Rocky Hill Trail CPA Application.pdfPage | 1
COMMUNITY PRESERVATION
PROJECT APPLICATION COVER SHEET
I: Project Information
Project Title: Rocky Hill Greenway Multi-Use Trail
Project Summary: $3.6 million in federal earmark funding specifically for multi-use trail
construction in Northampton will soon be made available. We are requesting CPA funds
to complete and update the final trail design from Route 10 to Route 66 through the
Rocky Hill Greenway. Federal funding is available for construction work, but design
costs for this portion of the projecy are ineligible.
Estimated start date: 2022 Estimated completion date: 2024
CPA Program Area (check all that apply):
� Open Space � Historic Preservation
� Community Housing X Recreation
II: Applicant/Developer Information
Contact Person and or/primary applicant: Carolyn Misch
Property Owner (if applicable): Northampton Conservation Commission
Organization (if applicable): Office of Planning and Sustainability
Mailing Address: City Hall, 210 Main Street, Northampton MA 01060
Daytime phone #: (413)587-1287 Fax #: (413)587-1264
E-mail address & Website: cmisch@northamptonma.gov Northamptonma.gov/plan
III: Budget Summary
Total budget for project: $3,600,000
CPA funding request: $60,000
CPA request as percentage of total budget: 1.7%
Applicant’s Signature:
Date Submitted: September 15, 2022
Page | 2
Narrative:
Project location –
Rocky Hill Greenway, Parcel ID 37-049, to connect Rocky Hill Road/Rt 66 with the New
Haven-Northampton Canal Greenway just north of the Easthampton Road/Rt 10 crossing.
The Rocky Hill Greenway Trail will be a 2,630 linear foot (0.50 mile) multi-use trail
designed as a spur trail to connect two existing trails in the area. The area is located
entirely within a City-owned parcel situated between Rocky Hill Road (MA Route 66) and
Easthampton Road (MA Route 10).
The proposed trail project will improve pedestrian and bicycle facilities by connecting the
residential areas along Rocky Hill Road and Ice Pond Drive to the New Haven and
Northampton
Canal / Manhan Rail Trail. Bicyclists and pedestrians will benefit from being able to connect
to
these corridors more directly and with limited interaction with vehicular traffic, providing a
safer and more direct route to the existing rail trail. Additionally, it will provide access to an
eventual multi-use trail serving the southwestern and western half of the City, where the
network is slowly expanding, but is largely not currently served by any multi-use trails.
The proposed Rocky Hill Greenway Multi-Use Trail will support the City’s recreational goals
by adding to the existing network of bike paths in the region and encouraging non-
motorized travel, advancing the goals of the City of Northampton Open Space, Recreation,
and Multi-Use Trail Plan (2018-2025). This Plan seeks (among other goals) to maintain
vibrant urban centers, develop multi-use trails for easy public access, and create
recreational opportunities while protecting valuable habitat and natural resources. The
Open Space, Recreation & Multi-Use Trail Plan is an adoptive component of the Sustainable
Northampton Comprehensive Plan (2008) and has been adopted or endorsed by a number
of City Boards and approved by the Commonwealth of Massachusetts Executive Office of
Energy and Environmental Affairs. By implementing this project, the City will progress
toward three of the major goals outlined in the Massachusetts Department of
Transportation (MassDOT) 2012 GreenDOT Implementation
Plan, which include:
• Design of multi-modal transportation system;
• Promoting healthy transportation and livable communities; and
• Tripling of the bicycle and pedestrian transportation modes.
The project also supports the seven-corridor, 788-mile statewide system of bicycling routes,
known as the Bay State Greenway. A pilot sign program in the Pioneer Valley is currently
underway, linking a number of off-road paths and on-road routes in Massachusetts and
connecting to systems in Connecticut and Vermont.
Page | 3
The trail will be constructed of bituminous asphalt pavement and will vary in width between
10 and 16 feet to accommodate site conditions. At its northern end, off of Rocky Hill Road,
the trail will following the existing gravel driveway and will be 16 feet wide; this portion of
the trail will act as a shared multi-use trail and driveway, allowing restricted vehicle access
to the existing gas pumping station. The trail will then narrow to ten feet in width at the
wetland crossing, and will be limited to pedestrians and bicycles for the remaining length of
the spur trail to the junction with the existing Manhan Rail Trail.
Partially using CPA funding, the City engaged a consultant to complete trail design to the
25% level, and secure all necessary environmental permits. These documents helped to
secure $3.6 million in federal funding for trail construction. CPA funds are now requested
to engage an engineering consultant to finalize and update the plans to include design
requirement changes, implemented since drafts were completed several years ago, and to
review bids and oversee construction. A relatively small investment of City funds will be
able to fully complete the trail to a ribbon cutting.
The project meets many of the general review criteria for project evaluation:
Serves more than one CPA program area
While specifically a recreation project, the work will also enhance an open space area
Contributes to the preservation of Northampton’s unique character, boosts the vitality of the community, and enhances the quality of life for its residents
Northampton is well-known for its network of off-road multi-use trails. This trail, which will
be open to hiking, walking, running, mountain biking, bicycling, cross country skiing, snow
shoeing, roller blading, and dog walking, will tie into that network and provide additional
meaningful opportunities for safe commuting and recreation options.
Addresses recommendations contained in the Sustainable Northampton comprehensive plan
and/or the Northampton Open Space, Recreation, and Mixed Use Trail Plan or is consistent
with other city-wide planning efforts that have received broad-based scrutiny and input and
can demonstrate wide community support
Places high value on sustainable, ecologically responsible, energy-conserving structures,
locations, and materials; demonstrates that the project minimizes the ecological footprint
Receives endorsement by community groups, municipal boards and/or departments, and
City residents.
The project is presented by the Office of Planning and Sustainability, and is supported by
the Massachusetts Audubon Society, who holds the restriction on the property, and Friends
of Northampton Trails and Greenways
Leverages additional public and/or private funds, or demonstrates that other funding
sources are not readily available or sufficient
Demonstrates a high benefit/cost value
Can be implemented expeditiously and within budget
Page | 4
The project also meets all of the recreational projects evaluation criteria:
1. Support multiple active and passive recreation uses;
2. Serve a significant number of residents;
3. Expand the range of recreational opportunities available to Northampton residents of all
ages
4. Enhance the appreciation of the natural world and its conservation
5. Contribute to the positive health status of its citizens
6. Benefit conservation and recreation initiatives
7. Maximize the utility of land already owned by Northampton (e.g. school property)
8. Promote the creative use of former railway, waterways and other corridors, including
connecting corridors, to create safe and healthful non-motorized transportation and
exercise opportunities
9. Expand recreational opportunities for those segments of the population that are
underserved given the current location of existing recreational lands and unique needs of
different segments of the community
10. Accomplish any of the preceding by restoring or rehabilitating existing facilities or lands
to serve their intended purpose
11. Incorporate environmentally friendly design and long-term maintenance
12. Have the support of the Northampton Recreation Commission and other groups and
partners involved in recreation
Attachments:
Notice of Intent Application, including maps and photos
Draft Design Plans
Support Letters to be provided as received
ROCKY HILL GREENWAY BEGIN
STA 0+00
N2938622.3721
E341979.7527
ROCKY HILL GREENWAY END
STA 26+06.05
N2937480.3488
E343502.5523 608413_SV1(COVER SHEET).DWG21-Dec-2018 2:39 PMPlotted onFED. AID PROJ. NO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-1 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
TITLE SHEET
LENGTH OF PROJECT = 2610 FEET = 0.49 MILES
MASSACHUSETTS DEPARTMENT OF TRANSPORTATION SHEETNO.
DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
APPROVED:
DIVISION ADMINISTRATOR DATE DATE
CHIEF ENGINEER DATE
RECOMMENDED FOR APPROVAL
APPROVED
IN THE CITY OF
HAMPSHIRE COUNTY
NORTHAMPTON
HIGHWAY DIVISION
PLAN OF
HIGHWAY ADMINISTRATOR
DATE DESCRIPTION REV #
25% PERMITTING SUBMITTAL
500
SCALE: 1" = 500'
0 1000 1500 2000
ROCKY HILL GREENWAY
MULTI USE TRAIL
PROJECT
LOCATION
ROUTE 66
ICE
POND
DR
.
MANHA
N
R
AI
L
T
R
AI
L
DESIGN DESIGNATION
DESIGN SPEED N/A
ADT (2004)N/A
ADT (DESIGN YEAR)N/A
K N/A
D N/A
T (PEAK HOUR)N/A
T (AVERAGE DAY)N/A
DHV N/A
DDHV N/A
FUNCTIONAL CLASSIFICATION N/A
ROUTE 10
N
NOTE:
HORIZONTAL DATUM IS MASS GRID.
Sustainable Environmental Solutions
www.horsleywitten.com
90 Route 6A
Sandwich, MA 02563
508-833-6600 voice
508-833-3150 fax
Horsley Witten Group, Inc.
THE MASSACHUSETTS HIGHWAY DEPARTMENT STANDARD SPECIFICATIONS FOR HIGHWAYS AND
BRIDGES DATED 1988, AS AMENDED, THE SUPPLEMENTAL SPECIFICATIONS DATED JULY 01, 2015,
THE 2017 CONSTRUCTION STANDARD DETAILS, THE 1996 CONSTRUCTION AND TRAFFIC STANDARD
DETAILS, (AS RELATED TO TRAFFIC STANDARD DETAILS ONLY), THE LATEST MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS WITH MASSACHUSETTS AMENDMENTS,
THE 1990 STANDARD DRAWINGS FOR SIGNS AND SUPPORTS, THE 1968 STANDARD DRAWINGS FOR
TRAFFIC SIGNALS AND HIGHWAY LIGHTING, AND THE LATEST EDITION OF THE AMERICAN
STANDARD FOR NURSERY STOCK, WILL GOVERN.
ROCKY
HI
L
L
R
O
A
D
PROPOSED
506FT
MULTI-USE PATH
10/8/2018 ADDRESSED REVIEW COMMENTS 1
Sheet List Table
Sheet Number Sheet Number
1 TITLE SHEET
2 LEGEND
3 TYPICAL SECTIONS
4 DETAILS (1)
5 DETAILS (2)
6 DETAILS (3)
7 DETAILS (4)
8 BASE PLAN (1)
9 BASE PLAN (2)
10 CONSTRUCTION PLANS (1)
11 CONSTRUCTION PLANS (2)
12 CONSTRUCTION PLANS (3)
13 GRADING PLAN (1)
14 GRADING PLAN (2)
15 GRADING PLAN (3)
16 ROCKY HILL GREENWAY PROFILE PLAN (1)
17 ROCK HILL GREENWAY PROFILE PLAN (2)
18 ROCKY HILL RD MULTI-USE PATH PROFILE PLAN
19 SIGNS AND MARKINGS PLAN (1)
20 SIGNS AND MARKINGS PLAN (2)
21 TRAFFIC SIGNAGE DETAILS
22 TRAFFIC MANAGEMENT (1)
23 TRAFFIC MANAGEMENT (2)
24 ROCKY HILL GREENWAY CROSS SECTIONS (1)
25 ROCKY HILL GREENWAY CROSS SECTIONS (2)
26 ROCKY HILL GREENWAY CROSS SECTIONS (3)
27 ROCKY HILL GREENWAY CROSS SECTIONS (4)
28 ROCKY HILL GREENWAY CROSS SECTIONS (5)
29 ROCKY HILL GREENWAY CROSS SECTIONS (6)
30 ROCKY HILL GREENWAY CROSS SECTIONS (7)
31 ROCKY HILL GREENWAY CROSS SECTIONS (8)
32 ROCKY HILL GREENWAY CROSS SECTIONS (9)
33 ROCKY HILL GREENWAY CROSS SECTIONS (10)
34 ROCKY HILL GREENWAY CROSS SECTIONS (11)
35 ROCKY HILL GREENWAY CROSS SECTIONS (12)
36 ROCKY HILL RD MULTIUSE PATH CROSS SECTIONS
12/21/2018 ADDRESSED CRM COMMENTS 2
608143_HD2(LAYOUT).DWG8-Jun-2015 12:12 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-2 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
LEGEND
TRAFFIC SYMBOLS
EXISTING PROPOSED DESCRIPTION
CONTROLLER PHASE ACTUATED
TRAFFIC SIGNAL HEAD (SIZE AS NOTED)
WIRE LOOP DETECTOR (6' x 6' TYP UNLESS OTHERWISE SPECIFIED)
VIDEO DETECTION CAMERA
MICROWAVE DETECTOR
PEDESTRIAN PUSH BUTTON, SIGN (DIRECTIONAL ARROW AS SHOWN) AND SADDLE
EMERGENCY PREEMPTION CONFIRMATION STROBE LIGHT
VEHICULAR SIGNAL HEAD
VEHICULAR SIGNAL HEAD, OPTICALLY PROGRAMMED
FLASHING BEACON
PEDESTRIAN SIGNAL HEAD, (TYPE AS NOTED OR AS SPECIFIED)
RAILROAD SIGNAL
SIGNAL POST AND BASE (ALPHA-NUMERIC DESIGNATION NOTED)
MAST ARM, SHAFT AND BASE (ARM LENGTH AS NOTED)
HIGH MAST POLE OR TOWER
SIGN AND POST
SIGN AND POST (2 POSTS)
MAST ARM WITH LUMINAIRE
OPTICAL PRE-EMPTION DETECTOR
CONTROL CABINET, GROUND MOUNTED
CONTROL CABINET, POLE MOUNTED
FLASHING BEACON CONTROL AND METER PEDESTAL
LOAD CENTER ASSEMBLY
PULL BOX 12"x12" (OR AS NOTED)
ELECTRIC HANDHOLE 12"x24" (OR AS NOTED)
TRAFFIC SIGNAL CONDUIT
PAVEMENT MARKINGS SYMBOLS
EXISTING PROPOSED DESCRIPTION
PAVEMENT ARROW - WHITE
LEGEND "ONLY" - WHITE
STOP LINE
CROSSWALK
SOLID WHITE LINE
SOLID YELLOW LINE
BROKEN WHITE LINE
BROKEN YELLOW LINE
DOTTED WHITE LINE
DOTTED YELLOW LINE
DOTTED WHITE LINE EXTENSION
DOTTED YELLOW LINE EXTENSION
DOUBLE WHITE LINE
DOUBLE YELLOW LINE
ABBREVIATIONS
GENERAL
AADT ANNUAL AVERAGE DAILY TRAFFIC
ABAN ABANDON
ADJ ADJUST
APPROX. APPROXIMATE
A.C.ASPHALT CONCRETE
ACCM PIPE ASPHALT COATED CORRUGATED METAL PIPE
BIT.BITUMINOUS
BC BOTTOM OF CURB
BD.BOUND
BL BASELINE
BLDG BUILDING
BM BENCHMARK
BO BY OTHERS
BOS BOTTOM OF SLOPE
BR.BRIDGE
CB CATCH BASIN
CBCI CATCH BASIN WITH CURB INLET
CC CEMENT CONCRETE
CCM CEMENT CONCRETE MASONRY
CEM CEMENT
CI CURB INLET
CIP CAST IRON PIPE
CLF CHAIN LINK FENCE
CL CENTERLINE
CMP CORRUGATED METAL PIPE
CSP CORRUGATED STEEL PIPE
CO.COUNTY
CONC CONCRETE
CONT CONTINUOUS
CONST CONSTRUCTION
CR GR CROWN GRADE
DHV DESIGN HOURLY VOLUME
DI DROP INLET
DIA DIAMETER
DIP DUCTILE IRON PIPE
DW STEADY DON'T WALK - PORTLAND ORANGE
DWY DRIVEWAY
ELEV (or EL.)ELEVATION
EMB EMBANKMENT
EOP EDGE OF PAVEMENT
EXIST (or EX)EXISTING
EXC EXCAVATION
F&C FRAME AND COVER
F&G FRAME AND GRATE
FDN. FOUNDATION
FLDSTN FIELDSTONE
GAR GARAGE
GD GROUND
GG GAS GATE
GI GUTTER INLET
GIP GALVANIZED IRON PIPE
GRAN GRANITE
GRAV GRAVEL
GRD GUARD
HDW HEADWALL
HMA HOT MIX ASPHALT
HOR HORIZONTAL
HYD HYDRANT
INV INVERT
JCT JUNCTION
L LENGTH OF CURVE
LB LEACH BASIN
LP LIGHT POLE
LT LEFT
MAHW MEAN ANNUAL HIGH WATER
MAX MAXIMUM
MB MAILBOX
MH MANHOLE
MHB MASSACHUSETTS HIGHWAY BOUND
MIN MINIMUM
NIC NOT IN CONTRACT
NO.NUMBER
OCS OUTLET CONTROL STRUCTURE
PC POINT OF CURVATURE
PCC POINT OF COMPOUND CURVATURE
P.G.L. PROFILE GRADE LINE
PI POINT OF INTERSECTION
POC POINT ON CURVE
POT POINT ON TANGENT
PRC POINT OF REVERSE CURVATURE
PROJ PROJECT
PROP PROPOSED
PSB PLANTABLE SOIL BORROW
PT POINT OF TANGENCY
PVC POINT OF VERTICAL CURVATURE
PVI POINT OF VERTICAL INTERSECTION
PVT POINT OF VERTICAL TANGENCY
ABBREVIATIONS (cont.)
GENERAL
PVMT PAVEMENT
PWW PAVED WATER WAY
R RADIUS OF CURVATURE
R&D REMOVE AND DISPOSE
RCP REINFORCED CONCRETE PIPE
RD ROAD
RDWY ROADWAY
REM REMOVE
RET RETAIN
RET WALL RETAINING WALL
ROW RIGHT OF WAY
RR RAILROAD
R&R REMOVE AND RESET
R&S REMOVE AND STACK
RT RIGHT
SB STONE BOUND
SHLD SHOULDER
SMH SEWER MANHOLE
ST STREET
STA STATION
SSD STOPPING SIGHT DISTANCE
SHLO STATE HIGHWAY LAYOUT LINE
SW SIDEWALK
T TANGENT DISTANCE OF CURVE/TRUCK %
TAN TANGENT
TEMP TEMPORARY
TC TOP OF CURB
TOS TOP OF SLOPE
TYP TYPICAL
UP UTILITY POLE
VAR VARIES
VERT VERTICAL
VC VERTICAL CURVE
WCR WHEEL CHAIR RAMP
WG WATER GATE
WIP WROUGHT IRON PIPE
WM WATER METER/WATER MAIN
X-SECT CROSS SECTION
TRAFFIC SIGNAL
CAB. CABINET
CCVE CLOSED CIRCUIT VIDEO EQUIPMENT
DW STEADY DON'T WALK
FDW FLASHING DON'T WALK
FR FLASHING CIRCULAR RED
FRL FLASHING RED LEFT ARROW
FRR FLASHING RED RIGHT ARROW
FY FLASHING CIRCULAR AMBER
FYL FLASHING AMBER LEFT ARROW
FYR FLASHING AMBER RIGHT ARROW
G STEADY CIRCULAR GREEN
GL STEADY GREEN LEFT ARROW
GR STEADY GREEN RIGHT ARROW
GSL STEADY GREEN SLASH LEFT ARROW
GSR STEADY GREEN SLASH RIGHT ARROW
GV STEADY GREEN VERTICAL ARROW
OL OVERLAP
PED PEDESTRIAN
PTZ PAN, TILE, ZOOM
R STEADY CIRCULAR RED
RL STEADY RED LEFT ARROW
RR STEADY RED RIGHT ARROW
TR SIG TRAFFIC SIGNAL
TSC TRAFFIC SIGNAL CONDUIT
W STEADY WALK
Y STEADY CIRCULAR AMBER
YL STEADY AMBER LEFT ARROW
DBYL
DBWL
BWL
SWL
CW
ONLY
SL
DYLEx
DWLEx
DYL
BYL
DWL
SYL
20'
20'
1
M*
RRSG
GENERAL SYMBOLS
EXISTING PROPOSED DESCRIPTION
JERSEY BARRIER
CATCH BASIN
CATCH BASIN CURB INLET
FLAG POLE
GAS PUMP
MAIL BOX
POST SQUARE
POST CIRCULAR
WELL
ELECTRIC HANDHOLE
FENCE GATE POST
GAS GATE
BORING HOLE
MONITORING WELL
TEST PIT
HYDRANT
LIGHT POLE
COUNTY BOUND
GPS POINT
CABLE MANHOLE
DRAINAGE MANHOLE
ELECTRIC MANHOLE
GAS MANHOLE
MISC MANHOLE
SEWER MANHOLE
TELEPHONE MANHOLE
WATER MANHOLE
MASSACHUSETTS HIGHWAY BOUND
MONUMENT
STONE BOUND
TOWN OR CITY BOUND
TRAVERSE OR TRIANGULATION STATION
TROLLEY POLE OR GUY POLE
TRANSMISSION POLE
UTILITY POLE W/ FIREBOX
UTILITY POLE WITH DOUBLE LIGHT
UTILITY POLE W / 1 LIGHT
UTILITY POLE
BUSH
TREE
STUMP
SWAMP / MARSH
WATER GATE
PARKING METER
OVERHEAD CABLE/WIRE
CURBING
CONTOURS (ON-THE-GROUND SURVEY DATA)
CONTOURS (PHOTOGRAMMETRIC DATA)
UNDERGROUND DRAIN PIPE (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND ELECTRIC DUCT (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND GAS MAIN (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND SEWER MAIN (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND TELEPHONE DUCT (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND WATER MAIN (DOUBLE LINE 24 INCH AND OVER)
BALANCED STONE WALL
GUARD RAIL - STEEL POSTS
GUARD RAIL - WOOD POSTS
CHAIN LINK OR METAL FENCE
WOOD PEDESTRIAN BARRIER
HAY BALES/SILT FENCE
TREE LINE
SAWCUT LINE
TOP OR BOTTOM OF SLOPE
LIMIT OF EDGE OF PAVEMENT OR COLD PLANE AND OVERLAY
BANK OF RIVER OR STREAM
BORDER OF WETLAND
100 FT WETLAND BUFFER
200 FT RIVERFRONT BUFFER
STATE HIGHWAY LAYOUT
TOWN OR CITY LAYOUT
COUNTY LAYOUT
RAILROAD SIDELINE
TOWN OR CITY BOUNDARY LINE
PROPERTY LINE OR APPROXIMATE PROPERTY LINE
EASEMENT
COMPOST SOCK
TURTLE FENCE / SILT FENCE
JB
CB
FP
GP
MB
WELL
EHH
GG
BHL #
MW #
TP #
MHB
TPL or GUY
UFB
UPDL
ULT
UPL
WG
PM
CB
SF
20'
608143_HD4(DETAILS).DWG21-Dec-2018 2:40 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-3 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
TYPICAL SECTIONS
TYPICAL 16' ROCKY HILL GREENWAY MULTI-USE TRAIL / DRIVEWAY
CROSS SECTION
STA 0+05.55 TO 7+77.39
NOT TO SCALE
TYPICAL 10' ROCKY HILL GREENWAY MULTI-USE PATH W/ SWALE
CROSS SECTION
STA 10+35.83 TO STA 13+85.99
NOT TO SCALE
PAVEMENT NOTES
PROPOSED FULL DEPTH PAVEMENT
SURFACE COURSE: 1-1/2" SUPERPAVE - 9.5 (SSC-9.5) OVER
INTERMEDIATE COURSE: 2" SUPERPAVE - 19.0 (SIC-19.0) OVER
BASE:8" GRAVEL BORROW (M1.03.0) TYPE B
TYPICAL 10' ROCKY HILL GREENWAY MULTI-USE PATH W/ SWALE
CROSS SECTION
STA 23+00.00 TO STA 25+99.78
NOT TO SCALE
10' PAVED TRAIL
℄
COMPACTED BASE
(SEE PAVEMENT DETAIL)
1.5% +/- 0.5%1.5% +/- 0.5%
1:6MAX
1.5' WIDE VEGETATED GRASS SWALE
1:4
TYP.
9"
TYP.
GRASS SHOULDER
2'2'6' TYP.
10' PAVED TRAIL
℄
COMPACTED BASE(SEE PAVEMENT DETAIL)
1.5% +/- 0.5%1.5% +/- 0.5%
1:6
MAX
1.5' WIDE
VEGETATED
GRASS SWALE
1:4
TYP.
9"TYP.
GRASS SHOULDER
2'2'6' TYP.
3:1 MAX. SIDE SLOPE
TO EXISTING GRADE
2:1 MAX. SIDE SLOPETO EXISTING GRADE
16' PAVED TRAIL
℄
1.5% +/- 0.5%
GRASS
SHOULDER
GRASS
SHOULDER
3:1 MAX. SIDE SLOPETO EXISTING GRADE COMPACTED BASE (SEE
PAVEMENT DETAIL)
2'2'
TYPICAL 10' ROCKY HILL GREEN WAY MULTI-USE TRAIL
CROSS SECTION
STA 7+77.39 TO 10+35.83 & STA 13+85.99 TO STA 15+50.00
& STA 17+50.00 TO 23+00.00
NOT TO SCALE
10' PAVED TRAIL
℄
1.5% +/- 0.5%
GRASS
SHOULDER
GRASSSHOULDER
3:1 MAX. SIDE SLOPE
TO EXISTING GRADE COMPACTED BASE (SEEPAVEMENT DETAIL)
2'2'
GRASS SHOULDER
GRASS SHOULDER
TYPICAL ROCKY HILL RD MULTI-USE PATH
W/ RETAINING WALL
CROSS SECTION
STA 4+80.00 TO STA 5+69.00
NOT TO SCALE
8' PAVED TRAIL
1:6MAX
℄
2'
BLOCK RETAINING WALL
GRASS
SHOULDER
WOOD PEDESTRIAN
BARRIER
COMPACTED SUBBASE
(SEE PAVEMENT DETAIL)
1.5% +/- 0.5%
MATCH TO EXISTING GRADE
TYPICAL ROCKY HILL RD MULTI-USE PATH
CROSS SECTION
STA 0+00.00 TO STA 2+19.00 & STA 3+50.00 TO STA 4+80.00
NOT TO SCALE
8' PAVED TRAIL
1:6MAX
℄
2'GRASS
SHOULDER
COMPACTED SUBBASE(SEE PAVEMENT DETAIL)
1.5% +/- 0.5%
MATCH TO EXISTING GRADE
TYPICAL ROCKY HILL RD MULTI-USE PATH
W/ MODIFIED STONE
CROSS SECTION
STA 2+19.00 TO STA 3+50.00
NOT TO SCALE
1' +/-
GENERAL NOTES:1.SUB-GRADE (EXISTING MATERIAL) SHALL CONSIST OF INERT MATERIAL THAT IS HARD, DURABLE STONEAND/OR COARSE SAND, FREE FROM LOAM AND CLAY. EXCAVATE SANDY-LOAM AND/OR LOAMY-SANDTOPSOIL MATERIAL FROM ALL PAVED AREAS PRIOR TO SUB-BASE INSTALLATION.3.COMPACT SUB-GRADE FILL TO 95% COMPACTION.4.COMPACT BASE COURSE TO 95% COMPACTION.5.SEE SITE LAYOUT PLAN FOR PAVEMENT WIDTH AND LOCATION.6.SEE GRADING PLANS FOR PAVEMENT SLOPE AND CROSS SLOPE.7.SWEEP CLEAN THE INTERMEDIATE COURSE SURFACE BY A STREET SWEEPING MACHINE AND APPLY ATACK COAT PER SPECIFICATIONS, PRIOR TO INSTALLING THE SURFACE COURSE.
TYPICAL BITUMINOUS PAVEMENT
NOT TO SCALE
APPROVED SUBGRADE
BASE COURSE: 8" GRAVEL BORROW(M1.03.0 TYPE B)
SURFACE COURSE: 1 1/2" SUPERPAVE(SSC-9.5)INTERMEDIATE COURSE: 2" SUPERPAVE(SIC-19.0)
TACK COAT
HEIGHT VARIES
(4' MAX)
ROCKY HILL RD MULTI-USE PATH ROCKY HILL GREENWAY MULTI-USE TRAIL
REMOVE AND DISCARD EXISTING CURB
EXISTING PAVEMENT
4' BIKE LANE
EXISTING TRAVEL LANE
VARIES FROM 11' TO 12'
EXISTING TRAVEL LANE
VARIES FROM 11' TO 12'
EXISTING
5' BIKE LANE
EXISTING GRASS SHOULDER
TYPICAL 10' ROCKY HILL GREEN WAY MULTI-USE TRAIL W/ WOOD BARRIER
CROSS SECTION
STA 15+50.00 TO 17+50.00
NOT TO SCALE
10' PAVED TRAIL
℄
1.5% +/- 0.5%
GRASS
SHOULDER
GRASSSHOULDER
3:1 MAX. SIDE SLOPE
TO EXISTING GRADE COMPACTED BASE (SEEPAVEMENT DETAIL)
2'2'
WOOD PEDESTRIANBARRIER VARIES SEE
PLAN FOR LOCATION
WOOD PEDESTRIAN
BARRIER VARIES SEE
PLAN FOR LOCATION
℄
NOTES:1. EXISTING ROAD CROSS SECTION VARIES
CONTRACTOR TO VERIFY IN THE FIELD.
2. NO CONSTRUCTION IS PROPOSED IN THE
EXISTING ROAD.
