Loading...
Northampton Permit Framework2-17-PDF90 90 30 303030 45 65 65 90 90 Withi n 65 daysWithin 65 day s 21 21 Within 65 day s DEMOLITION DELAY (161.5) NORTHA MPTON PERMITS April 30, 2017 Days Buildi n g Department ZONING PERMIT (Z 350-4.4) Historic Commi ssion Building permit submitted with additional information: - location - photo - purpose for demolition permit - proposed new use/construction Building Commissioner fowards application to Historical Commission Public Hearing held w/in 45 days of application If positive, 12 month delay of building permit issuance Historic Com m ission 0 ZBA Central Business Archi t ecture Comm ittee ELM ST/ROUND HILL (CH. 195) DETERMINATION of non-applicability by Commission or Planning Director conducted administratively, certificate issued within 14 days if exempt APPLICATION submitted for certificate of appropriateness or non-applicability: - photos - project description/information - plans (as applicable) Commission determines non-applicability or need for public hearing Public Hearing (if needed) DPW STORMWATER PERMIT APPLICATION submitted including: - Stormwater report - Zoning and land use - Existing and proposed easements and utilities - Existing and proposed topo (2') - Soils - Seasonal groundwater elevation - Existing stormwater flows/storage - Surfaces with runoff coefficient - Stormwater structural details - Excavation plans & erosion control Administrative review Planni n g B oard SUBDIVISION A PPROVAL (CH. 290) PRELIMINARY Plan Submitted (for non-residential subdivisions) w/: - boundaries - owners and abutters - roads/ easements/ common areas - topo & features - storm drainage, sewer/water (proposed or existing) Multiple city boards review within 21 days DEFINITIVE Plan Submitted w/: - boundaries and lot lines - owners and abutters - roads/easements/common areas - topo & special features - tree inventory - survey of streets and ways - grading contours - storm, sewer, water, LID - infrastructure construction details (catch basins, access roads, etc.) - boring logs - hydro study - sewer, water, traffic studies - septic plans, if applicable - flood elevations, if applicable Preliminary Subdivision decision issued within 45 days BOH comments 45 days after filing Cons. Comm. comments 30 days after filing, if able Public Hearing w/in 65 days of application filing Approval issued 90 days after filing for non-residential Plan ning Board SITE PLAN APPROVAL (Z 350.11) Application submitted with: - Zoning / abutters - Setbacks - Wetlands / contours - Parking / driveways / access - SW drainage - Utilities (water/sewer) - Landscaping / screening - Signs - Erosion control - Traffic/ped circulation Site Plan Approval issued within 90 days of closing of hearing process Site Plan Public Hearing within 65 days (can be continued over multiple meetings) Decision filed with city clerk within 14 days Planning Board SPECIAL PERMIT (Z 350.10) Decision filed with city clerk within 14 days Application submitted WITH SITE PLANS showing - setbacks/buffers - parking - stormwater/drainage - traffic (on & off site) - wetlands/waterways - water/sewer connections - pedestrian flow - zoning conformance -fire/safety impact - conformance with city plans Special Permit decision issued w/in 90 days of close of hearing Planning Board Public Hearing (can be continued over multiple meetings) ZBA COMPREHENSIVE PERMIT APPLICATION filed with ZBA including: - full site plan - number of units - Site Approval by MAC - parking & traffic - wetlands, stormwater - utilities ZBA Public Hearing w/in 30 days of application ZBA distributes application to local boards/committees ZBA can deny based on statutory minima/safe harbor (45 days); otherwise, negotiations ZBA Public Hearing closes after 180 days ZBA files decision w/in 40 days after close of public hearing ZBA FINDINGS (Z 350.9) APPLICATION filed with city clerk including: - project or site plan showing setbacks, parking, open space, new use Decision filed with city clerk w/ithn 20 days Finding issued w/in 90 days from end of hearing process (can be continued) ZBA Public Hearing w/in 65 days ZBA VARIANCE (Z 350.4-10) APPLICATION filed with city clerk including: - cicumstances unique to property - non-self-imposed hardship from literal zoning enforcement due to soil, shape, or topography - no reasonable use of property - no detriment to public good - aligns with intent of zoning - minimum variance afforded Public Hearing Multiple city boards review Decision filed with city clerk SPECIAL PERMIT (Z 350.10 & 10.12) Application submitted WITH FLOOR PLANS showing: - setbacks/buffers - elevations showing new entrances - parking - # of occupants - # of employees/clients (if relevant) - zoning conformance -delivery, hours, products on-site Public Hearing within 65 days (can be continued over multiple meetings) Applicant submits all necessary materials at least 30 days prior to public hearing Applicant submits all necessary materials at least 30 days prior to public hearing Applicant submits all necessary materials at least 30 days prior to public hearing AL L A PPLICA NTS SUBMIT FIRST Application submitted with: - lot size - frontage - height -setbacks - square footage - open space - parking spaces - status of/need for other permits Historic Commission determines significance, notifies Building Commissioner in writing Zoning permit issued Wi th in 30 d ays, b ut most often withi n 2-7 day s Does project involve demolition of structure built before 1900, on city's Form B Historic Inventory, and/or located in historic district other than Central Business Architecture? Is project located in Elm St. or Round Hill Historic District, and in need of a certificate of nonapplicability or appropriateness per Chapter 195.5? withi n 30 days within 14 days Determination if building should be preferably preserved w i t hin 30 days Certificate of Appropriateness, or Hardship, or Disapproval