Rocky Hill Trail CPA Application.pdfPage | 1 COMMUNITY PRESERVATION PROJECT APPLICATION COVER SHEET I: Project Information Project Title: Rocky Hill Greenway Multi-Use Trail Project Summary: $3.6 million in federal earmark funding specifically for multi-use trail construction in Northampton will soon be made available. We are requesting CPA funds to complete and update the final trail design from Route 10 to Route 66 through the Rocky Hill Greenway. Federal funding is available for construction work, but design costs for this portion of the projecy are ineligible. Estimated start date: 2022 Estimated completion date: 2024 CPA Program Area (check all that apply): � Open Space � Historic Preservation � Community Housing X Recreation II: Applicant/Developer Information Contact Person and or/primary applicant: Carolyn Misch Property Owner (if applicable): Northampton Conservation Commission Organization (if applicable): Office of Planning and Sustainability Mailing Address: City Hall, 210 Main Street, Northampton MA 01060 Daytime phone #: (413)587-1287 Fax #: (413)587-1264 E-mail address & Website: cmisch@northamptonma.gov Northamptonma.gov/plan III: Budget Summary Total budget for project: $3,600,000 CPA funding request: $60,000 CPA request as percentage of total budget: 1.7% Applicant’s Signature: Date Submitted: September 15, 2022 Page | 2 Narrative: Project location – Rocky Hill Greenway, Parcel ID 37-049, to connect Rocky Hill Road/Rt 66 with the New Haven-Northampton Canal Greenway just north of the Easthampton Road/Rt 10 crossing. The Rocky Hill Greenway Trail will be a 2,630 linear foot (0.50 mile) multi-use trail designed as a spur trail to connect two existing trails in the area. The area is located entirely within a City-owned parcel situated between Rocky Hill Road (MA Route 66) and Easthampton Road (MA Route 10). The proposed trail project will improve pedestrian and bicycle facilities by connecting the residential areas along Rocky Hill Road and Ice Pond Drive to the New Haven and Northampton Canal / Manhan Rail Trail. Bicyclists and pedestrians will benefit from being able to connect to these corridors more directly and with limited interaction with vehicular traffic, providing a safer and more direct route to the existing rail trail. Additionally, it will provide access to an eventual multi-use trail serving the southwestern and western half of the City, where the network is slowly expanding, but is largely not currently served by any multi-use trails. The proposed Rocky Hill Greenway Multi-Use Trail will support the City’s recreational goals by adding to the existing network of bike paths in the region and encouraging non- motorized travel, advancing the goals of the City of Northampton Open Space, Recreation, and Multi-Use Trail Plan (2018-2025). This Plan seeks (among other goals) to maintain vibrant urban centers, develop multi-use trails for easy public access, and create recreational opportunities while protecting valuable habitat and natural resources. The Open Space, Recreation & Multi-Use Trail Plan is an adoptive component of the Sustainable Northampton Comprehensive Plan (2008) and has been adopted or endorsed by a number of City Boards and approved by the Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs. By implementing this project, the City will progress toward three of the major goals outlined in the Massachusetts Department of Transportation (MassDOT) 2012 GreenDOT Implementation Plan, which include: • Design of multi-modal transportation system; • Promoting healthy transportation and livable communities; and • Tripling of the bicycle and pedestrian transportation modes. The project also supports the seven-corridor, 788-mile statewide system of bicycling routes, known as the Bay State Greenway. A pilot sign program in the Pioneer Valley is currently underway, linking a number of off-road paths and on-road routes in Massachusetts and connecting to systems in Connecticut and Vermont. Page | 3 The trail will be constructed of bituminous asphalt pavement and will vary in width between 10 and 16 feet to accommodate site conditions. At its northern end, off of Rocky Hill Road, the trail will following the existing gravel driveway and will be 16 feet wide; this portion of the trail will act as a shared multi-use trail and driveway, allowing restricted vehicle access to the existing gas pumping station. The trail will then narrow to ten feet in width at the wetland crossing, and will be limited to pedestrians and bicycles for the remaining length of the spur trail to the junction with the existing Manhan Rail Trail. Partially using CPA funding, the City engaged a consultant to complete trail design to the 25% level, and secure all necessary environmental permits. These documents helped to secure $3.6 million in federal funding for trail construction. CPA funds are now requested to engage an engineering consultant to finalize and update the plans to include design requirement changes, implemented since drafts were completed several years ago, and to review bids and oversee construction. A relatively small investment of City funds will be able to fully complete the trail to a ribbon cutting. The project meets many of the general review criteria for project evaluation: Serves more than one CPA program area While specifically a recreation project, the work will also enhance an open space area Contributes to the preservation of Northampton’s unique character, boosts the vitality of the community, and enhances the quality of life for its residents Northampton is well-known for its network of off-road multi-use trails. This trail, which will be open to hiking, walking, running, mountain biking, bicycling, cross country skiing, snow shoeing, roller blading, and dog walking, will tie into that network and provide additional meaningful opportunities for safe commuting and recreation options. Addresses recommendations contained in the Sustainable Northampton comprehensive plan and/or the Northampton Open Space, Recreation, and Mixed Use Trail Plan or is consistent with other city-wide planning efforts that have received broad-based scrutiny and input and can demonstrate wide community support Places high value on sustainable, ecologically responsible, energy-conserving structures, locations, and materials; demonstrates that the project minimizes the ecological footprint Receives endorsement by community groups, municipal boards and/or departments, and City residents. The project is presented by the Office of Planning and Sustainability, and is supported by the Massachusetts Audubon Society, who holds the restriction on the property, and Friends of Northampton Trails and Greenways Leverages additional public and/or private funds, or demonstrates that other funding sources are not readily available or sufficient Demonstrates a high benefit/cost value Can be implemented expeditiously and within budget Page | 4 The project also meets all of the recreational projects evaluation criteria: 1. Support multiple active and passive recreation uses; 2. Serve a significant number of residents; 3. Expand the range of recreational opportunities available to Northampton residents of all ages 4. Enhance the appreciation of the natural world and its conservation 5. Contribute to the positive health status of its citizens 6. Benefit conservation and recreation initiatives 7. Maximize the utility of land already owned by Northampton (e.g. school property) 8. Promote the creative use of former railway, waterways and other corridors, including connecting corridors, to create safe and healthful non-motorized transportation and exercise opportunities 9. Expand recreational opportunities for those segments of the population that are underserved given the current location of existing recreational lands and unique needs of different segments of the community 10. Accomplish any of the preceding by restoring or rehabilitating existing facilities or lands to serve their intended purpose 11. Incorporate environmentally friendly design and long-term maintenance 12. Have the support of the Northampton Recreation Commission and other groups and partners involved in recreation Attachments: Notice of Intent Application, including maps and photos Draft Design Plans Support Letters to be provided as received ROCKY HILL GREENWAY BEGIN STA 0+00 N2938622.3721 E341979.7527 ROCKY HILL GREENWAY END STA 26+06.05 N2937480.3488 E343502.5523 608413_SV1(COVER SHEET).DWG21-Dec-2018 2:39 PMPlotted onFED. AID PROJ. NO.TOTALSHEETSSTATE MA PROJECT FILE NO. -1 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 TITLE SHEET LENGTH OF PROJECT = 2610 FEET = 0.49 MILES MASSACHUSETTS DEPARTMENT OF TRANSPORTATION SHEETNO. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE RECOMMENDED FOR APPROVAL APPROVED IN THE CITY OF HAMPSHIRE COUNTY NORTHAMPTON HIGHWAY DIVISION PLAN OF HIGHWAY ADMINISTRATOR DATE DESCRIPTION REV # 25% PERMITTING SUBMITTAL 500 SCALE: 1" = 500' 0 1000 1500 2000 ROCKY HILL GREENWAY MULTI USE TRAIL PROJECT LOCATION ROUTE 66 ICE POND DR . MANHA N R AI L T R AI L DESIGN DESIGNATION DESIGN SPEED N/A ADT (2004)N/A ADT (DESIGN YEAR)N/A K N/A D N/A T (PEAK HOUR)N/A T (AVERAGE DAY)N/A DHV N/A DDHV N/A FUNCTIONAL CLASSIFICATION N/A ROUTE 10 N NOTE: HORIZONTAL DATUM IS MASS GRID. Sustainable Environmental Solutions www.horsleywitten.com 90 Route 6A Sandwich, MA 02563 508-833-6600 voice 508-833-3150 fax Horsley Witten Group, Inc. THE MASSACHUSETTS HIGHWAY DEPARTMENT STANDARD SPECIFICATIONS FOR HIGHWAYS AND BRIDGES DATED 1988, AS AMENDED, THE SUPPLEMENTAL SPECIFICATIONS DATED JULY 01, 2015, THE 2017 CONSTRUCTION STANDARD DETAILS, THE 1996 CONSTRUCTION AND TRAFFIC STANDARD DETAILS, (AS RELATED TO TRAFFIC STANDARD DETAILS ONLY), THE LATEST MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS WITH MASSACHUSETTS AMENDMENTS, THE 1990 STANDARD DRAWINGS FOR SIGNS AND SUPPORTS, THE 1968 STANDARD DRAWINGS FOR TRAFFIC SIGNALS AND HIGHWAY LIGHTING, AND THE LATEST EDITION OF THE AMERICAN STANDARD FOR NURSERY STOCK, WILL GOVERN. ROCKY HI L L R O A D PROPOSED 506FT MULTI-USE PATH 10/8/2018 ADDRESSED REVIEW COMMENTS 1 Sheet List Table Sheet Number Sheet Number 1 TITLE SHEET 2 LEGEND 3 TYPICAL SECTIONS 4 DETAILS (1) 5 DETAILS (2) 6 DETAILS (3) 7 DETAILS (4) 8 BASE PLAN (1) 9 BASE PLAN (2) 10 CONSTRUCTION PLANS (1) 11 CONSTRUCTION PLANS (2) 12 CONSTRUCTION PLANS (3) 13 GRADING PLAN (1) 14 GRADING PLAN (2) 15 GRADING PLAN (3) 16 ROCKY HILL GREENWAY PROFILE PLAN (1) 17 ROCK HILL GREENWAY PROFILE PLAN (2) 18 ROCKY HILL RD MULTI-USE PATH PROFILE PLAN 19 SIGNS AND MARKINGS PLAN (1) 20 SIGNS AND MARKINGS PLAN (2) 21 TRAFFIC SIGNAGE DETAILS 22 TRAFFIC MANAGEMENT (1) 23 TRAFFIC MANAGEMENT (2) 24 ROCKY HILL GREENWAY CROSS SECTIONS (1) 25 ROCKY HILL GREENWAY CROSS SECTIONS (2) 26 ROCKY HILL GREENWAY CROSS SECTIONS (3) 27 ROCKY HILL GREENWAY CROSS SECTIONS (4) 28 ROCKY HILL GREENWAY CROSS SECTIONS (5) 29 ROCKY HILL GREENWAY CROSS SECTIONS (6) 30 ROCKY HILL GREENWAY CROSS SECTIONS (7) 31 ROCKY HILL GREENWAY CROSS SECTIONS (8) 32 ROCKY HILL GREENWAY CROSS SECTIONS (9) 33 ROCKY HILL GREENWAY CROSS SECTIONS (10) 34 ROCKY HILL GREENWAY CROSS SECTIONS (11) 35 ROCKY HILL GREENWAY CROSS SECTIONS (12) 36 ROCKY HILL RD MULTIUSE PATH CROSS SECTIONS 12/21/2018 ADDRESSED CRM COMMENTS 2 608143_HD2(LAYOUT).DWG8-Jun-2015 12:12 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -2 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 LEGEND TRAFFIC SYMBOLS EXISTING PROPOSED DESCRIPTION CONTROLLER PHASE ACTUATED TRAFFIC SIGNAL HEAD (SIZE AS NOTED) WIRE LOOP DETECTOR (6' x 6' TYP UNLESS OTHERWISE SPECIFIED) VIDEO DETECTION CAMERA MICROWAVE DETECTOR PEDESTRIAN PUSH BUTTON, SIGN (DIRECTIONAL ARROW AS SHOWN) AND SADDLE EMERGENCY PREEMPTION CONFIRMATION STROBE LIGHT VEHICULAR SIGNAL HEAD VEHICULAR SIGNAL HEAD, OPTICALLY PROGRAMMED FLASHING BEACON PEDESTRIAN SIGNAL HEAD, (TYPE AS NOTED OR AS SPECIFIED) RAILROAD SIGNAL SIGNAL POST AND BASE (ALPHA-NUMERIC DESIGNATION NOTED) MAST ARM, SHAFT AND BASE (ARM LENGTH AS NOTED) HIGH MAST POLE OR TOWER SIGN AND POST SIGN AND POST (2 POSTS) MAST ARM WITH LUMINAIRE OPTICAL PRE-EMPTION DETECTOR CONTROL CABINET, GROUND MOUNTED CONTROL CABINET, POLE MOUNTED FLASHING BEACON CONTROL AND METER PEDESTAL LOAD CENTER ASSEMBLY PULL BOX 12"x12" (OR AS NOTED) ELECTRIC HANDHOLE 12"x24" (OR AS NOTED) TRAFFIC SIGNAL CONDUIT PAVEMENT MARKINGS SYMBOLS EXISTING PROPOSED DESCRIPTION PAVEMENT ARROW - WHITE LEGEND "ONLY" - WHITE STOP LINE CROSSWALK SOLID WHITE LINE SOLID YELLOW LINE BROKEN WHITE LINE BROKEN YELLOW LINE DOTTED WHITE LINE DOTTED YELLOW LINE DOTTED WHITE LINE EXTENSION DOTTED YELLOW LINE EXTENSION DOUBLE WHITE LINE DOUBLE YELLOW LINE ABBREVIATIONS GENERAL AADT ANNUAL AVERAGE DAILY TRAFFIC ABAN ABANDON ADJ ADJUST APPROX. APPROXIMATE A.C.ASPHALT CONCRETE ACCM PIPE ASPHALT COATED CORRUGATED METAL PIPE BIT.BITUMINOUS BC BOTTOM OF CURB BD.BOUND BL BASELINE BLDG BUILDING BM BENCHMARK BO BY OTHERS BOS BOTTOM OF SLOPE BR.BRIDGE CB CATCH BASIN CBCI CATCH BASIN WITH CURB INLET CC CEMENT CONCRETE CCM CEMENT CONCRETE MASONRY CEM CEMENT CI CURB INLET CIP CAST IRON PIPE CLF CHAIN LINK FENCE CL CENTERLINE CMP CORRUGATED METAL PIPE CSP CORRUGATED STEEL PIPE CO.COUNTY CONC CONCRETE CONT CONTINUOUS CONST CONSTRUCTION CR GR CROWN GRADE DHV DESIGN HOURLY VOLUME DI DROP INLET DIA DIAMETER DIP DUCTILE IRON PIPE DW STEADY DON'T WALK - PORTLAND ORANGE DWY DRIVEWAY ELEV (or EL.)ELEVATION EMB EMBANKMENT EOP EDGE OF PAVEMENT EXIST (or EX)EXISTING EXC EXCAVATION F&C FRAME AND COVER F&G FRAME AND GRATE FDN. FOUNDATION FLDSTN FIELDSTONE GAR GARAGE GD GROUND GG GAS GATE GI GUTTER INLET GIP GALVANIZED IRON PIPE GRAN GRANITE GRAV GRAVEL GRD GUARD HDW HEADWALL HMA HOT MIX ASPHALT HOR HORIZONTAL HYD HYDRANT INV INVERT JCT JUNCTION L LENGTH OF CURVE LB LEACH BASIN LP LIGHT POLE LT LEFT MAHW MEAN ANNUAL HIGH WATER MAX MAXIMUM MB MAILBOX MH MANHOLE MHB MASSACHUSETTS HIGHWAY BOUND MIN MINIMUM NIC NOT IN CONTRACT NO.NUMBER OCS OUTLET CONTROL STRUCTURE PC POINT OF CURVATURE PCC POINT OF COMPOUND CURVATURE P.G.L. PROFILE GRADE LINE PI POINT OF INTERSECTION POC POINT ON CURVE POT POINT ON TANGENT PRC POINT OF REVERSE CURVATURE PROJ PROJECT PROP PROPOSED PSB PLANTABLE SOIL BORROW PT POINT OF TANGENCY PVC POINT OF VERTICAL CURVATURE PVI POINT OF VERTICAL INTERSECTION PVT POINT OF VERTICAL TANGENCY ABBREVIATIONS (cont.) GENERAL PVMT PAVEMENT PWW PAVED WATER WAY R RADIUS OF CURVATURE R&D REMOVE AND DISPOSE RCP REINFORCED CONCRETE PIPE RD ROAD RDWY ROADWAY REM REMOVE RET RETAIN RET WALL RETAINING WALL ROW RIGHT OF WAY RR RAILROAD R&R REMOVE AND RESET R&S REMOVE AND STACK RT RIGHT SB STONE BOUND SHLD SHOULDER SMH SEWER MANHOLE ST STREET STA STATION SSD STOPPING SIGHT DISTANCE SHLO STATE HIGHWAY LAYOUT LINE SW SIDEWALK T TANGENT DISTANCE OF CURVE/TRUCK % TAN TANGENT TEMP TEMPORARY TC TOP OF CURB TOS TOP OF SLOPE TYP TYPICAL UP UTILITY POLE VAR VARIES VERT VERTICAL VC VERTICAL CURVE WCR WHEEL CHAIR RAMP WG WATER GATE WIP WROUGHT IRON PIPE WM WATER METER/WATER MAIN X-SECT CROSS SECTION TRAFFIC SIGNAL CAB. CABINET CCVE CLOSED CIRCUIT VIDEO EQUIPMENT DW STEADY DON'T WALK FDW FLASHING DON'T WALK FR FLASHING CIRCULAR RED FRL FLASHING RED LEFT ARROW FRR FLASHING RED RIGHT ARROW FY FLASHING CIRCULAR AMBER FYL FLASHING AMBER LEFT ARROW FYR FLASHING AMBER RIGHT ARROW G STEADY CIRCULAR GREEN GL STEADY GREEN LEFT ARROW GR STEADY GREEN RIGHT ARROW GSL STEADY GREEN SLASH LEFT ARROW GSR STEADY GREEN SLASH RIGHT ARROW GV STEADY GREEN VERTICAL ARROW OL OVERLAP PED PEDESTRIAN PTZ PAN, TILE, ZOOM R STEADY CIRCULAR RED RL STEADY RED LEFT ARROW RR STEADY RED RIGHT ARROW TR SIG TRAFFIC SIGNAL TSC TRAFFIC SIGNAL CONDUIT W STEADY WALK Y STEADY CIRCULAR AMBER YL STEADY AMBER LEFT ARROW DBYL DBWL BWL SWL CW ONLY SL DYLEx DWLEx DYL BYL DWL SYL 20' 20' 1 M* RRSG GENERAL SYMBOLS EXISTING PROPOSED DESCRIPTION JERSEY BARRIER CATCH BASIN CATCH BASIN CURB INLET FLAG POLE GAS PUMP MAIL BOX POST SQUARE POST CIRCULAR WELL ELECTRIC HANDHOLE FENCE GATE POST GAS GATE BORING HOLE MONITORING WELL TEST PIT HYDRANT LIGHT POLE COUNTY BOUND GPS POINT CABLE MANHOLE DRAINAGE MANHOLE ELECTRIC MANHOLE GAS MANHOLE MISC MANHOLE SEWER MANHOLE TELEPHONE MANHOLE WATER MANHOLE MASSACHUSETTS HIGHWAY BOUND MONUMENT STONE BOUND TOWN OR CITY BOUND TRAVERSE OR TRIANGULATION STATION TROLLEY POLE OR GUY POLE TRANSMISSION POLE UTILITY POLE W/ FIREBOX UTILITY POLE WITH DOUBLE LIGHT UTILITY POLE W / 1 LIGHT UTILITY POLE BUSH TREE STUMP SWAMP / MARSH WATER GATE PARKING METER OVERHEAD CABLE/WIRE CURBING CONTOURS (ON-THE-GROUND SURVEY DATA) CONTOURS (PHOTOGRAMMETRIC DATA) UNDERGROUND DRAIN PIPE (DOUBLE LINE 24 INCH AND OVER) UNDERGROUND ELECTRIC DUCT (DOUBLE LINE 24 INCH AND OVER) UNDERGROUND GAS MAIN (DOUBLE LINE 24 INCH AND OVER) UNDERGROUND SEWER MAIN (DOUBLE LINE 24 INCH AND OVER) UNDERGROUND TELEPHONE DUCT (DOUBLE LINE 24 INCH AND OVER) UNDERGROUND WATER MAIN (DOUBLE LINE 24 INCH AND OVER) BALANCED STONE WALL GUARD RAIL - STEEL POSTS GUARD RAIL - WOOD POSTS CHAIN LINK OR METAL FENCE WOOD PEDESTRIAN BARRIER HAY BALES/SILT FENCE TREE LINE SAWCUT LINE TOP OR BOTTOM OF SLOPE LIMIT OF EDGE OF PAVEMENT OR COLD PLANE AND OVERLAY BANK OF RIVER OR STREAM BORDER OF WETLAND 100 FT WETLAND BUFFER 200 FT RIVERFRONT BUFFER STATE HIGHWAY LAYOUT TOWN OR CITY LAYOUT COUNTY LAYOUT RAILROAD SIDELINE TOWN OR CITY BOUNDARY LINE PROPERTY LINE OR APPROXIMATE PROPERTY LINE EASEMENT COMPOST SOCK TURTLE FENCE / SILT FENCE JB CB FP GP MB WELL EHH GG BHL # MW # TP # MHB TPL or GUY UFB UPDL ULT UPL WG PM CB SF 20' 608143_HD4(DETAILS).DWG21-Dec-2018 2:40 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -3 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 TYPICAL SECTIONS TYPICAL 16' ROCKY HILL GREENWAY MULTI-USE TRAIL / DRIVEWAY CROSS SECTION STA 0+05.55 TO 7+77.39 NOT TO SCALE TYPICAL 10' ROCKY HILL GREENWAY MULTI-USE PATH W/ SWALE CROSS SECTION STA 10+35.83 TO STA 13+85.99 NOT TO SCALE PAVEMENT NOTES PROPOSED FULL DEPTH PAVEMENT SURFACE COURSE: 1-1/2" SUPERPAVE - 9.5 (SSC-9.5) OVER INTERMEDIATE COURSE: 2" SUPERPAVE - 19.0 (SIC-19.0) OVER BASE:8" GRAVEL BORROW (M1.03.0) TYPE B TYPICAL 10' ROCKY HILL GREENWAY MULTI-USE PATH W/ SWALE CROSS SECTION STA 23+00.00 TO STA 25+99.78 NOT TO SCALE 10' PAVED TRAIL ℄ COMPACTED BASE (SEE PAVEMENT DETAIL) 1.5% +/- 0.5%1.5% +/- 0.5% 1:6MAX 1.5' WIDE VEGETATED GRASS SWALE 1:4 TYP. 9" TYP. GRASS SHOULDER 2'2'6' TYP. 10' PAVED TRAIL ℄ COMPACTED BASE(SEE PAVEMENT DETAIL) 1.5% +/- 0.5%1.5% +/- 0.5% 1:6 MAX 1.5' WIDE VEGETATED GRASS SWALE 1:4 TYP. 9"TYP. GRASS SHOULDER 2'2'6' TYP. 3:1 MAX. SIDE SLOPE TO EXISTING GRADE 2:1 MAX. SIDE SLOPETO EXISTING GRADE 16' PAVED TRAIL ℄ 1.5% +/- 0.5% GRASS SHOULDER GRASS SHOULDER 3:1 MAX. SIDE SLOPETO EXISTING GRADE COMPACTED BASE (SEE PAVEMENT DETAIL) 2'2' TYPICAL 10' ROCKY HILL GREEN WAY MULTI-USE TRAIL CROSS SECTION STA 7+77.39 TO 10+35.83 & STA 13+85.99 TO STA 15+50.00 & STA 17+50.00 TO 23+00.00 NOT TO SCALE 10' PAVED TRAIL ℄ 1.5% +/- 0.5% GRASS SHOULDER GRASSSHOULDER 3:1 MAX. SIDE SLOPE TO EXISTING GRADE COMPACTED BASE (SEEPAVEMENT DETAIL) 2'2' GRASS SHOULDER GRASS SHOULDER TYPICAL ROCKY HILL RD MULTI-USE PATH W/ RETAINING WALL CROSS SECTION STA 4+80.00 TO STA 5+69.00 NOT TO SCALE 8' PAVED TRAIL 1:6MAX ℄ 2' BLOCK RETAINING WALL GRASS SHOULDER WOOD PEDESTRIAN BARRIER COMPACTED SUBBASE (SEE PAVEMENT DETAIL) 1.5% +/- 0.5% MATCH TO EXISTING GRADE TYPICAL ROCKY HILL RD MULTI-USE PATH CROSS SECTION STA 0+00.00 TO STA 2+19.00 & STA 3+50.00 TO STA 4+80.00 NOT TO SCALE 8' PAVED TRAIL 1:6MAX ℄ 2'GRASS SHOULDER COMPACTED SUBBASE(SEE PAVEMENT DETAIL) 1.5% +/- 0.5% MATCH TO EXISTING GRADE TYPICAL ROCKY HILL RD MULTI-USE PATH W/ MODIFIED STONE CROSS SECTION STA 2+19.00 TO STA 3+50.00 NOT TO SCALE 1' +/- GENERAL NOTES:1.SUB-GRADE (EXISTING MATERIAL) SHALL CONSIST OF INERT MATERIAL THAT IS HARD, DURABLE STONEAND/OR COARSE SAND, FREE FROM LOAM AND CLAY. EXCAVATE SANDY-LOAM AND/OR LOAMY-SANDTOPSOIL MATERIAL FROM ALL PAVED AREAS PRIOR TO SUB-BASE INSTALLATION.3.COMPACT SUB-GRADE FILL TO 95% COMPACTION.4.COMPACT BASE COURSE TO 95% COMPACTION.5.SEE SITE LAYOUT PLAN FOR PAVEMENT WIDTH AND LOCATION.6.SEE GRADING PLANS FOR PAVEMENT SLOPE AND CROSS SLOPE.7.SWEEP CLEAN THE INTERMEDIATE COURSE SURFACE BY A STREET SWEEPING MACHINE AND APPLY ATACK COAT PER SPECIFICATIONS, PRIOR TO INSTALLING THE SURFACE COURSE. TYPICAL BITUMINOUS PAVEMENT NOT TO SCALE APPROVED SUBGRADE BASE COURSE: 8" GRAVEL BORROW(M1.03.0 TYPE B) SURFACE COURSE: 1 1/2" SUPERPAVE(SSC-9.5)INTERMEDIATE COURSE: 2" SUPERPAVE(SIC-19.0) TACK COAT HEIGHT VARIES (4' MAX) ROCKY HILL RD MULTI-USE PATH ROCKY HILL GREENWAY MULTI-USE TRAIL REMOVE AND DISCARD EXISTING CURB EXISTING PAVEMENT 4' BIKE LANE EXISTING TRAVEL LANE VARIES FROM 11' TO 12' EXISTING TRAVEL LANE VARIES FROM 11' TO 12' EXISTING 5' BIKE LANE EXISTING GRASS SHOULDER TYPICAL 10' ROCKY HILL GREEN WAY MULTI-USE TRAIL W/ WOOD BARRIER CROSS SECTION STA 15+50.00 TO 17+50.00 NOT TO SCALE 10' PAVED TRAIL ℄ 1.5% +/- 0.5% GRASS SHOULDER GRASSSHOULDER 3:1 MAX. SIDE SLOPE TO EXISTING GRADE COMPACTED BASE (SEEPAVEMENT DETAIL) 2'2' WOOD PEDESTRIANBARRIER VARIES SEE PLAN FOR LOCATION WOOD PEDESTRIAN BARRIER VARIES SEE PLAN FOR LOCATION ℄ NOTES:1. EXISTING ROAD CROSS SECTION VARIES CONTRACTOR TO VERIFY IN THE FIELD. 2. NO CONSTRUCTION IS PROPOSED IN THE EXISTING ROAD. NOTES: 1. EXISTING ROAD CROSS SECTION VARIES CONTRACTOR TO VERIFY IN THE FIELD.2. NO CONSTRUCTION IS PROPOSED IN THEEXISTING ROAD. PAVED SURFACE(SEE PAVEMENT DETAIL) PAVED SURFACE(SEE PAVEMENT DETAIL) 6X18 GRANITE CURB 8' PAVED TRAIL 1:1 MAX ℄ VARIES SEE PLAN MODIFIED STONE SLOPE STABILIZATION COMPACTED SUBBASE (SEE PAVEMENT DETAIL) 1.5% +/- 0.5% MATCH TO EXISTING GRADE REMOVE AND DISCARD EXISTING CURB EXISTING PAVEMENT 4' BIKE LANE EXISTING TRAVEL LANE VARIES FROM 11' TO 12' EXISTING TRAVEL LANE VARIES FROM 11' TO 12' EXISTING 5' BIKE LANE EXISTING GRASS SHOULDER ℄ PAVED SURFACE(SEE PAVEMENT DETAIL) 6X18 GRANITE CURB SURFACE VARIES (SEE SITE PLAN) 608143_HD4(DETAILS).DWG21-Dec-2018 2:40 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -4 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 SECTION · THIS DRAWING PROVIDED BY REDIROCK INTERNATIONAL. DESIGN PARAMETERS, BLOCK SIZE, BLOCKCONFIGURATION ARE SUBJECT TO THE STRUCTURAL ENGINEER AT NOT ADDITION COST TO THE PROJECTDURING SHOP DRAWING PRODUCTION. · FINAL DESIGNS FOR CONSTRUCTION MUST BE PROVIDED BY THE CONTRACTOR AND PREPARED BY A REGISTERED PROFESSIONAL STRUCTURAL ENGINEER USING THE ACTUAL CONDITIONS OF THE PROPOSED SITE. · FINAL WALL DESIGN MUST ADDRESS BOTH INTERNAL AND EXTERNAL DRAINAGE AND SHALL BE EVALUATED BY THE PROFESSIONAL ENGINEER WHO IS RESPONSIBLE FOR THE WALL DESIGN. CRUSHED STONE LEVELING PAD (ASTM NO. 57 OR EQUIVALENT) PERFORATED DRAIN W/ SOCK(GRAVITY DRAIN TO OUTLET) NON-WOVEN GEOTEXTILE FABRIC DRAINSTONE (ASTM NO.57 OR EQUIVALENT)TO EXTEND AT LEAST 12" BEHIND BLOCKS BASE ELEVATION GROUND LEVEL 11'-0" MAX (EXPOSED WALL FACE) 28" TOP BLOCK 1'-0" (LEVELING PAD) 1'-0" (MIN. BURY DEPTH) REDI-ROCK 60" BOTTOM BLOCK GRADE TO DRAIN AWAY FROM WALL.SEE SITE PLAN FOR SURFACE TYPE MOVE BLOCKS FORWARD DURING INSTALLATION TO ENGAGE SHEAR KNOBS (TYPICAL) TYPICAL SEGMENTAL CONCRETE BLOCK RETAINING WALL DETAIL NOT TO SCALE SUITABLE UNDISTURBED OR COMPACTED MATERIAL 2'MIN. 1/16" SHEETALUMINUM 5-6'TYP. 2.5'MIN. 1.25' 1.25' 4' EDGE OF SHOULDER,TRAIL, BICYCLE TRAILOR CURB LINE USE M10 DIA. HOT DIPPEDGALVANIZED BUTTON HEADWITH A SLOT IN HEAD AND NUTWITH LOCKWASHER, WITH AMINIMUM OF 1/4" OF THREADSBEYOND NUTS ON ALL SIGNSAFTER THEY ARE SECURELYFASTENED P5 POST ASSEMBLY ORAPPROVED ALTERNATE TYPICAL INSTALLATION FOR SIGNS NOT TO SCALE APPROVED SOLID SUBGRADE MATERIAL DETAILS (1) SECTION A BEAN POLES UNDISTURBEDSOIL SECTION B BACKFILL TURTLE/SILTATION CONTROL FENCE NOT TO SCALE 2" X 2" X 4'WOODEN STAKE SEDIMENTLADENRUNOFF FLOW NOTES:1.FENCE FABRIC SHALL BE 36-INCHES WIDEMINIMUM AND SHALL BE SECURELY FASTENEDTO BEANPOLES. 6" MIN OF FABRIC SHALL BEBELOW GROUND SURFACE (BACKFILLED ORTOE-ED INTO GROUND).2.WOODEN STAKE POST SPACING SHALL BE4-FOOT MAX ON CENTER. 16" MIN.BELOWGROUND 30"EXPOSED 6"MIN BURY SILT FENCE JOINING SECTIONS OF FENCE TOPVIEW SILT FENCE:M9.50.0 TYPE V CONCRETE SLAB PATH EDGE BENCH DETAIL NOT TO SCALE NOTES: 1. ALL STEEL HARDWARE TO BE COATED W/ ZINC RICH EPOXY THEN FINISHED WITH BLACK POLYESTER POWDER COATING. 2. HARDWARE TO BE STAINLESS STEEL (S.S.) TYPE 316. 3. BENCH MANUFACTURER TO BE DUMOR INC., THOMAS STEELE SITE FURNISHINGS, VICTOR STANLEY, ORAPPROVED EQUAL.4. CONTRACTOR TO PROVIDE COLOR CHART FOR BENCH SLATS TO OWNER. FRONT VIEW BENCH CONCRETE SLAB DETAIL NOT TO SCALE 6'-0"16-11/16" 11-12" 17-18" 3" 12" SIDE VIEW 3" SQ. X 1/4" W.STEEL TUBING 3" X 4" (NOMINAL) STEEL SLATS (COLOR BY OWNER) 3/8" X 4-1/2"STEEL BAR CONCRETE SLAB(SEE DETAIL) S.S ANCHORSTO SUIT 4" S.S ANCHORS TO SUIT (2" MIN. EMBEDMENT) 1/2" X 3" STEEL SURFACE PLATE 3/8" X 2" S.S. BTN. SKT. HD. LAG W/ WASHERW.W. MESH (SEE NOTES) NOTES:1. WIRE MESH (PER M8.01.2) TO BE 6 X 6W 1.4W X 1.4 FLAT SHEETS SET 1" FROM THE BOTTOM FOR A 4" THICK SLAB AND 2" FROM THE BOTTOM FOR A 6" THICK SLAB. 2. HARDWARE TO BE STAINLESS STEEL (S.S.) TYPE 316. 