Loading...
burts pit rd amendment.pdfMassachusetts Department of Environmental Protection Bureau of Resource Protection ­ Wetlands WPA Form 5 ­ Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File #:246­0724 eDEP Transaction #:1322939 City/Town:NORTHAMPTON A. General Information 1. Conservation Commission NORTHAMPTON 2. Issuance a.OOC b.Amended OOC 3. Applicant Details a. First Name DAVID b. Last Name VELETA c. Organization NORTHAMPTON DPW d. Mailing Address 125 LOCUST STREET e. City/Town NORTHAMPTON f. State MA g. Zip Code 01060 4. Property Owner a. First Name DAVID b. Last Name VELETA c. Organization NORTHAMPTON DPW d. Mailing Address 125 LOCUST STREET e. City/Town NORTHAMPTON f. State MA g. Zip Code 01060 5. Project Location a.Street Address BURTS PIT ROAD b.City/Town NORTHAMPTON c. Zip Code 01060 d. Assessors Map/Plat#NA e. Parcel/Lot#NA f. Latitude 42.31046N g. Longitude 72.69234W 6. Property recorded at the Registry of Deed for: a. County b. Certificate c. Book d. Page NA­ROW NA­ROW 7.Dates a. Date NOI Filed :9/4/2018 b. Date Public Hearing Closed:10/28/2021 c. Date Of Issuance:10/28/2021 8.Final Approved Plans and Other Documents a. Plan Title:b. Plan Prepared by:c. Plan Signed/Stamped by:d. Revised Final Date:e. Scale: REQUEST TO AMEND TO ORDER OF CONDITIONS FOR 246­0724 PACKET NORTHAMPTON DPW NA 10/18/2021 NA NOTICE OF INTENT ­ BURTS PIT ROAD CULVERT SLIPLINING PROJECT NORTHAMPTON DPW NA august 30, 2018 NA B. Findings 1.Findings pursuant to the Massachusetts Wetlands Protection Act Following the review of the the above­referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply: a.  Public Water Supply b.  Land Containing Shellfish c. Prevention of Pollution d.  Private Water Supply e.  Fisheries f.  Protection of Wildlife Habitat g.  Ground Water Supply h.  Storm Damage Prevention i.  Flood Control 2. Commission hereby finds the project, as proposed, is: Approved subject to: a.The following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. Denied because: b.The proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations. Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect interests of the Act, and a final Order of Conditions is issued. A description of the performance standards which the proposed work cannot meet is attached to this Order. c.The information submitted by the applicant is not sufficient to describe the site, the work or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the interests of the Act , and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). 3.Buffer Zone Impacts:Shortest distance between limit of project disturbance and the wetland resource area specified in 310CMR10.02(1)(a).a. linear feet Inland Resource Area Impacts:(For Approvals Only): Resource Area Proposed Alteration Permitted Alteration Proposed Replacement Permitted Replacement 4. Bank 735 a. linear feet b. linear feet 735 c. linear feet d. linear feet 5. Bordering Vegetated Wetland 1585 a. square feet b. square feet 1585 c. square feet d. square feet 6. Land under Waterbodies and Waterways 1703 a. square feet 1703 b. square feet 1582 c. square feet 1582 d. square feet 0 e. c/y dredged f. c/y dredged 7.Bordering Land Subject to Flooding 4023 a. square feet b. square feet 4023 c. square feet d. square feet Cubic Feet Flood Storage 15 e. cubic feet 15 f. cubic feet 0 g. cubic feet 0 h. cubic feet 8.Isolated Land Subject to Flooding a. square feet b. square feet Cubic Feet Flood Storage c. cubic feet d. cubic feet e. cubic feet f. cubic feet 9.Riverfront Area 5550 a. total sq. feet b. total sq. feet Sq ft within 100 ft c. square feet d. square feet e. square feet f. square feet Sq ft between 100­200 ft g. square feet h. square feet i. square feet j. square feet Coastal Resource Area Impacts: Resource Area Proposed Alteration Permitted Alteration Proposed Replacement Permitted Replacement 10.Designated Port Areas Indicate size under Land Under the Ocean, below 11.Land Under the Ocean a. square feet b. square feet c. c/y dredged d. c/y dredged 12.Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below 13.Coastal Beaches a. square feet b. square feet c. c/y nourishment d. c/y nourishment 14.Coastal Dunes a. square feet b. square feet c. c/y nourishment d. c/y nourishment 15.Coastal Banks a. linear feet b. linear feet 16.Rocky Intertidal Shores a. square feet b. square feet 17.Salt Marshes a. square feet b. square feet c. square feet d. square feet 18. Land Under Salt Ponds a. square feet b. square feet c. c/y dredged d. c/y dredged 19.Land Containing Shellfish a. square feet b. square feet c. square feet d. square feet 20.Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above c. c/y dredged d. c/y dredged 21.Land Subject to Coastal Storm Flowage a. square feet b. square feet 22.  Restoration/Enhancement (For Approvals Only) If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.5.c & d or B.17.c & d above, please entered the additional amount here. a. square feet of BVW b. square feet of Salt Marsh 23. Streams Crossing(s) If the project involves Stream Crossings, please enter the number of new stream crossings/number of replacement stream crossings. a. number of new stream crossings b. number of replacement stream crossings C. General Conditions Under Massachusetts Wetlands Protection Act The following conditions are only applicable to Approved projects 1.Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2.The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3.This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.  4.The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5.This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6.If this Order constitutes an Amended Order of Conditions, this Amended Order of Conditions does not exceed the issuance date of the original Final Order of Conditions. 7.Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 8.This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. 9.No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to the Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work.. 10.A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, " Massachusetts Department of Environmental Protection"  [or 'MassDEP"]  File Number :"246­0724" 11.Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before Mass DEP. 12.Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance (WPA Form 8A) to the Conservation Commission. 13.The work shall conform to the plans and special conditions referenced in this order. 14.Any change to the plans identified in Condition #13 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 15.The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. 16.This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 17.Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 18.All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS 19.The work associated with this Order(the "Project") is (1)  is not (2) subject to the Massachusetts Stormwater Standards. If the work is subject to Stormwater Standards, then the project is subject to the following conditions; a)All work, including site preparation, land disturbance, construction and redevelopment, shall be implemented in accordance with the construction period pollution prevention and erosion and sedimentation control plan and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Construction General Permit as required by Stormwater Standard 8. Construction period erosion, sedimentation and pollution control measures and best management practices (BMPs) shall remain in place until the site is fully stabilized. b)No stormwater runoff may be discharged to the post­construction stormwater BMPs unless and until a Registered Professional Engineer provides a Certification that: i. all construction period BMPs have been removed or will be removed by a date certain specified in the Certification. For any construction period BMPs intended to be converted to post construction operation for stormwater attenuation, recharge, and/or treatment, the conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation, including removal of all construction period sediment trapped in inlet and outlet control structures; ii.. as­built final construction BMP plans are included, signed and stamped by a Registered Professional Engineer, certifying the site is fully stabilized; iii. any illicit discharges to the stormwater management system have been removed, as per the requirements of Stormwater Standard 10; iv. all post­construction stormwater BMPs are installed in accordance with the plans (including all planting plans) approved by the issuing authority, and have been inspected to ensure that they are not damaged and that they are in proper working condition; v. any vegetation associated with post­construction BMPs is suitably established to withstand erosion. c)The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed responsibility for BMP maintenance. Prior to requesting a Certificate of Compliance, or Partial Certificate of Compliance, the responsible party (defined in General Condition 19(e)) shall execute and submit to the issuing authority an Operation and Maintenance Compliance Statement ("O&M Statement") for the Stormwater BMPs identifying the party responsible for implementing the stormwater BMP Operation and Maintenance Plan ("O&M Plan") and certifying the following: i.) the O&M Plan is complete and will be implemented upon receipt of the Certificate of Compliance, and ii.) the future responsible parties shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and implement the Stormwater Pollution Prevention Plan. d)Post­construction pollution prevention and source control shall be implemented in accordance with the long­ term pollution prevention plan section of the approved Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Multi­Sector General Permit. e)Unless and until another party accepts responsibility, the landowner, or owner of any drainage easement, assumes responsibility for maintaining each BMP. To overcome this presumption, the landowner of the property must submit to the issuing authority a legally binding agreement of record, acceptable to the issuing authority, evidencing that another entity has accepted responsibility for maintaining the BMP, and that the proposed responsible party shall be treated as a permittee for purposes of implementing the requirements of Conditions 19(f) through 19(k) with respect to that BMP. Any failure of the proposed responsible party to implement the requirements of Conditions 19(f) through 19(k) with respect to that BMP shall be a violation of the Order of Conditions or Certificate of Compliance. In the case of stormwater BMPs that are serving more than one lot, the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs. A plan and easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted along with the legally binding agreement. f)The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans, the O&M Plan, and the requirements of the Massachusetts Stormwater Handbook. g)The responsible party shall: 1. Maintain an operation and maintenance log for the last three (3) consecutive calendar years of inspections, repairs, maintenance and/or replacement of the stormwater management system or any part thereof, and disposal (for disposal the log shall indicate the type of material and the disposal location); 2. Make the maintenance log available to MassDEP and the Conservation Commission ("Commission") upon request; and 3. Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure that the responsible party is in compliance with the requirements for each BMP established in the O&M Plan approved by the issuing authority. h)All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable federal, state, and local laws and regulations. i)Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited. j)The stormwater management system approved in the Order of Conditions shall not be changed without the prior written approval of the issuing authority. k)Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit (as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1, Low Impact Development Site Design Credits) shall not be altered without the prior written approval of the issuing authority. l)Access for maintenance, repair, and/or replacement of BMPs shall not be withheld. Any fencing constructed around stormwater BMPs shall include access gates and shall be at least six inches above grade to allow for wildlife passage. Special Conditions: D. Findings Under Municipal Wetlands Bylaw or Ordinance 1.Is a municipal wetlands bylaw or ordinance applicable? Yes  No 2.The Conservation Commission hereby(check one that applies): a.DENIES the proposed work which cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: 1. Municipal Ordinance or Bylaw 2. Citation Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order or Conditions is issued. Which are necessary to comply with a municipal ordinance or bylaw: b.APPROVES the proposed work, subject to the following additional conditions. 1. Municipal Ordinance or Bylaw NORTHAMPTON WETLANDS ORDINANCE 2. Citation CHAPTER 337 3.The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. The special conditions relating to municipal ordinance or bylaw are as follows: PLEASE SEE ATTACHMENT A E. Signatures This Order is valid for three years from the date of issuance, unless otherwise specified pursuant to General Condition #4. If this is an Amended Order of Conditions, the Amended Order expires on the same date as the original Order of Conditions. 10/16/2018 1. Date of Original Order Please indicate the number of members who will sign this form. This Order must be signed by a majority of the Conservation Commission. 4 2. Number of Signers The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A copy also must be mailed or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office, if not filing electronically, and the property owner, if different from applicant. Signatures:jen smith kevin lake c. mason maronn randy krotowski  by hand delivery on by certified mail, return receipt requested, on Date Date F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Request for Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7) within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order, or providing written information to the Department prior to issuance of a Superseding Order.  The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act (M.G.L. c. 131, § 40), and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. G. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on this page shall be submitted to the Conservation Commission listed below.  NORTHAMPTON Conservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. To: NORTHAMPTON Conservation Commission Please be advised that the Order of Conditions for the Project at: BURTS PIT ROAD 246­0724 Project Location MassDEP File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner DAVID VELETA and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant Rev. 4/1/2010 Page 1 of 10 * ELECTRONIC COPY Massachusetts Department of EnvironmentalProtectionBureau of Resource Protection ­ WetlandsWPA Form 5 ­ Order of ConditionsMassachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP:MassDEP File #:246­0724eDEP Transaction #:1322939City/Town:NORTHAMPTONA. General Information1. Conservation Commission NORTHAMPTON2. Issuance a.OOC b.Amended OOC3. Applicant Detailsa. First Name DAVID b. Last Name VELETAc. Organization NORTHAMPTON DPWd. Mailing Address 125 LOCUST STREETe. City/Town NORTHAMPTON f. State MA g. Zip Code 010604. Property Ownera. First Name DAVID b. Last Name VELETAc. Organization NORTHAMPTON DPWd. Mailing Address 125 LOCUST STREETe. City/Town NORTHAMPTON f. State MA g. Zip Code 010605. Project Locationa.Street Address BURTS PIT ROADb.City/Town NORTHAMPTON c. Zip Code 01060d. AssessorsMap/Plat#NA e. Parcel/Lot#NAf. Latitude 42.31046N g. Longitude 72.69234W6. Property recorded at the Registry of Deed for:a. County b. Certificate c. Book d. PageNA­ROW NA­ROW7.Datesa. Date NOI Filed :9/4/2018 b. Date Public Hearing Closed:10/28/2021 c. Date Of Issuance:10/28/20218.Final Approved Plans and Other Documentsa. Plan Title:b. Plan Prepared by:c. Plan Signed/Stamped by:d. Revised Final Date:e. Scale:REQUEST TOAMEND TOORDER OFCONDITIONS FOR 246­0724 PACKET NORTHAMPTONDPW NA 10/18/2021 NA NOTICE OF INTENT ­ BURTS PIT ROAD CULVERT SLIPLINING PROJECT NORTHAMPTON DPW NA august 30, 2018 NA B. Findings 1.Findings pursuant to the Massachusetts Wetlands Protection Act Following the review of the the above­referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply: a.  Public Water Supply b.  Land Containing Shellfish c. Prevention of Pollution d.  Private Water Supply e.  Fisheries f.  Protection of Wildlife Habitat g.  Ground Water Supply h.  Storm Damage Prevention i.  Flood Control 2. Commission hereby finds the project, as proposed, is: Approved subject to: a.The following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. Denied because: b.The proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations. Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect interests of the Act, and a final Order of Conditions is issued. A description of the performance standards which the proposed work cannot meet is attached to this Order. c.The information submitted by the applicant is not sufficient to describe the site, the work or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the interests of the Act , and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). 