Loading...
C-PMT-2300986-Special Permit Narrative Special Permit with Site Plan Application Narrative Planning and Sustainability Department For the Proposed: Proposed Development Located at: 171-187 King Street Northampton, Massachusetts Prepared for Submission to: City of Northampton, Massachusetts January 15, 2023 Prepared for: Cosenzi Automotive Realty Limited Partnership 40 Russell Street – P.O. Box 547 Hadley, MA 01035 Prepared by: BL Companies 100 Constitution Plaza, 10th Floor Hartford, Connecticut 06103 Phone: (860) 249-2200 Fax: (860) 249-2400 BL Project Number: 2300986 Special Permit with Site Plan Application January 14, 2023 Proposed Development, Northampton, MA 100 Constitution Plaza ▪ Hartford, CT 06103 ▪ T (860) 249-2200 ▪ F (860) 249-2400 ▪ www.blcompanies.com Contents 1. Existing Conditions .................................................................................................................3 1.1. Zoning and Dimension Requirements.............................................................................3 1.2. Wetlands and Rare Species..............................................................................................3 1.3. Historic Resources...........................................................................................................4 2. Proposed Development............................................................................................................4 2.1. Project Schedule ..............................................................................................................4 2.2. Municipal Services & Infrastructure ...............................................................................4 2.2.1. Electric, Cable & Data.............................................................................................4 2.2.2. Gas...........................................................................................................................5 2.2.3. Sewer .......................................................................................................................5 2.2.4. Domestic Water & Fire Suppression.......................................................................5 2.2.5. Stormwater...............................................................................................................5 2.2.6. Site Lighting ............................................................................................................5 2.2.7. Landscaping.............................................................................................................6 2.2.8. Traffic......................................................................................................................6 3. Compliance with Northampton Special Permit and Site Plan Criteria....................................6 3.1. Compliance with Special Permit and/or Site Plan Criteria..............................................6 3.2. Site Plan Criteria..............................................................................................................8 3.3. Site Plan – Onsite Traffic ................................................................................................9 3.4. Site Plan – Offsite Traffic..............................................................................................10 4. Summary................................................................................................................................10 Special Permit with Site Plan Application January 14, 2023 Proposed Development, Northampton, MA 100 Constitution Plaza ▪ Hartford, CT 06103 ▪ T (860) 249-2200 ▪ F (860) 249-2400 ▪ www.blcompanies.com Appendix A: Site Plan Appendix B: Location Maps Figure 1: USGS Location Map Figure 2: Aerial Location Map Appendix C: Abutter’s List Appendix D: Executed Zoning Permit Application Special Permit with Site Plan Application January 14, 2023 Proposed Development, Northampton, MA 100 Constitution Plaza ▪ Hartford, CT 06103 ▪ T (860) 249-2200 ▪ F (860) 249-2400 ▪ www.blcompanies.com 1. Existing Conditions The subject site is within the Central Business - Gateway zoning district. It consists of parcels 080-001, 338-001, and 081-001 with a total area of +/- 5.3 acres. The site is bounded to the north by property of the Massachusetts Electric Company and bounded to the south by Foster Farrar True Value. The site is bounded to the west by King Street and bounded to the east by the Northampton Bikeway. Existing features of the site include a paved parking lot, with broken pavement around the edges of the site and the remains of a demolished building approximately 16,000 square feet in area. Topography generally slopes towards to eastern and western side of the site from a ridge running diagonal through the site from the northwestern corner to the southeastern corner. The existing elevation at the high point of the ridge is approximately 144’ near the northwest corner. The eastern side of the site is at an elevation of approximately 140’ while the western side of the site reaches a low point of about 139’. Stormwater and soil details have been provided in the Stormwater Management Report which are included in this submission. 