NOTES:
1. EXISTING ROAD CROSS SECTION VARIES
CONTRACTOR TO VERIFY IN THE FIELD.2. NO CONSTRUCTION IS PROPOSED IN THEEXISTING ROAD.
PAVED SURFACE(SEE PAVEMENT DETAIL)
PAVED SURFACE(SEE PAVEMENT DETAIL)
6X18 GRANITE CURB
8' PAVED TRAIL
1:1
MAX
℄
VARIES SEE PLAN
MODIFIED STONE SLOPE STABILIZATION
COMPACTED SUBBASE
(SEE PAVEMENT DETAIL)
1.5% +/- 0.5%
MATCH TO EXISTING GRADE
REMOVE AND DISCARD EXISTING CURB
EXISTING PAVEMENT
4' BIKE LANE
EXISTING TRAVEL LANE
VARIES FROM 11' TO 12'
EXISTING TRAVEL LANE
VARIES FROM 11' TO 12'
EXISTING
5' BIKE LANE
EXISTING GRASS SHOULDER
℄
PAVED SURFACE(SEE PAVEMENT DETAIL)
6X18 GRANITE CURB
SURFACE VARIES
(SEE SITE PLAN)
608143_HD4(DETAILS).DWG21-Dec-2018 2:40 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-4 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
SECTION
· THIS DRAWING PROVIDED BY REDIROCK INTERNATIONAL. DESIGN PARAMETERS, BLOCK SIZE, BLOCKCONFIGURATION ARE SUBJECT TO THE STRUCTURAL ENGINEER AT NOT ADDITION COST TO THE PROJECTDURING SHOP DRAWING PRODUCTION.
· FINAL DESIGNS FOR CONSTRUCTION MUST BE PROVIDED BY THE CONTRACTOR AND PREPARED BY A
REGISTERED PROFESSIONAL STRUCTURAL ENGINEER USING THE ACTUAL CONDITIONS OF THE PROPOSED SITE.
· FINAL WALL DESIGN MUST ADDRESS BOTH INTERNAL AND EXTERNAL DRAINAGE AND SHALL BE EVALUATED BY
THE PROFESSIONAL ENGINEER WHO IS RESPONSIBLE FOR THE WALL DESIGN.
CRUSHED STONE LEVELING PAD
(ASTM NO. 57 OR EQUIVALENT)
PERFORATED DRAIN W/ SOCK(GRAVITY DRAIN TO OUTLET)
NON-WOVEN
GEOTEXTILE FABRIC
DRAINSTONE (ASTM NO.57 OR EQUIVALENT)TO EXTEND AT LEAST 12"
BEHIND BLOCKS
BASE ELEVATION
GROUND LEVEL
11'-0" MAX
(EXPOSED WALL FACE)
28" TOP
BLOCK
1'-0"
(LEVELING PAD)
1'-0"
(MIN. BURY DEPTH)
REDI-ROCK 60"
BOTTOM BLOCK
GRADE TO DRAIN AWAY FROM WALL.SEE SITE PLAN FOR SURFACE TYPE
MOVE BLOCKS FORWARD
DURING INSTALLATION TO
ENGAGE SHEAR KNOBS
(TYPICAL)
TYPICAL SEGMENTAL CONCRETE BLOCK
RETAINING WALL DETAIL
NOT TO SCALE
SUITABLE UNDISTURBED OR
COMPACTED MATERIAL
2'MIN.
1/16" SHEETALUMINUM
5-6'TYP.
2.5'MIN.
1.25'
1.25'
4'
EDGE OF SHOULDER,TRAIL, BICYCLE TRAILOR CURB LINE
USE M10 DIA. HOT DIPPEDGALVANIZED BUTTON HEADWITH A SLOT IN HEAD AND NUTWITH LOCKWASHER, WITH AMINIMUM OF 1/4" OF THREADSBEYOND NUTS ON ALL SIGNSAFTER THEY ARE SECURELYFASTENED
P5 POST ASSEMBLY ORAPPROVED ALTERNATE
TYPICAL INSTALLATION FOR SIGNS
NOT TO SCALE
APPROVED SOLID SUBGRADE MATERIAL
DETAILS (1)
SECTION A
BEAN POLES
UNDISTURBEDSOIL
SECTION B
BACKFILL
TURTLE/SILTATION CONTROL FENCE
NOT TO SCALE
2" X 2" X 4'WOODEN STAKE
SEDIMENTLADENRUNOFF
FLOW
NOTES:1.FENCE FABRIC SHALL BE 36-INCHES WIDEMINIMUM AND SHALL BE SECURELY FASTENEDTO BEANPOLES. 6" MIN OF FABRIC SHALL BEBELOW GROUND SURFACE (BACKFILLED ORTOE-ED INTO GROUND).2.WOODEN STAKE POST SPACING SHALL BE4-FOOT MAX ON CENTER.
16" MIN.BELOWGROUND
30"EXPOSED
6"MIN
BURY SILT FENCE
JOINING SECTIONS OF FENCE TOPVIEW
SILT FENCE:M9.50.0 TYPE V
CONCRETE SLAB
PATH EDGE
BENCH DETAIL
NOT TO SCALE
NOTES:
1. ALL STEEL HARDWARE TO BE COATED W/ ZINC RICH EPOXY THEN FINISHED WITH BLACK POLYESTER
POWDER COATING.
2. HARDWARE TO BE STAINLESS STEEL (S.S.) TYPE 316.
3. BENCH MANUFACTURER TO BE DUMOR INC., THOMAS STEELE SITE FURNISHINGS, VICTOR STANLEY, ORAPPROVED EQUAL.4. CONTRACTOR TO PROVIDE COLOR CHART FOR BENCH SLATS TO OWNER.
FRONT VIEW
BENCH CONCRETE SLAB DETAIL
NOT TO SCALE
6'-0"16-11/16"
11-12"
17-18"
3"
12"
SIDE VIEW
3" SQ. X 1/4" W.STEEL TUBING
3" X 4" (NOMINAL)
STEEL SLATS
(COLOR BY OWNER)
3/8" X 4-1/2"STEEL BAR
CONCRETE SLAB(SEE DETAIL)
S.S ANCHORSTO SUIT
4"
S.S ANCHORS TO SUIT
(2" MIN. EMBEDMENT)
1/2" X 3" STEEL
SURFACE PLATE
3/8" X 2" S.S. BTN. SKT.
HD. LAG W/ WASHERW.W. MESH
(SEE NOTES)
NOTES:1. WIRE MESH (PER M8.01.2) TO BE 6 X 6W 1.4W X 1.4 FLAT SHEETS SET 1" FROM THE BOTTOM FOR A 4" THICK
SLAB AND 2" FROM THE BOTTOM FOR A 6" THICK SLAB.
2. HARDWARE TO BE STAINLESS STEEL (S.S.) TYPE 316.
3. CONCRETE TO BE TYPE I, 4,000 PSI 3/4 IN. 610, MASSDOT M4 CONCRETE FOOTING.
EXTEND PAD 3' OUTSIDE BENCH (BOTH SIDES)
FOR HANDICAP ACCOMMODATIONS
2'-6"
5'-0"±
1'-0"45°
BENCH(SEE DETAIL)
CHAMFERED
EDGE ON
ALL SIDES4 INCH THICK CONCRETE SLAB FINE BROOM FINISH
PERPENDICULAR TO DIRECTION OF TRAVEL
ARM REST
STEEL POST
HANDICAPPED RESERVED PARKING SIGN
PARKING
At Owner's ExpenseMay Be RemovedUnauthorized VehiclesREQUIREDSPECIAL PLATE
HANDICAPPED
RESERVED PARKING SIGN DETAIL
NOT TO SCALE
NOTE:1.SIGN LAYOUT, COLORS, SYMBOL AND LETTERING SHALL BE STANDARD.2.TO BE LOCATED ON SITE AS DIRECTED.3.METAL POST TO BE PAINTED 2 COATS OF EXTERIOR GREEN ENAMEL (SEE SPECS.).4.TO BE LOCATED AT APPROPRIATE SPACES.5.STEEL PIPE TO BE USED WHERE SIGN IS INSTALLED ON PAVED AREA.
ELEVATION
12" x 18"
"VAN ACCESSIBLE"SIGN AS REQUIRED
METAL POST2" x 2" x 0.188"
CROWN
PAVING
6" DIA. STEEL PIPESEE NOTE BELOW
CLASS "D" CONC.
6'-0" MIN.
3'-0"
3'-0"
6"
12" DIA.
4-1/
2
"6'-0"
9"6"2-1"Ø H
OL
E
S
2-#3 REBARS
PRECAST CONCRETE BUMPER DETAIL
NOT TO SCALE
L PARKING STALLC
2"
9"
14"
6"
2"
3"5"
INSTALLATION PLAN
1'-6" TO EDGEOF PARKING STALL
SEAL 1/2" DEEP HOLE W/ MORTAR
WHEEL STOP
PAINTED STRIPES AS SHOWN IN THE SITE PLAN
EDGE OF PAVEMENT
SECTION
#6 @ 2'-6"LONG
NOTE:
1. CONCRETE TO BE
TYPE I, 4,000 PSI
3/4 IN. 610,
MASSDOT M4CONCRETEFOOTING.
8' VAN8' MIN
3'
ACCESIBLE PARKING SPACE DETAIL
NOT TO SCALE
NOTE:1. HANDICAPPED ACCESSAISLE WIDTH FOR NONVAN (CAR) ACCESSIBLESPACES TO BE 5FEET-SEE PLANS.2. ALL PARKING LOTSTRIPING TO BE 4"SOLID WHITE PAINTEDLINES.3. ALL PAINT TO BENON-SKID.
4. VAN SPACES TO BEPAINT MARKED WITH"VAN".
2% SLOPE
MAX IN ALL
DIRECTIONS
HANDICAP PARKING SIGN
AND VAN ACCESSIBLE SIGN
WHEN REQUIRED
RETAINING WALL -SEE
PLANS AND DETAILS
4' HANDICAP GRAPHIC
SYMBOL PAINTED
WHITE ON PAINTED
BLUE BACKGROUND
4" WIDEPAINTEDLINES (TYP.)
PRECAST CONCRETE
BUMPER
SHREDDED NON-DYED
NATURAL MULCH (M6.04.4)
SUBSOIL - NATIVE OR
IMPORTED ORDINARY BORROW
(M1.01.0) COMPACTED TO MIN.
90% MAXIMUM DENSITY
FINISH GRADE
3" DEPTH
MULCH SURFACE TREATMENT DETAIL
NOT TO SCALE
NOTES:
MULCH TO BE THE SURFACE TREATMENT FOR THE DISTURBED SHOULDERS FOR AREASNOT DESIGNATED FOR LOAM AND SEED.
608143_HD4(DETAILS).DWG21-Dec-2018 2:40 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-5 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
NOTES:1.DESIGN LOADING FOR THE BOX CULVERT IS H-20.2.MANUFACTURER DRAWINGS AND CALCULATIONS FOR ALL SECTIONS OF THE BOX CULVERT SHALL BEPREPARED AND STAMPED BY A MASSACHUSETTS REGISTERED PROFESSIONAL ENGINEER AND BESUBMITTED FOR REVIEW.3.EXISTING SOILS MUST BE VERIFIED DURING EXCAVATION AND REPLACED AS NECESSARY TO PROVIDE ASTABLE FOUNDATION FOR THE PROPOSED CULVERTS / CULVERT FOUNDATION PAD.4.COMPACT APPROVED BACKFILL TO 95%. PROTECTION IN 6-9" LIFTS.
℄OF TRAIL TRAIL(SEE PLAN)
DENSE GRADE SUB-BASE (M2.01.7)
CONCRETE BOX CULVERT
12" MIN. COVER
COMPACTED NATIVE ORGRAVEL BORROW(M1.03.0) SUBGRADE
TOP OF CULVERT
6" COMPACTED WASHED 3/4"CRUSHED STONE BASE (M2.01.0)
PEDESTRIAN RAILING: POST SPACINGSPAN CENTERED OFF CULVERT
TYPICAL PRECAST CONCRETE BOX CULVERT PROFILE
NOT TO SCALE
ELEV.= SEE PLAN
2% MAX SLOPE
VARIES(SEE PLAN)
SLOPEDEND SECTION
6" OF NATIVE COMMON FILL ORGRAVEL BORROW M1.03.0 MATERIAL
CROSS SECTION A-A
NOT TO SCALE
CL
SLOPE PER GRADING PLAN
BACKFILL MATERIAL AROUND CULVERT SHALL BE GRANULAR
PROCESSED GRAVEL FILL (M1.03.1) COMPACTED TO 95% DENSITY.
EROSION CONTROL BLANKET
STABILIZATION FOR SLOPES
EQUAL/GREATER THAN 3:1(SEE DETAIL)
SEE STONE LINED
SLOPE DETAIL
NOTES:
1. ANY UNSUITABLE ORGANIC MATERIAL
FOUND BELOW THE SUB-BASE OF THE
CULVERT SHALL BE REMOVED &
REPLACED W/ COMPACTED PROCESSED
GRAVEL SUBBASE (M1.03.1) ASREQUIRED AT AN ADDITIONAL EXPENSE.
BOX CULVERT
(SEE DETAILS)
2.0'
COMPACTED NATIVE OR GRAVEL
BORROW (M1.03.0) MATERIAL
EL.= SEE PLAN
TOP STONE SET AT CULVERT INVERTDEPTH=24", d50=12", MASSDOT M2.02.0
6" CRUSHED STONE BASE (M2.01.0)
6" NATIVE COMMON FILL OR GRAVEL BORROW
(M1.03.0) MATERIAL WITHIN CULVERT
SEECULVERT
DETAILS
SEE SITE PLANS
FOR SURFACE
TREATMENT CULVERT
(TYP.)
W2=10-12'
CULVERT TO STONE TRANSITION DETAIL
NOT TO SCALE
SIDE SECTION
PLAN VIEW
STONE SLOPED SIDEWALLS
(SEE STONE LINED SLOPE DETAIL)
CHANNEL
W1=2'
L1=8'
W1=2' MIN.
NATIVE OR GRAVELBORROW (M1.03.0) SUBGRADE
1D 1
SEE PLAN
NOTES:1. RIPRAP STONE PER MASSDOT M2.02.02. STONE TO EXTEND UP BOTH SIDES OF THE
APRON AND AROUND THE END OF THE
CULVERT AT THE DISCHARGE OUTLET AT
A MAXIMUM SLOPE OF 2:1 AND A HEIGHT
NOT LESS THAN 2/3 THE CULVERT HEIGHT.
3. THE AREA TO BE STONED TO BEUNDERCUT SO THAT THE INVERT OF THEAPRON SHALL BE AT THE SAME GRADE(FLUSH) WITH THE RECEIVING CHANNEL.
4. THE WIDTH OF THE END OF THE APRON TO
BE EQUAL TO THE BOTTOM WIDTH OF THE
RECEIVING CHANNEL (MAX. TAPER 5:1).
5. ALL SUBGRADE FOR STRUCTURE TO BECOMPACTED TO 95% OR GREATER.6. ANY DISTURBED AREA FROM END OFAPRON TO RECEIVING CHANNEL MUST BE
STABILIZED.
12"
DEPTH
L
2 MAX.
CULVERT
END SECTION
6" MIN. 34" CRUSHEDSTONE BASE (M2.01.0)
GEOTEXTILEM9.50.0 TYPE III
RIPRAP STONE
(MIN. D50=12")
NATURAL GRADE
OR BACKFILL
6" MIN. 34" M2.01.0
CRUSHED STONE BED
NON-WOVENGEOTEXTILEUNDERNEATH STONE
M9.50.0 TYPE III -
FILTRATION/DRAINAGE
STONE
2' MIN
FRONT SECTION VIEW
L2=2' MIN.
1" DIA. INSERTS FOR INSTALLATION/
ERECTION HARDWARE
2'-0"
OPENING
2'-0" OPENING
ROOF, FLOOR AND
WALL THICKNESSES
AS REQ'D (6" MIN.)
8" X 8"
CHAMFERS
A
A
FRONT VIEW SECTION A-A
2"
1" X 1" CLOSED CELL
RUBBER GASKET
2" DIA. LIFTING HOLES
8'-0" OR
AS REQUIRED 2'-0"
OPENING
2'-0"
OPENING
TYPICAL BOX CULVERT & SLOPED END DETAIL
NOT TO SCALE
8'-0"
MAX.
GENERAL NOTES:1. CONCRETE: 5,000 P.S.I MINIMUM
STRENGTH @ 28 DAYS.
2. STEEL REINFORCING- ASTM A-615,
GRADE 60.
3. COVER TO STEEL-1" MINIMUM.
4. ASTM C858 AND ACI 318 WITH AASHTOHS-20 LOADING.5. CONSTRUCTION JOINT-SEALED WITH 1"DIA. BUTYL RUBBER OR EQUIVALENT.
6. EARTH COVER= 0 TO 8 FEET MAX.
SLOPED END SCHEMATICBOX CULVERT
SCHEMATIC
TYPICAL RIP RAP OUTFALL DETAIL
NOT TO SCALE
SECTION A-A
1D 1
SEE PLAN
5D
PLAN
A
NOTES:
1. STONE SHOULD EXTEND UP BOTH SIDES OF THE
APRON AND AROUND THE END OF THE PIPE OR
CULVERT AT THE DISCHARGE OUTLET AT A
MAXIMUM SLOPE OF 2:1 AND A HEIGHT NOT LESS
THAN TWO THIRDS THE PIPE DIAMETER ORCULVERT HEIGHT.2. THE AREA TO BE STONED SHALL BE UNDERCUT SOTHAT THE INVERT OF THE APRON SHALL BE AT THE
SAME GRADE (FLUSH) WITH THE SURFACE OF THE
RECEIVING CHANNEL.
3. THE WIDTH OF THE END OF THE APRON SHALL BE
EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING
CHANNEL. MAXIMUM TAPER TO RECEIVINGCHANNEL 5:14. ALL SUBGRADE FOR STRUCTURE TO BECOMPACTED TO 95% OR GREATER.
5. HORIZONTAL ALIGNMENT OF THE APRON SHALL BE
PER THE SITE PLAN.
6. ANY DISTURBED AREA FROM END OF APRON TO
RECEIVING CHANNEL MUST BE STABILIZED.
1' MIN.
D
SECTION B-B
A
12"
DEPTH
A
SEE B-B
12"
B
B
OUTLET PIPE 2D
3D
4D 12"
2 MAX.
HEADWALLOR STONE FOREBAY
6" MIN. 34" WASHEDSTONE BED FILTERFABRIC NATURAL STONE
(MIN. D50=6")
CUT PIPE TOMATCH SLOPE
EXTEND ROCK
AROUND PIPE
IF NOHEADWALL
APRON
NATURAL GRADE
OR BACKFILL
6" MIN. 34" WASHED
STONE BED
NON-WOVEN FILTERFABRIC
STONE
DETAILS (2)
MIN. TRENCH WIDTH
FINAL BACKFILL
INITIAL BACKFILL,
6"-12" ABOVE
TOP OF PIPE.
BEDDING MATERIAL
HAUNCHINGTO SPRINGLINE OF PIPE
MINIMUM RECOMMENDEDSURFACE LIVE
LOADING CONDITION
*
4.
COVER, in (mm)
*
1.
TYPICAL DRAINAGE PIPE TRENCH DETAIL
NOT TO SCALE
FOUNDATION: WHERE THE
TRENCH BOTTOM IS
UNSTABLE, THE CONTRACTOR
TO EXCAVATE TO A DEPTH
REQUIRED BY THE ENGINEERAND REPLACE WITH AFOUNDATION OF CLASS I OR II
MATERIAL AS DEFINED IN
ASTM D2321, "STANDARD
PRACTICE FOR INSTALLATION
OF THERMOPLASTIC PIPE FOR
SEWERS AND OTHER
GRAVITY-FLOWAPPLICATIONS," LATESTEDITION; AS AN ALTERNATIVEAND AT THE DISCRETION OF
THE ENGINEER, THE TRENCH
BOTTOM MAY BE STABILIZED
USING A WOVEN GEOTEXTILE
FABRIC.
2.
MINIMUM BEDDING THICKNESS TOBE 4" (100mm) FOR 4"-24"
(100-600mm) AND
42"-48"(1050-1200mm) CORRUGATED
POLYETHYLENE PIPE (CPEP); 6"
(150mm) FOR 30"-36" (750-900mm)
CPEP.
H25 (FLEXIBLE PAVEMENT)H25 (RIGID PAVEMENT) E80RAILWAY HEAVY
CONSTRUCTION
12 (300)12 (300)24 (610)48 (1220)
MINIMUM COVER: MINIMUM RECOMMENDED DEPTHS OF COVER
FOR VARIOUS LIVE LOADING CONDITIONS ARE SUMMARIZED IN
THE FOLLOWING TABLE. UNLESS OTHERWISE NOTED, ALL
DIMENSIONS ARE TAKEN FROM THE TOP OF PIPE TO THEGROUND SURFACE.
MINIMUM TRENCH WIDTHS TO BE AS FOLLOWS:
TOP OF PIPE TO BOTTOM OF BITUMINOUS PAVEMENT
8 (200)10 (250)12 (300)
15 (375)
18 (450)
25 (630)
28 (710)31 (790)34 (860)39 (990)
3
BEDDING, HAUNCHING AND INITIAL
BACKFILL: SUITABLE MATERIAL TOCONSIST OF CLEAN, HARD,PARTICLES OF GRAVEL MEETING
THE FOLLOWING:
SIEVE SIZE% PASSING
3/8" 85-95
NO. 4 5-15
NO. 8 0-2
MATERIAL TO BE INSTALLED ASREQUIRED IN ASTM D2321, LATESTEDITION.
THE MINIMUM COVER FOR A HDPE PIPE IS 1'-0" FOR H-20
TRAFFIC LOADS IF INSTALLED IN ACCORDANCE WITH AASHTO
SECTION 30. THIS IS BASED ON EMPIRICAL CALCULATION OF
LOAD RESPONSE, MANUFACTURER'S TESTING AND FIELDEXPERIENCE WITH THE PIPE. AASHTO SPECIFICATIONSSECTION 18.4.1.5 DEFINES THE MINIMUM COVER AS "ID/8 BUTNOT LESS THAN 12 INCHES". THIS COVER IS MEASURED FROM
THE PIPE OD TO THE TOP OF A RIGID (CONCRETE) PAVEMENT
OR THE BOTTOM OF A FLEXIBLE (BITUMINOUS) PAVEMENT.
BOTH AASHTO AND ASTM, AS WELL AS MOST
MANUFACTURERS, REQUIRE ADDITIONAL (TEMPORARY
COVER, MOUNDED OVER THE PIPE AND REMOVED FOR FINALGRADING AND PAVING, IS SUFFICIENT FOR LARGECONSTRUCTION VEHICLE LOADS.
NOTES:
MIN. RECOMMENDED
TRENCH WIDTH, in (mm)
NOMINAL Ø
in (mm)
GROUND SURFACE UNDISTURBED
EARTH
HDPE PIPE
FOUNDATION
DETAIL PROVIDED BY ADVANCED DRAINAGE SYSTEMS, INC.
6.5"
TYP.
29"
TYP.
10"
TYP.
6.5"
TYP.
25"
TYP.6.5"
TYP.
TYPICAL FLARED END SECTION
NOT TO SCALE
NOTES:
1. PE THREADED ROD W/WING NUTS PROVIDED FOR END SECTIONS 12"-24". 30" & 36" END
SECTIONS TO BE WELDED TO PIPE PER MANUFACTURER'S RECOMMENDATIONS.
2. ALL DIMENSIONS ARE NOMINAL
3. DRAIN PIPES LESS THAN 12" IN DIAMETER SHALL BE SAWCUT TO MATCH SLOPE.4. DETAIL PROVIDED BY ADVANCED DRAINAGE SYSTEMS, INC.
PE THREADED ROD
W/WING NUTS (SEE NOTE)
TOP VIEW RIGHT SIDE VIEW FRONT VIEW
608143_HD4(DETAILS).DWG21-Dec-2018 2:40 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-6 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
RIP RAP LINED SLOPE DETAIL
NOT TO SCALE
NON-WOVEN GEOTEXTILE
BENEATH STONE M9.50.0 TYPE
III - FILTRATION & DRAINAGE
2' EXCAVATION
RIPRAP STONE SLOPE
d10 = 6"
d50 =12"
d100 = 18"
DEPTH = 24"
2' MIN.
BASE
SEE NOTE
ON GEOTEXTILE
NOTES:1. TOE-IN & EMBED GEOTEXTILE
MIN. 6" BELOW GRADE
STONE SET 3" ABOVE FINISH
GRADE OF ACCESS WAY
6" THICK LAYER OF 3/4"
CRUSHED STONE BED
(M2.01.0)
COMPLETELY BACKFILL GEOTEXTILE
DETAILS (3)
3' TYP.
3' TYP.
SEE SITE PLANFOR CLEAR OPENING
(12' TYP.)
12"
2.75' TYP.
12"ACCESS GATE DETAIL
NOT TO SCALE
CLCL
LOCK CHAMBER POST
TOP RAIL - 3" ID ( 7.58# / FT ) STEEL PIPE
LOCK CHAMBER
POST 6" ID (18.97# /
FT) REMOVABLE
STEEL BOLLARD
BOLLARD SLEEVE
8" x 8" x 1/4" STEEL
PLATE WITH 3/16" WELD
6" COMPACTED GRAVEL (M1.03.0)
3' ID (7.58#/FT) STEEL
PIPE BRACE
9/16" HOLE THROUGH POST CAP & HINGE SHAFT 1/2"DIAM. GALV., TREATED ROD TO EXTEND THROUGH ANDBE SECURED ON BOTH ENDS WITH GALV. CAP NUTS
3" CAP
3/16" WELDED
6" ID (28.57# / FT)
EXTRA STRONG
STEEL PIPE
2 STANDARD
GREASE FITTINGS
3"3"
1-1/2"
3/16" WELD
HINGE SHAFT 5" ID(14.62# / FT) STEEL PIPECONCRETE FILLED
6" x 6" x 1/4" STEEL
PLATE WITH 3/16" WELD
SHOULDER SLOPE TO DRAIN
DOUBLE POST WHERE REQUIRED
3'-6"MIN.
NOTE:1. PROVIDE TWO LOCK CHAMBER POSTS FOR EACH GATE:ONE AT LOCKED POSITION AND ONE AT OPEN POSITION
(SEE SITE PLAN).
2. ANY HOLLOW POSTS TO BE FILLED WITH CONCRETE
(4,000 PSI, 3/4 IN. MASSDOT M4)
4,000 PSI CONCRETE FOOTING
(3/4 IN. 610, MASSDOT M4)
4' PEDESTRIANACCESS CLEAROPENING
6'-0" MAX
SHOULDER
CLEARANCE
TO BOULDER
3'± DIAM.
BOULDER
(BOTH SIDES)
HEAVY DUTY
PAD LOCK
W/ KEY FOR
BOTH BOLLARDS
12"12"
REMOVABLE
STEEL BOLLARD
12"12"
TO SUIT
TO SUIT
TO SUITTO SUITTO SUIT
TO SUIT
PLAN
ELEVATION - FRONT VIEW
ELEVATION - SIDE VIEWACCESS GATE LOCK DETAIL
NOT TO SCALE
1-1/2"
1-1/2"
LOCK CHAMBER
1-1/4" DIAM. HOLE
TOP RAIL
TRIANGULAR STEEL PLATE
LOCK CHAMBER POST CONCRETE FILLED
3/16" WELD
HOLLOW POSTS TO BE FILLED W/ 4,000 PSI CONCRETE(3/4 INCH. MASSDOT M4) CROWN CONCRETE TO DRAIN
CHAIN WELDED TO TOP PLATE
GALVANIZED STEEL CHAIN
4" DIAM. x 3/8"
STEEL PLATE 3/16"
WELD
MIDDLE PLATE
1/2" DIAM. > HOLE
SIDE PLATE
3/16" WELD ALL JOINTS
TRIANGULAR STEEL PLATE
CHAIN WELDED TO PIN
1" x 9" SINGLE PIECE MACHINED LOCK PIN
TOP PLATE
TOP RAIL
SIDE PLATE
BOTTOM PLATE
LOCK CHAMBER POST
LOCK CHAMBER POST
TOP PLATE 3/8" STEEL
PLATE
CHAIN WELDED
TO TOP PLATE
HEAVY GAUGEGALVANIZED STEELCHAIN, 20" LONG
MIDDLE PLATE 3/8"STEEL PLATE
3.16" WELD
SIDE PLATE 3/8" STEEL
PLATE
3/16" WELD ALL JOINTS
BOTTOM PLATE 3/8" STEELPLATE
3/8" TRIANGULAR STEEL PLATE WELDED
TO POST AND PLATE
CHAIN WELDED TO PIN
1" x 9" SINGLE PIECE
MACHINED LOCK PIN
TOP RAIL
4" DIAM. x 3/8" STEEL PLATE'
1/2" DIAM. HOLE
SETTING RURAL MAILBOXES
NOT TO SCALE
2'-0"
MIN.
MAIL BOXES ON NARROWSIDEWALKS SHALL BE SETBEHIND CURB AND PARALLELTO IT WITH THE LETTER SLOT
FACING TRAFFIC
7"±
43"±
NOTES:
1. LUMBER TO BE
PLANED ON ALL
FOUR SIDES TOFULL 2"X6" SIZE TOFIT BOTTOM OFMAIL BOXES.
