Loading...
Village Hill (NSH) Traffic impact and access-- olderr Preliminary Traffic Impact and Access Study Northampton State Hospital Campus Phase I Redevelopment Northampton, MA APPENDIX MATERIALS Prepared for MassDevelopment APPENDIX AUTOMATIC TRAFFIC RECORDER DATA MANUAL TURNING MOVEMENT COUNT DATA ACCIDENT DATA SEASONAL GROWTH DATA TRIP GENERATION/DISTRIBUTION CALCULATIONS SYNCHRO ANALYSIS HCS ANALYSIS SIGNAL WARRANT ANALYSIS MITIGATION ANALYSIS L AUTOMATIC TRAFFIC RECORDER DATA F ATR Location Client r-- Interval Begin 12:00 12 :15 12 :30 12 :45 01:00 01:15 01:30 01:45 02:00 02 :15. 02:30 02:45 03:00 03:15 03:30 03:45 04:00 04 ;15 04:30 04 :45 05 :00 05:15 05:30 05:45 06 :00 06:15 06:30 06:45 07;00 07:15 07:30 07:45 08:00 08:15 08:30 08:45 09:00 09:15 09:30 09:45 10:00 10 :15 10:30 10:45 11:00 11:15 11:30 11:45 Totals Sol it% Data File 01691B Wcst Street west of Eerie St, Nor MA VAl/S. Kelly WB AM PM 8 26 47 171 8 29 5 43 5 52 3 6 48 172 0 47 1 38 2 39 2 8 44 180 1 38 2 46 3 52 1 5 64 263 1 58 1 72 2 69 0 3 72 264 1 71 1 60 4. 1 61 2 10 83 283 1 88 2 55 5 57 4 52 40 176 12 52 18 41 18 43 26 112 43 168 32 32 20 49 34 44 32 137 41 149 36 37 28 37 34 50 154 23 93 32 20 32 26 40 24 24 104 18 64 26 19 24 18 30 9 27 125 12 37 37 11 29 10 32 4 742 2,020 36.1 57.2 Day Totals 2,762 Day Splits 49.4 Peak Hour 08:15 04 :30 Volume 155 292 Factor 0.77 0.83 AM 2 7 41 155 2 40 2 36 1 38 1 6 40 148 2 42 1 26 2 40 0 1 44 177 1 31 p 42 0 60 0 3 50 191 40 1 45 1 566 6 13 62 207 2 46 4 55 44- 10 48 50 177 8 44 16 36 14 47 14 141 52 182 39 52 36 38 52 40 68 299 30 112 67 28 66 36 98 18 88 331 14 68 102 18 74 18 67 18 54 184 18 46 50 15 44 7 36 6 38 124 9 27 30 6 32 8 2.4 4 36 159 15 23 36 2 43 4 44 2 1.316 1.513 63.9 42.8 07;45 362 0.89 2 3 W$IrtiI Stre€1 Neuck, MA 01760 TRANS PO ATIO T5Iuphone: (508) 651.1610 fl fax (508) 651.1229 EWA CORPORATION Pager. (800) 898-0783 EB PM 2,829 50.6 03:45 219 0.88 Cambincd AM PM 10 33 88 326 10 69 7 79 6 90 4 12 88 320 2 89 2 64 4 79 2 9 88 357 2 69 2 88 3 112 1 8 114 454 2 98 2 117 3 125 6 16 134 471 3 117 5 115 2 105 12 58 133 460 9 132 18 91 19 104 18 193 92 358 51 104 54 79 70 83 94 411 73 280 99 60 86 85 132 62 120 468 55 217 138 55 102 55 108 52 104 338 41 139 82 35 76 3 76 30 62 228 27 91 56 25 56 26 S4 13 63 284 27 60 73 13 '72 14 76 6 2,058 3.533 5.591 07:45 03 :30 492 493 0.89 0.92 Ste: 3206 Date: 09!06/01 Dav: Thursday TOG 23 Walnut Street ATR New South Street north of Old TFiANSP OR O Telephone: 508) 