound
PASSENGER CARS & HEAVY VEHICLES COMBINED
Westbound
Northbound Southbound
King St King St Finn St Site Drive
Northbound Southbound Eastbound
Northbound
0.00
Westbound
0.87 0.92 0.94
Southbound Eastbound
0.89 0.92 0.00
King St King St Finn St Site Drive
Northbound Westbound
0.92
King St Finn St Site Drive
Southbound Eastbound
King St
Michael Dion, P.E., PTOE
1281_2_BL
Location 2
North Hampton, MA
King St
Finn St / Site Drive
Eastbound
King St King St Finn St
6/1/2023
Thursday
Clouds & Sun, 60°F
New EnglandCOUNTS
PO Box 1723
Framingham, MA 01701
6/14/2023, 9:57 AM, 1281_TMC_2 (June 1)
Client:
Project #:
BTD #:
Location:
Street 1:
Street 2:
Count Date:
Day of Week:
Weather:
Start Time U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
7:00 AM 0 0 1 0 0 0 2 0 0 1 0 0 0 0 0 0
7:15 AM 0 0 4 0 0 0 2 1 0 0 0 0 0 0 0 0
7:30 AM 0 0 3 0 0 0 2 0 0 1 0 0 0 0 0 0
7:45 AM 0 0 5 0 0 0 5 3 0 0 0 0 0 0 0 0
8:00 AM 0 0 3 0 0 0 1 3 0 0 0 1 0 0 0 0
8:15 AM 0 0 7 0 0 0 7 0 0 1 0 0 0 0 0 0
8:30 AM 0 1 6 0 0 0 4 1 0 0 0 0 0 0 0 0
8:45 AM 0 0 1 0 0 0 2 1 0 0 0 0 0 0 0 0
9:00 AM
Start Time U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
4:00 PM 0 0 3 0 0 0 2 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0
4:30 PM 0 0 1 0 0 0 1 2 0 1 0 0 0 0 0 0
4:45 PM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 3 0 0 0 1 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0
5:30 PM 0 0 1 0 0 0 1 1 0 1 0 0 0 0 0 0
5:45 PM 0 2 2 0 0 0 1 0 0 1 0 0 0 0 0 0
6:00 PM
AM PEAK HOUR
7:45 AM
to U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
8:45 AM 0 1 21 0 0 0 17 7 0 1 0 1 0 0 0 0
PHF
PM PEAK HOUR
5:00 PM
to U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
6:00 PM 0 2 6 0 0 0 4 1 0 3 0 0 0 0 0 0
PHF
Location 2
1281_2_BL
Michael Dion, P.E., PTOE
Clouds & Sun, 60°F
Thursday
6/1/2023
Finn St / Site Drive
King St
Northbound Southbound Eastbound Westbound
North Hampton, MA
HEAVY VEHICLES
King St King St Finn St Site Drive
King St King St Finn St Site Drive
Northbound Southbound Eastbound Westbound
King St King St Finn St Site Drive
Northbound Southbound Eastbound Westbound
0.79 0.75 0.50 0.00
0.75 0.00
King St King St Finn St Site Drive
Northbound Southbound Eastbound Westbound
0.50 0.63
New EnglandCOUNTS
PO Box 1723
Framingham, MA 01701
6/14/2023, 9:57 AM, 1281_TMC_2 (June 1)
Client:
Project #:
BTD #:
Location:
Street 1:
Street 2:
Count Date:
Day of Week:
Weather:
Start Time Left Thru Right PED Left Thru Right PED Left Thru Right PED Left Thru Right PED
7:00 AM 1 0 0 0 0 0 0 0 0 0 0 4 0 0 0 1
7:15 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 1
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0
8:00 AM 0 0 0 0 0 1 0 0 0 0 0 3 0 0 0 5
8:15 AM 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 3
8:30 AM 0 0 0 0 0 1 0 0 0 0 0 6 0 0 0 1
8:45 AM 1 0 0 0 0 0 0 0 0 0 0 2 0 0 0 2
Start Time Left Thru Right PED Left Thru Right PED Left Thru Right PED Left Thru Right PED
4:00 PM 0 1 0 0 0 3 0 0 0 0 0 2 0 0 0 1
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0
4:30 PM 1 1 0 0 0 0 0 0 0 0 0 5 0 0 0 0
4:45 PM 0 1 0 0 0 0 0 0 0 0 0 6 0 0 0 1
5:00 PM 0 4 0 2 0 0 0 0 0 0 1 1 0 0 0 1
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0
5:30 PM 0 0 0 0 0 1 0 0 0 0 0 3 0 0 0 4
5:45 PM 0 0 0 3 0 2 0 0 0 0 0 3 0 0 0 3
AM PEAK HOUR1
8:00 AM
to Left Thru Right PED Left Thru Right PED Left Thru Right PED Left Thru Right PED
9:00 AM 1 1 0 0 0 3 0 0 0 0 0 11 0 0 0 11
PM PEAK HOUR1
4:00 PM
to Left Thru Right PED Left Thru Right PED Left Thru Right PED Left Thru Right PED
5:00 PM 1 3 0 0 0 3 0 0 0 0 0 16 0 0 0 2
1NOTE: Peak hour summaries here correspond to peak hours identified for passenger cars and heavy vehicles combined.
Southbound Eastbound Westbound
Northbound Southbound Eastbound Westbound
King St King St Finn St
Northbound
Site Drive
King St King St Finn St Site Drive
Eastbound WestboundSouthboundNorthbound
King St Finn St Site Drive
Eastbound WestboundSouthbound
Michael Dion, P.E., PTOE
1281_2_BL
Location 2
North Hampton, MA
King St
King St
PEDESTRIANS & BICYCLES
Northbound
King St
Finn St / Site Drive
6/1/2023
Thursday
Clouds & Sun, 60°F
King St Finn St Site Drive
New EnglandCOUNTS
PO Box 1723
Framingham, MA 01701
6/14/2023, 9:57 AM, 1281_TMC_2 (June 1)
Client:
Project #:
BTD #:
Location:
Street 1:
Street 2:
Count Date:
Day of Week:
Weather:
Start Time U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
11:00 AM 0 24 137 0 1 1 90 64 0 66 0 22 0 0 0 1
11:15 AM 0 46 108 0 0 0 118 49 0 56 0 28 0 0 0 0
11:30 AM 0 35 133 0 0 0 119 49 0 72 0 33 0 0 0 0
11:45 AM 0 28 131 0 0 0 99 71 0 60 0 25 0 0 0 0
12:00 PM 0 21 133 0 0 0 110 69 0 55 0 23 0 0 0 0
12:15 PM 0 31 120 0 0 0 115 66 0 49 0 20 0 0 0 0
12:30 PM 0 34 100 0 0 0 114 59 0 54 0 22 0 0 0 0
12:45 PM 0 25 120 1 0 0 97 68 0 51 0 32 0 0 0 0
1:00 PM
MID PEAK HOUR
11:15 AM
to U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
12:15 PM 0 130 505 0 0 0 446 238 0 243 0 109 0 0 0 0
PHF
HV %0.0%0.8%1.2%0.0%0.0%0.0%1.6%1.3%0.0%1.2%0.0%0.0%0.0%0.0%0.0%0.0%
Northbound Southbound Eastbound Westbound
King St King St Finn St Site Drive
King St Finn St Site Drive
EastboundNorthbound
King St
0.94 0.96
Westbound
PASSENGER CARS & HEAVY VEHICLES COMBINED
0.84 0.00
Southbound
6/3/2023
Saturday
Cloudy, 60°F
Michael Dion, P.E., PTOE
1281_2_BL
Location 2
North Hampton, MA
King St
Finn St / Site Drive
New EnglandCOUNTS
PO Box 1723
Framingham, MA 01701
6/14/2023, 9:59 AM, 1281_TMC_2 (June 3)
Client:
Project #:
BTD #:
Location:
Street 1:
Street 2:
Count Date:
Day of Week:
Weather:
Start Time U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
11:00 AM 0 0 1 0 0 0 1 1 0 2 0 1 0 0 0 0
11:15 AM 0 0 1 0 0 0 2 1 0 0 0 0 0 0 0 0
11:30 AM 0 1 1 0 0 0 0 0 0 3 0 0 0 0 0 0
11:45 AM 0 0 1 0 0 0 4 1 0 0 0 0 0 0 0 0
12:00 PM 0 0 3 0 0 0 1 1 0 0 0 0 0 0 0 0
12:15 PM 0 0 2 0 0 0 1 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 1 0 0 0 3 0 0 2 0 1 0 0 0 0
12:45 PM 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0
1:00 PM
MID PEAK HOUR
11:00 AM
to U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
12:00 PM 0 1 4 0 0 0 7 3 0 5 0 1 0 0 0 0
PHF
Southbound Eastbound Westbound
Michael Dion, P.E., PTOE
1281_2_BL
Location 2
North Hampton, MA
HEAVY VEHICLES
King St
Finn St / Site Drive
6/3/2023
Saturday
Cloudy, 60°F
King St King St Finn St Site Drive
Northbound
King St Finn St Site Drive
Northbound Southbound Eastbound Westbound
King St
0.50 0.50 0.000.63
New EnglandCOUNTS
PO Box 1723
Framingham, MA 01701
6/14/2023, 9:59 AM, 1281_TMC_2 (June 3)
Client:
Project #:
BTD #:
Location:
Street 1:
Street 2:
Count Date:
Day of Week:
Weather:
Start Time Left Thru Right PED Left Thru Right PED Left Thru Right PED Left Thru Right PED
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 2 0 0 0 1 0 0 0 0 0 5 0 0 0 1
11:30 AM 0 1 0 0 0 0 0 0 0 0 0 1 0 0 0 1
11:45 AM 0 2 0 2 0 4 0 2 0 0 0 1 0 0 0 6
12:00 PM 0 1 0 1 1 1 0 1 0 0 0 1 0 0 0 2
12:15 PM 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 3
12:45 PM 0 0 0 1 0 0 0 0 0 0 0 6 0 0 1 2
1:00 PM
MID PEAK HOUR
11:15 AM
to Left Thru Right PED Left Thru Right PED Left Thru Right PED Left Thru Right PED
12:15 PM 0 6 0 3 1 6 0 3 0 0 0 8 0 0 0 10
NOTE: Peak hour summaries here correspond to peak hours identified for passenger car and heavy vehicles combined.
Northbound Southbound Eastbound Westbound
King St King St Finn St Site Drive
King St King St Finn St Site Drive
Eastbound Westbound
Michael Dion, P.E., PTOE
1281_2_BL
Location 2
North Hampton, MA
King St
Finn St / Site Drive
6/3/2023
Saturday
Cloudy, 60°F
Northbound Southbound
PEDESTRIANS & BICYCLES
New EnglandCOUNTS
PO Box 1723
Framingham, MA 01701
6/14/2023, 9:59 AM, 1281_TMC_2 (June 3)
Client:
Project #:
BTD #:
Location:
Street 1:
Street 2:
Count Date:
Day of Week:
Weather:
Start Time U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
7:00 AM 0 0 81 0 0 0 49 0 0 0 0 0 0 0 0 0
7:15 AM 1 0 116 0 0 0 72 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 126 0 0 0 89 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 151 0 0 0 123 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 128 0 0 0 123 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 138 0 0 0 147 0 0 0 0 0 0 0 0 0
8:30 AM 0 0 170 0 0 0 125 0 0 0 0 0 0 0 0 0
8:45 AM 0 0 156 0 0 0 152 0 0 0 0 0 0 0 0 0
9:00 AM
Start Time U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
4:00 PM 0 0 189 0 0 0 214 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 206 0 0 0 185 0 0 0 0 0 0 0 0 0
4:30 PM 0 0 192 0 0 0 217 0 0 0 0 0 0 0 0 0
4:45 PM 0 0 204 0 0 0 190 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 174 0 0 0 215 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 169 0 0 0 172 0 0 0 0 0 0 0 0 0
5:30 PM 0 0 160 0 0 0 153 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 137 0 0 0 138 0 0 0 0 0 0 0 0 0
6:00 PM
AM PEAK HOUR
8:00 AM
to U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
9:00 AM 0 0 592 0 0 0 547 0 0 0 0 0 0 0 0 0
PHF
HV %0.0%0.0%2.5%0.0%0.0%0.0%3.7%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%
PM PEAK HOUR
4:00 PM
to U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
5:00 PM 0 0 791 0 0 0 806 0 0 0 0 0 0 0 0 0
PHF
HV %0.0%0.0%0.8%0.0%0.0%0.0%0.7%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%
North Hampton Bikeway Crossing
Eastbound
King St King St
6/1/2023
Thursday
Clouds & Sun, 60°F
Michael Dion, P.E., PTOE
1281_2_BL
Location 3
North Hampton, MA
King St
0.96 0.93 0.00
King St King St
Northbound Westbound
0.00
King St
Southbound Eastbound
King St
Northbound Southbound Eastbound
Northbound
0.00
Westbound
0.87 0.90 0.00
Southbound Eastbound
Westbound
PASSENGER CARS & HEAVY VEHICLES COMBINED
Westbound
Northbound Southbound
King St King St
New EnglandCOUNTS
PO Box 1723
Framingham, MA 01701
6/14/2023, 10:04 AM, 1281_TMC_3 (June 1)
Client:
Project #:
BTD #:
Location:
Street 1:
Street 2:
Count Date:
Day of Week:
Weather:
Start Time U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
7:00 AM 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 4 0 0 0 4 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 4 0 0 0 4 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 5 0 0 0 7 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 4 0 0 0 4 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 5 0 0 0 8 0 0 0 0 0 0 0 0 0
8:30 AM 0 0 5 0 0 0 5 0 0 0 0 0 0 0 0 0
8:45 AM 0 0 1 0 0 0 3 0 0 0 0 0 0 0 0 0
9:00 AM
Start Time U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
4:00 PM 0 0 2 0 0 0 1 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 2 0 0 0 1 0 0 0 0 0 0 0 0 0
4:30 PM 0 0 1 0 0 0 2 0 0 0 0 0 0 0 0 0
4:45 PM 0 0 1 0 0 0 2 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0
5:30 PM 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 3 0 0 0 1 0 0 0 0 0 0 0 0 0
6:00 PM
AM PEAK HOUR
7:45 AM
to U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
8:45 AM 0 0 19 0 0 0 24 0 0 0 0 0 0 0 0 0
PHF
PM PEAK HOUR
4:00 PM
to U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
5:00 PM 0 0 6 0 0 0 6 0 0 0 0 0 0 0 0 0
PHF
Northbound Southbound Eastbound Westbound
0.75 0.75
0.95 0.75 0.00 0.00
0.00 0.00
King St King St
King St King St
Northbound Southbound Eastbound Westbound
King St King St
Northbound Southbound Eastbound Westbound
Northbound Southbound Eastbound Westbound
North Hampton, MA
HEAVY VEHICLES
King St King St
Location 3
1281_2_BL
Michael Dion, P.E., PTOE
Clouds & Sun, 60°F
Thursday
6/1/2023
North Hampton Bikeway Crossing
King St
New EnglandCOUNTS
PO Box 1723
Framingham, MA 01701
6/14/2023, 10:04 AM, 1281_TMC_3 (June 1)
Client:
Project #:
BTD #:
Location:
Street 1:
Street 2:
Count Date:
Day of Week:
Weather:
Start Time Left Thru Right PED Left Thru Right PED Left Thru Right PED Left Thru Right PED
7:00 AM 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 0 0 2 0 2 0 0 0 0 0 0 0 0
8:15 AM 0 1 0 0 0 2 0 3 0 0 0 0 0 0 0 0
8:30 AM 0 2 0 0 0 4 0 8 0 0 0 0 0 0 0 0
8:45 AM 0 0 0 0 0 5 0 6 0 0 0 0 0 0 0 0
Start Time Left Thru Right PED Left Thru Right PED Left Thru Right PED Left Thru Right PED
4:00 PM 0 1 0 0 0 4 0 2 0 0 0 0 0 0 0 0
4:15 PM 0 0 0 0 0 3 0 4 0 0 0 0 0 0 0 0
4:30 PM 0 1 0 0 0 5 0 0 0 0 0 0 0 0 0 0
4:45 PM 0 2 0 0 0 5 0 1 0 0 0 0 0 0 0 0
5:00 PM 0 4 0 0 0 5 0 3 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 1 0 8 0 2 0 0 0 0 0 0 0 0
5:30 PM 0 0 0 0 0 3 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 4 0 1 0 0 0 0 0 0 0 0
AM PEAK HOUR1
8:00 AM
to Left Thru Right PED Left Thru Right PED Left Thru Right PED Left Thru Right PED
9:00 AM 0 3 0 0 0 13 0 19 0 0 0 0 0 0 0 0
PM PEAK HOUR1
4:00 PM
to Left Thru Right PED Left Thru Right PED Left Thru Right PED Left Thru Right PED
5:00 PM 0 4 0 0 0 17 0 7 0 0 0 0 0 0 0 0
1NOTE: Peak hour summaries here correspond to peak hours identified for passenger cars and heavy vehicles combined.
Michael Dion, P.E., PTOE
1281_2_BL
Location 3
North Hampton, MA
King St
King St
PEDESTRIANS & BICYCLES
Northbound
King St
North Hampton Bikeway Crossing
6/1/2023
Thursday
Clouds & Sun, 60°F
King St
King St
Eastbound WestboundSouthbound
King St King St
Eastbound WestboundSouthboundNorthbound
Southbound Eastbound Westbound
Northbound Southbound Eastbound Westbound
King St King St
Northbound
New EnglandCOUNTS
PO Box 1723
Framingham, MA 01701
6/14/2023, 10:04 AM, 1281_TMC_3 (June 1)
Client:
Project #:
BTD #:
Location:
Street 1:
Street 2:
Count Date:
Day of Week:
Weather:
Start Time U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
11:00 AM 0 0 206 0 0 0 166 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 164 0 0 0 179 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 203 0 0 0 149 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 190 0 0 0 172 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 191 0 0 0 176 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 170 0 0 0 177 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 150 0 0 0 178 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 170 0 0 0 158 0 0 0 0 0 0 0 0 0
1:00 PM
MID PEAK HOUR
11:00 AM
to U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
12:00 PM 0 0 763 0 0 0 666 0 0 0 0 0 0 0 0 0
PHF
HV %0.0%0.0%0.9%0.0%0.0%0.0%1.4%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%
6/3/2023
Saturday
Cloudy, 60°F
Michael Dion, P.E., PTOE
1281_2_BL
Location 3
North Hampton, MA
King St
North Hampton Bikeway Crossing
Westbound
PASSENGER CARS & HEAVY VEHICLES COMBINED
0.00 0.00
Southbound EastboundNorthbound
King St
0.93 0.93
King St
King St King St
Northbound Southbound Eastbound Westbound
New EnglandCOUNTS
PO Box 1723
Framingham, MA 01701
6/14/2023, 10:07 AM, 1281_TMC_3 (June 3)
Client:
Project #:
BTD #:
Location:
Street 1:
Street 2:
Count Date:
Day of Week:
Weather:
Start Time U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
11:00 AM 0 0 3 0 0 0 2 0 0 0 0 0 0 0 0 0
11:15 AM 0 0 1 0 0 0 3 0 0 0 0 0 0 0 0 0
11:30 AM 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 1 0 0 0 4 0 0 0 0 0 0 0 0 0
12:00 PM 0 0 3 0 0 0 3 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 2 0 0 0 3 0 0 0 0 0 0 0 0 0
12:30 PM 0 0 3 0 0 0 1 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 1 0 0 0 2 0 0 0 0 0 0 0 0 0
1:00 PM
MID PEAK HOUR
11:45 AM
to U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
12:45 PM 0 0 9 0 0 0 11 0 0 0 0 0 0 0 0 0
PHF 0.69 0.00 0.000.75
King St
Northbound Southbound Eastbound Westbound
King St
King St King St
Northbound
Michael Dion, P.E., PTOE
1281_2_BL
Location 3
North Hampton, MA
HEAVY VEHICLES
King St
North Hampton Bikeway Crossing
6/3/2023
Saturday
Cloudy, 60°F
Southbound Eastbound Westbound
New EnglandCOUNTS
PO Box 1723
Framingham, MA 01701
6/14/2023, 10:07 AM, 1281_TMC_3 (June 3)
Client:
Project #:
BTD #:
Location:
Street 1:
Street 2:
Count Date:
Day of Week:
Weather:
Start Time Left Thru Right PED Left Thru Right PED Left Thru Right PED Left Thru Right PED
11:00 AM 0 0 0 0 0 2 0 3 0 0 0 0 0 0 0 0
11:15 AM 0 2 0 0 0 5 0 1 0 0 0 0 0 0 0 0
11:30 AM 0 1 0 0 0 6 0 1 0 0 0 0 0 0 0 0
11:45 AM 0 2 0 0 0 4 0 9 0 0 0 0 0 0 0 0
12:00 PM 0 1 0 0 0 2 0 4 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 6 0 3 0 0 0 0 0 0 0 0
12:30 PM 0 2 0 0 0 2 0 2 0 0 0 0 0 0 0 0
12:45 PM 0 1 0 0 0 8 0 3 0 0 0 0 0 0 0 0
1:00 PM
MID PEAK HOUR
11:00 AM
to Left Thru Right PED Left Thru Right PED Left Thru Right PED Left Thru Right PED
12:00 PM 0 5 0 0 0 17 0 14 0 0 0 0 0 0 0 0
NOTE: Peak hour summaries here correspond to peak hours identified for passenger car and heavy vehicles combined.