1.1. Zoning and Dimension Requirements Based on a review of the City’s Zoning Map, the proposed project is located in the Central Business District – Gateway (CB-Gateway). The dimensional and density regulations for the site are listed on the Site Plan included with this submission. All abutting parcels are zoned in the Central Business District – Gateway zoning district. The Project is seeking a waiver for the Minimum Building Frontage Occupancy requirement. 1.2. Wetlands and Rare Species There is a wetland system and river to the east of the site. The entire buffer zone for the wetland system is located off site. A portion of the riverfront buffer zone is located within the existing parking lot. A copy of the Wetland and Watercourse Evaluation Report for this site can be provided if requested. An analysis of rare and endangered species, vernal pools, regulated floodplain, drinking water resources, areas of protected open space, and Areas of Critical Environmental Concern was conducted based on available GIS data, field observations and coordination with the US Fish and Wildlife Service. Based on this analysis there are no rare and endangered species, vernal pools, regulated floodplain, drinking water resources, areas of Special Permit with Site Plan Application January 14, 2023 Proposed Development, Northampton, MA 100 Constitution Plaza ▪ Hartford, CT 06103 ▪ T (860) 249-2200 ▪ F (860) 249-2400 ▪ www.blcompanies.com protected open space, and Areas of Critical Environmental Concern within 100 feet of the limit of work. 1.3. Historic Resources According to the Massachusetts Cultural Resources Information System provided by the Massachusetts Historical Commission (MHC) there are no historic sites within the project area. A copy of the MHC search results can be provided upon request. 2. Proposed Development The existing parcels will be re-configured into three new lots with new lot interior lot lines. The Applicant will submit a separate permit for the lot consolidation. Work for their proposed development shall include construction of one building of approximately ±14,200 square feet (s.f.) automobile dealership facility. Site improvements include new parking and circulation areas, a shared driveway, site grading, utility connections, a stormwater management system, site lighting and landscaping. The driveway aisles have been sized to accommodate the applicable vehicles. The wider driver aisle (30’ total width) have been sized to accommodate a Car Carrier Trailer (see Sheet 1.20 of the plan set). The 24’ wide drive aisles have been sized to accommodate a SU-40 truck. Site grading has been designed to maintain a 4% maximum slope through the paved areas to provide safe access in all weather conditions. Areas immediately surrounding paved areas have a maximum slope of 5% to provide access to vehicle drivers. Perimeter grading tie-ins vary from 1% minimum to a maximum of 33.33% for slope stability. 2.1. Project Schedule The Applicant would like to begin construction as soon as possible. It is anticipated that it will take 12 months to complete construction. The expected initial occupancy of building will occur in early 2025. 2.2. Municipal Services & Infrastructure 2.2.1. Electric, Cable & Data It is anticipated that the dealership facility will have a three phase, 480 volt underground electric service. The facility will connect to a utility pole along the east side of King Street through an underground duct bank. New underground telephone and data services will generally run in the same trench as the electrical services. Special Permit with Site Plan Application January 14, 2023 Proposed Development, Northampton, MA 100 Constitution Plaza ▪ Hartford, CT 06103 ▪ T (860) 249-2200 ▪ F (860) 249-2400 ▪ www.blcompanies.com 2.2.2. Gas There is an existing 6” gas main in King Street. The proposed gas service for the dealership facility will connect to the main in King Street and run to the proposed meter location near the northwest corner of the building 2.2.3. Sewer King