651 •.1610 Site: 2306 1~ Fax: 1608) 6Telephone: Date: 09/06/11 Location South Street, Northampton. MA DATA C ra:14710N Pager: (8001898.0763 Chant VAI/S. Kelily interval SB NB Combined Day: 'Thursday Bolin AM PM AM FM AM PM 12 :00 26 37 154 642 11 76 148 566 37 113 302 1,208 12:15 10 170 16 142 26 312 12:30 1 160 26 152 27 312 12:45 0 158 23 124 23 282 01 :00 14 45 150 607 14 42 122 498 28 87 272 1.105 01:15 15 160 10 110 25 270 01:30 8 157 10 114 18 271 01 :45 8 140 8 152 16 292 02:00 6 24 157 669 8 21 124 569 14 45 281 1.238 02:15 6 165 8 155 14 320 02 :30 10 178 1 128 11 306 02 :45 2 169 4 162 6 331 03:00 10 26 202 887 4 15 159 560 14 41 361 1.447 03:15 10 215 3 140 13 355 03:30 2 232 2 107 4 339 03:45 4 238 6 154 10 392 04:00 8 29 248 930 2 40 139 592 10 69 387 1.522 04 :15 4 216 10 138 14 354 04:30 6 228 11 163 17 391 04:45 11 238 17 152 28 390 05:00 10 82 250 943 19 134 169 625:— 29 216 419 1,568 05:15 13 259 27 138 40 397 05:30 24 218 38 150 62 368 05 :45 35 _216 50 168 85 384 06:00 30 247 193 632 59 379 158 583 89 626 351 1,215 06:15 50 158 84 153 134 311 06:30 84 129 106 124 190 253 06:45 83 152 130 148 213 300 07 :00 120 608 162 550 154 653 126 468 274 1.261 288 1.018 07:15 148 130 166 131 314 261 07:30 166 140 141 105 307 245 07 :45 174 118 192 106 366 224 08 :00 162 693+. 112 421 202 737— 86 300 364 1.430 198 721 08:15 185 111 204 78 389 189 08:30 198 110 164 66 362 176 08:45 X1 88 167 70 315 158 09:00 146 525 96 338 150 636 70 253 296 1.161 166 591 09 :15 142 104 164 52 306 156 09:30 125 BO 136 65 261 145 09:45 112 58 186 66 298 124 10:00 138 603 73 202 125 563 45 160 263 1.166 118 362 10:15 140 56 158 41 298 97 10:30 178 39 132 38 310 77 10:45 147 34 148 36 295 70 11 :00 160 588 36 142 144 557 27 89 304 1,145 63 231 11:15 136 36 128 16 264 52 11:30 140 48 139 24 279 72 11:45 152 22 146 22 298 44 Totals 3,507 6,963 3,853 5.263 7.360 12.226 Split% 47.6 57.0 52.4 43.0 Dav Totals Dav Splits Data Filo 01691A 10.470 53.5 9.116 46.5 19,586 Peak Hour 07 :45 04:30 07:45 05:30 07:45 04 :30 Volume 719 975 762 629 1.481 1.597 Factor 0.91 0.94 0.93 0.94 0.95 0.95 7 1 J J L TDC 23 Walnut Strout Natick. MA 01780 ATION .,wne: 631.1810 TRAI PORTATION F pl 1 508 651.1 Pap' B00 898.076,1 DATA COFPOp4Pt ee Site: 3206 ATR South Street (Route 10) north Date 09/13/01 3206 ocation of Earle St., Northampton. MA Client VAT/S. Kelly Direction: Na eczin Total 1 15 19 20.24 25-29 30-34 3549 4044 45 -41 5MPH 5549 M21-1 MPH '7 1`x}1 Avg tali MPH MPH MPH MPH MPH 11 MPH 0 2 p 0 0 0. 