Loading...
38A-99,102 Village at Hospital Hill Notice of IntentI J Kolimorgen at Village Hill Northampton, Massachusetts Notice of Intent Prepared For: Kollmorgen Electro Optical Northampton, Massachusetts June 2009 O 106 -3 -01 June 5, 2009 Office of Planning and Development Northampton Conservation Commission 210 Main Street Northampton, MA 01060 Re: Notice of Intent (NOI) Kollmorgen at Village Hill Northampton, Massachusetts Dear Members of the Commission: On behalf of Kollmorgen Electro- Optical (Kollmorgen), Tighe Bond is submitting this Notice of Intent (NOI) for the construction of a new light industrial /commercial building at the Village Hill South Campus in Northampton, Massachusetts. The new facility will serve as Koilmorgen's new world headquarters and incorporates a major employer to the Village Hill community. A copy of WPA Form 3 and City of Northampton Wetlands Application, is provided on the next pages. An Order of Conditions is required for this project, as work will be taking place within. the 100 -foot Buffer Zone of an isolated vegetated wetland /wet meadow. This project is, not subject to the provisions of the Massachusetts Wetlands Protection Act (M.G.L. c. 131,.40): We look forward to discussing this important project with the Commission at the June 28, 2009 public hearing. Should you have any questions or require additional information, please contact Daniel Rukakoski at (413) 875 -1302 or me at (413) 572 -3281. Very truly yours, TIGHE BOND, INC. Jay P. Viamari, P.E. Associate Enclosures Copy: David Graves, Kollmorgen Electro- Optical J: \O \00106 \Permits \NOI \NOI cover letter.doc Tighe &Bond www.tighebond.com 53 Southampton Road Westfield, MA 01085 Tel 413.562.1600 Fax 413 -562.5317 Table of Contents Tighe &Bond Cover Letter WPA Form 3 Notice of Intent City of Northampton Wetlands Application Copy of NOI Conservation Commission Fee Checks Appendix A Project Narrative Section 1 Introduction Section 2 Existing Environment 2.1 Methodology of Resource Area Investigations 2-1 2.2 Description of Wetland Resource Areas 2 -1 2.3 Rare Species 2 -1 Section 3 Project Description 3.1 Proposed Activities 3 -1 3.1.1 Construction Sequence 3 -1 3.2 Construction Period Protective Measures 3 -1 3.2.1 General 3 =1 3.3 Restoration Plan 3 -2 3.3.1 Buffer Zone 3 -2 Section 4 Regulatory Compliance 4.1 Massachusetts Wetlands Protection Act 4 -1 4.2 City of Northampton Wetlands Ordinance 4 -1 4.3 Stormwater Compliance 4 -1 Appendix B Figures Figure 1 USGS Site Locus Map Figure 2 DEP Priority Resource Map Figure 3 NHESP Map Figure 4 FEMA Flood Zones Map Project Drawings (Sheets 1 through 12 provided at half scale) Appendix C Photographs Appendix D Stormwater Report Appendix E Abutter Notification Information List of Abutters Abutter Notification Form Assessors Tax Map fl Important: When filling out forms on the computer, use only the tab key to move your cursor do not use the return key. O NBRUn f f Note: Before completing this form consult your local Conservation Commission regarding any municipal bylaw or ordinance. Massachusetts Department of Environmental Protection Bureau of Resource Protection Wetlands WPA Form 3 Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. General Information 1. Project Location (Note: electronic filers will click on button to locate project site): Village at Hospital Hill a. Street Address Latitude and Longitude: 38A 99, 102 f. Assessors Map /Plat Number g. Parcel /Lot Number 2. Applicant: David Graves a. First Name b. Last Name Kollmorgen Electro Optical c. Organization 347 King Street d. Street Address Northampton MA e. City/Town f. State 413- 586 -2330 h. Phone Number i. Fax Number 3. Property owner (required if different from applicant): Check if more than one owner a. First Name Hospital Hill Development LLC c. Organization 160 Federal Street d. Street Address Boston e. City/Town h. Phone Number 4. Representative (if any): Jay a. First Name Tighe Bond c. Company 53 Southampton Road i. Fax Number d. Street Address Westfield e. City/Town 413- 572 -3281 413- 562 -5317 h. Phone Number i. Fax Number MA f. State a. Total Fee Paid b. State Fee Paid j. Email Address j. Email address Northampton b. City/Town 42.30964 d. Latitude b. Last Name Viamari b. Last Name j. Email address 5. Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form): $200 NA Provided by MassDEP: $200 MassDEP File Number Document Transaction Number City/Town 01060 c. Zip Code 72.64703 e. Longitude 01060 g. Zip Code 02110 g. Zip Code MA 01085 f. State g. Zip Code jpviamari @tighebond.com c. City/Town Fee Paid wpaform3.doc rev. 04 /08/09 age fa For all projects affecting other Resource Areas, please attach a narrative explaining how the resource area was delineated. wpaform3: bd rev: 04 /08/09 Massachusetts Department of Environmental Protection Bureau of- Resource Protection Wetlands WPA Form 3 Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. General Information (continued) Provided by MassDEP: MassDEP File Number Document Transaction Number City/Town 6. General Project Description: Construction of approximate 140,000 square foot light industrial /commercial building. 7a. Project Type Checklist: 1. Single Family Home 2. Residential Subdivision 3. Limited Project Driveway Crossing 4. Commercial /Industrial 5. Dock/Pier 6. Utilities 7. Coastal Engineering Structure 8. Agriculture (e.g., cranberries, forestry) 9. Transportation 10. Other 7b. Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 (coastal) or 310 CMR 10.53 (inland)? 1. Yes No If yes, describe which limited project applies to this project: 2. Limited Project 8. Property recorded at the Registry of Deeds for: Hampshire a. County 6925 c. Book b. Certificate (if registered land) 302 d. Page Number B. Buffer Zone Resource Area Impacts (temporary permanent) 1. Buffer Zone Only Check if the project is located only in the Buffer Zone of a Bordering Vegetated Wetland, Inland Bank, or Coastal Resource Area. 2. Inland Resource Areas (see 310 CMR 10.54- 10.58; if not applicable, go to Section B.3, Coastal Resource Areas). Check all that apply below. Attach narrative and any supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. Resource Area a. Bank Size of Proposed Alteration Proposed Replacement (if any) 1. linear feet 2. linear feet b. Bordering Vegetated Wetland 1. square feet 2. square feet c. Land Under Waterbodies and Waterways 1. square feet 2. square feet 3. cubic yards dredged Page 2 of 8 C I L n I Online Users: Include your document transaction number (provided on your receipt page) with all supplementary information you submit to the Department. wpaform3.doc -rev: 04 /08/09_______ Massachusetts Department of Environmental Protection Bureau of Resource Protection Wetlands WPA Form 3 Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Buffer Zone Resource Area Impacts (temporary permanent) (cont'd) Resource Area d. Bordering Land Subject to Flooding e. Isolated Land Subject to Flooding 1. square feet f. Riverfront Area 2. Width of Riverfront Area (check one): 25 ft. Designated Densely Developed Areas only 100 ft. New agricultural projects only 200 ft. All other projects 3. Total area of Riverfront Area on the site of the proposed project: 4. Proposed alteration of the Riverfront Area: a. total square feet 5. Has an alternatives analysis been done and is it attached to this NOI? Yes No 6. Was the lot where the activity is proposed created prior to August 1, 1996? Yes No 3. Coastal Resource Areas: (See 310 CMR 10.25- 10.35) Check all that apply below. Attach narrative and supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. Resource Area a. Designated Port Areas Indicate size under Land Under the Ocean, below b. Land Under the Ocean c. Barrier Beach d. Coastal Beaches e. Coastal Dunes Provided by MassDEP: MassDEP File Number City/Town Size of Proposed Alteration Proposed Replacement (if any) 1. square feet 2. square feet 3. cubic feet of flood storage lost 4. cubic feet replaced 2. cubic feet of flood storage lost 3. cubic feet replaced 1. Name of Waterway (if available) Document Transaction Number square feet b. square feet within 100 ft. c. square feet between 100 ft. and 200 ft. Size of Proposed Alteration Proposed Replacement (if anv) 1. square feet 2. cubic yards dredged Indicate size under Coastal Beaches and /or Coastal Dunes below 1. square feet 2. cubic yards beach nourishment 1. square feet 2. cubic yards dune nourishment Page 3 of 8 L-. L j f wpaform3,doc rev: O4 /08/09 Massachusetts department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection Wetlands WPA Form 3 Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Buffer Zone Resource Area Impacts (temporary permanent) (cont'd) Size of Proposed Alteration Proposed Replacement (if any) f. Coastal Banks g. Rocky Intertidal Shores h. Salt Marshes i. Land Under Salt Ponds j. Land Containing Shellfish k. Fish Runs 10/2008 b. Date of map 1. linear feet 1. square feet 1. square feet 2. cubic yards dredged 1. cubic yards dredged a. square feet of BVW b. square feet of Salt Marsh 5. Project Involves Stream Crossings MassDEP File Number Document Transaction Number City/Town 1. square feet 2. sq ft restoration, rehab., creation 1. square feet Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and /or inland Land Under Waterbodies and Waterways, above I. Land Subject to Coastal Storm Flowage 1. square feet 4. Restoration /Enhancement If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.2.b or B.3.h above, please enter the additional amount here. a. number of new stream crossings b. number of replacement stream crossings C. Other Applicable Standards and Requirements Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review 1. Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on the most recent Estimated Habitat Map of State Listed Rare Wetland Wildlife published by the Natural Heritage and Endangered Species Program (NHESP)? To view habitat maps, see the Massachusetts Natural Heritage Atlas or go to http: /www. mass .gov /dfwele /dfw /nhesp /regulatory review /priority habitat/online viewer.htm. a. Yes No If yes, include proof of mailing or hand delivery of NOI to: Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife Route 135, North Drive Westborough, MA 01581 Page 4 of 8 ii Massachusetts Department of Environmental Protection Bureau of Resource Protection Wetlands WPA Form 3 Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. Other Applicable Standards and Requirements (cont'd) If yes, the project is also subject to Massachusetts Endangered Species Act (MESA) review (321 CMR 10.18). To qualify for a streamlined, 30 -day, MESA/Wetlands Protection Act review, please complete Section C.1.C, and include requested materials with this Notice of Intent (NOI); OR complete Section C.1.d, if applicable. If MESA supplemental information is not included with the NOI, by completing Section 1 of this form, the NHESP will require a separate MESA filing which may take up to 90 days to review (unless noted exceptions in Section 2 apply, see below). 