Street contains a 6” PVC sewer main across the southwest frontage of the site. The proposed sanitary sewer service for the dealership facility will connect to an existing manhole at the end of the existing 6” sewer line, continuing in a 10” line towards Finn Street. The facility will connect to the existing manhole via a 6” sewer line. 2.2.4. Domestic Water & Fire Suppression The Project includes a new 2-inch copper domestic water service and a new 4-inch ductile iron fire service. The proposed domestic water service and fire service for the automobile dealership shall connect into the existing 10-inch water main in King Street. The proposed domestic water service and fire service will connect into the northeast corner of the proposed building. 2.2.5. Stormwater Stormwater runoff from the newly paved areas will be collected in deep sump and hooded catch basins, treated in a hydrodynamic separator for total suspended solids removal and treated in a Jellyfish Filter for phosphorus removal. Stormwater from the site will be discharged into the City’s existing Storm Drain system. Further details of the proposed stormwater management system are provided in the Stormwater Management Report which is included with this submission under a separate cover. 2.2.6. Site Lighting Site lighting is provided through the developed area of the site through a combination of pole mounted lights and building wall mounted lights. Pole mounted lights are to be installed at 16’-0” above grade, the maximum height allowable per the city Zoning Regulations. Building mounted lights are to be mounted at 14’-0” above grade. The site has an average light level of approximately 2.0 footcandles to provide for driver and pedestrian safety as well as security. Per city Zoning Regulations, there is no light spillage across property lines and the maximum light intensity on site is 5 footcandles. Special Permit with Site Plan Application January 14, 2023 Proposed Development, Northampton, MA 100 Constitution Plaza ▪ Hartford, CT 06103 ▪ T (860) 249-2200 ▪ F (860) 249-2400 ▪ www.blcompanies.com 2.2.7. Landscaping The site landscaping plan was thoughtfully designed to both complement the commercial nature of the development and enhance the condition of the site. The proposed landscape design includes a variety of trees, shrubs, and grasses strategically placed throughout the site. An irrigation system is included as part of the proposed work to ensure the longevity of the plantings. 2.2.8. Traffic As discussed earlier the parcel will be reconfigured into 3 new lots and the majority proposed development will take place on Lots 2 and 3 (see Plan set). The proposed development includes re-using the existing curb cut on King Street as a shared driveway entrance and the construction of a new curb cut onto King Street to provide an exit and safe travel path for emergency vehicles. All driveway aisles are a minimum of 24’ wide. There will be (70) seventy traditional parking spaces for employees, customers or service spaces and these will be 9’x18’. It is worth noting that the site will contain 140 inventory storage spaces at a minimum of 8.5’ x 16’ however these will only be used to store inventory. A Traffic Study was prepared by BL Companies to analyze the impacts the proposed development will have on the nearby road network. The Traffic Study recommended the following improvements to support the proposed development: 1) Install mast arm assembly and appropriate traffic signal equipment at the intersection of King Street, Finn Street and the site’s proposed shared driveway; 2) Restripe Finn Street to support access to the proposed shared driveway. Finn Street should be restriped to one exclusive left turn land and on shared right turn through lane; 3) King Street Southbound be restriped to one exclusive right turn land and one shared through/left turn lane; 4) Optimize signal timings of the intersection of King Street, Finn Street and the proposed shared driveway; 5) add “no left turn” sign (R3-2) at the exit only driveway. The Applicant has hired Fuss & O’Neil to prepare plans to address these recommendations and they will be submitted to the City for approval. 3. Compliance with Northampton Special Permit and Site Plan Criteria 3.1. Compliance with Special Permit and/or Site Plan Criteria 1. Will protect adjoining premises from seriously detrimental uses. The proposed project replaces an existing parking lot and previously demolished concrete building foundation with a new building with a generously landscaped site Special Permit with Site Plan Application January 14, 2023 Proposed Development, Northampton, MA 100 Constitution Plaza ▪ Hartford, CT 06103 ▪ T (860) 249-2200 ▪ F (860) 249-2400 ▪ www.blcompanies.com with native plantings. It is thoughtfully designed to improve the aesthetics of the area with negatively impacting the adjoining parcels. 