38 0 0 p p 5 9 4 39 12:AM 20 1 3 3 2 0 0 0 0 0 01:00 10 0 0 0 1 0 2 4 1 1 0 0 0 0 41 02:00 9 0 0 0 0 2 1 6 0 0 0 0 0 0 39 03:00 9 18 10 11 1 0 0 0 0 40 04:00 47 0 0 1 1 5 2 0 0 0 3 8 13 52 29 4 3 2 0 0 0 38 07:00 537 L 0 2 14 108 223 05:00 106 0 0 1 14 59 151 121 9 06:00 360 0 0 0 1 0 38 164 22 2 08:00 590 0 2 4 22 99 204 157 20 1 1 p 0 0 37 1 1 3 14 89 197 132 20 4 0 0 0 0 37 09:00 463 407 0 7 0 0 2 11 67 176 124 24 3 0 0 0 0 38 1 111:00 460 0 0 0 13 76 209 136 24 2 0 0 0 0 38 12'.PM 404 0 0 4 11 56 139 150 41 1 0 0 0 39 2 22 81 168 134 33 6 0 0 0 0 38 02:00 446 0 0 4 70 159 162 28 6 0 0 0 0 39 3 :00 458 0 0 0 1 73 197 139 39 1 0 0 0 0 38 03:00 458 0 0 0 9 1 67 187 13 50 208 135 31 153 41 1 0 0 0 0 38 05:00 440 0 0 1 04:00 466 0 0 17 2 0 0 0 0 38 06100 448 0 0 0 9 57 174 173 32 3 0 0 0 0 39 07:00 290 0 0 0 6 62 144 69 9 0 0 0 0 0 37 08 100 218 0 0 0 5 27 86 81 18 1 0 0 0 0 39 09 :00 167 0 0 0 1 19 53 62 27 5 0 0 0 0 40 10:00 115 0 0 0 8 18 41 37 9 2 0 0 0 0 38 11:00 62 0 0 0 2 9 16 17 9 0 0 0 0 0 39 Daily 6.962 2 3 23 213 1,113 2.897 2,202 454 48 6 0 1 0 3 Totals Percent 0.0 0.0 0.3 3.1 16.0 41.6 31.6 6.5 0.7 0.1 0.0 0.0 0.0 of Total Perceoti c Speedo 10% 15% 50% 85% 90% 32.0 33.6 38.7 43.8 44.6 10 MPH Pax Spoed 35 45 Number in pace 5,099 in pace 73.2 Snead exceeded 45 MPH 55 MPH 65 MPH Puntaitc 7.3 0.1 0.0 Totals 509 7 1 Data File 01691C ATR South Street (Route 10) north Location of Earle St., Northampton, MA VAI/S. Kelly Client Begin Total Time MPH MPH MPH MPH MPH MPH MPH MPH MPH MPH MPH MPH MPH 11:Am 74 o 0 0 e 8 28 30 6 1 0 1 0 0 40 01 :00 46 0 0 0 0 5 15 22 4 0 0 0 0 0 40 02:00 18 0 0 0 0 1 5 8 4 0 0 0 0 0 41 03:00 11 0 0 0 1 2 3 3 2 0 0 0 0 0 38 04:00 13 0 0 0 0 2 5 4 2 0 0 0 0 0 39 05:00 63 0 0 0 2 9 19 29 4 0 0 0 0 0 39 06 :00 136 0 0 0 1 31 70 32 2 0 0 0 0 0 37 07 :00 294 0 0 0 3 61 133 89 7 0 1 0 0 0 38 08 :00 326 0 0 0 9 59 163 8.3 11 I 0 0 0 0 37 09 :00 328 0 0 0 3 57 169 93 4 1 0 1 0 0 38 10:00 361 0 0 1 3 53 177 115 12 0 0 0 0 0 38 11 :00 437 0 0 0 9 75 221 112 18 1 1 0 0 0 38 12:PM 456 0 0 0 14 74 225 123 18 2 0 0 0 0 38 01:00 424 0 0 0 4 72 191 131 25 0 1 0 0 0 38 02 :00 504 0 1 1 2 68 279 139 14 0 0 0 0 0 38 03:00 576 0 0 0 8 113 282 148 23 0 1 1 0 0 38 04 :00 686 0 0 0 6 158 355 149 16 1 0 1 0 0 37 05 :00 730 0 0 1 6 148 420 144 11 0 0 0 0 0 37 06:00 483 0 0 0 6 65 233 111 16 2 0 0 0 0 38 07 :00 415 0 0 0 2 70 237 98 6 1 0 1 0 0 38 08:00 335 0 0 0 2 42 174 100 17 0 0 0 0 0 38 09:00 266 