Loading...
CPA March 2 2022.pdfHistoric Northampton Shepherd Barn Project CPA Grant Fall 2021 Cleaning and consolidation of flaking paint of artifacts for barn exhibit Treating sign to create a non- rusting surface Two signs transported to conservator Historic Northampton’s SHEPHERD BARN Budget Full concrete foundation, concrete slab floor, and brick masonry exterior $ 70,000 Replacement of portions of exterior clapboard siding 20,000 New barn flooring 2,500 Upgrade electrical and new lighting 28,000 Ventilation for artifact preservation and comfort 2,500 Reconstruction of ell with timber frame and saving original feature 30,000 Artifact mounts and installation 20,000 TOTAL REQUESTED $ 173,000 1.Full concrete foundation, concrete slab floor, and brick masonry exterior. 2. Replacement of portions of exterior clapboard siding. 3. New barn flooring. 4. Upgrade electrical and new lighting. 5. Ventilation for artifact preservation and comfort. 6. Reconstruction of ell (12’ x 16’) with timber frame and saving original feature. Inside the ell 7. Artifact mounts and installation. CPA PROJECT BUDGET 2022 (as of February 4, 2022) Task HN Share CPA Request Source of Cost 1.Site prep for foundation, full concrete foundation and poured concrete floors $10,000 $70,000 Estimate (not to exceed) from Dave Loven Excavating & Elite Concrete & Paving 2.New exterior siding of main barn (pre-painted oil, clear cedar clapboard)5,000 20,000 Estimate from rk Miles 3.Locally-sourced hemlock plank flooring, sleepers plus installation in main barn (with help of volunteers)2,500 Estimate from David Lashway, Highland Lumber; Alicia Spence 4.Fans for ventilation & air circulation in main barn 30,000 2,500 Internet pricing 5.Full upgrade of electrical system, lighting design for artifacts & installation (labor & materials) for entire project 25,769 28,000 Estimate from Wade Clement; electrician & lighting designer 6.Demo & reconstruction of timber-frame, fully accessible ell (does not include bathrooms)30,000 Estimates from contractors & subs (Douglas Thayer, Alicia Spence, DA Sullivan) 7.Construction & installation of artifact mounts 20,000 Estimates by Mike Hanke, Exhibit Designer & HN TOTALS $70,769 $173,000 Percent Contribution 29%71%