Loading...
TreatmentReport-Old Section Bridge St 2019.pdfSTONE CONSERVATION TREATMENTS Old Section– Bridge St Cemetery, Northampton MA MONUMENT CONSERVATION COLLABORATIVE LLC, NORFOLK, CT © 2019All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, is made with respect thereto or with respect to the infringement of any patent. June 2019 Page 1 Documentation of Restorations to Old Section of Bridge Street Cemetery, Northampton, MA 2019 Some of the finest early gravestone carvings can be found in the old section of the Bridge Street Cemetery in Northampton, Massacgusetts STONE CONSERVATION TREATMENTS Old Section– Bridge St Cemetery, Northampton MA MONUMENT CONSERVATION COLLABORATIVE LLC, NORFOLK, CT © 2019All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, is made with respect thereto or with respect to the infringement of any patent. June 2019 Page 2 Approximate location of markers in Old section. Markers circled in red have been restored Documentation Prior to starting any work, all gravestones, tombs and other monuments to be restored were digitally recorded. A condition assessment form was prepared for each monument, describing existing conditions and recom- mended treatments. Documentation was made of all conservation treatments performed, and a completed set of these documents is enclosed. All digital images are recorded on the enclosed DVD and are identified with the marker’s ID number; the grid location on the enclosed map. STONE CONSERVATION TREATMENTS Old Section– Bridge St Cemetery, Northampton MA MONUMENT CONSERVATION COLLABORATIVE LLC, NORFOLK, CT © 2019All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, is made with respect thereto or with respect to the infringement of any patent. June 2019 Page 3 List of 58 Restored Markers in Old Section 1 1.F.1 Susan French 20 4.D.4 Tanner Obelisk 39 5.J.4 n.a. Prescott? 2 1.F.4 Lydia Edwards 21 4.D.6 Sarah Leonard 40 5.K.1 Ebenezer Prescott 3 1.G.1 Rebecca Kingsley 22 4.D.7 Abiathar Alvord 41 6.B.1 Mary Graves 4 2.E.1 n.a. 23 4.E.2 Jeduthan Burleigh 42 6.B.2 Harriet Graves 5 2.F.1 David Stoddard 24 4.G.1 Mary Strong 43 6.B.3 Viola Graves 6 2.G.1 Solomon Stoddard 25 4.G.2 Warren Sauter 44 6.H.2 John Clapp 7 2.H.2 Elizabeth Bartlett 26 4.G.3 Kate n.a. 45 6.H.3 Mary Ann n.a. 8 3.E.1 Edwin Pease 27 4.H.2 John Hunt 46 6.H.4 n.a. 9 3.E.2 Henry C. & Albert M.? 28 4.I.2 Little Jennie 47 6.H.5 Lyman Monument 10 3.G.1 Abigail Lyman 29 4.J.1 Cordella Strong 48 6.H.6 n.a. Phipps 11 3.G.2 John Gleason 30 4.J.3 Maria Butler 49 6.H.7 Eleanor Trist 12 3.H.2 David Clark 31 4.J.4 Jemimah Gere 50 6.H.8 George Phipps 13 4.B.1 Anna Denniston 32 5.D.1 Mary Tucker 51 6.H.9 Lucy Day 14 4.B.2 Katherine Prince 33 5.E.1 Pamela Phelps 52 6.J.1 John Braunwarth 15 4.B.3 John Prince 34 5.G.1 Dolly Edwards 53 7.D.1 Princely Monument 16 4.C.1 Stephen Stone 35 5.G.2 Elizabeth Edwards 54 7.E.1 Annie Francis 17 4.D.1 Josephine Tanner 36 5.H.1 Nancy Edward 55 7.E.2 Lydia Judd 18 4.D.2 Varnum Tanner 37 5.J.2 n.a. 56 7.F Rachel Strong 19 4.D.3 Vincent Tanner 38 5.J.3 Esther Brewster 57 7.G.2 H. Elizabeth Howe 58 8.E Mosley Monument STONE CONSERVATION TREATMENTS Old Section– Bridge St Cemetery, Northampton MA MONUMENT CONSERVATION COLLABORATIVE LLC, NORFOLK, CT © 2019All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, is made with respect thereto or with respect to the infringement of any patent. June 2019 Page 4 Resetting Tilted and Sunken Markers It’s often not possible to determine how to reset early grave markers until the resetting site has been excavated. Below grade bases are often discovered and can be re-used. Tilted markers are often fractured below grade and will require a new base. Earlier gravestones are typically long panels of stone that were set directly into the ground. After determination of the correct location and orientation of the stone, soil was removed to an appropriate depth. Gravel (or broken stone) was introduced to establish a stable base. The stone was made plumb and level, and set in plane with the adjacent markers. Backfilling was done with sand and gravel, wetted and compacted. Every effort was to re- place disturbed areas with existing topsoil and turf, however additional top- soil was required at a number of sites. STONE CONSERVATION TREATMENTS Old Section– Bridge St Cemetery, Northampton MA MONUMENT CONSERVATION COLLABORATIVE LLC, NORFOLK, CT © 2019All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, is made with respect thereto or with respect to the infringement of any patent. June 2019 Page 5 Resetting into existing bases In many cases, fallen markers had been originally set into below grade sandstone bases. When discovered, these bases were often uncommonly deep, more than one foot. Bases were excavated, examined for soundness and reset level at a higher elevation and aligned with adjacent markers. When excavating for resetting often original, or old bases are discovered Old base reset higher and aligned with adjacent markers Gravestones that required insertion into existing bases were set with a relatively weak cement/lime- based grout (3:2:9 with fine aggregates (000), made fluid with a high-range water reducer which ensures a complete fill. This was poured into the base slot. Stones were braced for a minimum of three days to limit movement during curing of the grout. STONE CONSERVATION TREATMENTS Old Section– Bridge St Cemetery, Northampton MA MONUMENT CONSERVATION COLLABORATIVE LLC, NORFOLK, CT © 2019All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, is made with respect thereto or with respect to the infringement of any patent. June 2019 Page 6 Resetting into New Bases A new below-grade base was fabricated when an original base could not be located, or the existing base was damaged beyond repair. Fabrication of a base was also necessary to re-erect the upper fragment(s) of earlier gravestones that did not have adequate length for conventional re-setting. These stones were usually fractured at or near the ground level and their lower elements are missing. Bases were made on site by casting in place with concrete. The casting is generally 9 to 12 inches deep, and 6 inches greater in both thickness and width than the stone itself. The finished top surface of the base should be entirely below grade. A form for a 1 inch deep setting slot, ½ inch wider and ½ thicker than the stone, was positioned in the concrete. After the base cured, the gravestone was reset into the slot with a cement/lime-based grout as previously described. The top of the new base was covered with topsoil. Form for new below grade concrete base Concrete poured, with form for setting slot in place Form removed, ready for resetting marker STONE CONSERVATION TREATMENTS Old Section– Bridge St Cemetery, Northampton MA MONUMENT CONSERVATION COLLABORATIVE LLC, NORFOLK, CT © 2019All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, is made with respect thereto or with respect to the infringement of any patent. June 2019 Page 7 Resetting onto existing Bases When required, existing bases were leveled and aligned with adjacent mark- ers. For resetting onto existing bases or ledgers, setting surfaces were first primed with Acryl 60 diluted with water 1:3, and markers were reset with a ce- ment/lime-based grout (3:2:9:1) with fine aggregates (000). When necessary, stones were braced for a minimum of three days to limit movement during curing of the grout. Discovering and excavating existing base. Raising and re-setting base Marker securely reset onto base STONE CONSERVATION TREATMENTS Old Section– Bridge St Cemetery, Northampton MA MONUMENT CONSERVATION COLLABORATIVE LLC, NORFOLK, CT © 2019All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, is made with respect thereto or with respect to the infringement of any patent. June 2019 Page 8 Resetting onto existing bases cont’d Any remaining failed setting mortar or material is removed by hand and the setting surfaces treated with D/2 Biological Solution. Existing pins were inspected and if sound, were re-used. If missing or unsound they were removed by drilling around them with a core drill and replaced with stainless steel threaded rods. Setting holes were drilled to clean out debris. Loose pins are easily removed by hand and replaced with threaded stainless steel. Below: failed setting mortar removed from setting surfaces and areas treated with antimicrobial D/2 Above: Example of cracking cause by rusted pin. Below: Iron pins removed with core drill, replaced with threaded