0 0 0 0 42 117 96 11 0 0 0 0 0 38 10 :00 150 0 0 0 2 27 77 41 2 0 1 0 0 0 33 11:00 131 0 0 0 0 12 59 52 7 1 0 0 0 0 39 Daily 7263 0 1 3 33 1254 3,707 1,952 242 11 5 5 0 0 38 Totals Peroe:ut 0.0 0.0 0,0 1.1 17,3 51.0 26,9 3.3 0.2 0.1 0.1 0.0 0.0 of Total Percentile Speeds 10 MPH Pace Speed 35 45 Number in race 5.659 1n pace 77.9 Speed ExAeeded 45 MPH 55 MPH 65 MPH Percentage 3.6 0.1 0.0 Totals 263 10 0 Data Fife: 01691C 10% 15% 50% 85% 90% 32.6 34.0 38.1 42.9 43.8 1 ij‘ N; O1760 TRANS- Tel•pt er»: 651.1610 fex: (G0 6 61.1228 154T GQRPt RAfi Pager: (800) 8050763 Site: 3206 Date: 09/13/01 Direction: SB 1 -14 15-19 20 -24 25 -29 30 -34 35 40-44 4549 50-54 55 -59 60-64 65 -69 70-99 MANUAL TURNING MOVEMENT COUNT DATA ri r N: Drive To Active Building E/W: Prince Street City, State: Northampton, MA Client: VAI/S. Kelly `15 from North Sum Thno Right Thnil Left] Pods 04:00 f o 7 0415 PM 4 0 6 1 04:30 PM 8 0 3 0 04:45 PM 1 0 1 2 Total 12 0 11 3 05:00 PM 05:15 PM 05:30 PM 05:45 PM Total Grand Total Apprch Total Staft Time Poidc Maur From 04:00 Intersection Volume Percent 04:30 Volume Peak Factor High Int Volume Peak Factor 20 47.6 6.5 3 0 1 3 3 0 0 4 2 0 3 2 0 0 1 2 a tr 3 11 0 22 14 0,0 52.4 0.0 7.1 Frorn142rtn_ R Th ight ru I Lott 1 PM to 05:45 Pa: Peak a 1 04:15 PM 14 56.0 6 0 0.0 0 11 44.0 3 04:15 PM 4 0 6 (506) 65M610 TRANSPORTATION FM: (soti) 651.1229 WA MARDI:WM:1N Pager: (BOO) 898-0763 Ri I maid Let Pods Rkalt O 16 0 0 0 1 16 0 0 0 1 15 0 0 0 O 18 0 0 0 2 84 0 1 0 1 1 3 5 135 3.6 90.4 1.6 43.7 25 9 10 0.825 Groups Prinbsd- Cars Trucks PrinCe Street From East 21 20 15 15 71 3 4.1 1 05:00 PM 1 70 95,9 15 0 0 0 _o 0 0 0 0 0" 0 0 0.0 0.0 0 0.0 0 O 17 0 15 O 11 O 13 56 21 0 22 0.830 Prince Strwt From Wept 73 16 19 15 21 12 67 0 0.0 0 04:30 PM 0 Left Pods 0 0 0 1 0 2 0 3 0 0 0 0 0 0 0 1 0 1 0 65 95.8 21 File Name 01691GG Site Code 00003206 Start Date 09/06/20C Page No :1 Ell Indu. To Total 0 42 1 42 47 2 34 3 166 3 43 4 38 2 32 2 31 11 14 309 323 0 123 4 0,0 96.9 3.1 0.0 39.8 1.3 4.3 95.7 NOM neat 1 Prince Singel From East From West 'ffi URI_ App. Tota14_, Int Tote 3 88 4.4 1 22 21 1 22 0.773 Int. Total 42 43 47 38 168 46 42 34 33 166 164 4 0.883 N. Main Drive E/W: West Street (Route 66) City, State: Northampton, MA Client: VAI/S. Kelly M 04:15 PM 04:30 PM 04:45 PM Total Main Cwt., From North Start Time Right] Thru f Ltiti Pads 0 0 0 1 0 3 2 0 2 0 5 0 8 2 8 o• 11 3 05:00 PM 1 0 0 2 05:15 PM 2 0 1 8 0.5:30 PM 1 0 1 4 08:45 PM 2 0 0 3 Total 6 0 2 