2. SET 1-1/2" GALV.
PIPE POST - USE
DRVING POINT OF
SAME SIZE & TAMP
POST INTO PLACEPLUMB BOTHWAYS.3. ALL FITTINGS ARE
TO GALVANIZED.
4. 4"X4" PRESSURE
TREATED POST
MAY BE
SUBSTITUTED FOR
A PIPE POST.5. SEE MA DOTSPECIFICATIONS
FOR ADDITIONAL
INFORMATION.
WOOD
SCREWS
1-1/2" GALV.
IRON PIPE
5'-3"± LONG
2" X 6" X 18"
LONG SPRUCE
TOP OF
CURB
TOP OF
ROAD
SURFACE
HEAVY DUTYPIPE FLANGE
NAIL
TOP OF CURB
WOODSCREWS
TOP OFSIDEWALK
TOP OF ROAD SERVICE
TYPICAL OFF-STREET BICYCLE PEDESTRIAN TRAIL
TWO-WAY TRAFFIC STRIPING DETAIL
NOT TO SCALE
3'
TO SUIT 9'
NOTES:1.MARKINGS TO BE INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS.2.MARKINGS ON PAVEMENT ONLY.3.MARKING PER MASSDOT SPECIFICATIONS.
CENTER OFTRAVEL WAY
3'
6" PAINTED YELLOW LINEAT CENTERLINE OF PATH
ARROWS EVERY 200-FT±
LANDSCAPE BOULDER OR BARRIER
NOT TO SCALE
GRADE
COMPACTED
NATIVE
SUBGRADE
SET BOULDER AT GRADE ANDBACKFILL SO THERE IS NO
MOVEMENT OF STONE
SPACING PERSITE PLANLANDSCAPE BOULDERWIDTH VARIES BETWEEN 3-4'
WOOD PEDESTRIAN BARRIER
NOT TO SCALE
2 X 6 RAIL
4'-0"
NOTES:
1. MATERIALS PER MASSDOT M9.05.1, M9.05.3 AND M9.05.5. SEE SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
2. POST AND RAILS TO BE PRESSURE TREATED LUMBER GROUND CONTACT LUMBER, NO. 2 GRADE MIN.3. ALL SPLICES ARE TO BE MADE AT POSTS. ALTERNATE SPLICE CONNECTIONS.4. FASTENERS TO BE HOT DIPPED GALVANIZED OR STAINLESS STEEL MATCHING ASTM A153 AND ASTMA653.
5. THE CONTRACTOR SHALL INSTALL EITHER TWO 1/2"Ø BOLTS OR ONE 1"Ø BOLT AT EACH RAIL TO POST
CONNECTION. ALTERNATIVE OPTION: THRU-LOCKING BOLT (FASTENMASTER THRU LOCK OR EQUAL).
6. CONCRETE FOOTING NOT NECESSARY FOR HYDRAULIC POST INSTALLATION. FOOTING MATERIAL TO
EXTEND AROUND THE ENTIRE POST IF EXCAVATING AND BACKFILLING.7. WOOD POSTS SHALL BE NOTCHED AS NECESSARY TO FACILITATE CURVES AND CHANGES INDIRECTION. RAIL SHALL BE CUT TO CREATE A RAIL TO RAIL FLUSH FACE JOINT AS NECESSARY.8. BEGINNING & END SECTIONS SHALL BE ANCHORED INTO THE GROUND A MINIMUM 1-FOOT BELOW FINISH
GRADE WHERE PARALLEL TO TRAFFIC OR FLARED AT A 45 DEGREE ANGLE AWAY FROM THE DIRECTION
OF TRAVEL TO AVOID BLUNT ENDINGS.
8' O.C.
FINSH GRADE
2"
6" MIN.
SECTION
PLAN
2 X 6 RAIL
4'-0"MIN.
TOP RAIL
SPLICE RAIL
AT POST
FASTENERS
(SEE NOTES)TOP POSTFLUSH W/RAIL
4 X 4POST
4,000 PSI, 3/4 IN. 610
CONCRETE FOOTINGM4 (SEE NOTES)
HEX NUT W/WASHER
BOLT W/WASHER
(SEE NOTES)
4 X 4POST
NO SPACER
HEX NUTW/WASHER
BOLTW/WASHER
2 X 6 RAIL
1'-6"±
1'-6"±
2 X 6 TOP RAIL
POST BELOW CONCRETE(1" MIN.) FOR FREE DRAINAGE GALV. SPIKE OR SCREW
(2" MIN. EMBEDMENT INTO RAIL)
FINISH GRADE
4"
LOAM AND SEED DETAIL
NOT TO SCALE
SEED:ALONG PATH - SLOPES & SHOULDERS M6.03.1WETLAND RESTORATION/MITIGATION - PER PLAN
TOPSOIL: M1.05.0
SUBSOIL: COMPACTED NATIVE MATERIALOR ORDINARY BORROW (M1.01.0)COMPACTED AT 90% MAXIMUM DENSITY
608143_HD4(DETAILS).DWG21-Dec-2018 2:40 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-7 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
DETAILS (4)
EROSION CONTROL BLANKET DETAIL
NOT TO SCALE
BRING MATERIAL DOWN TO A LEVEL AREA W/24" BASE EXTENSION, TURN THE END UNDER4" AND STAPLE AT 12" INTERVALS
NOTES:.1.LOAM AND SEED PRIOR TO BLANKET INSTALLATION.2.SLOPE SURFACE SHALL BE SMOOTH BEFORE PLACEMENT FOR PROPER SOIL CONTACT.3.STAPLING PATTERN AS PER MANUFACTURER'S RECOMMENDATIONS.4.DO NOT STRETCH BLANKETS/MATTINGS TIGHT. ALLOW THE ROLLS TO MOLD TO ANY IRREGULARITIES.5.FOR SLOPES LESS THAN 3H:1V, ROLLS MAY BE PLACED IN HORIZONTAL STRIPS.6.LIME, FERTILIZE AND SEED BEFORE INSTALLATION. PLANTING OF SHRUBS, TREES, ETC. SHOULD OCCURAFTER INSTALLATION.
STAPLE OVERLAPS MAX. 5' SPACING
6" MIN.OVERLAP
ANCHOR IN 6"x6"MIN. TRENCH &STAPLE AT12" INTERVALS
2" MIN.OVERLAPEROSION CONTROLBLANKET M9.50.0TYPE IV - SLOPEPROTECTION
HYDROSEED PRIOR TOBLANKET INSTALLATIONTIE DOWN STRAP (SEE NOTES)PUMP DISCHARGE HOSE
SPOUT SEWN INTO BAG
FLOW FROM PUMP
FILTERED WATER FILTERED WATERFILTERED WATERDEWATERING BAGON AGGREGATEOR STRAWUNDERLAY
FLOW FROM PUMP
PUMP DISCHARGE HOSE
TIE DOWN STRAP(SEE NOTES)
SPOUT SEWN INTO BAG
DEWATERINGBAG
TEMP. AGGREGATE OR STRAW UNDERLAY
A A
SECTION A - A
DEWATERING BAG DETAIL
NOT TO SCALE
INSTALLATION NOTES:1.PLACE LIFTING STRAPS (NOTINCLUDED) UNDER THE UNIT TOFACILITATE REMOVAL AFTER USAGE2.UNFOLD DANDY DEWATERING BAG ONSTABILIZED AREA OVER DENSEVEGETATION, STRAW, OR GRAVEL (IFAN INCREASED DRAINAGE SURFACEIS NEEDED)3.INSERT DISCHARGE HOSE FROMPUMP INTO DANDY DEWATERING BAGA MINIMUM OF SIZE INCHES ANDTIGHTLY SECURE WITH ATTACHEDSTRAP TO PREVENT WATER FROMFLOWING OUT OF THE UNIT WITHOUTBEING FILTERED4.IF USING OPTIONAL ABSORBENTS,PLACE ABSORBENT BOOM INTO THEDANDY DEWATERING BAG
MAINTENANCE:
1.REPLACE THE UNIT WHEN 1/2 FULL OFSEDIMENT OR WHEN SEDIMENT HASREDUCED THE FLOW RATE OF THEPUMP DISCHARGE TO ANIMPRACTICAL RATE
2.IF USING OPTIONAL OIL ABSORBENTS,REMOVE AND REPLACE ABSORBENTPILLOW WHEN NEAR SATURATION
APPROVED NATIVEMATERIAL OR ORDINARYBORROW (M1.01.0)
DEPTH = 6" MIN.
1 2
6" CLEAN WASHED SAND(MEETING M1.04.0 TYPE A) ORENGINEER APPROVED EQUALNATIVE MATERIAL 4" LOAM (M1.05.0) & SEED (SLOPES & SHOULDERS -M6.03.1) W/ EROSION BLANKET (SEE NOTES)
TYPICAL GRASS CHANNEL (SWALE) DETAIL
NOT TO SCALE
3:1 TYP.2:1 MAX 1.5'TYP 2.0'2:1 TYP.
3' TYP.2% ±SHOULDERALONG PATH
2.0'2:1 TYP.
NOTES:1.BOTTOM AND SIDE SLOPES WITHIN THE GRASSCHANNEL/SWALE TO BE STABILIZED EROSION CONTROLBLANKET.2.LINEAR SLOPE OF CHANNEL TO SUIT PLAN.
PAVEDSURFACE
1
1 TYP.
FLOW
FLOW LINE
VARIES
3' TYP.
3' MAX.
GEOTEXTILE
UNDERNEATH STONE
M9.50.0 TYPE III -
FILTRATION/DRAINAGE
RIPRAP STONE:M2.02.0, 6-12" D50
FLOW LINE
50' TYPICALSEE PLAN FOR LOCATION
PROFILE A-A
SPACING
STONE CHECK DAM FOR SWALE DETAIL
NOT TO SCALE
CROSS SECTION
FILTER FABRIC
(M9.50.0 TYPE III)
3' MAX.
9" MIN.
18"SEE NOTE 118"SEE NOTE 1
A
A
NOTES:1. KEY STONE INTO THE SWALE/DITCH BANKS AND EXTEND INTO THE ABUTMENTS A MINIMUM
OF 18" TO PREVENT FLOW FROM DIVERTING THE CHECK DAM.
MAINTAIN LOWPOINT AT
CENTER OF CHECK
DEWATERING SUMP DETAIL
NOT TO SCALE
NOTES:1.ALL EQUIPMENT IS TEMPORARY AND MUST BE REMOVED AFTER USE. STONE AND/OR NATURALMATERIAL CAN REMAIN.2.PUMP LOCATION TO SUIT WORK. PUMP SIZE/HP TO SUIT SITE REQUIREMENTS. MULTIPLE PUMPSTO BE INSTALLED WHERE NECESSARY.3.PUMP CHAMBER SIZE TO BE DETERMINED BASED ON PUMP DIMENSIONS.4.FINAL DEPTH TO BE DETERMINED BY CONTRACTOR BASED ON EXISTING GRADE.
EXISTING GRADE
PERFORATED HDPE/PVC PIPE ORPRE-CAST PERFORATED PUMP CAGE
UNDISTURBEDNATIVEMATERIAL
3/4" WASHED STONE
TO SUIT2' MIN.
TO SUIT2' MIN.
DEWATERING PUMP(S)- SEE NOTES
PUMP DISCHARGE TODEWATERING SYSTEM
SEENOTES
CONCRETE HANDICAP RAMP DETAIL
NOT TO SCALE
SIDEWALK OR PATH(WIDTH PER PLAN)
8.3%
MAX
CONCRETE
SLOPED RAMP
HIGH SIDE TRANSITION(6-7' TYP.)
SHOULDER
ROADWAY
"LEVEL ENTRANCE"
2% MAX. SLOPE FORDRAINAGE
CURB OR
BERM
MATCHEXISTINGGRADE
5' MIN.
NOTES:
1. CONTRACTOR TO CONTACT THE ENGINEER IF DISCREPANCIES ARE FOUND IN THE SLOPES AND GRADES
SHOWN PRIOR TO POURING THE CONCRETE.
2. RAMP TO BE CONSTRUCTED OF PORTLAND CEMENT CONCRETE PER MASS DOT & ADA REQUIREMENTS.3. CONTRACTOR TO REPLACE/RESET EX. CURB/BERM AS NECESSARY.4. CURB END SECTIONS TO BE INSTALLED AT ALL RAMPS WHEN APPLICABLE.5. DETECTABLE WARNING PANEL TO BE NON SLIP SURFACE FULLY EMBEDED AND MEETING ADA
REQUIREMENTS INSTALLED AT ALL ROADWAY CROSSING AND INLINE WITH CROSSWALK.
DETECTABLEWARNING PANEL
WHERE PATHMEETS EX.SIDEWALK SEERAMP DETAIL.
LIMIT OF CONCRETE
DIRECTION
OF TRAFFIC
CROSSWALK
(SEE DETAIL)
ROCK
Y
HIL
L
R
O
AD ROCKY HILL ROADMATCHLINEMATCHLINEΔΔΔPLPLPLPLPLPLΔCONTINUED ONSHEET NO. 9608413_SV3.DWG10-Mar-2015 3:39 PMPlotted onPREPARED BY:
OFSHEETPARS. NO:
FILE NAME:
37-049-001 DATE:
608413_SV3.dwg
REV.COMMENTS
REVISIONS
DATE
FIELD BOOK. NO:XXXX
FED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-
PLAN OF TOPOGRAPHIC SURVEY OF
SCALE: 40 FEET TO THE INCH AS ORDERED BY
THE MASSACHUSETTS DEPARTMENT OF
TRANSPORTATION, HIGHWAY DIVISION
MASSACHUSETTS DEPARTMENT OF TRANSPORTATION
0
SCALE: 1" = 40'
40 160100
FIELD CHIEF:DM
DRAWN BY:CHECKED BY:
ROCKY HILL GREENWAY MULTI-USE TRAIL
ROCKY HILL ROAD
IN THE CITY OF
NORTHAMPTON, MASSACHUSETTS
MC JL/RC
Sustainable Environmental Solutions
www.horsleywitten.com
90 Route 6A
Sandwich, MA 02563
508-833-6600 voice
508-833-3150 fax
Horsley Witten Group, Inc.
8 36FEBRUARY 2016
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
BASE PLAN (1)
608413
8 36
SURVEY NOTES
1. THE TOPOGRAPHY AND EXISTING SITE CONDITIONS DEPICTED HEREON ARE THE RESULT OF AN ON THE GROUND FIELD SURVEYCONDUCTED BY THE HORSLEY WITTEN GROUP, INC. MARCH 26 & 27, 2015. WITH SUPPLEMENTAL FIELD SURVEYS ON AUGUST 23, 2017 &
SEPTEMBER 11, 2017
2. HORIZONTAL DATUM IS MASS STATE PLANE, ESTABLISHED WITH GPS.
3. THE ELEVATIONS DEPICTED HEREON ARE BASED ON NAD83 DATUM.
4. THE PROPERTY LINES AND RIGHTS OF WAYS ARE THE RESULT OF PLANS OF RECORD AND READILY AVAILABLE FIELD SURVEYMEASUREMENT. IT DOES NOT DEPICT AN AUTHORITATIVE BOUNDARY OPINION..
5. PROPERTY LINES BETWEEN ABUTTING PROPERTY OWNERS ARE APPROXIMATE ONLY.
6. THE ACCURACY OF MEASURED PIPE INVERTS AND PIPE SIZES IS SUBJECT TO FIELD CONDITIONS, THE ABILITY TO MAKE VISUAL
OBSERVATIONS, DIRECT ACCESS TO THE VARIOUS ELEMENTS AND OTHER CONDITIONS.
7. THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AND STRUCTURES AS SHOWN ON THESE PLANS ARE BASED ON RECORDS OF
VARIOUS UTILITY COMPANIES, AND WHEREVER POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THIS INFORMATION IS NOT TO BE RELIEDUPON AS BEING EXACT OR COMPLETE. THE LOCATION OF ALL UNDERGROUND UTILITIES AND STRUCTURES SHALL BE VERIFIED IN THEFIELD PRIOR TO THE START OF ANY CONSTRUCTION. THE CONTRACTOR MUST CONTACT THE APPROPRIATE UTILITY COMPANY, ANY
GOVERNING PERMITTING AUTHORITY IN THE CITY OF NORTHAMPTON, AND "DIGSAFE" (1-888-344-7233) AT LEAST 72 HOURS PRIOR TO ANYEXCAVATION WORK IN PREVIOUSLY UNALTERED AREAS TO REQUEST EXACT FIELD LOCATION OF UTILITIES.
8. THE WETLAND DELINEATION SHOWN HEREON WAS CONDUCTED BY THE HORSLEY WITTEN GROUP, INC. ON MARCH 26, 2015.
9. REFERENCE PLANS: HAMPSHIRE COUNTY REGISTRY OF DEEDS
1.) PLAN BOOK 119 PAGE 312.) PLAN BOOK 17 PAGE 243.) PLAN BOOK 53 PAGE 99
4.) PLAN BOOK 196 PAGE 705.) PLAN BOOK 23 PAGE 23A6.) PLAN BOOK 92 PAGE 607.) PLAN BOOK 231 PAGE 62
8.) PLAN BOOK 190 PAGE 69 & 70 N
NEW HAVEN AND NORTHAMPTON CANAL LINE RAIL TRAILMAT
C
HLI
N
E MATCHLINEΔPL
PL
PL
PL
CONTINUED ONSHEET NO. 8608413_SV3.DWG10-Mar-2015 3:39 PMPlotted onPREPARED BY:
OFSHEETPARS. NO:
FILE NAME:
37-049-001 DATE:
608413_SV3.dwg
REV.COMMENTS
REVISIONS
DATE
FIELD BOOK. NO:XXXX
FED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-
PLAN OF TOPOGRAPHIC SURVEY OF
SCALE: 40 FEET TO THE INCH AS ORDERED BY
THE MASSACHUSETTS DEPARTMENT OF
TRANSPORTATION, HIGHWAY DIVISION
MASSACHUSETTS DEPARTMENT OF TRANSPORTATION
0
SCALE: 1" = 40'
40 160100
FIELD CHIEF:DM
DRAWN BY:CHECKED BY:
ROCKY HILL GREENWAY MULTI-USE TRAIL
ROCKY HILL ROAD
IN THE CITY OF
NORTHAMPTON, MASSACHUSETTS
MC JL/RC
Sustainable Environmental Solutions
www.horsleywitten.com
90 Route 6A
Sandwich, MA 02563
508-833-6600 voice
508-833-3150 fax
Horsley Witten Group, Inc.
9 36FEBRUARY 2016
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
9 36
BASE PLAN (2)
608413N
ROCKY
HI
L
L
RO
A
D ROCKY HILL ROADMATCHLINEMATCHLINEPLPLPLPLPLPLTP 11
2 3 4 5 6 7 8 9 10
11
120+00
+41.44
OFFSET: 6.79 +73.99
OFFSET: 6.79
+73.99
OFFSET: 6.79
+41.44
OFFSET: 6.79
+64.79
OFFSET: 10.93
+64.10
OFFSET: 10.20
+99.18
OFFSET: 10.82
+99.21
OFFSET: 10.58
+66.19
OFFSET: 8.00
+66.19
OFFSET: 8.00
ROCKY HILL GREENWAY BEGIN
STA 0+00
N2938622.3837
E341979.6534
12345
0+005+81.2416' WIDE SHARED MULTI-USE
TRAIL AND DRIVEWAY
REDUCE TRAIL
WIDTH TO 10'
UTILITY CROSSINGS
CULVERT
(SEE GD PLAN)
WOOD PEDESTRIAN BARRIER
WOOD PEDESTRIAN BARRIER
CULVERT
(SEE GD PLAN)
BOULDERS AT PATH
EDGE (2 TOTAL)(SEE GRADING PLAN)L1
L2 L3
L12 L13
L14
L4 L5 L6 L7 L8 L9 L10 L11
C1
L25L26L27L28L29L30L31L32L33L34L35L36L37L38L39L40L41L42L43L44L45L46L47 L48C12 C13
SEE CONSTRUCTION PLANS (3) SHEET NO. 12Line Table: Alignments
Line #
L1
L2
L3
L4
L5
L6
L7
L8
L9
L10
Direction
S32°49'25"E
S26°32'00"E
S34°37'02"E
S32°40'00"E
S35°40'33"E
S33°32'03"E
S34°24'38"E
S33°37'58"E
S32°40'06"E
S34°18'48"E
Length
100.12
82.41
83.60
55.72
44.31
54.90
32.40
55.11
47.08
222.43
Start Point
(N:2938622.384, E:341979.653)
(N:2938538.252, E:342033.922)
(N:2938464.518, E:342070.738)
(N:2938395.720, E:342118.229)
(N:2938348.812, E:342148.305)
(N:2938312.819, E:342174.145)
(N:2938267.054, E:342204.476)
(N:2938240.324, E:342222.786)
(N:2938194.440, E:342253.308)
(N:2938154.805, E:342278.723)
End Point
(N:2938622.384, E:341979.653)
(N:2938538.252, E:342033.922)
(N:2938464.518, E:342070.738)
(N:2938395.720, E:342118.229)
(N:2938348.812, E:342148.305)
(N:2938312.819, E:342174.145)
(N:2938267.054, E:342204.476)
(N:2938240.324, E:342222.786)
(N:2938194.440, E:342253.308)
(N:2938154.805, E:342278.723)
Line Table: Alignments
Line #
L11
L12
L13
Direction
S31°25'21"E
S36°21'24"E
S41°22'25"E
Length
103.66
119.46
127.73
Start Point
(N:2937971.086, E:342404.110)
(N:2937882.629, E:342458.153)
(N:2937786.420, E:342528.972)
End Point
(N:2937971.086, E:342404.110)
(N:2937882.629, E:342458.153)
(N:2937786.420, E:342528.972)608143_HD2(LAYOUT).DWG8-Jun-2015 12:12 PMPlotted on0
SCALE: 1" = 40'
40 160100
FED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-10 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
CONSTRUCTION PLANS (1)
HIGHWAY GUARD DETAILS
NONE
TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
NONE
DRAINAGE DETAILS
NONE NCONTINUED ONSHEET NO. 11
NEW HAVEN AND NORTHAMPTON CANAL LINE RAIL TRAILMATCHLINEMATCHLINEPL
PL
PL
TP 1TP 2
10
11
12
13 14
15 161718
192021
22
2
324 25
26 26+30.03
ROCKY HILL GREENWAY END
STA 26+00.40
N2937482.5679
E343496.6877
REMOVE AND
DISPOSE TREES
(TYPICAL FOR ALL)
W
O
O
D
P
E
D
E
S
T
R
I
A
N
B
A
R
R
I
E
R
STONE CHECK DAM
EVERY 50' (TYP)
LIMIT OF WORK
RESTING AREA 2% MAXW/BENCH
RESTING AREA 2% MAX
W/BENCH
CULVERT(SEE GD PLAN)
WETLANDREPLICATION AREA
STONE CHECK DAM
EVERY 50' (TYP)
CULVERT(SEE GRADING PLAN)
START WOOD
PEDESTRIAN
BARRIER
15+50.00
OFFSET RT: 6.00
END WOOD
PEDESTRIAN
BARRIER
20+00.00
OFFSET LT & RT: 6.00
L1
3
L14
L15 L16 L17L18
L19L20L2
1
L22
L
2
3
L24
C1
C2 C3 C4C5C6
C7C8C9 C10C11END WOOD
PEDESTRIAN
BARRIER
16+50.00
OFFSET RT: 6.00
START WOODPEDESTRIANBARRIER16+50.00OFFSET LT: 6.00
END WOOD
PEDESTRIAN
BARRIER
17+50.00
OFFSET LT: 6.00
Curve Table: Alignments
Curve #
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
C11
Start Station
11+29
12+52
14+19
15+55
16+54
17+26
19+16
19+86
21+10
21+66
23+54
End Station
11+60
12+87
14+29
16+49
17+24
18+65
19+79
21+00
21+59
22+94
25+10
Radius
100.000
100.000
100.000
50.210
43.136
100.000
100.000
100.000
100.000
54.492
67.529
Length
31.503
35.908
9.864
93.983
70.002
139.395
62.180
114.030
49.082
127.646
155.268
Chord Direction
S 50° 23' 55" E
S 69° 42' 38" E
S 77° 10' 18" E
N 52° 01' 53" E
N 44° 53' 55" E
S 48° 40' 39" E
S 9° 04' 10" W
S 5° 47' 04" E
S 52° 30' 45" E
N 46° 19' 11" E
N 45° 04' 57" E
Delta
18°03'00"
20°34'26"
5°39'06"
107°14'44"
92°58'49"
79°52'03"
35°37'35"
65°20'04"
28°07'18"
134°12'48"
131°44'20"
Tangent Lengths
15.88
18.15
4.94
68.16
45.44
83.71
32.13
64.12
25.05
129.04
150.75
Start Point
(N:2937690.5697,E:342613.3963)
(N:2937624.2299,E:342716.0014)
(N:2937588.9932,E:342879.0660)
(N:2937552.8468,E:343009.8583)
(N:2937607.7180,E:343073.4547)
(N:2937651.9881,E:343119.7408)
(N:2937516.8185,E:343223.9068)
(N:2937450.1439,E:343211.0906)
(N:2937334.4324,E:343228.5692)
(N:2937302.0445,E:343273.6251)
(N:2937427.9491,E:343324.7623)
End Point
(N:2937690.5697,E:342613.3963)
(N:2937624.2299,E:342716.0014)
(N:2937588.9932,E:342879.0660)
(N:2937552.8468,E:343009.8583)
(N:2937607.7180,E:343073.4547)
(N:2937651.9881,E:343119.7408)
(N:2937516.8185,E:343223.9068)
(N:2937450.1439,E:343211.0906)
(N:2937334.4324,E:343228.5692)
(N:2937302.0445,E:343273.6251)
(N:2937427.9491,E:343324.7623)
Line Table: Alignments
Line #
L14
L15
L16
L17
L18
L19
L20
L21
L22
L23
L24
Direction
S59°25'25"E
S79°59'51"E
S74°20'45"E
N1°35'29"W
S88°36'41"E
S8°44'38"E
S26°52'57"W
S38°27'06"E
S66°34'25"E
N20°47'13"W
S69°02'53"E
Length
91.10
131.56
125.85
5.13
2.12
50.99
7.01
10.61
7.08
60.50
120.27
Start Point
(N:2937670.571, E:342637.569)
(N:2937611.845, E:342749.501)
(N:2937586.804, E:342888.680)
(N:2937602.589, E:343073.597)
(N:2937652.040, E:343117.620)
(N:2937567.219, E:343216.155)
(N:2937456.401, E:343214.262)
(N:2937342.742, E:343221.971)
(N:2937304.861, E:343267.125)
(N:2937371.384, E:343346.235)
(N:2937514.979, E:343412.043)
End Point
(N:2937670.571, E:342637.569)
(N:2937611.845, E:342749.501)
(N:2937586.804, E:342888.680)
(N:2937602.589, E:343073.597)
(N:2937652.040, E:343117.620)
(N:2937567.219, E:343216.155)
(N:2937456.401, E:343214.262)
(N:2937342.742, E:343221.971)
(N:2937304.861, E:343267.125)
(N:2937371.384, E:343346.235)
(N:2937514.979, E:343412.043)608143_HD2(LAYOUT).DWG8-Jun-2015 12:12 PMPlotted on0
SCALE: 1" = 40'
40 160100 FED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-11 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
CONSTRUCTION PLANS (2)NHIGHWAY GUARD DETAILS
NONE
TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
NONE
DRAINAGE DETAILS
NONE
CONTINUED ONSHEET NO. 10
ROCKY
H
I
L
L
R
O
A
D
ROCKY HILL ROADΔ
Δ
10+0024.00'
1
2
3 4
50+00
5+81.24
20.00'
18.83'L1L25
L26 L27 L28 L29 L30
L31
L32 L33 L34
L35
L36
L37 L38 L39 L40 L41 L42 L43 L44 L45 L46
L47L48
C
1
2
C
1
3
16' CLEAR OPENING ACCESSSWING GATE W/ REMOVABLESTEEL SAFETY BOLLARDS W/ 4'WIDE CLEAR PEDESTRIAN OPENING
BLOCK RETAINING WALL, APPROX. LENGTH = 100 FT
REMOVE EXISTINGMAILBOX ANDINSTALL NEW MAILBOX
REMOVE EXISTINGMAILBOX ANDINSTALL NEW MAILBOX
PROPOSED 8' WIDE MULTI-USE PATH
REMOVE EXISTINGMAILBOX ANDINSTALL NEW MAILBOX
RELOCATE HYDRANT 2' OFFOF PROPOSED MULTI-USEPATH PAVEMENT EDGE
8'x18' PARKING SPACE (TYP)
BLOCK RETAINING WALL,APPROX. LENGTH = 85 FT
REDUCE TRAILWIDTH TO 16'
ASPHALT APRONWITH H/C RAMPS
ASPHALT APRONWITH H/C RAMPS
ASPHALT APRONWITH H/C RAMPSCONC. H/C RAMP
CONC. H/C RAMP
CONC. H/C RAMP
BOULDERS AT PATHEDGE (4 TOTAL)
43 LF OF WOOD PEDESTRIAN BARRIER
8'x18' HANDICAP PARKING SPACE
33 LF OF WOODPEDESTRIANBARRIER
GRANITE CURBING
REMOVE EXISTING CROSSWALKMARKINGS AND APPLY 10' THERMALMARKINGS
96 LF WOOD PEDESTRIAN BARRIER
ROCKY HILL RD MULTIUSE PATH BEGINSTA 0+00N2938339.1949E341562.7184
ROCKY HILL RD MULTIUSE PATH ENDSTA 5+81.24N2938546.7589E342028.4343
MODIFIED STONE
MODIFIED STONE
Line Table: Alignments
Line #
L25
L26
L27
L28
L29
L30
L31
L32
L33
L34
L35
L36
Direction
N49°24'43"E
N49°57'12"E
N49°57'12"E
N49°30'32"E
N49°30'32"E
N48°54'26"E
N49°10'30"E
N49°32'18"E
N48°53'15"E
N48°53'15"E
N49°25'52"E
N50°10'26"E
Length
43.96
13.65
8.00
16.81
8.00
14.07
39.63
8.00
13.50
8.00
34.92
36.14
Start Point
(N:2938339.195, E:341562.718)
(N:2938367.794, E:341596.100)
(N:2938376.575, E:341606.548)
(N:2938381.723, E:341612.672)
(N:2938392.641, E:341625.459)
(N:2938397.835, E:341631.543)
(N:2938407.080, E:341642.143)
(N:2938432.991, E:341672.134)
(N:2938438.182, E:341678.221)
(N:2938447.062, E:341688.396)
(N:2938452.323, E:341694.423)
(N:2938475.035, E:341720.951)
End Point
(N:2938339.195, E:341562.718)
(N:2938367.794, E:341596.100)
(N:2938376.575, E:341606.548)
(N:2938381.723, E:341612.672)
(N:2938392.641, E:341625.459)
(N:2938397.835, E:341631.543)
(N:2938407.080, E:341642.143)
(N:2938432.991, E:341672.134)
(N:2938438.182, E:341678.221)
(N:2938447.062, E:341688.396)
(N:2938452.323, E:341694.423)
(N:2938475.035, E:341720.951)
Line Table: Alignments
Line #
L37
L38
L39
L40
L41
L42
L43
L44
L45
L46
L47
L48
Direction
N51°55'20"E
N54°48'34"E
N56°47'18"E
N59°36'51"E
N63°16'30"E
N66°36'07"E
N66°36'07"E
N67°58'50"E
N67°58'50"E
N71°23'40"E
S32°49'33"E
N57°10'35"E
Length
23.26
23.69
32.37
24.65
32.52
8.00
25.02
8.00
22.48
8.40
40.38
12.00
Start Point
(N:2938498.179, E:341748.704)
(N:2938512.523, E:341767.012)
(N:2938526.178, E:341786.377)
(N:2938543.906, E:341813.456)
(N:2938556.373, E:341834.718)
(N:2938570.998, E:341863.765)
(N:2938574.175, E:341871.107)
(N:2938584.112, E:341894.071)
(N:2938587.112, E:341901.490)
(N:2938595.539, E:341922.327)
(N:2938585.382, E:341963.062)
(N:2938540.256, E:342018.353)
End Point
(N:2938498.179, E:341748.704)
(N:2938512.523, E:341767.012)
(N:2938526.178, E:341786.377)
(N:2938543.906, E:341813.456)
(N:2938556.373, E:341834.718)
(N:2938570.998, E:341863.765)
(N:2938574.175, E:341871.107)
(N:2938584.112, E:341894.071)
(N:2938587.112, E:341901.490)
(N:2938595.539, E:341922.327)
(N:2938585.382, E:341963.062)
(N:2938540.256, E:342018.353)
Curve Table: Alignments
Curve #
C12
C13
Start Station
4+53
5+31
End Station
4+91
5+69
Radius
30.097
27.635
Length
37.600
38.193
Chord Direction
S 68° 36' 56" E
S 71° 28' 31" E
Delta
71°34'45"
79°11'13"
Tangent Lengths
21.70
22.86
Start Point
(N:2938598.2176,E:341930.2840)
(N:2938551.4478,E:341984.9532)
End Point
(N:2938598.2176,E:341930.2840)
(N:2938551.4478,E:341984.9532)608143_HD2(LAYOUT).DWG8-Jun-2015 12:12 PMPlotted on20
SCALE: 1" = 20'
0 50 100
FED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-12 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
CONSTRUCTION PLANS (3)
HIGHWAY GUARD DETAILS
NONE
TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
NONE
DRAINAGE DETAILS
NONE
N
1234567891011120+00+41.44OFFSET: 6.79+73.99OFFSET: 6.79+73.99OFFSET: 6.79+41.44OFFSET: 6.79+64.79OFFSET: 10.93+64.10OFFSET: 10.20+99.18OFFSET: 10.82+99.21OFFSET: 10.58+66.19OFFSET: 8.00+66.19OFFSET: 8.00ROCKY HILL GREENWAY BEGINSTA 0+00N2938622.3837E341979.65341 2 3 4 50+00 5+81.24L1L2L3
L12L13L14L4L5L6L7L8L9L10L11C1L25 L26L27 L28 L29L30 L31 L32L33L34 L35 L36 L37 L38 L39 L40 L41 L42 L43 L44 L45 L46 L47L48C12C13SEE GRADING PLAN (3) SHEET NO. 15ROCKY HILL ROAD ROCKY HILL ROAD
MATCHLINE
MATCHLINEPL
PL
PL
PL
PL
PLΔ
200205210215220198199201202203204206207208209211212213214216217218219221222223224220PROP 25LF X 24"-SQ. BOX CULVERTEROSION CONTROLBARRIER - SILT SOCK (TYP)STONESTABILIZATIONINV. = 213.76'INV. = 213.56'INV. = 207.36'INV. = 207.26'PED. RAILING AT CULVERTPEDESTRIAN (PED.)RAILING AT CULVERTSTONE STABILIZATIONPROP 29LF X 24"-SQ. BOX CULVERTSTONE CHECKDAMS AT 50' TYP.P
R
O
P
1
8
L
F
X
2
4
"
-
S
Q
.
