Eversource Northampton - Letter of Understanding and Sequencing Signed (1).pdf       March 1, 2022  File No. 01.0174841.00    Ms. Sarah LaValley, Conservation Agent  Northampton Conservation Commission  210 Main Street, Room 11  Northampton, Massachusetts 01060    Re:  Letter of Understanding and Proposed Sequencing Plan    Order of Conditions  MassDEP File No. 246‐0759  23 Randolph Place    Northampton, Massachusetts 01060    To Whom It May Concern:  As required in the above referenced Order of Conditions (OOC), GZA GeoEnvironmental, Inc. (GZA,  applicant),  Soil  X  Corp  (the  applicant’s  drilling  subcontractor),  and  Eversource  Gas  Company  of  Massachusetts  (EGMA,  owner)  acknowledge  that  we  have  received, read,  understood,  and  will  comply with the OOC.    As  required  by  Condition  21  of  the  OOC,  GZA  proposes  the  following  sequencing  for  erosion/sedimentation controls and construction:   Mobilize  to  the  Project  Area  and establish  soil  erosion  and  sediment  control  Best  Management Practices (BMPs), including  linear  erosion  control  barriers  (straw  wattle)  around areas of proposed ground disturbance.   Meet with Conservation Commission to review sediment and erosion control placement.    Drill borings and install monitoring wells. Monitoring wells will consist of 2‐inch diameter  schedule 40 PVC. Annular space around the well screens will be backfilled with clean filter  sand, followed by a one‐foot bentonite clay seal, followed by clean material to ground  surface.   Collect impacted soils, if encountered, into DOT‐rated 55‐gallon drums and transport offsite.    Restore areas of temporary disturbance and apply clean loam or topsoil as needed.   Apply  wetland  seed  mix  and  mulch  disturbed  wetland  areas  including  around  boring  locations and access.    Restore other temporary impacts, including gravel parking lot of 32 Smith Street property as  appropriate.   Meet with Conservation Commission to assess Site stabilization.   Demobilize from Site.    Return to Site after final stabilization to remove temporary BMPs, as appropriate.  GZA, Soil X Corp, and EGMA are currently assessing site conditions and scheduling issues and will  provide an anticipated timeline for the work as soon as it is known.   March 1, 2022  File No. 01.0174841.00  Letter of Understanding and Proposed Sequencing Plan  OOC – 23 Randolph Place  Page 2  LETTER OF UNDERSTANDING ACKNOWLEDGEMENTS   EGMA (Owner): __________________________________________________  By: Saskia Oosting, (Senior Environmental Specialist ‐ Remediation)  GZA (Applicant): ______________________________________________ By: David E. Leone, Associate Principal  Soil X Corp. (Applicant’s Subcontractor): ___________________________  By: Jacques Brouilette, (Project Manager)  J:\170,000‐179,999\174841\174841‐00.JLR\ECOLOGY\Permitting\Letter of Understanding and Sequencing Plan\Eversource Northampton ‐ Letter of Understanding and Sequencing.docx