15 Grand Total 14 0 13 18 Apprch 51.9 0.0 48.1 Total 1.5 0.0 1.4 L 1 R ht Th priv5 Lett Frorn NOM Pook1.61.7rrom 04:00 PM to 05:45 PM Peek 1 of 1 Intersection 04:30 PM Volume 10 0 9 19 Percent 52.8 0.0 47.4 05:15 Volume 2 0 1 3 Peak Factor High Int. 04:45 PM Volume 5 0 6 11 Peek Factor 0.432 1 a Ur MIKA, NI/4 v Telephone: rol 651-1229 6S1-1810 Fax: Rage BOO 898-0763 608 TRANSPORTATION DATA CORPORXDON Group Pnnied- Cars Trunks West Street (Route SS) From East Right F Thru Left Pads 1 60 0 2 63 1 BO 0 2 59 0 6 242 0 0 81 0 0 1 87 0 0 0 59 0 0 1 50 0 0 2 277 0 0 8 519 0 1.5 98.5 0.0 0.9 55.7 0.0 Right 0 0 0 0 O 0 O 0 0 6 55 43 51 41 190 0 51 0 45 0 37 0 43 0 i 0 386 0.0 97.1 0.0 39.3 4 287 0 291 1.4 98.8 0.0 1 87 0 88 05:15 PM 1 87 0 88 0.827 West 61Tes outs 88) From west Thru File Name 01691FF Site Code 00003206 Start Date 09/06/20( Page No :1 left L Peds 6a'" Tot t indu Total Int. Total al 1 0 0 117 111 1 0 1 113 114 3 0 0 119 119 1 2 4 114 118 6 2 0 2 2 5 1 0 2 0 5 7 11 9 2.9 12 4 133 137 11 138 149 4 99 103 3 98 101 22 468 466 27 931 058 2.8 97,2 mot tIsso( (Routo 88) Wet Street (Waite Be) From East From wait ApOl'ast 15112nel ThruT Leta App. Total finir Lett App. Total Int Tog O 188 6 194 0,0 96.9 3.1 O 45 2 47 04:30 PM O 51 3 54 0.898 0.913 501 131 L_ T r L f L 1 Li 1 N/S: Chapel Street /Rocky Hill Road E: Grove Street City, State: Northampton, MA Client: VAI/S. Kelly Chapel Street (Rcuts 68) From North Shut Time RIghtl 11 Loft Peds 04:00P 0 42 1 04:15 PM 0 37 2 04:30 PM 0 51 0 0445 PM 0 48 3 Total 0 178 6 05:00 PM 0 65 1 05:15 PM 0 60 6 05:30 PM 0 38 1 05:45 PM 0 34 2 Total 0 197 10 Grand Total 0 375 16 Apprch 0,0 95.9 4.1 Total 0,0 50.1 2.1 1 0 0 0 0 0 1 0 0 0 3 0 4 3 12 12.9 1.6 1 L TRANSPORTATION Z 1*°r*: S0 1: DCA QQAPORAITON Pager: (eool 098.4763 Eirou Printed- Cars Trucks Croy* Strew,. /i Mn Road (Rout4 86) FrornEast From South Right Thrul Loft r Pads Right 4 0 10 27 1 0 2 0 4 25 3 0 a o 6 30 0 0 9 4 24 8 0 28 0 0 0 0 0 0 0.0 0.0 13 17 8 2 15 53 2 81 4 87.1 10.8 24 106 8 9 4 4 25 49 18.5 8.5 29 27 24 30 110 218 81.5 28.8 Lail Pada 1 ot i Inciu. To1 Int. Tots! o 1 93 O 0 0 71 71 O 0 0 98 98 O 0 4 88 92 ti 5 350 355 O 0 O 0 O 0 0 0 0 0 0 0 0.0 0.0 File Name 01691DD Site Code 00003206 Start Date 09/06/20( Page No :1 O 118 O 120 2 75 0 88 2 399 7 749 758 0.9 99.1 T chapel shot (Ftoutelifs) From North Grove RockfT1111 rtoecl (Route 68) From East From South Start Time t Right r 7 '571 App. Total "triin L Trovr1.1.01 K.1 Rot I Trim