Grading and Drainage from Site Plans Revised April 2011SSSSSSSSSSSSSSSSSSSSSSSSSSSSOHOHOHOHOHOH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH140138
1
3
9
13
9
140
138
140
135
137138
139
136138137
SLOPE WALK/
CURB TO GRADE
W
G
CATCH BASIN
RIM 136.95
OUT 133.95
CATCH BASIN
RIM 136.55
OUT 133.85
CATCH BASIN
RIM 136.70
OUT 133.85
CATCH BASIN
RIM 138.90
OUT 135.65
CONNECT TO DRY
WELL AT 137.00,
TYP. OF 3
55LF 10" PVC @ 0.5%
31LF 10" PVC @ 0.5%
8" P
V
C
@
0
.
5
%
40
L
F
1
2
"
H
D
P
E
@
4
%67LF 12" HDPE @2.6%DRY WELL 2
BOTTOM 135.00
TOP 137.35
PIPE INV. 136.00
DETENTION BASINS
BOTTOM 132.50
TOP 136.55
EX. DMH
RIM 138.65
CORE NEW INV. AT 129.50
54" OUT 120.35
DRAIN BASIN
RIM 139.75
OUT 137.75115LF 10" HDPE @ 0.5%
8" PVC @0.5%
52L
F
1
2
"
H
D
P
E
@
0
.
6
%32LF 12" HDPE @ 0.5%22LF 12"
H
D
P
E
@ 1%
DMH(5'Ø)
RIM 138.95
IN(4) 133.90
OUT 133.80
30L
F
1
2
"
H
D
P
E
@
0
.
6
%
CATCH BASIN
RIM 136.75
OUT 133.85
CATCH BASIN
RIM 136.55
OUT 133.85
DMH
RIM 136.92
IN(3) 133.65
OUT 133.60
CATCH BASIN
RIM 138.80
OUT 134.70
(12" HDPE)8" HDPE @ 0.5%OCS 1
RIM 139.65
IN 137.00
OUT 135.50
80LF
1
0
"
P
V
C
@
1
%
ROOF
E
M
E
R
G
E
N
C
Y
R
O
U
T
E
CONNECT TO DRY
WELL AT 136.00,
TYP. OF 3
OCS
RIM 139.98
IN 136.35
OUT 133.35
85LF 12" HDPE @ 2.7%25LF 12" HDPE@ 0.8%55LF 12" HDPE @ 0.5%DMH
RIM 137.27
IN(2) 133.65
OUT 133.55
OCS 3
RIM 139.60
IN 133.00
OUT 133.00
SWTC1-STC900
RIM 139.50
IN 132.95
OUT 132.87
DRY WELL 1
BOTTOM 137.00
TOP 138.35
PIPE INV. 137.00
10" HDPE FEO
INV 135.35'WWWWWWWWWWWWWW
GGGGGGGGGGGGGGGGGGGGGGGGGSS SSSSSSSSSSSSW
SSEEEEEE63LF 12" HDPE @ 0.5
%
DMH
RIM 139.60
IN 133.45
OUT 133.35
E EEEEEEEE139
GGGGGG
G140 1391401
4
0
141141
136
139
1
3
8
138
141
40LF 12" RCP @ 2.7%TAPPING SLEEVE
& VALVEWC.O.
C.O.
Grading & Drainage
St. Elizabeth Ann
Seton Parish
NORTHAMPTON, MA
Plan
1. All areas disturbed from construction activity to
be raked, smoothed, fertilized and seeded with
perennial turfgrasses unless otherwise noted.
2. All sidewalks/walkways and curb ramps shall
conform to the Massachusetts Architectural Access
Board's (AAB) requirements. Sidewalk/walkway
cross-slope is 1.5 % minimum, 2.0% maximum.
Slopes shall not exceed 2% across any accessible
parking space or adjacent aisles.
3. All materials and construction methods shall
conform to the applicable construction standards
and specifications of the City and the
Massachusetts Department of Transporation.
4. Utilities indicated on these plans (water, sanitary,
sewer, gas, electric) are schematic in nature.
5. Do not scale drawings for quantity take-offs or
construction. Use written dimensions only
General Notes
4-13-11 DPW/Stormwater Comments
Revisions
Landscape Architecture
Civil EngineeringPlanning
Berkshire
Group, Inc.Design
The
Land Surveying
2
NOT FOR CONSTRUCTION
FOR PERMIT REVIEW ONLY