stainless steel. Rusted iron pins expand and have cracked this marble base and marker. STONE CONSERVATION TREATMENTS Old Section– Bridge St Cemetery, Northampton MA MONUMENT CONSERVATION COLLABORATIVE LLC, NORFOLK, CT © 2019All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, is made with respect thereto or with respect to the infringement of any patent. June 2019 Page 9 Resetting Monuments Older large monuments are typically set on a deep bed of dry laid stones. At times these stones will shift due to ground conditions; sometimes due to burrowing animals, frost heaves, flood- ing, etc. causing the monument to tilt and become unstable. At a certain angle they become hazard- ous to themselves, adjacent stones, and to bystanders. Using cranes or hydraulic jacks to lift these substantial monuments, the base is stabilized and set level. If required, individual elements are separated and reset onto a mortar bed. Tilted Obelisk Scaffolding is used to help aid resetting the upper elements Example of leveling the base with hydraulic jacks. STONE CONSERVATION TREATMENTS Old Section– Bridge St Cemetery, Northampton MA MONUMENT CONSERVATION COLLABORATIVE LLC, NORFOLK, CT © 2019All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, is made with respect thereto or with respect to the infringement of any patent. June 2019 Page 10 Structural Adhesion All fragments were carefully cleaned and dry fitted. A thixotropic, thermosetting structural resin (A-5522, by Abatron, Kenosha, WI or equivalent) was thinly and evenly applied along the bond line only. The fragments were aligned, joined with clamps, and adequately braced during curing, which was typically a period of several days. Several factors, including weathering, can result in a loss of stone surface, which results in a poor 'fit' at the fracture. In this instance, a structural fill (mix of structural resin and fine aggregates) was required in addition to the structural adhesive. The fill was tucked into any voids of the fracture, but was kept well back from the surface of the stone. After curing, the structural fill was concealed by installation of an appropriately colored cement/lime-based crack filler or restoration mortar (see “Cracks and Losses”). Work in this section was not performed when the temperature of the air or of the stone surface was below 50 degrees Fahrenheit. Example of structural adhesion STONE CONSERVATION TREATMENTS Old Section– Bridge St Cemetery, Northampton MA MONUMENT CONSERVATION COLLABORATIVE LLC, NORFOLK, CT © 2019All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, is made with respect thereto or with respect to the infringement of any patent. June 2019 Page 11 Cracks and Losses The color and texture of all composites used to fill cracks and losses was matched to that of adjacent unsoiled stone. Fine cracks were filled with an integrally colored cement/lime-based formulation (Voidspan PHLc Crack Filler. Larger areas of loss were filled with Jahn™ M-70, or M-110 Restoration Mortars. After partial curing, the fills and surrounding areas were treated with a light acid washing with 5% acetic acid. This final treatment removes any excess cement or lime from the surface of the filled areas. All treated areas were thoroughly rinsed with water. Fills and patches are made to look weathered. Where lettering and inscriptions are lost, they are not replaced. In these areas the filled plane is kept slightly back from the stone surface to indicate that there is a loss. Areas where there are no inscriptions can be filled level with the original stone. Example of fractured marker will fills, Before and After After structural adhesion, losses were filled with Jahn M-70 and M-110 pigmented mortar STONE CONSERVATION TREATMENTS Old Section– Bridge St Cemetery, Northampton MA MONUMENT CONSERVATION COLLABORATIVE LLC, NORFOLK, CT © 2019All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, is made with respect thereto or with respect to the infringement of any patent. June 2019 Page 12 PRODUCTS/SUPPLIERS D/2 Biological Solution Granite City Tool 11 Blackwell Street Barre, VT 05641 802) 476-3137 Jahn™ Restoration Mortars Cathedral Stone Products Inc. 7266 Park Circle Drive Hanover, MD 21076 USA 800 684 0901 fax 800 684 0904 Adhesives Aboweld 55-22 Abatron Inc 5501 95th Avenue Kenosha, WI 53144 414 653 2000 fax 414 653 2019 PRODUCTS/SUPPLIERS VoidSpan PHLc VoidSpan Technology 34 Boardman St Salem MA 01970 TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: 4/29/2019 Susan French Headstone on base Marble Legible Unstable Level base Reset all elements 1. Marker removed from the area and inspected for soundness. 2. Setting area excavated to an appropriate depth removing any roots or large stones. 3. Base is aligned with adjacent markers and re-set level at appro- priate height. 4. Area around base was backfilled with tamped gravel and re- graded with existing topsoil 5. Failed mortar removed from setting area and bottom of marker 6. When required, any existing pins were inspected, and if neces- sary, replaced with stainless steel threaded pins 7. Setting surfaces primed with Acryl 60 diluted 1:3 with water. 8. Marker reset plumb onto base with cement/lime mortar (3/2/9) with fine sand (00 or 000) 9. Excess grout removed and joint area cleaned. 1.F.1 1 Old Section TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: 4/29/2019 2 Lydia Edwards Headstone on base Marble Legible Fallen, off base Plumb bases and reset 1. Marker removed from the area and inspected for soundness. 2. Setting area excavated to an appropriate depth removing any roots or large stones. 3. Base is aligned with adjacent markers and re-set level at appro- priate height. 4. Area around base was backfilled with tamped gravel and re- graded with existing topsoil 5. Failed mortar removed from setting area and bottom of marker 6. When required, any existing pins were inspected, and if neces- sary, replaced with stainless steel threaded pins 7. Setting surfaces primed with Acryl 60 diluted 1:3 with water. 8. Marker reset plumb onto base with cement/lime mortar (3/2/9) with fine sand (00 or 000) 9. Excess grout removed and joint area cleaned. 1.F.4 Old Section TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: 4/25-29/2019 3 Rebecca Kingsley Headstone Marble Decipherable Fractured Attach fragments with structural adhesive or reset into possible new base 1. It was determined that the fracture would be below grade and not a candidate for structural adhesion but reset to a new below grade base. . 2. Setting area excavated for new below grade cast concrete base sized minimum of 12 inches deep, 12 inches greater in thickness and 6 inches wider than the stone. 3. Wooden forms and setting slot form stabilized and aligned with adjacent markers before concrete is poured 4. The lower edge of marker is re-squared with minimal loss using a power grinder 5. Setting forms are removed after partial curing of the concrete and the base backfilled with tamped sand or gravel 6. Marker reset into setting slot with a cement/lime grout (3/2/9) with 000 sand made fluid with a super plasticizer. 7. Marker set plumb and level, and braced for minimum of 5 days. 8. Disturbed areas backfilled with existing topsoil. 1.G.1 Old Section TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: 5/8-13/2019 4 n.a. Headstone Marble Illegible Fractured Attach fragments with structural adhesive Poss new base 1. Setting area excavated for new below grade cast concrete base. Any fragments that are discovered are cleaned and set aside. 2. Cast a new concrete base sized min. 12” deep, 12” greater in thickness and 6” wider than the stone. The finished top to be below grade. 3. Wooden forms and setting slot form stabilized and aligned with adjacent markers before concrete is poured 4. Setting forms are removed after partial curing of the concrete and the base backfilled with tamped sand or gravel 5. When required, the lower edge of marker is re-squared with minimal loss using a power grinder 6. Lower fragment reset plumb and level into slot using a cement/lime grout (3/2/9) with 000 sand. Braced for min 3 days 7. All mating edges of fragments cleaned with water and any failed adhe- sives removed with hand tools 8. Fragments attached with structural adhesive (Abatron 55-22), clamped and braced until cured. Excess adhesive removed with hand chisels within 24 hours. 9. Cracks and losses filled with appropriate Voidspan products . 