Eastbound Westbound
Michael Dion, P.E., PTOE
1281_2_BL
Location 3
North Hampton, MA
King St
North Hampton Bikeway Crossing
6/3/2023
Saturday
Cloudy, 60°F
Northbound Southbound
PEDESTRIANS & BICYCLES
King St King St
King St King St
Northbound Southbound Eastbound Westbound
New EnglandCOUNTS
PO Box 1723
Framingham, MA 01701
6/14/2023, 10:07 AM, 1281_TMC_3 (June 3)
Client:
Project #:
BTD #:
Location:
Street 1:
Street 2:
Count Date:
Day of Week:
Weather:
Start Time U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
7:00 AM 0 13 64 3 0 1 46 15 0 7 0 1 0 0 0 0
7:15 AM 0 16 96 2 0 0 51 8 0 10 0 3 0 0 0 0
7:30 AM 1 18 99 6 0 0 78 16 0 10 0 6 0 0 0 1
7:45 AM 0 28 115 7 0 0 104 15 0 10 2 7 0 0 1 0
8:00 AM 0 29 95 9 0 6 106 27 0 12 0 4 0 2 2 4
8:15 AM 1 20 109 7 0 3 120 25 0 20 0 8 0 3 2 2
8:30 AM 0 29 136 4 0 6 95 14 0 9 0 11 0 1 1 4
8:45 AM 1 26 114 16 0 4 120 15 0 18 1 8 0 0 1 5
9:00 AM
Start Time U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
4:00 PM 0 38 147 12 0 4 142 36 0 25 1 19 0 16 2 13
4:15 PM 0 35 145 12 1 9 123 27 0 32 2 12 0 14 3 8
4:30 PM 0 39 146 10 0 2 156 43 0 25 2 31 0 11 0 13
4:45 PM 1 41 146 11 1 6 143 34 0 21 0 12 0 9 1 8
5:00 PM 1 33 138 10 0 0 149 31 0 32 0 23 0 12 1 10
5:15 PM 1 37 128 6 0 2 116 26 0 24 0 17 0 10 1 6
5:30 PM 0 40 120 10 0 1 113 19 0 24 0 16 0 4 0 8
5:45 PM 0 30 96 3 1 2 96 19 0 19 0 23 0 4 2 2
6:00 PM
AM PEAK HOUR
8:00 AM
to U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
9:00 AM 2 104 454 36 0 19 441 81 0 59 1 31 0 6 6 15
PHF
HV %0.0%2.9%2.9%2.8%0.0%5.3%3.6%6.2%0.0%5.1%0.0%3.2%0.0%0.0%0.0%13.3%
PM PEAK HOUR
4:00 PM
to U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
5:00 PM 1 153 584 45 2 21 564 140 0 103 5 74 0 50 6 42
PHF
HV %0.0%0.7%0.9%0.0%0.0%0.0%0.5%0.7%0.0%1.0%0.0%0.0%0.0%0.0%0.0%0.0%
Walgreens
Westbound
PASSENGER CARS & HEAVY VEHICLES COMBINED
Westbound
Northbound Southbound
King St King St Stop and Shop Walgreens
Northbound Southbound Eastbound
Northbound
0.84
Westbound
0.88 0.91 0.81
Southbound Eastbound
0.98 0.90 0.79
King St King St Stop and Shop Walgreens
Northbound Westbound
0.78
King St Stop and Shop Walgreens
Southbound Eastbound
King St
Michael Dion, P.E., PTOE
1281_2_BL
Location 4
North Hampton, MA
King St
Stop and Shop / Walgreens Plaza
Eastbound
King St King St Stop and Shop
6/1/2023
Thursday
Clouds & Sun, 60°F
New EnglandCOUNTS
PO Box 1723
Framingham, MA 01701
6/14/2023, 10:11 AM, 1281_TMC_4 (June 1)
Client:
Project #:
BTD #:
Location:
Street 1:
Street 2:
Count Date:
Day of Week:
Weather:
Start Time U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
7:00 AM 0 1 1 1 0 0 1 2 0 0 0 0 0 0 0 0
7:15 AM 0 1 3 0 0 0 3 0 0 3 0 0 0 0 0 0
7:30 AM 0 1 3 0 0 0 5 0 0 1 0 0 0 0 0 0
7:45 AM 0 0 3 1 0 0 6 2 0 0 0 0 0 0 0 0
8:00 AM 0 1 4 0 0 0 3 1 0 0 0 0 0 0 0 1
8:15 AM 0 2 4 0 0 0 7 3 0 2 0 0 0 0 0 0
8:30 AM 0 0 5 0 0 1 3 0 0 0 0 1 0 0 0 1
8:45 AM 0 0 0 1 0 0 3 1 0 1 0 0 0 0 0 0
9:00 AM
Start Time U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
4:00 PM 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 PM 0 1 0 0 0 0 1 1 0 0 0 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0
5:00 PM 0 1 3 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 2 0 0 1 0 0 0 0 0 0
5:30 PM 0 0 2 0 0 1 2 1 0 0 0 0 0 0 0 0
5:45 PM 0 1 2 0 0 0 0 0 0 1 0 0 0 0 0 0
6:00 PM
AM PEAK HOUR
7:45 AM
to U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
8:45 AM 0 3 16 1 0 1 19 6 0 2 0 1 0 0 0 2
PHF
PM PEAK HOUR
5:00 PM
to U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
6:00 PM 0 2 7 0 0 1 4 1 0 2 0 0 0 0 0 0
PHF
Location 4
1281_2_BL
Michael Dion, P.E., PTOE
Clouds & Sun, 60°F
Thursday
6/1/2023
Stop and Shop / Walgreens Plaza
King St
Northbound Southbound Eastbound Westbound
North Hampton, MA
HEAVY VEHICLES
King St King St Stop and Shop Walgreens
King St King St Stop and Shop Walgreens
Northbound Southbound Eastbound Westbound
King St King St Stop and Shop Walgreens
Northbound Southbound Eastbound Westbound
0.83 0.65 0.38 0.50
0.50 0.00
King St King St Stop and Shop Walgreens
Northbound Southbound Eastbound Westbound
0.56 0.38
New EnglandCOUNTS
PO Box 1723
Framingham, MA 01701
6/14/2023, 10:11 AM, 1281_TMC_4 (June 1)
Client:
Project #:
BTD #:
Location:
Street 1:
Street 2:
Count Date:
Day of Week:
Weather:
Start Time Left Thru Right PED Left Thru Right PED Left Thru Right PED Left Thru Right PED
7:00 AM 0 0 0 1 0 0 0 0 0 0 0 5 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
7:30 AM 0 0 0 1 0 0 0 0 0 0 0 1 0 0 0 0
7:45 AM 0 0 0 1 0 1 0 0 0 0 0 3 0 0 1 1
8:00 AM 0 1 0 1 0 1 0 0 0 0 0 2 0 0 0 7
8:15 AM 0 1 0 0 0 1 0 0 0 0 0 1 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0
8:45 AM 0 0 0 0 1 0 1 0 1 0 0 1 0 0 0 1
Start Time Left Thru Right PED Left Thru Right PED Left Thru Right PED Left Thru Right PED
4:00 PM 0 1 0 1 0 1 0 0 1 0 0 3 0 0 0 1
4:15 PM 0 0 0 4 0 0 0 0 0 0 0 2 0 0 0 0
4:30 PM 0 2 0 1 0 0 0 0 0 0 0 0 1 0 0 1
4:45 PM 0 0 0 0 1 3 1 0 0 0 0 4 0 0 0 1
5:00 PM 0 2 0 1 0 0 0 0 0 1 0 1 0 0 0 1
5:15 PM 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 3
5:30 PM 0 1 0 1 0 0 1 0 0 0 1 5 0 0 0 0
5:45 PM 0 1 0 0 0 2 0 0 0 0 0 0 0 0 0 0
AM PEAK HOUR1
8:00 AM
to Left Thru Right PED Left Thru Right PED Left Thru Right PED Left Thru Right PED
9:00 AM 0 2 0 1 1 2 1 0 1 0 1 5 0 0 0 8
PM PEAK HOUR1
4:00 PM
to Left Thru Right PED Left Thru Right PED Left Thru Right PED Left Thru Right PED
5:00 PM 0 3 0 6 1 4 1 0 1 0 0 9 1 0 0 3
1NOTE: Peak hour summaries here correspond to peak hours identified for passenger cars and heavy vehicles combined.
Southbound Eastbound Westbound
Northbound Southbound Eastbound Westbound
King St King St Stop and Shop
Northbound
Walgreens
King St King St Stop and Shop Walgreens
Eastbound WestboundSouthboundNorthbound
King St Stop and Shop Walgreens
Eastbound WestboundSouthbound
Michael Dion, P.E., PTOE
1281_2_BL
Location 4
North Hampton, MA
King St
King St
PEDESTRIANS & BICYCLES
Northbound
King St
Stop and Shop / Walgreens Plaza
6/1/2023
Thursday
Clouds & Sun, 60°F
King St Stop and Shop Walgreens
New EnglandCOUNTS
PO Box 1723
Framingham, MA 01701
6/14/2023, 10:11 AM, 1281_TMC_4 (June 1)
Client:
Project #:
BTD #:
Location:
Street 1:
Street 2:
Count Date:
Day of Week:
Weather:
Start Time U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
11:00 AM 1 53 116 5 0 7 112 38 0 39 2 23 0 7 1 7
11:15 AM 0 36 147 8 0 6 110 38 0 35 3 20 0 11 2 5
11:30 AM 1 43 113 6 0 5 132 37 0 39 1 25 0 8 0 10
11:45 AM 1 49 146 3 0 9 131 51 0 30 2 17 0 12 1 9
12:00 PM 0 34 135 6 0 2 132 39 0 35 0 21 0 8 2 6
12:15 PM 1 23 157 5 1 5 116 49 0 21 0 20 0 2 1 5
12:30 PM 0 55 127 7 1 3 128 42 0 29 2 20 0 7 2 8
12:45 PM 0 46 120 4 0 3 130 32 0 30 4 18 0 4 2 6
1:00 PM
MID PEAK HOUR
11:15 AM
to U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
12:15 PM 2 162 541 23 0 22 505 165 0 139 6 83 0 39 5 30
PHF
HV %0.0%0.6%1.3%0.0%0.0%0.0%0.6%0.6%0.0%0.7%0.0%0.0%0.0%0.0%0.0%0.0%
6/17/2023
Saturday
Cloudy, 60°F
Michael Dion, P.E., PTOE
1281_2_BL
Location 4
North Hampton, MA
King St
Stop and Shop / Walgreens Plaza
Westbound
PASSENGER CARS & HEAVY VEHICLES COMBINED
0.88 0.84
Southbound EastboundNorthbound
King St
0.91 0.91
King St Stop and Shop Walgreens
King St King St Stop and Shop Walgreens
Northbound Southbound Eastbound Westbound
New EnglandCOUNTS
PO Box 1723
Framingham, MA 01701
6/22/2023, 11:23 AM, 1281_TMC_4 (June 17)
Client:
Project #:
BTD #:
Location:
Street 1:
Street 2:
Count Date:
Day of Week:
Weather:
Start Time U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
11:00 AM 0 0 6 0 0 0 1 0 0 0 0 0 0 0 0 0
11:15 AM 0 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0
11:30 AM 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 3 0 0 0 0 1 0 0 0 0 0 0 0 0
12:00 PM 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 0
12:15 PM 0 0 0 0 0 0 3 1 0 0 0 0 0 0 0 0
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:45 PM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0
1:00 PM
MID PEAK HOUR
11:00 AM
to U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
12:00 PM 0 1 11 0 0 0 2 1 0 1 0 0 0 0 0 0
PHF 0.75 0.25 0.000.50
King St Stop and Shop Walgreens
Northbound Southbound Eastbound Westbound
King St
King St King St Stop and Shop Walgreens
Northbound
Michael Dion, P.E., PTOE
1281_2_BL
Location 4
North Hampton, MA
HEAVY VEHICLES
King St
Stop and Shop / Walgreens Plaza
6/17/2023
Saturday
Cloudy, 60°F
Southbound Eastbound Westbound
New EnglandCOUNTS
PO Box 1723
Framingham, MA 01701
6/22/2023, 11:23 AM, 1281_TMC_4 (June 17)
Client:
Project #:
BTD #:
Location:
Street 1:
Street 2:
Count Date:
Day of Week:
Weather:
Start Time Left Thru Right PED Left Thru Right PED Left Thru Right PED Left Thru Right PED
11:00 AM 0 0 0 1 0 0 0 0 0 0 0 1 0 0 0 0
11:15 AM 0 0 1 1 0 0 0 0 0 0 0 1 0 0 0 0
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 1 0 0 0 0 1 0 0 0 0 3 0 0 0 0
12:00 PM 0 0 0 0 0 1 0 0 0 0 0 1 0 0 0 4
12:15 PM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 2
12:30 PM 0 3 0 2 0 0 0 0 0 0 0 1 0 0 0 5
12:45 PM 1 1 0 5 0 0 0 0 0 0 0 0 0 0 0 2
1:00 PM
MID PEAK HOUR
11:15 AM
to Left Thru Right PED Left Thru Right PED Left Thru Right PED Left Thru Right PED
12:15 PM 0 1 1 1 0 1 1 0 0 0 0 5 0 0 0 4
NOTE: Peak hour summaries here correspond to peak hours identified for passenger car and heavy vehicles combined.
Eastbound Westbound
Michael Dion, P.E., PTOE
1281_2_BL
Location 4
North Hampton, MA
King St
Stop and Shop / Walgreens Plaza
6/17/2023
Saturday
Cloudy, 60°F
Northbound Southbound
PEDESTRIANS & BICYCLES
King St King St Stop and Shop Walgreens
King St King St Stop and Shop Walgreens
Northbound Southbound Eastbound Westbound
New EnglandCOUNTS
PO Box 1723
Framingham, MA 01701
6/22/2023, 11:23 AM, 1281_TMC_4 (June 17)
APPENDIX
CAPACITY ANALYSES
APPENDIX
EXISTING
Lanes, Volumes, Timings Existing AM
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: Existing 2023 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 60 5 30 5 5 15 105 455 35 20 440 80
Future Volume (vph) 60 5 30 5 5 15 105 455 35 20 440 80
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 130 0 100 0
Storage Lanes 0 1 0 0 1 0 1 0
Taper Length (ft) 25 25 150 150
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 0.95 0.95
Frt 0.850 0.917 0.989 0.977
Flt Protected 0.956 0.990 0.950 0.950
Satd. Flow (prot) 0 1734 1568 0 1586 0 1752 3466 0 1719 3381 0
Flt Permitted 0.723 0.928 0.950 0.950
Satd. Flow (perm) 0 1311 1568 0 1486 0 1752 3466 0 1719 3381 0
Right Turn on Red Yes Yes No No
Satd. Flow (RTOR) 172 16
Link Speed (mph) 25 25 30 30
Link Distance (ft) 150 153 744 468
Travel Time (s) 4.1 4.2 16.9 10.6
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Heavy Vehicles (%) 5% 2% 3% 2% 2% 13% 3% 3% 3% 5% 4% 6%
Adj. Flow (vph) 63 5 32 5 5 16 111 479 37 21 463 84
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 68 32 0 26 0 111 516 0 21 547 0
Turn Type Perm NA Perm Perm NA Prot NA Prot NA
Protected Phases 3 3 1 6 5 2
Permitted Phases 3 3 3
Detector Phase 3 3 3 3 3 1 6 5 2
Switch Phase
Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Minimum Split (s) 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0
Total Split (s) 25.0 25.0 25.0 25.0 25.0 22.0 47.0 9.0 34.0
Total Split (%) 23.1% 23.1% 23.1% 23.1% 23.1% 20.4% 43.5% 8.3% 31.5%
Maximum Green (s) 20.0 20.0 20.0 20.0 20.0 17.0 42.0 4.0 29.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize?
Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 1.5 2.5 1.5 2.5
Recall Mode None None None None None None Max None Max
Walk Time (s)
Flash Dont Walk (s)
Pedestrian Calls (#/hr)
Act Effct Green (s) 8.7 8.7 8.7 8.6 48.7 4.2 38.4
Actuated g/C Ratio 0.13 0.13 0.13 0.12 0.70 0.06 0.55
v/c Ratio 0.41 0.09 0.13 0.51 0.21 0.20 0.29
Control Delay 38.5 0.5 21.2 39.4 8.3 42.2 14.9
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 38.5 0.5 21.2 39.4 8.3 42.2 14.9
LOS D A C D A D B
Approach Delay 26.3 21.2 13.8 15.9
Approach LOS C C B B
Lanes, Volumes, Timings Existing AM
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: Existing 2023 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 2
Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Heavy Vehicles (%)
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 18.0
Minimum Split (s) 27.0
Total Split (s) 27.0
Total Split (%) 25%
Maximum Green (s) 22.0
Yellow Time (s) 4.0
All-Red Time (s) 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0
Recall Mode None
Walk Time (s) 6.0
Flash Dont Walk (s) 16.0
Pedestrian Calls (#/hr) 3
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Lanes, Volumes, Timings Existing AM
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: Existing 2023 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 3
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 23 0 3 38 26 7 59
Queue Length 95th (ft) 84 0 31 123 163 39 210
Internal Link Dist (ft) 70 73 664 388
Turn Bay Length (ft) 130 100
Base Capacity (vph) 395 592 459 449 2434 103 1871
Starvation Cap Reductn 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.17 0.05 0.06 0.25 0.21 0.20 0.29
Intersection Summary
Area Type: Other
Cycle Length: 108
Actuated Cycle Length: 69.3
Natural Cycle: 60
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.51
Intersection Signal Delay: 15.8 Intersection LOS: B
Intersection Capacity Utilization 43.3% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza Driveway
Lanes, Volumes, Timings Existing AM
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: Existing 2023 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 4
Lane Group Ø9
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
Lanes, Volumes, Timings Existing AM
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: Existing 2023 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 5
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 0 0 0 0 590 0 0 545 0
Future Volume (vph) 0 0 0 0 0 0 0 590 0 0 545 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00
Frt
Flt Protected
Satd. Flow (prot) 0 0 0 0 0 0 0 3539 0 0 3539 0
Flt Permitted
Satd. Flow (perm) 0 0 0 0 0 0 0 3539 0 0 3539 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR)
Link Speed (mph) 30 30 30 30
Link Distance (ft) 91 78 785 744
Travel Time (s) 2.1 1.8 17.8 16.9
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 0 0 0 0 0 0 0 641 0 0 592 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 0 0 0 0 641 0 0 592 0
Turn Type NA NA
Protected Phases 2 6
Permitted Phases
Detector Phase 2 6
Switch Phase
Minimum Initial (s) 5.0 5.0
Minimum Split (s) 41.0 41.0
Total Split (s) 41.0 41.0
Total Split (%) 60.3% 60.3%
Maximum Green (s) 35.0 35.0
Yellow Time (s) 4.0 4.0
All-Red Time (s) 2.0 2.0
Lost Time Adjust (s) 0.0 0.0
Total Lost Time (s) 6.0 6.0
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0
Recall Mode Min Min
Walk Time (s)
Flash Dont Walk (s)
Pedestrian Calls (#/hr)
Act Effct Green (s) 33.7 33.7
Actuated g/C Ratio 0.90 0.90
v/c Ratio 0.20 0.19
Control Delay 3.1 3.1
Queue Delay 0.0 0.0
Total Delay 3.1 3.1
LOS A A
Approach Delay 3.1 3.1
Approach LOS A A
Queue Length 50th (ft) 0 0
Queue Length 95th (ft) 110 101
Internal Link Dist (ft) 11 1 705 664
Turn Bay Length (ft)
Lanes, Volumes, Timings Existing AM
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: Existing 2023 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 6
Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 5.0
Minimum Split (s) 27.0
Total Split (s) 27.0
Total Split (%) 40%
Maximum Green (s) 22.0
Yellow Time (s) 4.0
All-Red Time (s) 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0
Recall Mode None
Walk Time (s) 7.0
Flash Dont Walk (s) 15.0
Pedestrian Calls (#/hr) 19
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Lanes, Volumes, Timings Existing AM
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: Existing 2023 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 7
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Base Capacity (vph) 3196 3196
Starvation Cap Reductn 0 0
Spillback Cap Reductn 0 0
Storage Cap Reductn 0 0
Reduced v/c Ratio 0.20 0.19
Intersection Summary
Area Type: Other
Cycle Length: 68
Actuated Cycle Length: 37.3
Natural Cycle: 70
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.20
Intersection Signal Delay: 3.1 Intersection LOS: A
Intersection Capacity Utilization 21.3% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway Crossing
Lanes, Volumes, Timings Existing AM
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: Existing 2023 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 8
Lane Group Ø9
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
Lanes, Volumes, Timings Existing AM
3: King Street (MA Route 10 / US Route 5) & Finn Street Timing Plan: Existing 2023 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 9
Lane Group EBL EBR NBL NBT SBT SBR Ø4 Ø9
Lane Configurations
Traffic Volume (vph) 165 130 190 445 365 195
Future Volume (vph) 165 130 190 445 365 195
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 100 100
Storage Lanes 1 1 1 1
Taper Length (ft) 25 100
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.850 0.850
Flt Protected 0.950 0.950
Satd. Flow (prot) 1770 1583 1770 1827 1827 1568
Flt Permitted 0.950 0.379
Satd. Flow (perm) 1770 1583 706 1827 1827 1568
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 143 214
Link Speed (mph) 30 30 30
Link Distance (ft) 341 617 785
Travel Time (s) 7.8 14.0 17.8
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91
Heavy Vehicles (%) 2% 2% 2% 4% 4% 3%
Adj. Flow (vph) 181 143 209 489 401 214
Shared Lane Traffic (%)
Lane Group Flow (vph) 181 143 209 489 401 214
Turn Type Prot pt+ov pm+pt NA NA pt+ov
Protected Phases 7 4 5 5 2 6 6 7 4 9
Permitted Phases 2
Detector Phase 7 4 5 5 2 6 6 7
Switch Phase
Minimum Initial (s) 16.0 6.0 20.0 20.0 16.0 5.0
Minimum Split (s) 24.0 11.5 25.5 25.5 22.0 23.0
Total Split (s) 24.0 13.5 31.5 31.5 24.0 23.0
Total Split (%) 26.1% 14.7% 34.2% 34.2% 26% 25%
Maximum Green (s) 18.0 8.0 26.0 26.0 18.0 20.0
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 2.0
All-Red Time (s) 2.5 2.0 2.0 2.0 2.5 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 5.5 5.5 5.5
Lead/Lag Lead Lag
Lead-Lag Optimize?
Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 3.0
Recall Mode None None C-Min C-Min None None
Walk Time (s) 7.0
Flash Dont Walk (s) 13.0
Pedestrian Calls (#/hr) 3
Act Effct Green (s) 16.4 28.4 59.5 59.5 46.3 68.7
Actuated g/C Ratio 0.18 0.31 0.65 0.65 0.50 0.75
v/c Ratio 0.57 0.24 0.38 0.41 0.44 0.17
Control Delay 42.5 3.9 10.6 10.6 19.6 1.5
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 42.5 3.9 10.6 10.6 19.6 1.5
LOS D A B B B A
Approach Delay 25.5 10.6 13.3
Approach LOS C B B
Lanes, Volumes, Timings Existing AM
3: King Street (MA Route 10 / US Route 5) & Finn Street Timing Plan: Existing 2023 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 10
Lane Group EBL EBR NBL NBT SBT SBR Ø4 Ø9
Queue Length 50th (ft) 98 0 44 111 125 0
Queue Length 95th (ft) 162 22 115 234 #352 31
Internal Link Dist (ft) 261 537 705
Turn Bay Length (ft) 100 100
Base Capacity (vph) 346 542 549 1181 920 1248
Starvation Cap Reductn 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.52 0.26 0.38 0.41 0.44 0.17
Intersection Summary
Area Type: Other
Cycle Length: 92
Actuated Cycle Length: 92
Offset: 91.5 (99%), Referenced to phase 2:NBTL and 6:SBT, Start of Yellow
Natural Cycle: 85
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.57
Intersection Signal Delay: 14.6 Intersection LOS: B
Intersection Capacity Utilization 57.2% ICU Level of Service B
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 3: King Street (MA Route 10 / US Route 5) & Finn Street
Lanes, Volumes, Timings Existing AM
4: King Street (MA Route 10 / US Route 5) & Summer Street/North StreetTiming Plan: Existing 2023 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 11
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 45 105 40 95 0 235 0 375 35 115 385 0
Future Volume (vph) 45 105 40 95 0 235 0 375 35 115 385 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 0 0 170 0
Storage Lanes 1 0 0 0 0 0 1 0
Taper Length (ft) 25 25 25 100
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.958 0.904 0.989
Flt Protected 0.950 0.986 0.950
Satd. Flow (prot) 1770 1785 0 0 1660 0 0 1810 0 1770 1827 0
Flt Permitted 0.373 0.788 0.359
Satd. Flow (perm) 695 1785 0 0 1327 0 0 1810 0 669 1827 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 23 150 6
Link Speed (mph) 25 30 30 30
Link Distance (ft) 569 342 240 617
Travel Time (s) 15.5 7.8 5.5 14.0
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91
Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 4% 2% 2% 4% 2%
Adj. Flow (vph) 49 115 44 104 0 258 0 412 38 126 423 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 49 159 0 0 362 0 0 450 0 126 423 0
Turn Type Perm NA Perm NA NA pm+pt NA
Protected Phases 4 8 2 1 6
Permitted Phases 4 8 6
Detector Phase 4 4 8 8 2 1 6
Switch Phase
Minimum Initial (s) 13.0 13.0 13.0 13.0 17.0 6.0 17.0
Minimum Split (s) 18.5 18.5 18.5 18.5 22.5 12.0 25.5
Total Split (s) 38.0 38.0 38.0 38.0 40.0 14.0 40.0
Total Split (%) 41.3% 41.3% 41.3% 41.3% 43.5% 15.2% 43.5%
Maximum Green (s) 32.5 32.5 32.5 32.5 34.5 8.0 34.5
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.5 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.5 5.5 5.5 5.5 6.0 5.5
Lead/Lag Lag Lead
Lead-Lag Optimize?
Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Recall Mode None None None None C-Min None C-Min
Walk Time (s) 3.0 3.0 3.0 3.0 3.0 7.0
Flash Dont Walk (s) 9.0 9.0 9.0 9.0 13.0 13.0
Pedestrian Calls (#/hr) 3 3 3 3 3 3
Act Effct Green (s) 20.5 20.5 20.5 47.5 60.0 60.5
Actuated g/C Ratio 0.22 0.22 0.22 0.52 0.65 0.66
v/c Ratio 0.32 0.38 0.88 0.48 0.24 0.35
Control Delay 32.7 26.7 41.6 18.2 10.8 10.3
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 32.7 26.7 41.6 18.2 10.8 10.3
LOS C C D B B B
Approach Delay 28.1 41.6 18.2 10.4
Approach LOS C D B B
Lanes, Volumes, Timings Existing AM
4: King Street (MA Route 10 / US Route 5) & Summer Street/North StreetTiming Plan: Existing 2023 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 12
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 24 68 126 154 22 76
Queue Length 95th (ft) 50 106 209 305 74 195
Internal Link Dist (ft) 489 262 160 537
Turn Bay Length (ft) 170
Base Capacity (vph) 245 645 565 937 531 1200
Starvation Cap Reductn 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.20 0.25 0.64 0.48 0.24 0.35
Intersection Summary
Area Type: Other
Cycle Length: 92
Actuated Cycle Length: 92
Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBTL, Start of Yellow, Master Intersection
Natural Cycle: 55
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.88
Intersection Signal Delay: 22.2 Intersection LOS: C
Intersection Capacity Utilization 77.5% ICU Level of Service D
Analysis Period (min) 15
Splits and Phases: 4: King Street (MA Route 10 / US Route 5) & Summer Street/North Street
Lanes, Volumes, Timings Existing PM
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: Exsiting 2023 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 105 5 75 50 5 40 155 585 45 20 565 140
Future Volume (vph) 105 5 75 50 5 40 155 585 45 20 565 140
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 130 0 100 0
Storage Lanes 0 1 0 0 1 0 1 0
Taper Length (ft) 25 25 150 150
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 0.95 0.95
Frt 0.850 0.943 0.989 0.970
Flt Protected 0.954 0.974 0.950 0.950
Satd. Flow (prot) 0 1777 1583 0 1711 0 1770 3500 0 1770 3433 0
Flt Permitted 0.700 0.774 0.950 0.950
Satd. Flow (perm) 0 1304 1583 0 1360 0 1770 3500 0 1770 3433 0
Right Turn on Red Yes Yes No No
Satd. Flow (RTOR) 172 30
Link Speed (mph) 25 25 30 30
Link Distance (ft) 150 153 744 468
Travel Time (s) 4.1 4.2 16.9 10.6
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Adj. Flow (vph) 112 5 80 53 5 43 165 622 48 21 601 149
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 117 80 0 101 0 165 670 0 21 750 0
Turn Type Perm NA Perm Perm NA Prot NA Prot NA
Protected Phases 3 3 1 6 5 2
Permitted Phases 3 3 3
Detector Phase 3 3 3 3 3 1 6 5 2
Switch Phase
Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Minimum Split (s) 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0
Total Split (s) 25.0 25.0 25.0 25.0 25.0 22.0 47.0 9.0 34.0
Total Split (%) 23.1% 23.1% 23.1% 23.1% 23.1% 20.4% 43.5% 8.3% 31.5%
Maximum Green (s) 20.0 20.0 20.0 20.0 20.0 17.0 42.0 4.0 29.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize?
Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 1.5 2.5 1.5 2.5
Recall Mode None None None None None None Max None Max
Walk Time (s)
Flash Dont Walk (s)
Pedestrian Calls (#/hr)
Act Effct Green (s) 11.8 11.8 11.8 10.6 44.6 4.2 31.8
Actuated g/C Ratio 0.16 0.16 0.16 0.14 0.61 0.06 0.43
v/c Ratio 0.56 0.20 0.42 0.65 0.32 0.21 0.51
Control Delay 42.3 1.1 28.7 44.8 11.4 46.0 20.6
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 42.3 1.1 28.7 44.8 11.4 46.0 20.6
LOS D A C D B D C
Approach Delay 25.6 28.7 18.0 21.3
Approach LOS C C B C
Queue Length 50th (ft) 43 0 25 62 46 8 106
Lanes, Volumes, Timings Existing PM
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: Exsiting 2023 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 2
Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 18.0
Minimum Split (s) 27.0
Total Split (s) 27.0
Total Split (%) 25%
Maximum Green (s) 22.0
Yellow Time (s) 4.0
All-Red Time (s) 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0
Recall Mode None
Walk Time (s) 6.0
Flash Dont Walk (s) 16.0
Pedestrian Calls (#/hr) 3
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Lanes, Volumes, Timings Existing PM
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: Exsiting 2023 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 3
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 95th (ft) 133 0 94 178 236 42 330
Internal Link Dist (ft) 70 73 664 388
Turn Bay Length (ft) 130 100
Base Capacity (vph) 371 574 409 428 2123 100 1482
Starvation Cap Reductn 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.32 0.14 0.25 0.39 0.32 0.21 0.51
Intersection Summary
Area Type: Other
Cycle Length: 108
Actuated Cycle Length: 73.6
Natural Cycle: 80
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.65
Intersection Signal Delay: 20.7 Intersection LOS: C
Intersection Capacity Utilization 53.3% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza Driveway
Lanes, Volumes, Timings Existing PM
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: Exsiting 2023 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 4
Lane Group Ø9
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
Lanes, Volumes, Timings Existing PM
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: Exsiting 2023 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 5
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 0 0 0 0 790 0 0 805 0
Future Volume (vph) 0 0 0 0 0 0 0 790 0 0 805 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00
Frt
Flt Protected
Satd. Flow (prot) 0 0 0 0 0 0 0 3539 0 0 3539 0
Flt Permitted
Satd. Flow (perm) 0 0 0 0 0 0 0 3539 0 0 3539 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR)
Link Speed (mph) 30 30 30 30
Link Distance (ft) 91 78 785 744
Travel Time (s) 2.1 1.8 17.8 16.9
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Adj. Flow (vph) 0 0 0 0 0 0 0 806 0 0 821 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 0 0 0 0 806 0 0 821 0
Turn Type NA NA
Protected Phases 2 6
Permitted Phases
Detector Phase 2 6
Switch Phase
Minimum Initial (s) 5.0 5.0
Minimum Split (s) 41.0 41.0
Total Split (s) 41.0 41.0
Total Split (%) 60.3% 60.3%
Maximum Green (s) 35.0 35.0
Yellow Time (s) 4.0 4.0
All-Red Time (s) 2.0 2.0
Lost Time Adjust (s) 0.0 0.0
Total Lost Time (s) 6.0 6.0
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0
Recall Mode Min Min
Walk Time (s)
Flash Dont Walk (s)
Pedestrian Calls (#/hr)
Act Effct Green (s) 36.5 36.5
Actuated g/C Ratio 0.91 0.91
v/c Ratio 0.25 0.25
Control Delay 3.0 3.0
Queue Delay 0.0 0.0
Total Delay 3.0 3.0
LOS A A
Approach Delay 3.0 3.0
Approach LOS A A
Queue Length 50th (ft) 0 0
Queue Length 95th (ft) 141 144
Internal Link Dist (ft) 11 1 705 664
Turn Bay Length (ft)
Lanes, Volumes, Timings Existing PM
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: Exsiting 2023 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 6
Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 5.0
Minimum Split (s) 27.0
Total Split (s) 27.0
Total Split (%) 40%
Maximum Green (s) 22.0
Yellow Time (s) 4.0
All-Red Time (s) 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0
Recall Mode None
Walk Time (s) 7.0
Flash Dont Walk (s) 15.0
Pedestrian Calls (#/hr) 7
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Lanes, Volumes, Timings Existing PM
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: Exsiting 2023 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 7
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Base Capacity (vph) 3224 3224
Starvation Cap Reductn 0 0
Spillback Cap Reductn 0 0
Storage Cap Reductn 0 0
Reduced v/c Ratio 0.25 0.25
Intersection Summary
Area Type: Other
Cycle Length: 68
Actuated Cycle Length: 40.1
Natural Cycle: 70
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.25
Intersection Signal Delay: 3.0 Intersection LOS: A
Intersection Capacity Utilization 27.3% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway Crossing
Lanes, Volumes, Timings Existing PM
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: Exsiting 2023 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 8
Lane Group Ø9
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
Lanes, Volumes, Timings Existing PM
3: King Street (MA Route 10 / US Route 5) & Finn Street Timing Plan: Exsiting 2023 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 9
Lane Group EBL EBR NBL NBT SBT SBR Ø4 Ø9
Lane Configurations
Traffic Volume (vph) 225 150 235 565 530 290
Future Volume (vph) 225 150 235 565 530 290
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 100 100
Storage Lanes 1 1 1 1
Taper Length (ft) 25 100
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.850 0.850
Flt Protected 0.950 0.950
Satd. Flow (prot) 1770 1583 1770 1863 1863 1583
Flt Permitted 0.950 0.308
Satd. Flow (perm) 1770 1583 574 1863 1863 1583
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 156 182
Link Speed (mph) 30 30 30
Link Distance (ft) 341 617 785
Travel Time (s) 7.8 14.0 17.8
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96
Adj. Flow (vph) 234 156 245 589 552 302
Shared Lane Traffic (%)
Lane Group Flow (vph) 234 156 245 589 552 302
Turn Type Prot pt+ov pm+pt NA NA pt+ov
Protected Phases 7 4 5 5 2 6 6 7 4 9
Permitted Phases 2
Detector Phase 7 4 5 5 2 6 6 7
Switch Phase
Minimum Initial (s) 16.0 6.0 20.0 20.0 16.0 5.0
Minimum Split (s) 24.0 11.5 25.5 25.5 22.0 23.0
Total Split (s) 28.0 25.5 49.5 49.5 28.0 23.0
Total Split (%) 22.2% 20.2% 39.3% 39.3% 22% 18%
Maximum Green (s) 22.0 20.0 44.0 44.0 22.0 20.0
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 2.0
All-Red Time (s) 2.5 2.0 2.0 2.0 2.5 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 5.5 5.5 5.5
Lead/Lag Lead Lag
Lead-Lag Optimize?
Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 3.0
Recall Mode None None C-Min C-Min None None
Walk Time (s) 7.0
Flash Dont Walk (s) 13.0
Pedestrian Calls (#/hr) 3
Act Effct Green (s) 20.0 36.3 89.9 89.9 72.4 98.4
Actuated g/C Ratio 0.16 0.29 0.71 0.71 0.57 0.78
v/c Ratio 0.84 0.28 0.47 0.44 0.52 0.24
Control Delay 76.0 4.3 12.2 12.2 22.2 3.2
Queue Delay 0.0 0.0 0.0 0.3 0.0 0.0
Total Delay 76.0 4.3 12.2 12.5 22.2 3.2
LOS E A B B C A
Approach Delay 47.3 12.4 15.5
Approach LOS D B B
Queue Length 50th (ft) 185 0 72 177 235 14
Lanes, Volumes, Timings Existing PM
3: King Street (MA Route 10 / US Route 5) & Finn Street Timing Plan: Exsiting 2023 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 10
Lane Group EBL EBR NBL NBT SBT SBR Ø4 Ø9
Queue Length 95th (ft) #301 30 m123 274 #606 92
Internal Link Dist (ft) 261 537 705
Turn Bay Length (ft) 100 100
Base Capacity (vph) 309 639 599 1329 1070 1298
Starvation Cap Reductn 0 0 0 257 0 0
Spillback Cap Reductn 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.76 0.24 0.41 0.55 0.52 0.23
Intersection Summary
Area Type: Other
Cycle Length: 126
Actuated Cycle Length: 126
Offset: 9.5 (8%), Referenced to phase 2:NBTL and 6:SBT, Start of Yellow
Natural Cycle: 95
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.84
Intersection Signal Delay: 20.2 Intersection LOS: C
Intersection Capacity Utilization 68.4% ICU Level of Service C
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 3: King Street (MA Route 10 / US Route 5) & Finn Street
Lanes, Volumes, Timings Existing PM
4: King Street (MA Route 10 / US Route 5) & Summer Street/North StreetTiming Plan: Exsiting 2023 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 11
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 50 110 25 105 0 340 0 430 35 220 495 0
Future Volume (vph) 50 110 25 105 0 340 0 430 35 220 495 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 0 0 170 0
Storage Lanes 1 0 0 0 0 0 1 0
Taper Length (ft) 25 25 25 100
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.972 0.897 0.990
Flt Protected 0.950 0.988 0.950
Satd. Flow (prot) 1770 1811 0 0 1651 0 0 1844 0 1770 1863 0
Flt Permitted 0.323 0.822 0.334
Satd. Flow (perm) 602 1811 0 0 1373 0 0 1844 0 622 1863 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 10 143 4
Link Speed (mph) 25 30 30 30
Link Distance (ft) 569 342 240 617
Travel Time (s) 15.5 7.8 5.5 14.0
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Adj. Flow (vph) 51 112 26 107 0 347 0 439 36 224 505 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 51 138 0 0 454 0 0 475 0 224 505 0
Turn Type Perm NA Perm NA NA pm+pt NA
Protected Phases 4 8 2 1 6
Permitted Phases 4 8 6
Detector Phase 4 4 8 8 2 1 6
Switch Phase
Minimum Initial (s) 13.0 13.0 13.0 13.0 17.0 6.0 17.0
Minimum Split (s) 18.5 18.5 18.5 18.5 22.5 12.0 25.5
Total Split (s) 50.0 50.0 50.0 50.0 57.0 19.0 57.0
Total Split (%) 39.7% 39.7% 39.7% 39.7% 45.2% 15.1% 45.2%
Maximum Green (s) 44.5 44.5 44.5 44.5 51.5 13.0 51.5
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.5 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.5 5.5 5.5 5.5 6.0 5.5
Lead/Lag Lag Lead
Lead-Lag Optimize?
Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Recall Mode None None None None C-Min None C-Min
Walk Time (s) 3.0 3.0 3.0 3.0 3.0 7.0
Flash Dont Walk (s) 9.0 9.0 9.0 9.0 13.0 13.0
Pedestrian Calls (#/hr) 3 3 3 3 3 3
Act Effct Green (s) 33.9 33.9 33.9 64.4 80.6 81.1
Actuated g/C Ratio 0.27 0.27 0.27 0.51 0.64 0.64
v/c Ratio 0.31 0.28 0.96 0.50 0.45 0.42
Control Delay 38.9 32.9 62.1 25.0 18.8 16.5
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.2
Total Delay 38.9 32.9 62.1 25.0 18.8 16.7
LOS D C E C B B
Approach Delay 34.5 62.1 25.0 17.3
Approach LOS C E C B
Queue Length 50th (ft) 33 81 265 252 61 141
Lanes, Volumes, Timings Existing PM
4: King Street (MA Route 10 / US Route 5) & Summer Street/North StreetTiming Plan: Exsiting 2023 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 12
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 95th (ft) 65 123 382 420 197 373
Internal Link Dist (ft) 489 262 160 537
Turn Bay Length (ft) 170
Base Capacity (vph) 212 646 577 945 516 1198
Starvation Cap Reductn 0 0 0 0 0 196
Spillback Cap Reductn 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.24 0.21 0.79 0.50 0.43 0.50
Intersection Summary
Area Type: Other
Cycle Length: 126
Actuated Cycle Length: 126
Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBTL, Start of Yellow, Master Intersection
Natural Cycle: 55
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.96
Intersection Signal Delay: 32.1 Intersection LOS: C
Intersection Capacity Utilization 93.3% ICU Level of Service F
Analysis Period (min) 15
Splits and Phases: 4: King Street (MA Route 10 / US Route 5) & Summer Street/North Street
Lanes, Volumes, Timings Existing SAT
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: Existing 2023 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 140 5 85 40 5 30 160 540 25 20 505 165
Future Volume (vph) 140 5 85 40 5 30 160 540 25 20 505 165
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 130 0 100 0
Storage Lanes 0 1 0 0 1 0 1 0
Taper Length (ft) 25 25 150 150
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 0.95 0.95
Frt 0.850 0.946 0.993 0.963
Flt Protected 0.954 0.974 0.950 0.950
Satd. Flow (prot) 0 1777 1583 0 1716 0 1770 3514 0 1770 3408 0
Flt Permitted 0.754 0.709 0.950 0.950
Satd. Flow (perm) 0 1405 1583 0 1249 0 1770 3514 0 1770 3408 0
Right Turn on Red Yes Yes No No
Satd. Flow (RTOR) 204 30
Link Speed (mph) 25 25 30 30
Link Distance (ft) 150 153 744 468
Travel Time (s) 4.1 4.2 16.9 10.6
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Adj. Flow (vph) 151 5 91 43 5 32 172 581 27 22 543 177
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 156 91 0 80 0 172 608 0 22 720 0
Turn Type Perm NA Perm Perm NA Prot NA Prot NA
Protected Phases 3 3 1 6 5 2
Permitted Phases 3 3 3
Detector Phase 3 3 3 3 3 1 6 5 2
Switch Phase
Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Minimum Split (s) 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0
Total Split (s) 17.0 17.0 17.0 17.0 17.0 17.0 30.0 9.0 30.0
Total Split (%) 18.7% 18.7% 18.7% 18.7% 18.7% 18.7% 33.0% 9.9% 33.0%
Maximum Green (s) 12.0 12.0 12.0 12.0 12.0 12.0 25.0 4.0 25.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize?
Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 1.5 2.5 1.5 2.5
Recall Mode None None None None None None Max None Max
Walk Time (s)
Flash Dont Walk (s)
Pedestrian Calls (#/hr)
Act Effct Green (s) 11.8 11.8 11.8 10.1 39.6 4.1 25.7
Actuated g/C Ratio 0.18 0.18 0.18 0.15 0.59 0.06 0.38
v/c Ratio 0.63 0.20 0.33 0.65 0.29 0.20 0.55
Control Delay 42.2 1.0 23.8 41.9 10.2 39.5 20.4
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 42.2 1.0 23.8 41.9 10.2 39.5 20.4
LOS D A C D B D C
Approach Delay 27.0 23.8 17.2 21.0
Approach LOS C C B C
Queue Length 50th (ft) 54 0 16 61 43 8 105
Lanes, Volumes, Timings Existing SAT
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: Existing 2023 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 2
Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 18.0
Minimum Split (s) 27.0
Total Split (s) 27.0
Total Split (%) 30%
Maximum Green (s) 22.0
Yellow Time (s) 4.0
All-Red Time (s) 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0
Recall Mode None
Walk Time (s) 6.0
Flash Dont Walk (s) 16.0
Pedestrian Calls (#/hr) 3
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Lanes, Volumes, Timings Existing SAT
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: Existing 2023 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 3
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 95th (ft) #199 0 72 #194 189 37 267
Internal Link Dist (ft) 70 73 664 388
Turn Bay Length (ft) 130 100
Base Capacity (vph) 258 457 254 325 2075 108 1307
Starvation Cap Reductn 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.60 0.20 0.31 0.53 0.29 0.20 0.55
Intersection Summary
Area Type: Other
Cycle Length: 91
Actuated Cycle Length: 67
Natural Cycle: 80
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.65
Intersection Signal Delay: 20.3 Intersection LOS: C
Intersection Capacity Utilization 53.7% ICU Level of Service A
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza Driveway
Lanes, Volumes, Timings Existing SAT
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: Existing 2023 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 4
Lane Group Ø9
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
Lanes, Volumes, Timings Existing SAT
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: Existing 2023 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 5
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 0 0 0 0 765 0 0 665 0
Future Volume (vph) 0 0 0 0 0 0 0 765 0 0 665 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00
Frt
Flt Protected
Satd. Flow (prot) 0 0 0 0 0 0 0 3539 0 0 3539 0
Flt Permitted
Satd. Flow (perm) 0 0 0 0 0 0 0 3539 0 0 3539 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR)
Link Speed (mph) 30 30 30 30
Link Distance (ft) 91 78 785 744
Travel Time (s) 2.1 1.8 17.8 16.9
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Adj. Flow (vph) 0 0 0 0 0 0 0 797 0 0 693 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 0 0 0 0 797 0 0 693 0
Turn Type NA NA
Protected Phases 2 6
Permitted Phases
Detector Phase 2 6
Switch Phase
Minimum Initial (s) 5.0 5.0
Minimum Split (s) 41.0 41.0
Total Split (s) 41.0 41.0
Total Split (%) 60.3% 60.3%
Maximum Green (s) 35.0 35.0
Yellow Time (s) 4.0 4.0
All-Red Time (s) 2.0 2.0
Lost Time Adjust (s) 0.0 0.0
Total Lost Time (s) 6.0 6.0
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0
Recall Mode Min Min
Walk Time (s)
Flash Dont Walk (s)
Pedestrian Calls (#/hr)
Act Effct Green (s) 36.3 36.3
Actuated g/C Ratio 0.91 0.91
v/c Ratio 0.25 0.22
Control Delay 3.0 2.9
Queue Delay 0.0 0.0
Total Delay 3.0 2.9
LOS A A
Approach Delay 3.0 2.9
Approach LOS A A
Queue Length 50th (ft) 0 0
Queue Length 95th (ft) 139 118
Internal Link Dist (ft) 11 1 705 664
Turn Bay Length (ft)
Lanes, Volumes, Timings Existing SAT
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: Existing 2023 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 6
Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 5.0
Minimum Split (s) 27.0
Total Split (s) 27.0
Total Split (%) 40%
Maximum Green (s) 22.0
Yellow Time (s) 4.0
All-Red Time (s) 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0
Recall Mode None
Walk Time (s) 7.0
Flash Dont Walk (s) 15.0
Pedestrian Calls (#/hr) 14
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Lanes, Volumes, Timings Existing SAT
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: Existing 2023 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 7
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Base Capacity (vph) 3222 3222
Starvation Cap Reductn 0 0
Spillback Cap Reductn 0 0
Storage Cap Reductn 0 0
Reduced v/c Ratio 0.25 0.22
Intersection Summary
Area Type: Other
Cycle Length: 68
Actuated Cycle Length: 39.9
Natural Cycle: 70
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.25
Intersection Signal Delay: 3.0 Intersection LOS: A
Intersection Capacity Utilization 26.1% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway Crossing
Lanes, Volumes, Timings Existing SAT
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: Existing 2023 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 8
Lane Group Ø9
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
Lanes, Volumes, Timings Existing SAT
3: King Street (MA Route 10 / US Route 5) & Finn Street Timing Plan: Existing 2023 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 9
Lane Group EBL EBR NBL NBT SBT SBR Ø4 Ø9
Lane Configurations
Traffic Volume (vph) 245 110 130 505 445 240
Future Volume (vph) 245 110 130 505 445 240
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 100 100
Storage Lanes 1 1 1 1
Taper Length (ft) 25 100
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.850 0.850
Flt Protected 0.950 0.950
Satd. Flow (prot) 1770 1583 1770 1863 1863 1583
Flt Permitted 0.950 0.325
Satd. Flow (perm) 1770 1583 605 1863 1863 1583
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 116 232
Link Speed (mph) 30 30 30
Link Distance (ft) 341 617 785
Travel Time (s) 7.8 14.0 17.8
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Adj. Flow (vph) 258 116 137 532 468 253
Shared Lane Traffic (%)
Lane Group Flow (vph) 258 116 137 532 468 253
Turn Type Prot pt+ov pm+pt NA NA pt+ov
Protected Phases 7 4 5 5 2 6 6 7 4 9
Permitted Phases 2
Detector Phase 7 4 5 5 2 6 6 7
Switch Phase
Minimum Initial (s) 16.0 6.0 20.0 20.0 16.0 5.0
Minimum Split (s) 24.0 11.5 25.5 25.5 22.0 23.0
Total Split (s) 24.0 13.5 31.5 31.5 24.0 23.0
Total Split (%) 26.1% 14.7% 34.2% 34.2% 26% 25%
Maximum Green (s) 18.0 8.0 26.0 26.0 18.0 20.0
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 2.0
All-Red Time (s) 2.5 2.0 2.0 2.0 2.5 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 5.5 5.5 5.5
Lead/Lag Lead Lag
Lead-Lag Optimize?
Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 3.0
Recall Mode None None C-Min C-Min None None
Walk Time (s) 7.0
Flash Dont Walk (s) 13.0
Pedestrian Calls (#/hr) 3
Act Effct Green (s) 17.2 28.4 58.7 58.7 46.3 69.5
Actuated g/C Ratio 0.19 0.31 0.64 0.64 0.50 0.76
v/c Ratio 0.78 0.20 0.29 0.45 0.50 0.20
Control Delay 53.1 4.0 8.5 9.4 21.0 1.8
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 53.1 4.0 8.5 9.4 21.0 1.8
LOS D A A A C A
Approach Delay 37.9 9.2 14.3
Approach LOS D A B
Queue Length 50th (ft) 143 0 19 78 156 2
Lanes, Volumes, Timings Existing SAT
3: King Street (MA Route 10 / US Route 5) & Finn Street Timing Plan: Existing 2023 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 10
Lane Group EBL EBR NBL NBT SBT SBR Ø4 Ø9
Queue Length 95th (ft) #254 20 52 336 #439 39
Internal Link Dist (ft) 261 537 705
Turn Bay Length (ft) 100 100
Base Capacity (vph) 346 560 487 1188 936 1263
Starvation Cap Reductn 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.75 0.21 0.28 0.45 0.50 0.20
Intersection Summary
Area Type: Other
Cycle Length: 92
Actuated Cycle Length: 92
Offset: 91.5 (99%), Referenced to phase 2:NBTL and 6:SBT, Start of Yellow
Natural Cycle: 85
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.78
Intersection Signal Delay: 17.4 Intersection LOS: B
Intersection Capacity Utilization 58.4% ICU Level of Service B
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 3: King Street (MA Route 10 / US Route 5) & Finn Street
Lanes, Volumes, Timings Existing SAT
4: King Street (MA Route 10 / US Route 5) & Summer Street/North StreetTiming Plan: Existing 2023 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 11
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 45 50 20 65 0 170 0 430 35 125 420 0
Future Volume (vph) 45 50 20 65 0 170 0 430 35 125 420 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 0 0 170 0
Storage Lanes 1 0 0 0 0 0 1 0
Taper Length (ft) 25 25 25 100
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.957 0.902 0.990
Flt Protected 0.950 0.986 0.950
Satd. Flow (prot) 1770 1783 0 0 1657 0 0 1844 0 1770 1863 0
Flt Permitted 0.393 0.881 0.369
Satd. Flow (perm) 732 1783 0 0 1480 0 0 1844 0 687 1863 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 21 157 5
Link Speed (mph) 25 30 30 30
Link Distance (ft) 569 342 240 617
Travel Time (s) 15.5 7.8 5.5 14.0
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Adj. Flow (vph) 47 52 21 68 0 177 0 448 36 130 438 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 47 73 0 0 245 0 0 484 0 130 438 0
Turn Type Perm NA Perm NA NA pm+pt NA
Protected Phases 4 8 2 1 6
Permitted Phases 4 8 6
Detector Phase 4 4 8 8 2 1 6
Switch Phase
Minimum Initial (s) 13.0 13.0 13.0 13.0 17.0 6.0 17.0
Minimum Split (s) 18.5 18.5 18.5 18.5 22.5 12.0 22.5
Total Split (s) 38.0 38.0 38.0 38.0 40.0 14.0 40.0
Total Split (%) 41.3% 41.3% 41.3% 41.3% 43.5% 15.2% 43.5%
Maximum Green (s) 32.5 32.5 32.5 32.5 34.5 8.0 34.5
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.5 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.5 5.5 5.5 5.5 6.0 5.5
Lead/Lag Lag Lead
Lead-Lag Optimize?
Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Recall Mode None None None None C-Min None C-Min
Walk Time (s) 3.0 3.0 3.0 3.0 3.0 7.0
Flash Dont Walk (s) 9.0 9.0 9.0 9.0 13.0 13.0
Pedestrian Calls (#/hr) 3 3 3 3 3 3
Act Effct Green (s) 14.4 14.4 14.4 53.9 66.1 66.6
Actuated g/C Ratio 0.16 0.16 0.16 0.59 0.72 0.72
v/c Ratio 0.41 0.25 0.67 0.45 0.23 0.32
Control Delay 45.7 27.1 23.5 12.8 8.5 8.8
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 45.7 27.1 23.5 12.8 8.5 8.8
LOS D C C B A A
Approach Delay 34.4 23.5 12.8 8.7
Approach LOS C C B A
Queue Length 50th (ft) 26 27 47 137 18 72
Lanes, Volumes, Timings Existing SAT
4: King Street (MA Route 10 / US Route 5) & Summer Street/North StreetTiming Plan: Existing 2023 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 12
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 95th (ft) 58 62 119 257 94 253
Internal Link Dist (ft) 489 262 160 537
Turn Bay Length (ft) 170
Base Capacity (vph) 258 643 624 1082 587 1348
Starvation Cap Reductn 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.18 0.11 0.39 0.45 0.22 0.32
Intersection Summary
Area Type: Other
Cycle Length: 92
Actuated Cycle Length: 92
Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBTL, Start of Yellow, Master Intersection
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.67
Intersection Signal Delay: 14.9 Intersection LOS: B
Intersection Capacity Utilization 66.6% ICU Level of Service C
Analysis Period (min) 15
Splits and Phases: 4: King Street (MA Route 10 / US Route 5) & Summer Street/North Street
APPENDIX
NO BUILD
Lanes, Volumes, Timings No Build AM
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: No Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 65 5 30 5 5 15 115 600 40 20 590 85
Future Volume (vph) 65 5 30 5 5 15 115 600 40 20 590 85
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 130 0 100 0
Storage Lanes 0 1 0 0 1 0 1 0
Taper Length (ft) 25 25 150 150
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 0.95 0.95
Frt 0.850 0.917 0.991 0.981
Flt Protected 0.955 0.990 0.950 0.950
Satd. Flow (prot) 0 1731 1568 0 1586 0 1752 3473 0 1719 3397 0
Flt Permitted 0.722 0.928 0.950 0.950
Satd. Flow (perm) 0 1309 1568 0 1486 0 1752 3473 0 1719 3397 0
Right Turn on Red Yes Yes No No
Satd. Flow (RTOR) 172 16
Link Speed (mph) 25 25 30 30
Link Distance (ft) 150 153 744 468
Travel Time (s) 4.1 4.2 16.9 10.6
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Heavy Vehicles (%) 5% 2% 3% 2% 2% 13% 3% 3% 3% 5% 4% 6%
Adj. Flow (vph) 68 5 32 5 5 16 121 632 42 21 621 89
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 73 32 0 26 0 121 674 0 21 710 0
Turn Type Perm NA Perm Perm NA Prot NA Prot NA
Protected Phases 3 3 1 6 5 2
Permitted Phases 3 3 3
Detector Phase 3 3 3 3 3 1 6 5 2
Switch Phase
Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Minimum Split (s) 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0
Total Split (s) 25.0 25.0 25.0 25.0 25.0 22.0 47.0 9.0 34.0
Total Split (%) 23.1% 23.1% 23.1% 23.1% 23.1% 20.4% 43.5% 8.3% 31.5%
Maximum Green (s) 20.0 20.0 20.0 20.0 20.0 17.0 42.0 4.0 29.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize?
Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 1.5 2.5 1.5 2.5
Recall Mode None None None None None None Max None Max
Walk Time (s)
Flash Dont Walk (s)
Pedestrian Calls (#/hr)
Act Effct Green (s) 9.0 9.0 9.0 8.9 47.7 4.2 37.3
Actuated g/C Ratio 0.13 0.13 0.13 0.13 0.70 0.06 0.55
v/c Ratio 0.42 0.09 0.12 0.53 0.28 0.20 0.38
Control Delay 38.4 0.5 21.0 39.3 8.9 42.2 16.4
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 38.4 0.5 21.0 39.3 8.9 42.2 16.4
LOS D A C D A D B
Approach Delay 26.9 21.0 13.5 17.2
Approach LOS C C B B
Lanes, Volumes, Timings No Build AM
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: No Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 2
Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Heavy Vehicles (%)
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 18.0
Minimum Split (s) 27.0
Total Split (s) 27.0
Total Split (%) 25%
Maximum Green (s) 22.0
Yellow Time (s) 4.0
All-Red Time (s) 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0
Recall Mode None
Walk Time (s) 6.0
Flash Dont Walk (s) 16.0
Pedestrian Calls (#/hr) 3
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Lanes, Volumes, Timings No Build AM
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: No Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 3
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 25 0 3 42 37 7 83
Queue Length 95th (ft) 89 0 31 132 221 40 287
Internal Link Dist (ft) 70 73 664 388
Turn Bay Length (ft) 130 100
Base Capacity (vph) 405 604 470 460 2432 106 1859
Starvation Cap Reductn 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.18 0.05 0.06 0.26 0.28 0.20 0.38
Intersection Summary
Area Type: Other
Cycle Length: 108
Actuated Cycle Length: 68.1
Natural Cycle: 65
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.53
Intersection Signal Delay: 16.1 Intersection LOS: B
Intersection Capacity Utilization 48.4% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza Driveway
Lanes, Volumes, Timings No Build AM
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: No Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 4
Lane Group Ø9
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
Lanes, Volumes, Timings No Build AM
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: No Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 5
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 0 0 0 0 745 0 0 705 0
Future Volume (vph) 0 0 0 0 0 0 0 745 0 0 705 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00
Frt
Flt Protected
Satd. Flow (prot) 0 0 0 0 0 0 0 3539 0 0 3539 0
Flt Permitted
Satd. Flow (perm) 0 0 0 0 0 0 0 3539 0 0 3539 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR)
Link Speed (mph) 30 30 30 30
Link Distance (ft) 91 78 785 744
Travel Time (s) 2.1 1.8 17.8 16.9
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 0 0 0 0 0 0 0 810 0 0 766 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 0 0 0 0 810 0 0 766 0
Turn Type NA NA
Protected Phases 2 6
Permitted Phases
Detector Phase 2 6
Switch Phase
Minimum Initial (s) 5.0 5.0
Minimum Split (s) 41.0 41.0
Total Split (s) 41.0 41.0
Total Split (%) 60.3% 60.3%
Maximum Green (s) 35.0 35.0
Yellow Time (s) 4.0 4.0
All-Red Time (s) 2.0 2.0
Lost Time Adjust (s) 0.0 0.0
Total Lost Time (s) 6.0 6.0
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0
Recall Mode Min Min
Walk Time (s)
Flash Dont Walk (s)
Pedestrian Calls (#/hr)
Act Effct Green (s) 36.4 36.4
Actuated g/C Ratio 0.91 0.91
v/c Ratio 0.25 0.24
Control Delay 3.0 3.0
Queue Delay 0.0 0.0
Total Delay 3.0 3.0
LOS A A
Approach Delay 3.0 3.0
Approach LOS A A
Queue Length 50th (ft) 0 0
Queue Length 95th (ft) 142 132
Internal Link Dist (ft) 11 1 705 664
Turn Bay Length (ft)
Lanes, Volumes, Timings No Build AM
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: No Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 6
Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 5.0
Minimum Split (s) 27.0
Total Split (s) 27.0
Total Split (%) 40%
Maximum Green (s) 22.0
Yellow Time (s) 4.0
All-Red Time (s) 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0
Recall Mode None
Walk Time (s) 7.0
Flash Dont Walk (s) 15.0
Pedestrian Calls (#/hr) 19
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Lanes, Volumes, Timings No Build AM
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: No Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 7
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Base Capacity (vph) 3223 3223
Starvation Cap Reductn 0 0
Spillback Cap Reductn 0 0
Storage Cap Reductn 0 0
Reduced v/c Ratio 0.25 0.24
Intersection Summary
Area Type: Other
Cycle Length: 68
Actuated Cycle Length: 40
Natural Cycle: 70
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.25
Intersection Signal Delay: 3.0 Intersection LOS: A
Intersection Capacity Utilization 25.6% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway Crossing
Lanes, Volumes, Timings No Build AM
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: No Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 8
Lane Group Ø9
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
Lanes, Volumes, Timings No Build AM
3: King Street (MA Route 10 / US Route 5) & Finn Street Timing Plan: No Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 9
Lane Group EBL EBR NBL NBT SBT SBR Ø4 Ø9
Lane Configurations
Traffic Volume (vph) 175 140 205 585 510 210
Future Volume (vph) 175 140 205 585 510 210
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 100 100
Storage Lanes 1 1 1 1
Taper Length (ft) 25 100
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.850 0.850
Flt Protected 0.950 0.950
Satd. Flow (prot) 1770 1583 1770 1827 1827 1568
Flt Permitted 0.950 0.251
Satd. Flow (perm) 1770 1583 468 1827 1827 1568
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 154 177
Link Speed (mph) 30 30 30
Link Distance (ft) 341 617 785
Travel Time (s) 7.8 14.0 17.8
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91
Heavy Vehicles (%) 2% 2% 2% 4% 4% 3%
Adj. Flow (vph) 192 154 225 643 560 231
Shared Lane Traffic (%)
Lane Group Flow (vph) 192 154 225 643 560 231
Turn Type Prot pt+ov pm+pt NA NA pt+ov
Protected Phases 7 4 5 5 2 6 6 7 4 9
Permitted Phases 2
Detector Phase 7 4 5 5 2 6 6 7
Switch Phase
Minimum Initial (s) 16.0 6.0 20.0 20.0 16.0 5.0
Minimum Split (s) 24.0 11.5 25.5 25.5 22.0 23.0
Total Split (s) 24.0 13.5 31.5 31.5 24.0 23.0
Total Split (%) 26.1% 14.7% 34.2% 34.2% 26% 25%
Maximum Green (s) 18.0 8.0 26.0 26.0 18.0 20.0
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 2.0
All-Red Time (s) 2.5 2.0 2.0 2.0 2.5 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 5.5 5.5 5.5
Lead/Lag Lead Lag
Lead-Lag Optimize?
Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 3.0
Recall Mode None None C-Min C-Min None None
Walk Time (s) 7.0
Flash Dont Walk (s) 13.0
Pedestrian Calls (#/hr) 3
Act Effct Green (s) 16.5 28.8 59.4 59.4 45.9 68.4
Actuated g/C Ratio 0.18 0.31 0.65 0.65 0.50 0.74
v/c Ratio 0.61 0.26 0.54 0.55 0.62 0.19
Control Delay 43.5 3.9 16.0 13.1 23.8 2.3
Queue Delay 0.0 0.0 0.0 0.2 0.0 0.0
Total Delay 43.5 3.9 16.0 13.2 23.8 2.3
LOS D A B B C A
Approach Delay 25.9 14.0 17.5
Approach LOS C B B
Lanes, Volumes, Timings No Build AM
3: King Street (MA Route 10 / US Route 5) & Finn Street Timing Plan: No Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 10
Lane Group EBL EBR NBL NBT SBT SBR Ø4 Ø9
Queue Length 50th (ft) 105 0 34 138 197 5
Queue Length 95th (ft) 172 23 m#142 #414 #570 48
Internal Link Dist (ft) 261 537 705
Turn Bay Length (ft) 100 100
Base Capacity (vph) 346 550 415 1178 910 1233
Starvation Cap Reductn 0 0 0 89 0 0
Spillback Cap Reductn 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.55 0.28 0.54 0.59 0.62 0.19
Intersection Summary
Area Type: Other
Cycle Length: 92
Actuated Cycle Length: 92
Offset: 91.5 (99%), Referenced to phase 2:NBTL and 6:SBT, Start of Yellow
Natural Cycle: 95
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.62
Intersection Signal Delay: 17.4 Intersection LOS: B
Intersection Capacity Utilization 65.7% ICU Level of Service C
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 3: King Street (MA Route 10 / US Route 5) & Finn Street
Lanes, Volumes, Timings No Build AM
4: King Street (MA Route 10 / US Route 5) & Summer Street/North StreetTiming Plan: No Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 11
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 50 115 45 100 0 250 0 510 40 125 530 0
Future Volume (vph) 50 115 45 100 0 250 0 510 40 125 530 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 0 0 170 0
Storage Lanes 1 0 0 0 0 0 1 0
Taper Length (ft) 25 25 25 100
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.958 0.904 0.990
Flt Protected 0.950 0.986 0.950
Satd. Flow (prot) 1770 1785 0 0 1660 0 0 1811 0 1770 1827 0
Flt Permitted 0.373 0.764 0.236
Satd. Flow (perm) 695 1785 0 0 1287 0 0 1811 0 440 1827 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 24 151 5
Link Speed (mph) 25 30 30 30
Link Distance (ft) 569 342 240 617
Travel Time (s) 15.5 7.8 5.5 14.0
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91
Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 4% 2% 2% 4% 2%
Adj. Flow (vph) 55 126 49 110 0 275 0 560 44 137 582 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 55 175 0 0 385 0 0 604 0 137 582 0
Turn Type Perm NA Perm NA NA pm+pt NA
Protected Phases 4 8 2 1 6
Permitted Phases 4 8 6
Detector Phase 4 4 8 8 2 1 6
Switch Phase
Minimum Initial (s) 13.0 13.0 13.0 13.0 17.0 6.0 17.0
Minimum Split (s) 18.5 18.5 18.5 18.5 22.5 12.0 25.5
Total Split (s) 38.0 38.0 38.0 38.0 40.0 14.0 40.0
Total Split (%) 41.3% 41.3% 41.3% 41.3% 43.5% 15.2% 43.5%
Maximum Green (s) 32.5 32.5 32.5 32.5 34.5 8.0 34.5
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.5 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.5 5.5 5.5 5.5 6.0 5.5
Lead/Lag Lag Lead
Lead-Lag Optimize?
Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Recall Mode None None None None C-Min None C-Min
Walk Time (s) 3.0 3.0 3.0 3.0 3.0 7.0
Flash Dont Walk (s) 9.0 9.0 9.0 9.0 13.0 13.0
Pedestrian Calls (#/hr) 3 3 3 3 3 3
Act Effct Green (s) 22.0 22.0 22.0 45.9 58.5 59.0
Actuated g/C Ratio 0.24 0.24 0.24 0.50 0.64 0.64
v/c Ratio 0.33 0.39 0.91 0.67 0.36 0.50
Control Delay 31.5 26.0 46.1 24.5 14.8 12.8
Queue Delay 0.0 0.0 0.0 0.1 0.0 0.0
Total Delay 31.5 26.0 46.1 24.6 14.8 12.8
LOS C C D C B B
Approach Delay 27.3 46.1 24.6 13.2
Approach LOS C D C B
Lanes, Volumes, Timings No Build AM
4: King Street (MA Route 10 / US Route 5) & Summer Street/North StreetTiming Plan: No Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 12
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 27 74 140 249 19 84
Queue Length 95th (ft) 53 112 228 #524 m95 290
Internal Link Dist (ft) 489 262 160 537
Turn Bay Length (ft) 170
Base Capacity (vph) 245 646 552 905 395 1170
Starvation Cap Reductn 0 0 0 0 0 0
Spillback Cap Reductn 0 0 1 23 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.22 0.27 0.70 0.68 0.35 0.50
Intersection Summary
Area Type: Other
Cycle Length: 92
Actuated Cycle Length: 92
Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBTL, Start of Yellow, Master Intersection
Natural Cycle: 65
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.91
Intersection Signal Delay: 25.0 Intersection LOS: C
Intersection Capacity Utilization 86.7% ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 4: King Street (MA Route 10 / US Route 5) & Summer Street/North Street
Lanes, Volumes, Timings No Build PM
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: No Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 115 5 80 55 5 45 165 715 50 20 710 150
Future Volume (vph) 115 5 80 55 5 45 165 715 50 20 710 150
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 130 0 100 0
Storage Lanes 0 1 0 0 1 0 1 0
Taper Length (ft) 25 25 150 150
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 0.95 0.95
Frt 0.850 0.942 0.990 0.974
Flt Protected 0.954 0.974 0.950 0.950
Satd. Flow (prot) 0 1777 1583 0 1709 0 1770 3504 0 1770 3447 0
Flt Permitted 0.677 0.753 0.950 0.950
Satd. Flow (perm) 0 1261 1583 0 1321 0 1770 3504 0 1770 3447 0
Right Turn on Red Yes Yes No No
Satd. Flow (RTOR) 172 31
Link Speed (mph) 25 25 30 30
Link Distance (ft) 150 153 744 468
Travel Time (s) 4.1 4.2 16.9 10.6
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Adj. Flow (vph) 122 5 85 59 5 48 176 761 53 21 755 160
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 127 85 0 112 0 176 814 0 21 915 0
Turn Type Perm NA Perm Perm NA Prot NA Prot NA
Protected Phases 3 3 1 6 5 2
Permitted Phases 3 3 3
Detector Phase 3 3 3 3 3 1 6 5 2
Switch Phase
Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Minimum Split (s) 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0
Total Split (s) 25.0 25.0 25.0 25.0 25.0 22.0 47.0 9.0 34.0
Total Split (%) 23.1% 23.1% 23.1% 23.1% 23.1% 20.4% 43.5% 8.3% 31.5%
Maximum Green (s) 20.0 20.0 20.0 20.0 20.0 17.0 42.0 4.0 29.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize?
Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 1.5 2.5 1.5 2.5
Recall Mode None None None None None None Max None Max
Walk Time (s)
Flash Dont Walk (s)
Pedestrian Calls (#/hr)
Act Effct Green (s) 12.4 12.4 12.4 11.1 44.8 4.2 31.5
Actuated g/C Ratio 0.17 0.17 0.17 0.15 0.60 0.06 0.42
v/c Ratio 0.60 0.21 0.46 0.67 0.39 0.21 0.63
Control Delay 44.2 1.2 29.7 45.8 12.2 46.5 23.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 44.2 1.2 29.7 45.8 12.2 46.5 23.2
LOS D A C D B D C
Approach Delay 27.0 29.7 18.2 23.7
Approach LOS C C B C
Queue Length 50th (ft) 48 0 29 68 62 8 145
Lanes, Volumes, Timings No Build PM
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: No Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 2
Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 18.0
Minimum Split (s) 27.0
Total Split (s) 27.0
Total Split (%) 25%
Maximum Green (s) 22.0
Yellow Time (s) 4.0
All-Red Time (s) 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0
Recall Mode None
Walk Time (s) 6.0
Flash Dont Walk (s) 16.0
Pedestrian Calls (#/hr) 3
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Lanes, Volumes, Timings No Build PM
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: No Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 3
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 95th (ft) 144 0 106 190 297 42 #471
Internal Link Dist (ft) 70 73 664 388
Turn Bay Length (ft) 130 100
Base Capacity (vph) 354 568 393 423 2109 99 1458
Starvation Cap Reductn 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.36 0.15 0.28 0.42 0.39 0.21 0.63
Intersection Summary
Area Type: Other
Cycle Length: 108
Actuated Cycle Length: 74.5
Natural Cycle: 90
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.67
Intersection Signal Delay: 21.9 Intersection LOS: C
Intersection Capacity Utilization 58.8% ICU Level of Service B
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza Driveway
Lanes, Volumes, Timings No Build PM
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: No Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 4
Lane Group Ø9
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
Lanes, Volumes, Timings No Build PM
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: No Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 5
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 0 0 0 0 935 0 0 965 0
Future Volume (vph) 0 0 0 0 0 0 0 935 0 0 965 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00
Frt
Flt Protected
Satd. Flow (prot) 0 0 0 0 0 0 0 3539 0 0 3539 0
Flt Permitted
Satd. Flow (perm) 0 0 0 0 0 0 0 3539 0 0 3539 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR)
Link Speed (mph) 30 30 30 30
Link Distance (ft) 91 78 785 744
Travel Time (s) 2.1 1.8 17.8 16.9
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Adj. Flow (vph) 0 0 0 0 0 0 0 954 0 0 985 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 0 0 0 0 954 0 0 985 0
Turn Type NA NA
Protected Phases 2 6
Permitted Phases
Detector Phase 2 6
Switch Phase
Minimum Initial (s) 5.0 5.0
Minimum Split (s) 41.0 41.0
Total Split (s) 41.0 41.0
Total Split (%) 60.3% 60.3%
Maximum Green (s) 35.0 35.0
Yellow Time (s) 4.0 4.0
All-Red Time (s) 2.0 2.0
Lost Time Adjust (s) 0.0 0.0
Total Lost Time (s) 6.0 6.0
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0
Recall Mode Min Min
Walk Time (s)
Flash Dont Walk (s)
Pedestrian Calls (#/hr)
Act Effct Green (s) 39.6 39.6
Actuated g/C Ratio 0.92 0.92
v/c Ratio 0.29 0.30
Control Delay 2.9 2.9
Queue Delay 0.0 0.0
Total Delay 2.9 2.9
LOS A A
Approach Delay 2.9 2.9
Approach LOS A A
Queue Length 50th (ft) 0 0
Queue Length 95th (ft) 171 178
Internal Link Dist (ft) 11 1 705 664
Turn Bay Length (ft)
Lanes, Volumes, Timings No Build PM
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: No Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 6
Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 5.0
Minimum Split (s) 27.0
Total Split (s) 27.0
Total Split (%) 40%
Maximum Green (s) 22.0
Yellow Time (s) 4.0
All-Red Time (s) 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0
Recall Mode None
Walk Time (s) 7.0
Flash Dont Walk (s) 15.0
Pedestrian Calls (#/hr) 7
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Lanes, Volumes, Timings No Build PM
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: No Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 7
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Base Capacity (vph) 3218 3218
Starvation Cap Reductn 0 0
Spillback Cap Reductn 0 0
Storage Cap Reductn 0 0
Reduced v/c Ratio 0.30 0.31
Intersection Summary
Area Type: Other
Cycle Length: 68
Actuated Cycle Length: 43.1
Natural Cycle: 70
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.30
Intersection Signal Delay: 2.9 Intersection LOS: A
Intersection Capacity Utilization 31.7% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway Crossing
Lanes, Volumes, Timings No Build PM
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: No Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 8
Lane Group Ø9
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
Lanes, Volumes, Timings No Build PM
3: King Street (MA Route 10 / US Route 5) & Finn Street Timing Plan: No Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 9
Lane Group EBL EBR NBL NBT SBT SBR Ø4 Ø9
Lane Configurations
Traffic Volume (vph) 240 160 250 695 670 310
Future Volume (vph) 240 160 250 695 670 310
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 100 100
Storage Lanes 1 1 1 1
Taper Length (ft) 25 100
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.850 0.850
Flt Protected 0.950 0.950
Satd. Flow (prot) 1770 1583 1770 1863 1863 1583
Flt Permitted 0.950 0.189
Satd. Flow (perm) 1770 1583 352 1863 1863 1583
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 167 154
Link Speed (mph) 30 30 30
Link Distance (ft) 341 617 785
Travel Time (s) 7.8 14.0 17.8
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96
Adj. Flow (vph) 250 167 260 724 698 323
Shared Lane Traffic (%)
Lane Group Flow (vph) 250 167 260 724 698 323
Turn Type Prot pt+ov pm+pt NA NA pt+ov
Protected Phases 7 4 5 5 2 6 6 7 4 9
Permitted Phases 2
Detector Phase 7 4 5 5 2 6 6 7
Switch Phase
Minimum Initial (s) 16.0 6.0 20.0 20.0 16.0 5.0
Minimum Split (s) 24.0 11.5 25.5 25.5 22.0 23.0
Total Split (s) 28.0 25.5 49.5 49.5 28.0 23.0
Total Split (%) 22.2% 20.2% 39.3% 39.3% 22% 18%
Maximum Green (s) 22.0 20.0 44.0 44.0 22.0 20.0
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 2.0
All-Red Time (s) 2.5 2.0 2.0 2.0 2.5 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 5.5 5.5 5.5
Lead/Lag Lead Lag
Lead-Lag Optimize?
Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 3.0
Recall Mode None None C-Min C-Min None None
Walk Time (s) 7.0
Flash Dont Walk (s) 13.0
Pedestrian Calls (#/hr) 3
Act Effct Green (s) 20.4 40.0 89.5 89.5 68.7 95.0
Actuated g/C Ratio 0.16 0.32 0.71 0.71 0.55 0.75
v/c Ratio 0.87 0.27 0.61 0.55 0.69 0.26
Control Delay 80.6 3.9 11.8 10.0 28.5 4.3
Queue Delay 0.0 0.3 0.0 1.2 0.2 0.0
Total Delay 80.6 4.2 11.8 11.2 28.7 4.3
LOS F A B B C A
Approach Delay 50.0 11.4 21.0
Approach LOS D B C
Queue Length 50th (ft) 198 0 44 314 384 28
Lanes, Volumes, Timings No Build PM
3: King Street (MA Route 10 / US Route 5) & Finn Street Timing Plan: No Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 10
Lane Group EBL EBR NBL NBT SBT SBR Ø4 Ø9
Queue Length 95th (ft) #331 31 m123 m530 #867 120
Internal Link Dist (ft) 261 537 705
Turn Bay Length (ft) 100 100
Base Capacity (vph) 309 660 475 1323 1015 1250
Starvation Cap Reductn 0 0 0 360 0 0
Spillback Cap Reductn 0 161 0 0 37 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.81 0.33 0.55 0.75 0.71 0.26
Intersection Summary
Area Type: Other
Cycle Length: 126
Actuated Cycle Length: 126
Offset: 9.5 (8%), Referenced to phase 2:NBTL and 6:SBT, Start of Green
Natural Cycle: 115
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.87
Intersection Signal Delay: 22.1 Intersection LOS: C
Intersection Capacity Utilization 76.6% ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 3: King Street (MA Route 10 / US Route 5) & Finn Street
Lanes, Volumes, Timings No Build PM
4: King Street (MA Route 10 / US Route 5) & Summer Street/North StreetTiming Plan: No Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 11
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 55 120 25 115 0 365 0 550 40 235 635 0
Future Volume (vph) 55 120 25 115 0 365 0 550 40 235 635 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 0 0 170 0
Storage Lanes 1 0 0 0 0 0 1 0
Taper Length (ft) 25 25 25 100
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.974 0.897 0.991
Flt Protected 0.950 0.988 0.950
Satd. Flow (prot) 1770 1814 0 0 1651 0 0 1846 0 1770 1863 0
Flt Permitted 0.337 0.818 0.207
Satd. Flow (perm) 628 1814 0 0 1367 0 0 1846 0 386 1863 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 9 140 4
Link Speed (mph) 25 30 30 30
Link Distance (ft) 569 342 240 617
Travel Time (s) 15.5 7.8 5.5 14.0
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Adj. Flow (vph) 56 122 26 117 0 372 0 561 41 240 648 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 56 148 0 0 489 0 0 602 0 240 648 0
Turn Type Perm NA Perm NA NA pm+pt NA
Protected Phases 4 8 2 1 6
Permitted Phases 4 8 6
Detector Phase 4 4 8 8 2 1 6
Switch Phase
Minimum Initial (s) 13.0 13.0 13.0 13.0 17.0 6.0 17.0
Minimum Split (s) 18.5 18.5 18.5 18.5 22.5 12.0 25.5
Total Split (s) 50.0 50.0 50.0 50.0 57.0 19.0 57.0
Total Split (%) 39.7% 39.7% 39.7% 39.7% 45.2% 15.1% 45.2%
Maximum Green (s) 44.5 44.5 44.5 44.5 51.5 13.0 51.5
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.5 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.5 5.5 5.5 5.5 6.0 5.5
Lead/Lag Lag Lead
Lead-Lag Optimize?
Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Recall Mode None None None None C-Min None C-Min
Walk Time (s) 3.0 3.0 3.0 3.0 3.0 7.0
Flash Dont Walk (s) 9.0 9.0 9.0 9.0 13.0 13.0
Pedestrian Calls (#/hr) 3 3 3 3 3 3
Act Effct Green (s) 38.1 38.1 38.1 58.9 76.4 76.9
Actuated g/C Ratio 0.30 0.30 0.30 0.47 0.61 0.61
v/c Ratio 0.29 0.27 0.96 0.70 0.66 0.57
Control Delay 35.7 30.9 60.6 33.7 30.8 31.4
Queue Delay 0.1 0.0 1.6 0.1 0.0 2.8
Total Delay 35.8 30.9 62.2 33.8 30.8 34.2
LOS D C E C C C
Approach Delay 32.3 62.2 33.8 33.3
Approach LOS C E C C
Queue Length 50th (ft) 34 83 290 399 159 530
Lanes, Volumes, Timings No Build PM
4: King Street (MA Route 10 / US Route 5) & Summer Street/North StreetTiming Plan: No Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 12
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 95th (ft) 70 132 #479 579 263 655
Internal Link Dist (ft) 489 262 160 537
Turn Bay Length (ft) 170
Base Capacity (vph) 221 646 573 865 376 1136
Starvation Cap Reductn 0 0 0 0 0 363
Spillback Cap Reductn 8 0 21 17 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.26 0.23 0.89 0.71 0.64 0.84
Intersection Summary
Area Type: Other
Cycle Length: 126
Actuated Cycle Length: 126
Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBTL, Start of Yellow, Master Intersection
Natural Cycle: 75
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.96
Intersection Signal Delay: 39.8 Intersection LOS: D
Intersection Capacity Utilization 102.8% ICU Level of Service G
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 4: King Street (MA Route 10 / US Route 5) & Summer Street/North Street
Lanes, Volumes, Timings No Build SAT
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: No Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 150 5 90 45 5 30 170 655 25 20 630 175
Future Volume (vph) 150 5 90 45 5 30 170 655 25 20 630 175
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 130 0 100 0
Storage Lanes 0 1 0 0 1 0 1 0
Taper Length (ft) 25 25 150 150
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 0.95 0.95
Frt 0.850 0.949 0.994 0.967
Flt Protected 0.954 0.973 0.950 0.950
Satd. Flow (prot) 0 1777 1583 0 1720 0 1770 3518 0 1770 3422 0
Flt Permitted 0.739 0.660 0.950 0.950
Satd. Flow (perm) 0 1377 1583 0 1167 0 1770 3518 0 1770 3422 0
Right Turn on Red Yes Yes No No
Satd. Flow (RTOR) 204 28
Link Speed (mph) 25 25 30 30
Link Distance (ft) 150 153 744 468
Travel Time (s) 4.1 4.2 16.9 10.6
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Adj. Flow (vph) 161 5 97 48 5 32 183 704 27 22 677 188
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 166 97 0 85 0 183 731 0 22 865 0
Turn Type Perm NA Perm Perm NA Prot NA Prot NA
Protected Phases 3 3 1 6 5 2
Permitted Phases 3 3 3
Detector Phase 3 3 3 3 3 1 6 5 2
Switch Phase
Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Minimum Split (s) 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0
Total Split (s) 17.0 17.0 17.0 17.0 17.0 17.0 30.0 9.0 30.0
Total Split (%) 18.7% 18.7% 18.7% 18.7% 18.7% 18.7% 33.0% 9.9% 33.0%
Maximum Green (s) 12.0 12.0 12.0 12.0 12.0 12.0 25.0 4.0 25.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize?
Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 1.5 2.5 1.5 2.5
Recall Mode None None None None None None Max None Max
Walk Time (s)
Flash Dont Walk (s)
Pedestrian Calls (#/hr)
Act Effct Green (s) 12.3 12.3 12.3 10.5 39.9 4.1 25.6
Actuated g/C Ratio 0.18 0.18 0.18 0.15 0.59 0.06 0.38
v/c Ratio 0.67 0.21 0.36 0.67 0.35 0.21 0.67
Control Delay 44.4 1.1 25.8 42.6 10.7 39.8 23.3
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 44.4 1.1 25.8 42.6 10.7 39.8 23.3
LOS D A C D B D C
Approach Delay 28.4 25.8 17.1 23.7
Approach LOS C C B C
Queue Length 50th (ft) 59 0 19 65 54 8 136
Lanes, Volumes, Timings No Build SAT
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: No Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 2
Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 18.0
Minimum Split (s) 27.0
Total Split (s) 27.0
Total Split (%) 30%
Maximum Green (s) 22.0
Yellow Time (s) 4.0
All-Red Time (s) 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0
Recall Mode None
Walk Time (s) 6.0
Flash Dont Walk (s) 16.0
Pedestrian Calls (#/hr) 3
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Lanes, Volumes, Timings No Build SAT
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: No Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 3
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 95th (ft) #216 0 78 #211 233 37 #370
Internal Link Dist (ft) 70 73 664 388
Turn Bay Length (ft) 130 100
Base Capacity (vph) 249 453 234 320 2070 106 1291
Starvation Cap Reductn 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.67 0.21 0.36 0.57 0.35 0.21 0.67
Intersection Summary
Area Type: Other
Cycle Length: 91
Actuated Cycle Length: 67.8
Natural Cycle: 90
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.67
Intersection Signal Delay: 21.6 Intersection LOS: C
Intersection Capacity Utilization 58.3% ICU Level of Service B
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza Driveway
Lanes, Volumes, Timings No Build SAT
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: No Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 4
Lane Group Ø9
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
Lanes, Volumes, Timings No Build SAT
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: No Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 5
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 0 0 0 0 895 0 0 800 0
Future Volume (vph) 0 0 0 0 0 0 0 895 0 0 800 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00
Frt
Flt Protected
Satd. Flow (prot) 0 0 0 0 0 0 0 3539 0 0 3539 0
Flt Permitted
Satd. Flow (perm) 0 0 0 0 0 0 0 3539 0 0 3539 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR)
Link Speed (mph) 30 30 30 30
Link Distance (ft) 91 78 785 744
Travel Time (s) 2.1 1.8 17.8 16.9
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Adj. Flow (vph) 0 0 0 0 0 0 0 932 0 0 833 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 0 0 0 0 932 0 0 833 0
Turn Type NA NA
Protected Phases 2 6
Permitted Phases
Detector Phase 2 6
Switch Phase
Minimum Initial (s) 5.0 5.0
Minimum Split (s) 41.0 41.0
Total Split (s) 41.0 41.0
Total Split (%) 60.3% 60.3%
Maximum Green (s) 35.0 35.0
Yellow Time (s) 4.0 4.0
All-Red Time (s) 2.0 2.0
Lost Time Adjust (s) 0.0 0.0
Total Lost Time (s) 6.0 6.0
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0
Recall Mode Min Min
Walk Time (s)
Flash Dont Walk (s)
Pedestrian Calls (#/hr)
Act Effct Green (s) 38.8 38.8
Actuated g/C Ratio 0.92 0.92
v/c Ratio 0.29 0.26
Control Delay 3.0 2.8
Queue Delay 0.0 0.0
Total Delay 3.0 2.8
LOS A A
Approach Delay 3.0 2.8
Approach LOS A A
Queue Length 50th (ft) 0 0
Queue Length 95th (ft) 166 145
Internal Link Dist (ft) 11 1 705 664
Turn Bay Length (ft)
Lanes, Volumes, Timings No Build SAT
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: No Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 6
Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 5.0
Minimum Split (s) 27.0
Total Split (s) 27.0
Total Split (%) 40%
Maximum Green (s) 22.0
Yellow Time (s) 4.0
All-Red Time (s) 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0
Recall Mode None
Walk Time (s) 7.0
Flash Dont Walk (s) 15.0
Pedestrian Calls (#/hr) 14
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Lanes, Volumes, Timings No Build SAT
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: No Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 7
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Base Capacity (vph) 3234 3234
Starvation Cap Reductn 0 0
Spillback Cap Reductn 0 0
Storage Cap Reductn 0 0
Reduced v/c Ratio 0.29 0.26
Intersection Summary
Area Type: Other
Cycle Length: 68
Actuated Cycle Length: 42.3
Natural Cycle: 70
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.29
Intersection Signal Delay: 2.9 Intersection LOS: A
Intersection Capacity Utilization 29.7% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway Crossing
Lanes, Volumes, Timings No Build SAT
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: No Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 8
Lane Group Ø9
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
Lanes, Volumes, Timings No Build SAT
3: King Street (MA Route 10 / US Route 5) & Finn Street Timing Plan: No Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 9
Lane Group EBL EBR NBL NBT SBT SBR Ø4 Ø9
Lane Configurations
Traffic Volume (vph) 265 120 140 620 565 255
Future Volume (vph) 265 120 140 620 565 255
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 100 100
Storage Lanes 1 1 1 1
Taper Length (ft) 25 100
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.850 0.850
Flt Protected 0.950 0.950
Satd. Flow (prot) 1770 1583 1770 1863 1863 1583
Flt Permitted 0.950 0.225
Satd. Flow (perm) 1770 1583 419 1863 1863 1583
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 126 193
Link Speed (mph) 30 30 30
Link Distance (ft) 341 617 785
Travel Time (s) 7.8 14.0 17.8
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Adj. Flow (vph) 279 126 147 653 595 268
Shared Lane Traffic (%)
Lane Group Flow (vph) 279 126 147 653 595 268
Turn Type Prot pt+ov pm+pt NA NA pt+ov
Protected Phases 7 4 5 5 2 6 6 7 4 9
Permitted Phases 2
Detector Phase 7 4 5 5 2 6 6 7
Switch Phase
Minimum Initial (s) 16.0 6.0 20.0 20.0 16.0 5.0
Minimum Split (s) 24.0 11.5 25.5 25.5 22.0 23.0
Total Split (s) 24.0 13.5 31.5 31.5 24.0 23.0
Total Split (%) 26.1% 14.7% 34.2% 34.2% 26% 25%
Maximum Green (s) 18.0 8.0 26.0 26.0 18.0 20.0
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 2.0
All-Red Time (s) 2.5 2.0 2.0 2.0 2.5 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 5.5 5.5 5.5
Lead/Lag Lead Lag
Lead-Lag Optimize?
Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 3.0
Recall Mode None None C-Min C-Min None None
Walk Time (s) 7.0
Flash Dont Walk (s) 13.0
Pedestrian Calls (#/hr) 3
Act Effct Green (s) 17.4 28.8 58.5 58.5 45.9 69.3
Actuated g/C Ratio 0.19 0.31 0.64 0.64 0.50 0.75
v/c Ratio 0.84 0.22 0.40 0.55 0.64 0.22
Control Delay 58.5 3.9 10.1 10.6 24.5 2.5
Queue Delay 0.0 0.0 0.0 0.1 0.0 0.0
Total Delay 58.5 3.9 10.1 10.7 24.5 2.5
LOS E A B B C A
Approach Delay 41.5 10.6 17.6
Approach LOS D B B
Queue Length 50th (ft) 156 0 24 110 220 7
Lanes, Volumes, Timings No Build SAT
3: King Street (MA Route 10 / US Route 5) & Finn Street Timing Plan: No Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 10
Lane Group EBL EBR NBL NBT SBT SBR Ø4 Ø9
Queue Length 95th (ft) #285 21 63 #406 #609 57
Internal Link Dist (ft) 261 537 705
Turn Bay Length (ft) 100 100
Base Capacity (vph) 346 567 384 1185 929 1249
Starvation Cap Reductn 0 0 0 59 0 0
Spillback Cap Reductn 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.81 0.22 0.38 0.58 0.64 0.21
Intersection Summary
Area Type: Other
Cycle Length: 92
Actuated Cycle Length: 92
Offset: 91.5 (99%), Referenced to phase 2:NBTL and 6:SBT, Start of Yellow
Natural Cycle: 95
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.84
Intersection Signal Delay: 19.6 Intersection LOS: B
Intersection Capacity Utilization 66.3% ICU Level of Service C
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 3: King Street (MA Route 10 / US Route 5) & Finn Street
Lanes, Volumes, Timings No Build SAT
4: King Street (MA Route 10 / US Route 5) & Summer Street/North StreetTiming Plan: No Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 11
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 50 55 20 70 0 180 0 540 40 135 535 0
Future Volume (vph) 50 55 20 70 0 180 0 540 40 135 535 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 0 0 170 0
Storage Lanes 1 0 0 0 0 0 1 0
Taper Length (ft) 25 25 25 100
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.960 0.903 0.991
Flt Protected 0.950 0.986 0.950
Satd. Flow (prot) 1770 1788 0 0 1659 0 0 1846 0 1770 1863 0
Flt Permitted 0.383 0.878 0.287
Satd. Flow (perm) 713 1788 0 0 1477 0 0 1846 0 535 1863 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 21 156 5
Link Speed (mph) 25 30 30 30
Link Distance (ft) 569 342 240 617
Travel Time (s) 15.5 7.8 5.5 14.0
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Adj. Flow (vph) 52 57 21 73 0 188 0 563 42 141 557 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 52 78 0 0 261 0 0 605 0 141 557 0
Turn Type Perm NA Perm NA NA pm+pt NA
Protected Phases 4 8 2 1 6
Permitted Phases 4 8 6
Detector Phase 4 4 8 8 2 1 6
Switch Phase
Minimum Initial (s) 13.0 13.0 13.0 13.0 17.0 6.0 17.0
Minimum Split (s) 18.5 18.5 18.5 18.5 22.5 12.0 22.5
Total Split (s) 38.0 38.0 38.0 38.0 40.0 14.0 40.0
Total Split (%) 41.3% 41.3% 41.3% 41.3% 43.5% 15.2% 43.5%
Maximum Green (s) 32.5 32.5 32.5 32.5 34.5 8.0 34.5
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.5 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.5 5.5 5.5 5.5 6.0 5.5
Lead/Lag Lag Lead
Lead-Lag Optimize?
Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Recall Mode None None None None C-Min None C-Min
Walk Time (s) 3.0 3.0 3.0 3.0 3.0 7.0
Flash Dont Walk (s) 9.0 9.0 9.0 9.0 13.0 13.0
Pedestrian Calls (#/hr) 3 3 3 3 3 3
Act Effct Green (s) 15.0 15.0 15.0 53.1 65.5 66.0
Actuated g/C Ratio 0.16 0.16 0.16 0.58 0.71 0.72
v/c Ratio 0.45 0.25 0.70 0.57 0.30 0.42
Control Delay 46.7 26.7 25.5 15.6 9.8 9.3
Queue Delay 0.0 0.0 0.0 0.1 0.0 0.0
Total Delay 46.7 26.7 25.5 15.7 9.8 9.3
LOS D C C B A A
Approach Delay 34.7 25.5 15.7 9.4
Approach LOS C C B A
Queue Length 50th (ft) 28 30 57 190 20 84
Lanes, Volumes, Timings No Build SAT
4: King Street (MA Route 10 / US Route 5) & Summer Street/North StreetTiming Plan: No Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Existing & No Build.syn 10/19/2023
BL Companies Page 12
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 95th (ft) 61 64 131 364 m86 269
Internal Link Dist (ft) 489 262 160 537
Turn Bay Length (ft) 170
Base Capacity (vph) 251 645 622 1066 488 1336
Starvation Cap Reductn 0 0 0 0 0 0
Spillback Cap Reductn 0 0 2 29 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.21 0.12 0.42 0.58 0.29 0.42
Intersection Summary
Area Type: Other
Cycle Length: 92
Actuated Cycle Length: 92
Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBTL, Start of Yellow, Master Intersection
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.70
Intersection Signal Delay: 16.1 Intersection LOS: B
Intersection Capacity Utilization 74.1% ICU Level of Service D
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 4: King Street (MA Route 10 / US Route 5) & Summer Street/North Street
APPENDIX
BUILD
Lanes, Volumes, Timings Build AM
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 65 5 30 5 5 15 115 603 40 20 599 85
Future Volume (vph) 65 5 30 5 5 15 115 603 40 20 599 85
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 130 0 100 0
Storage Lanes 0 1 0 0 1 0 1 0
Taper Length (ft) 25 25 150 150
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 0.95 0.95
Frt 0.850 0.917 0.991 0.981
Flt Protected 0.955 0.990 0.950 0.950
Satd. Flow (prot) 0 1731 1568 0 1586 0 1752 3473 0 1719 3397 0
Flt Permitted 0.722 0.928 0.950 0.950
Satd. Flow (perm) 0 1309 1568 0 1486 0 1752 3473 0 1719 3397 0
Right Turn on Red Yes Yes No No
Satd. Flow (RTOR) 172 16
Link Speed (mph) 25 25 30 30
Link Distance (ft) 150 153 744 468
Travel Time (s) 4.1 4.2 16.9 10.6
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Heavy Vehicles (%) 5% 2% 3% 2% 2% 13% 3% 3% 3% 5% 4% 6%
Adj. Flow (vph) 68 5 32 5 5 16 121 635 42 21 631 89
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 73 32 0 26 0 121 677 0 21 720 0
Turn Type Perm NA Perm Perm NA Prot NA Prot NA
Protected Phases 3 3 1 6 5 2
Permitted Phases 3 3 3
Detector Phase 3 3 3 3 3 1 6 5 2
Switch Phase
Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Minimum Split (s) 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0
Total Split (s) 25.0 25.0 25.0 25.0 25.0 22.0 47.0 9.0 34.0
Total Split (%) 23.1% 23.1% 23.1% 23.1% 23.1% 20.4% 43.5% 8.3% 31.5%
Maximum Green (s) 20.0 20.0 20.0 20.0 20.0 17.0 42.0 4.0 29.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize?
Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 1.5 2.5 1.5 2.5
Recall Mode None None None None None None Max None Max
Walk Time (s)
Flash Dont Walk (s)
Pedestrian Calls (#/hr)
Act Effct Green (s) 9.0 9.0 9.0 8.9 47.7 4.2 37.3
Actuated g/C Ratio 0.13 0.13 0.13 0.13 0.70 0.06 0.55
v/c Ratio 0.42 0.09 0.12 0.53 0.28 0.20 0.39
Control Delay 38.4 0.5 21.0 39.3 8.9 42.2 16.5
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Lanes, Volumes, Timings Build AM
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 2
Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Heavy Vehicles (%)
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 18.0
Minimum Split (s) 27.0
Total Split (s) 27.0
Total Split (%) 25%
Maximum Green (s) 22.0
Yellow Time (s) 4.0
All-Red Time (s) 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0
Recall Mode None
Walk Time (s) 6.0
Flash Dont Walk (s) 16.0
Pedestrian Calls (#/hr) 3
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Lanes, Volumes, Timings Build AM
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 3
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Total Delay 38.4 0.5 21.0 39.3 8.9 42.2 16.5
LOS D A C D A D B
Approach Delay 26.9 21.0 13.5 17.2
Approach LOS C C B B
Queue Length 50th (ft) 25 0 3 42 37 7 85
Queue Length 95th (ft) 89 0 31 132 223 40 292
Internal Link Dist (ft) 70 73 664 388
Turn Bay Length (ft) 130 100
Base Capacity (vph) 405 604 470 460 2432 106 1859
Starvation Cap Reductn 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.18 0.05 0.06 0.26 0.28 0.20 0.39
Intersection Summary
Area Type: Other
Cycle Length: 108
Actuated Cycle Length: 68.1
Natural Cycle: 65
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.53
Intersection Signal Delay: 16.1 Intersection LOS: B
Intersection Capacity Utilization 48.7% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza Driveway
Lanes, Volumes, Timings Build AM
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 4
Lane Group Ø9
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
Lanes, Volumes, Timings Build AM
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 5
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 0 0 0 0 748 0 0 714 0
Future Volume (vph) 0 0 0 0 0 0 0 748 0 0 714 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00
Frt
Flt Protected
Satd. Flow (prot) 0 0 0 0 0 0 0 3539 0 0 3539 0
Flt Permitted
Satd. Flow (perm) 0 0 0 0 0 0 0 3539 0 0 3539 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR)
Link Speed (mph) 30 30 30 30
Link Distance (ft) 91 78 554 744
Travel Time (s) 2.1 1.8 12.6 16.9
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 0 0 0 0 0 0 0 813 0 0 776 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 0 0 0 0 813 0 0 776 0
Turn Type NA NA
Protected Phases 2 6
Permitted Phases
Detector Phase 2 6
Switch Phase
Minimum Initial (s) 5.0 5.0
Minimum Split (s) 41.0 41.0
Total Split (s) 41.0 41.0
Total Split (%) 60.3% 60.3%
Maximum Green (s) 35.0 35.0
Yellow Time (s) 4.0 4.0
All-Red Time (s) 2.0 2.0
Lost Time Adjust (s) 0.0 0.0
Total Lost Time (s) 6.0 6.0
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0
Recall Mode Min Min
Walk Time (s)
Flash Dont Walk (s)
Pedestrian Calls (#/hr)
Act Effct Green (s) 36.4 36.4
Actuated g/C Ratio 0.91 0.91
v/c Ratio 0.25 0.24
Control Delay 3.0 3.0
Queue Delay 0.0 0.0
Total Delay 3.0 3.0
LOS A A
Approach Delay 3.0 3.0
Approach LOS A A
Lanes, Volumes, Timings Build AM
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 6
Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 5.0
Minimum Split (s) 27.0
Total Split (s) 27.0
Total Split (%) 40%
Maximum Green (s) 22.0
Yellow Time (s) 4.0
All-Red Time (s) 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0
Recall Mode None
Walk Time (s) 7.0
Flash Dont Walk (s) 15.0
Pedestrian Calls (#/hr) 19
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Lanes, Volumes, Timings Build AM
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 7
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 0 0
Queue Length 95th (ft) 142 134
Internal Link Dist (ft) 11 1 474 664
Turn Bay Length (ft)
Base Capacity (vph) 3223 3223
Starvation Cap Reductn 0 0
Spillback Cap Reductn 0 0
Storage Cap Reductn 0 0
Reduced v/c Ratio 0.25 0.24
Intersection Summary
Area Type: Other
Cycle Length: 68
Actuated Cycle Length: 40
Natural Cycle: 70
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.25
Intersection Signal Delay: 3.0 Intersection LOS: A
Intersection Capacity Utilization 25.7% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway Crossing
Lanes, Volumes, Timings Build AM
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 8
Lane Group Ø9
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
Lanes, Volumes, Timings Build AM
3: King Street (MA Route 10 / US Route 5) & Finn Street/Site Driveway #1 Timing Plan: Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 9
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 175 0 140 4 1 2 205 585 11 9 510 210
Future Volume (vph) 175 0 140 4 1 2 205 585 11 9 510 210
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 100 0 0 100
Storage Lanes 1 1 1 0 1 0 0 1
Taper Length (ft) 25 25 100 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.850 0.900 0.997 0.850
Flt Protected 0.950 0.950 0.950 0.999
Satd. Flow (prot) 1770 0 1583 1770 1676 0 1770 1822 0 0 1826 1568
Flt Permitted 0.950 0.950 0.217 0.987
Satd. Flow (perm) 1770 0 1583 1770 1676 0 404 1822 0 0 1804 1568
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 154 2 1 147
Link Speed (mph) 30 30 30 30
Link Distance (ft) 341 164 617 230
Travel Time (s) 7.8 3.7 14.0 5.2
Peak Hour Factor 0.91 0.92 0.91 0.92 0.92 0.92 0.91 0.91 0.92 0.92 0.91 0.91
Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 4% 2% 2% 4% 3%
Adj. Flow (vph) 192 0 154 4 1 2 225 643 12 10 560 231
Shared Lane Traffic (%)
Lane Group Flow (vph) 192 0 154 4 3 0 225 655 0 0 570 231
Turn Type Prot pt+ov Perm NA pm+pt NA Perm NA pt+ov
Protected Phases 7 4 5 8 5 2 6 6 7
Permitted Phases 8 2 6
Detector Phase 7 4 5 8 8 5 2 6 6 6 7
Switch Phase
Minimum Initial (s) 16.0 5.0 5.0 6.0 20.0 20.0 20.0
Minimum Split (s) 22.0 9.5 9.5 11.5 25.5 25.5 25.5
Total Split (s) 22.0 9.5 9.5 11.5 37.5 26.0 26.0
Total Split (%) 23.9% 10.3% 10.3% 12.5% 40.8% 28.3% 28.3%
Maximum Green (s) 16.0 5.0 5.0 6.0 32.0 20.5 20.5
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 2.5 1.0 1.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 4.5 4.5 5.5 5.5 5.5
Lead/Lag Lead Lag Lag Lead Lag Lag
Lead-Lag Optimize?
Vehicle Extension (s) 2.0 3.0 3.0 2.0 2.0 2.0 2.0
Recall Mode None None None None C-Min C-Min C-Min
Walk Time (s)
Flash Dont Walk (s)
Pedestrian Calls (#/hr)
Act Effct Green (s) 16.0 28.2 5.0 5.0 58.0 58.0 46.5 68.5
Actuated g/C Ratio 0.17 0.31 0.05 0.05 0.63 0.63 0.51 0.74
v/c Ratio 0.63 0.26 0.04 0.03 0.66 0.57 0.63 0.19
Control Delay 45.2 3.7 42.2 33.3 22.5 15.6 24.5 3.5
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Lanes, Volumes, Timings Build AM
3: King Street (MA Route 10 / US Route 5) & Finn Street/Site Driveway #1 Timing Plan: Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 10
Lane Group Ø4 Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Heavy Vehicles (%)
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 4 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 16.0 5.0
Minimum Split (s) 22.0 23.0
Total Split (s) 31.5 23.0
Total Split (%) 34% 25%
Maximum Green (s) 25.5 20.0
Yellow Time (s) 3.5 2.0
All-Red Time (s) 2.5 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 2.0 3.0
Recall Mode None None
Walk Time (s) 7.0
Flash Dont Walk (s) 13.0
Pedestrian Calls (#/hr) 3
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Lanes, Volumes, Timings Build AM
3: King Street (MA Route 10 / US Route 5) & Finn Street/Site Driveway #1 Timing Plan: Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 11
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Total Delay 45.2 3.7 42.2 33.3 22.5 15.6 24.5 3.5
LOS D A D C C B C A
Approach Delay 26.8 38.4 17.4 18.5
Approach LOS C D B B
Queue Length 50th (ft) 105 0 2 1 34 139 191 7
Queue Length 95th (ft) 177 19 13 10 m#194 #610 #652 70
Internal Link Dist (ft) 261 84 537 150
Turn Bay Length (ft) 100 100
Base Capacity (vph) 307 592 96 92 343 1148 911 1205
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.63 0.26 0.04 0.03 0.66 0.57 0.63 0.19
Intersection Summary
Area Type: Other
Cycle Length: 92
Actuated Cycle Length: 92
Offset: 91.5 (99%), Referenced to phase 2:NBTL and 6:SBTL, Start of Yellow
Natural Cycle: 105
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.66
Intersection Signal Delay: 19.5 Intersection LOS: B
Intersection Capacity Utilization 87.7% ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 3: King Street (MA Route 10 / US Route 5) & Finn Street/Site Driveway #1
Lanes, Volumes, Timings Build AM
3: King Street (MA Route 10 / US Route 5) & Finn Street/Site Driveway #1 Timing Plan: Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 12
Lane Group Ø4 Ø9
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
Lanes, Volumes, Timings Build AM
4: King Street (MA Route 10 / US Route 5) & Summer Street/North Street Timing Plan: Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 13
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 51 115 45 100 0 254 0 516 40 127 532 0
Future Volume (vph) 51 115 45 100 0 254 0 516 40 127 532 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 0 0 170 0
Storage Lanes 1 0 0 0 0 0 1 0
Taper Length (ft) 25 25 25 100
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.958 0.903 0.990
Flt Protected 0.950 0.986 0.950
Satd. Flow (prot) 1770 1785 0 0 1659 0 0 1811 0 1770 1827 0
Flt Permitted 0.371 0.767 0.230
Satd. Flow (perm) 691 1785 0 0 1290 0 0 1811 0 428 1827 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 24 153 5
Link Speed (mph) 25 30 30 30
Link Distance (ft) 569 342 240 617
Travel Time (s) 15.5 7.8 5.5 14.0
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91
Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 4% 2% 2% 4% 2%
Adj. Flow (vph) 56 126 49 110 0 279 0 567 44 140 585 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 56 175 0 0 389 0 0 611 0 140 585 0
Turn Type Perm NA Perm NA NA pm+pt NA
Protected Phases 4 8 2 1 6
Permitted Phases 4 8 6
Detector Phase 4 4 8 8 2 1 6
Switch Phase
Minimum Initial (s) 13.0 13.0 13.0 13.0 17.0 6.0 17.0
Minimum Split (s) 18.5 18.5 18.5 18.5 22.5 12.0 25.5
Total Split (s) 38.0 38.0 38.0 38.0 40.0 14.0 40.0
Total Split (%) 41.3% 41.3% 41.3% 41.3% 43.5% 15.2% 43.5%
Maximum Green (s) 32.5 32.5 32.5 32.5 34.5 8.0 34.5
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.5 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.5 5.5 5.5 5.5 6.0 5.5
Lead/Lag Lag Lead
Lead-Lag Optimize?
Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Recall Mode None None None None C-Min None C-Min
Walk Time (s) 3.0 3.0 3.0 3.0 3.0 7.0
Flash Dont Walk (s) 9.0 9.0 9.0 9.0 13.0 13.0
Pedestrian Calls (#/hr) 3 3 3 3 3 3
Act Effct Green (s) 22.2 22.2 22.2 45.7 58.3 58.8
Actuated g/C Ratio 0.24 0.24 0.24 0.50 0.63 0.64
v/c Ratio 0.34 0.39 0.91 0.68 0.37 0.50
Control Delay 31.6 25.8 45.9 24.9 16.7 15.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Lanes, Volumes, Timings Build AM
4: King Street (MA Route 10 / US Route 5) & Summer Street/North Street Timing Plan: Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 14
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Total Delay 31.6 25.8 45.9 24.9 16.7 15.1
LOS C C D C B B
Approach Delay 27.2 45.9 24.9 15.4
Approach LOS C D C B
Queue Length 50th (ft) 27 74 142 255 19 82
Queue Length 95th (ft) 54 112 230 #536 m113 363
Internal Link Dist (ft) 489 262 160 537
Turn Bay Length (ft) 170
Base Capacity (vph) 244 646 554 903 388 1168
Starvation Cap Reductn 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.23 0.27 0.70 0.68 0.36 0.50
Intersection Summary
Area Type: Other
Cycle Length: 92
Actuated Cycle Length: 92
Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBTL, Start of Yellow, Master Intersection
Natural Cycle: 65
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.91
Intersection Signal Delay: 25.8 Intersection LOS: C
Intersection Capacity Utilization 87.4% ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 4: King Street (MA Route 10 / US Route 5) & Summer Street/North Street
Lanes, Volumes, Timings Build AM
5: King Street (MA Route 10 / US Route 5) & Site Driveway #2 Timing Plan: Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 15
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 0 1 747 0 0 714
Future Volume (vph) 0 1 747 0 0 714
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.865
Flt Protected
Satd. Flow (prot) 0 1611 1863 0 0 1863
Flt Permitted
Satd. Flow (perm) 0 1611 1863 0 0 1863
Link Speed (mph) 30 30 30
Link Distance (ft) 151 230 554
Travel Time (s) 3.4 5.2 12.6
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 0 1 812 0 0 776
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 1 812 0 0 776
Sign Control Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 49.3% ICU Level of Service A
Analysis Period (min) 15
HCM 2010 TWSC Build AM
5: King Street (MA Route 10 / US Route 5) & Site Driveway #2 Timing Plan: Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 16
Intersection
Int Delay, s/veh 0
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 1 747 0 0 714
Future Vol, veh/h 0 1 747 0 0 714
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - Stop - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 1 812 0 0 776
Major/Minor Minor1 Major1 Major2
Conflicting Flow All - 812 0 - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 6.22 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.318 - - - -
Pot Cap-1 Maneuver 0 379 - 0 0 -
Stage 1 0 - - 0 0 -
Stage 2 0 - - 0 0 -
Platoon blocked, % - -
Mov Cap-1 Maneuver - 379 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach WB NB SB
HCM Control Delay, s 14.5 0 0
HCM LOS B
Minor Lane/Major Mvmt NBTWBLn1 SBT
Capacity (veh/h) - 379 -
HCM Lane V/C Ratio - 0.003 -
HCM Control Delay (s) - 14.5 -
HCM Lane LOS - B -
HCM 95th %tile Q(veh) - 0 -
HCM 6th TWSC Build AM
5: King Street (MA Route 10 / US Route 5) & Site Driveway #2 Timing Plan: Build 2030 AM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 17
Intersection
Int Delay, s/veh 0
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 1 747 0 0 714
Future Vol, veh/h 0 1 747 0 0 714
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - Stop - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 1 812 0 0 776
Major/Minor Minor1 Major1 Major2
Conflicting Flow All - 812 0 - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 6.22 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.318 - - - -
Pot Cap-1 Maneuver 0 379 - 0 0 -
Stage 1 0 - - 0 0 -
Stage 2 0 - - 0 0 -
Platoon blocked, % - -
Mov Cap-1 Maneuver - 379 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach WB NB SB
HCM Control Delay, s 14.5 0 0
HCM LOS B
Minor Lane/Major Mvmt NBTWBLn1 SBT
Capacity (veh/h) - 379 -
HCM Lane V/C Ratio - 0.003 -
HCM Control Delay (s) - 14.5 -
HCM Lane LOS - B -
HCM 95th %tile Q(veh) - 0 -
Lanes, Volumes, Timings Build PM
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 115 5 80 55 5 45 165 724 50 20 717 150
Future Volume (vph) 115 5 80 55 5 45 165 724 50 20 717 150
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 130 0 100 0
Storage Lanes 0 1 0 0 1 0 1 0
Taper Length (ft) 25 25 150 150
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 0.95 0.95
Frt 0.850 0.942 0.990 0.974
Flt Protected 0.954 0.974 0.950 0.950
Satd. Flow (prot) 0 1777 1583 0 1709 0 1770 3504 0 1770 3447 0
Flt Permitted 0.677 0.753 0.950 0.950
Satd. Flow (perm) 0 1261 1583 0 1321 0 1770 3504 0 1770 3447 0
Right Turn on Red Yes Yes No No
Satd. Flow (RTOR) 172 31
Link Speed (mph) 25 25 30 30
Link Distance (ft) 150 153 744 468
Travel Time (s) 4.1 4.2 16.9 10.6
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Adj. Flow (vph) 122 5 85 59 5 48 176 770 53 21 763 160
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 127 85 0 112 0 176 823 0 21 923 0
Turn Type Perm NA Perm Perm NA Prot NA Prot NA
Protected Phases 3 3 1 6 5 2
Permitted Phases 3 3 3
Detector Phase 3 3 3 3 3 1 6 5 2
Switch Phase
Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Minimum Split (s) 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0
Total Split (s) 25.0 25.0 25.0 25.0 25.0 22.0 47.0 9.0 34.0
Total Split (%) 23.1% 23.1% 23.1% 23.1% 23.1% 20.4% 43.5% 8.3% 31.5%
Maximum Green (s) 20.0 20.0 20.0 20.0 20.0 17.0 42.0 4.0 29.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize?
Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 1.5 2.5 1.5 2.5
Recall Mode None None None None None None Max None Max
Walk Time (s)
Flash Dont Walk (s)
Pedestrian Calls (#/hr)
Act Effct Green (s) 12.4 12.4 12.4 11.1 44.8 4.2 31.5
Actuated g/C Ratio 0.17 0.17 0.17 0.15 0.60 0.06 0.42
v/c Ratio 0.60 0.21 0.46 0.67 0.39 0.21 0.63
Control Delay 44.2 1.2 29.7 45.8 12.3 46.5 23.3
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 44.2 1.2 29.7 45.8 12.3 46.5 23.3
Lanes, Volumes, Timings Build PM
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 2
Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 18.0
Minimum Split (s) 27.0
Total Split (s) 27.0
Total Split (%) 25%
Maximum Green (s) 22.0
Yellow Time (s) 4.0
All-Red Time (s) 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0
Recall Mode None
Walk Time (s) 6.0
Flash Dont Walk (s) 16.0
Pedestrian Calls (#/hr) 3
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
Lanes, Volumes, Timings Build PM
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 3
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
LOS D A C D B D C
Approach Delay 27.0 29.7 18.2 23.8
Approach LOS C C B C
Queue Length 50th (ft) 48 0 29 68 63 8 146
Queue Length 95th (ft) 144 0 106 190 301 42 #477
Internal Link Dist (ft) 70 73 664 388
Turn Bay Length (ft) 130 100
Base Capacity (vph) 354 568 393 423 2109 99 1458
Starvation Cap Reductn 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.36 0.15 0.28 0.42 0.39 0.21 0.63
Intersection Summary
Area Type: Other
Cycle Length: 108
Actuated Cycle Length: 74.5
Natural Cycle: 90
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.67
Intersection Signal Delay: 21.9 Intersection LOS: C
Intersection Capacity Utilization 59.0% ICU Level of Service B
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza Driveway
Lanes, Volumes, Timings Build PM
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 4
Lane Group Ø9
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
Lanes, Volumes, Timings Build PM
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 5
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 0 0 0 0 944 0 0 972 0
Future Volume (vph) 0 0 0 0 0 0 0 944 0 0 972 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00
Frt
Flt Protected
Satd. Flow (prot) 0 0 0 0 0 0 0 3539 0 0 3539 0
Flt Permitted
Satd. Flow (perm) 0 0 0 0 0 0 0 3539 0 0 3539 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR)
Link Speed (mph) 30 30 30 30
Link Distance (ft) 91 78 554 744
Travel Time (s) 2.1 1.8 12.6 16.9
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Adj. Flow (vph) 0 0 0 0 0 0 0 963 0 0 992 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 0 0 0 0 963 0 0 992 0
Turn Type NA NA
Protected Phases 2 6
Permitted Phases
Detector Phase 2 6
Switch Phase
Minimum Initial (s) 5.0 5.0
Minimum Split (s) 41.0 41.0
Total Split (s) 41.0 41.0
Total Split (%) 60.3% 60.3%
Maximum Green (s) 35.0 35.0
Yellow Time (s) 4.0 4.0
All-Red Time (s) 2.0 2.0
Lost Time Adjust (s) 0.0 0.0
Total Lost Time (s) 6.0 6.0
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0
Recall Mode Min Min
Walk Time (s)
Flash Dont Walk (s)
Pedestrian Calls (#/hr)
Act Effct Green (s) 39.7 39.7
Actuated g/C Ratio 0.92 0.92
v/c Ratio 0.30 0.30
Control Delay 2.9 2.9
Queue Delay 0.0 0.0
Total Delay 2.9 2.9
LOS A A
Approach Delay 2.9 2.9
Approach LOS A A
Lanes, Volumes, Timings Build PM
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 6
Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 5.0
Minimum Split (s) 27.0
Total Split (s) 27.0
Total Split (%) 40%
Maximum Green (s) 22.0
Yellow Time (s) 4.0
All-Red Time (s) 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0
Recall Mode None
Walk Time (s) 7.0
Flash Dont Walk (s) 15.0
Pedestrian Calls (#/hr) 7
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Lanes, Volumes, Timings Build PM
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 7
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 0 0
Queue Length 95th (ft) 173 180
Internal Link Dist (ft) 11 1 474 664
Turn Bay Length (ft)
Base Capacity (vph) 3218 3218
Starvation Cap Reductn 0 0
Spillback Cap Reductn 0 0
Storage Cap Reductn 0 0
Reduced v/c Ratio 0.30 0.31
Intersection Summary
Area Type: Other
Cycle Length: 68
Actuated Cycle Length: 43.2
Natural Cycle: 70
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.30
Intersection Signal Delay: 2.9 Intersection LOS: A
Intersection Capacity Utilization 31.9% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway Crossing
Lanes, Volumes, Timings Build PM
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 8
Lane Group Ø9
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
Lanes, Volumes, Timings Build PM
3: King Street (MA Route 10 / US Route 5) & Finn Street/Site Driveway #1 Timing Plan: Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 9
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 240 0 160 11 1 6 250 695 8 7 670 310
Future Volume (vph) 240 0 160 11 1 6 250 695 8 7 670 310
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 100 0 0 100
Storage Lanes 1 1 1 0 1 0 0 1
Taper Length (ft) 25 25 100 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.850 0.869 0.998 0.850
Flt Protected 0.950 0.950 0.950 0.999
Satd. Flow (prot) 1770 0 1583 1770 1619 0 1770 1859 0 0 1861 1583
Flt Permitted 0.950 0.950 0.143 0.991
Satd. Flow (perm) 1770 0 1583 1770 1619 0 266 1859 0 0 1846 1583
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 167 7 1 133
Link Speed (mph) 30 30 30 30
Link Distance (ft) 341 164 617 230
Travel Time (s) 7.8 3.7 14.0 5.2
Peak Hour Factor 0.96 0.92 0.96 0.92 0.92 0.92 0.96 0.96 0.92 0.92 0.96 0.96
Adj. Flow (vph) 250 0 167 12 1 7 260 724 9 8 698 323
Shared Lane Traffic (%)
Lane Group Flow (vph) 250 0 167 12 8 0 260 733 0 0 706 323
Turn Type Prot pt+ov Perm NA pm+pt NA Perm NA pt+ov
Protected Phases 7 4 5 8 5 2 6 6 7
Permitted Phases 8 2 6
Detector Phase 7 4 5 8 8 5 2 6 6 6 7
Switch Phase
Minimum Initial (s) 16.0 5.0 5.0 6.0 20.0 20.0 20.0
Minimum Split (s) 22.0 9.5 9.5 11.5 25.5 25.5 25.5
Total Split (s) 28.5 9.5 9.5 24.0 65.0 41.0 41.0
Total Split (%) 22.6% 7.5% 7.5% 19.0% 51.6% 32.5% 32.5%
Maximum Green (s) 22.5 5.0 5.0 18.5 59.5 35.5 35.5
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 2.5 1.0 1.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 4.5 4.5 5.5 5.5 5.5
Lead/Lag Lead Lag Lag Lead Lag Lag
Lead-Lag Optimize?
Vehicle Extension (s) 2.0 3.0 3.0 2.0 2.0 2.0 2.0
Recall Mode None None None None C-Min C-Min C-Min
Walk Time (s)
Flash Dont Walk (s)
Pedestrian Calls (#/hr)
Act Effct Green (s) 20.6 43.1 5.0 5.0 85.5 85.5 65.6 92.2
Actuated g/C Ratio 0.16 0.34 0.04 0.04 0.68 0.68 0.52 0.73
v/c Ratio 0.86 0.26 0.17 0.11 0.74 0.58 0.73 0.27
Control Delay 78.5 3.2 64.3 37.7 34.7 13.7 32.6 6.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.0
Total Delay 78.5 3.2 64.3 37.7 34.7 14.2 32.6 6.0
Lanes, Volumes, Timings Build PM
3: King Street (MA Route 10 / US Route 5) & Finn Street/Site Driveway #1 Timing Plan: Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 10
Lane Group Ø4 Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 4 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 16.0 5.0
Minimum Split (s) 22.0 23.0
Total Split (s) 38.0 23.0
Total Split (%) 30% 18%
Maximum Green (s) 32.0 20.0
Yellow Time (s) 3.5 2.0
All-Red Time (s) 2.5 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 2.0 3.0
Recall Mode None None
Walk Time (s) 7.0
Flash Dont Walk (s) 13.0
Pedestrian Calls (#/hr) 3
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
Lanes, Volumes, Timings Build PM
3: King Street (MA Route 10 / US Route 5) & Finn Street/Site Driveway #1 Timing Plan: Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 11
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
LOS E A E D C B C A
Approach Delay 48.3 53.6 19.6 24.2
Approach LOS D D B C
Queue Length 50th (ft) 197 0 10 1 106 225 388 30
Queue Length 95th (ft) #325 26 31 19 m202 m573 #993 153
Internal Link Dist (ft) 261 84 537 150
Turn Bay Length (ft) 100 100
Base Capacity (vph) 316 697 70 70 401 1261 961 1216
Starvation Cap Reductn 0 0 0 0 0 205 0 0
Spillback Cap Reductn 0 29 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.79 0.25 0.17 0.11 0.65 0.69 0.73 0.27
Intersection Summary
Area Type: Other
Cycle Length: 126
Actuated Cycle Length: 126
Offset: 9.5 (8%), Referenced to phase 2:NBTL and 6:SBTL, Start of Yellow
Natural Cycle: 135
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.86
Intersection Signal Delay: 26.7 Intersection LOS: C
Intersection Capacity Utilization 105.2% ICU Level of Service G
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 3: King Street (MA Route 10 / US Route 5) & Finn Street/Site Driveway #1
Lanes, Volumes, Timings Build PM
3: King Street (MA Route 10 / US Route 5) & Finn Street/Site Driveway #1 Timing Plan: Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 12
Lane Group Ø4 Ø9
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
Lanes, Volumes, Timings Build PM
4: King Street (MA Route 10 / US Route 5) & Summer Street/North Street Timing Plan: Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 13
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 56 120 25 115 0 368 0 554 40 239 642 0
Future Volume (vph) 56 120 25 115 0 368 0 554 40 239 642 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 0 0 170 0
Storage Lanes 1 0 0 0 0 0 1 0
Taper Length (ft) 25 25 25 100
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.974 0.897 0.991
Flt Protected 0.950 0.988 0.950
Satd. Flow (prot) 1770 1814 0 0 1651 0 0 1846 0 1770 1863 0
Flt Permitted 0.335 0.820 0.201
Satd. Flow (perm) 624 1814 0 0 1370 0 0 1846 0 374 1863 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 9 142 4
Link Speed (mph) 25 30 30 30
Link Distance (ft) 569 342 240 617
Travel Time (s) 15.5 7.8 5.5 14.0
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Adj. Flow (vph) 57 122 26 117 0 376 0 565 41 244 655 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 57 148 0 0 493 0 0 606 0 244 655 0
Turn Type Perm NA Perm NA NA pm+pt NA
Protected Phases 4 8 2 1 6
Permitted Phases 4 8 6
Detector Phase 4 4 8 8 2 1 6
Switch Phase
Minimum Initial (s) 13.0 13.0 13.0 13.0 17.0 6.0 17.0
Minimum Split (s) 18.5 18.5 18.5 18.5 22.5 12.0 25.5
Total Split (s) 50.0 50.0 50.0 50.0 57.0 19.0 57.0
Total Split (%) 39.7% 39.7% 39.7% 39.7% 45.2% 15.1% 45.2%
Maximum Green (s) 44.5 44.5 44.5 44.5 51.5 13.0 51.5
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.5 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.5 5.5 5.5 5.5 6.0 5.5
Lead/Lag Lag Lead
Lead-Lag Optimize?
Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Recall Mode None None None None C-Min None C-Min
Walk Time (s) 3.0 3.0 3.0 3.0 3.0 7.0
Flash Dont Walk (s) 9.0 9.0 9.0 9.0 13.0 13.0
Pedestrian Calls (#/hr) 3 3 3 3 3 3
Act Effct Green (s) 38.3 38.3 38.3 58.5 76.2 76.7
Actuated g/C Ratio 0.30 0.30 0.30 0.46 0.60 0.61
v/c Ratio 0.30 0.27 0.96 0.71 0.68 0.58
Control Delay 35.9 30.8 60.4 34.2 38.6 22.6
Queue Delay 0.0 0.0 0.3 0.5 0.0 0.5
Total Delay 35.9 30.8 60.6 34.7 38.6 23.1
Lanes, Volumes, Timings Build PM
4: King Street (MA Route 10 / US Route 5) & Summer Street/North Street Timing Plan: Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 14
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
LOS D C E C D C
Approach Delay 32.2 60.6 34.7 27.3
Approach LOS C E C C
Queue Length 50th (ft) 34 83 291 405 105 181
Queue Length 95th (ft) 71 132 #482 584 m241 501
Internal Link Dist (ft) 489 262 160 537
Turn Bay Length (ft) 170
Base Capacity (vph) 220 646 575 859 370 1133
Starvation Cap Reductn 0 0 0 0 0 167
Spillback Cap Reductn 0 0 4 53 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.26 0.23 0.86 0.75 0.66 0.68
Intersection Summary
Area Type: Other
Cycle Length: 126
Actuated Cycle Length: 126
Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBTL, Start of Yellow, Master Intersection
Natural Cycle: 75
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.96
Intersection Signal Delay: 37.2 Intersection LOS: D
Intersection Capacity Utilization 103.5% ICU Level of Service G
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 4: King Street (MA Route 10 / US Route 5) & Summer Street/North Street
Lanes, Volumes, Timings Build PM
5: King Street (MA Route 10 / US Route 5) & Site Driveway #2 Timing Plan: Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 15
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 0 3 941 0 0 972
Future Volume (vph) 0 3 941 0 0 972
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.865
Flt Protected
Satd. Flow (prot) 0 1611 1863 0 0 1863
Flt Permitted
Satd. Flow (perm) 0 1611 1863 0 0 1863
Link Speed (mph) 30 30 30
Link Distance (ft) 151 230 554
Travel Time (s) 3.4 5.2 12.6
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 0 3 1023 0 0 1057
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 3 1023 0 0 1057
Sign Control Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 59.5% ICU Level of Service B
Analysis Period (min) 15
HCM 2010 TWSC Build PM
5: King Street (MA Route 10 / US Route 5) & Site Driveway #2 Timing Plan: Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 16
Intersection
Int Delay, s/veh 0
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 3 941 0 0 972
Future Vol, veh/h 0 3 941 0 0 972
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - Stop - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 3 1023 0 0 1057
Major/Minor Minor1 Major1 Major2
Conflicting Flow All - 1023 0 - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 6.22 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.318 - - - -
Pot Cap-1 Maneuver 0 286 - 0 0 -
Stage 1 0 - - 0 0 -
Stage 2 0 - - 0 0 -
Platoon blocked, % - -
Mov Cap-1 Maneuver - 286 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach WB NB SB
HCM Control Delay, s 17.7 0 0
HCM LOS C
Minor Lane/Major Mvmt NBTWBLn1 SBT
Capacity (veh/h) - 286 -
HCM Lane V/C Ratio - 0.011 -
HCM Control Delay (s) - 17.7 -
HCM Lane LOS - C -
HCM 95th %tile Q(veh) - 0 -
HCM 6th TWSC Build PM
5: King Street (MA Route 10 / US Route 5) & Site Driveway #2 Timing Plan: Build 2030 PM
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 17
Intersection
Int Delay, s/veh 0
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 3 941 0 0 972
Future Vol, veh/h 0 3 941 0 0 972
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - Stop - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 3 1023 0 0 1057
Major/Minor Minor1 Major1 Major2
Conflicting Flow All - 1023 0 - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 6.22 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.318 - - - -
Pot Cap-1 Maneuver 0 286 - 0 0 -
Stage 1 0 - - 0 0 -
Stage 2 0 - - 0 0 -
Platoon blocked, % - -
Mov Cap-1 Maneuver - 286 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach WB NB SB
HCM Control Delay, s 17.7 0 0
HCM LOS C
Minor Lane/Major Mvmt NBTWBLn1 SBT
Capacity (veh/h) - 286 -
HCM Lane V/C Ratio - 0.011 -
HCM Control Delay (s) - 17.7 -
HCM Lane LOS - C -
HCM 95th %tile Q(veh) - 0 -
Lanes, Volumes, Timings Build SAT
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 150 5 90 45 5 30 170 669 25 20 644 175
Future Volume (vph) 150 5 90 45 5 30 170 669 25 20 644 175
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 130 0 100 0
Storage Lanes 0 1 0 0 1 0 1 0
Taper Length (ft) 25 25 150 150
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 0.95 0.95
Frt 0.850 0.949 0.995 0.968
Flt Protected 0.954 0.973 0.950 0.950
Satd. Flow (prot) 0 1777 1583 0 1720 0 1770 3522 0 1770 3426 0
Flt Permitted 0.739 0.660 0.950 0.950
Satd. Flow (perm) 0 1377 1583 0 1167 0 1770 3522 0 1770 3426 0
Right Turn on Red Yes Yes No No
Satd. Flow (RTOR) 204 28
Link Speed (mph) 25 25 30 30
Link Distance (ft) 150 153 744 468
Travel Time (s) 4.1 4.2 16.9 10.6
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Adj. Flow (vph) 161 5 97 48 5 32 183 719 27 22 692 188
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 166 97 0 85 0 183 746 0 22 880 0
Turn Type Perm NA Perm Perm NA Prot NA Prot NA
Protected Phases 3 3 1 6 5 2
Permitted Phases 3 3 3
Detector Phase 3 3 3 3 3 1 6 5 2
Switch Phase
Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Minimum Split (s) 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0
Total Split (s) 17.0 17.0 17.0 17.0 17.0 17.0 30.0 9.0 30.0
Total Split (%) 18.7% 18.7% 18.7% 18.7% 18.7% 18.7% 33.0% 9.9% 33.0%
Maximum Green (s) 12.0 12.0 12.0 12.0 12.0 12.0 25.0 4.0 25.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize?