3. CONCRETE TO BE TYPE I, 4,000 PSI 3/4 IN. 610, MASSDOT M4 CONCRETE FOOTING. EXTEND PAD 3' OUTSIDE BENCH (BOTH SIDES) FOR HANDICAP ACCOMMODATIONS 2'-6" 5'-0"± 1'-0"45° BENCH(SEE DETAIL) CHAMFERED EDGE ON ALL SIDES4 INCH THICK CONCRETE SLAB FINE BROOM FINISH PERPENDICULAR TO DIRECTION OF TRAVEL ARM REST STEEL POST HANDICAPPED RESERVED PARKING SIGN PARKING At Owner's ExpenseMay Be RemovedUnauthorized VehiclesREQUIREDSPECIAL PLATE HANDICAPPED RESERVED PARKING SIGN DETAIL NOT TO SCALE NOTE:1.SIGN LAYOUT, COLORS, SYMBOL AND LETTERING SHALL BE STANDARD.2.TO BE LOCATED ON SITE AS DIRECTED.3.METAL POST TO BE PAINTED 2 COATS OF EXTERIOR GREEN ENAMEL (SEE SPECS.).4.TO BE LOCATED AT APPROPRIATE SPACES.5.STEEL PIPE TO BE USED WHERE SIGN IS INSTALLED ON PAVED AREA. ELEVATION 12" x 18" "VAN ACCESSIBLE"SIGN AS REQUIRED METAL POST2" x 2" x 0.188" CROWN PAVING 6" DIA. STEEL PIPESEE NOTE BELOW CLASS "D" CONC. 6'-0" MIN. 3'-0" 3'-0" 6" 12" DIA. 4-1/ 2 "6'-0" 9"6"2-1"Ø H OL E S 2-#3 REBARS PRECAST CONCRETE BUMPER DETAIL NOT TO SCALE L PARKING STALLC 2" 9" 14" 6" 2" 3"5" INSTALLATION PLAN 1'-6" TO EDGEOF PARKING STALL SEAL 1/2" DEEP HOLE W/ MORTAR WHEEL STOP PAINTED STRIPES AS SHOWN IN THE SITE PLAN EDGE OF PAVEMENT SECTION #6 @ 2'-6"LONG NOTE: 1. CONCRETE TO BE TYPE I, 4,000 PSI 3/4 IN. 610, MASSDOT M4CONCRETEFOOTING. 8' VAN8' MIN 3' ACCESIBLE PARKING SPACE DETAIL NOT TO SCALE NOTE:1. HANDICAPPED ACCESSAISLE WIDTH FOR NONVAN (CAR) ACCESSIBLESPACES TO BE 5FEET-SEE PLANS.2. ALL PARKING LOTSTRIPING TO BE 4"SOLID WHITE PAINTEDLINES.3. ALL PAINT TO BENON-SKID. 4. VAN SPACES TO BEPAINT MARKED WITH"VAN". 2% SLOPE MAX IN ALL DIRECTIONS HANDICAP PARKING SIGN AND VAN ACCESSIBLE SIGN WHEN REQUIRED RETAINING WALL -SEE PLANS AND DETAILS 4' HANDICAP GRAPHIC SYMBOL PAINTED WHITE ON PAINTED BLUE BACKGROUND 4" WIDEPAINTEDLINES (TYP.) PRECAST CONCRETE BUMPER SHREDDED NON-DYED NATURAL MULCH (M6.04.4) SUBSOIL - NATIVE OR IMPORTED ORDINARY BORROW (M1.01.0) COMPACTED TO MIN. 90% MAXIMUM DENSITY FINISH GRADE 3" DEPTH MULCH SURFACE TREATMENT DETAIL NOT TO SCALE NOTES: MULCH TO BE THE SURFACE TREATMENT FOR THE DISTURBED SHOULDERS FOR AREASNOT DESIGNATED FOR LOAM AND SEED. 608143_HD4(DETAILS).DWG21-Dec-2018 2:40 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -5 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 NOTES:1.DESIGN LOADING FOR THE BOX CULVERT IS H-20.2.MANUFACTURER DRAWINGS AND CALCULATIONS FOR ALL SECTIONS OF THE BOX CULVERT SHALL BEPREPARED AND STAMPED BY A MASSACHUSETTS REGISTERED PROFESSIONAL ENGINEER AND BESUBMITTED FOR REVIEW.3.EXISTING SOILS MUST BE VERIFIED DURING EXCAVATION AND REPLACED AS NECESSARY TO PROVIDE ASTABLE FOUNDATION FOR THE PROPOSED CULVERTS / CULVERT FOUNDATION PAD.4.COMPACT APPROVED BACKFILL TO 95%. PROTECTION IN 6-9" LIFTS. ℄OF TRAIL TRAIL(SEE PLAN) DENSE GRADE SUB-BASE (M2.01.7) CONCRETE BOX CULVERT 12" MIN. COVER COMPACTED NATIVE ORGRAVEL BORROW(M1.03.0) SUBGRADE TOP OF CULVERT 6" COMPACTED WASHED 3/4"CRUSHED STONE BASE (M2.01.0) PEDESTRIAN RAILING: POST SPACINGSPAN CENTERED OFF CULVERT TYPICAL PRECAST CONCRETE BOX CULVERT PROFILE NOT TO SCALE ELEV.= SEE PLAN 2% MAX SLOPE VARIES(SEE PLAN) SLOPEDEND SECTION 6" OF NATIVE COMMON FILL ORGRAVEL BORROW M1.03.0 MATERIAL CROSS SECTION A-A NOT TO SCALE CL SLOPE PER GRADING PLAN BACKFILL MATERIAL AROUND CULVERT SHALL BE GRANULAR PROCESSED GRAVEL FILL (M1.03.1) COMPACTED TO 95% DENSITY. EROSION CONTROL BLANKET STABILIZATION FOR SLOPES EQUAL/GREATER THAN 3:1(SEE DETAIL) SEE STONE LINED SLOPE DETAIL NOTES: 1. ANY UNSUITABLE ORGANIC MATERIAL FOUND BELOW THE SUB-BASE OF THE CULVERT SHALL BE REMOVED & REPLACED W/ COMPACTED PROCESSED GRAVEL SUBBASE (M1.03.1) ASREQUIRED AT AN ADDITIONAL EXPENSE. BOX CULVERT (SEE DETAILS) 2.0' COMPACTED NATIVE OR GRAVEL BORROW (M1.03.0) MATERIAL EL.= SEE PLAN TOP STONE SET AT CULVERT INVERTDEPTH=24", d50=12", MASSDOT M2.02.0 6" CRUSHED STONE BASE (M2.01.0) 6" NATIVE COMMON FILL OR GRAVEL BORROW (M1.03.0) MATERIAL WITHIN CULVERT SEECULVERT DETAILS SEE SITE PLANS FOR SURFACE TREATMENT CULVERT (TYP.) W2=10-12' CULVERT TO STONE TRANSITION DETAIL NOT TO SCALE SIDE SECTION PLAN VIEW STONE SLOPED SIDEWALLS (SEE STONE LINED SLOPE DETAIL) CHANNEL W1=2' L1=8' W1=2' MIN. NATIVE OR GRAVELBORROW (M1.03.0) SUBGRADE 1D 1 SEE PLAN NOTES:1. RIPRAP STONE PER MASSDOT M2.02.02. STONE TO EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END OF THE CULVERT AT THE DISCHARGE OUTLET AT A MAXIMUM SLOPE OF 2:1 AND A HEIGHT NOT LESS THAN 2/3 THE CULVERT HEIGHT. 3. THE AREA TO BE STONED TO BEUNDERCUT SO THAT THE INVERT OF THEAPRON SHALL BE AT THE SAME GRADE(FLUSH) WITH THE RECEIVING CHANNEL. 4. THE WIDTH OF THE END OF THE APRON TO BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL (MAX. TAPER 5:1). 5. ALL SUBGRADE FOR STRUCTURE TO BECOMPACTED TO 95% OR GREATER.6. ANY DISTURBED AREA FROM END OFAPRON TO RECEIVING CHANNEL MUST BE STABILIZED. 12" DEPTH L 2 MAX. CULVERT END SECTION 6" MIN. 34" CRUSHEDSTONE BASE (M2.01.0) GEOTEXTILEM9.50.0 TYPE III RIPRAP STONE (MIN. D50=12") NATURAL GRADE OR BACKFILL 6" MIN. 34" M2.01.0 CRUSHED STONE BED NON-WOVENGEOTEXTILEUNDERNEATH STONE M9.50.0 TYPE III - FILTRATION/DRAINAGE STONE 2' MIN FRONT SECTION VIEW L2=2' MIN. 1" DIA. INSERTS FOR INSTALLATION/ ERECTION HARDWARE 2'-0" OPENING 2'-0" OPENING ROOF, FLOOR AND WALL THICKNESSES AS REQ'D (6" MIN.) 8" X 8" CHAMFERS A A FRONT VIEW SECTION A-A 2" 1" X 1" CLOSED CELL RUBBER GASKET 2" DIA. LIFTING HOLES 8'-0" OR AS REQUIRED 2'-0" OPENING 2'-0" OPENING TYPICAL BOX CULVERT & SLOPED END DETAIL NOT TO SCALE 8'-0" MAX. GENERAL NOTES:1. CONCRETE: 5,000 P.S.I MINIMUM STRENGTH @ 28 DAYS. 2. STEEL REINFORCING- ASTM A-615, GRADE 60. 3. COVER TO STEEL-1" MINIMUM. 4. ASTM C858 AND ACI 318 WITH AASHTOHS-20 LOADING.5. CONSTRUCTION JOINT-SEALED WITH 1"DIA. BUTYL RUBBER OR EQUIVALENT. 6. EARTH COVER= 0 TO 8 FEET MAX. SLOPED END SCHEMATICBOX CULVERT SCHEMATIC TYPICAL RIP RAP OUTFALL DETAIL NOT TO SCALE SECTION A-A 1D 1 SEE PLAN 5D PLAN A NOTES: 1. STONE SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END OF THE PIPE OR CULVERT AT THE DISCHARGE OUTLET AT A MAXIMUM SLOPE OF 2:1 AND A HEIGHT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER ORCULVERT HEIGHT.2. THE AREA TO BE STONED SHALL BE UNDERCUT SOTHAT THE INVERT OF THE APRON SHALL BE AT THE SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL. 3. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL. MAXIMUM TAPER TO RECEIVINGCHANNEL 5:14. ALL SUBGRADE FOR STRUCTURE TO BECOMPACTED TO 95% OR GREATER. 5. HORIZONTAL ALIGNMENT OF THE APRON SHALL BE PER THE SITE PLAN. 6. ANY DISTURBED AREA FROM END OF APRON TO RECEIVING CHANNEL MUST BE STABILIZED. 1' MIN. D SECTION B-B A 12" DEPTH A SEE B-B 12" B B OUTLET PIPE 2D 3D 4D 12" 2 MAX. HEADWALLOR STONE FOREBAY 6" MIN. 34" WASHEDSTONE BED FILTERFABRIC NATURAL STONE (MIN. D50=6") CUT PIPE TOMATCH SLOPE EXTEND ROCK AROUND PIPE IF NOHEADWALL APRON NATURAL GRADE OR BACKFILL 6" MIN. 34" WASHED STONE BED NON-WOVEN FILTERFABRIC STONE DETAILS (2) MIN. TRENCH WIDTH FINAL BACKFILL INITIAL BACKFILL, 6"-12" ABOVE TOP OF PIPE. BEDDING MATERIAL HAUNCHINGTO SPRINGLINE OF PIPE MINIMUM RECOMMENDEDSURFACE LIVE LOADING CONDITION * 4. COVER, in (mm) * 1. TYPICAL DRAINAGE PIPE TRENCH DETAIL NOT TO SCALE FOUNDATION: WHERE THE TRENCH BOTTOM IS UNSTABLE, THE CONTRACTOR TO EXCAVATE TO A DEPTH REQUIRED BY THE ENGINEERAND REPLACE WITH AFOUNDATION OF CLASS I OR II MATERIAL AS DEFINED IN ASTM D2321, "STANDARD PRACTICE FOR INSTALLATION OF THERMOPLASTIC PIPE FOR SEWERS AND OTHER GRAVITY-FLOWAPPLICATIONS," LATESTEDITION; AS AN ALTERNATIVEAND AT THE DISCRETION OF THE ENGINEER, THE TRENCH BOTTOM MAY BE STABILIZED USING A WOVEN GEOTEXTILE FABRIC. 2. MINIMUM BEDDING THICKNESS TOBE 4" (100mm) FOR 4"-24" (100-600mm) AND 42"-48"(1050-1200mm) CORRUGATED POLYETHYLENE PIPE (CPEP); 6" (150mm) FOR 30"-36" (750-900mm) CPEP. H25 (FLEXIBLE PAVEMENT)H25 (RIGID PAVEMENT) E80RAILWAY HEAVY CONSTRUCTION 12 (300)12 (300)24 (610)48 (1220) MINIMUM COVER: MINIMUM RECOMMENDED DEPTHS OF COVER FOR VARIOUS LIVE LOADING CONDITIONS ARE SUMMARIZED IN THE FOLLOWING TABLE. UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE TAKEN FROM THE TOP OF PIPE TO THEGROUND SURFACE. MINIMUM TRENCH WIDTHS TO BE AS FOLLOWS: TOP OF PIPE TO BOTTOM OF BITUMINOUS PAVEMENT 8 (200)10 (250)12 (300) 15 (375) 18 (450) 25 (630) 28 (710)31 (790)34 (860)39 (990) 3 BEDDING, HAUNCHING AND INITIAL BACKFILL: SUITABLE MATERIAL TOCONSIST OF CLEAN, HARD,PARTICLES OF GRAVEL MEETING THE FOLLOWING: SIEVE SIZE% PASSING 3/8" 85-95 NO. 4 5-15 NO. 8 0-2 MATERIAL TO BE INSTALLED ASREQUIRED IN ASTM D2321, LATESTEDITION. THE MINIMUM COVER FOR A HDPE PIPE IS 1'-0" FOR H-20 TRAFFIC LOADS IF INSTALLED IN ACCORDANCE WITH AASHTO SECTION 30. THIS IS BASED ON EMPIRICAL CALCULATION OF LOAD RESPONSE, MANUFACTURER'S TESTING AND FIELDEXPERIENCE WITH THE PIPE. AASHTO SPECIFICATIONSSECTION 18.4.1.5 DEFINES THE MINIMUM COVER AS "ID/8 BUTNOT LESS THAN 12 INCHES". THIS COVER IS MEASURED FROM THE PIPE OD TO THE TOP OF A RIGID (CONCRETE) PAVEMENT OR THE BOTTOM OF A FLEXIBLE (BITUMINOUS) PAVEMENT. BOTH AASHTO AND ASTM, AS WELL AS MOST MANUFACTURERS, REQUIRE ADDITIONAL (TEMPORARY COVER, MOUNDED OVER THE PIPE AND REMOVED FOR FINALGRADING AND PAVING, IS SUFFICIENT FOR LARGECONSTRUCTION VEHICLE LOADS. NOTES: MIN. RECOMMENDED TRENCH WIDTH, in (mm) NOMINAL Ø in (mm) GROUND SURFACE UNDISTURBED EARTH HDPE PIPE FOUNDATION DETAIL PROVIDED BY ADVANCED DRAINAGE SYSTEMS, INC. 6.5" TYP. 29" TYP. 10" TYP. 6.5" TYP. 25" TYP.6.5" TYP. TYPICAL FLARED END SECTION NOT TO SCALE NOTES: 1. PE THREADED ROD W/WING NUTS PROVIDED FOR END SECTIONS 12"-24". 30" & 36" END SECTIONS TO BE WELDED TO PIPE PER MANUFACTURER'S RECOMMENDATIONS. 2. ALL DIMENSIONS ARE NOMINAL 3. DRAIN PIPES LESS THAN 12" IN DIAMETER SHALL BE SAWCUT TO MATCH SLOPE.4. DETAIL PROVIDED BY ADVANCED DRAINAGE SYSTEMS, INC. PE THREADED ROD W/WING NUTS (SEE NOTE) TOP VIEW RIGHT SIDE VIEW FRONT VIEW 608143_HD4(DETAILS).DWG21-Dec-2018 2:40 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -6 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 RIP RAP LINED SLOPE DETAIL NOT TO SCALE NON-WOVEN GEOTEXTILE BENEATH STONE M9.50.0 TYPE III - FILTRATION & DRAINAGE 2' EXCAVATION RIPRAP STONE SLOPE d10 = 6" d50 =12" d100 = 18" DEPTH = 24" 2' MIN. BASE SEE NOTE ON GEOTEXTILE NOTES:1. TOE-IN & EMBED GEOTEXTILE MIN. 6" BELOW GRADE STONE SET 3" ABOVE FINISH GRADE OF ACCESS WAY 6" THICK LAYER OF 3/4" CRUSHED STONE BED (M2.01.0) COMPLETELY BACKFILL GEOTEXTILE DETAILS (3) 3' TYP. 3' TYP. SEE SITE PLANFOR CLEAR OPENING (12' TYP.) 12" 2.75' TYP. 12"ACCESS GATE DETAIL NOT TO SCALE CLCL LOCK CHAMBER POST TOP RAIL - 3" ID ( 7.58# / FT ) STEEL PIPE LOCK CHAMBER POST 6" ID (18.97# / FT) REMOVABLE STEEL BOLLARD BOLLARD SLEEVE 8" x 8" x 1/4" STEEL PLATE WITH 3/16" WELD 6" COMPACTED GRAVEL (M1.03.0) 3' ID (7.58#/FT) STEEL PIPE BRACE 9/16" HOLE THROUGH POST CAP & HINGE SHAFT 1/2"DIAM. GALV., TREATED ROD TO EXTEND THROUGH ANDBE SECURED ON BOTH ENDS WITH GALV. CAP NUTS 3" CAP 3/16" WELDED 6" ID (28.57# / FT) EXTRA STRONG STEEL PIPE 2 STANDARD GREASE FITTINGS 3"3" 1-1/2" 3/16" WELD HINGE SHAFT 5" ID(14.62# / FT) STEEL PIPECONCRETE FILLED 6" x 6" x 1/4" STEEL PLATE WITH 3/16" WELD SHOULDER SLOPE TO DRAIN DOUBLE POST WHERE REQUIRED 3'-6"MIN. NOTE:1. PROVIDE TWO LOCK CHAMBER POSTS FOR EACH GATE:ONE AT LOCKED POSITION AND ONE AT OPEN POSITION (SEE SITE PLAN). 2. ANY HOLLOW POSTS TO BE FILLED WITH CONCRETE (4,000 PSI, 3/4 IN. MASSDOT M4) 4,000 PSI CONCRETE FOOTING (3/4 IN. 610, MASSDOT M4) 4' PEDESTRIANACCESS CLEAROPENING 6'-0" MAX SHOULDER CLEARANCE TO BOULDER 3'± DIAM. BOULDER (BOTH SIDES) HEAVY DUTY PAD LOCK W/ KEY FOR BOTH BOLLARDS 12"12" REMOVABLE STEEL BOLLARD 12"12" TO SUIT TO SUIT TO SUITTO SUITTO SUIT TO SUIT PLAN ELEVATION - FRONT VIEW ELEVATION - SIDE VIEWACCESS GATE LOCK DETAIL NOT TO SCALE 1-1/2" 1-1/2" LOCK CHAMBER 1-1/4" DIAM. HOLE TOP RAIL TRIANGULAR STEEL PLATE LOCK CHAMBER POST CONCRETE FILLED 3/16" WELD HOLLOW POSTS TO BE FILLED W/ 4,000 PSI CONCRETE(3/4 INCH. MASSDOT M4) CROWN CONCRETE TO DRAIN CHAIN WELDED TO TOP PLATE GALVANIZED STEEL CHAIN 4" DIAM. x 3/8" STEEL PLATE 3/16" WELD MIDDLE PLATE 1/2" DIAM. > HOLE SIDE PLATE 3/16" WELD ALL JOINTS TRIANGULAR STEEL PLATE CHAIN WELDED TO PIN 1" x 9" SINGLE PIECE MACHINED LOCK PIN TOP PLATE TOP RAIL SIDE PLATE BOTTOM PLATE LOCK CHAMBER POST LOCK CHAMBER POST TOP PLATE 3/8" STEEL PLATE CHAIN WELDED TO TOP PLATE HEAVY GAUGEGALVANIZED STEELCHAIN, 20" LONG MIDDLE PLATE 3/8"STEEL PLATE 3.16" WELD SIDE PLATE 3/8" STEEL PLATE 3/16" WELD ALL JOINTS BOTTOM PLATE 3/8" STEELPLATE 3/8" TRIANGULAR STEEL PLATE WELDED TO POST AND PLATE CHAIN WELDED TO PIN 1" x 9" SINGLE PIECE MACHINED LOCK PIN TOP RAIL 4" DIAM. x 3/8" STEEL PLATE' 1/2" DIAM. HOLE SETTING RURAL MAILBOXES NOT TO SCALE 2'-0" MIN. MAIL BOXES ON NARROWSIDEWALKS SHALL BE SETBEHIND CURB AND PARALLELTO IT WITH THE LETTER SLOT FACING TRAFFIC 7"± 43"± NOTES: 1. LUMBER TO BE PLANED ON ALL FOUR SIDES TOFULL 2"X6" SIZE TOFIT BOTTOM OFMAIL BOXES. 2. SET 1-1/2" GALV. PIPE POST - USE DRVING POINT OF SAME SIZE & TAMP POST INTO PLACEPLUMB BOTHWAYS.3. ALL FITTINGS ARE TO GALVANIZED. 4. 4"X4" PRESSURE TREATED POST MAY BE SUBSTITUTED FOR A PIPE POST.5. SEE MA DOTSPECIFICATIONS FOR ADDITIONAL INFORMATION. WOOD SCREWS 1-1/2" GALV. IRON PIPE 5'-3"± LONG 2" X 6" X 18" LONG SPRUCE TOP OF CURB TOP OF ROAD SURFACE HEAVY DUTYPIPE FLANGE NAIL TOP OF CURB WOODSCREWS TOP OFSIDEWALK TOP OF ROAD SERVICE TYPICAL OFF-STREET BICYCLE PEDESTRIAN TRAIL TWO-WAY TRAFFIC STRIPING DETAIL NOT TO SCALE 3' TO SUIT 9' NOTES:1.MARKINGS TO BE INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS.2.MARKINGS ON PAVEMENT ONLY.3.MARKING PER MASSDOT SPECIFICATIONS. CENTER OFTRAVEL WAY 3' 6" PAINTED YELLOW LINEAT CENTERLINE OF PATH ARROWS EVERY 200-FT± LANDSCAPE BOULDER OR BARRIER NOT TO SCALE GRADE COMPACTED NATIVE SUBGRADE SET BOULDER AT GRADE ANDBACKFILL SO THERE IS NO MOVEMENT OF STONE SPACING PERSITE PLANLANDSCAPE BOULDERWIDTH VARIES BETWEEN 3-4' WOOD PEDESTRIAN BARRIER NOT TO SCALE 2 X 6 RAIL 4'-0" NOTES: 1. MATERIALS PER MASSDOT M9.05.1, M9.05.3 AND M9.05.5. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION. 2. POST AND RAILS TO BE PRESSURE TREATED LUMBER GROUND CONTACT LUMBER, NO. 2 GRADE MIN.3. ALL SPLICES ARE TO BE MADE AT POSTS. ALTERNATE SPLICE CONNECTIONS.4. FASTENERS TO BE HOT DIPPED GALVANIZED OR STAINLESS STEEL MATCHING ASTM A153 AND ASTMA653. 5. THE CONTRACTOR SHALL INSTALL EITHER TWO 1/2"Ø BOLTS OR ONE 1"Ø BOLT AT EACH RAIL TO POST CONNECTION. ALTERNATIVE OPTION: THRU-LOCKING BOLT (FASTENMASTER THRU LOCK OR EQUAL). 6. CONCRETE FOOTING NOT NECESSARY FOR HYDRAULIC POST INSTALLATION. FOOTING MATERIAL TO EXTEND AROUND THE ENTIRE POST IF EXCAVATING AND BACKFILLING.7. WOOD POSTS SHALL BE NOTCHED AS NECESSARY TO FACILITATE CURVES AND CHANGES INDIRECTION. RAIL SHALL BE CUT TO CREATE A RAIL TO RAIL FLUSH FACE JOINT AS NECESSARY.8. BEGINNING & END SECTIONS SHALL BE ANCHORED INTO THE GROUND A MINIMUM 1-FOOT BELOW FINISH GRADE WHERE PARALLEL TO TRAFFIC OR FLARED AT A 45 DEGREE ANGLE AWAY FROM THE DIRECTION OF TRAVEL TO AVOID BLUNT ENDINGS. 8' O.C. FINSH GRADE 2" 6" MIN. SECTION PLAN 2 X 6 RAIL 4'-0"MIN. TOP RAIL SPLICE RAIL AT POST FASTENERS (SEE NOTES)TOP POSTFLUSH W/RAIL 4 X 4POST 4,000 PSI, 3/4 IN. 610 CONCRETE FOOTINGM4 (SEE NOTES) HEX NUT W/WASHER BOLT W/WASHER (SEE NOTES) 4 X 4POST NO SPACER HEX NUTW/WASHER BOLTW/WASHER 2 X 6 RAIL 1'-6"± 1'-6"± 2 X 6 TOP RAIL POST BELOW CONCRETE(1" MIN.) FOR FREE DRAINAGE GALV. SPIKE OR SCREW (2" MIN. EMBEDMENT INTO RAIL) FINISH GRADE 4" LOAM AND SEED DETAIL NOT TO SCALE SEED:ALONG PATH - SLOPES & SHOULDERS M6.03.1WETLAND RESTORATION/MITIGATION - PER PLAN TOPSOIL: M1.05.0 SUBSOIL: COMPACTED NATIVE MATERIALOR ORDINARY BORROW (M1.01.0)COMPACTED AT 90% MAXIMUM DENSITY 608143_HD4(DETAILS).DWG21-Dec-2018 2:40 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -7 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 DETAILS (4) EROSION CONTROL BLANKET DETAIL NOT TO SCALE BRING MATERIAL DOWN TO A LEVEL AREA W/24" BASE EXTENSION, TURN THE END UNDER4" AND STAPLE AT 12" INTERVALS NOTES:.1.LOAM AND SEED PRIOR TO BLANKET INSTALLATION.2.SLOPE SURFACE SHALL BE SMOOTH BEFORE PLACEMENT FOR PROPER SOIL CONTACT.3.STAPLING PATTERN AS PER MANUFACTURER'S RECOMMENDATIONS.4.DO NOT STRETCH BLANKETS/MATTINGS TIGHT. ALLOW THE ROLLS TO MOLD TO ANY IRREGULARITIES.5.FOR SLOPES LESS THAN 3H:1V, ROLLS MAY BE PLACED IN HORIZONTAL STRIPS.6.LIME, FERTILIZE AND SEED BEFORE INSTALLATION. PLANTING OF SHRUBS, TREES, ETC. SHOULD OCCURAFTER INSTALLATION. STAPLE OVERLAPS MAX. 5' SPACING 6" MIN.OVERLAP ANCHOR IN 6"x6"MIN. TRENCH &STAPLE AT12" INTERVALS 2" MIN.OVERLAPEROSION CONTROLBLANKET M9.50.0TYPE IV - SLOPEPROTECTION HYDROSEED PRIOR TOBLANKET INSTALLATIONTIE DOWN STRAP (SEE NOTES)PUMP DISCHARGE HOSE SPOUT SEWN INTO BAG FLOW FROM PUMP FILTERED WATER FILTERED WATERFILTERED WATERDEWATERING BAGON AGGREGATEOR STRAWUNDERLAY FLOW FROM PUMP PUMP DISCHARGE HOSE TIE DOWN STRAP(SEE NOTES) SPOUT SEWN INTO BAG DEWATERINGBAG TEMP. AGGREGATE OR STRAW UNDERLAY A A SECTION A - A DEWATERING BAG DETAIL NOT TO SCALE INSTALLATION NOTES:1.PLACE LIFTING STRAPS (NOTINCLUDED) UNDER THE UNIT TOFACILITATE REMOVAL AFTER USAGE2.UNFOLD DANDY DEWATERING BAG ONSTABILIZED AREA OVER DENSEVEGETATION, STRAW, OR GRAVEL (IFAN INCREASED DRAINAGE SURFACEIS NEEDED)3.INSERT DISCHARGE HOSE FROMPUMP INTO DANDY DEWATERING BAGA MINIMUM OF SIZE INCHES ANDTIGHTLY SECURE WITH ATTACHEDSTRAP TO PREVENT WATER FROMFLOWING OUT OF THE UNIT WITHOUTBEING FILTERED4.IF USING OPTIONAL ABSORBENTS,PLACE ABSORBENT BOOM INTO THEDANDY DEWATERING BAG MAINTENANCE: 1.REPLACE THE UNIT WHEN 1/2 FULL OFSEDIMENT OR WHEN SEDIMENT HASREDUCED THE FLOW RATE OF THEPUMP DISCHARGE TO ANIMPRACTICAL RATE 2.IF USING OPTIONAL OIL ABSORBENTS,REMOVE AND REPLACE ABSORBENTPILLOW WHEN NEAR SATURATION APPROVED NATIVEMATERIAL OR ORDINARYBORROW (M1.01.0) DEPTH = 6" MIN. 1 2 6" CLEAN WASHED SAND(MEETING M1.04.0 TYPE A) ORENGINEER APPROVED EQUALNATIVE MATERIAL 4" LOAM (M1.05.0) & SEED (SLOPES & SHOULDERS -M6.03.1) W/ EROSION BLANKET (SEE NOTES) TYPICAL GRASS CHANNEL (SWALE) DETAIL NOT TO SCALE 3:1 TYP.2:1 MAX 1.5'TYP 2.0'2:1 TYP. 3' TYP.2% ±SHOULDERALONG PATH 2.0'2:1 TYP. NOTES:1.BOTTOM AND SIDE SLOPES WITHIN THE GRASSCHANNEL/SWALE TO BE STABILIZED EROSION CONTROLBLANKET.2.LINEAR SLOPE OF CHANNEL TO SUIT PLAN. PAVEDSURFACE 1 1 TYP. FLOW FLOW LINE VARIES 3' TYP. 3' MAX. GEOTEXTILE UNDERNEATH STONE M9.50.0 TYPE III - FILTRATION/DRAINAGE RIPRAP STONE:M2.02.0, 6-12" D50 FLOW LINE 50' TYPICALSEE PLAN FOR LOCATION PROFILE A-A SPACING STONE CHECK DAM FOR SWALE DETAIL NOT TO SCALE CROSS SECTION FILTER FABRIC (M9.50.0 TYPE III) 3' MAX. 9" MIN. 18"SEE NOTE 118"SEE NOTE 1 A A NOTES:1. KEY STONE INTO THE SWALE/DITCH BANKS AND EXTEND INTO THE ABUTMENTS A MINIMUM OF 18" TO PREVENT FLOW FROM DIVERTING THE CHECK DAM. MAINTAIN LOWPOINT AT CENTER OF CHECK DEWATERING SUMP DETAIL NOT TO SCALE NOTES:1.ALL EQUIPMENT IS TEMPORARY AND MUST BE REMOVED AFTER USE. STONE AND/OR NATURALMATERIAL CAN REMAIN.2.PUMP LOCATION TO SUIT WORK. PUMP SIZE/HP TO SUIT SITE REQUIREMENTS. MULTIPLE PUMPSTO BE INSTALLED WHERE NECESSARY.3.PUMP CHAMBER SIZE TO BE DETERMINED BASED ON PUMP DIMENSIONS.4.FINAL DEPTH TO BE DETERMINED BY CONTRACTOR BASED ON EXISTING GRADE. EXISTING GRADE PERFORATED HDPE/PVC PIPE ORPRE-CAST PERFORATED PUMP CAGE UNDISTURBEDNATIVEMATERIAL 3/4" WASHED STONE TO SUIT2' MIN. TO SUIT2' MIN. DEWATERING PUMP(S)- SEE NOTES PUMP DISCHARGE TODEWATERING SYSTEM SEENOTES CONCRETE HANDICAP RAMP DETAIL NOT TO SCALE SIDEWALK OR PATH(WIDTH PER PLAN) 8.3% MAX CONCRETE SLOPED RAMP HIGH SIDE TRANSITION(6-7' TYP.) SHOULDER ROADWAY "LEVEL ENTRANCE" 2% MAX. SLOPE FORDRAINAGE CURB OR BERM MATCHEXISTINGGRADE 5' MIN. NOTES: 1. CONTRACTOR TO CONTACT THE ENGINEER IF DISCREPANCIES ARE FOUND IN THE SLOPES AND GRADES SHOWN PRIOR TO POURING THE CONCRETE. 2. RAMP TO BE CONSTRUCTED OF PORTLAND CEMENT CONCRETE PER MASS DOT & ADA REQUIREMENTS.3. CONTRACTOR TO REPLACE/RESET EX. CURB/BERM AS NECESSARY.4. CURB END SECTIONS TO BE INSTALLED AT ALL RAMPS WHEN APPLICABLE.5. DETECTABLE WARNING PANEL TO BE NON SLIP SURFACE FULLY EMBEDED AND MEETING ADA REQUIREMENTS INSTALLED AT ALL ROADWAY CROSSING AND INLINE WITH CROSSWALK. DETECTABLEWARNING PANEL WHERE PATHMEETS EX.SIDEWALK SEERAMP DETAIL. LIMIT OF CONCRETE DIRECTION OF TRAFFIC CROSSWALK (SEE DETAIL) ROCK Y HIL L R O AD ROCKY HILL ROADMATCHLINEMATCHLINEΔΔΔPLPLPLPLPLPLΔCONTINUED ONSHEET NO. 9608413_SV3.DWG10-Mar-2015 3:39 PMPlotted onPREPARED BY: OFSHEETPARS. NO: FILE NAME: 37-049-001 DATE: 608413_SV3.dwg REV.COMMENTS REVISIONS DATE FIELD BOOK. NO:XXXX FED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. - PLAN OF TOPOGRAPHIC SURVEY OF SCALE: 40 FEET TO THE INCH AS ORDERED BY THE MASSACHUSETTS DEPARTMENT OF TRANSPORTATION, HIGHWAY DIVISION MASSACHUSETTS DEPARTMENT OF TRANSPORTATION 0 SCALE: 1" = 40' 40 160100 FIELD CHIEF:DM DRAWN BY:CHECKED BY: ROCKY HILL GREENWAY MULTI-USE TRAIL ROCKY HILL ROAD IN THE CITY OF NORTHAMPTON, MASSACHUSETTS MC JL/RC Sustainable Environmental Solutions www.horsleywitten.com 90 Route 6A Sandwich, MA 02563 508-833-6600 voice 508-833-3150 fax Horsley Witten Group, Inc. 8 36FEBRUARY 2016 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL BASE PLAN (1) 608413 8 36 SURVEY NOTES 1. THE TOPOGRAPHY AND EXISTING SITE CONDITIONS DEPICTED HEREON ARE THE RESULT OF AN ON THE GROUND FIELD SURVEYCONDUCTED BY THE HORSLEY WITTEN GROUP, INC. MARCH 26 & 27, 2015. WITH SUPPLEMENTAL FIELD SURVEYS ON AUGUST 23, 2017 & SEPTEMBER 11, 2017 2. HORIZONTAL DATUM IS MASS STATE PLANE, ESTABLISHED WITH GPS. 3. THE ELEVATIONS DEPICTED HEREON ARE BASED ON NAD83 DATUM. 4. THE PROPERTY LINES AND RIGHTS OF WAYS ARE THE RESULT OF PLANS OF RECORD AND READILY AVAILABLE FIELD SURVEYMEASUREMENT. IT DOES NOT DEPICT AN AUTHORITATIVE BOUNDARY OPINION.. 5. PROPERTY LINES BETWEEN ABUTTING PROPERTY OWNERS ARE APPROXIMATE ONLY. 6. THE ACCURACY OF MEASURED PIPE INVERTS AND PIPE SIZES IS SUBJECT TO FIELD CONDITIONS, THE ABILITY TO MAKE VISUAL OBSERVATIONS, DIRECT ACCESS TO THE VARIOUS ELEMENTS AND OTHER CONDITIONS. 7. THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AND STRUCTURES AS SHOWN ON THESE PLANS ARE BASED ON RECORDS OF VARIOUS UTILITY COMPANIES, AND WHEREVER POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THIS INFORMATION IS NOT TO BE RELIEDUPON AS BEING EXACT OR COMPLETE. THE LOCATION OF ALL UNDERGROUND UTILITIES AND STRUCTURES SHALL BE VERIFIED IN THEFIELD PRIOR TO THE START OF ANY CONSTRUCTION. THE CONTRACTOR MUST CONTACT THE APPROPRIATE UTILITY COMPANY, ANY GOVERNING PERMITTING AUTHORITY IN THE CITY OF NORTHAMPTON, AND "DIGSAFE" (1-888-344-7233) AT LEAST 72 HOURS PRIOR TO ANYEXCAVATION WORK IN PREVIOUSLY UNALTERED AREAS TO REQUEST EXACT FIELD LOCATION OF UTILITIES. 8. THE WETLAND DELINEATION SHOWN HEREON WAS CONDUCTED BY THE HORSLEY WITTEN GROUP, INC. ON MARCH 26, 2015. 