L Loftr ow Pook Hour Frtim 04:06 Irto 06:46 PM Peak 1 d 1 lntersecton 04:30 PM Volume 0 224 10 234 4 0 47 51 27 110 0 137 Percent 0.0 95.7 4.3 7.8 0.0 92.2 19.7 80.3 0.0 D5:15 Volume 0 60 6 68 1 0 17 18 9 27 0 38 Peak Factor High Int 05:00 PM 05:15 PM 05:00 PM Volume 0 85 1 68 1 0 17 18 8 29 0 37 Peak Factor 0.886 0.708 0.928 0.879 118 120 77 88 461 Inl Tot" 422 120 N /S: State Street /New South St (Rte 10) E /W: Main Street (Route 9) City, State: Northampton, MA Client VAI /S. Kelly Start Time 04:00 PM 04:15 PM 04:30 PM 04:45 PM Total 28 31 39 29 127 05:00 PM 23 45 05 :15 PM 25 45 05:30 PM 29 58 05:45 PM 25 43 Total 102 189 Grand Total Apprch Total state guise( itaf gtreet (Rout. 9) From Norita F r East Thru I Len Pods Right Thru Len 58 4 1 4 60 42 47 7 27 8 70 53 39 4 29 7 73 62 46 8 18 8 84 66 190 23 95 25 281 223 7 7 5 3 22 Street From North F Star Time Right Th ru_�LeR T Pe* Hour From 04 :00 PM to 05:45 PM -Peak 1 of 1 Intersection 04:30 PM Volume 116 175 26 317 Percent 36.6 56.2 8.2 05:00 23 45 7 75 Volume Peale Factor High Int 04:45 PM Volume 29 48 8 83 Peak Factor 0.955 28 44 26 19 117 7 87 9 87 12 93 10 80 38 347 229 379 45 212 83 634 35.1 58.0 6,9 5.3 53.7 4.7 7.7 0.9 1.3 13.0 Right air lie wntiw• rROUIrw TRANSPORTATION Telephone: 508) 651.1610 Fm: 508) 651.1229 [34tH OORPORATION Paget. 800) 898 -0787 64 68 84 88 283 3 9 2 0 14 483 29 40.9 9.9 Main 5troet (Routs o) From East Thru Left rou Printod- Cars Trucks New m (Routs 10) From South Pads Right Thru Lan 55 43 40 88 204 381 32.2 7.8 Total 7 24 31 30 3 57 28 80 39 1 48 25 82 49 d 48 32 69 53 15 177 114 280 177 27 32 22 32 113 227 19,2 4.6 79 82 81 74 296 31 34 38 28 127 578 304 48.6 11.8 127 98 125 116 129 119 95 80 423 889 47.4 18.2 File Name Site Code Start Date Page No Main Street (Rata 9) From Weer Thru I LMtf P.ds E>mu. Ind% 1 Total Total 138 32 12 7 585 90 31 13 82 598 98 41 11 90 823 94 38 20 95 838 388 142 58 2442 83 98 55 84 318 706 37.8 14.4 49 33 32 28 140 15 14 20 15 64 282 120 15.0 5.8 New South Street (Route 10) 1 Main §eeN (Route 9) From South From West Totes Right Trru I Lott Right Thnr Left App. 29 331 258 818 194 116 272 582 489 371 181 4.7 53.8 41.7 33.3 19.9 48.7 47.9 38.3 15.8 7 87 84 158 55 27 79 181 129 83 49 05 :15 PM 05:00 PM 104 :30 PM 9 87 68 182 55 27 79 181 125 98 0.954 0.904 77 655 732 101 824 725 84 584 888 60 589 849 2452 'M 885 4894 5559 12.0 88.0 01691CC :00003206 :09/06/200 :1 Total 1021 Int Total 581 880 713 731 Int Tdai 2538 281 855 