Loading...
Campora bid rejections WF4.16.2020    April 16, 2020  Campora Construction  77 Stivens Drive  Ludlow, MA 01056    RE: Shared Use & Sidewalk Ramps Project    Dear Campora Construction,    Thank you so much for your bid and for your follow‐up when we did our bid due diligence.    I regret to have to inform you that we are rejecting your bid on this project for two reasons.    First, based on the references and the material you provided us in the bid and your follow up, we find  that your firm lacks the necessary experience to carry out this somewhat complex project. (Please see  MGL Chapter 30, Section 39M on lowest responsible and eligible bidder.)    Second, the front end loading of your bid by way of the safety plan requirement does not meet the  requirements.  (Please see MassDOT 2020 Standard Specifications on Bids on unbalanced bids, discussed  in a couple of sections in those specifications.)    Please feel free to reach out to me if you have any questions.    I hope to work with you on future projects and love the fact that you are growing your business with a  greater emphasis on site work.      Thanks again for working with us.    Sincerely,      Wayne Feiden, FAICP  Director of Planning & Sustainability