Vehicle Extension (s) 2.5 2.5 2.5 2.5 2.5 1.5 2.5 1.5 2.5
Recall Mode None None None None None None Max None Max
Walk Time (s)
Flash Dont Walk (s)
Pedestrian Calls (#/hr)
Act Effct Green (s) 12.3 12.3 12.3 10.5 39.9 4.1 25.6
Actuated g/C Ratio 0.18 0.18 0.18 0.15 0.59 0.06 0.38
v/c Ratio 0.67 0.21 0.36 0.67 0.36 0.21 0.68
Control Delay 44.4 1.1 25.8 42.6 10.8 39.8 23.6
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 44.4 1.1 25.8 42.6 10.8 39.8 23.6
Lanes, Volumes, Timings Build SAT
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 2
Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 18.0
Minimum Split (s) 27.0
Total Split (s) 27.0
Total Split (%) 30%
Maximum Green (s) 22.0
Yellow Time (s) 4.0
All-Red Time (s) 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0
Recall Mode None
Walk Time (s) 6.0
Flash Dont Walk (s) 16.0
Pedestrian Calls (#/hr) 3
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
Lanes, Volumes, Timings Build SAT
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 3
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
LOS D A C D B D C
Approach Delay 28.4 25.8 17.0 24.0
Approach LOS C C B C
Queue Length 50th (ft) 59 0 19 65 55 8 140
Queue Length 95th (ft) #216 0 78 #211 238 37 #380
Internal Link Dist (ft) 70 73 664 388
Turn Bay Length (ft) 130 100
Base Capacity (vph) 249 453 234 320 2073 106 1293
Starvation Cap Reductn 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.67 0.21 0.36 0.57 0.36 0.21 0.68
Intersection Summary
Area Type: Other
Cycle Length: 91
Actuated Cycle Length: 67.8
Natural Cycle: 90
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.68
Intersection Signal Delay: 21.6 Intersection LOS: C
Intersection Capacity Utilization 58.7% ICU Level of Service B
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza Driveway
Lanes, Volumes, Timings Build SAT
1: King Street (MA Route 10 / US Route 5) & Stop and Shop Plaza Driveway/Walgreens Plaza DrivewayTiming Plan: Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 4
Lane Group Ø9
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
Lanes, Volumes, Timings Build SAT
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 5
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 0 0 0 0 909 0 0 814 0
Future Volume (vph) 0 0 0 0 0 0 0 909 0 0 814 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00
Frt
Flt Protected
Satd. Flow (prot) 0 0 0 0 0 0 0 3539 0 0 3539 0
Flt Permitted
Satd. Flow (perm) 0 0 0 0 0 0 0 3539 0 0 3539 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR)
Link Speed (mph) 30 30 30 30
Link Distance (ft) 91 78 554 744
Travel Time (s) 2.1 1.8 12.6 16.9
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Adj. Flow (vph) 0 0 0 0 0 0 0 947 0 0 848 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 0 0 0 0 947 0 0 848 0
Turn Type NA NA
Protected Phases 2 6
Permitted Phases
Detector Phase 2 6
Switch Phase
Minimum Initial (s) 5.0 5.0
Minimum Split (s) 41.0 41.0
Total Split (s) 41.0 41.0
Total Split (%) 60.3% 60.3%
Maximum Green (s) 35.0 35.0
Yellow Time (s) 4.0 4.0
All-Red Time (s) 2.0 2.0
Lost Time Adjust (s) 0.0 0.0
Total Lost Time (s) 6.0 6.0
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0
Recall Mode Min Min
Walk Time (s)
Flash Dont Walk (s)
Pedestrian Calls (#/hr)
Act Effct Green (s) 38.9 38.9
Actuated g/C Ratio 0.92 0.92
v/c Ratio 0.29 0.26
Control Delay 3.0 2.8
Queue Delay 0.0 0.0
Total Delay 3.0 2.8
LOS A A
Approach Delay 3.0 2.8
Approach LOS A A
Lanes, Volumes, Timings Build SAT
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 6
Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 5.0
Minimum Split (s) 27.0
Total Split (s) 27.0
Total Split (%) 40%
Maximum Green (s) 22.0
Yellow Time (s) 4.0
All-Red Time (s) 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0
Recall Mode None
Walk Time (s) 7.0
Flash Dont Walk (s) 15.0
Pedestrian Calls (#/hr) 14
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Lanes, Volumes, Timings Build SAT
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 7
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 0 0
Queue Length 95th (ft) 170 147
Internal Link Dist (ft) 11 1 474 664
Turn Bay Length (ft)
Base Capacity (vph) 3235 3235
Starvation Cap Reductn 0 0
Spillback Cap Reductn 0 0
Storage Cap Reductn 0 0
Reduced v/c Ratio 0.29 0.26
Intersection Summary
Area Type: Other
Cycle Length: 68
Actuated Cycle Length: 42.4
Natural Cycle: 70
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.29
Intersection Signal Delay: 2.9 Intersection LOS: A
Intersection Capacity Utilization 30.1% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway Crossing
Lanes, Volumes, Timings Build SAT
2: King Street (MA Route 10 / US Route 5) & Northampton Bikeway CrossingTiming Plan: Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 8
Lane Group Ø9
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
Lanes, Volumes, Timings Build SAT
3: King Street (MA Route 10 / US Route 5) & Finn Street/Site Driveway #1 Timing Plan: Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 9
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 265 0 120 15 1 9 140 625 16 14 565 255
Future Volume (vph) 265 0 120 15 1 9 140 625 16 14 565 255
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 100 0 0 100
Storage Lanes 1 1 1 0 1 0 0 1
Taper Length (ft) 25 25 100 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.850 0.864 0.996 0.850
Flt Protected 0.950 0.950 0.950 0.999
Satd. Flow (prot) 1770 0 1583 1770 1609 0 1770 1855 0 0 1861 1583
Flt Permitted 0.950 0.950 0.174 0.979
Satd. Flow (perm) 1770 0 1583 1770 1609 0 324 1855 0 0 1824 1583
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 126 10 2 160
Link Speed (mph) 30 30 30 30
Link Distance (ft) 341 164 617 230
Travel Time (s) 7.8 3.7 14.0 5.2
Peak Hour Factor 0.95 0.92 0.95 0.92 0.92 0.92 0.95 0.95 0.92 0.92 0.95 0.95
Adj. Flow (vph) 279 0 126 16 1 10 147 658 17 15 595 268
Shared Lane Traffic (%)
Lane Group Flow (vph) 279 0 126 16 11 0 147 675 0 0 610 268
Turn Type Prot pt+ov Perm NA pm+pt NA Perm NA pt+ov
Protected Phases 7 4 5 8 5 2 6 6 7
Permitted Phases 8 2 6
Detector Phase 7 4 5 8 8 5 2 6 6 6 7
Switch Phase
Minimum Initial (s) 16.0 5.0 5.0 6.0 20.0 20.0 20.0
Minimum Split (s) 22.0 9.5 9.5 11.5 25.5 25.5 25.5
Total Split (s) 22.0 9.5 9.5 11.5 37.5 26.0 26.0
Total Split (%) 23.9% 10.3% 10.3% 12.5% 40.8% 28.3% 28.3%
Maximum Green (s) 16.0 5.0 5.0 6.0 32.0 20.5 20.5
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 2.5 1.0 1.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 4.5 4.5 5.5 5.5 5.5
Lead/Lag Lead Lag Lag Lead Lag Lag
Lead-Lag Optimize?
Vehicle Extension (s) 2.0 3.0 3.0 2.0 2.0 2.0 2.0
Recall Mode None None None None C-Min C-Min C-Min
Walk Time (s)
Flash Dont Walk (s)
Pedestrian Calls (#/hr)
Act Effct Green (s) 16.0 30.1 5.0 5.0 56.1 56.1 44.6 66.6
Actuated g/C Ratio 0.17 0.33 0.05 0.05 0.61 0.61 0.48 0.72
v/c Ratio 0.91 0.21 0.17 0.11 0.50 0.60 0.69 0.23
Control Delay 71.8 3.3 45.7 26.5 17.5 14.4 27.7 4.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 71.8 3.3 45.7 26.5 17.5 14.4 27.7 4.0
Lanes, Volumes, Timings Build SAT
3: King Street (MA Route 10 / US Route 5) & Finn Street/Site Driveway #1 Timing Plan: Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 10
Lane Group Ø4 Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 4 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 16.0 5.0
Minimum Split (s) 22.0 23.0
Total Split (s) 31.5 23.0
Total Split (%) 34% 25%
Maximum Green (s) 25.5 20.0
Yellow Time (s) 3.5 2.0
All-Red Time (s) 2.5 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 2.0 3.0
Recall Mode None None
Walk Time (s) 7.0
Flash Dont Walk (s) 13.0
Pedestrian Calls (#/hr) 3
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
Lanes, Volumes, Timings Build SAT
3: King Street (MA Route 10 / US Route 5) & Finn Street/Site Driveway #1 Timing Plan: Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 11
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
LOS E A D C B B C A
Approach Delay 50.5 37.9 15.0 20.4
Approach LOS D D B C
Queue Length 50th (ft) 161 0 9 1 24 115 210 9
Queue Length 95th (ft) #308 18 30 18 #112 #632 #703 84
Internal Link Dist (ft) 261 84 537 150
Turn Bay Length (ft) 100 100
Base Capacity (vph) 307 602 96 96 292 1132 884 1190
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.91 0.21 0.17 0.11 0.50 0.60 0.69 0.23
Intersection Summary
Area Type: Other
Cycle Length: 92
Actuated Cycle Length: 92
Offset: 91.5 (99%), Referenced to phase 2:NBTL and 6:SBTL, Start of Yellow
Natural Cycle: 105
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.91
Intersection Signal Delay: 24.3 Intersection LOS: C
Intersection Capacity Utilization 98.2% ICU Level of Service F
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 3: King Street (MA Route 10 / US Route 5) & Finn Street/Site Driveway #1
Lanes, Volumes, Timings Build SAT
3: King Street (MA Route 10 / US Route 5) & Finn Street/Site Driveway #1 Timing Plan: Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 12
Lane Group Ø4 Ø9
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
Lanes, Volumes, Timings Build SAT
4: King Street (MA Route 10 / US Route 5) & Summer Street/North Street Timing Plan: Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 13
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 51 55 20 70 0 186 0 549 40 141 544 0
Future Volume (vph) 51 55 20 70 0 186 0 549 40 141 544 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 0 0 170 0
Storage Lanes 1 0 0 0 0 0 1 0
Taper Length (ft) 25 25 25 100
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.960 0.902 0.991
Flt Protected 0.950 0.987 0.950
Satd. Flow (prot) 1770 1788 0 0 1658 0 0 1846 0 1770 1863 0
Flt Permitted 0.373 0.881 0.279
Satd. Flow (perm) 695 1788 0 0 1480 0 0 1846 0 520 1863 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 21 161 5
Link Speed (mph) 25 30 30 30
Link Distance (ft) 569 342 240 617
Travel Time (s) 15.5 7.8 5.5 14.0
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Adj. Flow (vph) 53 57 21 73 0 194 0 572 42 147 567 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 53 78 0 0 267 0 0 614 0 147 567 0
Turn Type Perm NA Perm NA NA pm+pt NA
Protected Phases 4 8 2 1 6
Permitted Phases 4 8 6
Detector Phase 4 4 8 8 2 1 6
Switch Phase
Minimum Initial (s) 13.0 13.0 13.0 13.0 17.0 6.0 17.0
Minimum Split (s) 18.5 18.5 18.5 18.5 22.5 12.0 22.5
Total Split (s) 38.0 38.0 38.0 38.0 40.0 14.0 40.0
Total Split (%) 41.3% 41.3% 41.3% 41.3% 43.5% 15.2% 43.5%
Maximum Green (s) 32.5 32.5 32.5 32.5 34.5 8.0 34.5
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.5 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.5 5.5 5.5 5.5 6.0 5.5
Lead/Lag Lag Lead
Lead-Lag Optimize?
Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Recall Mode None None None None C-Min None C-Min
Walk Time (s) 3.0 3.0 3.0 3.0 3.0 7.0
Flash Dont Walk (s) 9.0 9.0 9.0 9.0 13.0 13.0
Pedestrian Calls (#/hr) 3 3 3 3 3 3
Act Effct Green (s) 15.1 15.1 15.1 52.8 65.4 65.9
Actuated g/C Ratio 0.16 0.16 0.16 0.57 0.71 0.72
v/c Ratio 0.46 0.25 0.71 0.58 0.32 0.42
Control Delay 47.8 26.6 25.3 16.0 11.6 11.3
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 47.8 26.6 25.3 16.0 11.6 11.3
Lanes, Volumes, Timings Build SAT
4: King Street (MA Route 10 / US Route 5) & Summer Street/North Street Timing Plan: Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 14
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
LOS D C C B B B
Approach Delay 35.2 25.3 16.0 11.4
Approach LOS D C B B
Queue Length 50th (ft) 29 30 58 198 20 81
Queue Length 95th (ft) 62 64 133 373 m101 349
Internal Link Dist (ft) 489 262 160 537
Turn Bay Length (ft) 170
Base Capacity (vph) 245 645 626 1062 478 1335
Starvation Cap Reductn 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.22 0.12 0.43 0.58 0.31 0.42
Intersection Summary
Area Type: Other
Cycle Length: 92
Actuated Cycle Length: 92
Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBTL, Start of Yellow, Master Intersection
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.71
Intersection Signal Delay: 17.0 Intersection LOS: B
Intersection Capacity Utilization 75.3% ICU Level of Service D
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 4: King Street (MA Route 10 / US Route 5) & Summer Street/North Street
Lanes, Volumes, Timings Build SAT
5: King Street (MA Route 10 / US Route 5) & Site Driveway #2 Timing Plan: Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 15
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 0 5 904 0 0 814
Future Volume (vph) 0 5 904 0 0 814
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.865
Flt Protected
Satd. Flow (prot) 0 1611 1863 0 0 1863
Flt Permitted
Satd. Flow (perm) 0 1611 1863 0 0 1863
Link Speed (mph) 30 30 30
Link Distance (ft) 151 230 554
Travel Time (s) 3.4 5.2 12.6
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Adj. Flow (vph) 0 5 983 0 0 885
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 5 983 0 0 885
Sign Control Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 57.6% ICU Level of Service B
Analysis Period (min) 15
HCM 2010 TWSC Build SAT
5: King Street (MA Route 10 / US Route 5) & Site Driveway #2 Timing Plan: Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 16
Intersection
Int Delay, s/veh 0
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 5 904 0 0 814
Future Vol, veh/h 0 5 904 0 0 814
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - Stop - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 5 983 0 0 885
Major/Minor Minor1 Major1 Major2
Conflicting Flow All - 983 0 - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 6.22 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.318 - - - -
Pot Cap-1 Maneuver 0 302 - 0 0 -
Stage 1 0 - - 0 0 -
Stage 2 0 - - 0 0 -
Platoon blocked, % - -
Mov Cap-1 Maneuver - 302 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach WB NB SB
HCM Control Delay, s 17.1 0 0
HCM LOS C
Minor Lane/Major Mvmt NBTWBLn1 SBT
Capacity (veh/h) - 302 -
HCM Lane V/C Ratio - 0.018 -
HCM Control Delay (s) - 17.1 -
HCM Lane LOS - C -
HCM 95th %tile Q(veh) - 0.1 -
HCM 6th TWSC Build SAT
5: King Street (MA Route 10 / US Route 5) & Site Driveway #2 Timing Plan: Build 2030 SAT
G:\JOBS23\08\2300986\TRAF\SYNCHRO\T-SYN-2300986 - Build.syn 10/19/2023
BL Companies Page 17
Intersection
Int Delay, s/veh 0
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 5 904 0 0 814
Future Vol, veh/h 0 5 904 0 0 814
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - Stop - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 5 983 0 0 885
Major/Minor Minor1 Major1 Major2
Conflicting Flow All - 983 0 - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 6.22 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.318 - - - -
Pot Cap-1 Maneuver 0 302 - 0 0 -
Stage 1 0 - - 0 0 -
Stage 2 0 - - 0 0 -
Platoon blocked, % - -
Mov Cap-1 Maneuver - 302 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach WB NB SB
HCM Control Delay, s 17.1 0 0
HCM LOS C
Minor Lane/Major Mvmt NBTWBLn1 SBT
Capacity (veh/h) - 302 -
HCM Lane V/C Ratio - 0.018 -
HCM Control Delay (s) - 17.1 -
HCM Lane LOS - C -
HCM 95th %tile Q(veh) - 0.1 -
APPENDIX
Outside Development Trip Generation
18 Future Conditions 42450.00
Build Condition
Build traffic volumes for study area roadways were determined by estimating site generated
traffic volumes and distributing these volumes over the study area roadways.
Site Generated Traffic
In order to estimate the trip-generating characteristics for the proposed project, traffic
projections can be derived from the City of Northampton’s Zoning Ordinance, which details
allowable trip generation rates to apply to different types of land uses. Table 3 details the
estimated the site generated traffic for the proposed uses on site, which includes an
approximately 2,007 SF coffee shop with drive-through window, 9,840 SF of medical/dental
office space, and 19,724 SF of retail space. The entire redevelopment is proposed to be
approximately 31,571 SF.
The anticipated new total trip generation for the proposed multiuse development is
summarized in Table 3. It should be noted that the trip generation detailed in Table 3 does not
yet consider the potential for pass-by traffic, shared-use trips, or the anticipated reduction in
vehicle traffic due to the implementation of Traffic Demand Management measures (TDM).
These traffic mitigation measures are discussed in the following sections.
Table 3 Site Generated Traffic Summary
Time Period
Medical/Dental
Office1
(9,840 SF)
Retail2
(19,724 SF)
Restaurant3
(2,007 SF)
Total Unadjusted
Gross Trips
Daily 290 744 1,641 2,675
Weekday Morning Peak Hour b
Enter 25 120 100 245
Exit 25 120 100 245
Total 50 240 200 490
Weekday Evening Peak Hour b
Enter 25 120 100 245
Exit 25 120 100 245
Total 50 240 200 490
Saturday Midday Peak Hourb
Enter 25 120 100 245
Exit 25 120 100 245
Total 50 240 200 490
Source: City of Northampton Trip Generation Zoning Code
a vehicles per day b vehicles per hour
1 Future trip generation based on Project Type Medical and Dental Offices based on 5 trips/1,000 SF for 9,840 SF
2 Future trip generation based on Project Type Grocery, Personal Services, Retail and Auto Sales, Medical Marijuana Dispensary based on 12 trips/1,000 SF for 19,724 SF
3 Future trip generation based on Project Type Gas, Convenience Stores, Fast-Food Restaurants based on 100
trips/1,000 SF for 2,007 SF
23 Future Conditions 42450.00
Table 4 Site Generated Traffic Summary- New Vehicle Trips
Time Period Total Gross Trips1
Integrated Land
Use Trip
Reduction2
Pass-By Trip
Reduction3 Net New Trips
Total Percent
Traffic Reduction
Daily 2,675 800 (30%) 470 (18%) 1,405 48%
Weekday Morning Peak Hour b
Enter 245 25 70 145
Exit 245 25 70 150
Total 490 50 (11%) 140 (29%) 295 40%
Weekday Evening Peak Hour b
Enter 245 70 65 110
Exit 245 70 65 110
Total 490 140 (28%) 130 (27%) 220 55%
Saturday Midday Peak Hourb
Enter 245 95 35 115
Exit 245 95 35 115
Total 490 190 (38%) 70 (14%) 230 52%
Source: City of Northampton Trip Generation Zoning Code
a vehicles per day b vehicles per hour
1 Total trips generated by combined City of Northampton Project Types
2 Number of trips reduced through reduction calculation based off of ITE Trip Reduction calculation, removed from network 3 Number of trips passing by the site calculated based off of ITE standard rates
24 Future Conditions 42450.00
Trip Distribution
The anticipated distribution of the site generated traffic was determined by examining the
population density of neighborhoods in Northampton in relation to the site location,
anticipating commuter traffic patterns in the area, and ease of access to the site.
It was assumed that site-generated traffic would be allocated across the major routes in the
area based on the traffic percentages that are summarized in Table 5. A figure depicting the
distribution patterns shown in Table 5 can be seen in the Appendix.
Table 5 Trip Distribution Summary
Roadway Direction [From/To] Site Generated Trip Distributiona
King Street (Route 5) North 45%
King Street (Route 5) South 45%
Barrett Street West 10%
Total 100%
a Based on a function of population densities, anticipated commuter traffic patterns, and ease of access to the Site
SITE
210
15
135
100
15
11511553050
1004803010
NEG
5
20
NEG
15506905
607205Barr
e
t
t
S
t
r
e
e
t
Lia DrivewayCarlon Drive
S
S
10
NEG
30
NEG
NEG
NEG562010
1052520S
Site Driveway
Northampton Crossing
Driveway
Driveways
\\vhb\gbl\proj\Springfield\42450.00\Graphics\FIGURES\Traffic Figures.dwg
Figure 8King St Mixed-Use Development2026 Build ConditionsWeekday Morning Peak Hour Traffic VolumesNorthampton, Massachusetts
Legend
Weekday Morning
Traffic Volume
NEG (Negligible)
NOT TO SCALE
XX
SITE
95
15
110
80
15
959066595
8579510510
NEG
5
60
NEG
551579010
309105Barr
e
t
t
S
t
r
e
e
t
Lia DrivewayS
S
S
5
NEG
35
20
NEG
10108655
597040Carlon Drive
Site Driveway
Northampton Crossing
Driveway
Driveways
\\vhb\gbl\proj\Springfield\42450.00\Graphics\FIGURES\Traffic Figures.dwg
Figure 9King St Mixed-Use Development2026 Build ConditionsWeekday Evening Peak Hour Traffic VolumesNorthampton, Massachusetts
Legend
Weekday Evening
Traffic Volume
NEG (Negligible)
NOT TO SCALE
XX
SITE
95
10
130
70
10
808077555
7096010520
NEG
5
20
NEG
301087020
1511005Barr
e
t
t
S
t
r
e
e
t
Lia Driveway
S
S
10
NEG
35
20
NEG
15591020
5106040SCarlon Drive
Site Driveway
Northampton Crossing
Driveway
Driveways
\\vhb\gbl\proj\Springfield\42450.00\Graphics\FIGURES\Traffic Figures.dwg
Figure 10King St Mixed-Use Development2026 Build ConditionsSaturday Midday Peak Hour Traffic VolumesNorthampton, Massachusetts
Legend
Saturday Midday
Traffic Volume
NEG (Negligible)
NOT TO SCALE
XX