10. Filled areas misted with water and covered for 3 days minimum 2.E.1 Old Section TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: David Stoddard Headstone Marble Partially decipherable Fractured Weathered Evaluate condition of marker for restoration 1. Area excavated to an appropriate depth around base and base is aligned with adjacent markers and re-set level. Backfilled with tamped gravel and re-graded with existing topsoil 2. Setting slot cleaned of debris or failed mortar 3. If required, lower edge of marker re-squared with minimal loss using power grinder 4. Lower marker fragment reset plumb and level into setting slot with a cement/lime grout (3/2/9) with 000 sand made fluid with a super plasti- cizer. Excess grout removed and joint area cleaned. 5. Marker braced for a minimum 3 days 6. All mating edges of fragments cleaned with water and any failed adhesives removed with hand tools 7. Fragments attached with structural adhesive (Abatron 55-22), clamped and braced until cured. Excess epoxy removed with hand chisels within 24 hours. 8. Cracks and losses filled with Voidspan Crack filler, misted with wa-ter and covered for 3 days min. 2.F.1 5/15-18/2019 Old Section 5 TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Solomon Stoddard Headstone Marble Mostly legible Old repair failing– unstable Reset level if required Re-attach fragments with struc- tural adhesive Fills losses w/ cementitious fills 1. Lower, in ground fragment, found to be set secure and plumb. 2. Fragments separated and all mating edges of fragments cleaned with water and any failed adhesives removed with hand tools 3. Fragments attached with structural adhesive (Abatron 55-22), clamped and braced until cured. Excess epoxy removed with hand chisels within 24 hours. 4. Cracks and losses filled with Voidspan Crack filler, misted with water and covered for 3 days min. 2.G.1 5/15-18/2019 Old Section 6 TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Elizabeth Bartlett Headstone on base Marble Partially legible Fallen, off base Plumb base and reset marker 1. Marker removed from the area and inspected for soundness. 2. Setting area excavated to an appropriate depth removing any roots or large stones. 3. Base is aligned with adjacent markers and re-set level at appro- priate height. 4. Area around base was backfilled with tamped gravel and re- graded with existing topsoil 5. Failed mortar removed from setting area and bottom of marker 6. When required, any existing pins were inspected, and if neces- sary, replaced with stainless steel threaded pins 7. Setting surfaces primed with Acryl 60 diluted 1:3 with water. 8. Marker reset plumb onto base with cement/lime mortar (3/2/9) with fine sand (00 or 000) 9. Excess grout removed and joint area cleaned. 2.H.2 4/25/2019 Old Section 7 TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Edwin S. Pease Headstone Marble Partially decipherable Fractured Out of ground Attach fragments with structural adhesive Poss new base 1. Existing base was located below grade while excavating for resetting. 2. The base was inspected and found to be sound and re-useable 3. Area excavated to an appropriate depth and base is aligned with ad- jacent markers and re-set level. Backfilled with tamped gravel and re- graded with existing topsoil. Setting slot cleaned of failed mortar 4. If required, lower edge of marker re-squared with minimal loss using power grinder 5. Lower marker fragment reset plumb and level into setting slot with a cement/lime grout (3/2/9) with 000 sand made fluid with a super plasti- cizer. Excess grout removed and joint area cleaned. 6. Marker braced for a minimum 3 days 7. All mating edges of fragments cleaned with water and any failed ad- hesives removed with hand tools 8. Fragments attached with structural adhesive (Abatron 55-22), clamped and braced until cured. Excess epoxy removed with hand chis- els within 24 hours. 9. Cracks and losses filled with Voidspan Crack filler, misted with water and covered for 3 days min. 3.E.1 Old Section 8 5/8-11/2019 TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Albert, Henry? Headstone Marble Decipherable Tilted, unstable Reset into new below grade base 1. Existing base was located below grade while excavating for re- setting. 2. The base was inspected and found to be sound and re-useable 3. Area excavated to an appropriate depth removing any roots or large stones. 4. Base was aligned with adjacent markers and re-set level at ap- propriate height. 5. Area around base was backfilled with tamped gravel and re- graded with existing topsoil 6. Setting slot cleaned of debris or failed mortar 7. Marker reset plumb and level into setting slot with cement/lime grout (3/2/9) with 000 sand made fluid with a super plasticizer. 8. Excess grout removed and joint area cleaned. 9. Marker braced for a minimum 3 days 3.E.2 Old Section 9 5/8/2019 TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Abigail Lyman Monument Marble Decipherable Tilting Reset plumb 1.Excavate around above ground base to depth of base. 2. Inspect loose stone foundation, remove unstable material. 3.Raise monument on one side with hydraulic jacks and remove loose stone rubble from setting area 4. Lower monument onto setting area, and repeat raising opera- tion on opposite side as needed. 5. Monument leveled onto setting area, shimmed tightly with flat stones on all sides and re-grade area with existing topsoil. 6. If setting joints are unsound, remove failed setting mortar. 7. Prime setting surfaces with Acryl 60 diluted 1:3 with water. 8. Re-set elements plumb onto base/s with a cement/lime mortar (3/2/9) with 000 sand Use lead shims for leveling if required. 3.G.1 5/14/2019 Old Section 10 TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section John Gleason Headstone Marble Legible Old repair failing– unstable Reset level if required Re-attach fragments with struc- tural adhesive Fills losses w/ cementitious fills 1. Failed adhesive and mortar removed from surfaces with hand tools 2. Where required, mating edges were treated with D/2 Biological Solution, scrubbed with nylon brushes and water. Rinsed fully with water 3. Fractured elements were dry fitted to ascertain final soundness and to check for necessary fills for large losses at mating areas. 4. Dry fragments attached with structural adhesive ( Abatron 55- 22), clamped and braced until cured. Excess adhesive removed with hand chisels 5. Cracks and voids filled with RepliCal products. Any large losses filled with Jahn cementitious mortar. 6. Filled areas misted with water and covered for 3 days minimum 3.G.2 11 5/7-11/2019 TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section David Clark Headstone Sandstone Legible Leaning on adjacent marker Possible new base required 1. Area probed and buried or overgrown fragments carefully excavat- ed and inspected for soundness. 2. Soling removed by light brushing with nylon brushes and water. 3. Setting area excavated to sufficient depth and lower fragment re- set plumb at appropriate height and level onto gravel bed, aligned with adjacent markers 4. Area backfilled around marker with tamped sand and gravel 5. Disturbed areas re-graded with existing topsoil and sod. 6. All mating edges of fragments cleaned with water and any failed adhesives removed with hand tools 7. Fragments attached with structural adhesive (Abatron 55-22), clamped and braced until cured. Excess adhesive removed with hand chisels within 24 hours. 8. Cracks and losses filled with pigmented Voidspan crack fill, larger losses filled with Jahn restoration mortar 9. Filled areas misted with water and covered for 3 days minimum 10. Filled surface areas treated with light acid wash rinsed thoroughly 3.H.2 5/15-18/2019 12 TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Anna Denniston Headstone on base Marble Legible Failed repair Reset to base Attach fragments with structural adhesive Fill losses 1. Old repair has completely failed, carefully fragments apart and remove any failed fills and adhesives with hand tools. 2. Area around existing base excavated to an appropriate depth removing any roots or large stones. 3. Base was aligned with adjacent markers and re-set level, area around base was backfilled with tamped gravel and re-graded with existing topsoil 4. Lower fragment was reset plumb onto exiting base, repin if required. 5. After curing, fragments were attached with structural adhesive (Abatron 55-22), clamped and braced until cured. 