Stormwater resolution Memo 7-6-18T REYNOLDS ENGINEERING | CIVIL ENGINEERS | PLANNING, DESIGN, AND PERMITTING SERVICES 152 MAPLEWOOD TERRACE, FLORENCE, MA 01062 | PHONE: 413-387-8078 | FAX: 413-727-3477 terry@treynoldsengineering.com | www.treynoldsengineering.com To: Saint Elizabeth Ann Seton Parish From: Terrence Reynolds P.E. Subject: 99 King Street, Northampton - Stormwater Issues Resolution Date: 7/6/2018 T Reynolds Engineering (TRE) met with Duffy Willard Paving & Excavation and Doug McDonald regarding the finding noted in the 99 King Street, Northampton, Stormwater Inspection and Recommendations memo dated 7/24/17. The meeting including myself, Frank Willard, Tom Fenton and Doug McDonald. During the meeting the findings of the above mentioned memo were discussed and a revised solution that will allow the project to be brought into compliance and obtain a Certificate of Compliance as required under the Northampton Stormwater Permit was agreed on. The following items have been agreed on to be done by Duffy Willard at their expense and are also agreeable to the representatives of Saint Elizabeth Ann Seton Parish; TRE is recommending the following improvements be made to the grading and structures listed below:  OCS #2 - Move the outlet control riser to outlet pipe. Riser INV should be adjusted to match the difference between the dry well pipe INV and Riser INV shown on the plan (1.35'). The new top of riser should be set at 137.68  OCS #3 - Outlet control riser should be replaced to include all specified orifices with all elevations raised 0.33' to match the difference found in the detention basin elevations. Outlet control inverts are as follows; o Top of Riser, 5" horizontal orifice =136.88 o 4.9" orifice=134.85 o 2.5" orifice=133.33 o 12" INV Out=133.22 (existing)  Add H20 rated Area Drain on the southern edge of the entrance drive just below the radius where the high point "BC 136.5" is specified. The structure rim will be set to match the existing grade (approx=136.4). The new area drain will be tied into Catch Basin #5 using 6" sdr35 PVC pipe cored into the structure. The Inv into catch basin #5 shall be set no lower the existing invert out and shall be run to the new area drain at a minimum slope of 1%. TRE will provide limited observation of the installation of the above listed structure repairs. cc: Frank Willard, Duffy Willard Doug McDonald, Northampton DPW