2. Will minimize and mitigate traffic impacts. The proposed project includes the reconfiguration of 4 existing parcels into 3 new parcels: Lot 1, Lot 2 and Lot 3. The majority of the proposed development will occur on proposed Lots 2 and 3. One new curb cut is proposed along King Street within the limits of Lot 2. This new curb cut has been designed as an exit only, right turn only access points and is necessary to allow emergency vehicles to safely access Lot 2. The existing curb cut along King Street (which is within the limits of Lot 3) will be used as a shared driveway for Lots 1, 2 and 3. An access easement agreement is being prepared for the shared driveway. There will be minor modifications to the existing curb cut in King Street. It is reasonable to assume that a curb cut for Lot 1 may be required for emergency vehicle access, when this lot is developed. The project will include offsite traffic improvements to minimize any traffic impacts. The offsite traffic improvements are currently being designed and will be submitted to the City for review and approval. Anticipated offsite traffic improvements include: a new traffic light and pavement striping. 3. Promote a harmonious relationship of structures and open space. The proposed building has been carefully designed to match the surrounding area. The project will transform a deteriorating abandoned parking lot into a new modern with commercial development with increased green space. 4. Protect the general welfare. The project includes new ADA accessible sidewalks, ramps, and crosswalks throughout the site to connect pedestrians to the proposed building. The project also includes an ADA accessible pathway to connect the existing sidewalk on King Street to the existing bike path on the rear side of the site, creating a vital connection point. 5. Avoid overloading and mitigate impacts on City resources. The Applicant owns an existing automobile dealership of the same size and car brand within the City of Northampton. This proposed development is intended to replace this existing automobile dealership and therefore, will not overload the City’s existing roadway system. In addition, the project includes offsite traffic improvements to mitigate any impacts on the City's existing roadway system. The Project includes connecting into the City's sanitary sewer and water system. The Project's proposed sanitary sewer and water demands are de minus in comparison to existing City's Special Permit with Site Plan Application January 14, 2023 Proposed Development, Northampton, MA 100 Constitution Plaza ▪ Hartford, CT 06103 ▪ T (860) 249-2200 ▪ F (860) 249-2400 ▪ www.blcompanies.com capacity and will not overload these systems. The proposed stormwater management system will reduce the peak flow rates entering the system and treat stormwater runoff that was previously untreated and un-detained. 6. Promote city planning objectives (see Sustainable Northampton, Open Space Plan, and Transportation Plan). The project will include EV charging stations (in excess of the City’s requirements) and provide conduits for the installation of future EV charging stations to reduce the need for fossil fuels. The project will protect the existing offsite wetland and riverfront area by limiting work with the riverfront area, providing erosion control measures to protect the resource areas during construction, and not disturbing the wetland or wetland buffer zone. The project includes new ADA accessible sidewalks, bike racks, ramps, and crosswalks throughout the site to promote biking and walking. The project also includes an ADA accessible pathway to connect the existing sidewalk on King Street to the existing bike path on the rear side of the site, creating a vital connection point. The building has been designed to comply with the City’s sustainability requirements. 7. Meet all zoning requirements. The proposed development is a permitted use in this zoning district. The proposed building has been designed to be in harmony with the surrounding structures and will significantly improve the existing conditions of the parcels. The project is requesting relief from the minimum building frontage occupancy requirement. 