6. Excess adhesive was removed with hand chisels within 24 hours 7. Cracks and losses were filled with Voidspan PHLc or Jahn products 8. Filled areas misted with water and kept covered for min, 3 days. 9. Filled surface areas treated with light acid wash and rinsed thoroughly 4.B.1 13 5/6-11/2019 TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Katherine Prince Headstone on base Marble Decipherable Fallen, off base Reset plumb 1. Setting area was excavated to an appropriate depth removing any roots or large stones. 2. Base was aligned with adjacent markers and re-set level at ap- propriate height. 3. Area around base was backfilled with tamped gravel and re- graded with existing topsoil 4. Failed mortar removed from setting area and bottom of marker 5. When required, any existing pins were inspected, and if neces- sary, replaced with stainless steel threaded pins 6. Setting surfaces primed with Acryl 60 diluted 1:3 with water. 7. Marker was reset plumb onto base with cement/lime mortar (3/2/9) with fine sand (00 or 000) 8. Excess grout removed and joint area cleaned. 9. Marker mechanically braced for a minimum 3 days while grout cured. 4.B.2 14 5/2-6/2019 TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section John Prince Marker on base Marble Decipherable Old repair failing– unstable Reset level if required Re-attach fragments with struc- tural adhesive Fills losses w/ cementitious fills 1. Old adhesion appears to be stable, All elements removed from existing in ground base. 2. Excavate area around existing base. 3. Align base with adjacent markers and re-set level at appropri- ate height. 4. Backfill with tamped gravel and re-grade with existing topsoil 5. If setting joint was unsound, remove failed setting mortar and, if required, replace setting pins with threaded stainless pins. 6. Fill cracks and losses with Voidspan PHLc or Jahn products. 7. Mist filled areas with water and cover for 3 days minimum 8. Prime setting surfaces with Acryl 60 diluted 1:3 with water. 9. Re-set marker plumb onto base/s with a cement/lime mortar (3/2/9) with 000 sand 10. Remove excess mortar, if required, brace marker min 3 days 4.B.3 15 5/1/2019 TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Stephen Stone Headstone Marble Legible Leaning on adjacent stone Reset into new below grade base 1. Carefully excavate marker and inspect marker for soundness. 2. Excavate setting area for new below grade cast concrete base sized minimum of 12 inches deep, 12 inches greater in thickness and 6 inches wider than the stone. The finished top to be entirely below grade. Align the 1” deep form for the setting slot (½” wider and thicker than the marker) with adjacent markers. 3. Remove soiling from marker by light brushing with nylon brush- es and water. Inspect for soundness. 4. If required, re-square the lower edge of marker with minimal loss. 5. After min 3 day cure, remove the setting form and reset stone into slot using a cement/lime grout (3/2/9) with 000 sand 6. Set marker plumb and level, brace for minimum of 5 days. 7. Disturbed areas to be backfilled with tamped sand and gravel, 4.C.1 5/14-15/2019 16 TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Josephine Tanner Headstone Marble Decipherable Fractured at grade level Reset into new below grade base 1. It was determined that the fracture would be below grade and not a candidate for structural adhesion therefore fragment should be reset to a new below grade base. . 2. Setting area excavated for new below grade cast concrete base sized minimum of 12 inches deep, 12 inches greater in thickness and 6 inches wider than the stone. 3. Wooden forms and setting slot form stabilized and aligned with adjacent markers before concrete is poured 4. The lower edge of marker is re-squared with minimal loss using a power grinder 5. Setting forms are removed after partial curing of the concrete and the base backfilled with tamped sand or gravel 6. Marker reset into setting slot with a cement/lime grout (3/2/9) with 000 sand made fluid with a super plasticizer. 7. Marker set plumb and level, and braced for minimum of 3 days. 8. Disturbed areas backfilled with existing topsoil. 4.D.1 17 4/30– 5/1/2019 TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Varnum Tanner Headstone Marble Legible Unstable Reset into new below grade base 1. Existing base was located below grade while excavating for re- setting. 2. The base was inspected and found to be sound and re-useable 3. Area excavated to an appropriate depth removing any roots or large stones. 4. Base was aligned with adjacent markers and re-set level at ap- propriate height. 5. Area around base was backfilled with tamped gravel and re- graded with existing topsoil 6. Setting slot cleaned of debris or failed mortar 7. Marker reset plumb and level into setting slot with cement/lime grout (3/2/9) with 000 sand made fluid with a super plasticizer. 8. Excess grout removed and joint area cleaned. 9. Marker braced for a minimum 3 days 4.D.2 18 4/30– 5/1/2019 TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Vincent Tanner Headstone Marble Decipherable Unstable Reset into new below grade base 1. Existing base was located below grade while excavating for re- setting. 2. The base was inspected and found to be sound and re-useable 3. Area excavated to an appropriate depth removing any roots or large stones. 4. Base was aligned with adjacent markers and re-set level at ap- propriate height 5. Area around base was backfilled with tamped gravel and re- graded with existing topsoil 6. Setting slot cleaned of debris or failed mortar 7. Marker reset plumb and level into setting slot with cement/lime grout (3/2/9) with 000 sand made fluid with a super plasticizer. 8. Excess grout removed and joint area cleaned. 9. Marker braced for a minimum 3 days 4.D.3 19 4/30– 5/1/2019 TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Tanner Monument Obelisk Marble Illegible Unstable Level base Reset all elements 1. Obelisk removed from base area with mechanical assistance, inspected for soundness, 2. Area round setting base excavated, base is aligned with adja- cent markers and re-set level at appropriate height. Backfilled w/ gravel. 3. Setting surfaces cleared of debris and any failed setting mortar removed. All surfaces treated with D/2 Biological Solution, scrubbed with nylon brushes and fully rinsed with water. 4. Setting bed primed with Acryl 60 diluted 1:3 with water. 5. Elements reset with a cement/lime mortar (3/2/9) with 000 sand. If necessary lead shims facilitated leveling. Excess mortar removed and joint area cleaned 6. Excess mortar removed and joint area cleaned 4.D.4 4/29/2019 20 TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Sarah Leonard Headstone on base Marble Illegible Unstable Level base Reset all elements Fill losses 1. Marker removed from the area and inspected for soundness. 2. Setting area excavated to an appropriate depth removing any roots or large stones. 3. Base is aligned with adjacent markers and re-set level at appro- priate height. 4. Area around base was backfilled with tamped gravel and re- graded with existing topsoil 5. Failed mortar removed from setting area and bottom of marker 6. Rusted pins removed and when required replaced with stainless steel threaded pins 7. Setting surfaces primed with Acryl 60 diluted 1:3 with water. 8. Marker reset plumb onto base with cement/lime mortar (3/2/9) with fine sand (00 or 000). Excess mortar removed and marker braced for min. 3 days 9. Cracks and small voids filled with Voidspan PHLc. Any large losses filled with Jahn cementitious mortar. 4.D.6 4/30-5/11/2019 21 TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Abiathar Alvord Headstone on base Marble Illegible Unstable Level base Reset all elements 1. Marker removed from the area and inspected for soundness. 2. Setting area excavated to an appropriate depth removing any roots or large stones. 3. Base is aligned with adjacent markers and re-set level at appro- priate height. 4. Area around base was backfilled with tamped gravel and re- graded with existing topsoil 5. Failed mortar removed from setting area and bottom of marker 6. When required, any existing pins were inspected, and if neces- sary, replaced with stainless steel threaded pins 7. Setting surfaces primed with Acryl 60 diluted 1:3 with water. 8. Marker reset plumb onto base with cement/lime mortar (3/2/9) with fine sand (00 or 000) 9. Excess grout removed and joint area cleaned. 