B
O
X227228227226225229230235240245250231232236237238239241242243244246248249251253254608143_HD3(GRADING).DWG 10-May-2016 8:03 AMPlotted on0SCALE: 1" = 40'40160100FED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATEMAPROJECT FILE NO.-13 36NORTHAMPTON, MASSACHUSETTSROCKY HILL GREENWAY MULTI-USE TRAIL608413GRADING PLAN (1)HIGHWAY GUARD DETAILSNONETRAFFIC SIGNAL CONDUITNONEWATER SUPPLY ALTERATIONSNONEDRAINAGE DETAILSNONEN
CONTINUED ON
SHEET NO. 14
TP 1TP 2
10
11
12
13 14
15 161718
192021
22
2
324 25
26 26+30.03
OFFSET: 6.79
ROCKY HILL GREENWAY END
STA 26+00.40
N2937482.5679
E343496.6877
L1
3
L14
L15
L16 L17L18
L19L20L2
1
L22
L
2
3
L24
C1
C2 C3 C4C5C6
C7C8C9 C10C11NEW HAVEN AND NORTHAMPTON CANAL LINE RAIL TRAILMAT
C
HLI
NE MATCHLINEPL
PL
1501551601651701
7
5
180
1851901952002051491
5
1
152
153
154
156157158159
161162163164166
16716816917117217317417
6
177
178
179
181
1
8
2
183184186187188189191192193194196197198199201202203204206207208 157
15
8
1
5
9
160
16116216316416516622
0
165
16
2
1
6
3
164166PROP 82LF X 24" HDPEW/FLARED ENDS
STONESTABILIZATION
INV. = 157.00'
INV. = 160.5'
1
6
1
STONE
STABILIZATION
STONE CHECKDAMS AT 50', TYP.
EROSION CONTROL BLANKETON ALL SLOPES 3:1 & GREATER
RESTING AREA 2%MAX W/BENCH
RESTING AREA 2%MAX W/BENCH
STONE CHECK
DAMS AT 50', TYP.
EROSION CONTROL BLANKETON ALL SLOPES 3:1 & GREATER
WETLANDREPLICATION AREA(SEE INSET "A")
INV. = 188.5'
PROP 18LF X 24"-SQ. BOXCULVERT
INV. = 188.04'
STONESTABILIZATION
1718
19
L17L18 L19
C5C6
170175
1801711
7
2
17
3
174
176
177178179162
165
162
163 164
166
INV. = 160.5'161
EROSION CONTROL BLANKET ON ALL SLOPES 3:1 & GREATER608143_HD3(GRADING).DWG10-May-2016 8:03 AMPlotted on0
SCALE: 1" = 40'
40 160100
FED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-14 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
GRADING PLAN (2)
HIGHWAY GUARD DETAILS
NONE
TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
NONE
DRAINAGE DETAILS
SEE BELOW
N
CONTINUED ONSHEET NO. 13INSET "A"
SCALE: 1" = 20'
1
0+00123450+005+81.24L1
L2 L25L26L27L28L29L30L31L32L33L34L35L36L37L38L39L40L41L42L43L44L45L46L47
L48C12C13ROCKY HILL RD MULTIUSE PATH BEGINSTA 0+00N2938339.1949E341562.7184ROCKY HILL RD MULTIUSE PATH ENDSTA 5+81.24N2938546.7589E342028.4343ROCKY HILL ROADROCKY HILL ROADPLΔ2
2
3
2
2
4
2
2
7 228227226
2
2
5
229 230235240245250
231
232
236
237238239241242243244246248249251253254
XTOW: 227.8BOW:222.33XTOW: 225.1BOW:221.11XTOW: 226.0BOW:222.89XTOW: 227.0BOW:224.75XTOW: 228.0BOW:227.13MODIFIED STONE SLOPE STABILIZATIONMODIFIED STONE SLOPE STABILIZATION608143_HD3(GRADING).DWG 10-May-2016 8:03 AMPlotted on20SCALE: 1" = 20'050100FED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATEMAPROJECT FILE NO.-15 36NORTHAMPTON, MASSACHUSETTSROCKY HILL GREENWAY MULTI-USE TRAIL608413GRADING PLAN (3)HIGHWAY GUARD DETAILSNONETRAFFIC SIGNAL CONDUITNONEWATER SUPPLY ALTERATIONSNONEDRAINAGE DETAILSNONEN
NAVD 88
BASE ELEV
120.00
PROPOSED BIKE PATH
130
140
150
160
170
180
190
200
210
220
230
240
227.550+00 226.31224.951+00 223.48221.932+00 221.06220.503+00 219.95219.424+00 218.91218.415+00 217.92217.406+00 216.70215.787+00 214.64213.318+00 211.96210.609+00 209.12207.4210+00 205.49203.3411+00 201.09198.8412+00 196.59194.3413+00 192.09189.8514+00 187.600+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00
-2.44%
-1.12%
-0.99%
-2.71%
-4.50%
-1.89%MATCHLINEMATCHLINESTART
OF TRAIL
21' (L) X 24" SQ BOX CULVERT
INVERT EL: 213.76
15' (L) X 24" SQ BOX CULVERT
INVERT EL: 207.36
UTILITY CROSSING
BIKE PATH ALIGNMENT
Station =8+54.60
ELEV = 211.08
BIKE PATH ALIGNMENT
Station =5+84.00
ELEV = 216.43
PROPOSED
EXISTING
HIGH POINT ELEV = 227.08
HIGH POINT STA = 0+19.26
PVI STA = 1+04.69
PVI ELEV = 225.00
A.D. = -0.84%K = 204.10
171' VC
PVC: 0+19.26ELEV: 227.08PVT: 1+90.12ELEV: 222.201374.6' SSD
HIGH POINT ELEV = 217.67
HIGH POINT STA = 5+75.83
PVI STA = 6+75.79
PVI ELEV = 216.68
A.D. = -1.72%
K = 115.99
200' VC
PVC: 5+75.83ELEV: 217.67PVT: 7+75.75ELEV: 213.97726.1' SSD
HIGH POINT ELEV = 210.68
HIGH POINT STA = 8+97.19
PVI STA = 9+97.19
PVI ELEV = 207.97
A.D. = -1.79%
K = 111.75
200' VC
PVC: 8+97.19ELEV: 210.68PVT: 10+97.19ELEV: 203.47703.0' SSD
LOW POINT ELEV = 218.83
LOW POINT STA = 4+58.05
PVI STA = 3+83.10
PVI ELEV = 219.57
A.D. = 0.13%
K = 1128.75
150' VC
PVC: 3+08.14ELEV: 220.41PVT: 4+58.05ELEV: 218.83???' SSD 608143_HD3(GRADING).DWG10-May-2016 8:03 AMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-16 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
ROCKY HILL GREENWAY PROFILE PLAN (1)
ROCKY HILL GREENWAY PROFILE
HORIZONTAL SCALE: 1" = 50'
VERTICAL SCALE: 1" = 10'CONTINUED ONSHEET NO. 17
120
130
140
150
160
170
180
190
200
210
220
230
240
194.3413+00 192.09189.8514+00 187.60185.3515+00 183.10180.8516+00 178.60176.3517+00 174.22172.3618+00 170.77169.2419+00 167.72166.1920+00 164.66163.1421+00 161.61160.0822+00 158.55157.0323+00 155.50153.9724+00 152.45150.9225+00 149.39147.8726+00 27+0013+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00
-4.50%
-3.05%MATCHLINEMATCHLINE82' (L) X 24" SQ BOX CULVERT
INVERT EL: 157.00
BIKE PATH ALIGNMENT
Station =18+79.44
ELEV = 169.87
PROPOSED
EXISTING
LOW POINT ELEV = 171.24
LOW POINT STA = 18+34.43
PVI STA = 17+68.90
PVI ELEV = 173.25
A.D. = 1.45%
K = 90.63
131' VC
PVC: 17+03.37ELEV: 176.19PVT: 18+34.43ELEV: 171.24???' SSD 608143_HD3(GRADING).DWG10-May-2016 8:03 AMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-17 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
ROCK HILL GREENWAY PROFILE PLAN (2)
ROCKY HILL GREENWAY PROFILE
HORIZONTAL SCALE: 1" = 50'
VERTICAL SCALE: 1" = 10'CONTINUED ONSHEET NO. 16
NAVD 88
BASE ELEV
200.00
ROCKY HILL RD 8' PATH
210
220
230
240
250
260
270
200
210
220
230
240
250
260
270
256.270+00 253.40250.481+00 247.48244.922+00 241.85239.043+00 236.42233.164+00 230.89226.065+00 223.116+000+00 1+00 2+00 3+00 4+00 5+00 6+00
-5.63%
-4.33%GRADE BREAK STA = 0+23.50ELEV = 254.90GRADE BREAK STA = 4+52.00ELEV = 230.78GRADE BREAK STA = 5+69.24ELEV = 225.70608143_HD3(GRADING).DWG10-May-2016 8:03 AMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-18 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
ROCKY HILL RD MULTI-USE PATH PROFILE PLAN
ROCKY HILL RD MULTI-USE PATH PROFILE
HORIZONTAL SCALE: 1" = 50'
VERTICAL SCALE: 1" = 10'
ROCKY
HI
L
L
RO
A
D ROCKY HILL ROADMATCHLINEMATCHLINEPLPLPLPLPLPLTP 11
2 3 4 5 6 7 8 9 10
11
120+00
+41.44
OFFSET: 6.79 +73.99
OFFSET: 6.79
+73.99
OFFSET: 6.79
+41.44
OFFSET: 6.79
+64.79
OFFSET: 10.93
+64.10
OFFSET: 10.20
+99.18
OFFSET: 10.82
+99.21
OFFSET: 10.58
+66.19
OFFSET: 8.00
+66.19
OFFSET: 8.00
12345
0+005+81.24L1
L2 L3
L12 L13
L14
L4 L5 L6 L7 L8 L9 L10 L11
C1
L25L26L27L28L29L30L31L32L33L34L35L36L37L38L39L40L41L42L43L44L45L46L47 L48C12 C13
WARNING SIGN (W7-5 & W16-9P)
STA 7+85.83 7.50' RT
USE SAME POST FOR SIGNS
"PATH NARROWS" SIGN (W5-4a)
"NO MOTOR VEHICLES" SIGN (R5-3).
STA 7+32.90 11.00' RT
USE SAME POST FOR SIGNS
"HANDICAP PARKING" SIGN
(R7-8 & R7-8p)
STA 0+25.98 28.66' RT
PATHNARROWS
NOMOTORVEHICLES
"ROCKY HILL
GREENWAY TRAIL
AHEAD" SIGN
(D11-1d & W16-9p)
STA 3+21.60 LT 6.00'
ROCKY HILLGREENWAY
"ROCKY HILL
GREENWAY TRAIL
AHEAD" SIGN
(D11-1d & W16-9p)
ROCKY HILLGREENWAY
10' WIDE
CROSSWALK
PROTECT EXISTING BIKE LANE MARKING
DURING CONSTRUCTION
CLOSE ONE LANE DURING
CONSTRUCTION OF MULTI-USE PATH
FOR TEMPORARY PEDESTRIAN ROUTE
ROCKY HILL RD SIGN MA-D3-1
STA 0+20.00 15.50' LT
RELOCATE STOP SIGN
FED. AID PROJ. NO.SHEETNO.TOTALSHEETS
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
36
STATE
MA
PROJECT FILE NO.
-
SIGNS AND MARKINGS PLAN (1)
608413
19
HIGHWAY GUARD DETAILS
NONE
TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
NONE
DRAINAGE DETAILS
NONE
608143_HD6(TRAFFIC SIGNAGE).DWG10-Mar-2015 3:39 PMPlotted on0
SCALE: 1" = 40'
40 160100 NCONTINUED ONSHEET NO. 20
NEW HAVEN AND NORTHAMPTON CANAL LINE RAIL TRAILMATCHLINEMATCHLINEPL
PL
PL
PL
TP 1TP 2
10
11
12
13 14
15 161718
192021
22
2
324 25
26 26+30.03
L1
3
L14
L15 L16 L17L18
L19L20L2
1
L22
L
2
3
L24
C1
C2 C3 C4C5C6
C7C8C9 C10C11WARNING SIGNS (W1-5 & W16-9p)
STA 15+18.16 8.00' RT
ROCKY HILLGREENWAY
WARNING SIGNS (W1-5 & W16-9p)
STA 25.31.30 8.00 LT
"ROCKY HILL GREENWAY TRAIL AHEAD" SIGN(D11-1d & M4-5)STA 25+88.16 44.00 LT & STA 26+22.55 22.5 RT
CANAL LINERAIL TRAIL "CANAL LINE RAIL TRAIL AHEAD"SIGN (D11-1e & M-4-6)STA 25+75.00 6.75 RT
FED. AID PROJ. NO.SHEETNO.TOTALSHEETS
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
36
STATE
MA
PROJECT FILE NO.
-
SIGNS AND MARKINGS PLAN (2)
608413
20
HIGHWAY GUARD DETAILS
NONE
TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
NONE
DRAINAGE DETAILS
NONE
608143_HD6(TRAFFIC SIGNAGE).DWG10-Mar-2015 3:39 PMPlotted onN
CONTINUED ONSHEET NO. 190
SCALE: 1" = 40'
40 160100
608143_HD4(DETAILS).DWG21-Dec-2018 2:43 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-21 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
TRAFFIC SIGNAGE DETAILS
ANDPOST SIZE
REQUIREDNUMBER
OF
NUMBER
REQUIREDSIGNSTEXT
HEIGHT
IDENTIFI-
NUMBER CATION
WIDTH
SIZE OF SIGN
18"18"
18"24"
2W1-5
W7-5
D11-1d
18 18"
NOTES:
1. SIGN SIZE, LETTERING, TEXT, AND COLORS PER MUTCD STANDARDS. ALL ROADWAY TRAFFIC SIGNSARE HIGH INTENSITY GRADE REFLECTIVE YELLOW-GREEN WHEN AVAILABLE.
2. ALL WARNING, REGULATORY AND ROUTE MARKERS ARE FABRICATED WITH HIGH INTENSITY
ENCAPSULATED LENS REFLECTIVE SHEETING (SEE SECTION M9.30.0) TYPE III OR IV.
3. ALL P5 POSTS ARE TELESCOPIC BREAKAWAY SQUARE TUBE POSTS PAINTED BLACK UNLESS
OTHERWISE REQUIRED. POSTS LOCATED IN PAVEMENT SHALL BE SET IN A BOLLARD PER THE
DETAILS.
4. QUANTITIES OF SIGNS AND POSTS SHOWN ON THIS SHEET MAY DIFFER FROM THE SITE PLAN. WHEREDIFFERENCES OCCUR, THE PAVEMENT MARKINGS AND SIGNAGE PLANS WILL PREVAIL.
5. SIGNS LISTED WITHOUT POSTS ARE EITHER SECURED TO A PROPOSED OR EXISTING FEATURE OR
MOUNTED ON A POST WITH ANOTHER SIGN LISTED.
4
12"18"1
1
ROCKY HILLGREENWAY P5
(4 REQ'D)
NOMOTORVEHICLES
R5-3 24"24"1
PATHNARROWS18" 18"1W5-4a
NOT TO SCALE
P5
(1 REQ'D)
P5
(2 REQ'D)
P5
(1 REQ'D)
P5
(1 REQ'D)
P5
(0 REQ'D)
R7-8
R7-8p 18"9"1
W16-9P 18"9"5 P5
(0 REQ'D)
CANAL LINERAIL TRAIL18"24"D11-1e 1 P5(1 REQ'D)
12"18"1 P5
(0 REQ'D)
M-4-6
12"18"2 P5
(0 REQ'D)
M4-5
BORDERBACK-GROUNDHEIGHTLETTER
TEXT DIMENSIONS (INCHES)
SPACINGVERTICAL
COLOR
LEGEND
MUTCD
STANDARD
MUTCD
STANDARD
608143_HD4(DETAILS).DWG21-Dec-2018 2:43 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-22 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
TRAFFIC MANAGEMENT (1)
P/F
NUMBER OF LANES NUMBER
OF
STUDIES
AVERAGE CAPACITY
MEASURED AVERAGE WORK ZONE CAPACITIES
LEGEND:
NOTES:
ROAD TYPE DISTANCE BETWEEN SIGNS **
BA C
SUGGESTED WORK ZONE WARNING SIGN SPACING
STOPPING SIGHT DISTANCE AS A FUNCTION OF SPEED
SPEED*
(mph)
DISTANCE
(ft)
SPEED*
(km/h)
DISTANCE
(m)
FORMULAS FOR DETERMINING TAPER LENGTHS
SPEED LIMIT (S)TAPER LENGTH (L)Meters
TYPE OF TAPER TAPER LENGTH (L)*
TAPER LENGTH CRITERIA FOR TEMPORARY TRAFFIC CONTROL ZONES
SPEED LIMIT (S)TAPER LENGTH (L)FEET
608143_HD4(DETAILS).DWG21-Dec-2018 2:44 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-23 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
TRAFFIC MANAGEMENT (2)
panelStyle:construction_guide.ssipanelName:namepanelQuantity:1panelStation:nonepanelMaterial:0legendMaterial:0panelMounting:0panelWidthLock:1panelHeightLock:1marginAlign:9panelRoundCorners:0panelSizes:constructPanelMode:0constructPanels:36|24|18
panelStyle:regulatory.ssmpanelName:namepanelQuantity:1panelStation:nonepanelMaterial:0legendMaterial:0panelMounting:0panelWidthLock:0panelHeightLock:0marginAlign:9panelRoundCorners:0panelSizes:constructPanelMode:0constructPanels:36|24|18
LEGEND
DIRECTION OF TRAVEL
DOWNSTREAM TAPER: GUIDES
TRAFFIC BACK TO ITS
ORIGINAL TRAVEL PATH
TERMINATION AREA:
LETS TRAFFIC
RESUME NORMAL
OPERATIONS
ACTIVITY AREA:
WHERE WORK
TAKES PLACE
TRANSITION AREA:
MOVES TRAFFIC
OUT OF ITS
NORMAL PATH
ADVANCE WARNING
AREA: TELLS
TRAFFIC WHAT TO
EXPECT AHEAD
LONGITUDINAL
BUFFER SPACE
LONGITUDINAL BUFFER SPACE:
PROVIDES PROTECTION FOR TRAFFIC
AND WORKERS = STOPPING SIGHT
DISTANCE. NOTHING SHALL BE
PLACED/STORED IN BUFFER SPACE
SHOULDER TAPER: GUIDES
TRAFFIC AWAY FROM
SHOULDER/ BREAK-DOWN LANE
LATERAL BUFFER SPACE:
PROVIDES PROTECTION FOR
TRAFFIC AND WORKERS
TRAFFIC SPACE: ALLOWS
TRAFFIC TO PASS THROUGH
THE ACTIVITY AREA
WORK SPACE: SET ASIDE FOR
WORKERS, EQUIPMENT, AND
MATERIAL STORAGE
USE "G20-1" SIGN
AT PROJECT LIMIT
IF WORK OCCURS
OVER A DISTANCE
OF MORE THAN 2
MILES (3.2 KM)W20-SERIES
R2-10a
R2-10e
G20-1
B
OR
C
ROADWORKXXX
ROAD WORK
NEXT XX MILES
panelStyle:construction_guide.ssipanelName:namepanelQuantity:1panelStation:nonepanelMaterial:0legendMaterial:0panelMounting:0panelWidthLock:1panelHeightLock:1marginAlign:9panelRoundCorners:0panelSizes:constructPanelMode:0constructPanels:36|24|18
END ROADWORKDOUBLEFINES END
WORK ZONES
SPEEDINGFINESDOUBLED
A
THE "A" DISTANCE CAN BE
MEASURED FROM THE START OF
THE TRAVEL LANE RESTRICTION
OR THE SHOULDER/BREAKDOWN
LANE RESTRICTION (IF
SHOULDER/BREAKDOWN LANE IS
ONLY LANE BEING CLOSED)
CHANNELIZING DEVICEWORK AREA
SIGN
COMPONENT PARTS OF A TEMPORARY
TRAFFIC CONTROL (TTC) ZONE
12*1
14
24" (MIN.)
REFLECTORIZED
DRUM
NOT TO SCALE
LIMIT OF EXCAVATION
TEMPORARY BIT.
CONC. PAVEMENT
GRAVEL BORROW/SUBBASE
EXIST.
PAVEMENT
LONGITUDINAL DROP-OFF DETAIL
TRAVEL WAY
WORK AREA
DIRECTION OF TRAFFIC
W8-3
OR
W8-8
OR
W8-1
* - INCREASE SLOPE RATIO
FOR HIGHER SPEEDS
NOT TO SCALE
C
Depth≥4"
LATERAL DROP-OFF DETAIL
LATERAL AND LONGITUDINAL
DROP-OFF DETAILS
B
W5-1W21-5a
RIGHTSHOULDERCLOSED
ROAD
NARROWS
AWORK ZONE 100 FT
(30m) BUFFER L/3100 FT
(30m)
TWO LANE ROAD
SHOULDER CLOSED
B A
WORK
ZONE BUFFER A BL/2DOWNSTREAM
TAPER
100 FT (30m) MAX
W5-1
ROAD
NARROWS
W1-4R
W5-1
ROAD
NARROWS
W1-4R
W1-4L
L/2
W1-4L
BUFFER
L/3
TWO LANE ROAD SHOULDER
AND TRAVEL LANE CLOSED
WORK
ZONE
100FT
(30m) MAX.
100FT
(30m) MAX.
BUFFER
100-150FT
(30-45m)
W20-7b
POLICEOFFICERAHEAD
W20-4
W13-1p
ONE LANEROADXXX
XXM.P.H.
W20-4
W13-1p
ONE LANEROADXXX
XXW20-7b
POLICEOFFICERAHEAD
P/F
OR
W20-7
W20-7
OR
P/F
A B
AB
M.P.H.