issued Does project disturb more than one acre of land? Wi th in 7 days Is the project not able to meet zoning requirements due to lot soils, shape, or topography or unique physical, non-self-imposed circumstances? Does the project involve a pre-existing non-conforming building, lot, or use? Withi n 30 days Wi t h in 35 d ays Has a site approval application been approved by a state housing subsidizing agency, and has the municipal CEO commented on the application? (Zoning permit does not apply at this stage.) Within 90 days Within 20 days ZBA Decision 40 days Is the project a detached accessory dwelling unit, sign not meeting by-right standards, or home occupation? Does the project type or use require a special permit based on the zoning code? Does the project type or use require site plan approval based on the zoning code? 7 Within 8 d ays THEN within 20 days Applicant may file an appeal for additional review w ithin 45 days Appeal decision wi th in 7 days within 14 days Permits manager coordinates with SW manager 14 Wi th in 35 d ays Permits manager reviews and provides recommendations within 18 days Appeals filed Withi n 14 days Within 20 days Permits manager reviews within 2 weeks; legal ad placed within 18 days of public hearing Public hearing usually resolved in one night 15 days 180 days Permits manager reviews within 2 weeks Permits manager reviews within 2 weeks Special Permit decision issued w/in 90 days of close of hearing Decision filed with city clerk within 14 days Appeals must be made within 20 days of decision filing Appeals must be made within 20 days of decision filing 90 day s 14 days 20 days 90 days 14 days 20 d ays Permits manager reviews within 2 weeks Appeals must be made within 20 days of decision filing 90 d ays 14 day s 20 day s Permits manager distributes application OR Public Hearing usually held w/in 45 days Certificate of action issued 135 days for residential with no prelimary plan Appeals filed within 21 days of certificate of action Does the project involve the division of land into two or more lots, and the construction of new ways and/or municipal services? 14 14 day s Certificate of non-applicability usually issued within 1-2 days 14-30 days Meeting publicly posted minimum 2 weeks before date Public hearing usually held within 30-40 days; permit usually issued concurrently Within 65 day s CBA Comm. public hearing and decision usually completed within 30 days DPW SW Permit issued within 21 days of complete application 90 90TRIGGERS7 100 +100+ 45 DPW WATER/SEWER/STORM AVAIL. Applicants Notified of Availability w/in 2-3 days "AVAILS" APPLIED FOR - applicant provides project location and plans Water/Sewer/Storm Superintendents review and assign pipe size, etc. Applicants may now apply for entry, trench, and building permits Has the project been assigned an address and received the first signature for a driveway location (for new development)? Conservation Com mission NOI (CH. 337) WPA Form 3 for NOI submitted, including: - boundaries of resource areas - proposed project and location in relation to resource areas - stormwater report - abutters notified File Notification Number issued Missing submittal information requested, if any, and site visit Public hearing held (may continue over successive hearings) Appeals filed for DEP decisions Will the project alter or take place in a protected resource area or buffer zone? Within 21 day s OR Within 21 days Order of Conditions Within 21 days Public hearing usually held within 14 days (unless delayed by winter season) Within 21 days Usually 1 day Within 10 days Appeals filed for Con Com decisions Within 21 day s Conserv ation Commis sion RDA (CH. 337) WPA Form 1 for RDA submitted, including: - boundaries of resource areas - proposed project and location in relation to resource areas Site visit by conservation agent Public Hearing scheduled to occur within 21 days of application Is it known whether project will take place within 100 feet of a protected resource area (wetland, stream, vernal pool, bank, etc.), or is the work within 100 feet on a developed lot? Within 30 days Determination (may require NOI) Withi n 21 days Public hearing usually held within 14 days (unless delayed by winter season) Abutters Notified Planning Board WEST ST. ARCH (S. 156-9) APPLICATION submitted including: - photos of existing conditions - scale plans of renovations/alterations/new constr. - renderings or simulations - existing and proposed materials - any financial hardships Planning Board meeting and decision within 65 days Is the project a non-exempt construction, alteration, or demolition project in the West Street Architecture District? Appeals filed within 21 days Permits manager reviews and provides recommendations to Planning Board Planning board meeting and decision usually within 30 days Plann ing Board ANR (SUBD IV.290-13) Application submitted with - Roadway alignment - Roadway designation/use - Utility and ROW easements - Lot numbers/lines - Abutters ANR Permit decision issued within 21 days ANR applicaton discussed as part of Planning Board Meeting Agenda Does the project involve the division of land into two or more lots with vital access to an existing way and adequate road frontage? Permits manager reviews CBA PERMIT (156-6) APPLICATION submitted including: - photos of existing conditions - scale plans of renovations/alterations/new constr. - renderings or simulations - existing and proposed materials - any financial hardships OR APPLICATION for non-applicability Permits manager reviews, determines applicability, and provides recommendations to CBA committee (if applicable) within 14 days CBA public hearing within 65 days CBA decision issued within 90 days after close of hearing Appeals filed within 21 days Is the project a non-exempt construction, alteration, or demolition project in the Central Business District? Appeals filed within 21 days after decision