9. REFERENCE PLANS: HAMPSHIRE COUNTY REGISTRY OF DEEDS 1.) PLAN BOOK 119 PAGE 312.) PLAN BOOK 17 PAGE 243.) PLAN BOOK 53 PAGE 99 4.) PLAN BOOK 196 PAGE 705.) PLAN BOOK 23 PAGE 23A6.) PLAN BOOK 92 PAGE 607.) PLAN BOOK 231 PAGE 62 8.) PLAN BOOK 190 PAGE 69 & 70 N NEW HAVEN AND NORTHAMPTON CANAL LINE RAIL TRAILMAT C HLI N E MATCHLINEΔPL PL PL PL CONTINUED ONSHEET NO. 8608413_SV3.DWG10-Mar-2015 3:39 PMPlotted onPREPARED BY: OFSHEETPARS. NO: FILE NAME: 37-049-001 DATE: 608413_SV3.dwg REV.COMMENTS REVISIONS DATE FIELD BOOK. NO:XXXX FED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. - PLAN OF TOPOGRAPHIC SURVEY OF SCALE: 40 FEET TO THE INCH AS ORDERED BY THE MASSACHUSETTS DEPARTMENT OF TRANSPORTATION, HIGHWAY DIVISION MASSACHUSETTS DEPARTMENT OF TRANSPORTATION 0 SCALE: 1" = 40' 40 160100 FIELD CHIEF:DM DRAWN BY:CHECKED BY: ROCKY HILL GREENWAY MULTI-USE TRAIL ROCKY HILL ROAD IN THE CITY OF NORTHAMPTON, MASSACHUSETTS MC JL/RC Sustainable Environmental Solutions www.horsleywitten.com 90 Route 6A Sandwich, MA 02563 508-833-6600 voice 508-833-3150 fax Horsley Witten Group, Inc. 9 36FEBRUARY 2016 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 9 36 BASE PLAN (2) 608413N ROCKY HI L L RO A D ROCKY HILL ROADMATCHLINEMATCHLINEPLPLPLPLPLPLTP 11 2 3 4 5 6 7 8 9 10 11 120+00 +41.44 OFFSET: 6.79 +73.99 OFFSET: 6.79 +73.99 OFFSET: 6.79 +41.44 OFFSET: 6.79 +64.79 OFFSET: 10.93 +64.10 OFFSET: 10.20 +99.18 OFFSET: 10.82 +99.21 OFFSET: 10.58 +66.19 OFFSET: 8.00 +66.19 OFFSET: 8.00 ROCKY HILL GREENWAY BEGIN STA 0+00 N2938622.3837 E341979.6534 12345 0+005+81.2416' WIDE SHARED MULTI-USE TRAIL AND DRIVEWAY REDUCE TRAIL WIDTH TO 10' UTILITY CROSSINGS CULVERT (SEE GD PLAN) WOOD PEDESTRIAN BARRIER WOOD PEDESTRIAN BARRIER CULVERT (SEE GD PLAN) BOULDERS AT PATH EDGE (2 TOTAL)(SEE GRADING PLAN)L1 L2 L3 L12 L13 L14 L4 L5 L6 L7 L8 L9 L10 L11 C1 L25L26L27L28L29L30L31L32L33L34L35L36L37L38L39L40L41L42L43L44L45L46L47 L48C12 C13 SEE CONSTRUCTION PLANS (3) SHEET NO. 12Line Table: Alignments Line # L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 Direction S32°49'25"E S26°32'00"E S34°37'02"E S32°40'00"E S35°40'33"E S33°32'03"E S34°24'38"E S33°37'58"E S32°40'06"E S34°18'48"E Length 100.12 82.41 83.60 55.72 44.31 54.90 32.40 55.11 47.08 222.43 Start Point (N:2938622.384, E:341979.653) (N:2938538.252, E:342033.922) (N:2938464.518, E:342070.738) (N:2938395.720, E:342118.229) (N:2938348.812, E:342148.305) (N:2938312.819, E:342174.145) (N:2938267.054, E:342204.476) (N:2938240.324, E:342222.786) (N:2938194.440, E:342253.308) (N:2938154.805, E:342278.723) End Point (N:2938622.384, E:341979.653) (N:2938538.252, E:342033.922) (N:2938464.518, E:342070.738) (N:2938395.720, E:342118.229) (N:2938348.812, E:342148.305) (N:2938312.819, E:342174.145) (N:2938267.054, E:342204.476) (N:2938240.324, E:342222.786) (N:2938194.440, E:342253.308) (N:2938154.805, E:342278.723) Line Table: Alignments Line # L11 L12 L13 Direction S31°25'21"E S36°21'24"E S41°22'25"E Length 103.66 119.46 127.73 Start Point (N:2937971.086, E:342404.110) (N:2937882.629, E:342458.153) (N:2937786.420, E:342528.972) End Point (N:2937971.086, E:342404.110) (N:2937882.629, E:342458.153) (N:2937786.420, E:342528.972)608143_HD2(LAYOUT).DWG8-Jun-2015 12:12 PMPlotted on0 SCALE: 1" = 40' 40 160100 FED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -10 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 CONSTRUCTION PLANS (1) HIGHWAY GUARD DETAILS NONE TRAFFIC SIGNAL CONDUIT NONE WATER SUPPLY ALTERATIONS NONE DRAINAGE DETAILS NONE NCONTINUED ONSHEET NO. 11 NEW HAVEN AND NORTHAMPTON CANAL LINE RAIL TRAILMATCHLINEMATCHLINEPL PL PL TP 1TP 2 10 11 12 13 14 15 161718 192021 22 2 324 25 26 26+30.03 ROCKY HILL GREENWAY END STA 26+00.40 N2937482.5679 E343496.6877 REMOVE AND DISPOSE TREES (TYPICAL FOR ALL) W O O D P E D E S T R I A N B A R R I E R STONE CHECK DAM EVERY 50' (TYP) LIMIT OF WORK RESTING AREA 2% MAXW/BENCH RESTING AREA 2% MAX W/BENCH CULVERT(SEE GD PLAN) WETLANDREPLICATION AREA STONE CHECK DAM EVERY 50' (TYP) CULVERT(SEE GRADING PLAN) START WOOD PEDESTRIAN BARRIER 15+50.00 OFFSET RT: 6.00 END WOOD PEDESTRIAN BARRIER 20+00.00 OFFSET LT & RT: 6.00 L1 3 L14 L15 L16 L17L18 L19L20L2 1 L22 L 2 3 L24 C1 C2 C3 C4C5C6 C7C8C9 C10C11END WOOD PEDESTRIAN BARRIER 16+50.00 OFFSET RT: 6.00 START WOODPEDESTRIANBARRIER16+50.00OFFSET LT: 6.00 END WOOD PEDESTRIAN BARRIER 17+50.00 OFFSET LT: 6.00 Curve Table: Alignments Curve # C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 Start Station 11+29 12+52 14+19 15+55 16+54 17+26 19+16 19+86 21+10 21+66 23+54 End Station 11+60 12+87 14+29 16+49 17+24 18+65 19+79 21+00 21+59 22+94 25+10 Radius 100.000 100.000 100.000 50.210 43.136 100.000 100.000 100.000 100.000 54.492 67.529 Length 31.503 35.908 9.864 93.983 70.002 139.395 62.180 114.030 49.082 127.646 155.268 Chord Direction S 50° 23' 55" E S 69° 42' 38" E S 77° 10' 18" E N 52° 01' 53" E N 44° 53' 55" E S 48° 40' 39" E S 9° 04' 10" W S 5° 47' 04" E S 52° 30' 45" E N 46° 19' 11" E N 45° 04' 57" E Delta 18°03'00" 20°34'26" 5°39'06" 107°14'44" 92°58'49" 79°52'03" 35°37'35" 65°20'04" 28°07'18" 134°12'48" 131°44'20" Tangent Lengths 15.88 18.15 4.94 68.16 45.44 83.71 32.13 64.12 25.05 129.04 150.75 Start Point (N:2937690.5697,E:342613.3963) (N:2937624.2299,E:342716.0014) (N:2937588.9932,E:342879.0660) (N:2937552.8468,E:343009.8583) (N:2937607.7180,E:343073.4547) (N:2937651.9881,E:343119.7408) (N:2937516.8185,E:343223.9068) (N:2937450.1439,E:343211.0906) (N:2937334.4324,E:343228.5692) (N:2937302.0445,E:343273.6251) (N:2937427.9491,E:343324.7623) End Point (N:2937690.5697,E:342613.3963) (N:2937624.2299,E:342716.0014) (N:2937588.9932,E:342879.0660) (N:2937552.8468,E:343009.8583) (N:2937607.7180,E:343073.4547) (N:2937651.9881,E:343119.7408) (N:2937516.8185,E:343223.9068) (N:2937450.1439,E:343211.0906) (N:2937334.4324,E:343228.5692) (N:2937302.0445,E:343273.6251) (N:2937427.9491,E:343324.7623) Line Table: Alignments Line # L14 L15 L16 L17 L18 L19 L20 L21 L22 L23 L24 Direction S59°25'25"E S79°59'51"E S74°20'45"E N1°35'29"W S88°36'41"E S8°44'38"E S26°52'57"W S38°27'06"E S66°34'25"E N20°47'13"W S69°02'53"E Length 91.10 131.56 125.85 5.13 2.12 50.99 7.01 10.61 7.08 60.50 120.27 Start Point (N:2937670.571, E:342637.569) (N:2937611.845, E:342749.501) (N:2937586.804, E:342888.680) (N:2937602.589, E:343073.597) (N:2937652.040, E:343117.620) (N:2937567.219, E:343216.155) (N:2937456.401, E:343214.262) (N:2937342.742, E:343221.971) (N:2937304.861, E:343267.125) (N:2937371.384, E:343346.235) (N:2937514.979, E:343412.043) End Point (N:2937670.571, E:342637.569) (N:2937611.845, E:342749.501) (N:2937586.804, E:342888.680) (N:2937602.589, E:343073.597) (N:2937652.040, E:343117.620) (N:2937567.219, E:343216.155) (N:2937456.401, E:343214.262) (N:2937342.742, E:343221.971) (N:2937304.861, E:343267.125) (N:2937371.384, E:343346.235) (N:2937514.979, E:343412.043)608143_HD2(LAYOUT).DWG8-Jun-2015 12:12 PMPlotted on0 SCALE: 1" = 40' 40 160100 FED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -11 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 CONSTRUCTION PLANS (2)NHIGHWAY GUARD DETAILS NONE TRAFFIC SIGNAL CONDUIT NONE WATER SUPPLY ALTERATIONS NONE DRAINAGE DETAILS NONE CONTINUED ONSHEET NO. 10 ROCKY H I L L R O A D ROCKY HILL ROADΔ Δ 10+0024.00' 1 2 3 4 50+00 5+81.24 20.00' 18.83'L1L25 L26 L27 L28 L29 L30 L31 L32 L33 L34 L35 L36 L37 L38 L39 L40 L41 L42 L43 L44 L45 L46 L47L48 C 1 2 C 1 3 16' CLEAR OPENING ACCESSSWING GATE W/ REMOVABLESTEEL SAFETY BOLLARDS W/ 4'WIDE CLEAR PEDESTRIAN OPENING BLOCK RETAINING WALL, APPROX. LENGTH = 100 FT REMOVE EXISTINGMAILBOX ANDINSTALL NEW MAILBOX REMOVE EXISTINGMAILBOX ANDINSTALL NEW MAILBOX PROPOSED 8' WIDE MULTI-USE PATH REMOVE EXISTINGMAILBOX ANDINSTALL NEW MAILBOX RELOCATE HYDRANT 2' OFFOF PROPOSED MULTI-USEPATH PAVEMENT EDGE 8'x18' PARKING SPACE (TYP) BLOCK RETAINING WALL,APPROX. LENGTH = 85 FT REDUCE TRAILWIDTH TO 16' ASPHALT APRONWITH H/C RAMPS ASPHALT APRONWITH H/C RAMPS ASPHALT APRONWITH H/C RAMPSCONC. H/C RAMP CONC. H/C RAMP CONC. H/C RAMP BOULDERS AT PATHEDGE (4 TOTAL) 43 LF OF WOOD PEDESTRIAN BARRIER 8'x18' HANDICAP PARKING SPACE 33 LF OF WOODPEDESTRIANBARRIER GRANITE CURBING REMOVE EXISTING CROSSWALKMARKINGS AND APPLY 10' THERMALMARKINGS 96 LF WOOD PEDESTRIAN BARRIER ROCKY HILL RD MULTIUSE PATH BEGINSTA 0+00N2938339.1949E341562.7184 ROCKY HILL RD MULTIUSE PATH ENDSTA 5+81.24N2938546.7589E342028.4343 MODIFIED STONE MODIFIED STONE Line Table: Alignments Line # L25 L26 L27 L28 L29 L30 L31 L32 L33 L34 L35 L36 Direction N49°24'43"E N49°57'12"E N49°57'12"E N49°30'32"E N49°30'32"E N48°54'26"E N49°10'30"E N49°32'18"E N48°53'15"E N48°53'15"E N49°25'52"E N50°10'26"E Length 43.96 13.65 8.00 16.81 8.00 14.07 39.63 8.00 13.50 8.00 34.92 36.14 Start Point (N:2938339.195, E:341562.718) (N:2938367.794, E:341596.100) (N:2938376.575, E:341606.548) (N:2938381.723, E:341612.672) (N:2938392.641, E:341625.459) (N:2938397.835, E:341631.543) (N:2938407.080, E:341642.143) (N:2938432.991, E:341672.134) (N:2938438.182, E:341678.221) (N:2938447.062, E:341688.396) (N:2938452.323, E:341694.423) (N:2938475.035, E:341720.951) End Point (N:2938339.195, E:341562.718) (N:2938367.794, E:341596.100) (N:2938376.575, E:341606.548) (N:2938381.723, E:341612.672) (N:2938392.641, E:341625.459) (N:2938397.835, E:341631.543) (N:2938407.080, E:341642.143) (N:2938432.991, E:341672.134) (N:2938438.182, E:341678.221) (N:2938447.062, E:341688.396) (N:2938452.323, E:341694.423) (N:2938475.035, E:341720.951) Line Table: Alignments Line # L37 L38 L39 L40 L41 L42 L43 L44 L45 L46 L47 L48 Direction N51°55'20"E N54°48'34"E N56°47'18"E N59°36'51"E N63°16'30"E N66°36'07"E N66°36'07"E N67°58'50"E N67°58'50"E N71°23'40"E S32°49'33"E N57°10'35"E Length 23.26 23.69 32.37 24.65 32.52 8.00 25.02 8.00 22.48 8.40 40.38 12.00 Start Point (N:2938498.179, E:341748.704) (N:2938512.523, E:341767.012) (N:2938526.178, E:341786.377) (N:2938543.906, E:341813.456) (N:2938556.373, E:341834.718) (N:2938570.998, E:341863.765) (N:2938574.175, E:341871.107) (N:2938584.112, E:341894.071) (N:2938587.112, E:341901.490) (N:2938595.539, E:341922.327) (N:2938585.382, E:341963.062) (N:2938540.256, E:342018.353) End Point (N:2938498.179, E:341748.704) (N:2938512.523, E:341767.012) (N:2938526.178, E:341786.377) (N:2938543.906, E:341813.456) (N:2938556.373, E:341834.718) (N:2938570.998, E:341863.765) (N:2938574.175, E:341871.107) (N:2938584.112, E:341894.071) (N:2938587.112, E:341901.490) (N:2938595.539, E:341922.327) (N:2938585.382, E:341963.062) (N:2938540.256, E:342018.353) Curve Table: Alignments Curve # C12 C13 Start Station 4+53 5+31 End Station 4+91 5+69 Radius 30.097 27.635 Length 37.600 38.193 Chord Direction S 68° 36' 56" E S 71° 28' 31" E Delta 71°34'45" 79°11'13" Tangent Lengths 21.70 22.86 Start Point (N:2938598.2176,E:341930.2840) (N:2938551.4478,E:341984.9532) End Point (N:2938598.2176,E:341930.2840) (N:2938551.4478,E:341984.9532)608143_HD2(LAYOUT).DWG8-Jun-2015 12:12 PMPlotted on20 SCALE: 1" = 20' 0 50 100 FED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -12 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 CONSTRUCTION PLANS (3) HIGHWAY GUARD DETAILS NONE TRAFFIC SIGNAL CONDUIT NONE WATER SUPPLY ALTERATIONS NONE DRAINAGE DETAILS NONE N 1234567891011120+00+41.44OFFSET: 6.79+73.99OFFSET: 6.79+73.99OFFSET: 6.79+41.44OFFSET: 6.79+64.79OFFSET: 10.93+64.10OFFSET: 10.20+99.18OFFSET: 10.82+99.21OFFSET: 10.58+66.19OFFSET: 8.00+66.19OFFSET: 8.00ROCKY HILL GREENWAY BEGINSTA 0+00N2938622.3837E341979.65341 2 3 4 50+00 5+81.24L1L2L3 L12L13L14L4L5L6L7L8L9L10L11C1L25 L26L27 L28 L29L30 L31 L32L33L34 L35 L36 L37 L38 L39 L40 L41 L42 L43 L44 L45 L46 L47L48C12C13SEE GRADING PLAN (3) SHEET NO. 15ROCKY HILL ROAD ROCKY HILL ROAD MATCHLINE MATCHLINEPL PL PL PL PL PLΔ 200205210215220198199201202203204206207208209211212213214216217218219221222223224220PROP 25LF X 24"-SQ. BOX CULVERTEROSION CONTROLBARRIER - SILT SOCK (TYP)STONESTABILIZATIONINV. = 213.76'INV. = 213.56'INV. = 207.36'INV. = 207.26'PED. RAILING AT CULVERTPEDESTRIAN (PED.)RAILING AT CULVERTSTONE STABILIZATIONPROP 29LF X 24"-SQ. BOX CULVERTSTONE CHECKDAMS AT 50' TYP.P R O P 1 8 L F X 2 4 " - S Q . B O X227228227226225229230235240245250231232236237238239241242243244246248249251253254608143_HD3(GRADING).DWG 10-May-2016 8:03 AMPlotted on0SCALE: 1" = 40'40160100FED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATEMAPROJECT FILE NO.-13 36NORTHAMPTON, MASSACHUSETTSROCKY HILL GREENWAY MULTI-USE TRAIL608413GRADING PLAN (1)HIGHWAY GUARD DETAILSNONETRAFFIC SIGNAL CONDUITNONEWATER SUPPLY ALTERATIONSNONEDRAINAGE DETAILSNONEN CONTINUED ON SHEET NO. 14 TP 1TP 2 10 11 12 13 14 15 161718 192021 22 2 324 25 26 26+30.03 OFFSET: 6.79 ROCKY HILL GREENWAY END STA 26+00.40 N2937482.5679 E343496.6877 L1 3 L14 L15 L16 L17L18 L19L20L2 1 L22 L 2 3 L24 C1 C2 C3 C4C5C6 C7C8C9 C10C11NEW HAVEN AND NORTHAMPTON CANAL LINE RAIL TRAILMAT C HLI NE MATCHLINEPL PL 1501551601651701 7 5 180 1851901952002051491 5 1 152 153 154 156157158159 161162163164166 16716816917117217317417 6 177 178 179 181 1 8 2 183184186187188189191192193194196197198199201202203204206207208 157 15 8 1 5 9 160 16116216316416516622 0 165 16 2 1 6 3 164166PROP 82LF X 24" HDPEW/FLARED ENDS STONESTABILIZATION INV. = 157.00' INV. = 160.5' 1 6 1 STONE STABILIZATION STONE CHECKDAMS AT 50', TYP. EROSION CONTROL BLANKETON ALL SLOPES 3:1 & GREATER RESTING AREA 2%MAX W/BENCH RESTING AREA 2%MAX W/BENCH STONE CHECK DAMS AT 50', TYP. EROSION CONTROL BLANKETON ALL SLOPES 3:1 & GREATER WETLANDREPLICATION AREA(SEE INSET "A") INV. = 188.5' PROP 18LF X 24"-SQ. BOXCULVERT INV. = 188.04' STONESTABILIZATION 1718 19 L17L18 L19 C5C6 170175 1801711 7 2 17 3 174 176 177178179162 165 162 163 164 166 INV. = 160.5'161 EROSION CONTROL BLANKET ON ALL SLOPES 3:1 & GREATER608143_HD3(GRADING).DWG10-May-2016 8:03 AMPlotted on0 SCALE: 1" = 40' 40 160100 FED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -14 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 GRADING PLAN (2) HIGHWAY GUARD DETAILS NONE TRAFFIC SIGNAL CONDUIT NONE WATER SUPPLY ALTERATIONS NONE DRAINAGE DETAILS SEE BELOW N CONTINUED ONSHEET NO. 13INSET "A" SCALE: 1" = 20' 1 0+00123450+005+81.24L1 L2 L25L26L27L28L29L30L31L32L33L34L35L36L37L38L39L40L41L42L43L44L45L46L47 L48C12C13ROCKY HILL RD MULTIUSE PATH BEGINSTA 0+00N2938339.1949E341562.7184ROCKY HILL RD MULTIUSE PATH ENDSTA 5+81.24N2938546.7589E342028.4343ROCKY HILL ROADROCKY HILL ROADPLΔ2 2 3 2 2 4 2 2 7 228227226 2 2 5 229 230235240245250 231 232 236 237238239241242243244246248249251253254 XTOW: 227.8BOW:222.33XTOW: 225.1BOW:221.11XTOW: 226.0BOW:222.89XTOW: 227.0BOW:224.75XTOW: 228.0BOW:227.13MODIFIED STONE SLOPE STABILIZATIONMODIFIED STONE SLOPE STABILIZATION608143_HD3(GRADING).DWG 10-May-2016 8:03 AMPlotted on20SCALE: 1" = 20'050100FED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATEMAPROJECT FILE NO.-15 36NORTHAMPTON, MASSACHUSETTSROCKY HILL GREENWAY MULTI-USE TRAIL608413GRADING PLAN (3)HIGHWAY GUARD DETAILSNONETRAFFIC SIGNAL CONDUITNONEWATER SUPPLY ALTERATIONSNONEDRAINAGE DETAILSNONEN NAVD 88 BASE ELEV 120.00 PROPOSED BIKE PATH 130 140 150 160 170 180 190 200 210 220 230 240 227.550+00 226.31224.951+00 223.48221.932+00 221.06220.503+00 219.95219.424+00 218.91218.415+00 217.92217.406+00 216.70215.787+00 214.64213.318+00 211.96210.609+00 209.12207.4210+00 205.49203.3411+00 201.09198.8412+00 196.59194.3413+00 192.09189.8514+00 187.600+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 -2.44% -1.12% -0.99% -2.71% -4.50% -1.89%MATCHLINEMATCHLINESTART OF TRAIL 21' (L) X 24" SQ BOX CULVERT INVERT EL: 213.76 15' (L) X 24" SQ BOX CULVERT INVERT EL: 207.36 UTILITY CROSSING BIKE PATH ALIGNMENT Station =8+54.60 ELEV = 211.08 BIKE PATH ALIGNMENT Station =5+84.00 ELEV = 216.43 PROPOSED EXISTING HIGH POINT ELEV = 227.08 HIGH POINT STA = 0+19.26 PVI STA = 1+04.69 PVI ELEV = 225.00 A.D. = -0.84%K = 204.10 171' VC PVC: 0+19.26ELEV: 227.08PVT: 1+90.12ELEV: 222.201374.6' SSD HIGH POINT ELEV = 217.67 HIGH POINT STA = 5+75.83 PVI STA = 6+75.79 PVI ELEV = 216.68 A.D. = -1.72% K = 115.99 200' VC PVC: 5+75.83ELEV: 217.67PVT: 7+75.75ELEV: 213.97726.1' SSD HIGH POINT ELEV = 210.68 HIGH POINT STA = 8+97.19 PVI STA = 9+97.19 PVI ELEV = 207.97 A.D. = -1.79% K = 111.75 200' VC PVC: 8+97.19ELEV: 210.68PVT: 10+97.19ELEV: 203.47703.0' SSD LOW POINT ELEV = 218.83 LOW POINT STA = 4+58.05 PVI STA = 3+83.10 PVI ELEV = 219.57 A.D. = 0.13% K = 1128.75 150' VC PVC: 3+08.14ELEV: 220.41PVT: 4+58.05ELEV: 218.83???' SSD 608143_HD3(GRADING).DWG10-May-2016 8:03 AMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -16 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 ROCKY HILL GREENWAY PROFILE PLAN (1) ROCKY HILL GREENWAY PROFILE HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 10'CONTINUED ONSHEET NO. 17 120 130 140 150 160 170 180 190 200 210 220 230 240 194.3413+00 192.09189.8514+00 187.60185.3515+00 183.10180.8516+00 178.60176.3517+00 174.22172.3618+00 170.77169.2419+00 167.72166.1920+00 164.66163.1421+00 161.61160.0822+00 158.55157.0323+00 155.50153.9724+00 152.45150.9225+00 149.39147.8726+00 27+0013+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 -4.50% -3.05%MATCHLINEMATCHLINE82' (L) X 24" SQ BOX CULVERT INVERT EL: 157.00 BIKE PATH ALIGNMENT Station =18+79.44 ELEV = 169.87 PROPOSED EXISTING LOW POINT ELEV = 171.24 LOW POINT STA = 18+34.43 PVI STA = 17+68.90 PVI ELEV = 173.25 A.D. = 1.45% K = 90.63 131' VC PVC: 17+03.37ELEV: 176.19PVT: 18+34.43ELEV: 171.24???' SSD 608143_HD3(GRADING).DWG10-May-2016 8:03 AMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -17 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 ROCK HILL GREENWAY PROFILE PLAN (2) ROCKY HILL GREENWAY PROFILE HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 10'CONTINUED ONSHEET NO. 16 NAVD 88 BASE ELEV 200.00 ROCKY HILL RD 8' PATH 210 220 230 240 250 260 270 200 210 220 230 240 250 260 270 256.270+00 253.40250.481+00 247.48244.922+00 241.85239.043+00 236.42233.164+00 230.89226.065+00 223.116+000+00 1+00 2+00 3+00 4+00 5+00 6+00 -5.63% -4.33%GRADE BREAK STA = 0+23.50ELEV = 254.90GRADE BREAK STA = 4+52.00ELEV = 230.78GRADE BREAK STA = 5+69.24ELEV = 225.70608143_HD3(GRADING).DWG10-May-2016 8:03 AMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -18 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 ROCKY HILL RD MULTI-USE PATH PROFILE PLAN ROCKY HILL RD MULTI-USE PATH PROFILE HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 10' ROCKY HI L L RO A D ROCKY HILL ROADMATCHLINEMATCHLINEPLPLPLPLPLPLTP 11 2 3 4 5 6 7 8 9 10 11 120+00 +41.44 OFFSET: 6.79 +73.99 OFFSET: 6.79 +73.99 OFFSET: 6.79 +41.44 OFFSET: 6.79 +64.79 OFFSET: 10.93 +64.10 OFFSET: 10.20 +99.18 OFFSET: 10.82 +99.21 OFFSET: 10.58 +66.19 OFFSET: 8.00 +66.19 OFFSET: 8.00 12345 0+005+81.24L1 L2 L3 L12 L13 L14 L4 L5 L6 L7 L8 L9 L10 L11 C1 L25L26L27L28L29L30L31L32L33L34L35L36L37L38L39L40L41L42L43L44L45L46L47 L48C12 C13 WARNING SIGN (W7-5 & W16-9P) STA 7+85.83 7.50' RT USE SAME POST FOR SIGNS "PATH NARROWS" SIGN (W5-4a) "NO MOTOR VEHICLES" SIGN (R5-3). STA 7+32.90 11.00' RT USE SAME POST FOR SIGNS "HANDICAP PARKING" SIGN (R7-8 & R7-8p) STA 0+25.98 28.66' RT PATHNARROWS NOMOTORVEHICLES "ROCKY HILL GREENWAY TRAIL AHEAD" SIGN (D11-1d & W16-9p) STA 3+21.60 LT 6.00' ROCKY HILLGREENWAY "ROCKY HILL GREENWAY TRAIL AHEAD" SIGN (D11-1d & W16-9p) ROCKY HILLGREENWAY 10' WIDE CROSSWALK PROTECT EXISTING BIKE LANE MARKING DURING CONSTRUCTION CLOSE ONE LANE DURING CONSTRUCTION OF MULTI-USE PATH FOR TEMPORARY PEDESTRIAN ROUTE ROCKY HILL RD SIGN MA-D3-1 STA 0+20.00 15.50' LT RELOCATE STOP SIGN FED. AID PROJ. NO.SHEETNO.TOTALSHEETS NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 36 STATE MA PROJECT FILE NO. - SIGNS AND MARKINGS PLAN (1) 608413 19 HIGHWAY GUARD DETAILS NONE TRAFFIC SIGNAL CONDUIT NONE WATER SUPPLY ALTERATIONS NONE DRAINAGE DETAILS NONE 608143_HD6(TRAFFIC SIGNAGE).DWG10-Mar-2015 3:39 PMPlotted on0 SCALE: 1" = 40' 40 160100 NCONTINUED ONSHEET NO. 20 NEW HAVEN AND NORTHAMPTON CANAL LINE RAIL TRAILMATCHLINEMATCHLINEPL PL PL PL TP 1TP 2 10 11 12 13 14 15 161718 192021 22 2 324 25 26 26+30.03 L1 3 L14 L15 L16 L17L18 L19L20L2 1 L22 L 2 3 L24 C1 C2 C3 C4C5C6 C7C8C9 C10C11WARNING SIGNS (W1-5 & W16-9p) STA 15+18.16 8.00' RT ROCKY HILLGREENWAY WARNING SIGNS (W1-5 & W16-9p) STA 25.31.30 8.00 LT "ROCKY HILL GREENWAY TRAIL AHEAD" SIGN(D11-1d & M4-5)STA 25+88.16 44.00 LT & STA 26+22.55 22.5 RT CANAL LINERAIL TRAIL "CANAL LINE RAIL TRAIL AHEAD"SIGN (D11-1e & M-4-6)STA 25+75.00 6.75 RT FED. AID PROJ. NO.SHEETNO.TOTALSHEETS NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 36 STATE MA PROJECT FILE NO. - SIGNS AND MARKINGS PLAN (2) 608413 20 HIGHWAY GUARD DETAILS NONE TRAFFIC SIGNAL CONDUIT NONE WATER SUPPLY ALTERATIONS NONE DRAINAGE DETAILS NONE 608143_HD6(TRAFFIC SIGNAGE).DWG10-Mar-2015 3:39 PMPlotted onN CONTINUED ONSHEET NO. 190 SCALE: 1" = 40' 40 160100 608143_HD4(DETAILS).DWG21-Dec-2018 2:43 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -21 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 TRAFFIC SIGNAGE DETAILS ANDPOST SIZE REQUIREDNUMBER OF NUMBER REQUIREDSIGNSTEXT HEIGHT IDENTIFI- NUMBER CATION WIDTH SIZE OF SIGN 18"18" 18"24" 2W1-5 W7-5 D11-1d 18 18" NOTES: 1. SIGN SIZE, LETTERING, TEXT, AND COLORS PER MUTCD STANDARDS. ALL ROADWAY TRAFFIC SIGNSARE HIGH INTENSITY GRADE REFLECTIVE YELLOW-GREEN WHEN AVAILABLE. 2. ALL WARNING, REGULATORY AND ROUTE MARKERS ARE FABRICATED WITH HIGH INTENSITY ENCAPSULATED LENS REFLECTIVE SHEETING (SEE SECTION M9.30.0) TYPE III OR IV. 3. ALL P5 POSTS ARE TELESCOPIC BREAKAWAY SQUARE TUBE POSTS PAINTED BLACK UNLESS OTHERWISE REQUIRED. POSTS LOCATED IN PAVEMENT SHALL BE SET IN A BOLLARD PER THE DETAILS. 4. QUANTITIES OF SIGNS AND POSTS SHOWN ON THIS SHEET MAY DIFFER FROM THE SITE PLAN. WHEREDIFFERENCES OCCUR, THE PAVEMENT MARKINGS AND SIGNAGE PLANS WILL PREVAIL. 5. SIGNS LISTED WITHOUT POSTS ARE EITHER SECURED TO A PROPOSED OR EXISTING FEATURE OR MOUNTED ON A POST WITH ANOTHER SIGN LISTED. 4 12"18"1 1 ROCKY HILLGREENWAY P5 (4 REQ'D) NOMOTORVEHICLES R5-3 24"24"1 PATHNARROWS18" 18"1W5-4a NOT TO SCALE P5 (1 REQ'D) P5 (2 REQ'D) P5 (1 REQ'D) P5 (1 REQ'D) P5 (0 REQ'D) R7-8 R7-8p 18"9"1 W16-9P 18"9"5 P5 (0 REQ'D) CANAL LINERAIL TRAIL18"24"D11-1e 1 P5(1 REQ'D) 12"18"1 P5 (0 REQ'D) M-4-6 12"18"2 P5 (0 REQ'D) M4-5 BORDERBACK-GROUNDHEIGHTLETTER TEXT DIMENSIONS (INCHES) SPACINGVERTICAL COLOR LEGEND MUTCD STANDARD MUTCD STANDARD 608143_HD4(DETAILS).DWG21-Dec-2018 2:43 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -22 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 TRAFFIC MANAGEMENT (1) P/F NUMBER OF LANES NUMBER OF STUDIES AVERAGE CAPACITY MEASURED AVERAGE WORK ZONE CAPACITIES LEGEND: NOTES: ROAD TYPE DISTANCE BETWEEN SIGNS ** BA C SUGGESTED WORK ZONE WARNING SIGN SPACING STOPPING SIGHT DISTANCE AS A FUNCTION OF SPEED SPEED* (mph) DISTANCE (ft) SPEED* (km/h) DISTANCE (m) FORMULAS FOR DETERMINING TAPER LENGTHS SPEED LIMIT (S)TAPER LENGTH (L)Meters TYPE OF TAPER TAPER LENGTH (L)* TAPER LENGTH CRITERIA FOR TEMPORARY TRAFFIC CONTROL ZONES SPEED LIMIT (S)TAPER LENGTH (L)FEET 608143_HD4(DETAILS).DWG21-Dec-2018 2:44 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -23 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 TRAFFIC MANAGEMENT (2) panelStyle:construction_guide.ssipanelName:namepanelQuantity:1panelStation:nonepanelMaterial:0legendMaterial:0panelMounting:0panelWidthLock:1panelHeightLock:1marginAlign:9panelRoundCorners:0panelSizes:constructPanelMode:0constructPanels:36|24|18 panelStyle:regulatory.ssmpanelName:namepanelQuantity:1panelStation:nonepanelMaterial:0legendMaterial:0panelMounting:0panelWidthLock:0panelHeightLock:0marginAlign:9panelRoundCorners:0panelSizes:constructPanelMode:0constructPanels:36|24|18 LEGEND DIRECTION OF TRAVEL DOWNSTREAM TAPER: GUIDES TRAFFIC BACK TO ITS ORIGINAL TRAVEL PATH TERMINATION AREA: LETS TRAFFIC RESUME NORMAL OPERATIONS ACTIVITY AREA: WHERE WORK TAKES PLACE TRANSITION AREA: MOVES TRAFFIC OUT OF ITS NORMAL PATH ADVANCE WARNING AREA: TELLS TRAFFIC WHAT TO EXPECT AHEAD LONGITUDINAL BUFFER SPACE LONGITUDINAL BUFFER SPACE: PROVIDES PROTECTION FOR TRAFFIC AND WORKERS = STOPPING SIGHT DISTANCE. NOTHING SHALL BE PLACED/STORED IN BUFFER SPACE SHOULDER TAPER: GUIDES TRAFFIC AWAY FROM SHOULDER/ BREAK-DOWN LANE LATERAL BUFFER SPACE: PROVIDES PROTECTION FOR TRAFFIC AND WORKERS TRAFFIC SPACE: ALLOWS TRAFFIC TO PASS THROUGH THE ACTIVITY AREA WORK SPACE: SET ASIDE FOR WORKERS, EQUIPMENT, AND MATERIAL STORAGE USE "G20-1" SIGN AT PROJECT LIMIT IF WORK OCCURS OVER A DISTANCE OF MORE THAN 2 MILES (3.2 KM)W20-SERIES R2-10a R2-10e G20-1 B OR C ROADWORKXXX ROAD WORK NEXT XX MILES panelStyle:construction_guide.ssipanelName:namepanelQuantity:1panelStation:nonepanelMaterial:0legendMaterial:0panelMounting:0panelWidthLock:1panelHeightLock:1marginAlign:9panelRoundCorners:0panelSizes:constructPanelMode:0constructPanels:36|24|18 END ROADWORKDOUBLEFINES END WORK ZONES SPEEDINGFINESDOUBLED A THE "A" DISTANCE CAN BE MEASURED FROM THE START OF THE TRAVEL LANE RESTRICTION OR THE SHOULDER/BREAKDOWN LANE RESTRICTION (IF SHOULDER/BREAKDOWN LANE IS ONLY LANE BEING CLOSED) CHANNELIZING DEVICEWORK AREA SIGN COMPONENT PARTS OF A TEMPORARY TRAFFIC CONTROL (TTC) ZONE 12*1 14 24" (MIN.) REFLECTORIZED DRUM NOT TO SCALE LIMIT OF EXCAVATION TEMPORARY BIT. CONC. PAVEMENT GRAVEL BORROW/SUBBASE EXIST. PAVEMENT LONGITUDINAL DROP-OFF DETAIL TRAVEL WAY WORK AREA DIRECTION OF TRAFFIC W8-3 OR W8-8 OR W8-1 * - INCREASE SLOPE RATIO FOR HIGHER SPEEDS NOT TO SCALE C Depth≥4" LATERAL DROP-OFF DETAIL LATERAL AND LONGITUDINAL DROP-OFF DETAILS B W5-1W21-5a RIGHTSHOULDERCLOSED ROAD NARROWS AWORK ZONE 100 FT (30m) BUFFER L/3100 FT (30m) TWO LANE ROAD SHOULDER CLOSED B A WORK ZONE BUFFER A BL/2DOWNSTREAM TAPER 100 FT (30m) MAX W5-1 ROAD NARROWS W1-4R W5-1 ROAD NARROWS W1-4R W1-4L L/2 W1-4L BUFFER L/3 TWO LANE ROAD SHOULDER AND TRAVEL LANE CLOSED WORK ZONE 100FT (30m) MAX. 100FT (30m) MAX. BUFFER 100-150FT (30-45m) W20-7b POLICEOFFICERAHEAD W20-4 W13-1p ONE LANEROADXXX XXM.P.H. W20-4 W13-1p ONE LANEROADXXX XXW20-7b POLICEOFFICERAHEAD P/F OR W20-7 W20-7 OR P/F A B AB M.P.H. TWO LANE ROAD ONE LANE ALTERNATING TRAFFIC 1+00 220 224 228 220 224 228 0 10 20 30 400-10-20-30-40 1+82.53 220 224 220 224 0 10 20 30 400-10-20-30-40 2+00 220 224 220 224 0 10 20 30 400-10-20-30-40 2+66.13 216 220 224 216 220 224 0 10 20 30 400-10-20-30-40 3+00 216 220 224 216 220 224 0 10 20 30 400-10-20-30-40 4+00 216 220 216 220 0 10 20 30 400-10-20-30-40 5+00 212 216 220 212 216 220 0 10 20 30 400-10-20-30-40 6+00 212 216 220 212 216 220 0 10 20 30 400-10-20-30-40 608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -24 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 ROCKY HILL GREENWAY CROSS SECTIONS (1)CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 4 4 8 4 4 8 7+00 212 216 220 212 216 220 0 10 20 30 400-10-20-30-40 8+00 208 212 216 208 212 216 0 10 20 30 400-10-20-30-40 9+00 208 212 216 208 212 216 0 10 20 30 400-10-20-30-40 10+00 204 208 212 216 204 208 212 216 0 10 20 30 400-10-20-30-40 10+01.21 204 208 212 216 204 208 212 216 0 10 20 30 400-10-20-30-40 608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -25 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 ROCKY HILL GREENWAY CROSS SECTIONS (2)CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 4 4 8 4 4 8 11+00 200 204 208 212 216 220 200 204 208 212 216 220 0 10 20 30 400-10-20-30-40 11+28.93 200 204 208 212 216 220 200 204 208 212 216 220 0 10 20 30 400-10-20-30-40 11+44.69 200 204 208 212 216 220 200 204 208 212 216 220 0 10 20 30 40 500-10-20-30-40 608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -26 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 ROCKY HILL GREENWAY CROSS SECTIONS (3)CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 