4.D.7 4/30/2019 22 TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Jeduthan Burleigh Headstone Marble Legible Unstable Reset into new below grade base 4.E.2 23 1. Existing base was located below grade while excavating for re- setting. 2. The base was inspected and found to be sound and re-useable 3. Area excavated to an appropriate depth removing any roots or large stones. 4. Base was aligned with adjacent markers and re-set level at ap-propriate height. 5. Area around base was backfilled with tamped gravel and re- graded with existing topsoil 6. Setting slot cleaned of debris or failed mortar 7. Marker reset plumb and level into setting slot with cement/lime grout (3/2/9) with 000 sand made fluid with a super plasticizer. 8. Excess grout removed and joint area cleaned. 9. Marker braced for a minimum 3 days 5/6/2019 TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Mary Strong Headstone Sandstone Decipherable Leaning on adjacent marker Reset into new below grade base 4.G.1 24 1. Marker excavated and found to be sound. Light soiling removed by brushing with nylon brushes and water. 2. Setting area excavated for new below grade cast concrete base sized minimum of 12 inches deep, 12 inches greater in thickness and 6 inches wider than the stone. 3. Wooden forms for the base are aligned with adjacent markers be- fore concrete is poured 4. A form for a setting slot was inserted into the wet concrete and aligned with adjacent markers. 5. When required, the lower edge of marker is re-squared with mini- mal loss using a power grinder 6. Setting forms are removed after partial curing of the concrete and the base backfilled with tamped sand or gravel 7. Marker reset into setting slot with a cement/lime grout (3/2/9) with 000 sand made fluid with a super plasticizer. 8. Marker set plumb and level, and braced for minimum of 5 days. 5/1-6/2019 TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Warren Sauter Headstone on base Marble Legible Unstable Level base Reset all elements 4.G.2 4/24/2019 25 1. Marker removed from the area and inspected for soundness. 2. Setting area excavated to an appropriate depth removing any roots or large stones. 3. Base is aligned with adjacent markers and re-set level at ap- propriate height. 4. Area around base was backfilled with tamped gravel and re- graded with existing topsoil 5. Failed mortar removed from setting area and bottom of marker 6. When required, any existing pins were inspected, and if neces- sary, replaced with stainless steel threaded pins 7. Setting surfaces primed with Acryl 60 diluted 1:3 with water. 8. Marker reset plumb onto base with cement/lime mortar (3/2/9) with fine sand (00 or 000) 9. Excess grout removed and joint area cleaned. TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Kate Headstone on base Marble Partially legible Fractured Tilted Reset level Attach fragments with structural adhesive 4.G.3 4/29-5/3/2019 26 1. Area was excavated to an appropriate depth removing any roots or large stones. Failed adhesive and pin removed with hand tools. 2. In ground base was aligned with adjacent markers and re-set level at appropriate height. 3. Area around base was backfilled with tamped gravel and re-graded with existing topsoil 4. Setting surfaces cleaned and primed with Acryl 60 diluted 1:3 with water and elements immediately reset plumb with cement/lime mortar (3/2/9) with fine sand (00 or 000) 5. Setting slot for marker cleaned of debris or failed mortar and bottom fragment reset plumb and level into setting slot with cement/lime grout (3/2/9) with 000 sand made fluid with a super plasticizer. 6. Fragments attached with structural adhesive (Abatron 55-22), clamped and braced until cured. 7. Excess adhesive was removed with hand chisels within 24 hours 8. Cracks and losses were filled with Voidspan PHLc or Jahn products 9. Filled areas misted with water and kept covered for min, 3 days. TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section John Hunt Table tomb Sandstone Decipherable Legs art unstable Border columns tilted Stabilize all elements 4.H.2 5/21/2019 27 1. Tilted border columns excavated and reset plumb at appropri- ate height and backfilled with tamped gravel. 2. Table top supported on jacks while each table leg removed from foundation and setting surfaces cleaned 3. Each leg reset plumb and level with cement/lime grout (3/2/9) with 000 sand 4. Table leveled with shims when necessary 5. Excess grout removed and joint areas cleaned. TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Little Jennie Headstone on base Marble Legible Unstable Level base Reset all elements 4.I.2 4/10/2019 28 1. Marker removed from the area and inspected for soundness. 2. Setting area excavated to an appropriate depth removing any roots or large stones. 3. Base is aligned with adjacent markers and re-set level at appro- priate height. 4. Area around base was backfilled with tamped gravel and re- graded with existing topsoil 5. Setting slot cleaned of debris or failed mortar 6. Marker reset plumb and level into setting slot with cement/lime grout (3/2/9) with 000 sand made fluid with a super plasticizer. 7. Excess grout removed and joint area cleaned. 8. Marker braced for a minimum 3 days TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Cordella Strong Headstone Marble Legible Leaning on adjacent marker Reset into new below grade base 4.J.1 4/16-18/2019 29 1. Marker excavated and found to be sound. Light soiling removed by brushing with nylon brushes and water. 2. Setting area excavated for new below grade cast concrete base sized minimum of 12 inches deep, 12 inches greater in thickness and 6 inches wider than the stone. 3. Wooden forms for the base are aligned with adjacent markers be-fore concrete is poured 4. A form for a setting slot was inserted into the wet concrete and aligned with adjacent markers. 5. When required, the lower edge of marker is re-squared with mini- mal loss using a power grinder 6. Setting forms are removed after partial curing of the concrete and the base backfilled with tamped sand or gravel 7. Marker reset into setting slot with a cement/lime grout (3/2/9) with 000 sand made fluid with a super plasticizer. 8. Marker set plumb and level, and braced for minimum of 5 days. 9. Disturbed areas backfilled with existing topsoil. TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Maria Butler Headstone on base Marble Legible/partial Unstable Level base Reset all elements 4.J.3 4/12/2019 30 1. Marker removed from the area and inspected for soundness. 2. Setting area excavated to an appropriate depth removing any roots or large stones. 3. Base is aligned with adjacent markers and re-set level at appro- priate height. 4. Area around base was backfilled with tamped gravel and re- graded with existing topsoil 5. Setting slot cleaned of debris or failed mortar 6. Marker reset plumb and level into setting slot with cement/lime grout (3/2/9) with 000 sand made fluid with a super plasticizer. 7. Excess grout removed and joint area cleaned. 8. Marker braced for a minimum 3 days TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Jemimah Gere Headstone Marble Illegible. partial Unstable Reset into new below grade base 4.J.4 4/17-23/2019 31 1. Marker excavated and found to be sound. Light soiling removed by brushing with nylon brushes and water. 2. Setting area excavated for new below grade cast concrete base sized minimum of 12 inches deep, 12 inches greater in thickness and 6 inches wider than the stone. 3. Wooden forms for the base are aligned with adjacent markers before concrete is poured 4. A form for a setting slot was inserted into the wet concrete and aligned with adjacent markers. 5. When required, the lower edge of marker is re-squared with mini- mal loss using a power grinder 6. Setting forms are removed after partial curing of the concrete and the base backfilled with tamped sand or gravel 7. Marker reset into setting slot with a cement/lime grout (3/2/9) with 000 sand made fluid with a super plasticizer. 8. Marker set plumb and level, and braced for minimum of 5 days. 9. Disturbed areas backfilled with existing topsoil. TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Mary Tucker Marker on base Granite Legible Unstable Locate existing base and reset 5.D.1 5/2-6/2019 32 1. Marker and base elements removed from setting area 2. Setting area excavated for a below grade concrete foundation, min 12" deep and size of the lower base element 3. All failed mortar was removed from setting areas 4. When required, any existing pins were inspected, and if neces- sary, replaced with stainless steel threaded pins 5. After 3 day cure setting surfaces primed with Acryl 60 diluted 1:3 with water. 