1. c. Submit Supplemental Information for Endangered Species Review* 1. Percentage /acreage of property to be altered: (a) within wetland Resource Area (b) outside Resource Area 2. Separate MESA review ongoing. percentage /acreage percentage /acreage Provided by MassDEP: MassDEP File Number Document Transaction Number'. City/Town 2. Assessor's Map or right -of -way plan of site 3. Project plans for entire project site, including wetland resource areas and areas outside of wetlands jurisdiction, showing existing and proposed conditions, existing and proposed tree /vegetation clearing line, and clearly demarcated limits of work (a) Project description (including description of impacts outside of wetland resource area buffer zone) (b) Photographs representative of the site (c) MESA filing fee (fee information available at:. http: /www. mass .gov /dfwele /dfw /nhesp /regulatory review /mesa /mesa fee schedule.htm). Make check payable to "Natural Heritage Endangered Species Fund" and mail to NHESP at above address Projects altering 10 or more acres of land, also submit: (d) Vegetation cover type map of site (e) Project plans showing Priority Estimated Habitat boundaries d. OR Check One of the Following 1. Project is exempt from MESA review. Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14, http: /www. mass .gov /dfwele /dfw /nhesp /regulatory review /mesa /mesa exemptions.htm; the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to 310 CMR 10.37 and 10.59.) a. NHESP Tracking b. Date submitted to NHESP Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review (see http: /www.mass.ciov /dfwele /dfw /nhesp /nhesp.htm, regulatory review tab). Priority Habitat includes habitat for state listed plants and strictly upland species not protected by the Wetlands Protection Act. MESA projects may not be segmented (321 CMR 10.16). The applicant must disclose full development plans even if such plans are not required as part of the Notice of Intent process. Page 5 of 8 wpaform3:doc rev. 04/08/09---___ Online Users: Include your document transaction number (provided on your receipt page) with all supplementary information you submit to the Department. b. Yes wpaform3.doc rev. 04/08/09 I Massachusetts L artment of Environmental Protet...on Bureau of Resource Protection Wetlands WPA Form 3 Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. Other Applicable Standards and Requirements (cont'd) 3. Separate MESA review completed. Include copy of NHESP "no Take" determination or valid Conservation Management Permit with approved plan. 2. For coastal projects only, is any portion of the proposed project located below the mean high water line or in a fish run? a. Not applicable project is in inland resource area only Also if yes, the project may require a Chapter 91 license. For coastal towns in the Northeast Region, please contact MassDEP's Boston Office. For coastal towns in the Southeast Region, please contact MassDEP's Southeast Regional Office. 3. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)? a. Yes No If yes, provide name of ACEC (see instructions to WPA Form 3 or MassDEP Website for ACEC locations). Note: electronic filers click on Website. b. ACEC 4. Is any portion of the proposed project within an area designated as an Outstanding Resource Water (ORW) as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00? a. Yes No 5. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Restriction Act (M.G.L. c. 131, 40A) or the Coastal Wetlands Restriction Act (M.G.L. c. 130, 105)? a. Yes No 6. Is this project subject to provisions of the MassDEP Stormwater Management Standards? a. Yes. Attach a copy of the Stormwater Report as required by the Stormwater Management Standards per 310 CMR 10.05(6)(k) -(q) and check if: 1. Applying for Low Impact Development (LID) site design credits (as described in Stormwater Management Handbook Vol. 2, Chapter 3) 2. A portion of the site constitutes redevelopment 3. Proprietary BMPs are included in the Stormwater Management System. b. No. Check why the project is exempt: Project not subject to WPA but has been designed to meet MAWPA Stormwater Standards 1. Single- family house South Shore Cohasset to Rhode Island, and the Cape Islands: Division of Marine Fisheries Southeast Marine Fisheries Station Attn: Environmental Reviewer 838 South Rodney French Blvd. New Bedford, MA 02744 Provided by MassDEP: No If yes, include proof of mailing or hand delivery of NOI to either: North Shore Hull to New Hampshire: Division of Marine Fisheries North Shore Office Attn: Environmental Reviewer 30 Emerson Avenue Gloucester, MA 01930 MassDEP File. Number Document Transaction, Number City/Town Page 6 of 8 I wpaform3.doc rev. 04/08/09 L .,1 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection Wetlands WPA Form 3 Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. Other Applicable Standards and Requirements (cont'd) 2. Emergency road repair s. Small Residential Subdivision (less than or equal to 4 single family houses or less than or equal to 4 units in multi family housing project) with no discharge to Critical Areas. D. Additional Information Applicants must include the following with this Notice of Intent (NOI). See instructions for details. Online Users: Attach the document transaction number (provided on your receipt page) for any of the following information you submit to the Department. 