3.Buffer Zone Impacts:Shortest distance between limit of project disturbance and the wetland resource area specified in 310CMR10.02(1)(a).a. linear feet Inland Resource Area Impacts:(For Approvals Only): Resource Area Proposed Alteration Permitted Alteration Proposed Replacement Permitted Replacement 4. Bank 735 a. linear feet b. linear feet 735 c. linear feet d. linear feet 5. Bordering Vegetated Wetland 1585 a. square feet b. square feet 1585 c. square feet d. square feet 6. Land under Waterbodies and Waterways 1703 a. square feet 1703 b. square feet 1582 c. square feet 1582 d. square feet 0 e. c/y dredged f. c/y dredged 7.Bordering Land Subject to Flooding 4023 a. square feet b. square feet 4023 c. square feet d. square feet Cubic Feet Flood Storage 15 e. cubic feet 15 f. cubic feet 0 g. cubic feet 0 h. cubic feet 8.Isolated Land Subject to Flooding a. square feet b. square feet Cubic Feet Flood Storage c. cubic feet d. cubic feet e. cubic feet f. cubic feet 9.Riverfront Area 5550 a. total sq. feet b. total sq. feet Sq ft within 100 ft c. square feet d. square feet e. square feet f. square feet Sq ft between 100­200 ft g. square feet h. square feet i. square feet j. square feet Coastal Resource Area Impacts: Resource Area Proposed Alteration Permitted Alteration Proposed Replacement Permitted Replacement 10.Designated Port Areas Indicate size under Land Under the Ocean, below 11.Land Under the Ocean a. square feet b. square feet c. c/y dredged d. c/y dredged 12.Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below 13.Coastal Beaches a. square feet b. square feet c. c/y nourishment d. c/y nourishment 14.Coastal Dunes a. square feet b. square feet c. c/y nourishment d. c/y nourishment 15.Coastal Banks a. linear feet b. linear feet 16.Rocky Intertidal Shores a. square feet b. square feet 17.Salt Marshes a. square feet b. square feet c. square feet d. square feet 18. Land Under Salt Ponds a. square feet b. square feet c. c/y dredged d. c/y dredged 19.Land Containing Shellfish a. square feet b. square feet c. square feet d. square feet 20.Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above c. c/y dredged d. c/y dredged 21.Land Subject to Coastal Storm Flowage a. square feet b. square feet 22.  Restoration/Enhancement (For Approvals Only) If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.5.c & d or B.17.c & d above, please entered the additional amount here. a. square feet of BVW b. square feet of Salt Marsh 23. Streams Crossing(s) If the project involves Stream Crossings, please enter the number of new stream crossings/number of replacement stream crossings. a. number of new stream crossings b. number of replacement stream crossings C. General Conditions Under Massachusetts Wetlands Protection Act The following conditions are only applicable to Approved projects 1.Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2.The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3.This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.  4.The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5.This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6.If this Order constitutes an Amended Order of Conditions, this Amended Order of Conditions does not exceed the issuance date of the original Final Order of Conditions. 7.Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 8.This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. 9.No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to the Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work.. 10.A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, " Massachusetts Department of Environmental Protection"  [or 'MassDEP"]  File Number :"246­0724" 11.Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before Mass DEP. 12.Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance (WPA Form 8A) to the Conservation Commission. 13.The work shall conform to the plans and special conditions referenced in this order. 14.Any change to the plans identified in Condition #13 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 15.The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. 16.This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 17.Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 18.All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS 19.The work associated with this Order(the "Project") is (1)  is not (2) subject to the Massachusetts Stormwater Standards. If the work is subject to Stormwater Standards, then the project is subject to the following conditions; a)All work, including site preparation, land disturbance, construction and redevelopment, shall be implemented in accordance with the construction period pollution prevention and erosion and sedimentation control plan and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Construction General Permit as required by Stormwater Standard 8. Construction period erosion, sedimentation and pollution control measures and best management practices (BMPs) shall remain in place until the site is fully stabilized. b)No stormwater runoff may be discharged to the post­construction stormwater BMPs unless and until a Registered Professional Engineer provides a Certification that: i. all construction period BMPs have been removed or will be removed by a date certain specified in the Certification. For any construction period BMPs intended to be converted to post construction operation for stormwater attenuation, recharge, and/or treatment, the conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation, including removal of all construction period sediment trapped in inlet and outlet control structures; ii.. as­built final construction BMP plans are included, signed and stamped by a Registered Professional Engineer, certifying the site is fully stabilized; iii. any illicit discharges to the stormwater management system have been removed, as per the requirements of Stormwater Standard 10; iv. all post­construction stormwater BMPs are installed in accordance with the plans (including all planting plans) approved by the issuing authority, and have been inspected to ensure that they are not damaged and that they are in proper working condition; v. any vegetation associated with post­construction BMPs is suitably established to withstand erosion. c)The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed responsibility for BMP maintenance. Prior to requesting a Certificate of Compliance, or Partial Certificate of Compliance, the responsible party (defined in General Condition 19(e)) shall execute and submit to the issuing authority an Operation and Maintenance Compliance Statement ("O&M Statement") for the Stormwater BMPs identifying the party responsible for implementing the stormwater BMP Operation and Maintenance Plan ("O&M Plan") and certifying the following: i.) the O&M Plan is complete and will be implemented upon receipt of the Certificate of Compliance, and ii.) the future responsible parties shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and implement the Stormwater Pollution Prevention Plan. d)Post­construction pollution prevention and source control shall be implemented in accordance with the long­ term pollution prevention plan section of the approved Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Multi­Sector General Permit. e)Unless and until another party accepts responsibility, the landowner, or owner of any drainage easement, assumes responsibility for maintaining each BMP. To overcome this presumption, the landowner of the property must submit to the issuing authority a legally binding agreement of record, acceptable to the issuing authority, evidencing that another entity has accepted responsibility for maintaining the BMP, and that the proposed responsible party shall be treated as a permittee for purposes of implementing the requirements of Conditions 19(f) through 19(k) with respect to that BMP. Any failure of the proposed responsible party to implement the requirements of Conditions 19(f) through 19(k) with respect to that BMP shall be a violation of the Order of Conditions or Certificate of Compliance. In the case of stormwater BMPs that are serving more than one lot, the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs. A plan and easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted along with the legally binding agreement. f)The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans, the O&M Plan, and the requirements of the Massachusetts Stormwater Handbook. g)The responsible party shall: 1. Maintain an operation and maintenance log for the last three (3) consecutive calendar years of inspections, repairs, maintenance and/or replacement of the stormwater management system or any part thereof, and disposal (for disposal the log shall indicate the type of material and the disposal location); 2. Make the maintenance log available to MassDEP and the Conservation Commission ("Commission") upon request; and 3. Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure that the responsible party is in compliance with the requirements for each BMP established in the O&M Plan approved by the issuing authority. h)All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable federal, state, and local laws and regulations. i)Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited. j)The stormwater management system approved in the Order of Conditions shall not be changed without the prior written approval of the issuing authority. k)Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit (as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1, Low Impact Development Site Design Credits) shall not be altered without the prior written approval of the issuing authority. l)Access for maintenance, repair, and/or replacement of BMPs shall not be withheld. Any fencing constructed around stormwater BMPs shall include access gates and shall be at least six inches above grade to allow for wildlife passage. Special Conditions: D. Findings Under Municipal Wetlands Bylaw or Ordinance 1.Is a municipal wetlands bylaw or ordinance applicable? Yes  No 2.The Conservation Commission hereby(check one that applies): a.DENIES the proposed work which cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: 1. Municipal Ordinance or Bylaw 2. Citation Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order or Conditions is issued. Which are necessary to comply with a municipal ordinance or bylaw: b.APPROVES the proposed work, subject to the following additional conditions. 1. Municipal Ordinance or Bylaw NORTHAMPTON WETLANDS ORDINANCE 2. Citation CHAPTER 337 3.The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. The special conditions relating to municipal ordinance or bylaw are as follows: PLEASE SEE ATTACHMENT A E. Signatures This Order is valid for three years from the date of issuance, unless otherwise specified pursuant to General Condition #4. If this is an Amended Order of Conditions, the Amended Order expires on the same date as the original Order of Conditions. 10/16/2018 1. Date of Original Order Please indicate the number of members who will sign this form. This Order must be signed by a majority of the Conservation Commission. 4 2. Number of Signers The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A copy also must be mailed or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office, if not filing electronically, and the property owner, if different from applicant. Signatures:jen smith kevin lake c. mason maronn randy krotowski  by hand delivery on by certified mail, return receipt requested, on Date Date F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Request for Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7) within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order, or providing written information to the Department prior to issuance of a Superseding Order.  The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act (M.G.L. c. 131, § 40), and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. G. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on this page shall be submitted to the Conservation Commission listed below.  NORTHAMPTON Conservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. To: NORTHAMPTON Conservation Commission Please be advised that the Order of Conditions for the Project at: BURTS PIT ROAD 246­0724 Project Location MassDEP File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner DAVID VELETA and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant Rev. 4/1/2010 Massachusetts Department of Environmental Protection Bureau of Resource Protection ­ Wetlands WPA Form 5 ­ Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File #:246­0724 eDEP Transaction #:1322939 City/Town:NORTHAMPTON Page 2 of 10 * ELECTRONIC COPY Massachusetts Department of EnvironmentalProtectionBureau of Resource Protection ­ WetlandsWPA Form 5 ­ Order of ConditionsMassachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP:MassDEP File #:246­0724eDEP Transaction #:1322939City/Town:NORTHAMPTONA. General Information1. Conservation Commission NORTHAMPTON2. Issuance a.OOC b.Amended OOC3. Applicant Detailsa. First Name DAVID b. Last Name VELETAc. Organization NORTHAMPTON DPWd. Mailing Address 125 LOCUST STREETe. City/Town NORTHAMPTON f. State MA g. Zip Code 010604. Property Ownera. First Name DAVID b. Last Name VELETAc. Organization NORTHAMPTON DPWd. Mailing Address 125 LOCUST STREETe. City/Town NORTHAMPTON f. State MA g. Zip Code 010605. Project Locationa.Street Address BURTS PIT ROADb.City/Town NORTHAMPTON c. Zip Code 01060d. AssessorsMap/Plat#NA e. Parcel/Lot#NAf. Latitude 42.31046N g. Longitude 72.69234W6. Property recorded at the Registry of Deed for:a. County b. Certificate c. Book d. PageNA­ROW NA­ROW7.Datesa. Date NOI Filed :9/4/2018 b. Date Public Hearing Closed:10/28/2021 c. Date Of Issuance:10/28/20218.Final Approved Plans and Other Documentsa. Plan Title:b. Plan Prepared by:c. Plan Signed/Stamped by:d. Revised Final Date:e. Scale:REQUEST TOAMEND TOORDER OFCONDITIONS FOR246­0724 PACKET NORTHAMPTONDPW NA 10/18/2021 NANOTICE OFINTENT ­ BURTSPIT ROADCULVERTSLIPLININGPROJECT NORTHAMPTONDPW NA august 30, 2018 NAB. Findings1.Findings pursuant to the Massachusetts Wetlands Protection ActFollowing the review of the the above­referenced Notice of Intent and based on the information provided in thisapplication and presented at the public hearing, this Commission finds that the areas in which work is proposed issignificant to the following interests of the Wetlands Protection Act.Check all that apply:a.  Public Water Supply b.  Land Containing Shellfish c. Prevention of Pollutiond.  Private Water Supply e.  Fisheries f.  Protection of Wildlife Habitatg.  Ground Water Supply h.  Storm Damage Prevention i.  Flood Control2. Commission hereby finds the project, as proposed, is:Approved subject to:a.The following conditions which are necessary in accordance with the performance standards set forth in thewetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice ofIntent referenced above, the following General Conditions, and any other special conditions attached to thisOrder. To the extent that the following conditions modify or differ from the plans, specifications, or otherproposals submitted with the Notice of Intent, these conditions shall control.Denied because:b.The proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations.Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted whichprovides measures which are adequate to protect interests of the Act, and a final Order of Conditions is issued. Adescription of the performance standards which the proposed work cannot meet is attached to thisOrder.c.The information submitted by the applicant is not sufficient to describe the site, the work or the effect of thework on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not goforward unless and until a revised Notice of Intent is submitted which provides sufficient information andincludes measures which are adequate to protect the interests of the Act , and a final Order of Conditions isissued. A description of the specific information which is lacking and why it is necessary is attached tothis Order as per 310 CMR 10.05(6)(c).3.Buffer Zone Impacts:Shortest distance between limit of project disturbance and the wetlandresource area specified in 310CMR10.02(1)(a).a. linear feetInland Resource Area Impacts:(For Approvals Only):Resource Area ProposedAlteration PermittedAlteration ProposedReplacement PermittedReplacement 4. Bank 735 a. linear feet b. linear feet 735 c. linear feet d. linear feet 5. Bordering Vegetated Wetland 1585 a. square feet b. square feet 1585 c. square feet d. square feet 6. Land under Waterbodies and Waterways 1703 a. square feet 1703 b. square feet 1582 c. square feet 1582 d. square feet 0 e. c/y dredged f. c/y dredged 7.Bordering Land Subject to Flooding 4023 a. square feet b. square feet 4023 c. square feet d. square feet Cubic Feet Flood Storage 15 e. cubic feet 15 f. cubic feet 0 g. cubic feet 0 h. cubic feet 8.Isolated Land Subject to Flooding a. square feet b. square feet Cubic Feet Flood Storage c. cubic feet d. cubic feet e. cubic feet f. cubic feet 9.Riverfront Area 5550 a. total sq. feet b. total sq. feet Sq ft within 100 ft c. square feet d. square feet e. square feet f. square feet Sq ft between 100­200 ft g. square feet h. square feet i. square feet j. square feet Coastal Resource Area Impacts: Resource Area Proposed Alteration Permitted Alteration Proposed Replacement Permitted Replacement 10.Designated Port Areas Indicate size under Land Under the Ocean, below 11.Land Under the Ocean a. square feet b. square feet c. c/y dredged d. c/y dredged 12.Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below 13.Coastal Beaches a. square feet b. square feet c. c/y nourishment d. c/y nourishment 14.Coastal Dunes a. square feet b. square feet c. c/y nourishment d. c/y nourishment 15.Coastal Banks a. linear feet b. linear feet 16.Rocky Intertidal Shores a. square feet b. square feet 17.Salt Marshes a. square feet b. square feet c. square feet d. square feet 18. Land Under Salt Ponds a. square feet b. square feet c. c/y dredged d. c/y dredged 19.Land Containing Shellfish a. square feet b. square feet c. square feet d. square feet 20.Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above c. c/y dredged d. c/y dredged 21.Land Subject to Coastal Storm Flowage a. square feet b. square feet 22.  