6. Base and elements reset with cement/lime mortar (3/2/9) with fine (00-000) sand. Leveled with lead shims as necessary. 7. Excess grout removed and joint area cleaned. TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Pamela Phelps Headstone Marble Legible Leaning on adjacent marker Reset into new below grade base 5.E.1 5/7/2019 33 1. Marker removed from the area and inspected for soundness. 2. Setting area excavated to an appropriate depth removing any roots or large stones. 3. Base is aligned with adjacent markers and re-set level at appropri- ate height. 4. Area around base was backfilled with tamped gravel and re- graded with existing topsoil 5. Failed mortar removed from setting area and bottom of marker 6. When required, any existing pins were inspected, and if neces- sary, replaced with stainless steel threaded pins 7. Setting surfaces primed with Acryl 60 diluted 1:3 with water. 8. Marker reset plumb onto base with cement/lime mortar (3/2/9) with fine sand (00 or 000) 9. Excess grout removed and joint area cleaned. TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Dolly Edwards Headstone on base Marble Legible Unstable Level base Reset all elements 5.G.1 4/10/2019 34 1. Marker removed from the area and inspected for soundness. 2. Setting area excavated to an appropriate depth removing any roots or large stones. 3. Base is aligned with adjacent markers and re-set level at appro- priate height. 4. Area around base was backfilled with tamped gravel and re- graded with existing topsoil 5. Failed mortar removed from setting area and bottom of marker 6. When required, any existing pins were inspected, and if neces- sary, replaced with stainless steel threaded pins 7. Setting surfaces primed with Acryl 60 diluted 1:3 with water. 8. Marker reset plumb onto base with cement/lime mortar (3/2/9) with fine sand (00 or 000) 9. Excess grout removed and joint area cleaned. TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Elizabeth Edwards Headstone on base Marble Legible/missing Old repair failing– unstable Reset level if required Re-attach fragments with struc- tural adhesive Fills losses w/ cementitious fills 5.G.2 4/10-23/2019 35 1. Elements removed from base taken apart, inspected, and found to be sound and re-useable 2. Area excavated to an appropriate depth removing any roots or large stones. 3. Base is aligned with adjacent markers and re-set level at appropriate height and backfilled with tamped gravel. 4. All mating edges of fragments cleaned with water and any failed adhe-sives removed with hand tools 5. Setting slot cleaned of debris or failed mortar 6. Lower fragment reset plumb and level into slot using a cement/lime grout (3/2/9) with fine (00-000) sand. Braced for min 3 days 7. Fragments attached with structural adhesive (Abatron 55-22), clamped and braced until cured. Excess adhesive removed with hand chisels with- in 24 hours. 8. Cracks and losses filled with Voidspan products, for large loses Jahn cementitious mortar was used.. 9. Filled areas misted with water and covered for 3 days minimum TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Nancy Edwards Headstone Marble Legible Fractured at grade Fallen Reset into new below grade base 5.H.1 4/11-12/2019 36 1. Marker excavated and found to be sound. Light soiling removed by brushing with nylon brushes and water. 2. Setting area excavated for new below grade cast concrete base sized minimum of 12 inches deep, 12 inches greater in thickness and 6 inches wider than the stone. 3. Wooden forms for the base are aligned with adjacent markers before concrete is poured 4. A form for a setting slot was inserted into the wet concrete and aligned with adjacent markers. 5. When required, the lower edge of marker is re-squared with mini- mal loss using a power grinder 6. Setting forms are removed after partial curing of the concrete and the base backfilled with tamped sand or gravel 7. Marker reset into setting slot with a cement/lime grout (3/2/9) with 000 sand made fluid with a super plasticizer. 8. Marker set plumb and level, and braced for minimum of 5 days. TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section n.a. Headstone Marble Illegible Fractured at grade Reset into new below grade base 5.J.2 4/16-17/2019 37 1. Marker excavated and found to be sound. Light soiling removed by brushing with nylon brushes and water. 2. Setting area excavated for new below grade cast concrete base sized minimum of 12 inches deep, 12 inches greater in thickness and 6 inches wider than the stone. 3. Wooden forms for the base are aligned with adjacent markers before concrete is poured 4. A form for a setting slot was inserted into the wet concrete and aligned with adjacent markers. 5. When required, the lower edge of marker is re-squared with mini- mal loss using a power grinder 6. Setting forms are removed after partial curing of the concrete and the base backfilled with tamped sand or gravel 7. Marker reset into setting slot with a cement/lime grout (3/2/9) with 000 sand made fluid with a super plasticizer. 8. Marker set plumb and level, and braced for minimum of 5 days. 9. Disturbed areas backfilled with existing topsoil. TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Esther Brewster Headstone Marble Illegible/ partial Fractured at grade Re-square bottom edge Reset into new below grade base 5.J.3 4/16-24/2019 38 1. Existing base was located below grade while excavating for resetting. The base was inspected and found to be sound and re-useable 2. Area excavated to an appropriate depth removing any roots or large stones. 3. Base is aligned with adjacent markers and re-set level at appropriate height and backfilled with tamped gravel. 4. All mating edges of fragments cleaned with water and any failed ad- hesives removed with hand tools 5. Setting slot cleaned of debris or failed mortar 6. Lower fragment reset plumb and level into slot using a cement/lime grout (3/2/9) with fine (00-000) sand. Braced for min 3 days 7. Fragments attached with structural adhesive (Abatron 55-22), clamped and braced until cured. Excess adhesive removed with hand chisels within 24 hours. 8. Cracks and losses filled with Voidspan products, for large loses Jahn cementitious mortar was used.. 9. Filled areas misted with water and covered for 3 days minimum TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Prescott ? Headstone on base Marble Illegible Unstable Level base Reset all elements 5.J.4 4/16-18/2019 39 1. Marker removed from the area and inspected for soundness. 2. Setting area excavated to an appropriate depth removing any roots or large stones. 3. Base is aligned with adjacent markers and re-set level at appro- priate height. 4. Area around base was backfilled with tamped gravel and re- graded with existing topsoil 5. Failed mortar removed from setting area and bottom of marker. 6. Lower edge of marker re-squared using a power grinder with min- imal loss 7. When required, any existing pins were inspected, and if neces- sary, replaced with stainless steel threaded pins 8. Setting surfaces primed with Acryl 60 diluted 1:3 with water. 9. Marker reset plumb onto base with cement/lime mortar (3/2/9) with fine sand (00 or 000) 10. Excess grout removed and joint area cleaned. TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Ebenezer and Jerusha Prescott Headstone Marble Partially decipherable Tilted Reset plumb 5.K.1 4/16-24/2019 40 1. Setting area excavated for new below grade cast concrete base. Any fragments that are discovered are cleaned and set aside. 2. A new concrete base was cast sized min. 12” deep, 12” greater in thick- ness and 6” wider than the stone. The finished top to be below grade. 3. Wooden forms and setting slot form stabilized and aligned with adja- cent markers before concrete is poured 4. Setting forms are removed after partial curing of the concrete and the base backfilled with tamped sand or gravel 5. When required, the lower edge of marker is re-squared with minimal loss using a power grinder 6. Lower fragment reset plumb and level into slot using a cement/lime grout (3/2/9) with 000 sand. Braced for min 5 days 7. All mating edges of fragments cleaned with water and any failed adhe- sives removed with hand tools 8. Fragments attached with structural adhesive (Abatron 55-22), clamped and braced until cured. Excess adhesive removed with hand chisels within 24 hours. 