1. USGS or other map of the area (along with a narrative description, if necessary) containing sufficient information for the Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.) 2. Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative to the boundaries of each affected resource area. 3. Identify the method for BVW and other resource area boundary delineations (MassDEP BVW Field Data Form(s), Determination of Applicability, Order of Resource Area Delineation, etc.), and attach documentation of the methodology. 4. List the titles and dates for all plans and other materials submitted with this NOI. Kollmorgen Electro Optical Village Hill a. Plan Title Tighe Bond, Inc. b. Prepared By May 2009 d. Final Revision Date Jay P. Viamari c. Signed and Stamped by 1:60 e. Scale MassDEP File Number Document Transaction Number City/Town f. Additional Plan or Document Title g. Date 5. If there is more than one property owner, please attach a list of these property owners not listed on this form. 6. Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed. 7. Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed. 8. Attach NOI Wetland Fee Transmittal Form NA 9. Attach Stormwater Report, if needed. _Pa9e.7 -Of wpaform3.doc rev. 04/08/09 Massachusetts Department -of Environmental Protection Bureau of Resource Protection Wetlands WPA Form 3 Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 E. Fees 1. 0 Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority. Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form) to confirm fee payment: 2. Municipal Check Number 3. Check date 4. State Check Number 5. Check date 6. Payor name on check: First Name 7. Payor name on check: Last Name F. Signatures and Submittal Requirements 1 hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, 40. Notice must be made by Certificate of Mailing or in writing by hand delivery or certified mail (return receipt requested) to all abutters within 100 feet of the property line of the project location. 3. Sign ure of Pr axed Graves, ollmorgen) re of Representative (if any) (Jay P. Viamari, Tighe Bond, Inc.) �1 Provided by MassDEP: MassDEP File Number Document Transaction Number City/Town ‘Aa4- s res, 2. Date perty Owner (if different) 4. Da e 6. Date For Conservation Commission: Two copies of the completed Notice of Intent (Form 3), including supporting plans and documents, two copies of the NOI Wetland Fee Transmittal Form, and the city/town fee payment, to the Conservation Commission by certified mail or hand delivery. For MassDEP: One copy of the completed Notice of Intent (Form 3), including supporting plans and documents, one copy of the NOI Wetland Fee Transmittal Form, and a copy of the state fee payment to the MassDEP Regional Office (see Instructions) by certified mail or hand delivery. Other: If the applicant has checked the "yes" box in any part of Section C, Item 3, above, refer to that section and the Instructions for additional submittal requirements. The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent. Page 8 of 8 City of Northampton Wetlands Application This form is required for all applications filed under the Northampton Wetlands Ordinance File with the Office of Planning and Development, 210 Main Street, Northampton, MA 01060 We recommend applicants consult with the Land Use and Conservation Planner (587 -1263) before applying 0 1. Check what kind of permit you are. requesting Request for Determination of Applicability (WPA form 1) Notice of Intent (WPA form 3) Abbreviated Notice of Resource Area Delineation (WPA form 4A) 2. Property Street Address: Village at Hospital Hill (Northampton State Hospital) 3. Assessors' Map and Parcel: 38A 102 Second lot (if any) Map and Parcel(s): 38A Additional property description: Hospital Hill South Campus 4. Check the items enclosed. Your application will not be accepted if any items are missing. The appropriate completed Massachusetts DEP application http://www.mass.gov/dep/water/approvals/wwfonns.htm Completed versions of this Wetlands Application Nine (9) copies of the fully completed and collated application packages (forms, plans and attachments) All plans folded (not rolled) and collated with each application packet For Notice of Intent applications only, submit the following: Appropriate Notice of Intent Conservation Commission Fees http: /www.northamptonma. gov /opd/ uploads /listW idget /2533 /opd %20fees.pdf An abutters list of all property owners within at least 100 feet of the property line of your project. Abutters lists may be generated at www.NorthamptonMA.gov /opd (click on Database: Abutters, Permits and Historic). Computers are available at City Hall, Forbes and Lilly Libraries. For Request for Determination applications, appropriate Request for Determination of Applicability Fees http: /www.northamptonma .gov /opd/uploads /listWidget /2533 /opd %20fees.pdf For Notice of Resource Area Delineation use Notice of Intent Fee http: /www.northamptonma. gov /opd/uploads /listW idget/2533 /opd %20fees.pdf A #10 business envelope addressed to the applicant. Ed 5. Provide an Existing Conditions Site Plan. Check the items shown on that plan. You may request a waiver from submittal requirements, with a reason for the waiver request. Boundary of entire lot and notation of lot area Context of adjacent lots, if necessary to show extent of wetland/Riverfront Area Numbered wetland flags Existing and potential vernal pools 50' AND 100' wetland buffer Mean Annual High Water line, for Riverfront Area permits 100' inner riparian zone AND 200' outer riparian zone, for Riverfront Area permits Existing structures, impervious surfaces (ie: pavement, gravel) and lawn areas Edge of vegetation accurately measured or surveyed Significant (8 Diameter Breast Height) trees within the limit of work area that are also within the 200' Riverfront Area, Bordering Vegetated Wetland, or 100' wetland buffer 2' contours Elevations in feet (not meters), for projects within the floodplain Zoning setbacks 1:20 scale, if possible 12 12 12 0 12 0 0 If new work is proposed, provide a Proposed Site Plan. Check the items shown on that plan, You may request a waiver from submittal requirements, with a reason for the waiver request, 0 Ei 0 Grading /proposed new contours Hardscape (i.e.: footprint of house, driveway, walkways, terraces, etc...) Any removal of vegetation and significant trees within the Riverfront Area, wetland and buffer Landscaping and plantings within the Riverfront Area, wetland and wetland buffer Location of erosion control barrier Limit of work line Utility lines Stormwater Management Form (use DEP form www.mass. ov /de /b )/ww /wwforms.htmj, if required Wildlife assessment if the site is in a habitat resource area based on NIIESP maps, Northampton Potential and Certified Vernal Pools Map or otherwise required by the Act or Ordinance. At the same scale as the Existing Conditions Site Plan For new homes in the Riverfront Area only, documentation of the date the lot was recorded. 7. We have provided and requested information and believe and understand that (initial each item below): Application deadline is one calendar month prior to a public hearing. If the application is incomplete or, waivers are requested, however, the public hearing may be delayed; We will check for the date and time of our public hearing at www.NorthamptonMA.gov or in the Daily Hampshire Gazette Legal Ads section. Such notice is posted seven days prior to the public hearing; The Conservation Commission may request an alternatives analysis for work proposed within the buffer zone of a wetland; The Conservation Commission and their representatives have permission to enter the property; All documents and plans submitted are in the public domain and may be copied freely in any form; and The City will record Orders of Conditions and Order of Resource Area Delineations at the Hampshire County Registry of Deeds. 8 PLEASE COMPLETE ONLY IF APPLYING FOR NOTICE OF INTENT or ABBREVIATED NOTICE OF RESOURCE ARE DELINEATION: We certify under the pains and penalties of perjury, that PRIOR to filing this application all abutters were notified of this application pursuant to the requirements of'M.G.L. <c. 131 40. Notice must be made in writing by hand delivery or certified mail (return receipt requested) to alI abutters within 100 feet of the property line of the project location. Applicant (print or type):. David Graves Applicant Signaturi. Address: 347 Kinq Street Applicant Phone: 413-586-2330 Owner (print or type): Hospital Hill Development LLC Owner Signature: F; 4G.- S Address: 106 Federal. Street, Boston, MA Owner Phone: /7' 330 "2000 Date submitted: 5/28/09 6‘..„ �F dT^ s ire t la ecw o(- (-L s at l� c�.h,ti, 6. (-6 k°1-- Cev d,� fie e w c� o; F o F (Le s�V E P h ay.s /,{J 1t o'- 1 c a ,,s gi. tv F 0., 'j' a U The Northampton Conservation Commission generally meets on the 2 °d and 4' Thursdays of each month in Hearing Room 18 located on the 2nd floor of City Hall, 210 Main Street Page 2 of 2 A USGS Site Locus (Figure 1), DEP Priority Resource Map (Figure 2), Orthophotograph (Figure 3) and FEMA Flood Zones Map (Figure 4), which illustrate the project location and surrounding physical and environmental features, are provided in Appendix B. A half -scale set of project drawings is also provided in Appendix B. Kollmorgen has been headquartered on King Street in Northampton since 1951. They have outgrown their existing facility and need to expand. The proposed 140,000 square foot building has been designed and sited to accomplish many community goals, including a sustainable design approach and the incorporation of a major employer into the Village Hill community. The location of the building on the South Campus provides easy access to public transportation and the multi -use trail as well as providing a visually appealing terminus to Village Hill Road. The building is sited to maintain views of the mountain ridgeline to the south and east from Village Hill Road, and many specimen trees from the former state hospital campus have been preserved. Sustainable construction and design techniques, as defined by LEED such as siting the building for maximum solar gain and daylighting and the use of rain gardens for stormwater infiltration have been incorporated into the project. Section 1 Introduction Tighe &Bond This Notice of Intent (NOI) is being submitted on behalf Kollmorgen Electo Optical (Kollmorgen) for a development project on the South Campus of Village Hill. The proposed project consists of the construction of an approximate 140,000 square foot light industrial building to house Kollmorgen's world headquarters. The project area is located within the former Northampton State Hospital south campus between Chapel, Prince, Earle, Grove and Laurel Streets. A portion of the project is sited within the 50 -foot and 100 -foot Buffer Zone of an isolated vegetated wetland (wet meadow). As such the project is subject to jurisdiction under the City of Northampton Wetlands Ordinance. The project is not subject to jurisdiction under the Massachusetts Wetlands Protection Act (M.G.L. c. 131, 40). The construction of a stormwater detention basin within the Buffer Zone will be completed in accordance with an existing Order of Conditions (MADEP 246 -537). Notice of Intent Kollmorgen at Village Hill (Northampton, MA) n Tighe &Bond Section 2 Existing Environment This section provides a site description and resource area characterization for the project area. Land use in the general vicinity of the project area was determined based on direct observations made during data collection site visits and a review of information available through the Massachusetts Geographic Information System (MassGIS) and Natural Resources Conservation Service (NRCS). The site is located at the former Northampton State Hospital South Campus. Buildings formerly located on the site have been demolished. The Village Hill North Campus is situated on the opposite side of Prince Street to the north. Residential properties are located along Chapel Street to the north and Laurel Street to the west. Rural residential and undeveloped properties are located along Grove Street to the south followed by a former railroad embankment, the Mill River and light industrial /commercial properties along South Street. Mixed light industrial /commercial, residential and undeveloped properties are located along Earle Street to the east. The site is zoned as Planned Village. Soils on the subject property have been mapped as Belgrade and Boxford silt loams (moderately well drained) and Hinckley loamy 'sands (excessively drained). Investigations 2003 as part of the original Notice Wetland areas associated with the as part of the South Campus 2.1 Methodology of Resource Area Wetland resource areas were originally delineated in of Intent filed for the Village at Hospital Hill project. subject property were revisited in October 2008 infrastructure improvements along Grove Street. 2.2 Description of Wetland Resource Areas Portions of the proposed project are located within the 100 -foot Buffer Zone of an isolated vegetated wetland /wet meadow. The hydrology in this area appears to be driven by surficial runoff towards the southeast and a high groundwater table. Dominant vegetation consists of reed canary grass (Phalaris arundinacea). Soils in this location consist of dark grayish brown silty loam to fine sandy loam, with redoximorphic features within six inches of the surface. This wetland is subject protection as an isolated wetland under the City of Northampton Wetlands Ordinance. Isolated wetlands are not jurisdictional under the Wetlands Protection Act (M.G.L. c. 131, 40). 2.3 Rare Species The Massachusetts Natural Heritage and Endangered Species Program (NHESP) Atlas (October 1, 2008) and MassGIS online (October 2008), were consulted during the preparation of this NOI. According to these sources, the project area is not located within the limits of mapped Priority Habitats of Rare Species or Estimated Habitats of Rare Wildlife. Notice of Intent Kollmorgen at Village Hill (Northampton, MA) 2 -1 Li rl L r L Section 3 Project Description Tighe &Bond 3.1 Proposed Activities The project entails the construction of a new two -story 140,000 square foot light industrial building to house Kollmorgen's world headquarters. The building will be accompanied by a 485 space parking lot and dense grade stone fire access road. The building has been designed and sited to accomplish many community goals, including a sustainable design approach and the incorporation of a major employer into the Village Hill community. Sustainable construction and design techniques, as defined by LEED such as siting the building for maximum solar gain and daylighting and the use or rain gardens for stormwater infiltration have been incorporated into the project. Stormwater detention basins to treat runoff generated from impervious areas have been designed and permitted by others and are not included as part of this Notice of Intent. 