Restoration/Enhancement (For Approvals Only) If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.5.c & d or B.17.c & d above, please entered the additional amount here. a. square feet of BVW b. square feet of Salt Marsh 23. Streams Crossing(s) If the project involves Stream Crossings, please enter the number of new stream crossings/number of replacement stream crossings. a. number of new stream crossings b. number of replacement stream crossings C. General Conditions Under Massachusetts Wetlands Protection Act The following conditions are only applicable to Approved projects 1.Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2.The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3.This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.  4.The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5.This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6.If this Order constitutes an Amended Order of Conditions, this Amended Order of Conditions does not exceed the issuance date of the original Final Order of Conditions. 7.Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 8.This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. 9.No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to the Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work.. 10.A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, " Massachusetts Department of Environmental Protection"  [or 'MassDEP"]  File Number :"246­0724" 11.Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before Mass DEP. 12.Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance (WPA Form 8A) to the Conservation Commission. 13.The work shall conform to the plans and special conditions referenced in this order. 14.Any change to the plans identified in Condition #13 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 15.The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. 16.This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 17.Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 18.All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS 19.The work associated with this Order(the "Project") is (1)  is not (2) subject to the Massachusetts Stormwater Standards. If the work is subject to Stormwater Standards, then the project is subject to the following conditions; a)All work, including site preparation, land disturbance, construction and redevelopment, shall be implemented in accordance with the construction period pollution prevention and erosion and sedimentation control plan and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Construction General Permit as required by Stormwater Standard 8. Construction period erosion, sedimentation and pollution control measures and best management practices (BMPs) shall remain in place until the site is fully stabilized. b)No stormwater runoff may be discharged to the post­construction stormwater BMPs unless and until a Registered Professional Engineer provides a Certification that: i. all construction period BMPs have been removed or will be removed by a date certain specified in the Certification. For any construction period BMPs intended to be converted to post construction operation for stormwater attenuation, recharge, and/or treatment, the conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation, including removal of all construction period sediment trapped in inlet and outlet control structures; ii.. as­built final construction BMP plans are included, signed and stamped by a Registered Professional Engineer, certifying the site is fully stabilized; iii. any illicit discharges to the stormwater management system have been removed, as per the requirements of Stormwater Standard 10; iv. all post­construction stormwater BMPs are installed in accordance with the plans (including all planting plans) approved by the issuing authority, and have been inspected to ensure that they are not damaged and that they are in proper working condition; v. any vegetation associated with post­construction BMPs is suitably established to withstand erosion. c)The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed responsibility for BMP maintenance. Prior to requesting a Certificate of Compliance, or Partial Certificate of Compliance, the responsible party (defined in General Condition 19(e)) shall execute and submit to the issuing authority an Operation and Maintenance Compliance Statement ("O&M Statement") for the Stormwater BMPs identifying the party responsible for implementing the stormwater BMP Operation and Maintenance Plan ("O&M Plan") and certifying the following: i.) the O&M Plan is complete and will be implemented upon receipt of the Certificate of Compliance, and ii.) the future responsible parties shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and implement the Stormwater Pollution Prevention Plan. d)Post­construction pollution prevention and source control shall be implemented in accordance with the long­ term pollution prevention plan section of the approved Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Multi­Sector General Permit. e)Unless and until another party accepts responsibility, the landowner, or owner of any drainage easement, assumes responsibility for maintaining each BMP. To overcome this presumption, the landowner of the property must submit to the issuing authority a legally binding agreement of record, acceptable to the issuing authority, evidencing that another entity has accepted responsibility for maintaining the BMP, and that the proposed responsible party shall be treated as a permittee for purposes of implementing the requirements of Conditions 19(f) through 19(k) with respect to that BMP. Any failure of the proposed responsible party to implement the requirements of Conditions 19(f) through 19(k) with respect to that BMP shall be a violation of the Order of Conditions or Certificate of Compliance. In the case of stormwater BMPs that are serving more than one lot, the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs. A plan and easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted along with the legally binding agreement. f)The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans, the O&M Plan, and the requirements of the Massachusetts Stormwater Handbook. g)The responsible party shall: 1. Maintain an operation and maintenance log for the last three (3) consecutive calendar years of inspections, repairs, maintenance and/or replacement of the stormwater management system or any part thereof, and disposal (for disposal the log shall indicate the type of material and the disposal location); 2. Make the maintenance log available to MassDEP and the Conservation Commission ("Commission") upon request; and 3. Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure that the responsible party is in compliance with the requirements for each BMP established in the O&M Plan approved by the issuing authority. h)All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable federal, state, and local laws and regulations. i)Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited. j)The stormwater management system approved in the Order of Conditions shall not be changed without the prior written approval of the issuing authority. k)Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit (as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1, Low Impact Development Site Design Credits) shall not be altered without the prior written approval of the issuing authority. l)Access for maintenance, repair, and/or replacement of BMPs shall not be withheld. Any fencing constructed around stormwater BMPs shall include access gates and shall be at least six inches above grade to allow for wildlife passage. Special Conditions: D. Findings Under Municipal Wetlands Bylaw or Ordinance 1.Is a municipal wetlands bylaw or ordinance applicable? Yes  No 2.The Conservation Commission hereby(check one that applies): a.DENIES the proposed work which cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: 1. Municipal Ordinance or Bylaw 2. Citation Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order or Conditions is issued. Which are necessary to comply with a municipal ordinance or bylaw: b.APPROVES the proposed work, subject to the following additional conditions. 1. Municipal Ordinance or Bylaw NORTHAMPTON WETLANDS ORDINANCE 2. Citation CHAPTER 337 3.The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. The special conditions relating to municipal ordinance or bylaw are as follows: PLEASE SEE ATTACHMENT A E. Signatures This Order is valid for three years from the date of issuance, unless otherwise specified pursuant to General Condition #4. If this is an Amended Order of Conditions, the Amended Order expires on the same date as the original Order of Conditions. 10/16/2018 1. Date of Original Order Please indicate the number of members who will sign this form. This Order must be signed by a majority of the Conservation Commission. 4 2. Number of Signers The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A copy also must be mailed or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office, if not filing electronically, and the property owner, if different from applicant. Signatures:jen smith kevin lake c. mason maronn randy krotowski  by hand delivery on by certified mail, return receipt requested, on Date Date F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Request for Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7) within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order, or providing written information to the Department prior to issuance of a Superseding Order.  The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act (M.G.L. c. 131, § 40), and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. G. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on this page shall be submitted to the Conservation Commission listed below.  NORTHAMPTON Conservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. To: NORTHAMPTON Conservation Commission Please be advised that the Order of Conditions for the Project at: BURTS PIT ROAD 246­0724 Project Location MassDEP File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner DAVID VELETA and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant Rev. 4/1/2010 Massachusetts Department of Environmental Protection Bureau of Resource Protection ­ Wetlands WPA Form 5 ­ Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File #:246­0724 eDEP Transaction #:1322939 City/Town:NORTHAMPTON Page 3 of 10 * ELECTRONIC COPY Massachusetts Department of EnvironmentalProtectionBureau of Resource Protection ­ WetlandsWPA Form 5 ­ Order of ConditionsMassachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP:MassDEP File #:246­0724eDEP Transaction #:1322939City/Town:NORTHAMPTONA. General Information1. Conservation Commission NORTHAMPTON2. Issuance a.OOC b.Amended OOC3. Applicant Detailsa. First Name DAVID b. Last Name VELETAc. Organization NORTHAMPTON DPWd. Mailing Address 125 LOCUST STREETe. City/Town NORTHAMPTON f. State MA g. Zip Code 010604. Property Ownera. First Name DAVID b. Last Name VELETAc. Organization NORTHAMPTON DPWd. Mailing Address 125 LOCUST STREETe. City/Town NORTHAMPTON f. State MA g. Zip Code 010605. Project Locationa.Street Address BURTS PIT ROADb.City/Town NORTHAMPTON c. Zip Code 01060d. AssessorsMap/Plat#NA e. Parcel/Lot#NAf. Latitude 42.31046N g. Longitude 72.69234W6. Property recorded at the Registry of Deed for:a. County b. Certificate c. Book d. PageNA­ROW NA­ROW7.Datesa. Date NOI Filed :9/4/2018 b. Date Public Hearing Closed:10/28/2021 c. Date Of Issuance:10/28/20218.Final Approved Plans and Other Documentsa. Plan Title:b. Plan Prepared by:c. Plan Signed/Stamped by:d. Revised Final Date:e. Scale:REQUEST TOAMEND TOORDER OFCONDITIONS FOR246­0724 PACKET NORTHAMPTONDPW NA 10/18/2021 NANOTICE OFINTENT ­ BURTSPIT ROADCULVERTSLIPLININGPROJECT NORTHAMPTONDPW NA august 30, 2018 NAB. Findings1.Findings pursuant to the Massachusetts Wetlands Protection ActFollowing the review of the the above­referenced Notice of Intent and based on the information provided in thisapplication and presented at the public hearing, this Commission finds that the areas in which work is proposed issignificant to the following interests of the Wetlands Protection Act.Check all that apply:a.  Public Water Supply b.  Land Containing Shellfish c. Prevention of Pollutiond.  Private Water Supply e.  Fisheries f.  Protection of Wildlife Habitatg.  Ground Water Supply h.  Storm Damage Prevention i.  Flood Control2. Commission hereby finds the project, as proposed, is:Approved subject to:a.The following conditions which are necessary in accordance with the performance standards set forth in thewetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice ofIntent referenced above, the following General Conditions, and any other special conditions attached to thisOrder. To the extent that the following conditions modify or differ from the plans, specifications, or otherproposals submitted with the Notice of Intent, these conditions shall control.Denied because:b.The proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations.Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted whichprovides measures which are adequate to protect interests of the Act, and a final Order of Conditions is issued. Adescription of the performance standards which the proposed work cannot meet is attached to thisOrder.c.The information submitted by the applicant is not sufficient to describe the site, the work or the effect of thework on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not goforward unless and until a revised Notice of Intent is submitted which provides sufficient information andincludes measures which are adequate to protect the interests of the Act , and a final Order of Conditions isissued. A description of the specific information which is lacking and why it is necessary is attached tothis Order as per 310 CMR 10.05(6)(c).3.Buffer Zone Impacts:Shortest distance between limit of project disturbance and the wetlandresource area specified in 310CMR10.02(1)(a).a. linear feetInland Resource Area Impacts:(For Approvals Only):Resource Area ProposedAlteration PermittedAlteration ProposedReplacement PermittedReplacement4. Bank 735a. linear feet b. linear feet 735c. linear feet d. linear feet5. Bordering Vegetated Wetland 1585a. square feet b. square feet 1585c. square feet d. square feet6. Land under Waterbodies and Waterways 1703a. square feet 1703b. square feet 1582c. square feet 1582d. square feet0e. c/y dredged f. c/y dredged7.Bordering Land Subject to Flooding 4023a. square feet b. square feet 4023c. square feet d. square feetCubic Feet Flood Storage 15e. cubic feet 15f. cubic feet 0g. cubic feet 0h. cubic feet8.Isolated Land Subject to Flooding a. square feet b. square feetCubic Feet Flood Storage c. cubic feet d. cubic feet e. cubic feet f. cubic feet9.Riverfront Area 5550a. total sq. feet b. total sq. feetSq ft within 100 ft c. square feet d. square feet e. square feet f. square feetSq ft between 100­200 ft g. square feet h. square feet i. square feet j. square feetCoastal Resource Area Impacts:Resource Area ProposedAlteration PermittedAlteration ProposedReplacement PermittedReplacement10.Designated Port Areas Indicate size under Land Under the Ocean, below11.Land Under the Ocean a. square feet b. square feetc. c/y dredged d. c/y dredged12.Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below13.Coastal Beaches a. square feet b. square feet c. c/y nourishment d. c/y nourishment14.Coastal Dunes a. square feet b. square feet c. c/y nourishment d. c/y nourishment15.Coastal Banks a. linear feet b. linear feet 16.Rocky Intertidal Shores a. square feet b. square feet 17.Salt Marshes a. square feet b. square feet c. square feet d. square feet 18. Land Under Salt Ponds a. square feet b. square feet c. c/y dredged d. c/y dredged 19.Land Containing Shellfish a. square feet b. square feet c. square feet d. square feet 20.Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above c. c/y dredged d. c/y dredged 21.Land Subject to Coastal Storm Flowage a. square feet b. square feet 22.  Restoration/Enhancement (For Approvals Only) If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.5.c & d or B.17.c & d above, please entered the additional amount here. a. square feet of BVW b. square feet of Salt Marsh 23. Streams Crossing(s) If the project involves Stream Crossings, please enter the number of new stream crossings/number of replacement stream crossings. a. number of new stream crossings b. number of replacement stream crossings C. General Conditions Under Massachusetts Wetlands Protection Act The following conditions are only applicable to Approved projects 1.Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2.The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3.This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.  4.The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5.This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6.If this Order constitutes an Amended Order of Conditions, this Amended Order of Conditions does not exceed the issuance date of the original Final Order of Conditions. 7.Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 8.This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. 9.No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to the Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work.. 10.A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, " Massachusetts Department of Environmental Protection"  [or 'MassDEP"]  File Number :"246­0724" 11.Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before Mass DEP. 12.Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance (WPA Form 8A) to the Conservation Commission. 13.The work shall conform to the plans and special conditions referenced in this order. 14.Any change to the plans identified in Condition #13 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 15.The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. 16.This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 17.Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 18.All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS 19.The work associated with this Order(the "Project") is (1)  is not (2) subject to the Massachusetts Stormwater Standards. If the work is subject to Stormwater Standards, then the project is subject to the following conditions; a)All work, including site preparation, land disturbance, construction and redevelopment, shall be implemented in accordance with the construction period pollution prevention and erosion and sedimentation control plan and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Construction General Permit as required by Stormwater Standard 8. Construction period erosion, sedimentation and pollution control measures and best management practices (BMPs) shall remain in place until the site is fully stabilized. b)No stormwater runoff may be discharged to the post­construction stormwater BMPs unless and until a Registered Professional Engineer provides a Certification that: i. all construction period BMPs have been removed or will be removed by a date certain specified in the Certification. For any construction period BMPs intended to be converted to post construction operation for stormwater attenuation, recharge, and/or treatment, the conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation, including removal of all construction period sediment trapped in inlet and outlet control structures; ii.. as­built final construction BMP plans are included, signed and stamped by a Registered Professional Engineer, certifying the site is fully stabilized; iii. any illicit discharges to the stormwater management system have been removed, as per the requirements of Stormwater Standard 10; iv. all post­construction stormwater BMPs are installed in accordance with the plans (including all planting plans) approved by the issuing authority, and have been inspected to ensure that they are not damaged and that they are in proper working condition; v. any vegetation associated with post­construction BMPs is suitably established to withstand erosion. c)The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed responsibility for BMP maintenance. Prior to requesting a Certificate of Compliance, or Partial Certificate of Compliance, the responsible party (defined in General Condition 19(e)) shall execute and submit to the issuing authority an Operation and Maintenance Compliance Statement ("O&M Statement") for the Stormwater BMPs identifying the party responsible for implementing the stormwater BMP Operation and Maintenance Plan ("O&M Plan") and certifying the following: i.) the O&M Plan is complete and will be implemented upon receipt of the Certificate of Compliance, and ii.) the future responsible parties shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and implement the Stormwater Pollution Prevention Plan. d)Post­construction pollution prevention and source control shall be implemented in accordance with the long­ term pollution prevention plan section of the approved Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Multi­Sector General Permit. e)Unless and until another party accepts responsibility, the landowner, or owner of any drainage easement, assumes responsibility for maintaining each BMP. To overcome this presumption, the landowner of the property must submit to the issuing authority a legally binding agreement of record, acceptable to the issuing authority, evidencing that another entity has accepted responsibility for maintaining the BMP, and that the proposed responsible party shall be treated as a permittee for purposes of implementing the requirements of Conditions 19(f) through 19(k) with respect to that BMP. Any failure of the proposed responsible party to implement the requirements of Conditions 19(f) through 19(k) with respect to that BMP shall be a violation of the Order of Conditions or Certificate of Compliance. In the case of stormwater BMPs that are serving more than one lot, the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs. A plan and easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted along with the legally binding agreement. f)The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans, the O&M Plan, and the requirements of the Massachusetts Stormwater Handbook. g)The responsible party shall: 1. Maintain an operation and maintenance log for the last three (3) consecutive calendar years of inspections, repairs, maintenance and/or replacement of the stormwater management system or any part thereof, and disposal (for disposal the log shall indicate the type of material and the disposal location); 2. Make the maintenance log available to MassDEP and the Conservation Commission ("Commission") upon request; and 3. Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure that the responsible party is in compliance with the requirements for each BMP established in the O&M Plan approved by the issuing authority. h)All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable federal, state, and local laws and regulations. i)Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited. j)The stormwater management system approved in the Order of Conditions shall not be changed without the prior written approval of the issuing authority. k)Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit (as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1, Low Impact Development Site Design Credits) shall not be altered without the prior written approval of the issuing authority. l)Access for maintenance, repair, and/or replacement of BMPs shall not be withheld. Any fencing constructed around stormwater BMPs shall include access gates and shall be at least six inches above grade to allow for wildlife passage. Special Conditions: D. Findings Under Municipal Wetlands Bylaw or Ordinance 1.Is a municipal wetlands bylaw or ordinance applicable? Yes  No 2.The Conservation Commission hereby(check one that applies): a.DENIES the proposed work which cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: 1. Municipal Ordinance or Bylaw 2. Citation Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order or Conditions is issued. Which are necessary to comply with a municipal ordinance or bylaw: b.APPROVES the proposed work, subject to the following additional conditions. 1. Municipal Ordinance or Bylaw NORTHAMPTON WETLANDS ORDINANCE 2. Citation CHAPTER 337 3.The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. The special conditions relating to municipal ordinance or bylaw are as follows: PLEASE SEE ATTACHMENT A E. Signatures This Order is valid for three years from the date of issuance, unless otherwise specified pursuant to General Condition #4. If this is an Amended Order of Conditions, the Amended Order expires on the same date as the original Order of Conditions. 10/16/2018 1. Date of Original Order Please indicate the number of members who will sign this form. This Order must be signed by a majority of the Conservation Commission. 4 2. Number of Signers The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A copy also must be mailed or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office, if not filing electronically, and the property owner, if different from applicant. Signatures:jen smith kevin lake c. mason maronn randy krotowski  by hand delivery on by certified mail, return receipt requested, on Date Date F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Request for Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7) within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order, or providing written information to the Department prior to issuance of a Superseding Order.  The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act (M.G.L. c. 131, § 40), and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. G. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on this page shall be submitted to the Conservation Commission listed below.  NORTHAMPTON Conservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. To: NORTHAMPTON Conservation Commission Please be advised that the Order of Conditions for the Project at: BURTS PIT ROAD 246­0724 Project Location MassDEP File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner DAVID VELETA and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant Rev. 4/1/2010 Massachusetts Department of Environmental Protection Bureau of Resource Protection ­ Wetlands WPA Form 5 ­ Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File #:246­0724 eDEP Transaction #:1322939 City/Town:NORTHAMPTON Page 4 of 10 * ELECTRONIC COPY Massachusetts Department of EnvironmentalProtectionBureau of Resource Protection ­ WetlandsWPA Form 5 ­ Order of ConditionsMassachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP:MassDEP File #:246­0724eDEP Transaction #:1322939City/Town:NORTHAMPTONA. General Information1. Conservation Commission NORTHAMPTON2. Issuance a.OOC b.Amended OOC3. Applicant Detailsa. First Name DAVID b. Last Name VELETAc. Organization NORTHAMPTON DPWd. Mailing Address 125 LOCUST STREETe. City/Town NORTHAMPTON f. State MA g. Zip Code 010604. Property Ownera. First Name DAVID b. Last Name VELETAc. Organization NORTHAMPTON DPWd. Mailing Address 125 LOCUST STREETe. City/Town NORTHAMPTON f. State MA g. Zip Code 010605. Project Locationa.Street Address BURTS PIT ROADb.City/Town NORTHAMPTON c. Zip Code 01060d. AssessorsMap/Plat#NA e. Parcel/Lot#NAf. Latitude 42.31046N g. Longitude 72.69234W6. Property recorded at the Registry of Deed for:a. County b. Certificate c. Book d. PageNA­ROW NA­ROW7.Datesa. Date NOI Filed :9/4/2018 b. Date Public Hearing Closed:10/28/2021 c. Date Of Issuance:10/28/20218.Final Approved Plans and Other Documentsa. Plan Title:b. Plan Prepared by:c. Plan Signed/Stamped by:d. Revised Final Date:e. Scale:REQUEST TOAMEND TOORDER OFCONDITIONS FOR246­0724 PACKET NORTHAMPTONDPW NA 10/18/2021 NANOTICE OFINTENT ­ BURTSPIT ROADCULVERTSLIPLININGPROJECT NORTHAMPTONDPW NA august 30, 2018 NAB. Findings1.Findings pursuant to the Massachusetts Wetlands Protection ActFollowing the review of the the above­referenced Notice of Intent and based on the information provided in thisapplication and presented at the public hearing, this Commission finds that the areas in which work is proposed issignificant to the following interests of the Wetlands Protection Act.Check all that apply:a.  Public Water Supply b.  Land Containing Shellfish c. Prevention of Pollutiond.  Private Water Supply e.  Fisheries f.  Protection of Wildlife Habitatg.  Ground Water Supply h.  Storm Damage Prevention i.  Flood Control2. Commission hereby finds the project, as proposed, is:Approved subject to:a.The following conditions which are necessary in accordance with the performance standards set forth in thewetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice ofIntent referenced above, the following General Conditions, and any other special conditions attached to thisOrder. To the extent that the following conditions modify or differ from the plans, specifications, or otherproposals submitted with the Notice of Intent, these conditions shall control.Denied because:b.The proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations.Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted whichprovides measures which are adequate to protect interests of the Act, and a final Order of Conditions is issued. Adescription of the performance standards which the proposed work cannot meet is attached to thisOrder.c.The information submitted by the applicant is not sufficient to describe the site, the work or the effect of thework on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not goforward unless and until a revised Notice of Intent is submitted which provides sufficient information andincludes measures which are adequate to protect the interests of the Act , and a final Order of Conditions isissued. A description of the specific information which is lacking and why it is necessary is attached tothis Order as per 310 CMR 10.05(6)(c).3.Buffer Zone Impacts:Shortest distance between limit of project disturbance and the wetlandresource area specified in 310CMR10.02(1)(a).a. linear feetInland Resource Area Impacts:(For Approvals Only):Resource Area ProposedAlteration PermittedAlteration ProposedReplacement PermittedReplacement4. Bank 735a. linear feet b. linear feet 735c. linear feet d. linear feet5. Bordering Vegetated Wetland 1585a. square feet b. square feet 1585c. square feet d. square feet6. Land under Waterbodies and Waterways 1703a. square feet 1703b. square feet 1582c. square feet 1582d. square feet0e. c/y dredged f. c/y dredged7.Bordering Land Subject to Flooding 4023a. square feet b. square feet 4023c. square feet d. square feetCubic Feet Flood Storage 15e. cubic feet 15f. cubic feet 0g. cubic feet 0h. cubic feet8.Isolated Land Subject to Flooding a. square feet b. square feetCubic Feet Flood Storage c. cubic feet d. cubic feet e. cubic feet f. cubic feet9.Riverfront Area 5550a. total sq. feet b. total sq. feetSq ft within 100 ft c. square feet d. square feet e. square feet f. square feetSq ft between 100­200 ft g. square feet h. square feet i. square feet j. square feetCoastal Resource Area Impacts:Resource Area ProposedAlteration PermittedAlteration ProposedReplacement PermittedReplacement10.Designated Port Areas Indicate size under Land Under the Ocean, below11.Land Under the Ocean a. square feet b. square feetc. c/y dredged d. c/y dredged12.Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below13.Coastal Beaches a. square feet b. square feet c. c/y nourishment d. c/y nourishment14.Coastal Dunes a. square feet b. square feet c. c/y nourishment d. c/y nourishment15.Coastal Banks a. linear feet b. linear feet16.Rocky Intertidal Shores a. square feet b. square feet17.Salt Marshes a. square feet b. square feet c. square feet d. square feet18. Land Under Salt Ponds a. square feet b. square feetc. c/y dredged d. c/y dredged19.Land Containing Shellfish a. square feet b. square feet c. square feet d. square feet20.Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under theOcean, and/or inland Land Under Waterbodies and Waterways,abovec. c/y dredged d. c/y dredged21.Land Subject to Coastal Storm Flowage a. square feet b. square feet22. Restoration/Enhancement (For Approvals Only)If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footagethat has been entered in Section B.5.c & d or B.17.c & d above, please entered the additional amount here.a. square feet of BVW b. square feet of Salt Marsh23.Streams Crossing(s)If the project involves Stream Crossings, please enter the number of new stream crossings/number of replacementstream crossings.a. number of new stream crossings b. number of replacement streamcrossingsC. General Conditions Under Massachusetts Wetlands Protection ActThe following conditions are only applicable to Approved projects1.Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures,shall be deemed cause to revoke or modify this Order.2.The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury toprivate property or invasion of private rights.3.This Order does not relieve the permittee or any other person of the necessity of complying with all otherapplicable federal, state, or local statutes, ordinances, bylaws, or regulations. 4.The work authorized hereunder shall be completed within three years from the date of this Order unless eitherof the following apply:a. the work is a maintenance dredging project as provided for in the Act; orb. the time for completion has been extended to a specified date more than three years, but less than fiveyears, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5.This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6.If this Order constitutes an Amended Order of Conditions, this Amended Order of Conditions does not exceed the issuance date of the original Final Order of Conditions. 7.Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 8.This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. 9.No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to the Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work.. 10.A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, " Massachusetts Department of Environmental Protection"  [or 'MassDEP"]  File Number :"246­0724" 11.Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before Mass DEP. 12.Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance (WPA Form 8A) to the Conservation Commission. 13.The work shall conform to the plans and special conditions referenced in this order. 14.Any change to the plans identified in Condition #13 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 15.The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. 16.This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 17.Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 18.All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS 19.The work associated with this Order(the "Project") is (1)  is not (2) subject to the Massachusetts Stormwater Standards. If the work is subject to Stormwater Standards, then the project is subject to the following conditions; a)All work, including site preparation, land disturbance, construction and redevelopment, shall be implemented in accordance with the construction period pollution prevention and erosion and sedimentation control plan and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Construction General Permit as required by Stormwater Standard 8. Construction period erosion, sedimentation and pollution control measures and best management practices (BMPs) shall remain in place until the site is fully stabilized. b)No stormwater runoff may be discharged to the post­construction stormwater BMPs unless and until a Registered Professional Engineer provides a Certification that: i. all construction period BMPs have been removed or will be removed by a date certain specified in the Certification. For any construction period BMPs intended to be converted to post construction operation for stormwater attenuation, recharge, and/or treatment, the conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation, including removal of all construction period sediment trapped in inlet and outlet control structures; ii.. as­built final construction BMP plans are included, signed and stamped by a Registered Professional Engineer, certifying the site is fully stabilized; iii. any illicit discharges to the stormwater management system have been removed, as per the requirements of Stormwater Standard 10; iv. all post­construction stormwater BMPs are installed in accordance with the plans (including all planting plans) approved by the issuing authority, and have been inspected to ensure that they are not damaged and that they are in proper working condition; v. any vegetation associated with post­construction BMPs is suitably established to withstand erosion. c)The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed responsibility for BMP maintenance. Prior to requesting a Certificate of Compliance, or Partial Certificate of Compliance, the responsible party (defined in General Condition 19(e)) shall execute and submit to the issuing authority an Operation and Maintenance Compliance Statement ("O&M Statement") for the Stormwater BMPs identifying the party responsible for implementing the stormwater BMP Operation and Maintenance Plan ("O&M Plan") and certifying the following: i.) the O&M Plan is complete and will be implemented upon receipt of the Certificate of Compliance, and ii.) the future responsible parties shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and implement the Stormwater Pollution Prevention Plan. d)Post­construction pollution prevention and source control shall be implemented in accordance with the long­ term pollution prevention plan section of the approved Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Multi­Sector General Permit. e)Unless and until another party accepts responsibility, the landowner, or owner of any drainage easement, assumes responsibility for maintaining each BMP. To overcome this presumption, the landowner of the property must submit to the issuing authority a legally binding agreement of record, acceptable to the issuing authority, evidencing that another entity has accepted responsibility for maintaining the BMP, and that the proposed responsible party shall be treated as a permittee for purposes of implementing the requirements of Conditions 19(f) through 19(k) with respect to that BMP. Any failure of the proposed responsible party to implement the requirements of Conditions 19(f) through 19(k) with respect to that BMP shall be a violation of the Order of Conditions or Certificate of Compliance. In the case of stormwater BMPs that are serving more than one lot, the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs. A plan and easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted along with the legally binding agreement. f)The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans, the O&M Plan, and the requirements of the Massachusetts Stormwater Handbook. g)The responsible party shall: 1. Maintain an operation and maintenance log for the last three (3) consecutive calendar years of inspections, repairs, maintenance and/or replacement of the stormwater management system or any part thereof, and disposal (for disposal the log shall indicate the type of material and the disposal location); 2. Make the maintenance log available to MassDEP and the Conservation Commission ("Commission") upon request; and 3. Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure that the responsible party is in compliance with the requirements for each BMP established in the O&M Plan approved by the issuing authority. h)All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable federal, state, and local laws and regulations. i)Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited. j)The stormwater management system approved in the Order of Conditions shall not be changed without the prior written approval of the issuing authority. k)Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit (as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1, Low Impact Development Site Design Credits) shall not be altered without the prior written approval of the issuing authority. l)Access for maintenance, repair, and/or replacement of BMPs shall not be withheld. Any fencing constructed around stormwater BMPs shall include access gates and shall be at least six inches above grade to allow for wildlife passage. Special Conditions: D. Findings Under Municipal Wetlands Bylaw or Ordinance 1.Is a municipal wetlands bylaw or ordinance applicable? Yes  No 2.The Conservation Commission hereby(check one that applies): a.DENIES the proposed work which cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: 1. Municipal Ordinance or Bylaw 2. Citation Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order or Conditions is issued. Which are necessary to comply with a municipal ordinance or bylaw: b.APPROVES the proposed work, subject to the following additional conditions. 1. Municipal Ordinance or Bylaw NORTHAMPTON WETLANDS ORDINANCE 2. Citation CHAPTER 337 3.The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. The special conditions relating to municipal ordinance or bylaw are as follows: PLEASE SEE ATTACHMENT A E. Signatures This Order is valid for three years from the date of issuance, unless otherwise specified pursuant to General Condition #4. If this is an Amended Order of Conditions, the Amended Order expires on the same date as the original Order of Conditions. 10/16/2018 1. Date of Original Order Please indicate the number of members who will sign this form. This Order must be signed by a majority of the Conservation Commission. 4 2. Number of Signers The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A copy also must be mailed or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office, if not filing electronically, and the property owner, if different from applicant. Signatures:jen smith kevin lake c. mason maronn randy krotowski  by hand delivery on by certified mail, return receipt requested, on Date Date F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Request for Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7) within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order, or providing written information to the Department prior to issuance of a Superseding Order.  The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act (M.G.L. c. 131, § 40), and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. G. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on this page shall be submitted to the Conservation Commission listed below.  NORTHAMPTON Conservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. To: NORTHAMPTON Conservation Commission Please be advised that the Order of Conditions for the Project at: BURTS PIT ROAD 246­0724 Project Location MassDEP File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner DAVID VELETA and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant Rev. 4/1/2010 Massachusetts Department of Environmental Protection Bureau of Resource Protection ­ Wetlands WPA Form 5 ­ Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File #:246­0724 eDEP Transaction #:1322939 City/Town:NORTHAMPTON Page 5 of 10 * ELECTRONIC COPY Massachusetts Department of EnvironmentalProtectionBureau of Resource Protection ­ WetlandsWPA Form 5 ­ Order of ConditionsMassachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP:MassDEP File #:246­0724eDEP Transaction #:1322939City/Town:NORTHAMPTONA. General Information1. Conservation Commission NORTHAMPTON2. Issuance a.OOC b.Amended OOC3. Applicant Detailsa. First Name DAVID b. Last Name VELETAc. Organization NORTHAMPTON DPWd. Mailing Address 125 LOCUST STREETe. City/Town NORTHAMPTON f. State MA g. Zip Code 010604. Property Ownera. First Name DAVID b. Last Name VELETAc. Organization NORTHAMPTON DPWd. Mailing Address 125 LOCUST STREETe. City/Town NORTHAMPTON f. State MA g. Zip Code 010605. Project Locationa.Street Address BURTS PIT ROADb.City/Town NORTHAMPTON c. Zip Code 01060d. AssessorsMap/Plat#NA e. Parcel/Lot#NAf. Latitude 42.31046N g. Longitude 72.69234W6. Property recorded at the Registry of Deed for:a. County b. Certificate c. Book d. PageNA­ROW NA­ROW7.Datesa. Date NOI Filed :9/4/2018 b. Date Public Hearing Closed:10/28/2021 c. Date Of Issuance:10/28/20218.Final Approved Plans and Other Documentsa. Plan Title:b. Plan Prepared by:c. Plan Signed/Stamped by:d. Revised Final Date:e. Scale:REQUEST TOAMEND TOORDER OFCONDITIONS FOR246­0724 PACKET NORTHAMPTONDPW NA 10/18/2021 NANOTICE OFINTENT ­ BURTSPIT ROADCULVERTSLIPLININGPROJECT NORTHAMPTONDPW NA august 30, 2018 NAB. Findings1.Findings pursuant to the Massachusetts Wetlands Protection ActFollowing the review of the the above­referenced Notice of Intent and based on the information provided in thisapplication and presented at the public hearing, this Commission finds that the areas in which work is proposed issignificant to the following interests of the Wetlands Protection Act.Check all that apply:a.  Public Water Supply b.  Land Containing Shellfish c. Prevention of Pollutiond.  Private Water Supply e.  Fisheries f.  Protection of Wildlife Habitatg.  Ground Water Supply h.  Storm Damage Prevention i.  Flood Control2. Commission hereby finds the project, as proposed, is:Approved subject to:a.The following conditions which are necessary in accordance with the performance standards set forth in thewetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice ofIntent referenced above, the following General Conditions, and any other special conditions attached to thisOrder. To the extent that the following conditions modify or differ from the plans, specifications, or otherproposals submitted with the Notice of Intent, these conditions shall control.Denied because:b.The proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations.Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted whichprovides measures which are adequate to protect interests of the Act, and a final Order of Conditions is issued. Adescription of the performance standards which the proposed work cannot meet is attached to thisOrder.c.The information submitted by the applicant is not sufficient to describe the site, the work or the effect of thework on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not goforward unless and until a revised Notice of Intent is submitted which provides sufficient information andincludes measures which are adequate to protect the interests of the Act , and a final Order of Conditions isissued. A description of the specific information which is lacking and why it is necessary is attached tothis Order as per 310 CMR 10.05(6)(c).3.Buffer Zone Impacts:Shortest distance between limit of project disturbance and the wetlandresource area specified in 310CMR10.02(1)(a).a. linear feetInland Resource Area Impacts:(For Approvals Only):Resource Area ProposedAlteration PermittedAlteration ProposedReplacement PermittedReplacement4. Bank 735a. linear feet b. linear feet 735c. linear feet d. linear feet5. Bordering Vegetated Wetland 1585a. square feet b. square feet 1585c. square feet d. square feet6. Land under Waterbodies and Waterways 1703a. square feet 1703b. square feet 1582c. square feet 1582d. square feet0e. c/y dredged f. c/y dredged7.Bordering Land Subject to Flooding 4023a. square feet b. square feet 4023c. square feet d. square feetCubic Feet Flood Storage 15e. cubic feet 15f. cubic feet 0g. cubic feet 0h. cubic feet8.Isolated Land Subject to Flooding a. square feet b. square feetCubic Feet Flood Storage c. cubic feet d. cubic feet e. cubic feet f. cubic feet9.Riverfront Area 5550a. total sq. feet b. total sq. feetSq ft within 100 ft c. square feet d. square feet e. square feet f. square feetSq ft between 100­200 ft g. square feet h. square feet i. square feet j. square feetCoastal Resource Area Impacts:Resource Area ProposedAlteration PermittedAlteration ProposedReplacement PermittedReplacement10.Designated Port Areas Indicate size under Land Under the Ocean, below11.Land Under the Ocean a. square feet b. square feetc. c/y dredged d. c/y dredged12.Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below13.Coastal Beaches a. square feet b. square feet c. c/y nourishment d. c/y nourishment14.Coastal Dunes a. square feet b. square feet c. c/y nourishment d. c/y nourishment15.Coastal Banks a. linear feet b. linear feet16.Rocky Intertidal Shores a. square feet b. square feet17.Salt Marshes a. square feet b. square feet c. square feet d. square feet18. Land Under Salt Ponds a. square feet b. square feetc. c/y dredged d. c/y dredged19.Land Containing Shellfish a. square feet b. square feet c. square feet d. square feet20.Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under theOcean, and/or inland Land Under Waterbodies and Waterways,abovec. c/y dredged d. c/y dredged21.Land Subject to Coastal Storm Flowage a. square feet b. square feet22. Restoration/Enhancement (For Approvals Only)If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footagethat has been entered in Section B.5.c & d or B.17.c & d above, please entered the additional amount here.a. square feet of BVW b. square feet of Salt Marsh23.Streams Crossing(s)If the project involves Stream Crossings, please enter the number of new stream crossings/number of replacementstream crossings.a. number of new stream crossings b. number of replacement streamcrossingsC. General Conditions Under Massachusetts Wetlands Protection ActThe following conditions are only applicable to Approved projects1.Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures,shall be deemed cause to revoke or modify this Order.2.The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury toprivate property or invasion of private rights.3.This Order does not relieve the permittee or any other person of the necessity of complying with all otherapplicable federal, state, or local statutes, ordinances, bylaws, or regulations. 4.The work authorized hereunder shall be completed within three years from the date of this Order unless eitherof the following apply:a. the work is a maintenance dredging project as provided for in the Act; orb. the time for completion has been extended to a specified date more than three years, but less than fiveyears, from the date of issuance. If this Order is intended to be valid for more than three years, theextension date and the special circumstances warranting the extended time period are set forth as aspecial condition in this Order.5.This Order may be extended by the issuing authority for one or more periods of up to three years each uponapplication to the issuing authority at least 30 days prior to the expiration date of the Order.6.If this Order constitutes an Amended Order of Conditions, this Amended Order of Conditions does not exceedthe issuance date of the original Final Order of Conditions.7.Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish,or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes,refrigerators, motor vehicles, or parts of any of the foregoing.8.This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appealhas been taken, until all proceedings before the Department have been completed.9.No work shall be undertaken until the Order has become final and then has been recorded in the Registry ofDeeds or the Land Court for the district in which the land is located, within the chain of title of the affectedproperty. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index underthe name of the owner of the land upon which the proposed work is to be done. In the case of the registeredland, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land uponwhich the proposed work is done. The recording information shall be submitted to the ConservationCommission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, priorto the commencement of work..10.A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearingthe words," Massachusetts Department of Environmental Protection" [or 'MassDEP"] File Number :"246­0724"11.Where the Department of Environmental Protection is requested to issue a Superseding Order, theConservation Commission shall be a party to all agency proceedings and hearings before Mass DEP.12.Upon completion of the work described herein, the applicant shall submit a Request for Certificate ofCompliance (WPA Form 8A) to the Conservation Commission.13.The work shall conform to the plans and special conditions referenced in this order.14.Any change to the plans identified in Condition #13 above shall require the applicant to inquire of theConservation Commission in writing whether the change is significant enough to require the filing of a newNotice of Intent.15.The Agent or members of the Conservation Commission and the Department of Environmental Protection shallhave the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance withthe conditions stated in this Order, and may require the submittal of any data deemed necessary by theConservation Commission or Department for that evaluation.16.This Order of Conditions shall apply to any successor in interest or successor in control of the property subjectto this Order and to any contractor or other person performing work conditioned by this Order.17.Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, theboundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging.Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has beenissued by the Conservation Commission.18.All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilizedwith vegetation or other means. At no time shall sediments be deposited in a wetland or water body. Duringconstruction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shallremove accumulated sediments as needed. The applicant shall immediately control any erosion problems thatoccur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS 19.The work associated with this Order(the "Project") is (1)  is not (2) subject to the Massachusetts Stormwater Standards. If the work is subject to Stormwater Standards, then the project is subject to the following conditions; a)All work, including site preparation, land disturbance, construction and redevelopment, shall be implemented in accordance with the construction period pollution prevention and erosion and sedimentation control plan and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Construction General Permit as required by Stormwater Standard 8. Construction period erosion, sedimentation and pollution control measures and best management practices (BMPs) shall remain in place until the site is fully stabilized. b)No stormwater runoff may be discharged to the post­construction stormwater BMPs unless and until a Registered Professional Engineer provides a Certification that: i. all construction period BMPs have been removed or will be removed by a date certain specified in the Certification. For any construction period BMPs intended to be converted to post construction operation for stormwater attenuation, recharge, and/or treatment, the conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation, including removal of all construction period sediment trapped in inlet and outlet control structures; ii.. as­built final construction BMP plans are included, signed and stamped by a Registered Professional Engineer, certifying the site is fully stabilized; iii. any illicit discharges to the stormwater management system have been removed, as per the requirements of Stormwater Standard 10; iv. all post­construction stormwater BMPs are installed in accordance with the plans (including all planting plans) approved by the issuing authority, and have been inspected to ensure that they are not damaged and that they are in proper working condition; v. any vegetation associated with post­construction BMPs is suitably established to withstand erosion. c)The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed responsibility for BMP maintenance. Prior to requesting a Certificate of Compliance, or Partial Certificate of Compliance, the responsible party (defined in General Condition 19(e)) shall execute and submit to the issuing authority an Operation and Maintenance Compliance Statement ("O&M Statement") for the Stormwater BMPs identifying the party responsible for implementing the stormwater BMP Operation and Maintenance Plan ("O&M Plan") and certifying the following: i.) the O&M Plan is complete and will be implemented upon receipt of the Certificate of Compliance, and ii.) the future responsible parties shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and implement the Stormwater Pollution Prevention Plan. d)Post­construction pollution prevention and source control shall be implemented in accordance with the long­ term pollution prevention plan section of the approved Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Multi­Sector General Permit. e)Unless and until another party accepts responsibility, the landowner, or owner of any drainage easement, assumes responsibility for maintaining each BMP. To overcome this presumption, the landowner of the property must submit to the issuing authority a legally binding agreement of record, acceptable to the issuing authority, evidencing that another entity has accepted responsibility for maintaining the BMP, and that the proposed responsible party shall be treated as a permittee for purposes of implementing the requirements of Conditions 19(f) through 19(k) with respect to that BMP. Any failure of the proposed responsible party to implement the requirements of Conditions 19(f) through 19(k) with respect to that BMP shall be a violation of the Order of Conditions or Certificate of Compliance. In the case of stormwater BMPs that are serving more than one lot, the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs. A plan and easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted along with the legally binding agreement. f)The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans, the O&M Plan, and the requirements of the Massachusetts Stormwater Handbook. g)The responsible party shall: 1. Maintain an operation and maintenance log for the last three (3) consecutive calendar years of inspections, repairs, maintenance and/or replacement of the stormwater management system or any part thereof, and disposal (for disposal the log shall indicate the type of material and the disposal location); 2. Make the maintenance log available to MassDEP and the Conservation Commission ("Commission") upon request; and 3. Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure that the responsible party is in compliance with the requirements for each BMP established in the O&M Plan approved by the issuing authority. h)All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable federal, state, and local laws and regulations. i)Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited. j)The stormwater management system approved in the Order of Conditions shall not be changed without the prior written approval of the issuing authority. k)Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit (as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1, Low Impact Development Site Design Credits) shall not be altered without the prior written approval of the issuing authority. l)Access for maintenance, repair, and/or replacement of BMPs shall not be withheld. Any fencing constructed around stormwater BMPs shall include access gates and shall be at least six inches above grade to allow for wildlife passage. Special Conditions: D. Findings Under Municipal Wetlands Bylaw or Ordinance 1.Is a municipal wetlands bylaw or ordinance applicable? Yes  No 2.The Conservation Commission hereby(check one that applies): a.DENIES the proposed work which cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: 1. Municipal Ordinance or Bylaw 2. Citation Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order or Conditions is issued. Which are necessary to comply with a municipal ordinance or bylaw: b.APPROVES the proposed work, subject to the following additional conditions. 1. Municipal Ordinance or Bylaw NORTHAMPTON WETLANDS ORDINANCE 2. Citation CHAPTER 337 3.The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. The special conditions relating to municipal ordinance or bylaw are as follows: PLEASE SEE ATTACHMENT A E. Signatures This Order is valid for three years from the date of issuance, unless otherwise specified pursuant to General Condition #4. If this is an Amended Order of Conditions, the Amended Order expires on the same date as the original Order of Conditions. 10/16/2018 1. Date of Original Order Please indicate the number of members who will sign this form. This Order must be signed by a majority of the Conservation Commission. 4 2. Number of Signers The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A copy also must be mailed or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office, if not filing electronically, and the property owner, if different from applicant. Signatures:jen smith kevin lake c. mason maronn randy krotowski  by hand delivery on by certified mail, return receipt requested, on Date Date F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Request for Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7) within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order, or providing written information to the Department prior to issuance of a Superseding Order.  The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act (M.G.L. c. 131, § 40), and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. G. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on this page shall be submitted to the Conservation Commission listed below.  NORTHAMPTON Conservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. To: NORTHAMPTON Conservation Commission Please be advised that the Order of Conditions for the Project at: BURTS PIT ROAD 246­0724 Project Location MassDEP File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner DAVID VELETA and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant Rev. 4/1/2010 Massachusetts Department of Environmental Protection Bureau of Resource Protection ­ Wetlands WPA Form 5 ­ Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File #:246­0724 eDEP Transaction #:1322939 City/Town:NORTHAMPTON Page 6 of 10 * ELECTRONIC COPY Massachusetts Department of EnvironmentalProtectionBureau of Resource Protection ­ WetlandsWPA Form 5 ­ Order of ConditionsMassachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP:MassDEP File #:246­0724eDEP Transaction #:1322939City/Town:NORTHAMPTONA. General Information1. Conservation Commission NORTHAMPTON2. Issuance a.OOC b.Amended OOC3. Applicant Detailsa. First Name DAVID b. Last Name VELETAc. Organization NORTHAMPTON DPWd. Mailing Address 125 LOCUST STREETe. City/Town NORTHAMPTON f. State MA g. Zip Code 010604. Property Ownera. First Name DAVID b. Last Name VELETAc. Organization NORTHAMPTON DPWd. Mailing Address 125 LOCUST STREETe. City/Town NORTHAMPTON f. State MA g. Zip Code 010605. Project Locationa.Street Address BURTS PIT ROADb.City/Town NORTHAMPTON c. Zip Code 01060d. AssessorsMap/Plat#NA e. Parcel/Lot#NAf. Latitude 42.31046N g. Longitude 72.69234W6. Property recorded at the Registry of Deed for:a. County b. Certificate c. Book d. PageNA­ROW NA­ROW7.Datesa. Date NOI Filed :9/4/2018 b. Date Public Hearing Closed:10/28/2021 c. Date Of Issuance:10/28/20218.Final Approved Plans and Other Documentsa. Plan Title:b. Plan Prepared by:c. Plan Signed/Stamped by:d. Revised Final Date:e. Scale:REQUEST TOAMEND TOORDER OFCONDITIONS FOR246­0724 PACKET NORTHAMPTONDPW NA 10/18/2021 NANOTICE OFINTENT ­ BURTSPIT ROADCULVERTSLIPLININGPROJECT NORTHAMPTONDPW NA august 30, 2018 NAB. Findings1.Findings pursuant to the Massachusetts Wetlands Protection ActFollowing the review of the the above­referenced Notice of Intent and based on the information provided in thisapplication and presented at the public hearing, this Commission finds that the areas in which work is proposed issignificant to the following interests of the Wetlands Protection Act.Check all that apply:a.  Public Water Supply b.  Land Containing Shellfish c. Prevention of Pollutiond.  Private Water Supply e.  Fisheries f.  Protection of Wildlife Habitatg.  Ground Water Supply h.  Storm Damage Prevention i.  Flood Control2. Commission hereby finds the project, as proposed, is:Approved subject to:a.The following conditions which are necessary in accordance with the performance standards set forth in thewetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice ofIntent referenced above, the following General Conditions, and any other special conditions attached to thisOrder. To the extent that the following conditions modify or differ from the plans, specifications, or otherproposals submitted with the Notice of Intent, these conditions shall control.Denied because:b.The proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations.Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted whichprovides measures which are adequate to protect interests of the Act, and a final Order of Conditions is issued. Adescription of the performance standards which the proposed work cannot meet is attached to thisOrder.c.The information submitted by the applicant is not sufficient to describe the site, the work or the effect of thework on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not goforward unless and until a revised Notice of Intent is submitted which provides sufficient information andincludes measures which are adequate to protect the interests of the Act , and a final Order of Conditions isissued. A description of the specific information which is lacking and why it is necessary is attached tothis Order as per 310 CMR 10.05(6)(c).3.Buffer Zone Impacts:Shortest distance between limit of project disturbance and the wetlandresource area specified in 310CMR10.02(1)(a).a. linear feetInland Resource Area Impacts:(For Approvals Only):Resource Area ProposedAlteration PermittedAlteration ProposedReplacement PermittedReplacement4. Bank 735a. linear feet b. linear feet 735c. linear feet d. linear feet5. Bordering Vegetated Wetland 1585a. square feet b. square feet 1585c. square feet d. square feet6. Land under Waterbodies and Waterways 1703a. square feet 1703b. square feet 1582c. square feet 1582d. square feet0e. c/y dredged f. c/y dredged7.Bordering Land Subject to Flooding 4023a. square feet b. square feet 4023c. square feet d. square feetCubic Feet Flood Storage 15e. cubic feet 15f. cubic feet 0g. cubic feet 0h. cubic feet8.Isolated Land Subject to Flooding a. square feet b. square feetCubic Feet Flood Storage c. cubic feet d. cubic feet e. cubic feet f. cubic feet9.Riverfront Area 5550a. total sq. feet b. total sq. feetSq ft within 100 ft c. square feet d. square feet e. square feet f. square feetSq ft between 100­200 ft g. square feet h. square feet i. square feet j. square feetCoastal Resource Area Impacts:Resource Area ProposedAlteration PermittedAlteration ProposedReplacement PermittedReplacement10.Designated Port Areas Indicate size under Land Under the Ocean, below11.Land Under the Ocean a. square feet b. square feetc. c/y dredged d. c/y dredged12.Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below13.Coastal Beaches a. square feet b. square feet c. c/y nourishment d. c/y nourishment14.Coastal Dunes a. square feet b. square feet c. c/y nourishment d. c/y nourishment15.Coastal Banks a. linear feet b. linear feet16.Rocky Intertidal Shores a. square feet b. square feet17.Salt Marshes a. square feet b. square feet c. square feet d. square feet18. Land Under Salt Ponds a. square feet b. square feetc. c/y dredged d. c/y dredged19.Land Containing Shellfish a. square feet b. square feet c. square feet d. square feet20.Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under theOcean, and/or inland Land Under Waterbodies and Waterways,abovec. c/y dredged d. c/y dredged21.Land Subject to Coastal Storm Flowage a. square feet b. square feet22. Restoration/Enhancement (For Approvals Only)If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footagethat has been entered in Section B.5.c & d or B.17.c & d above, please entered the additional amount here.a. square feet of BVW b. square feet of Salt Marsh23.Streams Crossing(s)If the project involves Stream Crossings, please enter the number of new stream crossings/number of replacementstream crossings.a. number of new stream crossings b. number of replacement streamcrossingsC. General Conditions Under Massachusetts Wetlands Protection ActThe following conditions are only applicable to Approved projects1.Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures,shall be deemed cause to revoke or modify this Order.2.The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury toprivate property or invasion of private rights.3.This Order does not relieve the permittee or any other person of the necessity of complying with all otherapplicable federal, state, or local statutes, ordinances, bylaws, or regulations. 4.The work authorized hereunder shall be completed within three years from the date of this Order unless eitherof the following apply:a. the work is a maintenance dredging project as provided for in the Act; orb. the time for completion has been extended to a specified date more than three years, but less than fiveyears, from the date of issuance. If this Order is intended to be valid for more than three years, theextension date and the special circumstances warranting the extended time period are set forth as aspecial condition in this Order.5.This Order may be extended by the issuing authority for one or more periods of up to three years each uponapplication to the issuing authority at least 30 days prior to the expiration date of the Order.6.If this Order constitutes an Amended Order of Conditions, this Amended Order of Conditions does not exceedthe issuance date of the original Final Order of Conditions.7.Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish,or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes,refrigerators, motor vehicles, or parts of any of the foregoing.8.This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appealhas been taken, until all proceedings before the Department have been completed.9.No work shall be undertaken until the Order has become final and then has been recorded in the Registry ofDeeds or the Land Court for the district in which the land is located, within the chain of title of the affectedproperty. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index underthe name of the owner of the land upon which the proposed work is to be done. In the case of the registeredland, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land uponwhich the proposed work is done. The recording information shall be submitted to the ConservationCommission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, priorto the commencement of work..10.A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearingthe words," Massachusetts Department of Environmental Protection" [or 'MassDEP"] File Number :"246­0724"11.Where the Department of Environmental Protection is requested to issue a Superseding Order, theConservation Commission shall be a party to all agency proceedings and hearings before Mass DEP.12.Upon completion of the work described herein, the applicant shall submit a Request for Certificate ofCompliance (WPA Form 8A) to the Conservation Commission.13.The work shall conform to the plans and special conditions referenced in this order.14.Any change to the plans identified in Condition #13 above shall require the applicant to inquire of theConservation Commission in writing whether the change is significant enough to require the filing of a newNotice of Intent.15.The Agent or members of the Conservation Commission and the Department of Environmental Protection shallhave the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance withthe conditions stated in this Order, and may require the submittal of any data deemed necessary by theConservation Commission or Department for that evaluation.16.This Order of Conditions shall apply to any successor in interest or successor in control of the property subjectto this Order and to any contractor or other person performing work conditioned by this Order.17.Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, theboundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging.Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has beenissued by the Conservation Commission.18.All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilizedwith vegetation or other means. At no time shall sediments be deposited in a wetland or water body. Duringconstruction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shallremove accumulated sediments as needed. The applicant shall immediately control any erosion problems thatoccur at the site and shall also immediately notify the Conservation Commission, which reserves the right torequire additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriersshall serve as the limit of work unless another limit of work line has been approved by this Order.NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS19.The work associated with this Order(the "Project") is (1)  is not (2) subject to the MassachusettsStormwater Standards. If the work is subject to Stormwater Standards, then the project is subject to thefollowing conditions;a)All work, including site preparation, land disturbance, construction and redevelopment, shall be implementedin accordance with the construction period pollution prevention and erosion and sedimentation control planand, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollutant DischargeElimination System Construction General Permit as required by Stormwater Standard 8. Construction perioderosion, sedimentation and pollution control measures and best management practices (BMPs) shall remainin place until the site is fully stabilized.b)No stormwater runoff may be discharged to the post­construction stormwater BMPs unless and until aRegistered Professional Engineer provides a Certification that: i. all construction period BMPs have beenremoved or will be removed by a date certain specified in the Certification. For any construction periodBMPs intended to be converted to post construction operation for stormwater attenuation, recharge, and/ortreatment, the conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that theBMP has been properly cleaned or prepared for post construction operation, including removal of allconstruction period sediment trapped in inlet and outlet control structures; ii.. as­built final constructionBMP plans are included, signed and stamped by a Registered Professional Engineer, certifying the site isfully stabilized; iii. any illicit discharges to the stormwater management system have been removed, as perthe requirements of Stormwater Standard 10; iv. all post­construction stormwater BMPs are installed inaccordance with the plans (including all planting plans) approved by the issuing authority, and have beeninspected to ensure that they are not damaged and that they are in proper working condition; v. any vegetationassociated with post­construction BMPs is suitably established to withstand erosion.c)The landowner is responsible for BMP maintenance until the issuing authority is notified that another partyhas legally assumed responsibility for BMP maintenance. Prior to requesting a Certificate of Compliance, orPartial Certificate of Compliance, the responsible party (defined in General Condition 19(e)) shall executeand submit to the issuing authority an Operation and Maintenance Compliance Statement ("O&M Statement")for the Stormwater BMPs identifying the party responsible for implementing the stormwater BMP Operationand Maintenance Plan ("O&M Plan") and certifying the following: i.) the O&M Plan is complete and will beimplemented upon receipt of the Certificate of Compliance, and ii.) the future responsible parties shall benotified in writing of their ongoing legal responsibility to operate and maintain the stormwater managementBMPs and implement the Stormwater Pollution Prevention Plan.d)Post­construction pollution prevention and source control shall be implemented in accordance with the long­term pollution prevention plan section of the approved Stormwater Report and, if applicable, the StormwaterPollution Prevention Plan required by the National Pollutant Discharge Elimination System Multi­SectorGeneral Permit.e)Unless and until another party accepts responsibility, the landowner, or owner of any drainage easement,assumes responsibility for maintaining each BMP. To overcome this presumption, the landowner of theproperty must submit to the issuing authority a legally binding agreement of record, acceptable to the issuingauthority, evidencing that another entity has accepted responsibility for maintaining the BMP, and that theproposed responsible party shall be treated as a permittee for purposes of implementing the requirements ofConditions 19(f) through 19(k) with respect to that BMP. Any failure of the proposed responsible party toimplement the requirements of Conditions 19(f) through 19(k) with respect to that BMP shall be a violationof the Order of Conditions or Certificate of Compliance. In the case of stormwater BMPs that are serving more than one lot, the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs. A plan and easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted along with the legally binding agreement. f)The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans, the O&M Plan, and the requirements of the Massachusetts Stormwater Handbook. g)The responsible party shall: 1. Maintain an operation and maintenance log for the last three (3) consecutive calendar years of inspections, repairs, maintenance and/or replacement of the stormwater management system or any part thereof, and disposal (for disposal the log shall indicate the type of material and the disposal location); 2. Make the maintenance log available to MassDEP and the Conservation Commission ("Commission") upon request; and 3. Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure that the responsible party is in compliance with the requirements for each BMP established in the O&M Plan approved by the issuing authority. h)All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable federal, state, and local laws and regulations. i)Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited. j)The stormwater management system approved in the Order of Conditions shall not be changed without the prior written approval of the issuing authority. k)Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit (as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1, Low Impact Development Site Design Credits) shall not be altered without the prior written approval of the issuing authority. l)Access for maintenance, repair, and/or replacement of BMPs shall not be withheld. Any fencing constructed around stormwater BMPs shall include access gates and shall be at least six inches above grade to allow for wildlife passage. Special Conditions: D. Findings Under Municipal Wetlands Bylaw or Ordinance 1.Is a municipal wetlands bylaw or ordinance applicable? Yes  No 2.The Conservation Commission hereby(check one that applies): a.DENIES the proposed work which cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: 1. Municipal Ordinance or Bylaw 2. Citation Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order or Conditions is issued. Which are necessary to comply with a municipal ordinance or bylaw: b.APPROVES the proposed work, subject to the following additional conditions. 1. Municipal Ordinance or Bylaw NORTHAMPTON WETLANDS ORDINANCE 2. Citation CHAPTER 337 3.The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. The special conditions relating to municipal ordinance or bylaw are as follows: PLEASE SEE ATTACHMENT A E. Signatures This Order is valid for three years from the date of issuance, unless otherwise specified pursuant to General Condition #4. If this is an Amended Order of Conditions, the Amended Order expires on the same date as the original Order of Conditions. 10/16/2018 1. Date of Original Order Please indicate the number of members who will sign this form. This Order must be signed by a majority of the Conservation Commission. 4 2. Number of Signers The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A copy also must be mailed or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office, if not filing electronically, and the property owner, if different from applicant. Signatures:jen smith kevin lake c. mason maronn randy krotowski  by hand delivery on by certified mail, return receipt requested, on Date Date F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Request for Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7) within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order, or providing written information to the Department prior to issuance of a Superseding Order.  The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act (M.G.L. c. 131, § 40), and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. G. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on this page shall be submitted to the Conservation Commission listed below.  NORTHAMPTON Conservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. To: NORTHAMPTON Conservation Commission Please be advised that the Order of Conditions for the Project at: BURTS PIT ROAD 246­0724 Project Location MassDEP File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner DAVID VELETA and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant Rev. 4/1/2010 Massachusetts Department of Environmental Protection Bureau of Resource Protection ­ Wetlands WPA Form 5 ­ Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File #:246­0724 eDEP Transaction #:1322939 City/Town:NORTHAMPTON Page 7 of 10 * ELECTRONIC COPY Massachusetts Department of EnvironmentalProtectionBureau of Resource Protection ­ WetlandsWPA Form 5 ­ Order of ConditionsMassachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP:MassDEP File #:246­0724eDEP Transaction #:1322939City/Town:NORTHAMPTONA. General Information1. Conservation Commission NORTHAMPTON2. Issuance a.OOC b.Amended OOC3. Applicant Detailsa. First Name DAVID b. Last Name VELETAc. Organization NORTHAMPTON DPWd. Mailing Address 125 LOCUST STREETe. City/Town NORTHAMPTON f. State MA g. Zip Code 010604. Property Ownera. First Name DAVID b. Last Name VELETAc. Organization NORTHAMPTON DPWd. Mailing Address 125 LOCUST STREETe. City/Town NORTHAMPTON f. State MA g. Zip Code 010605. Project Locationa.Street Address BURTS PIT ROADb.City/Town NORTHAMPTON c. Zip Code 01060d. AssessorsMap/Plat#NA e. Parcel/Lot#NAf. Latitude 42.31046N g. Longitude 72.69234W6. Property recorded at the Registry of Deed for:a. County b. Certificate c. Book d. PageNA­ROW NA­ROW7.Datesa. Date NOI Filed :9/4/2018 b. Date Public Hearing Closed:10/28/2021 c. Date Of Issuance:10/28/20218.Final Approved Plans and Other Documentsa. Plan Title:b. Plan Prepared by:c. Plan Signed/Stamped by:d. Revised Final Date:e. Scale:REQUEST TOAMEND TOORDER OFCONDITIONS FOR246­0724 PACKET NORTHAMPTONDPW NA 10/18/2021 NANOTICE OFINTENT ­ BURTSPIT ROADCULVERTSLIPLININGPROJECT NORTHAMPTONDPW NA august 30, 2018 NAB. Findings1.Findings pursuant to the Massachusetts Wetlands Protection ActFollowing the review of the the above­referenced Notice of Intent and based on the information provided in thisapplication and presented at the public hearing, this Commission finds that the areas in which work is proposed issignificant to the following interests of the Wetlands Protection Act.Check all that apply:a.  Public Water Supply b.  Land Containing Shellfish c. Prevention of Pollutiond.  Private Water Supply e.  Fisheries f.  Protection of Wildlife Habitatg.  Ground Water Supply h.  Storm Damage Prevention i.  Flood Control2. Commission hereby finds the project, as proposed, is:Approved subject to:a.The following conditions which are necessary in accordance with the performance standards set forth in thewetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice ofIntent referenced above, the following General Conditions, and any other special conditions attached to thisOrder. To the extent that the following conditions modify or differ from the plans, specifications, or otherproposals submitted with the Notice of Intent, these conditions shall control.Denied because:b.The proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations.Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted whichprovides measures which are adequate to protect interests of the Act, and a final Order of Conditions is issued. Adescription of the performance standards which the proposed work cannot meet is attached to thisOrder.c.The information submitted by the applicant is not sufficient to describe the site, the work or the effect of thework on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not goforward unless and until a revised Notice of Intent is submitted which provides sufficient information andincludes measures which are adequate to protect the interests of the Act , and a final Order of Conditions isissued. A description of the specific information which is lacking and why it is necessary is attached tothis Order as per 310 CMR 10.05(6)(c).3.Buffer Zone Impacts:Shortest distance between limit of project disturbance and the wetlandresource area specified in 310CMR10.02(1)(a).a. linear feetInland Resource Area Impacts:(For Approvals Only):Resource Area ProposedAlteration PermittedAlteration ProposedReplacement PermittedReplacement4. Bank 735a. linear feet b. linear feet 735c. linear feet d. linear feet5. Bordering Vegetated Wetland 1585a. square feet b. square feet 1585c. square feet d. square feet6. Land under Waterbodies and Waterways 1703a. square feet 1703b. square feet 1582c. square feet 1582d. square feet0e. c/y dredged f. c/y dredged7.Bordering Land Subject to Flooding 4023a. square feet b. square feet 4023c. square feet d. square feetCubic Feet Flood Storage 15e. cubic feet 15f. cubic feet 0g. cubic feet 0h. cubic feet8.Isolated Land Subject to Flooding a. square feet b. square feetCubic Feet Flood Storage c. cubic feet d. cubic feet e. cubic feet f. cubic feet9.Riverfront Area 5550a. total sq. feet b. total sq. feetSq ft within 100 ft c. square feet d. square feet e. square feet f. square feetSq ft between 100­200 ft g. square feet h. square feet i. square feet j. square feetCoastal Resource Area Impacts:Resource Area ProposedAlteration PermittedAlteration ProposedReplacement PermittedReplacement10.Designated Port Areas Indicate size under Land Under the Ocean, below11.Land Under the Ocean a. square feet b. square feetc. c/y dredged d. c/y dredged12.Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below13.Coastal Beaches a. square feet b. square feet c. c/y nourishment d. c/y nourishment14.Coastal Dunes a. square feet b. square feet c. c/y nourishment d. c/y nourishment15.Coastal Banks a. linear feet b. linear feet16.Rocky Intertidal Shores a. square feet b. square feet17.Salt Marshes a. square feet b. square feet c. square feet d. square feet18. Land Under Salt Ponds a. square feet b. square feetc. c/y dredged d. c/y dredged19.Land Containing Shellfish a. square feet b. square feet c. square feet d. square feet20.Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under theOcean, and/or inland Land Under Waterbodies and Waterways,abovec. c/y dredged d. c/y dredged21.Land Subject to Coastal Storm Flowage a. square feet b. square feet22. Restoration/Enhancement (For Approvals Only)If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footagethat has been entered in Section B.5.c & d or B.17.c & d above, please entered the additional amount here.a. square feet of BVW b. square feet of Salt Marsh23.Streams Crossing(s)If the project involves Stream Crossings, please enter the number of new stream crossings/number of replacementstream crossings.a. number of new stream crossings b. number of replacement streamcrossingsC. General Conditions Under Massachusetts Wetlands Protection ActThe following conditions are only applicable to Approved projects1.Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures,shall be deemed cause to revoke or modify this Order.2.The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury toprivate property or invasion of private rights.3.This Order does not relieve the permittee or any other person of the necessity of complying with all otherapplicable federal, state, or local statutes, ordinances, bylaws, or regulations. 4.The work authorized hereunder shall be completed within three years from the date of this Order unless eitherof the following apply:a. the work is a maintenance dredging project as provided for in the Act; orb. the time for completion has been extended to a specified date more than three years, but less than fiveyears, from the date of issuance. If this Order is intended to be valid for more than three years, theextension date and the special circumstances warranting the extended time period are set forth as aspecial condition in this Order.5.This Order may be extended by the issuing authority for one or more periods of up to three years each uponapplication to the issuing authority at least 30 days prior to the expiration date of the Order.6.If this Order constitutes an Amended Order of Conditions, this Amended Order of Conditions does not exceedthe issuance date of the original Final Order of Conditions.7.Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish,or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes,refrigerators, motor vehicles, or parts of any of the foregoing.8.This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appealhas been taken, until all proceedings before the Department have been completed.9.No work shall be undertaken until the Order has become final and then has been recorded in the Registry ofDeeds or the Land Court for the district in which the land is located, within the chain of title of the affectedproperty. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index underthe name of the owner of the land upon which the proposed work is to be done. In the case of the registeredland, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land uponwhich the proposed work is done. The recording information shall be submitted to the ConservationCommission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, priorto the commencement of work..10.A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearingthe words," Massachusetts Department of Environmental Protection" [or 'MassDEP"] File Number :"246­0724"11.Where the Department of Environmental Protection is requested to issue a Superseding Order, theConservation Commission shall be a party to all agency proceedings and hearings before Mass DEP.12.Upon completion of the work described herein, the applicant shall submit a Request for Certificate ofCompliance (WPA Form 8A) to the Conservation Commission.13.The work shall conform to the plans and special conditions referenced in this order.14.Any change to the plans identified in Condition #13 above shall require the applicant to inquire of theConservation Commission in writing whether the change is significant enough to require the filing of a newNotice of Intent.15.The Agent or members of the Conservation Commission and the Department of Environmental Protection shallhave the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance withthe conditions stated in this Order, and may require the submittal of any data deemed necessary by theConservation Commission or Department for that evaluation.16.This Order of Conditions shall apply to any successor in interest or successor in control of the property subjectto this Order and to any contractor or other person performing work conditioned by this Order.17.Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, theboundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging.Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has beenissued by the Conservation Commission.18.All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilizedwith vegetation or other means. At no time shall sediments be deposited in a wetland or water body. Duringconstruction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shallremove accumulated sediments as needed. The applicant shall immediately control any erosion problems thatoccur at the site and shall also immediately notify the Conservation Commission, which reserves the right torequire additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriersshall serve as the limit of work unless another limit of work line has been approved by this Order.NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS19.The work associated with this Order(the "Project") is (1)  is not (2) subject to the MassachusettsStormwater Standards. If the work is subject to Stormwater Standards, then the project is subject to thefollowing conditions;a)All work, including site preparation, land disturbance, construction and redevelopment, shall be implementedin accordance with the construction period pollution prevention and erosion and sedimentation control planand, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollutant DischargeElimination System Construction General Permit as required by Stormwater Standard 8. Construction perioderosion, sedimentation and pollution control measures and best management practices (BMPs) shall remainin place until the site is fully stabilized.b)No stormwater runoff may be discharged to the post­construction stormwater BMPs unless and until aRegistered Professional Engineer provides a Certification that: i. all construction period BMPs have beenremoved or will be removed by a date certain specified in the Certification. For any construction periodBMPs intended to be converted to post construction operation for stormwater attenuation, recharge, and/ortreatment, the conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that theBMP has been properly cleaned or prepared for post construction operation, including removal of allconstruction period sediment trapped in inlet and outlet control structures; ii.. as­built final constructionBMP plans are included, signed and stamped by a Registered Professional Engineer, certifying the site isfully stabilized; iii. any illicit discharges to the stormwater management system have been removed, as perthe requirements of Stormwater Standard 10; iv. all post­construction stormwater BMPs are installed inaccordance with the plans (including all planting plans) approved by the issuing authority, and have beeninspected to ensure that they are not damaged and that they are in proper working condition; v. any vegetationassociated with post­construction BMPs is suitably established to withstand erosion.c)The landowner is responsible for BMP maintenance until the issuing authority is notified that another partyhas legally assumed responsibility for BMP maintenance. Prior to requesting a Certificate of Compliance, orPartial Certificate of Compliance, the responsible party (defined in General Condition 19(e)) shall executeand submit to the issuing authority an Operation and Maintenance Compliance Statement ("O&M Statement")for the Stormwater BMPs identifying the party responsible for implementing the stormwater BMP Operationand Maintenance Plan ("O&M Plan") and certifying the following: i.) the O&M Plan is complete and will beimplemented upon receipt of the Certificate of Compliance, and ii.) the future responsible parties shall benotified in writing of their ongoing legal responsibility to operate and maintain the stormwater managementBMPs and implement the Stormwater Pollution Prevention Plan.d)Post­construction pollution prevention and source control shall be implemented in accordance with the long­term pollution prevention plan section of the approved Stormwater Report and, if applicable, the StormwaterPollution Prevention Plan required by the National Pollutant Discharge Elimination System Multi­SectorGeneral Permit.e)Unless and until another party accepts responsibility, the landowner, or owner of any drainage easement,assumes responsibility for maintaining each BMP. To overcome this presumption, the landowner of theproperty must submit to the issuing authority a legally binding agreement of record, acceptable to the issuingauthority, evidencing that another entity has accepted responsibility for maintaining the BMP, and that theproposed responsible party shall be treated as a permittee for purposes of implementing the requirements ofConditions 19(f) through 19(k) with respect to that BMP. Any failure of the proposed responsible party toimplement the requirements of Conditions 19(f) through 19(k) with respect to that BMP shall be a violationof the Order of Conditions or Certificate of Compliance. In the case of stormwater BMPs that are servingmore than one lot, the legally binding agreement shall also identify the lots that will be serviced by thestormwater BMPs. A plan and easement deed that grants the responsible party access to perform the requiredoperation and maintenance must be submitted along with the legally binding agreement.f)The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans,the O&M Plan, and the requirements of the Massachusetts Stormwater Handbook.g)The responsible party shall:1. Maintain an operation and maintenance log for the last three (3) consecutive calendar years ofinspections, repairs, maintenance and/or replacement of the stormwater management system or any partthereof, and disposal (for disposal the log shall indicate the type of material and the disposal location);2. Make the maintenance log available to MassDEP and the Conservation Commission ("Commission")upon request; and3. Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluateand ensure that the responsible party is in compliance with the requirements for each BMP established inthe O&M Plan approved by the issuing authority.h)All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance withall applicable federal, state, and local laws and regulations.i)Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited.j)The stormwater management system approved in the Order of Conditions shall not be changed without theprior written approval of the issuing authority.k)Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit (asdefined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1, Low Impact Development Site DesignCredits) shall not be altered without the prior written approval of the issuing authority.l)Access for maintenance, repair, and/or replacement of BMPs shall not be withheld. Any fencing constructedaround stormwater BMPs shall include access gates and shall be at least six inches above grade to allow forwildlife passage.Special Conditions:D. Findings Under Municipal Wetlands Bylaw or Ordinance1.Is a municipal wetlands bylaw or ordinance applicable? Yes  No2.The Conservation Commission hereby(check one that applies):a.DENIES the proposed work which cannot be conditionedto meet the standards set forth in a municipal ordinanceor bylaw specifically:1. Municipal Ordinance or Bylaw 2. CitationTherefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted whichprovides measures which are adequate to meet these standards, and a final Order or Conditions is issued. Whichare necessary to comply with a municipal ordinance or bylaw:b.APPROVES the proposed work, subject to the following additional conditions. 1. Municipal Ordinance or Bylaw NORTHAMPTON WETLANDS ORDINANCE 2. Citation CHAPTER 337 3.The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. The special conditions relating to municipal ordinance or bylaw are as follows: PLEASE SEE ATTACHMENT A E. Signatures This Order is valid for three years from the date of issuance, unless otherwise specified pursuant to General Condition #4. If this is an Amended Order of Conditions, the Amended Order expires on the same date as the original Order of Conditions. 10/16/2018 1. Date of Original Order Please indicate the number of members who will sign this form. This Order must be signed by a majority of the Conservation Commission. 4 2. Number of Signers The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A copy also must be mailed or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office, if not filing electronically, and the property owner, if different from applicant. Signatures:jen smith kevin lake c. mason maronn randy krotowski  by hand delivery on by certified mail, return receipt requested, on Date Date F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Request for Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7) within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order, or providing written information to the Department prior to issuance of a Superseding Order.  The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act (M.G.L. c. 131, § 40), and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. G. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on this page shall be submitted to the Conservation Commission listed below.  NORTHAMPTON Conservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. To: NORTHAMPTON Conservation Commission Please be advised that the Order of Conditions for the Project at: BURTS PIT ROAD 246­0724 Project Location MassDEP File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner DAVID VELETA and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant Rev. 4/1/2010 Massachusetts Department of Environmental Protection Bureau of Resource Protection ­ Wetlands WPA Form 5 ­ Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File #:246­0724 eDEP Transaction #:1322939 City/Town:NORTHAMPTON Page 8 of 10 * ELECTRONIC COPY “ATTACHMENT A” The Commission finds that placement of rocks at culvert outlets represents an additional disturbance to land under water and BVW, but is proposed solely for wildlife passage benefits. If the The change is of a relatively minor nature and the Commission finds that an amended Order is appropriate. This amendment does not extend the original Order, which is valid until January 20, 2023 pursuant to covid-related tolling. 20. Prior to the initiation of any work, the applicant/owner shall submit a letter of understanding to the Commission stating that he/she has received, read, understands and shall comply with these Orders. The applicant, and, his or her contractor, foreman and/or construction manager shall sign the letter of understanding. 21. Prior to the initiation of any work, the applicant shall submit to the Commission a sequencing plan for construction, and erosion and sedimentation control installation. 22. Prior to the start of any site work, excavation or construction, a pre-construction conference shall be held on the site, between the contractor conducting the work, the site/project engineer, the applicant, and a member or agent of the Conservation Commission, in order to ensure that the requirements of this Order are understood by all parties. Prior to the pre-construction meeting, all erosion control devices must be installed. 23. All required permits must be obtained from federal, state and municipal agencies and departments prior to the start of any project. 24. A copy of this Order and associated plans shall remain on site during all construction and/or building activities. The project manager and all equipment operators shall be familiar with the approved plans, and shall be informed of their location on the site. This location shall be accessible to all contractors whenever work is occurring on site. 25. All revised plans, referenced within this Order of Conditions, shall be approved by the Conservation Commission and incorporated into the permit by reference and shall be followed during the course of construction. 26. The areas of construction shall remain in a stable condition at the close of each construction day. Erosion control measures shall be inspected at this time, and maintained or reinforced as necessary. All such devices shall be inspected, cleaned or replaced during construction and shall remain in place until such time as stabilization of all areas that may impact resource areas is permanent. These devices shall also be inspected to assure that the maximum control has been provided. Any entrapped silt shall be removed to an area outside the buffer zone and resource areas, and maintained or reinforced as necessary. Erosion controls shall be inspected after every rainfall to assure that maximum control has been provided. 27. An adequate stockpile of erosion control materials shall be on site at all times for emergency or routine replacement and shall include materials to repair or replace silt fences, straw bales, erosion control blankets, riprap, filter berms or other devices planned for use during construction. 28. Soils exposed for periods greater than two months shall be stabilized with erosion control blankets and netting, a covering of straw mulch, or a temporary cover of rye or other grass to prevent erosion and sedimentation. Drainage ditches shall be stabilized and seeded with a native perennial grass mixture. Any stabilization materials such as jute netting shall be firmly anchored to prevent them from being washed from slopes by rain or flooding. Preference should be given to biodegradable materials. 29. All disturbed areas shall be graded, loamed and seeded, or stabilized with erosion control blankets or netting, and a covering of straw mulch prior to November 30, of each year. No disturbed areas or stockpiled materials will be left unprotected or without erosion control after this date. Condition 30 is specific to the Northampton Wetlands Ordinance: 30. No disposal of soils or other materials shall be allowed within: a 100-year floodplain; 40 feet of the 100-year floodplain elevation; any wetland; any area within 100-feet of a wetland; any area within 200 feet of a perennial stream; a vernal pool, or any area within 200 feet of a vernal pool unless such areas are specifically approved by the Commission, in accordance with 310 CMR 10.00, and City of Northampton Ordinances - Chapter 337 31. Ongoing conditions that shall not expire with the issuance of a Certificate of Compliance are as follows: 33 32. Upon completion of the work covered by this Order, the applicant shall submit an as-built plan, signed and stamped by a registered professional engineer or land surveyor, together with a written request for a Certificate of Compliance. The plan and written request shall specify any ways that the completed project differs from the plans referenced in the Order. The as-built plan shall include, at a minimum, and as applicable to the project: elevations of all pipe inverts and outlets, pipe sizes, materials, and slopes; all other drainage structures; limits of clearing, grading, and fill; all structures, pavement, and contours within 100 feet of wetland boundaries; all alterations within the wetland resource areas; and all dates of fieldwork. 33. The owner of the property described in this Order must advise any potential buyer of the property that any construction or alteration to said property, including brush cutting or clearance, may require approval by the Northampton Conservation Commission. Any deed or legal instrument conveying any or all of the owners' interest in said property or any portion thereof, shall contain the following language: "This property is subject to the Northampton Wetlands Protection Ordinance and/or Wetlands Protection Act. Any construction or maintenance work performed on this property may require an Order of Conditions, and/or a Determination of Applicability from the Northampton Conservation Commission. Condition specific to amendment: 34. All work with machinery shall take place from the roadway if possible. If off-roadway work is necessary for reach, machinery shall remain in upland areas. Work within resource areas shall take place manually.