Historic Northampton’s SHEPHERD BARN Budget
Full concrete foundation, concrete slab floor, and brick masonry
exterior $ 70,000
Replacement of portions of exterior clapboard siding 20,000
New barn flooring 2,500
Upgrade electrical and new lighting 28,000
Ventilation for artifact preservation and comfort 2,500
Reconstruction of ell with timber frame and saving original feature 30,000
Artifact mounts and installation 20,000
TOTAL REQUESTED $ 173,000
1.Full concrete foundation,
concrete slab floor, and brick
masonry exterior.
2. Replacement of portions of exterior clapboard siding.
3. New barn flooring.
4. Upgrade electrical and new lighting.
5. Ventilation for artifact preservation and comfort.
6. Reconstruction of ell (12’ x 16’) with timber frame and saving original feature.
Inside the ell
7. Artifact mounts and installation.
CPA PROJECT BUDGET 2022
(as of February 4, 2022)
Task HN
Share
CPA
Request Source of Cost
1.Site prep for foundation, full concrete foundation and poured concrete
floors $10,000 $70,000
Estimate (not to exceed) from
Dave Loven Excavating & Elite
Concrete & Paving
2.New exterior siding of main barn (pre-painted oil, clear cedar clapboard)5,000 20,000 Estimate from rk Miles
3.Locally-sourced hemlock plank flooring, sleepers
plus installation in main barn (with help of volunteers)2,500 Estimate from David Lashway,
Highland Lumber; Alicia Spence
4.Fans for ventilation & air circulation in main barn 30,000 2,500 Internet pricing
5.Full upgrade of electrical system, lighting design
for artifacts & installation (labor & materials) for entire project 25,769 28,000 Estimate from Wade Clement;
electrician & lighting designer
6.Demo & reconstruction of timber-frame,
fully accessible ell (does not include bathrooms)30,000
Estimates from contractors &
subs (Douglas Thayer, Alicia
Spence, DA Sullivan)
7.Construction & installation of artifact mounts 20,000 Estimates by Mike Hanke, Exhibit
Designer & HN
TOTALS $70,769 $173,000
Percent Contribution 29%71%