9. Cracks and losses filled with appropriate Voidspan and Jahn products 10. Filled areas misted with water and covered for 3 days minimum Marker re-positioned away from corner TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Mary J. Graves Headstone on base Marble Partially legible Unstable Level base Reset all elements 6.B.1 4/11/2019 41 1. Marker removed from the area and inspected for soundness. 2. Setting area excavated to an appropriate depth removing any roots or large stones. 3. Base is aligned with adjacent markers and re-set level at appropri- ate height. 4. Area around base was backfilled with tamped gravel and re- graded with existing topsoil 5. Failed mortar removed from setting area and bottom of marker 6. When required, any existing pins were inspected, and if neces- sary, replaced with stainless steel threaded pins 7. Setting surfaces primed with Acryl 60 diluted 1:3 with water. 8. Marker reset plumb onto base with cement/lime mortar (3/2/9) with fine sand (00 or 000) 9. Excess grout removed and joint area cleaned. TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Harriet Graves Headstone on base Marble Partially legible Unstable Level base Reset all elements 6.B.2 4/11/2019 42 1. Marker removed from the area and inspected for soundness. 2. Setting area excavated to an appropriate depth removing any roots or large stones. 3. Base is aligned with adjacent markers and re-set level at appropri- ate height. 4. Area around base was backfilled with tamped gravel and re- graded with existing topsoil 5. Failed mortar removed from setting area and bottom of marker 6. When required, any existing pins were inspected, and if neces- sary, replaced with stainless steel threaded pins 7. Setting surfaces primed with Acryl 60 diluted 1:3 with water. 8. Marker reset plumb onto base with cement/lime mortar (3/2/9) with fine sand (00 or 000) 9. Excess grout removed and joint area cleaned. TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Viola Graves Headstone on base Marble Partially legible Unstable Level base Reset all elements 6.B.3 4/11/2019 43 1. Marker removed from the area and inspected for soundness. 2. Setting area excavated to an appropriate depth removing any roots or large stones. 3. Base is aligned with adjacent markers and re-set level at appropri- ate height. 4. Area around base was backfilled with tamped gravel and re- graded with existing topsoil 5. Failed mortar removed from setting area and bottom of marker 6. When required, any existing pins were inspected, and if neces- sary, replaced with stainless steel threaded pins 7. Setting surfaces primed with Acryl 60 diluted 1:3 with water. 8. Marker reset plumb onto base with cement/lime mortar (3/2/9) with fine sand (00 or 000) 9. Excess grout removed and joint area cleaned. TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section John Clapp Headstone on base Marble Partially legible Unstable Level base Reset all elements 6.H.2. 4/23-24/2019 44 1. Marker excavated and found to be sound. Light soiling removed by brushing with nylon brushes and water. 2. Setting area excavated for new below grade cast concrete base sized minimum of 12 inches deep, 12 inches greater in thickness and 6 inches wider than the stone. 3. Wooden forms for the base are aligned with adjacent markers be- fore concrete is poured 4. A form for a setting slot was inserted into the wet concrete and aligned with adjacent markers. 5. When required, the lower edge of marker is re-squared with mini- mal loss using a power grinder 6. Setting forms are removed after partial curing of the concrete and the base backfilled with tamped sand or gravel 7. Marker reset into setting slot with a cement/lime grout (3/2/9) with 000 sand made fluid with a super plasticizer. 8. Marker set plumb and level, and braced for minimum of 5 days. 9. Disturbed areas backfilled with existing topsoil. TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Mary Ann ? Headstone Marble Partially decipherable Fractured Leaning on adjacent marker Reset into new base Attach fragments with structural adhesive 6.H.3 4/24-5/3/2019 45 1. Setting area excavated for new below grade cast concrete base. Any fragments that are discovered are cleaned and set aside. 2. A new concrete base was cast sized min. 12” deep, 12” greater in thick- ness and 6” wider than the stone. The finished top to be below grade. 3. Wooden forms and setting slot form stabilized and aligned with adjacent markers before concrete is poured 4. Setting forms are removed after partial curing of the concrete and the base backfilled with tamped sand or gravel 5. When required, the lower edge of marker is re-squared with minimal loss using a power grinder 6. Lower fragment reset plumb and level into slot using a cement/lime grout (3/2/9) with 000 sand. Braced for min 5 days 7. All mating edges of fragments cleaned with water and any failed adhe- sives removed with hand tools 8. Fragments attached with structural adhesive (Abatron 55-22), clamped and braced until cured. Excess adhesive removed with hand chisels within 24 hours. 9. Cracks and losses filled with appropriate Voidspan and Jahn products 10. Filled areas misted with water and covered for 3 days minimum TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section n.a. Headstone Marble Illegible Leaning on adjacent marker Reset into new below grade base 6.H.4 4/24-5/11/2019 46 1. Setting area excavated for new below grade cast concrete base. Any fragments that are discovered are cleaned and set aside. 2. A new concrete base was cast sized min. 12” deep, 12” greater in thick- ness and 6” wider than the stone. The finished top to be below grade. 3. Wooden forms and setting slot form stabilized and aligned with adjacent markers before concrete is poured 4. Setting forms are removed after partial curing of the concrete and the base backfilled with tamped sand or gravel 5. When required, the lower edge of marker is re-squared with minimal loss using a power grinder 6. Lower fragment reset plumb and level into slot using a cement/lime grout (3/2/9) with 000 sand. Braced for min 5 days 7. All mating edges of fragments cleaned with water and any failed adhe- sives removed with hand tools 8. Fragments attached with structural adhesive (Abatron 55-22), clamped and braced until cured. Excess adhesive removed with hand chisels within 24 hours. 9. Cracks and losses filled with appropriate Voidspan and Jahn products 10. Filled areas misted with water and covered for 3 days minimum TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Lyman Monument Obelisk Marble Partially legible Finial unstable Remove finial Replace pin and reset with struc-tural adhesive 6.H.5 4/22/2019 47 1. Area searched for missing final elements– none found 2. Existing pin cut and urn finial attached with structural adhesive 3. Losses filled with Jahn restoration mortar TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Phipps Cross on base Marble Decipherable Cross is unstable Reset cross to base with mortar 6.H.6 4/10-12/2019 48 1. Marker and base elements removed from setting area 2. Setting area excavated for a new below grade concrete foun- dation, min 12" deep and size of the lower base element 3. All failed mortar was removed from setting areas 4. When required, any existing pins were inspected, and if neces- sary, replaced with stainless steel threaded pins 5. After 3 day cure setting surfaces primed with Acryl 60 diluted 1:3 with water. 6. Base and elements reset with cement/lime mortar (3/2/9) with fine (00-000) sand. Leveled with lead shims as necessary. 7. Excess grout removed and joint area cleaned. TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Eleanor D. S. Trist Headstone on base Marble Partially legible Old repair failing– unstable Reset level if required Re-attach fragments with struc-tural adhesive Fills losses w/ cementitious fills 6.H.7 4/10-12/2019 49 1. Fragments separated and failed adhesives removed with hand tools. Mating edges of fragments cleaned with water. 2. Lower fragment and base elemnets appear to be sound and secure 3. Fragments attached with structural adhesive (Abatron 55-22), clamped and braced until cured. Excess adhesive removed with hand chisels within 24 hours. 4. Cracks filled with Voidspan Crack filler, larger losses filled with Jahn restoration mortar, misted with water and covered for 3 days min. TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section George Phipps Headstone on base Marble Legible Unstable Level base Reset all elements 6.H.8 4/10/2019 50 1. Marker removed from the area and inspected for soundness. 