TWO LANE ROAD ONE LANE
ALTERNATING TRAFFIC
1+00
220
224
228
220
224
228
0 10 20 30 400-10-20-30-40
1+82.53
220
224
220
224
0 10 20 30 400-10-20-30-40
2+00
220
224
220
224
0 10 20 30 400-10-20-30-40
2+66.13
216
220
224
216
220
224
0 10 20 30 400-10-20-30-40
3+00
216
220
224
216
220
224
0 10 20 30 400-10-20-30-40
4+00
216
220
216
220
0 10 20 30 400-10-20-30-40
5+00
212
216
220
212
216
220
0 10 20 30 400-10-20-30-40
6+00
212
216
220
212
216
220
0 10 20 30 400-10-20-30-40
608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-24 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
ROCKY HILL GREENWAY CROSS SECTIONS (1)CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
7+00
212
216
220
212
216
220
0 10 20 30 400-10-20-30-40
8+00
208
212
216
208
212
216
0 10 20 30 400-10-20-30-40
9+00
208
212
216
208
212
216
0 10 20 30 400-10-20-30-40
10+00
204
208
212
216
204
208
212
216
0 10 20 30 400-10-20-30-40
10+01.21
204
208
212
216
204
208
212
216
0 10 20 30 400-10-20-30-40 608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-25 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
ROCKY HILL GREENWAY CROSS SECTIONS (2)CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
11+00
200
204
208
212
216
220
200
204
208
212
216
220
0 10 20 30 400-10-20-30-40
11+28.93
200
204
208
212
216
220
200
204
208
212
216
220
0 10 20 30 400-10-20-30-40
11+44.69
200
204
208
212
216
220
200
204
208
212
216
220
0 10 20 30 40 500-10-20-30-40 608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-26 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
ROCKY HILL GREENWAY CROSS SECTIONS (3)CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
11+60.44
199
200
204
208
212
216
220
199
200
204
208
212
216
220
0 10 20 30 400-10-20-30-40
12+00
196
200
204
208
212
216
196
200
204
208
212
216
0 10 20 30 400-10-20-30-40
12+51.54
192
196
200
204
208
192
196
200
204
208
0 10 20 30 400-10-20-30-40
12+69.49
192
196
200
204
192
196
200
204
0 10 20 30 400-10-20-30-40
608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-27 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
ROCKY HILL GREENWAY CROSS SECTIONS (4)CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
12+87.45
192
196
200
204
192
196
200
204
0 10 20 30 400-10-20-30-40
13+00
192
196
200
204
192
196
200
204
0 10 20 30 400-10-20-30-40
14+00
184
188
192
196
200
184
188
192
196
200
0 10 20 30 400-10-20-30-40
14+19.01
180
184
188
192
196
180
184
188
192
196
0 10 20 30 400-10-20-30-40
14+23.94
180
184
188
192
196
180
184
188
192
196
0 10 20 30 400-10-20-30-40
608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-28 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
ROCKY HILL GREENWAY CROSS SECTIONS (5)CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
14+28.87
180
184
188
192
196
180
184
188
192
196
0 10 20 30 400-10-20-30-40
15+00
180
184
188
192
180
184
188
192
0 10 20 30 400-10-20-30-40
15+54.72
172
176
180
184
172
176
180
184
0 10 20 30 400-10-20-30-40
16+00
172
176
180
184
172
176
180
184
0 10 20 30 400-10-20-30-40
16+01.71
168
172
176
180
184
168
172
176
180
184
0 10 20 30 400-10-20-30-40 608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-29 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
ROCKY HILL GREENWAY CROSS SECTIONS (6)CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
16+48.70
164
168
172
176
180
164
168
172
176
180
0 10 20 30 400-10-20-30-40
16+53.83
164
168
172
176
180
164
168
172
176
180
0 10 20 30 400-10-20-30-40
16+88.83
164
168
172
176
180
164
168
172
176
180
0 10 20 30 400-10-20-30-40
17+00
164
168
172
176
180
164
168
172
176
180
0 10 20 30 400-10-20-30-40 608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-30 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
ROCKY HILL GREENWAY CROSS SECTIONS (7)CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
17+23.84
160
164
168
172
176
160
164
168
172
176
0 10 20 30 400-10-20-30-40
17+25.96
160
164
168
172
176
160
164
168
172
176
0 10 20 30 400-10-20-30-40-50
17+95.66
156
160
164
168
172
176
156
160
164
168
172
176
0 10 20 30 400-10-20-30-40-50 608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-31 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
ROCKY HILL GREENWAY CROSS SECTIONS (8)CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
18+00
156
160
164
168
172
176
156
160
164
168
172
176
0 10 20 30 400-10-20-30-40-50
18+65.35
156
160
164
168
172
156
160
164
168
172
0 10 20 30 400-10-20-30-40-50
19+00
156
160
164
168
172
156
160
164
168
172
0 10 20 30 400-10-20-30-40
19+16.35
156
160
164
168
172
156
160
164
168
172
0 10 20 30 400-10-20-30-40 608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-32 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
ROCKY HILL GREENWAY CROSS SECTIONS (9)CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
19+47.44
156
160
164
168
156
160
164
168
0 10 20 30 400-10-20-30-40
19+78.53
156
160
164
168
156
160
164
168
0 10 20 30 400-10-20-30-40
19+85.54
160
164
168
160
164
168
0 10 20 30 400-10-20-30-40
20+00
160
164
168
160
164
168
0 10 20 30 400-10-20-30-40
20+42.56
160
164
168
160
164
168
0 10 20 30 400-10-20-30-40
20+99.57
160
164
168
160
164
168
0 10 20 30 400-10-20-30-40
21+00
160
164
168
160
164
168
0 10 20 30 400-10-20-30-40
608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-33 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
ROCKY HILL GREENWAY CROSS SECTIONS (10)CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
21+10.18
160
164
160
164
0 10 20 30 400-10-20-30-40
21+34.72
160
164
160
164
0 10 20 30 400-10-20-30-40
21+59.26
156
160
164
156
160
164
0 10 20 30 400-10-20-30-40
21+66.35
156
160
164
156
160
164
0 10 20 30 400-10-20-30-40
22+00
152
156
160
164
152
156
160
164
0 10 20 30 400-10-20-30-40
22+30.17
152
156
160
152
156
160
0 10 20 30 400-10-20-30-40
22+93.99
152
156
160
152
156
160
0 10 20 30 400-10-20-30-40
23+00
152
156
160
152
156
160
0 10 20 30 400-10-20-30-40
608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-34 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
ROCKY HILL GREENWAY CROSS SECTIONS (11)CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
23+54.50
152
156
160
152
156
160
0 10 20 30 400-10-20-30-40
24+00
152
156
160
152
156
160
0 10 20 30 400-10-20-30-40
24+32.13
152
156
152
156
0 10 20 30 400-10-20-30-40
25+00
148
152
156
148
152
156
0 10 20 30 400-10-20-30-40
25+09.76
148
152
156
148
152
156
0 10 20 30 400-10-20-30-40
26+00
144
148
152
144
148
152
0 10 20 30 400-10-20-30-40
26+30.03
144
148
144
148
0 10 20 30 400-10-20-30-40 608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-35 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
ROCKY HILL GREENWAY CROSS SECTIONS (12)CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
0+50
252
256
252
256
0 10 200-10-20
1+50
244
248
252
244
248
252
0 10 200-10-20
2+00
244
248
252
244
248
252
0 10 200-10-20
2+50
240
244
248
240
244
248
0 10 200-10-20
3+00
236
240
244
248
236
240
244
248
0 10 200-10-20
3+50
232
236
240
244
232
236
240
244
0 10 200-10-20
4+50
228
232
228
232
0 10 200-10-20
608413_HD5(CROSS SECTIONS).DWG10-Mar-2015 3:39 PMPlotted onFED. AID PROJ. NO.SHEETNO.TOTALSHEETSSTATE
MA
PROJECT FILE NO.
-36 36
NORTHAMPTON, MASSACHUSETTS
ROCKY HILL GREENWAY MULTI-USE TRAIL
608413
ROCKY HILL RD MULTIUSE PATH CROSS SECTIONS
CONTINUED ONSHEET NO. 100HOR. SCALE IN FEET
VER. SCALE IN FEET
00
0
4 4 8
4 4 8
March 13, 2019
Northampton Conservation Commission
c/o Sarah LaValley, Conservation, Preservation & Land Use Planner
210 Main Street, Planning & Sustainability
Northampton, MA 01060
Dear Northampton Conservation Commission:
On behalf of Northampton Planning & Sustainability, the Horsley Witten Group, Inc. (HW) is pleased
to submit this Notice of Intent for the proposed Rocky Hill Greenway Multi-Use Trail. The 2,630
linear foot trail is proposed to connect Rocky Hill Road (Route 66) to the New Haven and
Northampton Canal/Manhan Rail Trail near Easthampton Road (Route 10), Northampton.
A portion of the proposed project will occur within Bordering Vegetated Wetland and its associated
buffer zone, as well as within Riverfront Area. None of this work is within the Natural Heritage and
Endangered Species Program Estimated Habitat of Rare Wildlife and Certified Vernal Pools and
Priority Habitat of Rare Species. These jurisdictional areas are protected and regulated under the
Massachusetts Wetlands Protection Act (M.G.L. Ch. 131 § 40), its implementing Regulations (310
CMR 10.00) and the Northampton Wetlands Protection Ordinance (Chapter 337).
Proposed mitigation includes providing wetland replacement at a greater than 1:1 ratio.
Stormwater management practices will be implemented and an erosion and sedimentation control
barrier will be used to protect downgradient resource areas. Construction-related impacts will be
minimized and disturbed areas will be stabilized and restored upon completion of construction.
HW has completed and submitted an online application, and is submitting nine copies of the NOI
application, supporting documentation, and project plans directly to the Conservation Commission.
One additional full size plan set is also included. A copy of the NOI has been filed with the
Massachusetts Department of Environmental Protection (MassDEP), Western Regional Office. As
the Applicant is a municipal entity, the project is exempt from filing fees. The Applicant will send
notification of the pending public hearing to abutters in accordance with State and local filing
regulations within the required timeframe.
If you need additional information please contact us at (508) 833-6600. Thank you.
Sincerely,
HORSLEY WITTEN GROUP, INC.
Amy M. Ball, PWS, CWS
Senior Ecologist
Justin L. Lamoureux, P.E.
Project Manager
wpaform3.doc • rev. 4/22/2015 Page 1 of 9
Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
NORTHAMPTON
City/Town
Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key.
Note: Before completing this form consult your local Conservation Commission regarding any municipal bylaw or ordinance.
A. General Information
1.Project Location (Note: electronic filers will click on button to locate project site):
Rocky Hill Road (MA Rt. 66) to Easthampton
Road (MA Rt. 10)
a. Street Address
Northampton
b. City/Town
01060
c. Zip Code
Latitude and Longitude: 42°18'20.85" N
d. Latitude
72°39'41.52" W
e. Longitude
37
f. Assessors Map/Plat Number
049-001
g. Parcel /Lot Number
2.Applicant:
Wayne
a. First Name
Feiden
b. Last Name
City of Northampton Planning & Sustainability
c.Organization
210 Main Street
d. Street Address
Northampton
e. City/Town
MA
f. State
01060
g. Zip Code
413-587-1265
h. Phone Number i. Fax Number
wfeiden@northamptonma.gov
j. Email Address
3.Property owner (required if different from applicant):Check if more than one owner
a. First Name b. Last Name
c. Organization
d. Street Address
e. City/Town f. State g. Zip Code
h. Phone Number i. Fax Number j.Email address
4.Representative (if any):
Amy
a. First Name
Ball
b. Last Name
Horsley Witten Group
c. Company
90 Route 6A
d. Street Address
Sandwich
e. City/Town
MA
f. State
02563
g. Zip Code
508-833-6600
h. Phone Number i. Fax Number
aball@horsleywitten.com
j. Email address
5.Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form):
(municipal project - fee exempt)
a. Total Fee Paid b. State Fee Paid c. City/Town Fee Paid
wpaform3.doc • rev. 4/22/2015 Page 2 of 9
Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
NORTHAMPTON
City/Town
A. General Information (continued)
6.General Project Description:
The proposed project is a mutli-use trail connecting the New Haven and Northampton Canal/Manhan
Rail Trail at Easthampton Road (MA Route 10) to Rocky Hill Road (MA Route 66). The 2,630 LF trailwill vary from 16 feet wide along an existing access road off Route 66 to 10 feet wide along the
steeper slopes descending toward the Manhan Rail Trail. See attached for additional detail.
7a. Project Type Checklist: (Limited Project Types see Section A. 7b.)
1. 2. Residential Subdivision
3. 4. Dock/Pier
5. 6. Coastal engineering Structure
7. 8. Transportation
9.
Single Family Home
Commercial/Industrial
Utilities
Agriculture (e.g., cranberries, forestry)
Other- Multi-Use Trail
7b. Is any portion of the proposed activity eligible to be treated as a limited project (including Ecological Restoration Limited Project) subject to 310 CMR 10.24 (coastal) or 310 CMR 10.53 (inland)?
1. Yes No If yes, describe which limited project applies to this project. (See 310 CMR 10.24 and 10.53 for a complete list and description of limited project types)
2. Limited Project Type
If the proposed activity is eligible to be treated as an Ecological Restoration Limited Project (310 CMR10.24(8), 310 CMR 10.53(4)), complete and attach Appendix A: Ecological Restoration Limited Project Checklist and Signed Certification.
8.Property recorded at the Registry of Deeds for:
Hampshire
a. County b. Certificate # (if registered land)
11784
c. Book
194
d. Page Number
B. Buffer Zone & Resource Area Impacts (temporary & permanent)
1. Buffer Zone Only – Check if the project is located only in the Buffer Zone of a Bordering
Vegetated Wetland, Inland Bank, or Coastal Resource Area.
2. Inland Resource Areas (see 310 CMR 10.54-10.58; if not applicable, go to Section B.3,
Coastal Resource Areas).
Check all that apply below. Attach narrative and any supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location.
wpaform3.doc • rev. 4/22/2015 Page 3 of 9
Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
NORTHAMPTON
City/Town
B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont’d)
For all projects affecting other Resource Areas, please attach a narrative explaining how the resource area was delineated.
Resource Area Size of Proposed Alteration Proposed Replacement (if any)
a. Bank 1. linear feet 2. linear feet
b. Bordering Vegetated Wetland 1. square feet 2. square feet
c. Land Under Waterbodies and Waterways
1,573
1.square feet
2,680
2. square feet
3. cubic yards dredged
Resource Area Size of Proposed Alteration Proposed Replacement (if any)
d. Bordering Land Subject to Flooding 1. square feet 2. square feet
3. cubic feet of flood storage lost 4. cubic feet replaced
e. Isolated Land Subject to Flooding 1. square feet
2. cubic feet of flood storage lost 3. cubic feet replaced
f. Riverfront Area Rocky Hill Pond Brook - inland
1. Name of Waterway (if available) - specify coastal or inland
2.Width of Riverfront Area (check one):
25 ft. - Designated Densely Developed Areas only
100 ft. - New agricultural projects only
200 ft. - All other projects
3.Total area of Riverfront Area on the site of the proposed project:82,137 SF
square feet
4.Proposed alteration of the Riverfront Area:
19,114
a. total square feet
0
b. square feet within 100 ft.
19,114
c. square feet between 100 ft. and 200 ft.
5.Has an alternatives analysis been done and is it attached to this NOI? Yes No
6.Was the lot where the activity is proposed created prior to August 1, 1996? Yes No
3. Coastal Resource Areas: (See 310 CMR 10.25-10.35)
Note: for coastal riverfront areas, please complete Section B.2.f. above.
wpaform3.doc • rev. 4/22/2015 Page 4 of 9
Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
NORTHAMPTON
City/Town
B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont’d)
Check all that apply below. Attach narrative and supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location.
Online Users: Include your document transaction number (provided on your receipt page) with all supplementary information you submit to the Department.
Resource Area Size of Proposed Alteration Proposed Replacement (if any)
a. Designated Port Areas Indicate size under Land Under the Ocean, below
b. Land Under the Ocean 1. square feet
2. cubic yards dredged
c. Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes below
d. Coastal Beaches 1. square feet 2. cubic yards beach nourishment
e. Coastal Dunes 1. square feet 2. cubic yards dune nourishment
Size of Proposed Alteration Proposed Replacement (if any)
f. Coastal Banks 1. linear feet
g. Rocky Intertidal Shores 1. square feet
h. Salt Marshes 1. square feet 2. sq ft restoration, rehab., creation
i. Land Under Salt Ponds 1. square feet
2. cubic yards dredged
j. Land Containing Shellfish 1. square feet
k. Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above
1. cubic yards dredged
l. Land Subject to
Coastal Storm Flowage 1. square feet
4. Restoration/Enhancement If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.2.b or B.3.h above, please enter the additional
amount here.
a. square feet of BVW b. square feet of Salt Marsh
5. Project Involves Stream Crossings
a. number of new stream crossings b. number of replacement stream crossings
wpaform3.doc • rev. 4/22/2015 Page 5 of 9
Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
NORTHAMPTON
City/Town
C. Other Applicable Standards and Requirements
This is a proposal for an Ecological Restoration Limited Project. Skip Section C and
complete Appendix A: Ecological Restoration Notice of Intent – Required Actions (310 CMR 10.11).
Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review
1.Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated onthe most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by theNatural Heritage and Endangered Species Program (NHESP)? To view habitat maps, see the
Massachusetts Natural Heritage Atlas or go tohttp://maps.massgis.state.ma.us/PRI_EST_HAB/viewer.htm.
a. Yes No If yes, include proof of mailing or hand delivery of NOI to:
Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife 1 Rabbit Hill Road Westborough, MA 01581
Phone: (508) 389-6360
October 1, 2008
b. Date of map
If yes, the project is also subject to Massachusetts Endangered Species Act (MESA) review (321 CMR 10.18). To qualify for a streamlined, 30-day, MESA/Wetlands Protection Act review, please complete Section C.1.c, and include requested materials with this Notice of Intent (NOI); OR complete Section C.1.f, if applicable. If MESA supplemental information is not included with the NOI,
by completing Section 1 of this form, the NHESP will require a separate MESA filing which may take
up to 90 days to review (unless noted exceptions in Section 2 apply, see below).
c.Submit Supplemental Information for Endangered Species Review
1. Percentage/acreage of property to be altered:
(a)within wetland Resource Area 40%/1.03 ac
percentage/acreage
(b)outside Resource Area 1.57 ac
percentage/acreage
2. Assessor’s Map or right-of-way plan of site
2. Project plans for entire project site, including wetland resource areas and areas outside of wetlands jurisdiction, showing existing and proposed conditions, existing and proposed
tree/vegetation clearing line, and clearly demarcated limits of work
(a) Project description (including description of impacts outside of wetland resource area & buffer zone)
(b) Photographs representative of the site
Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review (seehttp://www.mass.gov/eea/agencies/dfg/dfw/natural-heritage/regulatory-review/). Priority Habitat includes habitat for state-listed plantsand strictly upland species not protected by the Wetlands Protection Act. MESA projects may not be segmented (321 CMR 10.16). The applicant must disclose full development plans even if such plans arenot required as part of the Notice of Intent process.
wpaform3.doc • rev. 4/22/2015 Page 6 of 9
Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
NORTHAMPTON
City/Town
C. Other Applicable Standards and Requirements (cont’d)
(c) MESA filing fee (fee information available at
http://www.mass.gov/dfwele/dfw/nhesp/regulatory_review/mesa/mesa_fee_schedule.htm). Make check payable to “Commonwealth of Massachusetts - NHESP” and mail to NHESP at
above address
Projects altering 10 or more acres of land, also submit:
(d) Vegetation cover type map of site
(e) Project plans showing Priority & Estimated Habitat boundaries
(f)OR Check One of the Following
1. Project is exempt from MESA review. Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14, http://www.mass.gov/dfwele/dfw/nhesp/regulatory_review/mesa/mesa_exemptions.htm; the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to 310 CMR 10.37 and 10.59.)
2. Separate MESA review ongoing. 15-34694
a. NHESP Tracking #
07/22/15
b. Date submitted to NHESP
3. Separate MESA review completed. Include copy of NHESP “no Take” determination or valid Conservation & Management Permit with approved plan.
3.For coastal projects only, is any portion of the proposed project located below the mean high waterline or in a fish run?
a. Not applicable – project is in inland resource area only b. Yes No
If yes, include proof of mailing, hand delivery, or electronic delivery of NOI to either:
South Shore - Cohasset to Rhode Island border, and the Cape & Islands:
Division of Marine Fisheries - Southeast Marine Fisheries Station
Attn: Environmental Reviewer 1213 Purchase Street – 3rd Floor New Bedford, MA 02740-6694 Email: DMF.EnvReview-South@state.ma.us
North Shore - Hull to New Hampshire border:
Division of Marine Fisheries - North Shore Office
Attn: Environmental Reviewer 30 Emerson Avenue Gloucester, MA 01930 Email: DMF.EnvReview-North@state.ma.us
Also if yes, the project may require a Chapter 91 license. For coastal towns in the Northeast Region, please contact MassDEP’s Boston Office. For coastal towns in the Southeast Region, please contact MassDEP’s Southeast Regional Office.
wpaform3.doc • rev. 4/22/2015 Page 7 of 9
Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
NORTHAMPTON
City/Town
C.Other Applicable Standards and Requirements (cont’d)
Online Users: Include your document transaction number (provided on your receipt page) with all supplementary information you submit to the Department.
4.Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?
a. Yes No If yes, provide name of ACEC (see instructions to WPA Form 3 or MassDEP Website for ACEC locations). Note: electronic filers click on Website.
b. ACEC
5.Is any portion of the proposed project within an area designated as an Outstanding Resource Water(ORW) as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00?
a. Yes No
6.Is any portion of the site subject to a Wetlands Restriction Order under the Inland WetlandsRestriction Act (M.G.L. c. 131, § 40A) or the Coastal Wetlands Restriction Act (M.G.L. c. 130, § 105)?
a. Yes No
7.Is this project subject to provisions of the MassDEP Stormwater Management Standards?
a. Yes. Attach a copy of the Stormwater Report as required by the Stormwater Management Standards per 310 CMR 10.05(6)(k)-(q) and check if:
1. Applying for Low Impact Development (LID) site design credits (as described in Stormwater Management Handbook Vol. 2, Chapter 3)
2. A portion of the site constitutes redevelopment
3. Proprietary BMPs are included in the Stormwater Management System.
b. No. Check why the project is exempt:
1. Single-family house
2. Emergency road repair
3. Small Residential Subdivision (less than or equal to 4 single-family houses or less than or equal to 4 units in multi-family housing project) with no discharge to Critical Areas.
D.Additional Information
This is a proposal for an Ecological Restoration Limited Project. Skip Section D and completeAppendix A: Ecological Restoration Notice of Intent – Minimum Required Documents (310 CMR10.12).
Applicants must include the following with this Notice of Intent (NOI). See instructions for details.
Online Users: Attach the document transaction number (provided on your receipt page) for any ofthe following information you submit to the Department.
1. USGS or other map of the area (along with a narrative description, if necessary) containing sufficient information for the Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.)
2. Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative to the boundaries of each affected resource area.
wpaform3.doc • rev. 4/22/2015 Page 8 of 9
Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
NORTHAMPTON
City/Town
D. Additional Information (cont’d)
3. Identify the method for BVW and other resource area boundary delineations (MassDEP BVW Field Data Form(s), Determination of Applicability, Order of Resource Area Delineation, etc.), and attach documentation of the methodology.
4. List the titles and dates for all plans and other materials submitted with this NOI.
Rocky Hill Greenway
a. Plan Title
Horsley Witten Group, inc.
b. Prepared By
Richard A. Claytor, Jr., P.E.
c. Signed and Stamped by
December 21, 2018
d. Final Revision Date
1' = 40'
e. Scale
f. Additional Plan or Document Title g. Date
5. If there is more than one property owner, please attach a list of these property owners not listed on this form.
6. Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.
7. Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.
8. Attach NOI Wetland Fee Transmittal Form
9. Attach Stormwater Report, if needed.
E. Fees
1.Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district
of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority.
Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form) to confirm fee payment:
2. Municipal Check Number 3. Check date
4. State Check Number 5. Check date
6. Payor name on check: First Name 7. Payor name on check: Last Name
wpaform3.doc • rev. 4/22/2015 Page 9 of 9
Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
NORTHAMPTON
City/Town
F. Signatures and Submittal Requirements
I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying
plans, documents, and supporting data are true and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the
expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a).
I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, § 40. Notice must be made by Certificate of Mailing or in writing by
hand delivery or certified mail (return receipt requested) to all abutters within 100 feet of the property line of the project location.
1. Signature of Applicant 2. Date
3. Signature of Property Owner (if different)4. Date
5. Signature of Representative (if any)6. Date
For Conservation Commission:
Two copies of the completed Notice of Intent (Form 3), including supporting plans and documents, two copies of the NOI Wetland Fee Transmittal Form, and the city/town fee payment, to the
Conservation Commission by certified mail or hand delivery.
For MassDEP:
One copy of the completed Notice of Intent (Form 3), including supporting plans and documents, one copy of the NOI Wetland Fee Transmittal Form, and a copy of the state fee payment to the
MassDEP Regional Office (see Instructions) by certified mail or hand delivery.
Other: If the applicant has checked the “yes” box in any part of Section C, Item 3, above, refer to that section and the Instructions for additional submittal requirements.
The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent.
March 19, 2019As agent for the City of Northampton
noifeetf.doc • Wetland Fee Transmittal Form • rev. 10/11 Page 1 of 2
Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands NOI Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key.
A.Applicant Information
1.Location of Project:
Rocky Hill Road (MA Rt. 66) to EasthamptonRoad (MA Rt. 10)
a. Street Address
Northampton
b. City/Town
N/A
c.Check number
(fee exempt)
d.Fee amount
2.Applicant Mailing Address:
Wayne
a. First Name
Feiden
b. Last Name
City of Northampton
c. Organization
210 Main Street Room 11
d. Mailing Address
Northampton
e. City/Town
MA
f. State
01060
g. Zip Code
413-587-1265
h. Phone Number i. Fax Number
wfeiden@northamptonma.gov
j. Email Address
3.Property Owner (if different):
a. First Name b. Last Name
c. Organization
d. Mailing Address
e. City/Town f. State g. Zip Code
h. Phone Number i. Fax Number j. Email Address
To calculate filing fees, refer to the category fee list and examples in the instructions for filling out WPA Form 3 (Notice of Intent).
B.Fees
Fee should be calculated using the following process & worksheet. Please see Instructions before
filling out worksheet.
Step 1/Type of Activity: Describe each type of activity that will occur in wetland resource area and buffer zone.
Step 2/Number of Activities: Identify the number of each type of activity.
Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the instructions.
Step 4/Subtotal Activity Fee: Multiply the number of activities (identified in Step 2) times the fee per category (identified in Step 3) to reach a subtotal fee amount. Note: If any of these activities are in a Riverfront Area in addition to another Resource Area or the Buffer Zone, the fee per activity should be multiplied by 1.5 and then added to the subtotal amount.
Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4.
Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract $12.50. To calculate the city/town share of the fee, divide the total fee in half and add $12.50.
noifeetf.doc • Wetland Fee Transmittal Form • rev. 10/11 Page 2 of 2
Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands NOI Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Fees (continued)
Step 1/Type of Activity Step 2/Number of Activities Step 3/Individual Activity Fee
Step 4/Subtotal Activity Fee
Step 5/Total Project Fee:
Step 6/Fee Payments:
Total Project Fee: (fee exempt)
a. Total Fee from Step 5
State share of filing Fee: b. 1/2 Total Fee less $12.50
City/Town share of filling Fee: c. 1/2 Total Fee plus $12.50
C. Submittal Requirements
a.) Complete pages 1 and 2 and send with a check or money order for the state share of the fee, payable tothe Commonwealth of Massachusetts.
Department of Environmental Protection Box 4062 Boston, MA 02211
b.) To the Conservation Commission: Send the Notice of Intent or Abbreviated Notice of Intent; a copy of this form; and the city/town fee payment.
To MassDEP Regional Office (see Instructions): Send a copy of the Notice of Intent or Abbreviated Notice of Intent; a copy of this form; and a copy of the state fee payment. (E-filers of Notices of Intent may submit these electronically.)
167.71
76.9
100
141.79
197.51
50
73.69
66.28
149.1
184.18
446.96
190.58
564.52 676.34
267.22
527.69 349.52 146.78
200
100
210
350
190
105186.81
265.56 245
265.56234.33
107.8
79.87 40 102.29
58
62.83
139.87
113.92 212
150 93.31
156.14
479.77
329.23
397.41
404
404
359.6
321.42
152.18
372.55
80320
80
45.39
210.14
339.88 40.29 144.3
336.91
249.48
283.7
73.32
80
165
143.17
336.91
336.91
111.91
122.42
333.91
331.91
182.17
214.90
273.74
102.79
337.52 59.09
337.52 233.13
36.66
118.2
143.66
49.10
232.11 150
236.38
311.64
271
178.4
209
120.02
177.62
177.62 186.33
181.19
232.9
187.39
186.81
153.64 100.68
144.86
523.07
134.26
304.59
121.17
142.19 392.51
275 290
110
145
152.00
491
20
145.00
51.11
64.76
360 563.4
430
310
87.95 309.74
330
112
132
330 132
66
330
198
330
1408.36
1389
256
573
310
42
371.6
1420
846
107
185
201
130
890
229.5
1250
765.82 13301330
1085
1831
200
13381338
35.5
100
462.16
953.16
100
1040
410
130.15
200.69
117.59
140
263
100 100
305
6
306.15207.14
350
10
131.53
141.87
64.48
650
3016.95
342.00
91.84
107.68 44.03130.17
143.41
129.79
155.18
23
200
533.90
140.87
193
139.85
278.42
605.62
243.54
242.19
205.87
88.29
1058.65
496.19
643.00
124.34
321.00
350.00
312.96
1263.60
68.31
280.72
140.78
896.57
1035.41
213.98
8.42
604.30
8.54
282.55
431.15
352.13
72 200 350 74.53211.56 158 195
788.70
538.30
369.46 133.04
252.93
132.76
60.00
224.15
101.05
153.00 29.26 62.98
14.10
29.26125.18
101.49
185.85
111.28
318.11
1139.62
340.41
1480.03
79.24
260.34
256.99
228.78
295.821135.87
128.71
238.28
96.40
88.72
129.41
293.51 178.03
419.38
145.00
344.38
131.05
300.50
223.44 276.39
223.44
276.39223.04
150
138.4
154.6
128.5 143.2
132.9
111.7
398
169.93
145
50
97.5
144
100
141
100
100
145
147
109.2
125.9
321.69
344.03
343.93
124.6
124.75
80
241.95 152.18
197.