3.1.1 Construction Sequence The final sequence of construction will be determined by the selected contractor. The anticipated construction sequence includes the following: Install sedimentation and erosion controls /protective measures Remove vegetation as required, complete site grading Construct stormwater detention basin Construct retaining wall on southwest side of site Initiate construction of new 140,000 square foot building Construct rain gardens Install site landscaping Complete site paving /fire access road Remove protective measures upon receipt of authorization from the Conservation Commission 3.2 Construction Period Protective Measures 3.2.1 General Wetland resource areas at the site will be protected by haybales and /or silt fence. These protective measures will be placed to restrict the Contractor to the areas necessary to conduct the work and will define the limits of work. The locations of these barriers are illustrated on the project drawings provided in Appendix B of this document. Typical details are also provided in the project drawings. In addition: The Contractor will be required to maintain a reserve supply of haybales and /or silt fence on -site to make repairs, as necessary. Notice of Intent Kollmorgen at Village Hill (Northampton, MA) 3 -1 Section 3 Project Description Protective measures will be inspected after significant precipitation events and repaired, as necessary. The following general measures will be employed to minimize impacts adjacent to resource areas during construction: Erosion controls will be installed as shown on the plans prior to work adjacent to wetland resource areas. Erosion controls will be removed and properly disposed following Conservation Commission authorization. 3.3 Restoration Plan The Restoration Plan presented in this section describes the actions proposed to stabilize disturbed areas upon the completion of construction. 3.3.1 Buffer Zone Areas disturbed /regraded within the regulated Buffer Zone will be seeded with an erosion control mix for dry sites (New England Wetland Plants, Inc. (NEWP) New England Erosion Control /Restoration Mix for Dry Sites or equivalent). If necessary the area will be mulched to provide stabilization until vegetation is established. A summary of species included in this mix is presented in Table 3 -1. TABLE 3 -1 New England Erosion Control /Restoration Mix for Dry Sites Common Name Upland Bent grass Rough B e ntg ra ss/T i s kl e g ra ss Blue Grama Canada Wild Rye Creeping Red Fescue Annual Ryegrass (naturalized) Perrenial Ryegrass naturalized) Little Bluestem Indian Grass Scientific Name Agrostis perennans Agrostis scabra Bouteloua gracilis Elymus canadensis Festuca rubra Lolium multiflorum Lolium perenne Schizachyrium scoparium Sorghastrum nutans Indicator Status FACU FAC FACU+ FACU FACU UPL Tighe &Bond According to NEWP, best results can be achieved by seeding in either spring or fall. Late spring and summer seeding will benefit from a light (i.e. less than one inch thick) mulching of straw to conserve moisture. The mix comes with a recommended application rate of 35 pounds per acre (or 1,245 square feet per pound). The mix may be applied by hydro- seeding, by mechanical spreader, or on small sites it can be spread by hand. The planting of trees and shrubs within the Buffer Zone is not proposed to preserve the open meadow nature and viewshed provided from the building to the southeast. Notice of Intent Kollmorgen at Village Hill (Northampton, MA) 3-2 nl n 4.2 City of Northampton Wetlands Ordinance I 1 The project is subject to the provisions of the Northampton Wetlands Ordinance as activities will occur within 100 feet of an isolated vegetated wetland /wet meadow. The majority of the project, including the entire building footprint, has been sited outside of in the regulated 100 -foot Buffer Zone. Site work associated with the construction of a j 1 dense grade stone fire access road to the rear of the building, and a concrete block retaining wall to the southwest of the proposed building will fall within the regulated Buffer Zone. These activities, including associated limited grading, will result in 1 1 approximately 9,750 square feet of impacts to the 100 -foot Buffer Zone. Approximately L. 1,216 square feet of impacts will fall within 50 feet of the isolated wetland area. No impacts associated with the development project will fall within 30 feet of the wetland fl boundary. Section 4 Regulatory Compliance Tighe &Bond This section summarizes the project's relationship to and compliance with pertinent local, state and Federal regulations. 4.1 Massachusetts Wetlands Protection Act As the project is being conducted within the Buffer Zone of an isolated wetland the proposed work is not subject to the provisions of the Massachusetts Wetlands Protection Act. In accordance City of Northampton Wetlands Ordinance at 337 -10 B., for areas zoned as Planned Village the Conservation Commission waives any of the performance standards that are over and above state law with the exception of the setback requirements in Table 1. In accordance with Table 1, the setback requirements for this project are 10 feet from jurisdictional wetland areas. No work is proposed within the 10 -foot No- Encroachment Zone. It should be noted that activities associated with the construction of a stormwater detention basin will also occur within the regulated Buffer Zone of this isolated wetland. An Order of Conditions has already been obtained for this portion of the proposed work. 4.3 Stormwater Compliance The project has been designed to meet the Design Criteria established by the Northampton Planning Board Regulations. A stormwater design report and accompanying discharge permit application have been submitted to the Northampton Department of Public Works. An approved permit is anticipated to be issued prior to the public hearing for this application. A copy of the Stormwater Report and permit application are included in Appendix D. 3: \O \00106 \Permits \NOI \Report.doc Notice of Intent Kollmorgen at Village Hill (Northampton, MA) 4 -1 r P Appendix B Figures Tighe &Bond Based on USGS Topographic Map for Easthampton, MA Quadrangle. Revised 1979. 