2. Setting area excavated to an appropriate depth removing any roots or large stones. 3. Base is aligned with adjacent markers and re-set level at appro- priate height. 4. Area around base was backfilled with tamped gravel and re- graded with existing topsoil 5. Failed mortar removed from setting area and bottom of marker 6. When required, any existing pins were inspected, and if neces- sary, replaced with stainless steel threaded pins 7. Setting surfaces primed with Acryl 60 diluted 1:3 with water. 8. Marker reset plumb onto base with cement/lime mortar (3/2/9) with fine sand (00 or 000) 9. Excess grout removed and joint area cleaned. TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Lucy Day Headstone Marble Legible Fractured at grade Leaning on adjacent marker Resquare bottom edge Reset into new below grade base 6.H.9 4/10/2019 51 1. Existing base was located below grade while excavating for re- setting. 2. The base was inspected and found to be sound and re-useable 3. Area excavated to an appropriate depth removing any roots or large stones. 4. Base was aligned with adjacent markers and re-set level at ap- propriate height 5. Area around base was backfilled with tamped gravel and re- graded with existing topsoil 6. Setting slot cleaned of debris or failed mortar 7. Lower edge of marker re-squared with minimal loss 8. Marker reset plumb and level into setting slot with cement/lime grout (3/2/9) with 000 sand made fluid with a super plasticizer. 9. Excess grout removed and joint area cleaned. 10. Marker braced for a minimum 3 days TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section John Braunworth Headstone Marble Legible Upside down Reset into new below grade base 6.J.1 4/23-24/2019 52 1. Marker excavated and found to be sound. Light soiling removed by brushing with nylon brushes and water. 2. Setting area excavated for new below grade cast concrete base sized minimum of 12 inches deep, 12 inches greater in thickness and 6 inches wider than the stone. 3. Wooden forms for the base are aligned with adjacent markers be- fore concrete is poured 4. A form for a setting slot was inserted into the wet concrete and aligned with adjacent markers. 5. When required, the lower edge of marker is re-squared with mini- mal loss using a power grinder 6. Setting forms are removed after partial curing of the concrete and the base backfilled with tamped sand or gravel 7. Marker reset into setting slot with a cement/lime grout (3/2/9) with 000 sand made fluid with a super plasticizer. 8. Marker set plumb and level, and braced for minimum of 5 days. 9. Disturbed areas backfilled with existing topsoil. TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Princely Monument Obelisk Marble Legible Tilted Reset plumb 7.D.1 5/14/2019 53 1.Excavate around above ground base to depth of base. 2. Inspect loose stone foundation, remove unstable material. 3.Raise monument on one side with hydraulic jacks and remove loose stone rubble from setting area 4. Lower monument onto setting area, and repeat raising operation on opposite side as needed. 5. Monument leveled onto setting area, shimmed tightly with flat stones on all sides and re-grade area with existing topsoil. 6. If setting joints are unsound, remove failed setting mortar. 7. Prime setting surfaces with Acryl 60 diluted 1:3 with water. 8. Re-set elements plumb onto base/s with a cement/lime mortar (3/2/9) with 000 sand Use lead shims for leveling if required. TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Annie M. Francis Headstone Marble Legible/partial Leaning on adjacent marker Reset into new below grade base 7.E.1 5/14-15/2019 54 1. Marker excavated and found to be sound. Light soiling removed by brushing with nylon brushes and water. 2. Setting area excavated for new below grade cast concrete base sized minimum of 12 inches deep, 12 inches greater in thickness and 6 inches wider than the stone. 3. Wooden forms for the base are aligned with adjacent markers before concrete is poured 4. A form for a setting slot was inserted into the wet concrete and aligned with adjacent markers. 5. When required, the lower edge of marker is re-squared with min- imal loss using a power grinder 6. Setting forms are removed after partial curing of the concrete and the base backfilled with tamped sand or gravel 7. Marker reset into setting slot with a cement/lime grout (3/2/9) with 000 sand made fluid with a super plasticizer. 8. Marker set plumb and level, and braced for minimum of 5 days. 9. Disturbed areas backfilled with existing topsoil. TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Lydia Judd Headstone Sandstone Legible Leaning on adjacent Reset into new below grade base 7.E.2 5/9-13/2019 55 1. Area probed and buried or overgrown fragments carefully excavated and inspected for soundness. 2. Soling removed by light brushing with nylon brushes and water. 3. Setting area excavated to sufficient depth and lower fragment re-set plumb at appropriate height and level onto gravel bed, aligned with ad- jacent markers 4. Area backfilled around marker with tamped sand and gravel 5. Disturbed areas re-graded with existing topsoil and sod. 6. All mating edges of fragments cleaned with water and any failed ad-hesives removed with hand tools 7. Fragments attached with structural adhesive (Abatron 55-22), clamped and braced until cured. Excess adhesive removed with hand chisels within 24 hours. 8. Cracks and losses filled with pigmented Voidspan crack fill, larger losses filled with Jahn restoration mortar 9. Filled areas misted with water and covered for 3 days minimum 10. Filled surface areas treated with light acid wash rinsed thoroughly TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Rachel Strong Headstone Marble Legible Leaning on adjacent marker Reset into new below grade base 7.F.1 5/9-10?2019 56 1. Marker excavated and found to be sound. Light soiling removed by brushing with nylon brushes and water. 2. Setting area excavated for new below grade cast concrete base sized minimum of 12 inches deep, 12 inches greater in thickness and 6 inches wider than the stone. 3. Wooden forms for the base are aligned with adjacent markers be- fore concrete is poured 4. A form for a setting slot was inserted into the wet concrete and aligned with adjacent markers. 5. When required, the lower edge of marker is re-squared with mini- mal loss using a power grinder 6. Setting forms are removed after partial curing of the concrete and the base backfilled with tamped sand or gravel 7. Marker reset into setting slot with a cement/lime grout (3/2/9) with 000 sand made fluid with a super plasticizer. 8. Marker set plumb and level, and braced for minimum of 5 days. 9. Disturbed areas backfilled with existing topsoil. TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section H. Elizabeth Howe Headstone Marble Legible Leaning on adjacent marker Possible new base required 7.G.2 4/11-12/2019 57 1. Existing base was located below grade while excavating for re- setting. 2. The base was inspected and found to be sound and re-useable 3. Area excavated to an appropriate depth removing any roots or large stones. 4. Base was aligned with adjacent markers and re-set level at ap- propriate height. 5. Area around base was backfilled with tamped gravel and re- graded with existing topsoil 6. Setting slot cleaned of debris or failed mortar 7. Marker reset plumb and level into setting slot with cement/lime grout (3/2/9) with 000 sand made fluid with a super plasticizer. 8. Excess grout removed and joint area cleaned. 9. Marker braced for a minimum 3 days TREATMENT REPORT MONUMENT CONSERVATION COLLABORATIVE LLC PO Box 541, Norfolk, CT 06058 860 309 6695 MCCLLC@gmail.com Cemetery: NAME ON Material: Marker Type: Condition of Inscription: Inspection Date: Inspected EXISTING CONDITIONS CONSERVATION STRATEGY TREATMENT Comments: All information given and recommendations made herein are based upon our research and are believed to be accurate, but no guarantee, either expressed or implied, in made with respect thereto. © MONUMENT CONSERVATION COLLABORATIVE LLC Map Location Old Section- Bridge St Cemetery, Northampton, MA 10/23/2015 IS & MJ Dates: Old Section Mosley Monument Monument Marble Legible Cross fallen Attach with structural adhesive 8.E.1 4/19/2019 58 1. Failed mortar removed from setting surfaces 2. Lower tab on cross attached with structural adhesive 3. Cross reset with 000 mortar