4 4 8 4 4 8 11+60.44 199 200 204 208 212 216 220 199 200 204 208 212 216 220 0 10 20 30 400-10-20-30-40 12+00 196 200 204 208 212 216 196 200 204 208 212 216 0 10 20 30 400-10-20-30-40 12+51.54 192 196 200 204 208 192 196 200 204 208 0 10 20 30 400-10-20-30-40 12+69.49 192 196 200 204 192 196 200 204 0 10 20 30 400-10-20-30-40 608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -27 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 ROCKY HILL GREENWAY CROSS SECTIONS (4)CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 4 4 8 4 4 8 12+87.45 192 196 200 204 192 196 200 204 0 10 20 30 400-10-20-30-40 13+00 192 196 200 204 192 196 200 204 0 10 20 30 400-10-20-30-40 14+00 184 188 192 196 200 184 188 192 196 200 0 10 20 30 400-10-20-30-40 14+19.01 180 184 188 192 196 180 184 188 192 196 0 10 20 30 400-10-20-30-40 14+23.94 180 184 188 192 196 180 184 188 192 196 0 10 20 30 400-10-20-30-40 608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -28 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 ROCKY HILL GREENWAY CROSS SECTIONS (5)CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 4 4 8 4 4 8 14+28.87 180 184 188 192 196 180 184 188 192 196 0 10 20 30 400-10-20-30-40 15+00 180 184 188 192 180 184 188 192 0 10 20 30 400-10-20-30-40 15+54.72 172 176 180 184 172 176 180 184 0 10 20 30 400-10-20-30-40 16+00 172 176 180 184 172 176 180 184 0 10 20 30 400-10-20-30-40 16+01.71 168 172 176 180 184 168 172 176 180 184 0 10 20 30 400-10-20-30-40 608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -29 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 ROCKY HILL GREENWAY CROSS SECTIONS (6)CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 4 4 8 4 4 8 16+48.70 164 168 172 176 180 164 168 172 176 180 0 10 20 30 400-10-20-30-40 16+53.83 164 168 172 176 180 164 168 172 176 180 0 10 20 30 400-10-20-30-40 16+88.83 164 168 172 176 180 164 168 172 176 180 0 10 20 30 400-10-20-30-40 17+00 164 168 172 176 180 164 168 172 176 180 0 10 20 30 400-10-20-30-40 608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -30 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 ROCKY HILL GREENWAY CROSS SECTIONS (7)CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 4 4 8 4 4 8 17+23.84 160 164 168 172 176 160 164 168 172 176 0 10 20 30 400-10-20-30-40 17+25.96 160 164 168 172 176 160 164 168 172 176 0 10 20 30 400-10-20-30-40-50 17+95.66 156 160 164 168 172 176 156 160 164 168 172 176 0 10 20 30 400-10-20-30-40-50 608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -31 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 ROCKY HILL GREENWAY CROSS SECTIONS (8)CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 4 4 8 4 4 8 18+00 156 160 164 168 172 176 156 160 164 168 172 176 0 10 20 30 400-10-20-30-40-50 18+65.35 156 160 164 168 172 156 160 164 168 172 0 10 20 30 400-10-20-30-40-50 19+00 156 160 164 168 172 156 160 164 168 172 0 10 20 30 400-10-20-30-40 19+16.35 156 160 164 168 172 156 160 164 168 172 0 10 20 30 400-10-20-30-40 608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -32 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 ROCKY HILL GREENWAY CROSS SECTIONS (9)CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 4 4 8 4 4 8 19+47.44 156 160 164 168 156 160 164 168 0 10 20 30 400-10-20-30-40 19+78.53 156 160 164 168 156 160 164 168 0 10 20 30 400-10-20-30-40 19+85.54 160 164 168 160 164 168 0 10 20 30 400-10-20-30-40 20+00 160 164 168 160 164 168 0 10 20 30 400-10-20-30-40 20+42.56 160 164 168 160 164 168 0 10 20 30 400-10-20-30-40 20+99.57 160 164 168 160 164 168 0 10 20 30 400-10-20-30-40 21+00 160 164 168 160 164 168 0 10 20 30 400-10-20-30-40 608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -33 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 ROCKY HILL GREENWAY CROSS SECTIONS (10)CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 4 4 8 4 4 8 21+10.18 160 164 160 164 0 10 20 30 400-10-20-30-40 21+34.72 160 164 160 164 0 10 20 30 400-10-20-30-40 21+59.26 156 160 164 156 160 164 0 10 20 30 400-10-20-30-40 21+66.35 156 160 164 156 160 164 0 10 20 30 400-10-20-30-40 22+00 152 156 160 164 152 156 160 164 0 10 20 30 400-10-20-30-40 22+30.17 152 156 160 152 156 160 0 10 20 30 400-10-20-30-40 22+93.99 152 156 160 152 156 160 0 10 20 30 400-10-20-30-40 23+00 152 156 160 152 156 160 0 10 20 30 400-10-20-30-40 608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -34 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 ROCKY HILL GREENWAY CROSS SECTIONS (11)CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 4 4 8 4 4 8 23+54.50 152 156 160 152 156 160 0 10 20 30 400-10-20-30-40 24+00 152 156 160 152 156 160 0 10 20 30 400-10-20-30-40 24+32.13 152 156 152 156 0 10 20 30 400-10-20-30-40 25+00 148 152 156 148 152 156 0 10 20 30 400-10-20-30-40 25+09.76 148 152 156 148 152 156 0 10 20 30 400-10-20-30-40 26+00 144 148 152 144 148 152 0 10 20 30 400-10-20-30-40 26+30.03 144 148 144 148 0 10 20 30 400-10-20-30-40 608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -35 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 ROCKY HILL GREENWAY CROSS SECTIONS (12)CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 4 4 8 4 4 8 0+50 252 256 252 256 0 10 200-10-20 1+50 244 248 252 244 248 252 0 10 200-10-20 2+00 244 248 252 244 248 252 0 10 200-10-20 2+50 240 244 248 240 244 248 0 10 200-10-20 3+00 236 240 244 248 236 240 244 248 0 10 200-10-20 3+50 232 236 240 244 232 236 240 244 0 10 200-10-20 4+50 228 232 228 232 0 10 200-10-20 608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE MA PROJECT FILE NO. -36 36 NORTHAMPTON, MASSACHUSETTS ROCKY HILL GREENWAY MULTI-USE TRAIL 608413 ROCKY HILL RD MULTIUSE PATH CROSS SECTIONS CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 4 4 8 4 4 8 March 13, 2019 Northampton Conservation Commission c/o Sarah LaValley, Conservation, Preservation & Land Use Planner 210 Main Street, Planning & Sustainability Northampton, MA 01060 Dear Northampton Conservation Commission: On behalf of Northampton Planning & Sustainability, the Horsley Witten Group, Inc. (HW) is pleased to submit this Notice of Intent for the proposed Rocky Hill Greenway Multi-Use Trail. The 2,630 linear foot trail is proposed to connect Rocky Hill Road (Route 66) to the New Haven and Northampton Canal/Manhan Rail Trail near Easthampton Road (Route 10), Northampton. A portion of the proposed project will occur within Bordering Vegetated Wetland and its associated buffer zone, as well as within Riverfront Area. None of this work is within the Natural Heritage and Endangered Species Program Estimated Habitat of Rare Wildlife and Certified Vernal Pools and Priority Habitat of Rare Species. These jurisdictional areas are protected and regulated under the Massachusetts Wetlands Protection Act (M.G.L. Ch. 131 § 40), its implementing Regulations (310 CMR 10.00) and the Northampton Wetlands Protection Ordinance (Chapter 337). Proposed mitigation includes providing wetland replacement at a greater than 1:1 ratio. Stormwater management practices will be implemented and an erosion and sedimentation control barrier will be used to protect downgradient resource areas. Construction-related impacts will be minimized and disturbed areas will be stabilized and restored upon completion of construction. HW has completed and submitted an online application, and is submitting nine copies of the NOI application, supporting documentation, and project plans directly to the Conservation Commission. One additional full size plan set is also included. A copy of the NOI has been filed with the Massachusetts Department of Environmental Protection (MassDEP), Western Regional Office. As the Applicant is a municipal entity, the project is exempt from filing fees. The Applicant will send notification of the pending public hearing to abutters in accordance with State and local filing regulations within the required timeframe. If you need additional information please contact us at (508) 833-6600. Thank you. Sincerely, HORSLEY WITTEN GROUP, INC. Amy M. Ball, PWS, CWS Senior Ecologist Justin L. Lamoureux, P.E. Project Manager wpaform3.doc • rev. 4/22/2015 Page 1 of 9 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number NORTHAMPTON City/Town Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. Note: Before completing this form consult your local Conservation Commission regarding any municipal bylaw or ordinance. A. General Information 1.Project Location (Note: electronic filers will click on button to locate project site): Rocky Hill Road (MA Rt. 66) to Easthampton Road (MA Rt. 10) a. Street Address Northampton b. City/Town 01060 c. Zip Code Latitude and Longitude: 42°18'20.85" N d. Latitude 72°39'41.52" W e. Longitude 37 f. Assessors Map/Plat Number 049-001 g. Parcel /Lot Number 2.Applicant: Wayne a. First Name Feiden b. Last Name City of Northampton Planning & Sustainability c.Organization 210 Main Street d. Street Address Northampton e. City/Town MA f. State 01060 g. Zip Code 413-587-1265 h. Phone Number i. Fax Number wfeiden@northamptonma.gov j. Email Address 3.Property owner (required if different from applicant):Check if more than one owner a. First Name b. Last Name c. Organization d. Street Address e. City/Town f. State g. Zip Code h. Phone Number i. Fax Number j.Email address 4.Representative (if any): Amy a. First Name Ball b. Last Name Horsley Witten Group c. Company 90 Route 6A d. Street Address Sandwich e. City/Town MA f. State 02563 g. Zip Code 508-833-6600 h. Phone Number i. Fax Number aball@horsleywitten.com j. Email address 5.Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form): (municipal project - fee exempt) a. Total Fee Paid b. State Fee Paid c. City/Town Fee Paid wpaform3.doc • rev. 4/22/2015 Page 2 of 9 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number NORTHAMPTON City/Town A. General Information (continued) 6.General Project Description: The proposed project is a mutli-use trail connecting the New Haven and Northampton Canal/Manhan Rail Trail at Easthampton Road (MA Route 10) to Rocky Hill Road (MA Route 66). The 2,630 LF trailwill vary from 16 feet wide along an existing access road off Route 66 to 10 feet wide along the steeper slopes descending toward the Manhan Rail Trail. See attached for additional detail. 7a. Project Type Checklist: (Limited Project Types see Section A. 7b.) 1. 2. Residential Subdivision 3. 4. Dock/Pier 5. 6. Coastal engineering Structure 7. 8. Transportation 9. Single Family Home Commercial/Industrial Utilities Agriculture (e.g., cranberries, forestry) Other- Multi-Use Trail 7b. Is any portion of the proposed activity eligible to be treated as a limited project (including Ecological Restoration Limited Project) subject to 310 CMR 10.24 (coastal) or 310 CMR 10.53 (inland)? 1. Yes No If yes, describe which limited project applies to this project. (See 310 CMR 10.24 and 10.53 for a complete list and description of limited project types) 2. Limited Project Type If the proposed activity is eligible to be treated as an Ecological Restoration Limited Project (310 CMR10.24(8), 310 CMR 10.53(4)), complete and attach Appendix A: Ecological Restoration Limited Project Checklist and Signed Certification. 8.Property recorded at the Registry of Deeds for: Hampshire a. County b. Certificate # (if registered land) 11784 c. Book 194 d. Page Number B. Buffer Zone & Resource Area Impacts (temporary & permanent) 1. Buffer Zone Only – Check if the project is located only in the Buffer Zone of a Bordering Vegetated Wetland, Inland Bank, or Coastal Resource Area. 2. Inland Resource Areas (see 310 CMR 10.54-10.58; if not applicable, go to Section B.3, Coastal Resource Areas). Check all that apply below. Attach narrative and any supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. wpaform3.doc • rev. 4/22/2015 Page 3 of 9 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number NORTHAMPTON City/Town B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont’d) For all projects affecting other Resource Areas, please attach a narrative explaining how the resource area was delineated. Resource Area Size of Proposed Alteration Proposed Replacement (if any) a. Bank 1. linear feet 2. linear feet b. Bordering Vegetated Wetland 1. square feet 2. square feet c. Land Under Waterbodies and Waterways 1,573 1.square feet 2,680 2. square feet 3. cubic yards dredged Resource Area Size of Proposed Alteration Proposed Replacement (if any) d. Bordering Land Subject to Flooding 1. square feet 2. square feet 3. cubic feet of flood storage lost 4. cubic feet replaced e. Isolated Land Subject to Flooding 1. square feet 2. cubic feet of flood storage lost 3. cubic feet replaced f. Riverfront Area Rocky Hill Pond Brook - inland 1. Name of Waterway (if available) - specify coastal or inland 2.Width of Riverfront Area (check one): 25 ft. - Designated Densely Developed Areas only 100 ft. - New agricultural projects only 200 ft. - All other projects 3.Total area of Riverfront Area on the site of the proposed project:82,137 SF square feet 4.Proposed alteration of the Riverfront Area: 19,114 a. total square feet 0 b. square feet within 100 ft. 19,114 c. square feet between 100 ft. and 200 ft. 5.Has an alternatives analysis been done and is it attached to this NOI? Yes No 6.Was the lot where the activity is proposed created prior to August 1, 1996? Yes No 3. Coastal Resource Areas: (See 310 CMR 10.25-10.35) Note: for coastal riverfront areas, please complete Section B.2.f. above. wpaform3.doc • rev. 4/22/2015 Page 4 of 9 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number NORTHAMPTON City/Town B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont’d) Check all that apply below. Attach narrative and supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. Online Users: Include your document transaction number (provided on your receipt page) with all supplementary information you submit to the Department. Resource Area Size of Proposed Alteration Proposed Replacement (if any) a. Designated Port Areas Indicate size under Land Under the Ocean, below b. Land Under the Ocean 1. square feet 2. cubic yards dredged c. Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes below d. Coastal Beaches 1. square feet 2. cubic yards beach nourishment e. Coastal Dunes 1. square feet 2. cubic yards dune nourishment Size of Proposed Alteration Proposed Replacement (if any) f. Coastal Banks 1. linear feet g. Rocky Intertidal Shores 1. square feet h. Salt Marshes 1. square feet 2. sq ft restoration, rehab., creation i. Land Under Salt Ponds 1. square feet 2. cubic yards dredged j. Land Containing Shellfish 1. square feet k. Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above 1. cubic yards dredged l. Land Subject to Coastal Storm Flowage 1. square feet 4. Restoration/Enhancement If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.2.b or B.3.h above, please enter the additional amount here. a. square feet of BVW b. square feet of Salt Marsh 5. Project Involves Stream Crossings a. number of new stream crossings b. number of replacement stream crossings wpaform3.doc • rev. 4/22/2015 Page 5 of 9 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number NORTHAMPTON City/Town C. Other Applicable Standards and Requirements This is a proposal for an Ecological Restoration Limited Project. Skip Section C and complete Appendix A: Ecological Restoration Notice of Intent – Required Actions (310 CMR 10.11). Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review 1.Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated onthe most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by theNatural Heritage and Endangered Species Program (NHESP)? To view habitat maps, see the Massachusetts Natural Heritage Atlas or go tohttp://maps.massgis.state.ma.us/PRI_EST_HAB/viewer.htm. a. Yes No If yes, include proof of mailing or hand delivery of NOI to: Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife 1 Rabbit Hill Road Westborough, MA 01581 Phone: (508) 389-6360 October 1, 2008 b. Date of map If yes, the project is also subject to Massachusetts Endangered Species Act (MESA) review (321 CMR 10.18). To qualify for a streamlined, 30-day, MESA/Wetlands Protection Act review, please complete Section C.1.c, and include requested materials with this Notice of Intent (NOI); OR complete Section C.1.f, if applicable. If MESA supplemental information is not included with the NOI, by completing Section 1 of this form, the NHESP will require a separate MESA filing which may take up to 90 days to review (unless noted exceptions in Section 2 apply, see below). c.Submit Supplemental Information for Endangered Species Review 1. Percentage/acreage of property to be altered: (a)within wetland Resource Area 40%/1.03 ac percentage/acreage (b)outside Resource Area 1.57 ac percentage/acreage 2. Assessor’s Map or right-of-way plan of site 2. Project plans for entire project site, including wetland resource areas and areas outside of wetlands jurisdiction, showing existing and proposed conditions, existing and proposed tree/vegetation clearing line, and clearly demarcated limits of work  (a) Project description (including description of impacts outside of wetland resource area & buffer zone) (b) Photographs representative of the site Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review (seehttp://www.mass.gov/eea/agencies/dfg/dfw/natural-heritage/regulatory-review/). Priority Habitat includes habitat for state-listed plantsand strictly upland species not protected by the Wetlands Protection Act. MESA projects may not be segmented (321 CMR 10.16). The applicant must disclose full development plans even if such plans arenot required as part of the Notice of Intent process. wpaform3.doc • rev. 4/22/2015 Page 6 of 9 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number NORTHAMPTON City/Town C. Other Applicable Standards and Requirements (cont’d) (c) MESA filing fee (fee information available at http://www.mass.gov/dfwele/dfw/nhesp/regulatory_review/mesa/mesa_fee_schedule.htm). Make check payable to “Commonwealth of Massachusetts - NHESP” and mail to NHESP at above address Projects altering 10 or more acres of land, also submit: (d) Vegetation cover type map of site (e) Project plans showing Priority & Estimated Habitat boundaries (f)OR Check One of the Following 1. Project is exempt from MESA review. Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14, http://www.mass.gov/dfwele/dfw/nhesp/regulatory_review/mesa/mesa_exemptions.htm; the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to 310 CMR 10.37 and 10.59.) 2. Separate MESA review ongoing. 15-34694 a. NHESP Tracking # 07/22/15 b. Date submitted to NHESP 3. Separate MESA review completed. Include copy of NHESP “no Take” determination or valid Conservation & Management Permit with approved plan. 3.For coastal projects only, is any portion of the proposed project located below the mean high waterline or in a fish run? a. Not applicable – project is in inland resource area only b. Yes No If yes, include proof of mailing, hand delivery, or electronic delivery of NOI to either: South Shore - Cohasset to Rhode Island border, and the Cape & Islands: Division of Marine Fisheries - Southeast Marine Fisheries Station Attn: Environmental Reviewer 1213 Purchase Street – 3rd Floor New Bedford, MA 02740-6694 Email: DMF.EnvReview-South@state.ma.us North Shore - Hull to New Hampshire border: Division of Marine Fisheries - North Shore Office Attn: Environmental Reviewer 30 Emerson Avenue Gloucester, MA 01930 Email: DMF.EnvReview-North@state.ma.us Also if yes, the project may require a Chapter 91 license. For coastal towns in the Northeast Region, please contact MassDEP’s Boston Office. For coastal towns in the Southeast Region, please contact MassDEP’s Southeast Regional Office. wpaform3.doc • rev. 4/22/2015 Page 7 of 9 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number NORTHAMPTON City/Town C.Other Applicable Standards and Requirements (cont’d) Online Users: Include your document transaction number (provided on your receipt page) with all supplementary information you submit to the Department. 4.Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)? a. Yes No If yes, provide name of ACEC (see instructions to WPA Form 3 or MassDEP Website for ACEC locations). Note: electronic filers click on Website. b. ACEC 5.Is any portion of the proposed project within an area designated as an Outstanding Resource Water(ORW) as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00? a. Yes No 6.Is any portion of the site subject to a Wetlands Restriction Order under the Inland WetlandsRestriction Act (M.G.L. c. 131, § 40A) or the Coastal Wetlands Restriction Act (M.G.L. c. 130, § 105)? a. Yes No 7.Is this project subject to provisions of the MassDEP Stormwater Management Standards? a. Yes. Attach a copy of the Stormwater Report as required by the Stormwater Management Standards per 310 CMR 10.05(6)(k)-(q) and check if: 1. Applying for Low Impact Development (LID) site design credits (as described in Stormwater Management Handbook Vol. 2, Chapter 3) 2. A portion of the site constitutes redevelopment 3. Proprietary BMPs are included in the Stormwater Management System. b. No. Check why the project is exempt: 1. Single-family house 2. Emergency road repair 3. Small Residential Subdivision (less than or equal to 4 single-family houses or less than or equal to 4 units in multi-family housing project) with no discharge to Critical Areas. D.Additional Information This is a proposal for an Ecological Restoration Limited Project. Skip Section D and completeAppendix A: Ecological Restoration Notice of Intent – Minimum Required Documents (310 CMR10.12). Applicants must include the following with this Notice of Intent (NOI). See instructions for details. Online Users: Attach the document transaction number (provided on your receipt page) for any ofthe following information you submit to the Department. 1. USGS or other map of the area (along with a narrative description, if necessary) containing sufficient information for the Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.) 2. Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative to the boundaries of each affected resource area. wpaform3.doc • rev. 4/22/2015 Page 8 of 9 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number NORTHAMPTON City/Town D. Additional Information (cont’d) 3. Identify the method for BVW and other resource area boundary delineations (MassDEP BVW Field Data Form(s), Determination of Applicability, Order of Resource Area Delineation, etc.), and attach documentation of the methodology. 4. List the titles and dates for all plans and other materials submitted with this NOI. Rocky Hill Greenway a. Plan Title Horsley Witten Group, inc. b. Prepared By Richard A. Claytor, Jr., P.E. c. Signed and Stamped by December 21, 2018 d. Final Revision Date 1' = 40' e. Scale f. Additional Plan or Document Title g. Date 5. If there is more than one property owner, please attach a list of these property owners not listed on this form. 6. Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed. 7. Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed. 8. Attach NOI Wetland Fee Transmittal Form 9. Attach Stormwater Report, if needed. E. Fees 1.Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority. Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form) to confirm fee payment: 2. Municipal Check Number 3. Check date 4. State Check Number 5. Check date 6. Payor name on check: First Name 7. Payor name on check: Last Name wpaform3.doc • rev. 4/22/2015 Page 9 of 9 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File Number Document Transaction Number NORTHAMPTON City/Town F. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, § 40. Notice must be made by Certificate of Mailing or in writing by hand delivery or certified mail (return receipt requested) to all abutters within 100 feet of the property line of the project location. 1. Signature of Applicant 2. Date 3. Signature of Property Owner (if different)4. Date 5. Signature of Representative (if any)6. Date For Conservation Commission: Two copies of the completed Notice of Intent (Form 3), including supporting plans and documents, two copies of the NOI Wetland Fee Transmittal Form, and the city/town fee payment, to the Conservation Commission by certified mail or hand delivery. For MassDEP: One copy of the completed Notice of Intent (Form 3), including supporting plans and documents, one copy of the NOI Wetland Fee Transmittal Form, and a copy of the state fee payment to the MassDEP Regional Office (see Instructions) by certified mail or hand delivery. Other: If the applicant has checked the “yes” box in any part of Section C, Item 3, above, refer to that section and the Instructions for additional submittal requirements. The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent. March 19, 2019As agent for the City of Northampton noifeetf.doc • Wetland Fee Transmittal Form • rev. 10/11 Page 1 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands NOI Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. A.Applicant Information 1.Location of Project: Rocky Hill Road (MA Rt. 66) to EasthamptonRoad (MA Rt. 10) a. Street Address Northampton b. City/Town N/A c.Check number (fee exempt) d.Fee amount 2.Applicant Mailing Address: Wayne a. First Name Feiden b. Last Name City of Northampton c. Organization 210 Main Street Room 11 d. Mailing Address Northampton e. City/Town MA f. State 01060 g. Zip Code 413-587-1265 h. Phone Number i. Fax Number wfeiden@northamptonma.gov j. Email Address 3.Property Owner (if different): a. First Name b. Last Name c. Organization d. Mailing Address e. City/Town f. State g. Zip Code h. Phone Number i. Fax Number j. Email Address To calculate filing fees, refer to the category fee list and examples in the instructions for filling out WPA Form 3 (Notice of Intent). B.Fees Fee should be calculated using the following process & worksheet. Please see Instructions before filling out worksheet. Step 1/Type of Activity: Describe each type of activity that will occur in wetland resource area and buffer zone. Step 2/Number of Activities: Identify the number of each type of activity. Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the instructions. Step 4/Subtotal Activity Fee: Multiply the number of activities (identified in Step 2) times the fee per category (identified in Step 3) to reach a subtotal fee amount. Note: If any of these activities are in a Riverfront Area in addition to another Resource Area or the Buffer Zone, the fee per activity should be multiplied by 1.5 and then added to the subtotal amount. Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4. Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract $12.50. To calculate the city/town share of the fee, divide the total fee in half and add $12.50. noifeetf.doc • Wetland Fee Transmittal Form • rev. 10/11 Page 2 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands NOI Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Fees (continued) Step 1/Type of Activity Step 2/Number of Activities Step 3/Individual Activity Fee Step 4/Subtotal Activity Fee Step 5/Total Project Fee: Step 6/Fee Payments: Total Project Fee: (fee exempt) a. Total Fee from Step 5 State share of filing Fee: b. 1/2 Total Fee less $12.50 City/Town share of filling Fee: c. 1/2 Total Fee plus $12.50 C. Submittal Requirements a.) Complete pages 1 and 2 and send with a check or money order for the state share of the fee, payable tothe Commonwealth of Massachusetts. Department of Environmental Protection Box 4062 Boston, MA 02211 b.) To the Conservation Commission: Send the Notice of Intent or Abbreviated Notice of Intent; a copy of this form; and the city/town fee payment. To MassDEP Regional Office (see Instructions): Send a copy of the Notice of Intent or Abbreviated Notice of Intent; a copy of this form; and a copy of the state fee payment. (E-filers of Notices of Intent may submit these electronically.) 167.71 76.9 100 141.79 197.51 50 73.69 66.28 149.1 184.18 446.96 190.58 564.52 676.34 267.22 527.69 349.52 146.78 200 100 210 350 190 105186.81 265.56 245 265.56234.33 107.8 79.87 40 102.29 58 62.83 139.87 113.92 212 150 93.31 156.14 479.77 329.23 397.41 404 404 359.6 321.42 152.18 372.55 80320 80 45.39 210.14 339.88 40.29 144.3 336.91 249.48 283.7 73.32 80 165 143.17 336.91 336.91 111.91 122.42 333.91 331.91 182.17 214.90 273.74 102.79 337.52 59.09 337.52 233.13 36.66 118.2 143.66 49.10 232.11 150 236.38 311.64 271 178.4 209 120.02 177.62 177.62 186.33 181.19 232.9 187.39 186.81 153.64 100.68 144.86 523.07 134.26 304.59 121.17 142.19 392.51 275 290 110 145 152.00 491 20 145.00 51.11 64.76 360 563.4 430 310 87.95 309.74 330 112 132 330 132 66 330 198 330 1408.36 1389 256 573 310 42 371.6 1420 846 107 185 201 130 890 229.5 1250 765.82 13301330 1085 1831 200 13381338 35.5 100 462.16 953.16 100 1040 410 130.15 200.69 117.59 140 263 100 100 305 6 306.15207.14 350 10 131.53 141.87 64.48 650 3016.95 342.00 91.84 107.68 44.03130.17 143.41 129.79 155.18 23 200 533.90 140.87 193 139.85 278.42 605.62 243.54 242.19 205.87 88.29 1058.65 496.19 643.00 124.34 321.00 350.00 312.96 1263.60 68.31 280.72 140.78 896.57 1035.41 213.98 8.42 604.30 8.54 282.55 431.15 352.13 72 200 350 74.53211.56 158 195 788.70 538.30 369.46 133.04 252.93 132.76 60.00 224.15 101.05 153.00 29.26 62.98 14.10 29.26125.18 101.49 185.85 111.28 318.11 1139.62 340.41 1480.03 79.24 260.34 256.99 228.78 295.821135.87 128.71 238.28 96.40 88.72 129.41 293.51 178.03 419.38 145.00 344.38 131.05 300.50 223.44 276.39 223.44 276.39223.04 150 138.4 154.6 128.5 143.2 132.9 111.7 398 169.93 145 50 97.5 144 100 141 100 100 145 147 109.2 125.9 321.69 344.03 343.93 124.6 124.75 80 241.95 152.18 197. 157.64 125.38 336.91 215.25 143.03 85.61 80.50 163.12 65.12 309.58 59.61 50.67 91.44 103.73 110.00 133.65 20.0080.94 151.63 85.90 101.19 70.77148.03 68.77 99.66 34.04 205.10 122.93 72.36 120.72 94.34 82.55 131.49 281.64 165.91 58.86 332.44 451.66 125.41 222.78 255.76 349.80 700.00 58.37 95.16 111.39141.46287.87 346.24 146.68 320.50 126.91 156.20 101.27 80.00 136.29 80.00 135.00 514.47161.44 224.61 245.81 262.15 128.43 80.00 129.95 42.96 136.74 133.39 79.20 46.19 83.76 156.64 156.64199.60 145.00 80.00 20.00 125.00 97.17 372.94 92.00 21.22 95.91 127.97132.30 113.22 85.00 135.00 85.00 135.00 83.20 130.45 95.11 120.15 94.4633.7989.84 231.8793.69 152.46 80.00 445.80 290.00 171.09 300.00 197.24 329.42160.26 64.01 129.20 185.19 153.09 115.00 350.00 429.53 697.81 1127.34 300.00 350.00 129.20 228.10 215.58 64.01 160.26 321 456.67 278.20 174.24 174.24116.82 116.82 183.18183.18 741.97 225.99 225.99 104.74 198.17208.53 147.39 95.23 116.28 65.3137.2942.00 385.75 156.05156.05 425 525.44 120.78120.78 90.58 90.58120.78 87.94 59.46 134.68 87.74 138.94 49.36 31.46 157.85 80.00 149.05 80.27 80.61 80.53 91.64 107.10 176.98 163.78 181.18181.18 126.13 126.13 140.56140.5680.04 60.00 110.78 919.26 317.00 523.07 235.61 790.24 511.50511.50 298.49419.27 161.54 281.81 119.87 271.16 250.18 359.71 446.52 249.80 119.77 160 244.3 114.42 202.92 291 100 102.19 105 126.72 100 231.07273.19 147.98 134.48 65.69 81.27 635.88 148 132 258.40 125.00 65.48 47.12 62.59 31.78 210 214.5 555.8 125.00 150.00 146.38 116.7 115 120 399.45 110 107 108.8 120 150 100 100 100 100 100 350.25 119.24 120 60 80 273 80 160 94.21 113.43 152.56 100 306 166.5 332.60 107.5 5.97 198 56 34.91 999.88 1005.28 130.00 238.55 120.36 690 130 117 211.66 162.70 211.30 24.55 866.99 159.61 125.71 47.61 47.40 48.87 164.86 235.54 228.86 216.92 221.29 381.89 283.81 93.00 93.00 202.46 63.66 133.89 12.40 140.00 139.13 140.00 140.00 140.00 140.00 112.9 162.5 148.02 50 92.62 125 125. 48.29 100.57 125.350 47.95 79.35 64.00 41.34 14.21 64.00 64.00 110.00 41.89 64.00 60.13 88.79 77.82 82.57 82.74 80.05 85.00 62.79 19.82 48.49 119.55 73.09 83.76 99.61 50.00 80.00 110.28 45.34 81.84 80.27 85.00 83.50 75.41 93.9147.12 97.40 70.77 148.41 80.0080.00 80.01 240.03 10.00 159.21 147.73 25.00 250.00 98.52 151.48 145 190 509 90.58 100.64 60.00 202.08 61.31 38.66 95.40 38.89 125. 125 125 161 119.32 190.27 105.45 263.72 120 198.96 80 80 100 141 156.41 66 171 680 40 131.84 131.84 573.75 205.47 270.20 39.24 101.19 50.32 255.46 112.49 35.00 80 121 35.93 87.52 385 459 unknownMAPLE R I DGE RD B U R T S P I T R DBURTS PIT RD PLATINUM CIRDIAMOND CTu n known unknownunknown ROCKY HILL RD-RT 66 GROVE S T C H AP E L ST unknown OLD WILSON RDEA STH AM PTO N R D unkno w n FLORENCE RDunknownBURTS PIT RD MOUNTAIN LAUREL PATH unknown Zoning: FFR Zoning: FFR Zoning: URB Zoning: BP Zoning: SR Zoning: FFR Zoning: FFR Zoning: FFR Zoning: FFR Zoning: FFR Zoning:WSP Zoning:WSP Zoning: GI Zoning: GI Zoning: GI Zoning: BP Zoning:BP Zoning: BP Zoning: SC Zoning: SC Zoning: SC Zoning: FFR 29 -487 30C-043 30C-046 30C-047 30C-05030C-051 30C-054 30C-06030C-072 30C-08030C-081 30C-090 30D-007 30D-009 30D-010 30D-012 36-091 36 -092 36 -093 36 -094 36 -165 36 -166 36 -167 36 -168 36 -169 36 -170 36 -171 36 -172 36 -173 36 -174 36 -232 36 -233 36 -234 36 -235 36 -236 36 -238 36 -239 36 -240 36 -250 36 -252 36 -28836 -405 37 -001 37 -002 37 -003 37 -004 37 -005 37 -006 37 -007 37 -008 37 -009 37 -010 37 -011 37 -012 37 -013 37 -014 37 -015 37 -016 37 -017 37 -018 37 -021 37 -023 37 -024 37 -025 37 -026 37 -027 37 -028 37 -029 37 -030 37 -031 37 -032 37 -033 37 -034 37 -035 37 -036 37 -037 37 -038 37 -039 37-040 37 -041 37 -042 37 -043 37 -044 37 -045 37 -046 37 -047 37 -048 37 -049 37 -050 37 -051 37 -055 37 -056 37 -057 37 -05837 -059 37 -060 37 -061 37 -062 37 -063 37 -064 37 -068 37 -069 37 -070 37 -071 37 -072 37 -073 37 -074 37 -075 37 -076 37 -077 37 -078 37 -079 37 -080 37 -081 37 -082 37 -084 37 -085 37 -086 37 -087 37 -088 37 -089 37 -090 37 -091 37 -092 37 -093 37 -094 37 -095 37 -096 37 -097 37 -098 37 -099 37 -100 37 -101 37 -102 37 -103 37 -104 37 -105 37 -106 37 -107 37 -108 37 -109 37 -110 37 -111 37 -112 37 -113 37 -114 37 -115 37 -116 37 -120 37 -121 37 -122 37 -123 37 -124 37 -125 37-126 37 -127 37 -128 37 -129 37 -130 37 -132 37 -133 38A-030 38A-03238A-033 38A-081 38A-088 38A-091 38A-092 37 -022 37 -065 37 -08337 -117 37-118 37-119 37 -131 38C-001 38C-013 38C-076 43 -084 43 -109 44 -001 44 -003 44 -010 44 -022 44 -023 44 -024 44 -025 44 -026 44 -04544 -102 44 -103 44 -104 44 -105 44 -106 44 -107 44 -119 44 -120 44 -121 44 -122 44 -125 45 -010 123.52 945.96 150 30.49 140.00 123.84 145.00 59.46 134.68 176.98163.78 125 425.32 52.11 360 260 333.54 Map SheetNorthampton Zoning Map 37 13 08 03 51 52 3534 27 28 36 49 29 20 26 50 14 48 21 53 40 02 09 06 07 19 04 05 01 33 45 474642 43 4441 39 12 15 11 18 22 32 25 10 11A 11C 38A 31A 24A 16A 22B 30A 10B 39A 23B 16B 30B 15B 23A 31B 32A 17A 17B 25A 38B 24B 38C 31C 24C 18C 30D30C 17D 12C 23C22D 38D 31D 24D 32C 23D 16D16C 10D 18D17C 25C 37 property line dimension lot numbermap number 99C-999 488.32 135 291.08 150.79 107.6 84.32 89.97 71.2 66 376.17 89.98 68 68 75 136.18 227.53 "A" Street"B" Streetwww.NorthamptonMA.gov e-mail: CityGIS@NorthamptonMA.gov o010050Meters 0 100 200 300 400 50050Feet Parcel boundaries revision date: 01 January 2013 Projection: Massachusetts State Plane (NAD83)These maps are not intended for use in conveyances and they contain errors and discrepancies. Individuals requiring an authoritative property boundary or other location must retain the services of a professional land surveyor. 1OBJECTIDFYMap_Par_ID MBOwner1Owner2Owner3OwnAddOwnCitywnStaOwnZip Version1 2019 38C-076-001 38C-076MASSACHUSETTS ELECTRIC COMPANYC/O PROPERTY TAX DEPT40 SYLVAN RDWALTHAMMA 024512019-02-252 201937 -120-001 37 -120 CITY OF NORTHAMPTONCITY HALL210 MAIN STNORTHAMPTONMA 010602019-02-253 201944 -014-805 44 -014 VERRILLO GIL F254 OLD WILSON RDFLORENCEMA 010622019-02-254 201937 -051-001 37 -051 DEPT OF FOOD & AGRICULTUREC/O UNIVERSITY OF MASS101 UNIVERSITY DRAMHERSTMA 010022019-02-255 201944 -027-001 44 -027 OPEN & SHUT LLC30 LYMAN STEASTHAMPTONMA 010272019-02-256 201937 -047-001 37 -047 SEK ANDREW & IRENA MARIA ET ALP O BOX 352NORTHAMPTONMA 010612019-02-257 201937 -063-001 37 -063 RICHARD'S FUEL INC.79 UNION STREETEASTHAMPTONMA 010272019-02-258 201937 -045-001 37 -045 PAGACZ JULIAN S206 B ROCKY HILL RDFLORENCEMA 010622019-02-259 201944 -026-001 44 -026 AUGUST JOYCE L TRUSTEE OF THE HERBERT R AUGUST NOMINEETRUST50 OLD WILSON RDNORTHAMPTONMA 010622019-02-2510 201944 -014-001 44 -014 VERRILLO GIL F254 OLD WILSON RDFLORENCEMA 010622019-02-2511 201944 -014-002 44 -014 VERRILLO GILMAIL: SBA COMMUNICATIONS CORP ATT: TAX DEPT8051 CONGRESS AVEBOCA RATONFL 334822019-02-2512 201944 -031-001 44 -031 RAYMOND ROBERT DP O BOX 70GOSHENMA 010322019-02-2513 201937 -049-001 37 -049 NORTHAMPTON CITY OFC/O PLANNING DEPT210 MAIN ST ROOM 11NORTHAMPTONMA 010602019-02-2514 201944 -028-001 44 -028 ZACHARA SHANE M321 EASTHAMPTON RDNORTHAMPTONMA 010602019-02-2515 201937 -116-001 37 -116 KRIVISKEY BRUCE M & ALISON F23 ICE POND DRFLORENCEMA 010622019-02-2516 201937 -048-001 37 -048 HATT KENNETH L & MARGARET A170 ROCKY HILL RDFLORENCEMA 010622019-02-2517 201937 -050-001 37 -050 TENNESSEE GAS TRANSMISSION COC/O PROPERTY TAX DEPTP O BOX 4372HOUSTONTX 772102019-02-2518 201937 -134-001 37 -134 BERKSHIRE GAS115 CHESHIRE RDPITTSFIELDMA 012012019-02-2519 201944 -138-001 44 -138 CITY OF NORTHAMPTONC/O PLANNING DEPTCITY HALLNORTHAMPTONMA 010602019-02-2537__049_100ft_20190314.xls Notification to Abutters Under the Massachusetts Wetlands Protection Act and the Northampton Wetlands Ordinance In accordance with the second paragraph of the Massachusetts General Laws Chapter 131, Section 40, you are hereby notified of the following: The name of the applicant is _Wayne Feiden, City of Northampton_______________________. The applicant has filed a Notice of Intent with the Northampton Conservation Commission seeking permission to remove, fill, dredge or alter an Area Subject to protection Under the Wetlands Protection Act (General Laws Chapter 131, Section 40) and the Northampton Wetlands Protection Ordinance (Chapter 337). The address of the lot where the activity is proposed is _between Rocky Hill Road and Easthampton Road_. Copies of the Notice of Intent may be examined at the Office of Planning and Community Development, 210 Main Street, Room 11, between the hours of 8:30 a.m. and 4:30 p.m., Monday – Friday, and online at www.northamptonma.gov/opd Copies of the Notice of Intent and more information may be obtained from either (check one) the applicant by calling this telephone number (413) 587-1265 between the hours of 8:00 and 4:30 on the following days of the week: _Monday through Friday____. Information regarding the date, time, and place of the public hearing may be obtained from the Office of Planning & Sustainability by calling (413) 587- 1263. Conservation Commission agendas are also posted at http://northamptonma.gov/AgendaCenter/Conservation- Commission-7 NOTE: Notice of the public hearing, including its date, time, and place, will published at least five (5) days in advance of the hearing in the Daily Hampshire Gazette, and will be posted in a ‘Public Notice’ sign on the subject property. NOTE: Notice of the public hearing, including its date, time, and place, will be posted in the Northampton City Hall not less than forty-eight (48) hours in advance. NOTE: You also may contact the nearest Department of Environmental Protection Regional Office for more information about this application or the Wetlands Protection Act. To contact DEP, call the Western Region at (413) 784-1100. AFFIDAVIT OF SERVICE Under the Massachusetts Wetlands Protection Act And the Northampton Wetlands Ordinance (To be submitted to the Massachusetts Department of Environmental Protection and the Conservation Commission when filing a Notice of Intent) I, __Wayne Feiden__________________________________________________, Name of person making affidavit hereby certify under the pains and penalties of perjury that on March 19, 2019 date I gave notification to abutters in compliance with the second paragraph of Massachusetts General Laws Chapter 131, Section 40, and the DEP Guide to Abutter Notification dated April 8, 1994, in connection with the following matter: A Notice of Intent was filed under the Massachusetts Wetlands Protection Act by _Wayne Feiden, City of Northampton_______________________________ with the Name of Applicant Northampton Conservation Commission on March 19, 2019 for property date located at _between Rocky Hill Road and Easthampton Road________________ Address of land where work is proposed The form of the notification and a list of the abutters to whom it was given and their addresses, are attached to this Affidavit of Service. as agent for the City March 19, 2019 ______________________________________________________________________ Applicant Signature Date PROJECT NARRATIVE i Rocky Hill Greenway Multi-Use Trail Northampton, Massachusetts Notice of Intent Project Narrative March 2019 Table of Contents SUMMARY ................................................................................................................................................................................... 1 1.0 INTRODUCTION ........................................................................................................................................................... 2 2.0 PROJECT BACKGROUND AND PURPOSE ........................................................................................................... 2 3.0 GENERAL SITE DESCRIPTION ................................................................................................................................ 3 3.1 FEMA Designation ..................................................................................................................... 3 3.2 State-listed Rare Species Habitat .............................................................................................. 3 3.3 Wetland Resource Areas ........................................................................................................... 3 4.0 PROPOSED PROJECT .................................................................................................................................................. 5 4.1 Project Description .................................................................................................................... 5 4.2 Project Alternatives ................................................................................................................... 6 4.3 Affected Jurisdictional Areas ..................................................................................................... 7 5.0 PROTECTION OF RESOURCE AREA INTERESTS ............................................................................................ 8 5.1 Bordering Vegetated Wetland – Wetland Replacement........................................................... 8 5.2 Riverfront Area Redevelopment ............................................................................................... 9 5.3 BVW 100-Foot Buffer Zone ..................................................................................................... 10 5.4 Local Ordinance Performance Standards ................................................................................ 11 5.5 Erosion and Sedimentation Control ........................................................................................ 12 6.0 STORMWATER MANAGEMENT ........................................................................................................................... 12 7.0 POST CONSTRUCTION OPERATION AND MAINTENANCE ...................................................................... 15 7.1 Responsible Parties ................................................................................................................. 16 7.2 General Maintenance Tasks .................................................................................................... 16 7.3 Stormwater Maintenance Tasks .............................................................................................. 17 7.4 Estimated Operation and Maintenance Budget ..................................................................... 18 7.5 Operation and Maintenance Log Form ................................................................................... 18 8.0 REFERENCES ............................................................................................................................................................... 22 ii LOCUS MAPS Figure 1 – USGS Topographic Map Figure 2 – Aerial Photograph Figure 3 – FEMA Flood Zones and National Flood Insurance Program, Flood Insurance Rate Map Figure 4 – Environmental Constraints Figure 5 – NRCS Soils Map SITE PHOTOGRAPHS APPENDICES APPENDIX A – Wetland Mitigation Plan Notice of Intent Project Narrative Northampton, MA Horsley Witten Group, Inc. Page 1 of 22 Rocky Hill Greenway Multi-Use Trail Northampton, Massachusetts Notice of Intent Project Narrative March 2019 SUMMARY The Applicant, the City of Northampton Planning & Sustainability, proposes a multi-use pedestrian and bicycle trail extending from Rocky Hill Road (MA Route 66) to Easthampton Road (MA Route 10) in Northampton, Massachusetts. This spur trail will serve to connect the New Haven and Northampton Canal/Manhan Rail Trail with the Rocky Hill Road neighborhood. The approximately 2,630-foot long project will be located entirely within property that has been deeded to the City of Northampton or is within easements provided by the Massachusetts Electric Company. A portion of the proposed bicycle and pedestrian trail will occur within Bordering Vegetated Wetland and its buffer zone, as well as a Riverfront Area, much of which has been disturbed. These resource areas are regulated under the Massachusetts Wetlands Protection Act and the City of Northampton Wetlands Ordinance (Chapter 337 of the Northampton Administrative Code) and associated regulations. Resource area impacts will be avoided and minimized to the extent practicable by using an existing dirt driveway and footpath, while still maintaining a trail that is safe and adheres to the local building code. An erosion and sedimentation control barrier will be used to further protect downgradient resource areas, and construction-related impacts will be minimized and restored upon completion of construction. Stormwater management practices will be implemented to the extent practicable for this project. Notice of Intent Project Narrative Northampton, MA Horsley Witten Group, Inc. Page 2 of 22 1.0 INTRODUCTION The City of Northampton proposes the Rocky Hill Greenway Multi-Use Trail, a 2,630 linear foot (0.50 mile) multi-use trail designed as a spur trail to connect two existing trails in the vicinity. The proposed project is located entirely within a City-owned parcel situated between Rocky Hill Road (MA Route 66) and Easthampton Road (MA Route 10) in Northampton, Massachusetts. The proposed trail project will improve pedestrian and bicycle facilities by connecting the residential areas along Rocky Hill Road and Ice Pond Drive to the New Haven and Northampton Canal / Manhan Rail Trail. Bicyclists and pedestrians will benefit from being able to connect to these corridors more directly and with limited interaction with vehicular traffic, providing a safer and more direct route to the existing rail trail. Additionally, it will provide access to an eventual multi-use trail serving the southwestern and western half of the City, which is not currently served by any multi-use trails. 2.0 PROJECT BACKGROUND AND PURPOSE The proposed Rocky Hill Greenway Multi-Use Trail will support the City’s recreational goals by adding to the existing network of bike paths in the region and encouraging non-motorized travel, advancing the goals of the City of Northampton Open Space, Recreation, and Multi-Use Trail Plan (2018-2025). This Plan seeks (among other goals) to maintain vibrant urban centers, develop multi-use trails for easy public access, and create recreational opportunities while protecting valuable habitat and natural resources. The Open Space, Recreation & Multi-Use Trail Plan is an adoptive component of the Sustainable Northampton Comprehensive Plan (2008) and has been adopted or endorsed by a number of City Boards and approved by the Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs. By implementing this project, the City will progress toward three of the major goals outlined in the Massachusetts Department of Transportation (MassDOT) 2012 GreenDOT Implementation Plan, which include: Design of multi-modal transportation system; Promoting healthy transportation and livable communities; and Tripling of the bicycle and pedestrian transportation modes. The project also supports the seven-corridor, 788-mile statewide system of bicycling routes, known as the Bay State Greenway. A pilot sign program in the Pioneer Valley is currently underway, linking a number of off-road paths and on-road routes in Massachusetts and connecting to systems in Connecticut and Vermont. Notice of Intent Project Narrative Northampton, MA Horsley Witten Group, Inc. Page 3 of 22 3.0 GENERAL SITE DESCRIPTION The proposed Rocky Hill Greenway Multi-Use Trail will be sited within a City-owned parcel (37- 049-001) located between Rocky Hill Road (MA Route 66) and Easthampton Road (MA Route 10) in Northampton, Massachusetts (Figures 1 and 2). The existing conditions at the site are varied. The northern portion of the proposed trail, starting at Rocky Hill Road, is currently occupied by a gravel driveway, which leads to a gas pumping station owned by the Tennessee Gas Transmission Company of Houston, Texas (Parcel 37-050-001). The proposed trail then passes through an easement of the Massachusetts Electric Company, which has overhead utility lines running through the maintained corridor. After crossing the easement, the southern portion of the proposed trail follows part of an existing footpath and then winds through undeveloped woodland area with grass, shrubs, and trees before connecting with the existing Manhan Rail Trail. 3.1 FEMA Designation According to the FEMA Flood Insurance Rate Map (Community Panel No. 250167 0002 A, effective April 3, 1978), the entire site is located within Zone C, areas of minimal flooding (Figures 3A and 3B). Zone C is considered to be outside of the 500-year floodplain. 