Loading...
Traffic Mitigation AlternativesPOST PB1Colvest Traffic Mitigation Options 301 & 303 King New Building 1 New Building 1 New Building 2 New Building 2 New Building2 Total New Building Alternative Uses for 301 King St Existing Building EXISTING USE Willard Concrete Take Out Rest. " " PROPOSED USE Drive through Retail Retail 40% Office 60% Retail Take-out Restaurant Retail (incl Marijuana) Sit Down Restaurant Square Footage 2007 4964 14760 3936 5904 31571 3147 3147 3147 PEAK HOUR TRIPS Assumed by Zoning 200 60 177 19.68 70.848 527.528 315 38 62 Existing Peak HR/ Credit -44 0 0 0 -44 -315 -277 -253 Reduction based on Mixed Use & Passby 0.5 0.25 0.25 0.05 0.25 0 0 0 ADJUSTED Peak Hour 78 45 132.75 18.696 53.136 327.582 327.582 50.582 74.582 Payment In-Lieu of Mitigation w/approved reduction (5%-50% as shown) 156000 90000 265500 37392 106272 655164 655164 101164 149164 LESS easement 301/ 2'x140' @ $22.68/sf 6350 6350 6350 LESS easement 303/ 2'x170' (340) 7711 7711 7711 LESS bike share pad & easement + Electric Bill 20000 20000 20000 LESS ADA Ramp @corner w/carwash 5000 5000 5000 Required - LESS right in/right-out only. Max 30' 50000 50000 50000 Required Mitigation 566103 12103 60103