3.2. Site Plan Criteria 1.Minimizing curb cuts, using only one unless traffic safety requires more, and using access from a common driveway shared service road, or existing side street when possible. The proposed project includes the reconfiguration of 4 existing parcels into 3 new parcels: Lot 1, Lot 2 and Lot 3. One new curb cut is proposed along King Street within the limits of Lot 2. This new curb cut has been designed as an exit only, right turn only access points and is necessary to allow emergency vehicles to safely access Lot 2. The existing curb cut along King Street (which is within the limits of Lot 3) will be used as a shared driveway for Lots 1, 2 and 3. An access easement agreement is being prepared for the shared driveway. There will be minor modifications to the existing curb cut in King Street. It is reasonable to assume that a curb cut for Lot 1 may be required for emergency vehicle access, when this lot is developed. It is the Special Permit with Site Plan Application January 14, 2023 Proposed Development, Northampton, MA 100 Constitution Plaza ▪ Hartford, CT 06103 ▪ T (860) 249-2200 ▪ F (860) 249-2400 ▪ www.blcompanies.com intent that each parcel will have one curb cut. The project will include offsite traffic improvements to minimize any traffic impacts. 2.Separation on-site of pedestrians, bicycles, and vehicles The new ADA accessible sidewalks, crosswalks and ADA ramps proposed throughout the site, will provide pedestrians a safe separated connection to the proposed building. In addition the new sidewalks connect the existing sidewalk in King Street to the existing bike path along the rear side of the property. The new bike racks have been proposed in a location that is convenient to the building entrance and provides separation from the vehicle traffic and parking. 3.Reducing parking demand and reducing the number of required parking spaces (provide detail on any request to reduce the number of parking spaces). The proposed parking lot is suitable for the proposed building use and is in excess of the City’s required parking count. The Applicant is requesting a reduction in required parking spaces. 3.3. Site Plan – Onsite Traffic Describe in detail how your project will avoid traffic conflicts where traffic accesses your site, including any traffic mitigation at your curb cut. The proposed project includes the reconfiguration of 4 existing parcels into 3 new parcels: Lot 1, Lot 2 and Lot 3. One new curb cut is proposed along King Street within the limits of Lot 2. This new curb cut has been designed as an exit only, right turn only access points and is necessary to allow emergency vehicles to safely access Lot 2. The new curb cut has been designed will curb radii that would prohibit a left hand turn from this exit. The existing curb cut along King Street (which is within the limits of Lot 3) will be used as a shared driveway for Lots 1, 2 and 3. An access easement agreement is being prepared for the shared driveway. There will be minor modifications to the existing curb cut in King Street, however the width of the curb cut will not change. It is reasonable to assume that a curb cut for Lot 1 may be required for emergency vehicle access, when this lot is developed. It is the intent that each parcel will have one curb cut. 3.4. Site Plan – Offsite Traffic 1.Providing off-site traffic improvements or public bicycle and pedestrian improvements that reduce traffic to mitigate for your projects traffic. Special Permit with Site Plan Application January 14, 2023 Proposed Development, Northampton, MA 100 Constitution Plaza ▪ Hartford, CT 06103 ▪ T (860) 249-2200 ▪ F (860) 249-2400 ▪ www.blcompanies.com A traffic study was completed for this project (it is included with this application) and determined the following offsite traffic improvements will be needed to avoid traffic conflicts: a new traffic light at the shared driveway entrance point (existing curb cut); and pavement striping. The offsite traffic improvements are currently in the design phase and will be submitted to the City for review when completed. The project includes the installation of bike racks and public benches at key locations onsite. In addition the proposed work includes a new walkway that will connect the existing sidewalk in King Street to the existing bike path along the rear side of the site. The new sidewalks, bike racks and benches encourage walking and bicycle to the property. 2.Paying payment-in-lieu of traffic, bicycle, and pedestrian improvements in accordance with the Zoning. No payment-in-lieu is proposed for this site. Offsite traffic improvements, bike racks, benches, and a connection to the existing bike path along the rear of the site are proposed. 