157.64
125.38
336.91
215.25
143.03
85.61
80.50
163.12
65.12
309.58
59.61
50.67
91.44 103.73
110.00
133.65
20.0080.94
151.63
85.90
101.19 70.77148.03
68.77
99.66
34.04 205.10
122.93 72.36
120.72
94.34
82.55
131.49
281.64
165.91
58.86
332.44
451.66
125.41
222.78
255.76
349.80
700.00
58.37 95.16
111.39141.46287.87
346.24
146.68
320.50
126.91
156.20
101.27
80.00
136.29 80.00
135.00
514.47161.44
224.61
245.81
262.15
128.43
80.00
129.95
42.96
136.74
133.39
79.20
46.19
83.76
156.64
156.64199.60
145.00
80.00
20.00 125.00
97.17
372.94
92.00
21.22
95.91
127.97132.30
113.22
85.00
135.00
85.00
135.00
83.20
130.45
95.11 120.15
94.4633.7989.84
231.8793.69
152.46
80.00
445.80
290.00
171.09
300.00
197.24
329.42160.26 64.01
129.20
185.19
153.09
115.00
350.00
429.53
697.81
1127.34
300.00
350.00
129.20
228.10
215.58
64.01
160.26
321
456.67
278.20
174.24
174.24116.82
116.82
183.18183.18
741.97
225.99
225.99
104.74
198.17208.53
147.39
95.23
116.28
65.3137.2942.00
385.75
156.05156.05
425
525.44
120.78120.78
90.58
90.58120.78
87.94
59.46
134.68
87.74
138.94
49.36
31.46
157.85
80.00
149.05
80.27 80.61
80.53
91.64
107.10
176.98 163.78
181.18181.18 126.13
126.13
140.56140.5680.04
60.00
110.78
919.26
317.00
523.07
235.61
790.24
511.50511.50
298.49419.27
161.54 281.81
119.87 271.16
250.18
359.71
446.52
249.80
119.77
160
244.3
114.42
202.92
291
100
102.19
105
126.72
100
231.07273.19
147.98
134.48
65.69
81.27
635.88
148
132
258.40
125.00
65.48
47.12
62.59
31.78
210
214.5
555.8
125.00
150.00
146.38
116.7
115
120
399.45
110
107
108.8
120
150
100
100
100
100
100
350.25
119.24
120
60
80
273
80
160
94.21
113.43
152.56
100
306
166.5
332.60
107.5
5.97
198
56
34.91
999.88
1005.28
130.00 238.55
120.36
690
130 117
211.66
162.70
211.30
24.55
866.99
159.61
125.71
47.61
47.40
48.87
164.86
235.54
228.86
216.92
221.29
381.89
283.81
93.00 93.00 202.46
63.66 133.89
12.40
140.00
139.13
140.00
140.00
140.00
140.00
112.9
162.5
148.02
50
92.62
125
125.
48.29
100.57
125.350
47.95
79.35 64.00
41.34
14.21
64.00
64.00
110.00
41.89
64.00
60.13 88.79
77.82
82.57
82.74
80.05
85.00
62.79
19.82 48.49 119.55
73.09
83.76
99.61
50.00
80.00
110.28
45.34
81.84
80.27
85.00
83.50 75.41
93.9147.12
97.40
70.77
148.41
80.0080.00
80.01
240.03
10.00 159.21
147.73
25.00
250.00
98.52
151.48
145
190
509
90.58
100.64
60.00
202.08
61.31
38.66
95.40
38.89
125.
125
125
161
119.32
190.27
105.45
263.72
120
198.96
80
80
100
141
156.41
66
171
680
40
131.84
131.84
573.75
205.47
270.20
39.24
101.19
50.32
255.46
112.49
35.00
80
121
35.93
87.52
385
459 unknownMAPLE
R I DGE RD
B U R T S
P I T R DBURTS PIT RD
PLATINUM CIRDIAMOND CTu n known
unknownunknown
ROCKY HILL RD-RT 66
GROVE S T
C H AP E L ST
unknown
OLD WILSON RDEA STH AM PTO N R D
unkno
w
n
FLORENCE RDunknownBURTS PIT RD
MOUNTAIN LAUREL PATH unknown
Zoning:
FFR
Zoning:
FFR
Zoning:
URB
Zoning: BP
Zoning: SR
Zoning:
FFR
Zoning:
FFR
Zoning:
FFR
Zoning:
FFR
Zoning:
FFR
Zoning:WSP
Zoning:WSP
Zoning: GI
Zoning: GI
Zoning: GI
Zoning: BP
Zoning:BP
Zoning: BP
Zoning:
SC
Zoning: SC
Zoning: SC
Zoning:
FFR
29 -487
30C-043
30C-046
30C-047
30C-05030C-051
30C-054
30C-06030C-072
30C-08030C-081
30C-090
30D-007
30D-009
30D-010
30D-012
36-091
36 -092
36 -093
36 -094
36 -165
36 -166
36 -167
36 -168
36 -169
36 -170
36 -171
36 -172
36 -173
36 -174
36 -232
36 -233
36 -234
36 -235
36 -236
36 -238
36 -239
36 -240
36 -250
36 -252
36 -28836 -405
37 -001
37 -002
37 -003
37 -004
37 -005
37 -006
37 -007
37 -008
37 -009
37 -010
37 -011
37 -012
37 -013
37 -014
37 -015
37 -016
37 -017
37 -018
37 -021
37 -023
37 -024
37 -025
37 -026
37 -027
37 -028
37 -029
37 -030
37 -031
37 -032
37 -033
37 -034
37 -035
37 -036
37 -037
37 -038
37 -039 37-040
37 -041
37 -042
37 -043
37 -044
37 -045
37 -046
37 -047
37 -048
37 -049
37 -050
37 -051
37 -055
37 -056
37 -057
37 -05837 -059
37 -060
37 -061
37 -062
37 -063
37 -064
37 -068
37 -069
37 -070
37 -071
37 -072
37 -073
37 -074
37 -075
37 -076
37 -077
37 -078
37 -079
37 -080
37 -081
37 -082
37 -084
37 -085
37 -086
37 -087
37 -088
37 -089
37 -090
37 -091
37 -092
37 -093
37 -094
37 -095
37 -096
37 -097
37 -098
37 -099
37 -100
37 -101
37 -102
37 -103
37 -104 37 -105
37 -106 37 -107
37 -108
37 -109
37 -110
37 -111
37 -112
37 -113
37 -114
37 -115
37 -116
37 -120
37 -121
37 -122
37 -123
37 -124 37 -125 37-126 37 -127
37 -128
37 -129
37 -130
37 -132
37 -133
38A-030
38A-03238A-033
38A-081
38A-088
38A-091
38A-092
37 -022
37 -065
37 -08337 -117
37-118
37-119
37 -131
38C-001
38C-013
38C-076
43 -084
43 -109 44 -001
44 -003
44 -010 44 -022
44 -023
44 -024 44 -025
44 -026
44 -04544 -102
44 -103
44 -104
44 -105 44 -106
44 -107
44 -119
44 -120
44 -121
44 -122
44 -125
45 -010
123.52
945.96
150
30.49
140.00
123.84
145.00
59.46
134.68
176.98163.78
125
425.32
52.11
360
260
333.54
Map SheetNorthampton Zoning Map 37
13
08
03
51 52
3534
27 28
36
49
29
20 26
50
14
48
21
53
40
02
09
06 07
19
04 05
01
33
45 474642 43 4441
39
12
15
11
18
22
32
25
10 11A
11C
38A
31A
24A
16A
22B
30A
10B
39A
23B
16B
30B
15B
23A
31B 32A
17A 17B
25A
38B
24B
38C
31C
24C
18C
30D30C
17D
12C
23C22D
38D
31D
24D
32C
23D
16D16C
10D
18D17C
25C
37
property line dimension
lot numbermap number
99C-999
488.32
135
291.08
150.79
107.6
84.32
89.97
71.2 66
376.17
89.98
68 68
75
136.18
227.53
"A" Street"B" Streetwww.NorthamptonMA.gov e-mail: CityGIS@NorthamptonMA.gov
o010050Meters
0 100 200 300 400 50050Feet
Parcel boundaries revision date: 01 January 2013
Projection: Massachusetts State Plane (NAD83)These maps are not intended for use in conveyances and they contain errors and discrepancies. Individuals requiring an authoritative property boundary or other location must retain the services of a professional land surveyor.
1OBJECTIDFYMap_Par_ID MBOwner1Owner2Owner3OwnAddOwnCitywnStaOwnZip Version1 2019 38C-076-001 38C-076MASSACHUSETTS ELECTRIC COMPANYC/O PROPERTY TAX DEPT40 SYLVAN RDWALTHAMMA 024512019-02-252 201937 -120-001 37 -120 CITY OF NORTHAMPTONCITY HALL210 MAIN STNORTHAMPTONMA 010602019-02-253 201944 -014-805 44 -014 VERRILLO GIL F254 OLD WILSON RDFLORENCEMA 010622019-02-254 201937 -051-001 37 -051 DEPT OF FOOD & AGRICULTUREC/O UNIVERSITY OF MASS101 UNIVERSITY DRAMHERSTMA 010022019-02-255 201944 -027-001 44 -027 OPEN & SHUT LLC30 LYMAN STEASTHAMPTONMA 010272019-02-256 201937 -047-001 37 -047 SEK ANDREW & IRENA MARIA ET ALP O BOX 352NORTHAMPTONMA 010612019-02-257 201937 -063-001 37 -063 RICHARD'S FUEL INC.79 UNION STREETEASTHAMPTONMA 010272019-02-258 201937 -045-001 37 -045 PAGACZ JULIAN S206 B ROCKY HILL RDFLORENCEMA 010622019-02-259 201944 -026-001 44 -026 AUGUST JOYCE L TRUSTEE OF THE HERBERT R AUGUST NOMINEETRUST50 OLD WILSON RDNORTHAMPTONMA 010622019-02-2510 201944 -014-001 44 -014 VERRILLO GIL F254 OLD WILSON RDFLORENCEMA 010622019-02-2511 201944 -014-002 44 -014 VERRILLO GILMAIL: SBA COMMUNICATIONS CORP ATT: TAX DEPT8051 CONGRESS AVEBOCA RATONFL 334822019-02-2512 201944 -031-001 44 -031 RAYMOND ROBERT DP O BOX 70GOSHENMA 010322019-02-2513 201937 -049-001 37 -049 NORTHAMPTON CITY OFC/O PLANNING DEPT210 MAIN ST ROOM 11NORTHAMPTONMA 010602019-02-2514 201944 -028-001 44 -028 ZACHARA SHANE M321 EASTHAMPTON RDNORTHAMPTONMA 010602019-02-2515 201937 -116-001 37 -116 KRIVISKEY BRUCE M & ALISON F23 ICE POND DRFLORENCEMA 010622019-02-2516 201937 -048-001 37 -048 HATT KENNETH L & MARGARET A170 ROCKY HILL RDFLORENCEMA 010622019-02-2517 201937 -050-001 37 -050 TENNESSEE GAS TRANSMISSION COC/O PROPERTY TAX DEPTP O BOX 4372HOUSTONTX 772102019-02-2518 201937 -134-001 37 -134 BERKSHIRE GAS115 CHESHIRE RDPITTSFIELDMA 012012019-02-2519 201944 -138-001 44 -138 CITY OF NORTHAMPTONC/O PLANNING DEPTCITY HALLNORTHAMPTONMA 010602019-02-2537__049_100ft_20190314.xls
Notification to Abutters Under the Massachusetts Wetlands Protection Act and the Northampton Wetlands Ordinance
In accordance with the second paragraph of the Massachusetts General Laws Chapter 131,
Section 40, you are hereby notified of the following:
The name of the applicant is _Wayne Feiden, City of Northampton_______________________.
The applicant has filed a Notice of Intent with the Northampton Conservation Commission seeking permission to remove, fill, dredge or alter an Area Subject to protection Under the Wetlands Protection Act (General Laws Chapter 131, Section 40) and the Northampton Wetlands Protection Ordinance (Chapter 337).
The address of the lot where the activity is proposed is _between Rocky Hill Road and
Easthampton Road_.
Copies of the Notice of Intent may be examined at the Office of Planning and Community
Development, 210 Main Street, Room 11, between the hours of 8:30 a.m. and 4:30 p.m.,
Monday – Friday, and online at www.northamptonma.gov/opd
Copies of the Notice of Intent and more information may be obtained from either (check one) the applicant by calling this telephone number (413) 587-1265 between the hours of 8:00 and 4:30 on the following days of the week: _Monday through Friday____.
Information regarding the date, time, and place of the public hearing may be obtained from the Office of Planning & Sustainability by calling (413) 587- 1263. Conservation Commission
agendas are also posted at http://northamptonma.gov/AgendaCenter/Conservation-
Commission-7
NOTE: Notice of the public hearing, including its date, time, and place, will published at
least five (5) days in advance of the hearing in the Daily Hampshire Gazette, and will be posted in a ‘Public Notice’ sign on the subject property.
NOTE: Notice of the public hearing, including its date, time, and place, will be posted in the Northampton City Hall not less than forty-eight (48) hours in advance.
NOTE: You also may contact the nearest Department of Environmental Protection Regional Office for more information about this application or the Wetlands Protection Act. To contact DEP, call the Western Region at (413) 784-1100.
AFFIDAVIT OF SERVICE Under the Massachusetts Wetlands Protection Act
And the Northampton Wetlands Ordinance
(To be submitted to the Massachusetts Department of Environmental Protection
and the Conservation Commission when filing a Notice of Intent)
I, __Wayne Feiden__________________________________________________,
Name of person making affidavit
hereby certify under the pains and penalties of perjury that on March 19, 2019
date I gave notification to abutters in compliance with the second paragraph of Massachusetts General Laws Chapter 131, Section 40, and the DEP Guide to Abutter Notification dated April 8, 1994, in connection with the following matter:
A Notice of Intent was filed under the Massachusetts Wetlands Protection Act by _Wayne Feiden, City of Northampton_______________________________ with the
Name of Applicant
Northampton Conservation Commission on March 19, 2019 for property
date located at _between Rocky Hill Road and Easthampton Road________________
Address of land where work is proposed
The form of the notification and a list of the abutters to whom it was given and their
addresses, are attached to this Affidavit of Service.
as agent for the City March 19, 2019
______________________________________________________________________
Applicant Signature Date
PROJECT NARRATIVE
i
Rocky Hill Greenway Multi-Use Trail
Northampton, Massachusetts
Notice of Intent Project Narrative
March 2019
Table of Contents
SUMMARY ................................................................................................................................................................................... 1
1.0 INTRODUCTION ........................................................................................................................................................... 2
2.0 PROJECT BACKGROUND AND PURPOSE ........................................................................................................... 2
3.0 GENERAL SITE DESCRIPTION ................................................................................................................................ 3
3.1 FEMA Designation ..................................................................................................................... 3
3.2 State-listed Rare Species Habitat .............................................................................................. 3
3.3 Wetland Resource Areas ........................................................................................................... 3
4.0 PROPOSED PROJECT .................................................................................................................................................. 5
4.1 Project Description .................................................................................................................... 5
4.2 Project Alternatives ................................................................................................................... 6
4.3 Affected Jurisdictional Areas ..................................................................................................... 7
5.0 PROTECTION OF RESOURCE AREA INTERESTS ............................................................................................ 8
5.1 Bordering Vegetated Wetland – Wetland Replacement........................................................... 8
5.2 Riverfront Area Redevelopment ............................................................................................... 9
5.3 BVW 100-Foot Buffer Zone ..................................................................................................... 10
5.4 Local Ordinance Performance Standards ................................................................................ 11
5.5 Erosion and Sedimentation Control ........................................................................................ 12
6.0 STORMWATER MANAGEMENT ........................................................................................................................... 12
7.0 POST CONSTRUCTION OPERATION AND MAINTENANCE ...................................................................... 15
7.1 Responsible Parties ................................................................................................................. 16
7.2 General Maintenance Tasks .................................................................................................... 16
7.3 Stormwater Maintenance Tasks .............................................................................................. 17
7.4 Estimated Operation and Maintenance Budget ..................................................................... 18
7.5 Operation and Maintenance Log Form ................................................................................... 18 8.0 REFERENCES ............................................................................................................................................................... 22
ii
LOCUS MAPS
Figure 1 – USGS Topographic Map
Figure 2 – Aerial Photograph
Figure 3 – FEMA Flood Zones and National Flood Insurance Program, Flood Insurance Rate Map
Figure 4 – Environmental Constraints
Figure 5 – NRCS Soils Map
SITE PHOTOGRAPHS
APPENDICES
APPENDIX A – Wetland Mitigation Plan
Notice of Intent Project Narrative
Northampton, MA
Horsley Witten Group, Inc.
Page 1 of 22
Rocky Hill Greenway Multi-Use Trail
Northampton, Massachusetts
Notice of Intent Project Narrative
March 2019
SUMMARY
The Applicant, the City of Northampton Planning & Sustainability, proposes a multi-use
pedestrian and bicycle trail extending from Rocky Hill Road (MA Route 66) to Easthampton
Road (MA Route 10) in Northampton, Massachusetts. This spur trail will serve to connect the
New Haven and Northampton Canal/Manhan Rail Trail with the Rocky Hill Road neighborhood.
The approximately 2,630-foot long project will be located entirely within property that has been
deeded to the City of Northampton or is within easements provided by the Massachusetts
Electric Company.
A portion of the proposed bicycle and pedestrian trail will occur within Bordering Vegetated
Wetland and its buffer zone, as well as a Riverfront Area, much of which has been disturbed.
These resource areas are regulated under the Massachusetts Wetlands Protection Act and the
City of Northampton Wetlands Ordinance (Chapter 337 of the Northampton Administrative
Code) and associated regulations. Resource area impacts will be avoided and minimized to the
extent practicable by using an existing dirt driveway and footpath, while still maintaining a trail
that is safe and adheres to the local building code.
An erosion and sedimentation control barrier will be used to further protect downgradient
resource areas, and construction-related impacts will be minimized and restored upon
completion of construction. Stormwater management practices will be implemented to the
extent practicable for this project.
Notice of Intent Project Narrative
Northampton, MA
Horsley Witten Group, Inc.
Page 2 of 22
1.0 INTRODUCTION
The City of Northampton proposes the Rocky Hill Greenway Multi-Use Trail, a 2,630 linear foot
(0.50 mile) multi-use trail designed as a spur trail to connect two existing trails in the vicinity.
The proposed project is located entirely within a City-owned parcel situated between Rocky Hill
Road (MA Route 66) and Easthampton Road (MA Route 10) in Northampton, Massachusetts.
The proposed trail project will improve pedestrian and bicycle facilities by connecting the
residential areas along Rocky Hill Road and Ice Pond Drive to the New Haven and Northampton
Canal / Manhan Rail Trail. Bicyclists and pedestrians will benefit from being able to connect to
these corridors more directly and with limited interaction with vehicular traffic, providing a
safer and more direct route to the existing rail trail. Additionally, it will provide access to an
eventual multi-use trail serving the southwestern and western half of the City, which is not
currently served by any multi-use trails.
2.0 PROJECT BACKGROUND AND PURPOSE
The proposed Rocky Hill Greenway Multi-Use Trail will support the City’s recreational goals by
adding to the existing network of bike paths in the region and encouraging non-motorized
travel, advancing the goals of the City of Northampton Open Space, Recreation, and Multi-Use
Trail Plan (2018-2025). This Plan seeks (among other goals) to maintain vibrant urban centers,
develop multi-use trails for easy public access, and create recreational opportunities while
protecting valuable habitat and natural resources. The Open Space, Recreation & Multi-Use
Trail Plan is an adoptive component of the Sustainable Northampton Comprehensive Plan
(2008) and has been adopted or endorsed by a number of City Boards and approved by the
Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs.
By implementing this project, the City will progress toward three of the major goals outlined in
the Massachusetts Department of Transportation (MassDOT) 2012 GreenDOT Implementation
Plan, which include:
Design of multi-modal transportation system;
Promoting healthy transportation and livable communities; and
Tripling of the bicycle and pedestrian transportation modes.
The project also supports the seven-corridor, 788-mile statewide system of bicycling routes,
known as the Bay State Greenway. A pilot sign program in the Pioneer Valley is currently
underway, linking a number of off-road paths and on-road routes in Massachusetts and
connecting to systems in Connecticut and Vermont.
Notice of Intent Project Narrative
Northampton, MA
Horsley Witten Group, Inc.
Page 3 of 22
3.0 GENERAL SITE DESCRIPTION
The proposed Rocky Hill Greenway Multi-Use Trail will be sited within a City-owned parcel (37-
049-001) located between Rocky Hill Road (MA Route 66) and Easthampton Road (MA Route
10) in Northampton, Massachusetts (Figures 1 and 2).
The existing conditions at the site are varied. The northern portion of the proposed trail,
starting at Rocky Hill Road, is currently occupied by a gravel driveway, which leads to a gas
pumping station owned by the Tennessee Gas Transmission Company of Houston, Texas (Parcel
37-050-001). The proposed trail then passes through an easement of the Massachusetts
Electric Company, which has overhead utility lines running through the maintained corridor.
After crossing the easement, the southern portion of the proposed trail follows part of an
existing footpath and then winds through undeveloped woodland area with grass, shrubs, and
trees before connecting with the existing Manhan Rail Trail.
3.1 FEMA Designation
According to the FEMA Flood Insurance Rate Map (Community Panel No. 250167 0002 A,
effective April 3, 1978), the entire site is located within Zone C, areas of minimal flooding
(Figures 3A and 3B). Zone C is considered to be outside of the 500-year floodplain.
3.2 State-listed Rare Species Habitat
According to the most recent version of the Massachusetts Natural Heritage Atlas (2017), the
proposed trail is not in proximity to Estimated Habitat of Rare Wildlife and Priority Habitat of
Rare Species as designated by the Massachusetts Natural Heritage and Endangered Species
Program (NHESP)(Figure 4).
3.3 Wetland Resource Areas
3.3.1 Resource Area Delineation Methodology
Wetland resource areas were identified by Horsley Witten Group, Inc. (HW) wetlands biologists
during site visits in March 2015 with supplemental site visits in August & September 2017.
Several segments of Bordering Vegetated Wetlands as well as the associated buffer zone, and a
segment of Riverfront Area were identified within the project area. HW followed wetland
resource area identification and on-site delineation procedure guidelines described in the
Massachusetts Department of Environmental Protection (DEP) handbook, entitled Delineating
Bordering Vegetated Wetlands Under the Massachusetts Wetlands Protection Act (March,
Notice of Intent Project Narrative
Northampton, MA
Horsley Witten Group, Inc.
Page 4 of 22
1995), the Massachusetts Wetlands Protection Act Regulations, and the City of Northampton
Wetland Protection Ordinance. The limit of BVW is demarcated at the point where 50% or
greater of the vegetation is considered wetland indicator species and where hydric conditions
are encountered, and is marked with consecutively numbered, pink flagging stations.
The mean annual high water line (MAHW) of a river is defined as “the line that is apparent from
visible markings or changes in the character of soils or vegetation due to the prolonged presence
of water and that distinguishes between predominantly aquatic and predominantly terrestrial
land” (310 CMR 10.58(2)(a) 2). Pursuant to these regulations, field indicators of “bankfull
conditions” (changes in slope, changes in vegetation, stain lines, top of point bars, changes in
bank materials or bank undercuts) were used to determine the MAHW associated with an
unnamed perennial stream originating from Rocky Hill Pond. MAHW is labeled with
sequentially numbered, blue flagging stations.
A brief description of the regulatory definitions and the observed resources areas is provided
below.
3.3.2 Bordering Vegetated Wetland
Bordering Vegetated Wetlands are defined under Massachusetts Wetlands Protection Act
Regulations at 310 CMR 10.55(2)(a) as, “freshwater wetlands that border on creeks, rivers,
streams, ponds and lakes. The types of freshwater wetlands are wet meadows, marshes,
swamps and bogs. Bordering Vegetated Wetlands are areas where the soils are saturated
and/or inundated such that they support a predominance of wetland indicator plants. The
boundary of Bordering Vegetated Wetland is defined at 310 CMR 10.55 (2)(c) as the line within
which 50% or more of the vegetational community consists of wetland indicator plants and
saturated or inundated conditions exist.” The Northampton Wetlands Ordinance does not have
a separate definition for BVW.
The BVW consists of a series of hill-side seeps associated with an unnamed perennial stream
that traverses the northwestern portion of the site. THE BVW is best described as a forested
red maple swamp dominated by red maple (Acer rubrum) with a shrub community supporting
winterberry (Ilex verticillata), arrowwood (Viburnum dentatum), nannyberry (Viburnum
lentago), as well as clumps and patches of honeysuckle (Lonicera sp.) and occasional multiflora
rose (Rosa multiflora). Sensitive fern (Onoclea sensibilis) was the dominant groundcover
species observed during the site evaluation. Witch-hazel (Hamamelis virginiana) and sapling
gray birch (Betula populifolia) were observed along the wetland boundary, as well as occasional
entanglements of Oriental bittersweet (Celastrus orbiculatus).
Areas in the maintained right-of-way consist of a low-growing shrub community/herbaceous-
dominant plant community (e.g., Palustrine Scrub-Shrub Wetland (PSS) or Palustrine Emergent
Wetland (PEM) communities) dominated by soft rush (Juncus effusus), meadowsweet (Spiraea
Notice of Intent Project Narrative
Northampton, MA
Horsley Witten Group, Inc.
Page 5 of 22
latifolia), sensitive fern, and purple loosestrife (Lythrum salicaria) with gray birch and
bittersweet vines.
Adjacent upland areas are dominated by eastern white pine (Pinus strobus) and mixed oak
(Quercus spp.) with witch hazel dominating the shrub community.
Flagging stations A1-A10; A11-A15; B1-B17; B-18-B23; C1-C-9; C10-C23; C24-C36; and E1-
E43represent the extent of BVW along the proposed pathway footprint.
3.3.3 Riverfront Area
Riverfront Area is defined at 310 CMR 10.58(2)(a) as, “land between a river’s mean annual high
water line and a parallel line measured horizontally. The riverfront area may include or overlap
other resource areas or their buffer zones. The riverfront area does not have a buffer zone.”
According to 310 CMR 10.58(2)(a)(1), “A river is any natural flowing body of water that empties
to any ocean, lake, pond, or other river which flows throughout the year.” Furthermore, 310
CMR 10.58(2)(a)(3) states that, “The riverfront area is the area of land between a river’s mean
annual high-water line measured horizontally outward from the river and a parallel line located
200 feet away.” The Northampton Wetlands Ordinance does not have a separate definition for
Riverfront Area.
An unnamed perennial stream flows from Rocky Hill Pond, located to the northeast of the
project site, to the south into Pynchon Meadows and ultimately into the Connecticut River.
This stream is shown as perennial on the most recent USGS Topographic Map (Easthampton
Quadrangle) and therefore meets the regulatory definition of a perennial stream with an
associated Riverfront Area. Mean annual high water (MAHW) was identified in the field by HW
to the northeast and approximately 40 feet lower in elevation than the existing gravel road.
The 200-foot Riverfront Area measured extends beyond the existing gravel road. Flagging
stations MAHW1-MAHW4 were placed at the limit of bankfull conditions along this stream.
4.0 PROPOSED PROJECT
4.1 Project Description
The proposed 0.50-mile Rocky Hill Greenway Multi-Use Trail will be constructed of bituminous
asphalt pavement and will vary in width between 10 and 16 feet to accommodate site
conditions. At its northern end, off of Rocky Hill Road, the trail will following the existing gravel
driveway and will be 16 feet wide; this portion of the trail will act as a shared multi-use trail and
driveway, allowing restricted vehicle access to the existing gas pumping station. The trail will
then narrow to ten feet in width at the wetland crossing, and will be limited to pedestrians and
bicycles for the remaining length of the spur trail to the junction with the existing Manhan Rail
Trail.
Notice of Intent Project Narrative
Northampton, MA
Horsley Witten Group, Inc.
Page 6 of 22
The proposed project also includes retaining walls, culvert replacements, and stormwater
management areas. Retaining walls are only proposed at the HC parking spot. New culverts
are proposed to replaced undersized existing culverts or in locations that the trail crosses
existing drainage ways/ditches. For the trail section that is proposed outside an existing gravel
trail or driveway (south of the overhead wire easement crossing) we are proposing to manage
stormwater via a vegetated swale.
Provisions for construction will include a Stormwater Pollution Prevention Plan (SWPPP) that
must be followed by the Contractor, and will be provided under separate cover. For work
within the resource area, the SWPPP will require the Contractor to implement measures to
ensure the protection outside the limit of work that will include:
•Rubber tire track machinery;
•Swamp mats for temporary access over intermittently flowing resources;
•Erosion control measures;
•Stockpiling outside the resource area;
•Construction timing; and
•Other measures as described in the Project Plans and SWPPP.
Details of the proposed project are provided on the enclosed site plans prepared by HW,
entitled “Rocky Hill Greenway Multi-Use Trail, Northampton, Massachusetts” (dated March
2016).
4.2 Project Alternatives
The City explored several alternative pathway locations including different routes as well as
different materials and designs, in addition to a No-Build alternative, in order to avoid and
minimize impacts within wetland resource areas while still resulting in an economically viable
project.