3.2 State-listed Rare Species Habitat According to the most recent version of the Massachusetts Natural Heritage Atlas (2017), the proposed trail is not in proximity to Estimated Habitat of Rare Wildlife and Priority Habitat of Rare Species as designated by the Massachusetts Natural Heritage and Endangered Species Program (NHESP)(Figure 4). 3.3 Wetland Resource Areas 3.3.1 Resource Area Delineation Methodology Wetland resource areas were identified by Horsley Witten Group, Inc. (HW) wetlands biologists during site visits in March 2015 with supplemental site visits in August & September 2017. Several segments of Bordering Vegetated Wetlands as well as the associated buffer zone, and a segment of Riverfront Area were identified within the project area. HW followed wetland resource area identification and on-site delineation procedure guidelines described in the Massachusetts Department of Environmental Protection (DEP) handbook, entitled Delineating Bordering Vegetated Wetlands Under the Massachusetts Wetlands Protection Act (March, Notice of Intent Project Narrative Northampton, MA Horsley Witten Group, Inc. Page 4 of 22 1995), the Massachusetts Wetlands Protection Act Regulations, and the City of Northampton Wetland Protection Ordinance. The limit of BVW is demarcated at the point where 50% or greater of the vegetation is considered wetland indicator species and where hydric conditions are encountered, and is marked with consecutively numbered, pink flagging stations. The mean annual high water line (MAHW) of a river is defined as “the line that is apparent from visible markings or changes in the character of soils or vegetation due to the prolonged presence of water and that distinguishes between predominantly aquatic and predominantly terrestrial land” (310 CMR 10.58(2)(a) 2). Pursuant to these regulations, field indicators of “bankfull conditions” (changes in slope, changes in vegetation, stain lines, top of point bars, changes in bank materials or bank undercuts) were used to determine the MAHW associated with an unnamed perennial stream originating from Rocky Hill Pond. MAHW is labeled with sequentially numbered, blue flagging stations. A brief description of the regulatory definitions and the observed resources areas is provided below. 3.3.2 Bordering Vegetated Wetland Bordering Vegetated Wetlands are defined under Massachusetts Wetlands Protection Act Regulations at 310 CMR 10.55(2)(a) as, “freshwater wetlands that border on creeks, rivers, streams, ponds and lakes. The types of freshwater wetlands are wet meadows, marshes, swamps and bogs. Bordering Vegetated Wetlands are areas where the soils are saturated and/or inundated such that they support a predominance of wetland indicator plants. The boundary of Bordering Vegetated Wetland is defined at 310 CMR 10.55 (2)(c) as the line within which 50% or more of the vegetational community consists of wetland indicator plants and saturated or inundated conditions exist.” The Northampton Wetlands Ordinance does not have a separate definition for BVW. The BVW consists of a series of hill-side seeps associated with an unnamed perennial stream that traverses the northwestern portion of the site. THE BVW is best described as a forested red maple swamp dominated by red maple (Acer rubrum) with a shrub community supporting winterberry (Ilex verticillata), arrowwood (Viburnum dentatum), nannyberry (Viburnum lentago), as well as clumps and patches of honeysuckle (Lonicera sp.) and occasional multiflora rose (Rosa multiflora). Sensitive fern (Onoclea sensibilis) was the dominant groundcover species observed during the site evaluation. Witch-hazel (Hamamelis virginiana) and sapling gray birch (Betula populifolia) were observed along the wetland boundary, as well as occasional entanglements of Oriental bittersweet (Celastrus orbiculatus). Areas in the maintained right-of-way consist of a low-growing shrub community/herbaceous- dominant plant community (e.g., Palustrine Scrub-Shrub Wetland (PSS) or Palustrine Emergent Wetland (PEM) communities) dominated by soft rush (Juncus effusus), meadowsweet (Spiraea Notice of Intent Project Narrative Northampton, MA Horsley Witten Group, Inc. Page 5 of 22 latifolia), sensitive fern, and purple loosestrife (Lythrum salicaria) with gray birch and bittersweet vines. Adjacent upland areas are dominated by eastern white pine (Pinus strobus) and mixed oak (Quercus spp.) with witch hazel dominating the shrub community. Flagging stations A1-A10; A11-A15; B1-B17; B-18-B23; C1-C-9; C10-C23; C24-C36; and E1- E43represent the extent of BVW along the proposed pathway footprint. 3.3.3 Riverfront Area Riverfront Area is defined at 310 CMR 10.58(2)(a) as, “land between a river’s mean annual high water line and a parallel line measured horizontally. The riverfront area may include or overlap other resource areas or their buffer zones. The riverfront area does not have a buffer zone.” According to 310 CMR 10.58(2)(a)(1), “A river is any natural flowing body of water that empties to any ocean, lake, pond, or other river which flows throughout the year.” Furthermore, 310 CMR 10.58(2)(a)(3) states that, “The riverfront area is the area of land between a river’s mean annual high-water line measured horizontally outward from the river and a parallel line located 200 feet away.” The Northampton Wetlands Ordinance does not have a separate definition for Riverfront Area. An unnamed perennial stream flows from Rocky Hill Pond, located to the northeast of the project site, to the south into Pynchon Meadows and ultimately into the Connecticut River. This stream is shown as perennial on the most recent USGS Topographic Map (Easthampton Quadrangle) and therefore meets the regulatory definition of a perennial stream with an associated Riverfront Area. Mean annual high water (MAHW) was identified in the field by HW to the northeast and approximately 40 feet lower in elevation than the existing gravel road. The 200-foot Riverfront Area measured extends beyond the existing gravel road. Flagging stations MAHW1-MAHW4 were placed at the limit of bankfull conditions along this stream. 4.0 PROPOSED PROJECT 4.1 Project Description The proposed 0.50-mile Rocky Hill Greenway Multi-Use Trail will be constructed of bituminous asphalt pavement and will vary in width between 10 and 16 feet to accommodate site conditions. At its northern end, off of Rocky Hill Road, the trail will following the existing gravel driveway and will be 16 feet wide; this portion of the trail will act as a shared multi-use trail and driveway, allowing restricted vehicle access to the existing gas pumping station. The trail will then narrow to ten feet in width at the wetland crossing, and will be limited to pedestrians and bicycles for the remaining length of the spur trail to the junction with the existing Manhan Rail Trail. Notice of Intent Project Narrative Northampton, MA Horsley Witten Group, Inc. Page 6 of 22 The proposed project also includes retaining walls, culvert replacements, and stormwater management areas. Retaining walls are only proposed at the HC parking spot. New culverts are proposed to replaced undersized existing culverts or in locations that the trail crosses existing drainage ways/ditches. For the trail section that is proposed outside an existing gravel trail or driveway (south of the overhead wire easement crossing) we are proposing to manage stormwater via a vegetated swale. Provisions for construction will include a Stormwater Pollution Prevention Plan (SWPPP) that must be followed by the Contractor, and will be provided under separate cover. For work within the resource area, the SWPPP will require the Contractor to implement measures to ensure the protection outside the limit of work that will include: •Rubber tire track machinery; •Swamp mats for temporary access over intermittently flowing resources; •Erosion control measures; •Stockpiling outside the resource area; •Construction timing; and •Other measures as described in the Project Plans and SWPPP. Details of the proposed project are provided on the enclosed site plans prepared by HW, entitled “Rocky Hill Greenway Multi-Use Trail, Northampton, Massachusetts” (dated March 2016). 4.2 Project Alternatives The City explored several alternative pathway locations including different routes as well as different materials and designs, in addition to a No-Build alternative, in order to avoid and minimize impacts within wetland resource areas while still resulting in an economically viable project. 4.2.1 Propose Project and Preferred Alternative The preferred alternative is the proposed project which utilizes an existing gravel driveway and existing footpath. It is the preferred alternative because it advances the goals of the City of Northampton to develop multi-use trails for easy and safe public access. The proposed project site is located strategically between a residential neighborhood and an existing trail and has part of a trail already built. Direct resource area impacts have been minimized by following the existing access driveway and following the existing gravel footpath to the extent practicable. Additionally, the path meanders through the wooded area to avoid impacts to the wetlands and other natural resources as much as possible. All construction-related temporary impacts will be restored upon completion of that portion of the pathway, and all construction staging areas will be located outside of wetland resource areas. Notice of Intent Project Narrative Northampton, MA Horsley Witten Group, Inc. Page 7 of 22 4.2.2 Alternative Trail Location The City considered establishing a bike route along the existing surface roads (along Route 66/Chapel Street to West Street to the intersection with South Street/Route 10), by creating a bike lane to establish a connection with the Manhan Rail Trail. This would increase connectivity to an existing trail and would reduce wetland resource impacts, however it would not meet the goals to reduce bicycle and pedestrian exposure to vehicular traffic and improve safety. Additionally, it would require the existing roads to be reduced in width to accommodate a bike lane along the outer edge of the road. It would also not meet the City’s goal of increasing multimodal paths, as pedestrians would not likely use a bike lane along an existing roadway. Another alternative trail location that was considered was to stay along the utility easement. However, it was determined that there would be more considerable unavoidable wetland impacts with this footprint, as well as more work within Riverfront. 4.2.3 No-Build Alternative A No-Build alternative would not result in impacts to wetland resources; however, this would not meet the project purpose of extending a network of safe multi-modal trails in the City. 4.3 Affected Jurisdictional Areas Given the preferred location of the trail, portions of the project will necessitate work within wetland resource areas as well as within the associated buffer zone. These impacts have been avoided and minimized to the extent practicable by following the existing gravel roadway and an existing gravel footpath that traverses the wetland areas; however, portions of the proposed activities will occur within BVW and Riverfront Area, and within the locally-regulated 100-foot buffer to the BVW. Specifically, the proposed trail will directly impact 1,573 SF of BVW; a total of 188 linear feet of the path will occur within BVW. Approximately 40,924 SF of the 100-foot buffer to BVW will also be directly impacted by the proposed trail. In addition, approximately 19,114 SF of Riverfront Area, much of which is previously-disturbed, will be impacted by the proposed project. Table 1. Resource Area, in square feet, impacted by proposed project. LOCATION IMPACT AREA (SF) IMPACT AREA (AC) BVW 1,573 0.03 BVW Buffer 40,924 0.9 Riverfront Area 0-100 ft 0 0 Riverfront Area 100-200 ft 19,114 0.4 Notice of Intent Project Narrative Northampton, MA Horsley Witten Group, Inc. Page 8 of 22 A discussion on how the proposed project will avoid and minimize these impacts, as well as the proposed mitigation measures, including wetland replacement, is provided below. 5.0 PROTECTION OF RESOURCE AREA INTERESTS As indicated above, the proposed project will result in unavoidable activities will occur within BVW and Riverfront Area, as well as within the locally-regulated 10-foot buffer zone to BVW. A discussion of how the proposed project is designed to meet the performance standards under the Massachusetts Wetlands Protection Act Regulations and the City of Northampton Wetlands Ordinance (Chapter 337 of the Northampton Administrative Code) and regulations follows. 5.1 Bordering Vegetated Wetland – Wetland Replacement The following performance standards, as stated in 310 CMR 10.55(4), will be met to the extent practicable for work within BVW. Direct impacts within BVW will occur where the trail traverses a segment of BVW that currently spans across an existing gravel footpath. A total of 1,573 SF of BVW will be mitigated through the creation of a wetland replacement area approximately 2,680SF. As noted above, impacts to the wetland area have been avoided and minimized to the extent practicable, through the project design. Proposed wetland replacement area is designed to meet the performance standards under 310 CMR 10.55(4)(b)(1 through 7) as well as the provisions set forth by MassDOT for wetland replacement. Wetland replacement activities will generally include the removal of fill material and debris as well as existing vegetation within the footprint of the wetland replacement area, regrading and establishment of a connection to the existing intermittent channel and to the hillside seeps, introduction of high-organic content soils, introduction of coarse woody debris or boulders to improve habitat diversity, stabilization of disturbed soils with native seed mixes, and revegetation of wetland area with native plants to provide for a 75% native plant community within all impacted areas after two growing seasons (as required under 310 CMR 10.55(4)(b)(6)). A qualified professional (Wetlands Specialist) will oversee all phases of the wetland restoration efforts to ensure that requirements set forth in the proposed plan are met (see below). This individual will also be granted the discretion to make slight field adjustments to ensure wetland replacement success. This wetland replacement plan was developed based upon observations made by HW of existing conditions and is modeled after the Massachusetts Inland Wetland Replication Guidelines (March 2002) prepared by MassDEP (see attached checklist). The replacement plan is also designed to meet the regulatory criteria for wetland replacement set forth in 310 CMR 10.55(4)(b)(1) through (7).Details of these activities are provided on Sheet C-16 of the enclosed plan set entitled “Multi-Use Rocky Hill Greenway, Northampton, Massachusetts” prepared by HW and dated April 2016. Notice of Intent Project Narrative Northampton, MA Horsley Witten Group, Inc. Page 9 of 22 Details of the proposed wetland replacement are provided in Appendix B. 5.2 Riverfront Area Redevelopment Activities within Riverfront Area will occur outside of the 0-100-foot Riverfront Area, and will occur within previously degraded areas including the existing access road. The following performance standards for redevelopment in Riverfront Area will be met for work within Riverfront Area. (a) At a minimum, proposed work shall result in an improvement over existing conditions of the capacity of the riverfront area to protect the interests identified in M.G.L. c. 131 § 40. Work within the outer Riverfront Area will involve re-use of en existing gravel (degraded) roadway. As part of the proposed project, existing culverts will be replaced to accommodate existing flows across the access road and footpath. A portion of the proposed wetland replacement areas will be located in Riverfront Area where materials from previous clearing activities had been dumped. Invasive species will be managed as part of the wetland replacement activities. (b) Stormwater management is provided according to standards established by the Department. Stormwater management measures will be provided to the extent practicable, although these measures will occur outside of Riverfront Area. (c) Within 200 foot riverfront areas, proposed work shall not be located closer to the river than existing conditions or 100 feet, whichever is less, or not closer than existing conditions within 25 foot riverfront areas, except in accordance with 310 CMR 10.58(5)(f) or (g). The proposed project will occur within Riverfront Area along existing paved or otherwise degraded Riverfront Area, but no closer to the river than under existing conditions with the exception of the wetland replacement areas. No work will occur within the inner 0-100-foot Riverfront Area. (d) Proposed work, including expansion of existing structures, shall be located outside the riverfront area or toward the riverfront area boundary and away from the river, except in accordance with 310 CMR 10.58(5)(f) or (g). The proposed project will occur along existing paved or otherwise degraded Riverfront Area but no closer to the unnamed perennial stream than under existing conditions with the exception of the proposed wetland replacement areas. (e) The area of proposed work shall not exceed the amount of degraded area, provided that the proposed work may alter up to 10% if the degraded area is less than 10% of the riverfront area, except in accordance with 310 CMR 10.58(5)(f) or (g). Notice of Intent Project Narrative Northampton, MA Horsley Witten Group, Inc. Page 10 of 22 Not applicable. The Project will result in redevelopment of an existing compacted gravel roadway. Approximately 23 percent (19,114 SF) of the Riverfront Area on this lot (82,137 SF) is currently degraded. Portions of the proposed wetland replacement areas will result in creation of wetland areas within Riverfront Area that is currently strewn with debris. Invasive species will be managed as part of the wetland replacement activities. (f) When an applicant proposes restoration on-site of degraded riverfront area, alteration may be allowed notwithstanding the criteria of 310 CMR 10.58(5)(c), (d), and (e) at a ratio in square feet of at least 1:1 of restored area to area of alteration not conforming to the criteria. Areas immediately along the river shall be selected for restoration. Alteration not conforming to the criteria shall begin at the riverfront area boundary. Restoration shall include: 1.removal of all debris, but retaining any trees or other mature vegetation; 2.grading to a topography which reduces runoff and increases infiltration; 3.coverage by topsoil at a depth consistent with natural conditions at the site; and 4.seeding and planting with an erosion control seed mixture, followed by plantings of herbaceous and woody species appropriate to the site; (Not applicable) (g) When an applicant proposes mitigation either on-site or in the riverfront area within the same general area of the river basin, alteration may be allowed notwithstanding the criteria of 310 CMR 10.58(5)(c), (d), or (e) at a ratio in square feet of at least 2:1 of mitigation area to area of alteration not conforming to the criteria or an equivalent level of environmental protection where square footage is not a relevant measure. Alteration not conforming to the criteria shall begin at the riverfront area boundary. Mitigation may include off-site restoration of riverfront areas, conservation restrictions under M.G.L. c. 184, §§ 31 to 33 to preserve undisturbed riverfront areas that could be otherwise altered under 310 CMR 10.00, the purchase of development rights within the riverfront area, the restoration of bordering vegetated wetland, projects to remedy an existing adverse impact on the interests identified in M.G.L. c. 131, § 40 for which the applicant is not legally responsible, or similar activities undertaken voluntarily by the applicant which will support a determination by the issuing authority of no significant adverse impact. Preference shall be given to potential mitigation projects, if any, identified in a River Basin Plan approved by the Secretary of the Executive Office of Environmental Affairs. (Not applicable) 5.3 BVW 100-Foot Buffer Zone The Northampton Wetlands Ordinance maintains a 100-foot buffer zone around BVW. Activities associated with this project will occur within the buffer zone by necessity of the Notice of Intent Project Narrative Northampton, MA Horsley Witten Group, Inc Page 11 of 22 project location. The multi-use trail is not anticipated to negatively impact the functions and values of the buffer. In accordance with the provisions in the City of Northampton Wetlands Ordinance Regulations, the Applicant requests relief from the standards for work within 100 feet of resource areas. Relief is requested because the required location of proposed trail is within portions of the buffer zone and BVW associated with an unnamed perennial stream. 5.4 Local Ordinance Performance Standards The Northampton Wetlands Ordinance contains performance standards for wetland resource areas and the 100-foot buffer to resource areas under §337-10(E). Included in this section is a provision for multi-use trails: “(2) The Commission shall not permit alteration within resource areas or their associated protected zones, subject to the following exceptions: … (c) Limited projects, as defined by the Massachusetts Wetlands Protection Act, and walking and multiuse trails designed for nonmotorized use.” The proposed Rocky Hill Greenway Multi-Use Trail falls under this provision. Proposed mitigation measures include providing wetland replacement (see above and in Appendix B) as well as providing improvements within the Riverfront Area (which also include portions of the 100-foot buffer zone to BVW. Additional discussion of how the proposed project is designed to meet the provisions of the local Ordinance is provided below. 5.4.1 Protecting Adjoining Premises from Detrimental Uses The abutting land uses around the property are primarily residential and wooded areas. The proposed project will not cause any detrimental uses to adjoining premises. In fact, the proposed trail will improve pedestrian and bicycle facilities by connecting the residential areas along Rocky Hill Road and Ice Pond Drive to the New Haven and Northampton Canal/Manhan Rail Trail. Local residents and visitors will benefit from being able to connect to these existing and future corridors more directly and with limited interaction with vehicular traffic. 5.4.2 Minimizing and Mitigating Traffic Impacts The proposed project is not anticipated to add to traffic congestion issues in the area. It will include 4 foot-wide shared shoulders marked for bicycle accommodation along Rocky Hill Road to connect the neighborhood at Ice Pond Drive. Secondary asset improvements include new project signage, restriping of Rocky Hill Road between Ice Pond Drive and the proposed trailwill be necessary to maintain appropriate lane and shoulder widths for bicycle accommodation adjacent to the project. Notice of Intent Project Narrative Northampton, MA Horsley Witten Group, Inc. Page 12 of 22 5.4.3 Promoting Harmonious Relationships between Structures and Open Space The proposed project is designed to enhance the City’s commitment to provide alternatives for non-vehicular travel and to be consistent with the goals detailed in the City of Northampton Open Space, Recreation, and Multiuse Trail Plan (2011-2018). Additionally, the project is designed to minimally impact the surrounding natural resources. 5.4.4 Protecting the General Welfare As indicated above, the portion along Rocky Hill Road and access to the trail will be well marked. All proposed trail grades are 4.5% or less and areas spanning a culvert are proposed to have pedestrian barriers as well as sections with slopes greater than 3:1. 5.4.5 Avoiding Overload on City Resources and Mitigating Impacts The proposed project will reduce overload on City resources by providing additional non- vehicular transportation opportunities thereby mitigating congestion and vehicular emissions. 5.4.6 Promoting City Planning Objectives The proposed project is in keeping with the goals and objectives of the City of Northampton Open Space, Recreation, and Multiuse Trail Plan as well as the Northampton Community Plan to maintain vibrant urban centers, develop multi-use trails for easy public access, and create recreational opportunities while protecting valuable habitat and natural resources. 5.4.7 Meeting Zoning Requirements The proposed project meets the zoning requirements, which consist of Business Park (BP), General Industry (GI), Suburban residential (SR), and Farms, Forest, Rivers (FFR). Which are all compatible with a municipal facility that is noncommercial recreational. 