3. Providing clear documentation as to why your project does not generate new traffic. The Applicant owns an existing automobile dealership of the same size and car brand within the City of Northampton. This proposed development is intended to replace this existing automobile dealership and therefore, will not generate new traffic to the City. Offsite traffic improvements are proposed to mitigate any impacts to King Street and the Project’s curb cuts. 4. Summary The project has been thoughtfully planned to meet project goals and minimize potential impacts to the surrounding area. The proposed project has been designed in accordance with the current zoning regulations. The project will provide an aesthetically appealing and energy efficient development, create jobs and generate revenue for the City. In consideration of this information we are asking the City of Northampton Planning Commission to approve the proposed development at 171-187 King Street. Special Permit with Site Plan Application January 14, 2023 Proposed Development, Northampton, MA 100 Constitution Plaza ▪ Hartford, CT 06103 ▪ T (860) 249-2200 ▪ F (860) 249-2400 ▪ www.blcompanies.com APPENDIX A Site Plan KING STREET±±±±SITE PLAN LEGEND1" = 40'SITEPLANC1.01DesignedReviewedProject No.ScaleDrawnDate230098601/15/2024Desc. REVISIONS DateNo.TitleNORTHAMPTON, HAMPSHIRE COUNTY, MASSACHUSETTS 171-187 KING STREETSheet No.Xref (s): ; XC230098601 ; BD230098601 ; XZ230098602 CAD File:SP2300986011/17/2024, LENNIS, G:\JOBS23\08\2300986\DWG\SP230098601.DWG.SP-1 24X36 40SC.2024 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.CLand Surveying Environmental Engineering ArchitecturePROPOSED DEVELOPMENT 100 Constitution Plaza(860) 249-2200Hartford, CT 0610310th Floor CONSTRUCTIONNOT RELEASED FOR PERMITTING OR S.M.K.E.A.E.J.N.B. Special Permit with Site Plan Application January 14, 2023 Proposed Development, Northampton, MA 100 Constitution Plaza ▪ Hartford, CT 06103 ▪ T (860) 249-2200 ▪ F (860) 249-2400 ▪ www.blcompanies.com APPENDIX B Location Maps Figure 1: USGS Location Map Figure 2: Aerial Location Map Special Permit with Site Plan Application January 14, 2023 Proposed Development, Northampton, MA 100 Constitution Plaza ▪ Hartford, CT 06103 ▪ T (860) 249-2200 ▪ F (860) 249-2400 ▪ www.blcompanies.com APPENDIX C Abutters List Abutter’s List 1. Parcel 24D-330-001 Massachusetts Electric Company C/O Property Tax Dept. 40 Sylvan Rd Waltham, Ma 02451 2. Parcel 24D-338-001 Cosenzi Automotive Realty Limited Partnership 40 Russell St, PO Box 547 Hadley, MA 01035 3. Parcel 24D-339-001 Standick Trust PO Box 797 Northampton, MA 01061 4. Parcel 32A-236-002 MA Department of Transportation 10 Park Plaza Boston, MA 02116 5. Parcel 24D-092-001 Sullivan DA & Sons, Inc 84 North Street Northampton, MA 01060 6. Parcel 24D-093-001 Rasool Joan M 96 North Street Northampton, MA 01060 7. Parcel 32A-236-001 MA Department of Transportation 10 Park Plaza Boston, MA 02116 8. Parcel 24D-134-001 Zimmerman Kurt R Trustee C/O Wilbraham Tire & Auto 2694 Boston Rd Wilbraham, MA 01095 9. Parcel 24D-136-001 King Enterprises LLC PO Box 447 Northampton, MA 01061 10. Parcel 24D-136-002 Florence Savings Bank PO Box 60700 Florence, MA 01062 11. Parcel 24D-078-001 Massachusetts Electric Company C/O Property Tax Department 40 Sylvan Rd Waltham, MA 02451 12. Parcel 24D-080-001 Cosenzi Automotive Realty Limited Partnership 40 Russell St, PO Box 547 Hadley, MA 01035 13. Parcel 24D-081-001 Cosenzi Automotive Realty Limited Partnership 40 Russell St, PO Box 547 Hadley, MA 01035 14. Parcel 24D-084-001 Standick Trust PO Box 797 Northampton, MA 01061 15. Parcel 24D-121-001 Northampton Rentals LLC PO Box 246 190 Russell Rd Hadley, MA 01035 16. Parcel 24D-159-001 Duprey Nicholas D & Betty L 164 Northampton St Easthampton, MA 01027 17. Parcel 24D-157-001 Duprey Nicholas D & Betty L 8 Grandview Lane Easthampton, MA 01027 18. Parcel 24D-158-001 Canon, Gail M & Canon Colby 26 Ashley Circle Easthampton, MA 01027 19. Parcel 24D-119-001 Northampton Rentals LLC PO Box 246 190 Russell Rd Hadley, MA 01035 20. Parcel 24D-085-001 Kingdon LLC C/O Donald Bernier 9 Arrowhead Drive Hadley, Ma 01035 21. Parcel 24D-091-001 Parshall Timothy & Paul Matylas 76 North Street Northampton, MA 01060 22. Parcel 24D-089-001 Harrington Michael 64 North Street Northampton, MA 01060 23. Parcel 24D-090-001 DevilBiss Jonathan Everett 68 North Street Northampton, MA 01060 Special Permit with Site Plan Application January 14, 2023 Proposed Development, Northampton, MA 100 Constitution Plaza ▪ Hartford, CT 06103 ▪ T (860) 249-2200 ▪ F (860) 249-2400 ▪ www.blcompanies.com APPENDIX D Executed Zoning Permit Application