4.2.1 Propose Project and Preferred Alternative
The preferred alternative is the proposed project which utilizes an existing gravel driveway and
existing footpath. It is the preferred alternative because it advances the goals of the City of
Northampton to develop multi-use trails for easy and safe public access. The proposed project
site is located strategically between a residential neighborhood and an existing trail and has
part of a trail already built.
Direct resource area impacts have been minimized by following the existing access driveway
and following the existing gravel footpath to the extent practicable. Additionally, the path
meanders through the wooded area to avoid impacts to the wetlands and other natural
resources as much as possible. All construction-related temporary impacts will be restored
upon completion of that portion of the pathway, and all construction staging areas will be
located outside of wetland resource areas.
Notice of Intent Project Narrative
Northampton, MA
Horsley Witten Group, Inc.
Page 7 of 22
4.2.2 Alternative Trail Location
The City considered establishing a bike route along the existing surface roads (along Route
66/Chapel Street to West Street to the intersection with South Street/Route 10), by creating a
bike lane to establish a connection with the Manhan Rail Trail. This would increase connectivity
to an existing trail and would reduce wetland resource impacts, however it would not meet the
goals to reduce bicycle and pedestrian exposure to vehicular traffic and improve safety.
Additionally, it would require the existing roads to be reduced in width to accommodate a bike
lane along the outer edge of the road. It would also not meet the City’s goal of increasing
multimodal paths, as pedestrians would not likely use a bike lane along an existing roadway.
Another alternative trail location that was considered was to stay along the utility easement.
However, it was determined that there would be more considerable unavoidable wetland
impacts with this footprint, as well as more work within Riverfront.
4.2.3 No-Build Alternative
A No-Build alternative would not result in impacts to wetland resources; however, this would
not meet the project purpose of extending a network of safe multi-modal trails in the City.
4.3 Affected Jurisdictional Areas
Given the preferred location of the trail, portions of the project will necessitate work within
wetland resource areas as well as within the associated buffer zone. These impacts have been
avoided and minimized to the extent practicable by following the existing gravel roadway and
an existing gravel footpath that traverses the wetland areas; however, portions of the proposed
activities will occur within BVW and Riverfront Area, and within the locally-regulated 100-foot
buffer to the BVW.
Specifically, the proposed trail will directly impact 1,573 SF of BVW; a total of 188 linear feet of
the path will occur within BVW. Approximately 40,924 SF of the 100-foot buffer to BVW will
also be directly impacted by the proposed trail. In addition, approximately 19,114 SF of
Riverfront Area, much of which is previously-disturbed, will be impacted by the proposed
project.
Table 1. Resource Area, in square feet, impacted by proposed project.
LOCATION IMPACT AREA (SF) IMPACT AREA (AC)
BVW 1,573 0.03
BVW Buffer 40,924 0.9
Riverfront Area 0-100 ft 0 0
Riverfront Area 100-200 ft 19,114 0.4
Notice of Intent Project Narrative
Northampton, MA
Horsley Witten Group, Inc.
Page 8 of 22
A discussion on how the proposed project will avoid and minimize these impacts, as well as the
proposed mitigation measures, including wetland replacement, is provided below.
5.0 PROTECTION OF RESOURCE AREA INTERESTS
As indicated above, the proposed project will result in unavoidable activities will occur within
BVW and Riverfront Area, as well as within the locally-regulated 10-foot buffer zone to BVW.
A discussion of how the proposed project is designed to meet the performance standards under
the Massachusetts Wetlands Protection Act Regulations and the City of Northampton Wetlands
Ordinance (Chapter 337 of the Northampton Administrative Code) and regulations follows.
5.1 Bordering Vegetated Wetland – Wetland Replacement
The following performance standards, as stated in 310 CMR 10.55(4), will be met to the extent
practicable for work within BVW. Direct impacts within BVW will occur where the trail
traverses a segment of BVW that currently spans across an existing gravel footpath. A total of
1,573 SF of BVW will be mitigated through the creation of a wetland replacement area
approximately 2,680SF. As noted above, impacts to the wetland area have been avoided and
minimized to the extent practicable, through the project design. Proposed wetland
replacement area is designed to meet the performance standards under 310 CMR 10.55(4)(b)(1
through 7) as well as the provisions set forth by MassDOT for wetland replacement.
Wetland replacement activities will generally include the removal of fill material and debris as
well as existing vegetation within the footprint of the wetland replacement area, regrading and
establishment of a connection to the existing intermittent channel and to the hillside seeps,
introduction of high-organic content soils, introduction of coarse woody debris or boulders to
improve habitat diversity, stabilization of disturbed soils with native seed mixes, and
revegetation of wetland area with native plants to provide for a 75% native plant community
within all impacted areas after two growing seasons (as required under 310 CMR
10.55(4)(b)(6)). A qualified professional (Wetlands Specialist) will oversee all phases of the
wetland restoration efforts to ensure that requirements set forth in the proposed plan are met
(see below). This individual will also be granted the discretion to make slight field adjustments
to ensure wetland replacement success.
This wetland replacement plan was developed based upon observations made by HW of
existing conditions and is modeled after the Massachusetts Inland Wetland Replication
Guidelines (March 2002) prepared by MassDEP (see attached checklist). The replacement plan
is also designed to meet the regulatory criteria for wetland replacement set forth in 310 CMR
10.55(4)(b)(1) through (7).Details of these activities are provided on Sheet C-16 of the enclosed
plan set entitled “Multi-Use Rocky Hill Greenway, Northampton, Massachusetts” prepared by
HW and dated April 2016.
Notice of Intent Project Narrative
Northampton, MA
Horsley Witten Group, Inc.
Page 9 of 22
Details of the proposed wetland replacement are provided in Appendix B.
5.2 Riverfront Area Redevelopment
Activities within Riverfront Area will occur outside of the 0-100-foot Riverfront Area, and will
occur within previously degraded areas including the existing access road. The following
performance standards for redevelopment in Riverfront Area will be met for work within
Riverfront Area.
(a) At a minimum, proposed work shall result in an improvement over existing conditions of the
capacity of the riverfront area to protect the interests identified in M.G.L. c. 131 § 40.
Work within the outer Riverfront Area will involve re-use of en existing gravel (degraded)
roadway. As part of the proposed project, existing culverts will be replaced to accommodate
existing flows across the access road and footpath. A portion of the proposed wetland
replacement areas will be located in Riverfront Area where materials from previous clearing
activities had been dumped. Invasive species will be managed as part of the wetland
replacement activities.
(b) Stormwater management is provided according to standards established by the
Department.
Stormwater management measures will be provided to the extent practicable, although these
measures will occur outside of Riverfront Area.
(c) Within 200 foot riverfront areas, proposed work shall not be located closer to the river than
existing conditions or 100 feet, whichever is less, or not closer than existing conditions within
25 foot riverfront areas, except in accordance with 310 CMR 10.58(5)(f) or (g).
The proposed project will occur within Riverfront Area along existing paved or otherwise
degraded Riverfront Area, but no closer to the river than under existing conditions with the
exception of the wetland replacement areas. No work will occur within the inner 0-100-foot
Riverfront Area.
(d) Proposed work, including expansion of existing structures, shall be located outside the
riverfront area or toward the riverfront area boundary and away from the river, except in
accordance with 310 CMR 10.58(5)(f) or (g).
The proposed project will occur along existing paved or otherwise degraded Riverfront Area but
no closer to the unnamed perennial stream than under existing conditions with the exception
of the proposed wetland replacement areas.
(e) The area of proposed work shall not exceed the amount of degraded area, provided that the
proposed work may alter up to 10% if the degraded area is less than 10% of the riverfront
area, except in accordance with 310 CMR 10.58(5)(f) or (g).
Notice of Intent Project Narrative
Northampton, MA
Horsley Witten Group, Inc.
Page 10 of 22
Not applicable. The Project will result in redevelopment of an existing compacted gravel
roadway. Approximately 23 percent (19,114 SF) of the Riverfront Area on this lot (82,137 SF) is
currently degraded. Portions of the proposed wetland replacement areas will result in creation
of wetland areas within Riverfront Area that is currently strewn with debris. Invasive species
will be managed as part of the wetland replacement activities.
(f) When an applicant proposes restoration on-site of degraded riverfront area, alteration may
be allowed notwithstanding the criteria of 310 CMR 10.58(5)(c), (d), and (e) at a ratio in
square feet of at least 1:1 of restored area to area of alteration not conforming to the
criteria. Areas immediately along the river shall be selected for restoration. Alteration not
conforming to the criteria shall begin at the riverfront area boundary. Restoration shall
include:
1.removal of all debris, but retaining any trees or other mature vegetation;
2.grading to a topography which reduces runoff and increases infiltration;
3.coverage by topsoil at a depth consistent with natural conditions at the site; and
4.seeding and planting with an erosion control seed mixture, followed by plantings of
herbaceous and woody species appropriate to the site;
(Not applicable)
(g) When an applicant proposes mitigation either on-site or in the riverfront area within the
same general area of the river basin, alteration may be allowed notwithstanding the criteria
of 310 CMR 10.58(5)(c), (d), or (e) at a ratio in square feet of at least 2:1 of mitigation area
to area of alteration not conforming to the criteria or an equivalent level of environmental
protection where square footage is not a relevant measure. Alteration not conforming to the
criteria shall begin at the riverfront area boundary. Mitigation may include off-site
restoration of riverfront areas, conservation restrictions under M.G.L. c. 184, §§ 31 to 33 to
preserve undisturbed riverfront areas that could be otherwise altered under 310 CMR 10.00,
the purchase of development rights within the riverfront area, the restoration of bordering
vegetated wetland, projects to remedy an existing adverse impact on the interests identified
in M.G.L. c. 131, § 40 for which the applicant is not legally responsible, or similar activities
undertaken voluntarily by the applicant which will support a determination by the issuing
authority of no significant adverse impact. Preference shall be given to potential mitigation
projects, if any, identified in a River Basin Plan approved by the Secretary of the Executive
Office of Environmental Affairs.
(Not applicable)
5.3 BVW 100-Foot Buffer Zone
The Northampton Wetlands Ordinance maintains a 100-foot buffer zone around BVW.
Activities associated with this project will occur within the buffer zone by necessity of the
Notice of Intent Project Narrative
Northampton, MA
Horsley Witten Group, Inc
Page 11 of 22
project location. The multi-use trail is not anticipated to negatively impact the functions and
values of the buffer.
In accordance with the provisions in the City of Northampton Wetlands Ordinance Regulations,
the Applicant requests relief from the standards for work within 100 feet of resource areas.
Relief is requested because the required location of proposed trail is within portions of the
buffer zone and BVW associated with an unnamed perennial stream.
5.4 Local Ordinance Performance Standards
The Northampton Wetlands Ordinance contains performance standards for wetland resource
areas and the 100-foot buffer to resource areas under §337-10(E). Included in this section is a
provision for multi-use trails:
“(2) The Commission shall not permit alteration within resource areas or their
associated protected zones, subject to the following exceptions:
… (c) Limited projects, as defined by the Massachusetts Wetlands Protection Act,
and walking and multiuse trails designed for nonmotorized use.”
The proposed Rocky Hill Greenway Multi-Use Trail falls under this provision. Proposed
mitigation measures include providing wetland replacement (see above and in Appendix B) as
well as providing improvements within the Riverfront Area (which also include portions of the
100-foot buffer zone to BVW. Additional discussion of how the proposed project is designed to
meet the provisions of the local Ordinance is provided below.
5.4.1 Protecting Adjoining Premises from Detrimental Uses
The abutting land uses around the property are primarily residential and wooded areas. The
proposed project will not cause any detrimental uses to adjoining premises. In fact, the
proposed trail will improve pedestrian and bicycle facilities by connecting the residential areas
along Rocky Hill Road and Ice Pond Drive to the New Haven and Northampton Canal/Manhan
Rail Trail. Local residents and visitors will benefit from being able to connect to these existing
and future corridors more directly and with limited interaction with vehicular traffic.
5.4.2 Minimizing and Mitigating Traffic Impacts
The proposed project is not anticipated to add to traffic congestion issues in the area. It will
include 4 foot-wide shared shoulders marked for bicycle accommodation along Rocky Hill Road
to connect the neighborhood at Ice Pond Drive. Secondary asset improvements include new
project signage, restriping of Rocky Hill Road between Ice Pond Drive and the proposed trailwill
be necessary to maintain appropriate lane and shoulder widths for bicycle accommodation
adjacent to the project.
Notice of Intent Project Narrative
Northampton, MA
Horsley Witten Group, Inc.
Page 12 of 22
5.4.3 Promoting Harmonious Relationships between Structures and Open Space
The proposed project is designed to enhance the City’s commitment to provide alternatives for
non-vehicular travel and to be consistent with the goals detailed in the City of Northampton
Open Space, Recreation, and Multiuse Trail Plan (2011-2018). Additionally, the project is
designed to minimally impact the surrounding natural resources.
5.4.4 Protecting the General Welfare
As indicated above, the portion along Rocky Hill Road and access to the trail will be well
marked. All proposed trail grades are 4.5% or less and areas spanning a culvert are proposed to
have pedestrian barriers as well as sections with slopes greater than 3:1.
5.4.5 Avoiding Overload on City Resources and Mitigating Impacts
The proposed project will reduce overload on City resources by providing additional non-
vehicular transportation opportunities thereby mitigating congestion and vehicular emissions.
5.4.6 Promoting City Planning Objectives
The proposed project is in keeping with the goals and objectives of the City of Northampton
Open Space, Recreation, and Multiuse Trail Plan as well as the Northampton Community Plan to
maintain vibrant urban centers, develop multi-use trails for easy public access, and create
recreational opportunities while protecting valuable habitat and natural resources.
5.4.7 Meeting Zoning Requirements
The proposed project meets the zoning requirements, which consist of Business Park (BP),
General Industry (GI), Suburban residential (SR), and Farms, Forest, Rivers (FFR). Which are all
compatible with a municipal facility that is noncommercial recreational.
5.5 Erosion and Sedimentation Control
The Applicant proposes to protect the resource areas by implementing a sedimentation and
erosion control program for the project. A sediment and erosion control barrier consisting of
siltation sock (also referred to as mulch sock or silt sock) will be placed at the limit of work
and/or as shown in the project plans. Erosion control barriers will remain in place and will be
maintained in good condition until all work is complete and all soils have been stabilized. A
temporary access way (also referred to as a haul road) of natural mulch material will be placed
within the resource area to facilitate the installation of the helical piles and contain the work
area within the designated limits.
6.0 STORMWATER MANAGEMENT
The proposed project meets the definition of a mix of development and redevelopment under
the Massachusetts Stormwater Handbook - Stormwater Management Standards (Stormwater
Handbook). Per the Stormwater Handbook the pedestrian trail project is subject to the
Notice of Intent Project Narrative
Northampton, MA
Horsley Witten Group, Inc.
Page 13 of 22
Standards to the maximum extent practicable. We offer the following responses with respect
to meeting the Stormwater Standards:
Standard 1. No new stormwater conveyances (e.g. outfalls) may discharge untreated
stormwater directly to or cause erosion in wetlands or waters of the Commonwealth.
The bicycle/pedestrian trail is designed such that no new stormwater conveyances will result in
any erosion or sedimentation to adjacent resource areas. Stormwater runoff from the paved
bicycle trail will be collected and/or filtered by surface stabilized grass swales/channels, grassed
filter strips, and/or stone (riprap) slopes/check dams that will promote sediment/debris
removal and energy dissipation of the runoff prior to discharging to the down gradient wetland
areas.
Standard 2. Stormwater management systems shall be designed so that post-development
peak discharge rates do not exceed pre-development peak discharge rates. This Standard
may be waived for discharges to land subject to coastal storm flowage as defined in 310 CMR
10.04.
Proposed best management practices have been included to maintain post-development peak
discharge rates equal to pre-development rates to the maximum extent practicable. Steep
sections of the paved bike trail will also be cross sloped to sheet runoff to grassed swales
located along the shoulders to reduce concentrated flows. Grass swales are equipped width
stone check dams to further reduce stormwater velocity and flow and promote filtering and
recharge to groundwater.
Standard 3. Loss of annual recharge to groundwater shall be eliminated or minimized
through the use of infiltration measures including environmentally sensitive site design, low
impact development techniques, stormwater best management practices, and good
operation and maintenance. At a minimum, the annual recharge from the post-development
site shall approximate the annual recharge from pre-development conditions based on soil
type. This Standard is met when the stormwater management system is designed to infiltrate
the required recharge volume as determined in accordance with the Massachusetts
Stormwater Handbook.
The use of existing and proposed drainage swales and stone shoulders will result in runoff sheet
flow from the new paved trail prior to discharging to resource (Note: this runoff is considered
free from any vehicular activity pollutants). Runoff that sheet flows over pervious surfaces
prior to discharge to resource areas is an acceptable method for stormwater recharge
according to the Stormwater Handbook. Therefore, annual recharge from the proposed bicycle
trail will be approximately equal to or slightly greater than existing recharge volumes.
Notice of Intent Project Narrative
Northampton, MA
Horsley Witten Group, Inc.
Page 14 of 22
Standard 4. Stormwater management systems shall be designed to remove 80% of the
average annual post-construction load of Total Suspended Solids (TSS). This Standard is met
when:
•Suitable practices for source control and pollution prevention are identified in a long-
term pollution prevention plan, and thereafter are implemented and maintained;
•Structural stormwater best management practices are sized to capture the required
water quality volume determined in accordance with the Massachusetts Stormwater
Handbook; and
•Pretreatment is provided in accordance with the Massachusetts Stormwater
Handbook.
A general long-term pollution prevention plan is provided below. The SWPPP will provide
resource protection requirements for the construction period. The trail will not be subject to
vehicle traffic and therefore will not be subject to sanding operations. For these factors the TSS
loading will be equal or less in post construction.
Standard 5. For land uses with higher potential pollutant loads, source control and pollution
prevention shall be implemented in accordance with the Massachusetts Stormwater
Handbook to eliminate or reduce the discharge of stormwater runoff from such land uses to
the maximum extent practicable. If through source control and/or pollution prevention all
land uses with higher potential pollutant loads cannot be completely protected from exposure
to rain, snow, snow melt, and stormwater runoff, the proponent shall use the specific
structural stormwater BMPs determined by the Department to be suitable for such uses as
provided in the Massachusetts Stormwater Handbook. Stormwater discharges from land uses
with higher potential pollutant loads shall also comply with the requirements of the
Massachusetts Clean Waters Act, M.G.L. c. 21, §§ 26-53 and the regulations promulgated
thereunder at 314 CMR 3.00, 314 CMR 4.00 and 314 CMR 5.00.
Not applicable. No area on the proposed site has been designated as a land use with higher
potential pollutant loads.
Standard 6. Stormwater discharges within the Zone II or Interim Wellhead Protection Area of
a public water supply, and stormwater discharges near or to any other critical area, require
the use of the specific source control and pollution prevention measures and the specific
structural stormwater best management practices determined by the Department to be
suitable for managing discharges to such areas, as provided in the Massachusetts Stormwater
Handbook. A discharge is near a critical area if there is a strong likelihood of a significant
impact occurring to said area, taking into account site-specific factors. Stormwater
discharges to Outstanding Resource Waters and Special Resource Waters shall be removed
and set back from the receiving water or wetland and receive the highest and best practical
method of treatment. A “storm water discharge” as defined in 314 CMR 3.04(2)(a)1 or (b) to
Notice of Intent Project Narrative
Northampton, MA
Horsley Witten Group, Inc.
Page 15 of 22
an Outstanding Resource Water or Special Resource Water shall comply with 314 CMR 3.00
and 314 CMR 4.00. Stormwater discharges to a Zone I or Zone A are prohibited unless
essential to the operation of a public water supply.
Not applicable.
Standard 7. A redevelopment project is required to meet the following Stormwater
Management Standards only to the maximum extent practicable: Standard 2, Standard 3,
and the pretreatment and structural best management practice requirements of Standards 4,
5, and 6. Existing stormwater discharges shall comply with Standard 1 only to the maximum
extent practicable. A redevelopment project shall also comply with all other requirements of
the Stormwater Management Standards and improve existing conditions.
Portions of the project are redevelopment. These sections are between Rocky Hill Road and
the gas substations and the maintenance path servicing the overhead wire easement. The
section of trail that traverses the wooded section is considered new development and
therefore we have included stormwater management for this section.
Standard 8. A plan to control construction-related impacts including erosion, sedimentation
and other pollutant sources during construction and land disturbance activities (construction
period erosion, sedimentation, and pollution prevention plan) shall be developed and
implemented.
The erosion and sediment control devices that will be implemented during construction of the
project are shown on the site plans. They include siltation socks adjacent to all resource areas
and designated stockpile/staging areas, retaining walls, and mulch surface treatment for
disturbed areas. Details are provided on the site plans.
Standard 9. A long-term operation and maintenance plan shall be developed and
implemented to ensure that stormwater management systems function as designed.
An operations and maintenance plan will be included in the Stormwater Pollution Prevention
Plan (SWPPP) that will be included in the Contract Documents.
Standard 10. All illicit discharges to the stormwater management system are prohibited.
There will be no illicit discharges to any resource area or stormwater management
system/structure as part of this project.
7.0 POST CONSTRUCTION OPERATION AND MAINTENANCE
In conformance with Standard 9 of the Stormwater Standards we offer the following
information for Post Construction Operation and Maintenance of the stormwater system
associated with the proposed Multi-Use Trail.
Notice of Intent Project Narrative
Northampton, MA
Horsley Witten Group, Inc.
Page 16 of 22
7.1 Responsible Parties
Stormwater Management System Owner:
City of Northampton
Planning & Sustainability
210 Main Street
Northampton, MA 01060
Phone: (413) 587-1265
www.NorthamptonMA.gov/PLAN
Party Responsible for Operation and Maintenance:
City of Northampton
Planning & Sustainability
210 Main Street
Northampton, MA 01060
Phone: (413) 587-1265
www.NorthamptonMA.gov/PLAN
7.2 General Maintenance Tasks
Mowing Outside Resource Areas – Herbaceous material along the shoulder of the Multi-Use
Trail within City-owned properties shall be mowed a minimum of four times per year or as
necessary. Mowing will be completed to maintain stormwater management system and
provide safe passage for trail users.
Bituminous Asphalt – Repair surface with patching as necessary. Inspect and document heaving
and cracking. Repair and seal pavement as necessary. Full pavement replacement shall be
conducted every 15-20 years or as determined necessary due to field conditions.
Signage, Fencing and Pedestrian Barriers – Inspection shall be conducted annually. Inspect
signage, fencing and pedestrian barriers for signs of tilting or stability issues and straighten as
necessary. Replace damaged or missing poles, signs or wood sections as necessary.
Curbing, Stone/Rock, Retaining Walls, and Riprap Stone – Inspection shall be conducted
annually. Remove and replace as necessary.
Pet Waste Management – Residents and visitors shall be encouraged to pick up after their pets
with signage along lawn areas. Waste shall be collected if found during other maintenance.
Solid Waste Management – Solid waste shall be removed from the site and disposed of
properly.
Snow Management/Removal Plan – Plowed snow collected from the Multi-Use Trail will be
deposited onto available pervious locations, and where available will be directed to stormwater
Notice of Intent Project Narrative
Northampton, MA
Horsley Witten Group, Inc.
Page 17 of 22
management systems for treatment. Plowing and salting of the trail is not anticipated but if
required will be conducted per the City requirements. Salt or de-icing agents shall not be
permitted in resource areas or resource area buffer zones.
Pavement Sweeping Schedules – Multi-Use Trail surfaces shall be swept annually after spring
snowmelt.
Litter/Trash Collection – Litter and trash collection from the Multi-Use Trail surface and
shoulders shall be conducted bi-annually or as required during other operation activity.
Soil/Surface Erosion Management – Soil erosion shall be monitored and remediated as
necessary. Soil washout into adjacent properties and/or resource areas shall be removed and
surface shall be re-established.
Graffiti Control – Graffiti shall be reported to the Police Department and removed with
environmentally safe detergent and water or repainted as necessary.
Vandalism – Vandalism shall be reported to the Police Department and repaired as necessary.
7.3 Stormwater Maintenance Tasks
All stormwater management and controls shall be operated and maintained appropriately
during regular operation of the site in the post-construction period. The stormwater control
system shall be regularly inspected to ensure proper performance. In general, the following
operation and maintenance provisions shall be provided:
All stormwater management systems shall be cleared of accumulated foreign debris,
including leaves and lawn cuttings;
All stormwater management systems shall be inspected for slope integrity and erosion
where applicable;
The snow removal plan shall be adhered to by the Owner;
A maintenance inspection report shall be made after each inspection. A copy of the
form to be completed by the inspector is attached;
All measures shall be maintained in good working order, if a repair is necessary, it shall
be initiated within 48 hours of discovery; and
All sediment and debris materials shall be disposed of properly in a pre-approved off-
site location.
The stormwater controls shall be inspected on a routine basis to prevent deficiencies in the
effectiveness of the systems due to sediment build-up, damage, or deterioration. Stormwater
controls shall be operated and maintained appropriately during regular operation of the site in
the post-construction period.
Notice of Intent Project Narrative
Northampton, MA
Horsley Witten Group, Inc.
Page 18 of 22
7.3.1 Drainage Structures - Culverts
All drainage culverts and other structures will be inspected at least twice annually (spring & fall)
to monitor for proper operation, litter and/or trash, and structural deterioration. The
structures will be cleaned when the depth of sediment exceeds one half the structure depth,
and repaired when required. Collected sediment will be disposed of properly in a pre-approved
off-site location.
7.3.2 Grass Swales and Filter Strips
Grass swales, channels, and filter strips will be inspected and cleaned of any debris and
sediment annually. Any erosion rutting or side slope stabilization issues will be reinforced with
loam and reseeded as necessary. The areas will be mowed and cleared of weeds and noxious
vegetation four times annually.
7.3.3 Stone Check Dams, Drainage Pipe and Riprap Outfalls
Stone check dams and riprap pipe outfalls shall be inspected annually. Remove any sediment
and debris found during inspection. Replace stone and repair surface erosion as necessary.
7.4 Estimated Operation and Maintenance Budget
The estimated average annual operating and maintenance budget for the project is as follows:
General Maintenance $1,250
($2,500/per mile)
Grass Swales/Channels $1,000
(lump sum)
Culverts $500
(lump sum)
Estimated Total Annual Maintenance Cost: $2,750
7.5 Operation and Maintenance Log Form
Operation and maintenance log form is provided below:
1
Operation and Maintenance Checklist
Rocky Hill Greenway Trail, Northampton, MA
210 Main Street
Northampton, MA 01060
Date:
Time:
Inspector:
Description Maintenance/Inspection Requirement Maintenance
Required?
(Y/N)
Mowing Outside Resource Areas Minimum four times per year
Bituminous Asphalt Pavement Inspect annually and repair as necessary
Signage, Fencing and Pedestrian
Barriers
Inspect annually and repair as necessary
Curbing, Stone/Rock, Retaining
Walls, and Riprap stone
Inspect annually and repair as necessary
Pet Waste Management As necessary when found
Solid Waste Management Waste removal per City requirements
Snow Removal As necessary per City requirements
Surface Sweeping Annually or as necessary
Litter/Trash Collection Bi-annually
Erosion Management Re-establish as necessary when found
Graffiti Control Report to Police Department and remove as
necessary
Vandalism Report to Police Department and repair as
necessary
Drainage Structures
Sediment/Debris Cleanout Remove all trash, debris, and sediment from
structures twice annually or as needed.
Structures Repair as necessary
2
Description Maintenance/Inspection Requirement Maintenance
Required?
(Y/N)
Stone check Dams and Riprap - Inspect annually and after major storms
Sediment Removal Remove sediment from riprap inlets and basins
when sediment buildup is > 3”
Side Slopes and Surface Repair any soil gullying and replenish stone on
barren areas as necessary
Inlet/Outlet Structures &
Spillways
Repair or replace riprap as necessary. Remove
sediment as needed. Remove trash and debris
Grass Channels and Swales
Sediment Removal Remove sediment when buildup is > 3”
Side Slopes and Surface Repair any soil gullying and revegetate/ replenish
topsoil on barren areas as necessary
Inlet/Outlet Structures &
Spillways
Mow grass four times annually to maintain grass
heights in the 4-6 inch range
Comments:
Actions to be taken:
Notice of Intent Project Narrative Horsley Witten Group, Inc.
Northampton, MA January 2018
Page 22 of 22
8.0 PROTECTION OF RARE SPECIES HABITAT
According to NHESP, the proposed project site, or a portion thereof, is located within Priority
Habitat 1337 (PH 1337) and Estimated Habitat 76 (EH 76) as indicated in the Massachusetts
Natural Heritage Atlas (13th Edition). This area is mapped for wood turtle (Glyptemys insculpta),
a Massachusetts Species of Special Concern. The wood turtle is protected under the
Massachusetts Endangered Species Act (MESA) (M.G.L. c. 131A) and it’s implementing
regulations (321 CMR 10.00).
The wood turtle is a medium-sized turtle (14-20 cm, 5.5-8 in) that can be readily recognized by
its sculpted shell and orange color on its legs and neck. The carapace is rough and each scale
rises upwards in an irregularly shaped pyramid of grooves and ridges. This species spends much
of its time in or near flowing waters. It can also be seen in forests and grasslands; however, this
species is rarely found more than 300 meters (1000 ft) from flowing water. This species is
typically active from mid-March through October. During the winter months the turtle
hibernates in flowing rivers and perennial streams. This species will also spend the hottest
parts of the summer in aestivation (prolonged dormancy or torpor during hot or dry periods).