5.5 Erosion and Sedimentation Control The Applicant proposes to protect the resource areas by implementing a sedimentation and erosion control program for the project. A sediment and erosion control barrier consisting of siltation sock (also referred to as mulch sock or silt sock) will be placed at the limit of work and/or as shown in the project plans. Erosion control barriers will remain in place and will be maintained in good condition until all work is complete and all soils have been stabilized. A temporary access way (also referred to as a haul road) of natural mulch material will be placed within the resource area to facilitate the installation of the helical piles and contain the work area within the designated limits. 6.0 STORMWATER MANAGEMENT The proposed project meets the definition of a mix of development and redevelopment under the Massachusetts Stormwater Handbook - Stormwater Management Standards (Stormwater Handbook). Per the Stormwater Handbook the pedestrian trail project is subject to the Notice of Intent Project Narrative Northampton, MA Horsley Witten Group, Inc. Page 13 of 22 Standards to the maximum extent practicable. We offer the following responses with respect to meeting the Stormwater Standards: Standard 1. No new stormwater conveyances (e.g. outfalls) may discharge untreated stormwater directly to or cause erosion in wetlands or waters of the Commonwealth. The bicycle/pedestrian trail is designed such that no new stormwater conveyances will result in any erosion or sedimentation to adjacent resource areas. Stormwater runoff from the paved bicycle trail will be collected and/or filtered by surface stabilized grass swales/channels, grassed filter strips, and/or stone (riprap) slopes/check dams that will promote sediment/debris removal and energy dissipation of the runoff prior to discharging to the down gradient wetland areas. Standard 2. Stormwater management systems shall be designed so that post-development peak discharge rates do not exceed pre-development peak discharge rates. This Standard may be waived for discharges to land subject to coastal storm flowage as defined in 310 CMR 10.04. Proposed best management practices have been included to maintain post-development peak discharge rates equal to pre-development rates to the maximum extent practicable. Steep sections of the paved bike trail will also be cross sloped to sheet runoff to grassed swales located along the shoulders to reduce concentrated flows. Grass swales are equipped width stone check dams to further reduce stormwater velocity and flow and promote filtering and recharge to groundwater. Standard 3. Loss of annual recharge to groundwater shall be eliminated or minimized through the use of infiltration measures including environmentally sensitive site design, low impact development techniques, stormwater best management practices, and good operation and maintenance. At a minimum, the annual recharge from the post-development site shall approximate the annual recharge from pre-development conditions based on soil type. This Standard is met when the stormwater management system is designed to infiltrate the required recharge volume as determined in accordance with the Massachusetts Stormwater Handbook. The use of existing and proposed drainage swales and stone shoulders will result in runoff sheet flow from the new paved trail prior to discharging to resource (Note: this runoff is considered free from any vehicular activity pollutants). Runoff that sheet flows over pervious surfaces prior to discharge to resource areas is an acceptable method for stormwater recharge according to the Stormwater Handbook. Therefore, annual recharge from the proposed bicycle trail will be approximately equal to or slightly greater than existing recharge volumes. Notice of Intent Project Narrative Northampton, MA Horsley Witten Group, Inc. Page 14 of 22 Standard 4. Stormwater management systems shall be designed to remove 80% of the average annual post-construction load of Total Suspended Solids (TSS). This Standard is met when: •Suitable practices for source control and pollution prevention are identified in a long- term pollution prevention plan, and thereafter are implemented and maintained; •Structural stormwater best management practices are sized to capture the required water quality volume determined in accordance with the Massachusetts Stormwater Handbook; and •Pretreatment is provided in accordance with the Massachusetts Stormwater Handbook. A general long-term pollution prevention plan is provided below. The SWPPP will provide resource protection requirements for the construction period. The trail will not be subject to vehicle traffic and therefore will not be subject to sanding operations. For these factors the TSS loading will be equal or less in post construction. Standard 5. For land uses with higher potential pollutant loads, source control and pollution prevention shall be implemented in accordance with the Massachusetts Stormwater Handbook to eliminate or reduce the discharge of stormwater runoff from such land uses to the maximum extent practicable. If through source control and/or pollution prevention all land uses with higher potential pollutant loads cannot be completely protected from exposure to rain, snow, snow melt, and stormwater runoff, the proponent shall use the specific structural stormwater BMPs determined by the Department to be suitable for such uses as provided in the Massachusetts Stormwater Handbook. Stormwater discharges from land uses with higher potential pollutant loads shall also comply with the requirements of the Massachusetts Clean Waters Act, M.G.L. c. 21, §§ 26-53 and the regulations promulgated thereunder at 314 CMR 3.00, 314 CMR 4.00 and 314 CMR 5.00. Not applicable. No area on the proposed site has been designated as a land use with higher potential pollutant loads. Standard 6. Stormwater discharges within the Zone II or Interim Wellhead Protection Area of a public water supply, and stormwater discharges near or to any other critical area, require the use of the specific source control and pollution prevention measures and the specific structural stormwater best management practices determined by the Department to be suitable for managing discharges to such areas, as provided in the Massachusetts Stormwater Handbook. A discharge is near a critical area if there is a strong likelihood of a significant impact occurring to said area, taking into account site-specific factors. Stormwater discharges to Outstanding Resource Waters and Special Resource Waters shall be removed and set back from the receiving water or wetland and receive the highest and best practical method of treatment. A “storm water discharge” as defined in 314 CMR 3.04(2)(a)1 or (b) to Notice of Intent Project Narrative Northampton, MA Horsley Witten Group, Inc. Page 15 of 22 an Outstanding Resource Water or Special Resource Water shall comply with 314 CMR 3.00 and 314 CMR 4.00. Stormwater discharges to a Zone I or Zone A are prohibited unless essential to the operation of a public water supply. Not applicable. Standard 7. A redevelopment project is required to meet the following Stormwater Management Standards only to the maximum extent practicable: Standard 2, Standard 3, and the pretreatment and structural best management practice requirements of Standards 4, 5, and 6. Existing stormwater discharges shall comply with Standard 1 only to the maximum extent practicable. A redevelopment project shall also comply with all other requirements of the Stormwater Management Standards and improve existing conditions. Portions of the project are redevelopment. These sections are between Rocky Hill Road and the gas substations and the maintenance path servicing the overhead wire easement. The section of trail that traverses the wooded section is considered new development and therefore we have included stormwater management for this section. Standard 8. A plan to control construction-related impacts including erosion, sedimentation and other pollutant sources during construction and land disturbance activities (construction period erosion, sedimentation, and pollution prevention plan) shall be developed and implemented. The erosion and sediment control devices that will be implemented during construction of the project are shown on the site plans. They include siltation socks adjacent to all resource areas and designated stockpile/staging areas, retaining walls, and mulch surface treatment for disturbed areas. Details are provided on the site plans. Standard 9. A long-term operation and maintenance plan shall be developed and implemented to ensure that stormwater management systems function as designed. An operations and maintenance plan will be included in the Stormwater Pollution Prevention Plan (SWPPP) that will be included in the Contract Documents. Standard 10. All illicit discharges to the stormwater management system are prohibited. There will be no illicit discharges to any resource area or stormwater management system/structure as part of this project. 7.0 POST CONSTRUCTION OPERATION AND MAINTENANCE In conformance with Standard 9 of the Stormwater Standards we offer the following information for Post Construction Operation and Maintenance of the stormwater system associated with the proposed Multi-Use Trail. Notice of Intent Project Narrative Northampton, MA Horsley Witten Group, Inc. Page 16 of 22 7.1 Responsible Parties Stormwater Management System Owner: City of Northampton Planning & Sustainability 210 Main Street Northampton, MA 01060 Phone: (413) 587-1265 www.NorthamptonMA.gov/PLAN Party Responsible for Operation and Maintenance: City of Northampton Planning & Sustainability 210 Main Street Northampton, MA 01060 Phone: (413) 587-1265 www.NorthamptonMA.gov/PLAN 7.2 General Maintenance Tasks Mowing Outside Resource Areas – Herbaceous material along the shoulder of the Multi-Use Trail within City-owned properties shall be mowed a minimum of four times per year or as necessary. Mowing will be completed to maintain stormwater management system and provide safe passage for trail users. Bituminous Asphalt – Repair surface with patching as necessary. Inspect and document heaving and cracking. Repair and seal pavement as necessary. Full pavement replacement shall be conducted every 15-20 years or as determined necessary due to field conditions. Signage, Fencing and Pedestrian Barriers – Inspection shall be conducted annually. Inspect signage, fencing and pedestrian barriers for signs of tilting or stability issues and straighten as necessary. Replace damaged or missing poles, signs or wood sections as necessary. Curbing, Stone/Rock, Retaining Walls, and Riprap Stone – Inspection shall be conducted annually. Remove and replace as necessary. Pet Waste Management – Residents and visitors shall be encouraged to pick up after their pets with signage along lawn areas. Waste shall be collected if found during other maintenance. Solid Waste Management – Solid waste shall be removed from the site and disposed of properly. Snow Management/Removal Plan – Plowed snow collected from the Multi-Use Trail will be deposited onto available pervious locations, and where available will be directed to stormwater Notice of Intent Project Narrative Northampton, MA Horsley Witten Group, Inc. Page 17 of 22 management systems for treatment. Plowing and salting of the trail is not anticipated but if required will be conducted per the City requirements. Salt or de-icing agents shall not be permitted in resource areas or resource area buffer zones. Pavement Sweeping Schedules – Multi-Use Trail surfaces shall be swept annually after spring snowmelt. Litter/Trash Collection – Litter and trash collection from the Multi-Use Trail surface and shoulders shall be conducted bi-annually or as required during other operation activity. Soil/Surface Erosion Management – Soil erosion shall be monitored and remediated as necessary. Soil washout into adjacent properties and/or resource areas shall be removed and surface shall be re-established. Graffiti Control – Graffiti shall be reported to the Police Department and removed with environmentally safe detergent and water or repainted as necessary. Vandalism – Vandalism shall be reported to the Police Department and repaired as necessary. 7.3 Stormwater Maintenance Tasks All stormwater management and controls shall be operated and maintained appropriately during regular operation of the site in the post-construction period. The stormwater control system shall be regularly inspected to ensure proper performance. In general, the following operation and maintenance provisions shall be provided: All stormwater management systems shall be cleared of accumulated foreign debris, including leaves and lawn cuttings; All stormwater management systems shall be inspected for slope integrity and erosion where applicable; The snow removal plan shall be adhered to by the Owner; A maintenance inspection report shall be made after each inspection. A copy of the form to be completed by the inspector is attached; All measures shall be maintained in good working order, if a repair is necessary, it shall be initiated within 48 hours of discovery; and All sediment and debris materials shall be disposed of properly in a pre-approved off- site location. The stormwater controls shall be inspected on a routine basis to prevent deficiencies in the effectiveness of the systems due to sediment build-up, damage, or deterioration. Stormwater controls shall be operated and maintained appropriately during regular operation of the site in the post-construction period. Notice of Intent Project Narrative Northampton, MA Horsley Witten Group, Inc. Page 18 of 22 7.3.1 Drainage Structures - Culverts All drainage culverts and other structures will be inspected at least twice annually (spring & fall) to monitor for proper operation, litter and/or trash, and structural deterioration. The structures will be cleaned when the depth of sediment exceeds one half the structure depth, and repaired when required. Collected sediment will be disposed of properly in a pre-approved off-site location. 7.3.2 Grass Swales and Filter Strips Grass swales, channels, and filter strips will be inspected and cleaned of any debris and sediment annually. Any erosion rutting or side slope stabilization issues will be reinforced with loam and reseeded as necessary. The areas will be mowed and cleared of weeds and noxious vegetation four times annually. 7.3.3 Stone Check Dams, Drainage Pipe and Riprap Outfalls Stone check dams and riprap pipe outfalls shall be inspected annually. Remove any sediment and debris found during inspection. Replace stone and repair surface erosion as necessary. 7.4 Estimated Operation and Maintenance Budget The estimated average annual operating and maintenance budget for the project is as follows: General Maintenance $1,250 ($2,500/per mile) Grass Swales/Channels $1,000 (lump sum) Culverts $500 (lump sum) Estimated Total Annual Maintenance Cost: $2,750 7.5 Operation and Maintenance Log Form Operation and maintenance log form is provided below: 1 Operation and Maintenance Checklist Rocky Hill Greenway Trail, Northampton, MA 210 Main Street Northampton, MA 01060 Date: Time: Inspector: Description Maintenance/Inspection Requirement Maintenance Required? (Y/N) Mowing Outside Resource Areas Minimum four times per year Bituminous Asphalt Pavement Inspect annually and repair as necessary Signage, Fencing and Pedestrian Barriers Inspect annually and repair as necessary Curbing, Stone/Rock, Retaining Walls, and Riprap stone Inspect annually and repair as necessary Pet Waste Management As necessary when found Solid Waste Management Waste removal per City requirements Snow Removal As necessary per City requirements Surface Sweeping Annually or as necessary Litter/Trash Collection Bi-annually Erosion Management Re-establish as necessary when found Graffiti Control Report to Police Department and remove as necessary Vandalism Report to Police Department and repair as necessary Drainage Structures Sediment/Debris Cleanout Remove all trash, debris, and sediment from structures twice annually or as needed. Structures Repair as necessary 2 Description Maintenance/Inspection Requirement Maintenance Required? (Y/N) Stone check Dams and Riprap - Inspect annually and after major storms Sediment Removal Remove sediment from riprap inlets and basins when sediment buildup is > 3” Side Slopes and Surface Repair any soil gullying and replenish stone on barren areas as necessary Inlet/Outlet Structures & Spillways Repair or replace riprap as necessary. Remove sediment as needed. Remove trash and debris Grass Channels and Swales Sediment Removal Remove sediment when buildup is > 3” Side Slopes and Surface Repair any soil gullying and revegetate/ replenish topsoil on barren areas as necessary Inlet/Outlet Structures & Spillways Mow grass four times annually to maintain grass heights in the 4-6 inch range Comments: Actions to be taken: Notice of Intent Project Narrative Horsley Witten Group, Inc. Northampton, MA January 2018 Page 22 of 22 8.0 PROTECTION OF RARE SPECIES HABITAT According to NHESP, the proposed project site, or a portion thereof, is located within Priority Habitat 1337 (PH 1337) and Estimated Habitat 76 (EH 76) as indicated in the Massachusetts Natural Heritage Atlas (13th Edition). This area is mapped for wood turtle (Glyptemys insculpta), a Massachusetts Species of Special Concern. The wood turtle is protected under the Massachusetts Endangered Species Act (MESA) (M.G.L. c. 131A) and it’s implementing regulations (321 CMR 10.00). The wood turtle is a medium-sized turtle (14-20 cm, 5.5-8 in) that can be readily recognized by its sculpted shell and orange color on its legs and neck. The carapace is rough and each scale rises upwards in an irregularly shaped pyramid of grooves and ridges. This species spends much of its time in or near flowing waters. It can also be seen in forests and grasslands; however, this species is rarely found more than 300 meters (1000 ft) from flowing water. This species is typically active from mid-March through October. During the winter months the turtle hibernates in flowing rivers and perennial streams. This species will also spend the hottest parts of the summer in aestivation (prolonged dormancy or torpor during hot or dry periods). Given the range of the wood turtle and the proximity of the proposed project to the unnamed perennial stream and surrounding wetland areas, it will be necessary to implement a rare species protection plan to ensure that the local population of this species is not adversely impacted. The plan will ensure that encounters with this species during construction are avoided, or depending upon the construction timing, relocated if found within the limit of work prior to the start of construction. A draft Rare Species Protection Plan is provided as Appendix B. The Applicant will work with NHESP during the MESA Project Review to finalize an approved protection plan. 8.0 REFERENCES City of Northampton Open Space, Recreation & Multi-Use Trail Plan (2018-2025) Massachusetts Department of Transportation (MassDOT) 2012 GreenDOT Implementation Document Path: H:\Projects\2015\15004 Northampton Rocky Hill Greenway Trail\GIS\Maps\150721_USGS For MESA Info Request_15004_2.mxd USGS QuadrangleRocky Hill Greenway Multi-UseTrail (Bike Path)Northampton, MA± Date: 1/19/2018 Legend *USGS Northampton 24K Quadrangle 0 500 1" = 500 feet Figure 1 Rocky Hill GreenwayMulti-Use Trail (approximate) GROV E S TR EET ROCKY HILL R OAD UNITED METHODISTD RIV E ICE PONDDRIVE ICEPONDDRIVE CHAPEL STREET OLDWILSONROADEASTHAMPTONROADUNITEDM E THODISTDRIVE Document Path: H:\Projects\2015\15004 Northampton Rocky Hill Greenway Trail\GIS\Maps\Aerial.mxd Aerial PhotoRocky Hill Greenway Multi-UseTrail (Bike Path)Northampton, MA± Date: 1/19/2018 Figure 21" = 500 feet 0 500 Legend Rocky Hill GreenwayMulti-Use Trail (approximate) Parcels *Aerial Imagery - ESRI 2016 $# $# $# $# !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! ! ! ! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!! ! ! !!! ! !!! ! ! ! ! ! ! ! ! ! ! ! !! ! ! !! ! ! ! ! ! ! ! ! ! ! ! !!!!!!!!!!!!!!!!! !! ! !! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! ! ! ! ! ! !!!!!!!!!!!!!! ! ! GROV E S TREET ROCKY HILLROAD UNITED METHODISTD RIV E ICE PONDDRIVE ICEPONDDRIVE OLDWILSONROADCHAPEL STREET UNITED METHO DIST D RIVE UNITEDMETHODISTDRIV E EASTHAMPTON ROADDocument Path: H:\Projects\2015\15004 Northampton Rocky Hill Greenway Trail\GIS\Maps\Existing_Constraints_II.mxd Existing ConstraintsRocky Hill Greenway Multi-Use Trail (Bike Path)Northampton, MA± Date: 1/19/2018 Figure 4A1" = 500 feet 0 500 Legend Rocky Hill GreenwayMulti - Use Trail (approximate)Parcels !!!Powerline Underground Storage Tanks Hydrologic Connection Marsh/Bog Wooded marsh Open Water DEP Wetlands $# GROV E S TREET R O C K Y HILL ROAD UNITED METHODISTD RIV E ICE PONDDRIVE ICEPONDDRIVE OLDWILSONROADC H A P E L S T R E E T UNITED METHO DIST D RIVE UNITEDMETHODISTDRIV E EASTHAMPTON ROADRocky HillConservationArea Rocky HillGreenway ManhanRail Trail IcePond Cr Ice PondConservationArea ArcadiaWildlifeSanctuary Pine GroveGolf Club Northampton CityOf Rt 66 Apr NorthamptonAgriculturalReserve RayEllerbrookField Document Path: H:\Projects\2015\15004 Northampton Rocky Hill Greenway Trail\GIS\Maps\Existing_Constraints.mxd Existing ConstraintsRocky Hill Greenway Multi-Use Trail (Bike Path)Northampton, MA± Date: 1/19/2018 Figure 4B1" = 500 feet 0 500 Legend Rocky Hill GreenwayMulti-Use Trail (approximate) Parcels NHESP Priority Habitats of Rare Species NHESP Estimated Habitats of Rare Wildlife MHC Historic Inventory Areas Commonwealth of Massachusetts Department of Agricultural Resources Land Trust Municipal Private MassGIS Protected and Recreational OpenSpace ROCKY HILL ROAD U NI TED M E T HODIS TDRIVEUNITEDMETHODIST D RIVE311B 225A 316C 316B 253B 88B 741A 316B 225B 258B 441C 253C 30A 441D 30A 600 441B 14A 14A 750C 441B Document Path: H:\Projects\2015\15004 Northampton Rocky Hill Greenway Trail\GIS\Maps\Soils.mxd Soils MapRocky Hill Greenway Multi-UseTrail (Bike Path)Northampton, MA Date: 1/19/2018 Figure 5 Legend Rocky Hill GreenwayMulti-Use Trail(approximate)Parcels *Soils - MassGIS 2012 14A, Scitico 225A, Belgrade 225B, Raynham 253B, Hinckley 253C, Hinckley 258B, Agawam 306C, Paxton 30A, Raynham 311B, Woodbridge 316B, Scituate 316C, Scituate 441B, Gloucester 441C, Gloucester 441D, Gloucester 600, Pits 741A, Amostown 750C, Windsor 88B, Ridgebury ± 1" = 300 feet 0 300 FIGURES & PHOTOS Existing Site Conditions Photo 1. Existing driveway servicing the natural gas pump station (looking north-west). Photo 2. Existing stream bank (looking back up slope towards the existing driveway to the west). Photo 3. Existing drainage ditch (looking west). Photo 4. Unnamed perennial stream that flows from Rocky Hill Pond. Photo 5. Existing wetland resource area as viewed from the culvert on the existing gravel path between the gas substations and the overhead wiring crossing (looking west). Photo 6. Existing pathway (looking south from below the overhead wire crossing). Photo 7. Existing culvert located beneath the existing gravel path near wetland flags WF C6 and WF C7. Photo 8. Location of the gas line. The proposed trail will cross near the gas substations. Photo 9. Massachusetts Electric Company right-of-way for utility line access and maintenance. Proposed trail will cross under the overhead wires. Photo 10. Existing natural gas right-of-way. Mitigation area is proposed at the location of the debris pile shown in the left side of the photo. View is looking east with the gas substations behind. Photo 11. Proposed mitigation area with debris from previous clearing (looking south). APPENDIX A Wetland Mitigation Plan Wetland Replacement Area Northampton, Massachusetts Horsley Witten Group, Inc. Page 1 of 11 APPENDIX A Wetland Replacement Plan Rocky Hill Greenway Multi-Use Trail Northampton, MA March 2019 1.0 Introduction The City of Northampton proposes the Rocky Hill Greenway Multi-Use Trail, a 2,630 linear foot (0.50 mile) multi-use trail designed as a spur trail to connect two existing trails in the neighborhood. The proposed project is located entirely within a City-owned parcel situated between Rocky Hill Road (MA Route 66) and Easthampton Road (MA Route 10) in Northampton, Massachusetts. The proposed trail project will improve pedestrian and bicycle facilities by connecting the residential areas along Rocky Hill Road and Ice Pond Drive to the New Haven and Northampton Canal /Manhan Rail Trail. Bicyclists and pedestrians will benefit from being able to connect to these corridors more directly and with limited interaction with vehicular traffic along these two major roadways, providing a safer and more direct route to the existing rail trail. Additionally, the proposed trail will provide access to an eventual multi-use trail serving the southwestern and western half of the City, which is not currently served by any multi-use trails. The proposed project will result in unavoidable impacts to Bordering Vegetated Wetland (BVW). Alterations to BVW have been avoided and minimized to the extent practicable given the site constraints; however, some BVW alteration is necessary to meet the project goals. The proposed trail is sited to maximize the reuse of existing disturbed areas by reusing an existing gravel access driveway within the Massachusetts Electric Company easement and following the existing gravel footpath that currently traverses the BVW. Alternate trail locations would result in even greater wetland impacts, as the BVW at this site consists of a series of hill-side seeps along the slopes leading downgradient toward an unnamed perennial stream. The Applicant proposes to provide wetland mitigation for unavoidable wetland impacts by creating two wetland replacement areas totaling approximately 2,680 SF adjacent to the proposed multi-use trail to the north/northeast of the existing gravel roadway, near wetland flags A11-A12 and A13-A14 and flags B22-B23 where hillside seeps occur along a small drainage channel. Details of the proposed mitigation areas are provided below and are shown on Sheet Wetland Replacement Area Northampton, Massachusetts Horsley Witten Group, Inc. Page 2 of 11 8 of the project plans prepared by Horsley Witten Group, Inc.