10 -Foot Contour Interval. Circles indicate 500 -foot and half -mile radii Kollmorgen Electro- Optical Village Hill Northampton, Massachusetts T V: \Projects \O \00106\usgs.mxd J: \0 \00106 \GIS -PDFS \usgs.pdf 0 -0106 NHESP Certified Vernal Pools O Community Public Water Supply Surface Water O Community Public Water Supply Groundwater Non Community Non Transient Public Water Supply Non Community Transient Public Water Supply Non Potential Drinking Water Source Area High Yield Non Potential Drinking Water Source Area Medium Yield Potentially Productive Medium Yield Aquifer Potentially Productive High Yield Aquifer I EPA Designated Sole Source Aquifer DEP Approved Wellhead Protection Area (Zone II) DEP Interim Wellhead Protection Area (IWPA) NHESP Priority Habitats for Rare Species NHESP Estimated Habitats for Rare Wildlife Public Surface Water Supply Protection Area (Zone A) Protected and Recreational Open Space Area of Critical Environmental Concern (ACEC) Solid Waste Landfill Public Surface Water Supply (PSWS) Fresh Water Non Forested Wetland ,r Salt Water Wetland I Waterbodies Major Drainage Basin U Sub Drainage Basin Limited Access Highway Multi -Lane Highway, NOT Limited Access Other Numbered Highway Major Road Collector Minor Street or Road Town Boundary County Boundary Quad Sheet Boundary Track or Trail Train Powedine Pipeline Aqueduct ME NM I I $9- cc 1:25,000 p 2,000 Feet FIGURE 2 PRIORITY RESOURCE MAP Kollmorgen Electro Optical Village Hill Northamtpon, Massachusetts Tighe &Bond May 2009 Data source: Office of Geographic and Environmental Information (MassGIS), Commonwealth of Massachusetts Executive Office of Environmental Affairs. Circles indicate 500 -foot and half -mile radii. Data valid as of April 2009. V: \Projects \0 \00106 \g i s. mxd J: \O \00106 \G IS -P DFS \gis. pdf 0 -0106 r Legend NHESP Certified Vernal Pools NHESP Priority Habitats for Rare Species mxsop Estimated Habitats for Rare Wildlife 1:2400 Feet Based on MassGIS Color Orthophotography (April 2005) Orthophoto Sheet ID 109894 Kollmorgen Village Hill Northampton, Massachusetts Legend 100 Year Flood Plain 500 Year Flood Plain 1:25,000 2,000 FIGURE 4 FEMA Kollmorgen Electro- Optical Village Hill Northampton, Massachusetts Tighe &Bond May 2009 V: \Projects \0 \00106\fem a. mxd J:\0\00106\GIS-PDFS\fema.pdf 0 -0106 >p NO. TITLE 1 COVER SHEET 2 EXISTING CONDITIONS PLAN 3 SITE LAYOUT PLAN 4 SITE UTILITY PLAN 5 GRADING AND DRAINAGE PLAN 6 DETAILS -1 7 DETAILS -2 8 DETAILS -3 9A PLANTING PLAN (BY CAROL R JOHNSON ASSOCIATES INC.) 9B PLANTING DETAILS (BY CAROL R JOHNSON ASSOCIATES INC.) 10 BIORETENTION DETAILS 1 1 TRAFFIC FLOW PLAN n 12 PHOTOMETRIC PLAN APPROVED BY THE CITY OF NORTHAMPTON PLANNING BOARD: -DATE DATE: KOLLWTRGEN ELECT VILLAGE HILL. NORTHAMPTON, MASSACHUSETTS APPLICATION FOR SITE PLAN APPROVAL. MAY 2009 REVISED JUNE 2009 I, CLERK OF THE CITY OF NORTHAMPTON, HEREBY CERTIFY THAT THE NOTICE OF APPROVAL OF THIS PLAN BY THE PLANNING BOARD HAS BEEN RECEIVED AND RECORDED AT THIS OFFICE AND NO NOTICE OF APPEAL WAS RECEIVED DURING THE NEXT TWENTY DAYS AFTER RECEIPT AND RECORDING OF SAID NOTICE. CHAIRPERSON LOCUS PLAN SCALE: 1 1,000' OWNER KOLLMORGEN ELECTRO- OPTICAL, INC. 347 KING STREET NORTHAMPTON, MA 01060 DEVELOPER O'CONNELL DEVELOPMENT ;GROUP 480 HAMPDEN STREET HOLYOKE, MA 01040 ARCHITECT ARGMANN, HENDRIE ARCHETYPE, INC. 300 A STREET BOSTON, MA 02210 E NGINEER Tighe&Bond Consulting Engineers 53 SOUTHAMPTON ROAD WESTFIELD, MA 01085 �JOSEPO P VIAMARL JP. CIVIL No. ame COMPLETE SET 13 SHEETS 7 1 1 1 l/i( 4I,'V OSP ELO c 71 NORTHAMPTON 1L c>/ 1/LQ7 NIF 1 1 1 r 42 I' I 3 61 STATE HOSPITAL Q 0 e-- ------t::;•- _22N 'NIF 9M d/i i 1 P 1 1 '1 B-1 5 LO L2 NIF HOSITAL HILL N/F 0 EVELOPMENT 1 1 i' 0 0 L_FU Ric IF INC. FRANK, __J vac I1&ij Residential NIF DIV CAT/ON\ INC. &Re CUT,* F PV cV MARIE —9- pro Planned Village o3o# NIF NIF ILUMENTHAL, JOSEPH /1! N/F RAY. JOAN C. d1\ hl f*//41LU\'////'' 0 0 1 j Ile NIF V/ HOSPITAL HILL DEVELOPMENT LLC RHODES, NANCY "IX NOR77 HOUSING AU77-IORITY vvestrlelo, iviassacnusetts (413) 562-1600 www.fighebond.com plCsJ.. HO CAVIL No. 41778 SlIt 0 y;Li: ,,'-;/J /i// KoHmorgen /\POUDRIERTHOMAS\ ft:N URB :'2 fl Urban 1 '1 A(LO<LL/ J 4/)7/ j Residential B Northampton, No J Village Hill, o 1 1,- N\ J_ 1 1 1 -1- 18Q General 1 Massachusefts NIF McCUTHEON 1 "(4/ j// Industry 1 7 I/ HOSPIT4L/LL /J 72 i N SITE PLAN APPROVAL j NOT FOR CONSTRUCTION U 4 y J BARBARA J 1 /F ')r1#/ j sTLAURENCE N/F C7!OO S PPROV LFUCA r oi JANICE D. z'b OCONNELLOJL ///l'. ,'ro F.N/r ASSOCIATED, INC. lb T "1' 'l NOTON N/F 1 I 3000 00/10100 1. THIS PLAN WAS COMPILED USING A PLAN SET ZUCHOWSKJ, 3 i• •_//4///2f// TITLED "THE VILLAGE AT HOSPITAL HILL PHASE 1 EDWARD S. JUDITH A 6 0 0 30 60 120 ONE DEFINITIVE SUBDIVISION" DATED NOVEMBER 20, 26558 cor.. 1 L- 2003 A 0, 2004 PREPARED BY ND REVISED APRIL 3 3-2 L4IL PLAN Th0"LOT DIVISION" PREPARED BY 60 SHERMAN FREDRYK DATED 3, U AUU 3 12, 00)3)0. ____t 0'- 2. THE BOUNDARIES OF THE PROPOSED LOT 1 PARCEL WLL 80 DEFINED IN A SUBSEQUENT N/F 32 -SUBDIVISION NIF 0/I1PTI44MPTOIO I'T 4\ 4RW,4'>/// 1 84Y STATE GAS CO. 1 A 41101091,50/000300 005S0000IOPI,I303500/000 I 1 CHECKED: JPV APPROVEDBY: FJH CONDITIONS PLAN 1 60 1 Ql­4PP:T (R 1 9