Given the range of the wood turtle and the proximity of the proposed project to the unnamed
perennial stream and surrounding wetland areas, it will be necessary to implement a rare
species protection plan to ensure that the local population of this species is not adversely
impacted. The plan will ensure that encounters with this species during construction are
avoided, or depending upon the construction timing, relocated if found within the limit of work
prior to the start of construction. A draft Rare Species Protection Plan is provided as Appendix
B. The Applicant will work with NHESP during the MESA Project Review to finalize an approved
protection plan.
8.0 REFERENCES
City of Northampton Open Space, Recreation & Multi-Use Trail Plan (2018-2025)
Massachusetts Department of Transportation (MassDOT) 2012 GreenDOT Implementation
Document Path: H:\Projects\2015\15004 Northampton Rocky Hill Greenway Trail\GIS\Maps\150721_USGS For MESA Info Request_15004_2.mxd
USGS QuadrangleRocky Hill Greenway Multi-UseTrail (Bike Path)Northampton, MA±
Date: 1/19/2018
Legend *USGS Northampton 24K Quadrangle
0 500
1" = 500 feet Figure 1
Rocky Hill GreenwayMulti-Use Trail (approximate)
GROV E S TR EET
ROCKY HILL
R
OAD
UNITED METHODISTD
RIV
E
ICE PONDDRIVE
ICEPONDDRIVE
CHAPEL STREET
OLDWILSONROADEASTHAMPTONROADUNITEDM E THODISTDRIVE
Document Path: H:\Projects\2015\15004 Northampton Rocky Hill Greenway Trail\GIS\Maps\Aerial.mxd
Aerial PhotoRocky Hill Greenway Multi-UseTrail (Bike Path)Northampton, MA±
Date: 1/19/2018 Figure 21" = 500 feet
0 500
Legend
Rocky Hill GreenwayMulti-Use Trail (approximate)
Parcels
*Aerial Imagery - ESRI 2016
$#
$#
$#
$#
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
!
!
!
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
!
!
!!!
!
!!!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!!!!!!!!!!!!!!!!! !! ! !! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
!
!
!
!
!
!!!!!!!!!!!!!!
!
!
GROV E S TREET
ROCKY HILLROAD
UNITED METHODISTD
RIV
E
ICE PONDDRIVE
ICEPONDDRIVE
OLDWILSONROADCHAPEL STREET
UNITED
METHO
DIST
D
RIVE
UNITEDMETHODISTDRIV
E
EASTHAMPTON ROADDocument Path: H:\Projects\2015\15004 Northampton Rocky Hill Greenway Trail\GIS\Maps\Existing_Constraints_II.mxd
Existing ConstraintsRocky Hill Greenway Multi-Use Trail (Bike Path)Northampton, MA±
Date: 1/19/2018 Figure 4A1" = 500 feet
0 500
Legend
Rocky Hill GreenwayMulti - Use Trail (approximate)Parcels
!!!Powerline
Underground Storage Tanks
Hydrologic Connection
Marsh/Bog
Wooded marsh
Open Water
DEP Wetlands
$#
GROV E S TREET
R O C K Y HILL ROAD
UNITED METHODISTD
RIV
E
ICE PONDDRIVE
ICEPONDDRIVE
OLDWILSONROADC H A P E L S T R E E T
UNITED
METHO
DIST
D
RIVE
UNITEDMETHODISTDRIV
E
EASTHAMPTON ROADRocky HillConservationArea
Rocky HillGreenway
ManhanRail Trail
IcePond Cr
Ice PondConservationArea
ArcadiaWildlifeSanctuary
Pine GroveGolf Club
Northampton CityOf Rt 66 Apr
NorthamptonAgriculturalReserve
RayEllerbrookField
Document Path: H:\Projects\2015\15004 Northampton Rocky Hill Greenway Trail\GIS\Maps\Existing_Constraints.mxd
Existing ConstraintsRocky Hill Greenway Multi-Use Trail (Bike Path)Northampton, MA±
Date: 1/19/2018 Figure 4B1" = 500 feet
0 500
Legend Rocky Hill GreenwayMulti-Use Trail (approximate)
Parcels
NHESP Priority Habitats of Rare Species
NHESP Estimated Habitats of Rare Wildlife
MHC Historic Inventory Areas
Commonwealth of Massachusetts
Department of Agricultural Resources
Land Trust
Municipal
Private
MassGIS Protected and Recreational OpenSpace
ROCKY HILL ROAD
U
NI
TED
M
E
T
HODIS
TDRIVEUNITEDMETHODIST D RIVE311B
225A
316C
316B
253B
88B
741A
316B
225B
258B
441C
253C
30A
441D
30A 600
441B
14A
14A
750C
441B
Document Path: H:\Projects\2015\15004 Northampton Rocky Hill Greenway Trail\GIS\Maps\Soils.mxd
Soils MapRocky Hill Greenway Multi-UseTrail (Bike Path)Northampton, MA
Date: 1/19/2018 Figure 5
Legend
Rocky Hill GreenwayMulti-Use Trail(approximate)Parcels
*Soils - MassGIS 2012
14A, Scitico
225A, Belgrade
225B, Raynham
253B, Hinckley
253C, Hinckley
258B, Agawam
306C, Paxton
30A, Raynham
311B, Woodbridge
316B, Scituate
316C, Scituate
441B, Gloucester
441C, Gloucester
441D, Gloucester
600, Pits
741A, Amostown
750C, Windsor
88B, Ridgebury
±
1" = 300 feet
0 300
FIGURES & PHOTOS
Existing Site Conditions
Photo 1. Existing driveway servicing the natural gas pump station (looking north-west).
Photo 2. Existing stream bank (looking back up slope towards the existing driveway to the west).
Photo 3. Existing drainage ditch (looking west).
Photo 4. Unnamed perennial stream that flows from Rocky Hill Pond.
Photo 5. Existing wetland resource area as viewed from the culvert on the existing gravel path between the gas substations
and the overhead wiring crossing (looking west).
Photo 6. Existing pathway (looking south from below the overhead wire crossing).
Photo 7. Existing culvert located beneath the existing gravel path near wetland flags WF C6 and WF C7.
Photo 8. Location of the gas line. The proposed trail will cross near the gas substations.
Photo 9. Massachusetts Electric Company right-of-way for utility line access and maintenance. Proposed trail will cross
under the overhead wires.
Photo 10. Existing natural gas right-of-way. Mitigation area is proposed at the location of the debris pile shown in the left
side of the photo. View is looking east with the gas substations behind.
Photo 11. Proposed mitigation area with debris from previous clearing (looking south).
APPENDIX A
Wetland Mitigation Plan
Wetland Replacement Area
Northampton, Massachusetts
Horsley Witten Group, Inc.
Page 1 of 11
APPENDIX A
Wetland Replacement Plan
Rocky Hill Greenway Multi-Use Trail
Northampton, MA
March 2019
1.0 Introduction
The City of Northampton proposes the Rocky Hill Greenway Multi-Use Trail, a 2,630 linear foot
(0.50 mile) multi-use trail designed as a spur trail to connect two existing trails in the
neighborhood. The proposed project is located entirely within a City-owned parcel situated
between Rocky Hill Road (MA Route 66) and Easthampton Road (MA Route 10) in
Northampton, Massachusetts.
The proposed trail project will improve pedestrian and bicycle facilities by connecting the
residential areas along Rocky Hill Road and Ice Pond Drive to the New Haven and Northampton
Canal /Manhan Rail Trail. Bicyclists and pedestrians will benefit from being able to connect to
these corridors more directly and with limited interaction with vehicular traffic along these two
major roadways, providing a safer and more direct route to the existing rail trail. Additionally,
the proposed trail will provide access to an eventual multi-use trail serving the southwestern
and western half of the City, which is not currently served by any multi-use trails.
The proposed project will result in unavoidable impacts to Bordering Vegetated Wetland
(BVW). Alterations to BVW have been avoided and minimized to the extent practicable given
the site constraints; however, some BVW alteration is necessary to meet the project goals. The
proposed trail is sited to maximize the reuse of existing disturbed areas by reusing an existing
gravel access driveway within the Massachusetts Electric Company easement and following the
existing gravel footpath that currently traverses the BVW. Alternate trail locations would result
in even greater wetland impacts, as the BVW at this site consists of a series of hill-side seeps
along the slopes leading downgradient toward an unnamed perennial stream.
The Applicant proposes to provide wetland mitigation for unavoidable wetland impacts by
creating two wetland replacement areas totaling approximately 2,680 SF adjacent to the
proposed multi-use trail to the north/northeast of the existing gravel roadway, near wetland
flags A11-A12 and A13-A14 and flags B22-B23 where hillside seeps occur along a small drainage
channel. Details of the proposed mitigation areas are provided below and are shown on Sheet
Wetland Replacement Area
Northampton, Massachusetts
Horsley Witten Group, Inc.
Page 2 of 11
8 of the project plans prepared by Horsley Witten Group, Inc.(HW), entitled “Rocky Hill
Greenway Multi-Use Trail, Northampton, Massachusetts” (dated April 2016).
2.0 Wetland Replacement Details
Wetland replacement activities will generally include the removal of fill material and debris as
well as existing vegetation within the footprint of the two wetland replacement areas,
regrading and establishment of a connection to the existing intermittent channel and to the
hillside seeps, introduction of high-organic content soils, introduction of coarse woody debris or
boulders to improve habitat diversity, stabilization of disturbed soils with native seed mixes,
and revegetation of wetland areas with native plants to provide for a 75% native plant
community within all impacted areas after two growing seasons (as required under 310 CMR
10.55(4)(b)(6)). A qualified professional (Wetlands Specialist) will oversee all phases of the
wetland restoration efforts to ensure that requirements set forth in the proposed plan are met.
This wetland replacement plan was developed based upon observations made by HW of
existing conditions and is modeled after the Massachusetts Inland Wetland Replacement
Guidelines (March 2002) prepared by MassDEP). The replacement plan is also designed to
meet the regulatory criteria for wetland replacement set forth in 310 CMR 10.55(4)(b)(1)
through (7) as well as the provisions set forth by Massachusetts Department of Transportation
(MassDOT) for wetland replacement.
2.1 Wetland Specialist
As required by MassDOT and in accordance with the MassDOT specifications, a Wetland
Specialist will be retained to oversee all aspects of the wetland replacement. This individual
must have a minimum of 5-years experience in wetland replacement and will be responsible for
the following, including, but not limited to, finalizing the location of the replacement areas,
overseeing siltation controls, final grading, overseeing plantings, long-term monitoring of plant
growth and any invasives, and preparing and submitting monitoring reports. This individual will
also be granted the discretion to make slight field adjustments to ensure wetland replacement
success.
2.2 Erosion and Sedimentation Control
Prior to the commencement of any wetland replacement activities, a sedimentation and
erosion control barrier consisting of staked siltation fencing or staked silt socks will be installed
along the existing wetland boundary to protect the adjacent areas during earth-moving
activities. Erosion control barriers may also serve as the downgradient barrier for rare species
protection, and the locations and type of barriers will be coordinated with the Massachusetts
Natural Heritage and Endangered Species Program (NHESP) and the Conservation Commission.
Wetland Replacement Area
Northampton, Massachusetts
Horsley Witten Group, Inc.
Page 3 of 11
Erosion control barriers will be regularly inspected and properly maintained during and after
construction, including after every storm event, pursuant to specifications. Devices will be
removed at the end of the two-year monitoring period if vegetation has been successfully
established and sediments are stabilized.
2.3 Site Preparation and Excavation
Following installation of the sedimentation barrier, vegetation and soils within the proposed
replacement areas will be removed using mechanized equipment, creating two areas totaling of
approximately 2,680 SF of wetland area. Sediments and vegetation removed from this area will
be transported off-site to a suitable disposal facility; soils may be re-used on-site as fill material
if appropriate. Miscellaneous debris observed within the replacement areas will be removed
and disposed of off-site at a suitable facility. At the discretion of the Wetland Specialist,
suitable debris may be retained and stockpiled nearby for re-introduction in the replacement
areas following final grading and introduction of wetland soils to enhance wildlife habitat. The
replacement areas will be designed to mimic the topography of the adjacent BVW; the
elevations specified on the replacement BVW as shown on the attached plans are based on
observations of the adjacent natural wetlands.
2.4 Soils
Depending upon the condition of the underlying soils within the replacement areas, the areas
will either be lightly regraded and/or supplemented as necessary. Soils within the impacted
BVW will be reused as feasible, and will not be compacted or grubbed in order to retain soil
structure and the existing seedbank/rootstock. It is anticipated that these would need to be
supplemented to accommodate for the larger replacement areas.
If it is determined that soils need to be supplemented, the replacement areas would be over-
excavated by approximately 6-12 inches to allow for introduction of a layer of low permeability
soils and organic-rich sediments to support the proposed wetland plant community.
It will be ensured that the completed wetland replacement areas will tie into the adjacent
wetland grades to allow for an unrestricted hydrologic connection between the existing
wetland area and the replacement areas. Variable microtopography within the replacement
areas will be created to enhance habitat diversity and improve the hydrologic connection with
groundwater.
The organic-rich soils will be obtained from a commercial source, will be certified as weed-free,
and will be allowed to settle for a minimum of 48 hours prior to introducing plants.
Wetland Replacement Area
Northampton, Massachusetts
Horsley Witten Group, Inc.
Page 4 of 11
2.5 Wetland Replacement Area Plantings
Following placement of wetland soils and re-grading, native saplings, shrubs, and herbaceous
materials obtained from local nursery stock will be introduced within the replacement areas.
Proposed species were selected to be compatible with the natural wetland and designed to
enhance the existing vegetation community.
Proposed species for the wetland and adjacent buffer include, but are not limited to, red maple
(Acer rubrum), gray birch (Betula populifolia), iron wood (Carpinus caroliniana), highbush
blueberry (Vaccinium corymbosum), spicebush (Lindera benzoin), winterberry (Ilex verticillata),
arrowwood (Viburnum dentatum), nannyberry (Viburnum lentago), meadowsweet (Spiraea
latifolia), steeplebush (Spiraea tomentosa), cinnamon fern (Osmunda cinnamomea), sensitive
fern (Onoclea sensibilis), and Cardinal flower (Lobelia cardinalis) in accordance with the
specifications provided on the plans.
Tree species will be planted singly, while shrubs and container-grown herbaceous plants will be
planted in clusters to provide a mosaic of wetland plantings. Plantings will be installed near the
beginning or the end of the growing season for Hampshire County, MA (April 29 – October 12;
USDA, 2002), to ensure greater plant survival. Planting specifications are provided on Sheet C-
16 of the project plans. Proposed plantings are designed to provide a densely vegetated
forested swamp community upon full grow-out.
2.6 Stabilization with Wetland Seed Mix
A wetland seed mix will be introduced to stabilize disturbed soils within the wetland
replacement areas. Appropriate seed mixes that contain native seeds suitable for most
wetland mitigation sites are commercially available. A native seed mix, such as the “New
England Wetmix,” supplied by New England Wetland Plants, Inc. (www.newp.com) or
acceptable equivalent, will be introduced to stabilize the soil surface and enhance the wetland
plant community to ensure a 75% native wetland plant cover after two growing seasons.
According to the NEWP website, the New England Wetmix “contains a wide variety of native
seeds that are suitable for most wetland restoration sites that are not permanently flooded. All
species are best suited to moist ground as found in most wet meadows, scrub shrub, or
forested wetland restoration areas.” Following the planting of woody vegetation and fern
species, the seed mix will be introduced at the recommended application rate of 1 LB/2500 SF
(or 18 lbs/acre) and lightly raked in as recommended. All plantings will be watered during the
two to three week grow-in period as necessary.
Wetland Replacement Area
Northampton, Massachusetts
Horsley Witten Group, Inc.
Page 5 of 11
Species included within this wetland seed mix include: fox sedge (Carex vulpinoidea), lurid
sedge (Carex lurida), blunt broom sedge (Carex scoparia), sensitive fern (Onoclea sensibilis),
blue vervain (Verbena hastata), hop sedge (Carex lupulina), green bulrush (Scirpus atrovirens),
nodding bur marigold (Bidens cernua), bristly sedge (Carex comosa), fringed sedge (Carex
crinita), American mannagrass (Glyceria grandis), wool grass (Scirpus cyperinus), soft rush
(Juncus effusus), spotted Joe Pye weed (Eupatorium maculatum), boneset (Eupatorium
perfoliatum), mud plantain (Alisma subcordatum), New England aster (Aster novae-angliae),
rattlesnake grass (Glyceria canadensis), purplestem aster (Aster puniceus), soft stem bulrush
(Scirpus validus), blueflag (Iris versicolor), swamp milkweed (Asclepias incarnata), and monkey
flower (Mimulus ringens).
Upper reaches and side slopes along the existing access driveway/proposed trail will be
stabilized with a similar native seed mix such as the New England Conservation/Wildlife Mix.
According to the specification sheet, this seed mix “provides a permanent cover of grasses,
wildflowers, and legumes. For both good erosion control and wildlife habitat value. The mix is
designed to be a no maintenance seeding, and is appropriate for cut and fill slopes, detention
basin side slopes, and disturbed areas adjacent to commercial and residential projects” at the
recommended application rate of 25 lbs/acre (1,750 SF/lb). Species contained in this native
seed mix include: Virginia wild rye (Elymus virginicus), little bluestem (Schizachyrium
scoparium), big bluestem (Andropogon gerardii), creeping red fescue (Festuca rubra), switch
grass (Panicum virgatum), partridge pea (Chamaecrista fasciculata), deer tongue (Panicum
clandestinum), Indian grass (Sorghastrum nutans), ox eye sunflower (Heliopsis helianthoides),
common milkweed (Asclepias syriaca), spotted Joe Pye weed (Eupatorium maculatum), grass
leaved goldenrod (Euthamia graminifolia), blue vervain (Verbena hastata), New England aster
(Aster novae-angliae), and early goldenrod (Solidago juncea).
2.7 Invasive Species Management
HW observed the presence of occasional non-native invasive species during the initial site
survey, including, but not limited to, honeysuckle (Lonicera sp.), Oriental bittersweet (Celastrus
orbiculatus), and purple loosestrife (Lythrum salicaria). These species are capable of spreading
rapidly through and extensive seedbank, and/or rhizomes and can leave a long-lived seed bank
in the soil. As these species are considered either invasive, likely invasive, or potentially
invasive in Massachusetts, precautions will be taken to minimize the re-introduction or spread
of this species within the newly created wetland replacement areas. Any observed seedlings
found within the replacement areas during the grow-in and monitoring periods will be pulled by
hand, bagged, and disposed of properly.
Wetland Replacement Area
Northampton, Massachusetts
Horsley Witten Group, Inc.
Page 6 of 11
2.8 Monitoring
The wetland replacement areas will be monitored twice annually (approximately early to mid-
June and early to mid-September) for a minimum of two growing seasons to assess the relative
success of the replacement wetlands. Semi-annual site inspections conducted during late
spring and late summer will include an assessment of the relative health and vigor of the
planted vegetation, percent vegetative cover, percent cover of wetland species, and general
compliance with the performance standards.
Written reports detailing the findings of each monitoring event will be submitted on an annual
basis for two years, to the Northampton Conservation Commission. Photographic
documentation will be incorporated within the monitoring reports and photographs will be
taken from pre-established vantage points for consistency between monitoring events.
Recommendations will be made for the replacement of dead or dying plants, and any additional
remediation, as necessary.
3.0 Wetland Replacement Sequence of Construction
1). A qualified wetland professional, Wetland Specialist (WS), will be identified to monitor all
phases of construction of the replacement areas including, but not limited to, installation
of sedimentation control barriers, removal of fill materials and debris, excavation of sub-
base materials, soil augmentation, revegetation, reseeding, and implementation of the
monitoring plan. The WS will photo-document all phases of the restoration process and
provide reports to the Northampton Conservation Commission.
2). The WS will meet on-site with the Conservation Commission or its designated Agent to
review all components of the replacement areas prior to the start of wetland replacement
activities, to discuss any slight deviations that may need to be considered, and to establish
the reporting protocol and schedule.
3). Prior to construction of wetland replacement areas, wetland flags will be refreshed as
needed to define the boundary of the proposed wetland replacement areas as shown on
the site plans.
4). A sedimentation and erosion control barrier will be installed along the wetland boundary
in accordance with the manufacturer’s specifications, by a qualified contractor who is
experienced with installation of such sedimentation and erosion control barriers and who
is also generally experienced in wetland replacement practices.
Wetland Replacement Area
Northampton, Massachusetts
Horsley Witten Group, Inc.
Page 7 of 11
5). Debris within the restoration area will be removed using mechanized equipment such as a
bobcat. All debris will be disposed of at a proper facility in accordance with all state and
local laws, unless determined by the WS to be suitable for reuse in the mitigation areas.
6). Existing vegetation within the replacement areas will be cut, removed (or stockpiled for
reuse if suitable), and the root systems grubbed and removed.
7). The wetland replacement areas will be roughly excavated to a depth of six to 12 inches
below grade to ensure proper hydrological connection to groundwater within the final
grade of the replacement areas.
8). Clean, weed-free high-organic soils will be introduced within the replacement areas and
regraded, incorporating slight undulating pit-and-mound microtopography throughout to
mimic conditions within the undisturbed wetland. The exact configuration of the
replacement areas will be determined in the field by the WS in coordination with the
contractor. Sediments will be allowed to settle for a minimum of 48 hours prior to
planting.
9). A sedimentation and erosion control barrier will be installed along the upland areas and
the newly created wetland boundaries to protect the replacement areas during grow-in
period.
10). Following settling of introduced sediments, small rocks and/or fallen woody debris will be
placed within the replacement areas to provide added wildlife habitat. Additional habitat
features may be incorporated (e.g., turtle nesting habitat)
11). Nursery grown native vegetation will be planted in accordance with the planting
specifications, working from far interior portions of the restoration area outward.
Seeding with appropriate seed mix will occur in a similar manner, such that newly planted
vegetation and seed mix are not continually trampled once planted. All plantings will be
conducted by a qualified landscaper or other qualified professional who has experience
with wetland replacement areas. Any deviations from the specified planting list must be
approved by the WS.
12). Note: All plantings should occur during the growing season for Hampshire County,
Massachusetts, which occurs from April 29 through October 12 (USDA, 2002). Should the
replacement activities commence outside of that timeframe, excavation and soil
augmentation activities may occur at the discretion of the WS, however, plantings should
not occur. Instead the area may be temporarily stabilized with a non-persistent annual
rye or weed-free straw.
Wetland Replacement Area
Northampton, Massachusetts
Horsley Witten Group, Inc.
Page 8 of 11
13). All vegetation will be irrigated, particularly during dry periods, at the direction of the WS
overseeing the wetland replacement efforts.
14). The downgradient erosion control barrier will be removed from existing wetland
boundary once all soils are stabilized with vegetation.
15). The Contractor will inspect erosion and sediment control systems immediately after each
significant rainfall and daily during prolonged rainfall events, and will make repairs
immediately including the removal and disposal of accumulated sediments when they
reach approximately one-half the height of the control system, and when directed by the
WS. Control systems will be promptly replaced if fabric decomposes or system becomes
ineffective prior to the expected usable life.
16). The WS will monitor the wetland replacement areas twice annually during the growing
season for two growing seasons as required. Bi-annual site inspections will include an
assessment of the relative health and vigor of the introduced plants, percent cover of
vegetation, percent cover of wetland species, and general compliance with the
performance standards under 310 CMR 10.55(4)(b)(1 through 7). Randomly distributed
vegetation monitoring quadrats will be established within the wetland restoration areas
to provide consistent data regarding the relative success of the wetland plant community
and to confirm that they are meeting the 75 percent reestablishment standard. The WS
will establish photographic stations in strategic locations throughout the replacement
areas to ensure consistency among photo-documentation during the monitoring period.
Monitoring forms such as the sample provided in DEP handbook will be used. Annual
reports will be submitted to the Northampton Conservation Commission and to MassDEP.
4.0 Compliance with Wetlands Regulations
The proposed wetland replacement areas are designed to comply with the regulations at 310
CMR 10.55(4)(b) (1 through 7). The regulations state,
Notwithstanding the provisions of 310 CMR 10.55(4)(a), the issuing authority may issue an
Order of Conditions permitting work which results in the loss of up to 5000 square feet of
Bordering Vegetated Wetland when said area is replaced in accordance with the following
general conditions and any additional, specific conditions the issuing authority deems
necessary to ensure that the replacement area will function in a manner similar to the area
that will be lost:
1.the surface of the replacement area to be created ("the replacement area") shall be
equal to that of the area that will be lost ("the lost area");
Wetland Replacement Area
Northampton, Massachusetts
Horsley Witten Group, Inc.
Page 9 of 11
Combined, the proposed wetland replacement areas are 2,680 SF, providing an approximately
1.6:1 mitigation ratio to impacted BVW. This is slightly lower than the local mitigation
requirement, but is designed in an area currently strewn with debris that was determined to be
the most appropriate location for the proposed mitigation area. Additional mitigation would
result in the removal of undisturbed forested buffer zone, areas that are also important for the
protection of wetland resources.
2.the ground water and surface elevation of the replacement area shall be approximately
equal to that of the lost area;
3.the overall horizontal configuration and location of the replacement area with respect to
the bank shall be similar to that of the lost area;
4.the replacement area shall have an unrestricted hydraulic connection to the same water
body or waterway associated with the lost area;
The proposed replacement areas are located directly adjacent to two wetland segments and at
the same or similar elevations. They are designed to mimic the adjacent hill-side seep
wetlands.
5.the replacement area shall be located within the same general area of the water body or
reach of the waterway as the lost area;
The proposed wetland replacement areas are sited in an area directly adjacent to and north of
the proposed wetland crossing and within the same approximate distance to the nearby
unnamed perennial stream.
6.at least 75% of the surface of the replacement area shall be reestablished with
indigenous wetland plant species within two growing seasons, and prior to said
vegetative reestablishment any exposed soil in the replacement area shall be
temporarily stabilized to prevent erosion in accordance with standard U.S. Soil
Conservation Service methods; and
The wetland replacement areas are designed to achieve a 75 percent or greater native wetland
plant community after two growing seasons. Native plantings obtained from nursery stock are
the same or similar in composition to species observed within the undisturbed wetland. Native
seed mixes will ensure cover of native species as well as provide erosion control during the
grow-in period.
7.the replacement area shall be provided in a manner which is consistent with all other
General Performance Standards for each resource area in Part III of 310 CMR 10.00.
Wetland Replacement Area
Northampton, Massachusetts
Horsley Witten Group, Inc.
Page 10 of 11
In the exercise of this discretion, the issuing authority shall consider the magnitude of the
alteration and the significance of the project site to the interests identified in M.G.L. c. 131, § 40,
the extent to which adverse impacts can be avoided, the extent to which adverse impacts are
minimized, and the extent to which mitigation measures, including replacement or restoration,
are provided to contribute to the protection of the interests identified in M.G.L. c. 131, § 40.
The proposed wetland replacement area is designed to be consistent with all other
performance standards for freshwater wetlands, and will provide greater than 1:1 mitigation
for lost wetlands that are currently disturbed (e.g., the gravel footpath that traverses the
wetland area). Provisions have been incorporated to provide additional wildlife habitat
features, and a monitoring plan has been established to control the spread of invasive species
that have been observed in the vicinity. Further, a rare species protection plan has been
drafted for review and approval by NHESP to ensure no adverse effects to the local rare species
populations.
An alternatives analysis of the project has been performed and it has been determined that the
proposed project and preferred alternative is the only feasible alternative that will meet the
project purpose. Measures to further minimize wetland impacts include incorporation of
retaining walls in areas of the trail that abut or are in the vicinity of wetland resource areas.
New culverts are proposed to replaced undersized existing culverts or in locations that the trail
crossing existing drainage ways/ditches. Stormwater will be managed in accordance with the
Massachusetts Stormwater Management Standards, incorporating a vegetated swale to
manage runoff of new impervious surfaces.
Wetland Replacement Area
Northampton, Massachusetts
Horsley Witten Group, Inc.
Page 11 of 11
5.0 REFERENCES
Cowardin, Lewis M., V. Carter, F.C. Golet, and E.T. LaRoe. December 1979. Classification of
Wetlands and Deepwater Habitats of the United States. Fish and Wildlife Service U.S.
Department of the Interior, FWS/OBS-79/31.
Massachusetts Invasive Plant Advisory Group, Final Report: “The Evaluation of Non-Native Plant
Species for Invasiveness in Massachusetts,” February 28, 2005.
Mehrhoff, L. J., J. A. Silander, Jr., S. A. Leicht, E. S. Mosher and N. M. Tabak. 2003. IPANE:
Invasive Plant Atlas of New England. Department of Ecology & Evolutionary Biology,
University of Connecticut, Storrs, CT, USA (http://www.ipane.org).
New England Wetland Plants, Inc. 2015-2016 Wholesale Pricing Catalog
(http://www.newp.com).
USDA Growing Seasons, as cited in Massachusetts Inland Wetland Replacement Guidelines.
March 2002, Appendix B, Massachusetts Executive Office of Environmental Affairs,
Department of Environmental Protection, Guidance No. BRP/DWM/WetG02-2, 35 pp.