(HW), entitled “Rocky Hill Greenway Multi-Use Trail, Northampton, Massachusetts” (dated April 2016). 2.0 Wetland Replacement Details Wetland replacement activities will generally include the removal of fill material and debris as well as existing vegetation within the footprint of the two wetland replacement areas, regrading and establishment of a connection to the existing intermittent channel and to the hillside seeps, introduction of high-organic content soils, introduction of coarse woody debris or boulders to improve habitat diversity, stabilization of disturbed soils with native seed mixes, and revegetation of wetland areas with native plants to provide for a 75% native plant community within all impacted areas after two growing seasons (as required under 310 CMR 10.55(4)(b)(6)). A qualified professional (Wetlands Specialist) will oversee all phases of the wetland restoration efforts to ensure that requirements set forth in the proposed plan are met. This wetland replacement plan was developed based upon observations made by HW of existing conditions and is modeled after the Massachusetts Inland Wetland Replacement Guidelines (March 2002) prepared by MassDEP). The replacement plan is also designed to meet the regulatory criteria for wetland replacement set forth in 310 CMR 10.55(4)(b)(1) through (7) as well as the provisions set forth by Massachusetts Department of Transportation (MassDOT) for wetland replacement. 2.1 Wetland Specialist As required by MassDOT and in accordance with the MassDOT specifications, a Wetland Specialist will be retained to oversee all aspects of the wetland replacement. This individual must have a minimum of 5-years experience in wetland replacement and will be responsible for the following, including, but not limited to, finalizing the location of the replacement areas, overseeing siltation controls, final grading, overseeing plantings, long-term monitoring of plant growth and any invasives, and preparing and submitting monitoring reports. This individual will also be granted the discretion to make slight field adjustments to ensure wetland replacement success. 2.2 Erosion and Sedimentation Control Prior to the commencement of any wetland replacement activities, a sedimentation and erosion control barrier consisting of staked siltation fencing or staked silt socks will be installed along the existing wetland boundary to protect the adjacent areas during earth-moving activities. Erosion control barriers may also serve as the downgradient barrier for rare species protection, and the locations and type of barriers will be coordinated with the Massachusetts Natural Heritage and Endangered Species Program (NHESP) and the Conservation Commission. Wetland Replacement Area Northampton, Massachusetts Horsley Witten Group, Inc. Page 3 of 11 Erosion control barriers will be regularly inspected and properly maintained during and after construction, including after every storm event, pursuant to specifications. Devices will be removed at the end of the two-year monitoring period if vegetation has been successfully established and sediments are stabilized. 2.3 Site Preparation and Excavation Following installation of the sedimentation barrier, vegetation and soils within the proposed replacement areas will be removed using mechanized equipment, creating two areas totaling of approximately 2,680 SF of wetland area. Sediments and vegetation removed from this area will be transported off-site to a suitable disposal facility; soils may be re-used on-site as fill material if appropriate. Miscellaneous debris observed within the replacement areas will be removed and disposed of off-site at a suitable facility. At the discretion of the Wetland Specialist, suitable debris may be retained and stockpiled nearby for re-introduction in the replacement areas following final grading and introduction of wetland soils to enhance wildlife habitat. The replacement areas will be designed to mimic the topography of the adjacent BVW; the elevations specified on the replacement BVW as shown on the attached plans are based on observations of the adjacent natural wetlands. 2.4 Soils Depending upon the condition of the underlying soils within the replacement areas, the areas will either be lightly regraded and/or supplemented as necessary. Soils within the impacted BVW will be reused as feasible, and will not be compacted or grubbed in order to retain soil structure and the existing seedbank/rootstock. It is anticipated that these would need to be supplemented to accommodate for the larger replacement areas. If it is determined that soils need to be supplemented, the replacement areas would be over- excavated by approximately 6-12 inches to allow for introduction of a layer of low permeability soils and organic-rich sediments to support the proposed wetland plant community. It will be ensured that the completed wetland replacement areas will tie into the adjacent wetland grades to allow for an unrestricted hydrologic connection between the existing wetland area and the replacement areas. Variable microtopography within the replacement areas will be created to enhance habitat diversity and improve the hydrologic connection with groundwater. The organic-rich soils will be obtained from a commercial source, will be certified as weed-free, and will be allowed to settle for a minimum of 48 hours prior to introducing plants. Wetland Replacement Area Northampton, Massachusetts Horsley Witten Group, Inc. Page 4 of 11 2.5 Wetland Replacement Area Plantings Following placement of wetland soils and re-grading, native saplings, shrubs, and herbaceous materials obtained from local nursery stock will be introduced within the replacement areas. Proposed species were selected to be compatible with the natural wetland and designed to enhance the existing vegetation community. Proposed species for the wetland and adjacent buffer include, but are not limited to, red maple (Acer rubrum), gray birch (Betula populifolia), iron wood (Carpinus caroliniana), highbush blueberry (Vaccinium corymbosum), spicebush (Lindera benzoin), winterberry (Ilex verticillata), arrowwood (Viburnum dentatum), nannyberry (Viburnum lentago), meadowsweet (Spiraea latifolia), steeplebush (Spiraea tomentosa), cinnamon fern (Osmunda cinnamomea), sensitive fern (Onoclea sensibilis), and Cardinal flower (Lobelia cardinalis) in accordance with the specifications provided on the plans. Tree species will be planted singly, while shrubs and container-grown herbaceous plants will be planted in clusters to provide a mosaic of wetland plantings. Plantings will be installed near the beginning or the end of the growing season for Hampshire County, MA (April 29 – October 12; USDA, 2002), to ensure greater plant survival. Planting specifications are provided on Sheet C- 16 of the project plans. Proposed plantings are designed to provide a densely vegetated forested swamp community upon full grow-out. 2.6 Stabilization with Wetland Seed Mix A wetland seed mix will be introduced to stabilize disturbed soils within the wetland replacement areas. Appropriate seed mixes that contain native seeds suitable for most wetland mitigation sites are commercially available. A native seed mix, such as the “New England Wetmix,” supplied by New England Wetland Plants, Inc. (www.newp.com) or acceptable equivalent, will be introduced to stabilize the soil surface and enhance the wetland plant community to ensure a 75% native wetland plant cover after two growing seasons. According to the NEWP website, the New England Wetmix “contains a wide variety of native seeds that are suitable for most wetland restoration sites that are not permanently flooded. All species are best suited to moist ground as found in most wet meadows, scrub shrub, or forested wetland restoration areas.” Following the planting of woody vegetation and fern species, the seed mix will be introduced at the recommended application rate of 1 LB/2500 SF (or 18 lbs/acre) and lightly raked in as recommended. All plantings will be watered during the two to three week grow-in period as necessary. Wetland Replacement Area Northampton, Massachusetts Horsley Witten Group, Inc. Page 5 of 11 Species included within this wetland seed mix include: fox sedge (Carex vulpinoidea), lurid sedge (Carex lurida), blunt broom sedge (Carex scoparia), sensitive fern (Onoclea sensibilis), blue vervain (Verbena hastata), hop sedge (Carex lupulina), green bulrush (Scirpus atrovirens), nodding bur marigold (Bidens cernua), bristly sedge (Carex comosa), fringed sedge (Carex crinita), American mannagrass (Glyceria grandis), wool grass (Scirpus cyperinus), soft rush (Juncus effusus), spotted Joe Pye weed (Eupatorium maculatum), boneset (Eupatorium perfoliatum), mud plantain (Alisma subcordatum), New England aster (Aster novae-angliae), rattlesnake grass (Glyceria canadensis), purplestem aster (Aster puniceus), soft stem bulrush (Scirpus validus), blueflag (Iris versicolor), swamp milkweed (Asclepias incarnata), and monkey flower (Mimulus ringens). Upper reaches and side slopes along the existing access driveway/proposed trail will be stabilized with a similar native seed mix such as the New England Conservation/Wildlife Mix. According to the specification sheet, this seed mix “provides a permanent cover of grasses, wildflowers, and legumes. For both good erosion control and wildlife habitat value. The mix is designed to be a no maintenance seeding, and is appropriate for cut and fill slopes, detention basin side slopes, and disturbed areas adjacent to commercial and residential projects” at the recommended application rate of 25 lbs/acre (1,750 SF/lb). Species contained in this native seed mix include: Virginia wild rye (Elymus virginicus), little bluestem (Schizachyrium scoparium), big bluestem (Andropogon gerardii), creeping red fescue (Festuca rubra), switch grass (Panicum virgatum), partridge pea (Chamaecrista fasciculata), deer tongue (Panicum clandestinum), Indian grass (Sorghastrum nutans), ox eye sunflower (Heliopsis helianthoides), common milkweed (Asclepias syriaca), spotted Joe Pye weed (Eupatorium maculatum), grass leaved goldenrod (Euthamia graminifolia), blue vervain (Verbena hastata), New England aster (Aster novae-angliae), and early goldenrod (Solidago juncea). 2.7 Invasive Species Management HW observed the presence of occasional non-native invasive species during the initial site survey, including, but not limited to, honeysuckle (Lonicera sp.), Oriental bittersweet (Celastrus orbiculatus), and purple loosestrife (Lythrum salicaria). These species are capable of spreading rapidly through and extensive seedbank, and/or rhizomes and can leave a long-lived seed bank in the soil. As these species are considered either invasive, likely invasive, or potentially invasive in Massachusetts, precautions will be taken to minimize the re-introduction or spread of this species within the newly created wetland replacement areas. Any observed seedlings found within the replacement areas during the grow-in and monitoring periods will be pulled by hand, bagged, and disposed of properly. Wetland Replacement Area Northampton, Massachusetts Horsley Witten Group, Inc. Page 6 of 11 2.8 Monitoring The wetland replacement areas will be monitored twice annually (approximately early to mid- June and early to mid-September) for a minimum of two growing seasons to assess the relative success of the replacement wetlands. Semi-annual site inspections conducted during late spring and late summer will include an assessment of the relative health and vigor of the planted vegetation, percent vegetative cover, percent cover of wetland species, and general compliance with the performance standards. Written reports detailing the findings of each monitoring event will be submitted on an annual basis for two years, to the Northampton Conservation Commission. Photographic documentation will be incorporated within the monitoring reports and photographs will be taken from pre-established vantage points for consistency between monitoring events. Recommendations will be made for the replacement of dead or dying plants, and any additional remediation, as necessary. 3.0 Wetland Replacement Sequence of Construction 1). A qualified wetland professional, Wetland Specialist (WS), will be identified to monitor all phases of construction of the replacement areas including, but not limited to, installation of sedimentation control barriers, removal of fill materials and debris, excavation of sub- base materials, soil augmentation, revegetation, reseeding, and implementation of the monitoring plan. The WS will photo-document all phases of the restoration process and provide reports to the Northampton Conservation Commission. 2). The WS will meet on-site with the Conservation Commission or its designated Agent to review all components of the replacement areas prior to the start of wetland replacement activities, to discuss any slight deviations that may need to be considered, and to establish the reporting protocol and schedule. 3). Prior to construction of wetland replacement areas, wetland flags will be refreshed as needed to define the boundary of the proposed wetland replacement areas as shown on the site plans. 4). A sedimentation and erosion control barrier will be installed along the wetland boundary in accordance with the manufacturer’s specifications, by a qualified contractor who is experienced with installation of such sedimentation and erosion control barriers and who is also generally experienced in wetland replacement practices. Wetland Replacement Area Northampton, Massachusetts Horsley Witten Group, Inc. Page 7 of 11 5). Debris within the restoration area will be removed using mechanized equipment such as a bobcat. All debris will be disposed of at a proper facility in accordance with all state and local laws, unless determined by the WS to be suitable for reuse in the mitigation areas. 6). Existing vegetation within the replacement areas will be cut, removed (or stockpiled for reuse if suitable), and the root systems grubbed and removed. 7). The wetland replacement areas will be roughly excavated to a depth of six to 12 inches below grade to ensure proper hydrological connection to groundwater within the final grade of the replacement areas. 8). Clean, weed-free high-organic soils will be introduced within the replacement areas and regraded, incorporating slight undulating pit-and-mound microtopography throughout to mimic conditions within the undisturbed wetland. The exact configuration of the replacement areas will be determined in the field by the WS in coordination with the contractor. Sediments will be allowed to settle for a minimum of 48 hours prior to planting. 9). A sedimentation and erosion control barrier will be installed along the upland areas and the newly created wetland boundaries to protect the replacement areas during grow-in period. 10). Following settling of introduced sediments, small rocks and/or fallen woody debris will be placed within the replacement areas to provide added wildlife habitat. Additional habitat features may be incorporated (e.g., turtle nesting habitat) 11). Nursery grown native vegetation will be planted in accordance with the planting specifications, working from far interior portions of the restoration area outward. Seeding with appropriate seed mix will occur in a similar manner, such that newly planted vegetation and seed mix are not continually trampled once planted. All plantings will be conducted by a qualified landscaper or other qualified professional who has experience with wetland replacement areas. Any deviations from the specified planting list must be approved by the WS. 12). Note: All plantings should occur during the growing season for Hampshire County, Massachusetts, which occurs from April 29 through October 12 (USDA, 2002). Should the replacement activities commence outside of that timeframe, excavation and soil augmentation activities may occur at the discretion of the WS, however, plantings should not occur. Instead the area may be temporarily stabilized with a non-persistent annual rye or weed-free straw. Wetland Replacement Area Northampton, Massachusetts Horsley Witten Group, Inc. Page 8 of 11 13). All vegetation will be irrigated, particularly during dry periods, at the direction of the WS overseeing the wetland replacement efforts. 14). The downgradient erosion control barrier will be removed from existing wetland boundary once all soils are stabilized with vegetation. 15). The Contractor will inspect erosion and sediment control systems immediately after each significant rainfall and daily during prolonged rainfall events, and will make repairs immediately including the removal and disposal of accumulated sediments when they reach approximately one-half the height of the control system, and when directed by the WS. Control systems will be promptly replaced if fabric decomposes or system becomes ineffective prior to the expected usable life. 16). The WS will monitor the wetland replacement areas twice annually during the growing season for two growing seasons as required. Bi-annual site inspections will include an assessment of the relative health and vigor of the introduced plants, percent cover of vegetation, percent cover of wetland species, and general compliance with the performance standards under 310 CMR 10.55(4)(b)(1 through 7). Randomly distributed vegetation monitoring quadrats will be established within the wetland restoration areas to provide consistent data regarding the relative success of the wetland plant community and to confirm that they are meeting the 75 percent reestablishment standard. The WS will establish photographic stations in strategic locations throughout the replacement areas to ensure consistency among photo-documentation during the monitoring period. Monitoring forms such as the sample provided in DEP handbook will be used. Annual reports will be submitted to the Northampton Conservation Commission and to MassDEP. 4.0 Compliance with Wetlands Regulations The proposed wetland replacement areas are designed to comply with the regulations at 310 CMR 10.55(4)(b) (1 through 7). The regulations state, Notwithstanding the provisions of 310 CMR 10.55(4)(a), the issuing authority may issue an Order of Conditions permitting work which results in the loss of up to 5000 square feet of Bordering Vegetated Wetland when said area is replaced in accordance with the following general conditions and any additional, specific conditions the issuing authority deems necessary to ensure that the replacement area will function in a manner similar to the area that will be lost: 1.the surface of the replacement area to be created ("the replacement area") shall be equal to that of the area that will be lost ("the lost area"); Wetland Replacement Area Northampton, Massachusetts Horsley Witten Group, Inc. Page 9 of 11 Combined, the proposed wetland replacement areas are 2,680 SF, providing an approximately 1.6:1 mitigation ratio to impacted BVW. This is slightly lower than the local mitigation requirement, but is designed in an area currently strewn with debris that was determined to be the most appropriate location for the proposed mitigation area. Additional mitigation would result in the removal of undisturbed forested buffer zone, areas that are also important for the protection of wetland resources. 2.the ground water and surface elevation of the replacement area shall be approximately equal to that of the lost area; 3.the overall horizontal configuration and location of the replacement area with respect to the bank shall be similar to that of the lost area; 4.the replacement area shall have an unrestricted hydraulic connection to the same water body or waterway associated with the lost area; The proposed replacement areas are located directly adjacent to two wetland segments and at the same or similar elevations. They are designed to mimic the adjacent hill-side seep wetlands. 5.the replacement area shall be located within the same general area of the water body or reach of the waterway as the lost area; The proposed wetland replacement areas are sited in an area directly adjacent to and north of the proposed wetland crossing and within the same approximate distance to the nearby unnamed perennial stream. 6.at least 75% of the surface of the replacement area shall be reestablished with indigenous wetland plant species within two growing seasons, and prior to said vegetative reestablishment any exposed soil in the replacement area shall be temporarily stabilized to prevent erosion in accordance with standard U.S. Soil Conservation Service methods; and The wetland replacement areas are designed to achieve a 75 percent or greater native wetland plant community after two growing seasons. Native plantings obtained from nursery stock are the same or similar in composition to species observed within the undisturbed wetland. Native seed mixes will ensure cover of native species as well as provide erosion control during the grow-in period. 7.the replacement area shall be provided in a manner which is consistent with all other General Performance Standards for each resource area in Part III of 310 CMR 10.00. Wetland Replacement Area Northampton, Massachusetts Horsley Witten Group, Inc. Page 10 of 11 In the exercise of this discretion, the issuing authority shall consider the magnitude of the alteration and the significance of the project site to the interests identified in M.G.L. c. 131, § 40, the extent to which adverse impacts can be avoided, the extent to which adverse impacts are minimized, and the extent to which mitigation measures, including replacement or restoration, are provided to contribute to the protection of the interests identified in M.G.L. c. 131, § 40. The proposed wetland replacement area is designed to be consistent with all other performance standards for freshwater wetlands, and will provide greater than 1:1 mitigation for lost wetlands that are currently disturbed (e.g., the gravel footpath that traverses the wetland area). Provisions have been incorporated to provide additional wildlife habitat features, and a monitoring plan has been established to control the spread of invasive species that have been observed in the vicinity. Further, a rare species protection plan has been drafted for review and approval by NHESP to ensure no adverse effects to the local rare species populations. An alternatives analysis of the project has been performed and it has been determined that the proposed project and preferred alternative is the only feasible alternative that will meet the project purpose. Measures to further minimize wetland impacts include incorporation of retaining walls in areas of the trail that abut or are in the vicinity of wetland resource areas. New culverts are proposed to replaced undersized existing culverts or in locations that the trail crossing existing drainage ways/ditches. Stormwater will be managed in accordance with the Massachusetts Stormwater Management Standards, incorporating a vegetated swale to manage runoff of new impervious surfaces. Wetland Replacement Area Northampton, Massachusetts Horsley Witten Group, Inc. Page 11 of 11 5.0 REFERENCES Cowardin, Lewis M., V. Carter, F.C. Golet, and E.T. LaRoe. December 1979. Classification of Wetlands and Deepwater Habitats of the United States. Fish and Wildlife Service U.S. Department of the Interior, FWS/OBS-79/31. Massachusetts Invasive Plant Advisory Group, Final Report: “The Evaluation of Non-Native Plant Species for Invasiveness in Massachusetts,” February 28, 2005. Mehrhoff, L. J., J. A. Silander, Jr., S. A. Leicht, E. S. Mosher and N. M. Tabak. 2003. IPANE: Invasive Plant Atlas of New England. Department of Ecology & Evolutionary Biology, University of Connecticut, Storrs, CT, USA (http://www.ipane.org). New England Wetland Plants, Inc. 2015-2016 Wholesale Pricing Catalog (http://www.newp.com). USDA Growing Seasons, as cited in Massachusetts Inland Wetland Replacement Guidelines. March 2002, Appendix B, Massachusetts Executive Office of Environmental Affairs, Department of Environmental Protection, Guidance No. BRP/DWM/WetG02-2, 35 pp.