Loading...
36 Hampden St 12-04-2021 Site 4 Details 4 of4 Conservation Sig.pdfCultec FieldD01 SectionEngineerThe Engineer Group, LLCPO Box 262Chesterfield MA 01012413-626-8167johnw@theengineergroup.com DetailsOwnerPioneer Development, LLC32 Perkins AveNorthampton, MA 01060413-320-7208Project36 Hampden StNorthampton, MA570263-7296Page4 of 4Date/Rev: 12 / 11 / 2019Lat: 42.30657° NLong: 72.63983° WNOTES1. All stormwater piping proposed to be SDR35 gasketed unless noted.2. Invert elevations noted as el XXX.X3. Piping within the stone field and membrane shall be perforated, installed holesdown. Conversion to gasketed solid pipe shall be done inside the membrane.4. Contractor to verify all component dimensions in field prior to install.D01 PlanSeparator Row Longitudinal SectionMH01 SectionMH02 SectionDC01MH01 PlanConduit or Piping BeddingInspection Port SectionDate/Rev: 05 / 26 / 2020Silt Sock DetailsntsStone Construction Entrance SectionDrain Inlet Protection, typntsNotes:1) See Cultec Separator Row details for additional specificationsCultec FieldSeparator Row End ViewSeparator Row Date/Rev: 07 / 07 / 2020Date/Rev: 08 / 29 / 2020DS01Sewer Connector and Clean OutSC01SC02Scale: 38'=1'-0"3/8" = 1'-0"CS Curb Stop/Box Water ConnectionDate/Rev: 11 / 14 / 2021ntsntsBike Rack DetailCurb Detail Curb at Rail Detail12/6/2021