0.969 41 264 I 0.967 r N/S: Par le Street E/W: Texas Road/Grove Street City, State: Northampton, MA Client: VAI/S. Kelly Start Time 14:00 PM 04:15 PM 04:30 PM 04:45 PM Total Eraii Tt From North Thru 1 Leftl Pods V 1 sl. 0 0 21 1 0 0 22 0 0 1 28 1 1 2 3 1 05:00 PM 1 29 0 0 05:15 PM 2 18 0 1 05;30 PM 1 10 0 0 05:45 PM 0 8 0 0 Grand Total App(ch Tota l 8 151 3 2 3.8 94.4 1,9 1.1 27.0 0.5 Peek Hour tom 04:00 PM to 06:46 P11 Pek1 or 1 Intersection 04:15 PM Volume 2 100 2 104 Percent 1.9 96.2 1.9 05:00 1 29 0 Volume Peak Factor High Int 04:46 PM Volume 1 28 Peak Factor 1 mirmuf Mr. I uu TRANSPORTATION OffA CORPORATION Grou PrIntecl- Cara Trucks Plums Rood 8arle3treet From South Right TlIfU Left Pecls 1119m Thru Left Pods 0 1 i i 7 8 18 f 13 0 2 2 0 8 01 4 6 19 0 9 0 1 O 2 11 01 2 11 23 2 18 0 1 2 1 1 01 0 10 19 4 4 20 0 7 35 77 3 47 0 5 0 7 20.0 1.3 From East 4 11.4 0.7 24 68.0 4.3 04:30 PM 1 30 0 2 0.887 2 0 2 0 O 0 1 0 O 0 1 0 1 0 0 0 3 0 4 0 0 6 3 22 19.4 9.7 71.0 2 0 2 Thlephoncr., 6510610 Fes; SOB) 65/-1229 Pager; 800) 89/3-07Ell 0 12 0 8 1 6 1 4 230 9 65 171 8 3.7 28.5 89.8 1.6 11.8 30.5 31 4 28 0 15 1 28 0 22 0 94 05:00 PM 11 13 0 12 0.596 6 39 89 134 4.5 29.1 66.4 0 12 28 40 from West Right Thrul Left I Pais 0 0 9 0 1 17 1 1 0 17 0 2 0 13 0 3 0 12 0 2 0 59 1 106 88.3 18.9 1 13 0 0.8 10.8 0.2 2,3 Earle Street Tams Rood Ear% Street From North From East From South From West Thru Left 1 A PP' RIght 1 Thru Left I RIghtl Thad Leal To1/44 Right 1 Thru 1 Total Left 1 Int. Total Total Start Time Right APO. 61 1 4 91.1 1.8 7.1 05:00 PM 28 40 I 17 1 0.838 File Name 01691BB Site Code 00003206 Start Date 09/06/200 Page No :1 Esclu.1 Incltr. I Int Total Total I Total 1 60 81 0 71 71 2 88 90 3 73 78 6 O 93 93 2 62 64 O 83 83 O 50 50 268 21" 8 580 568 1.4 98.8 56 325 17 1 1 19 93 0.874 1 19 0.737 N: Elm Street (Route 9) E/W: Main St. (Rte 9)/West St. (Rte 66) City, State: Northampton, MA Client: VAI/S. Kelly Elm Street (Route 9) FrOr th n Start Time Rightf Thru I Lr ea Pads 3 3 3 2 44:CX:l PM 20 0 1 50 04:15 PM 22 0 142 04:30 PM 23 0 168 04:45 PM 21 0 149 Total 88 0 637 11 05:00 PM 28 05:15 PM 29 05:30 PM 13 05:45 PM 18 Grand Total 170 Apprch 12.5 Total 4.8 Start Time Peok Hour From Z00 !Nemec Volume Percent 04:30 Volume Peak Factor High Int. Volume Peak Factor 0 142 0 183 0 124 0 107 558 0 0.0 0.0 1193 87.5 32.8 05:15 PM 29 0 183 7 6 8 4 27 38 923 63.1 25.2 212 0.871 Telephone: (506) 661-1610 Fes: (S08)691-1229 CORPORKDON Pap,: (800) 898-0763 TRANSPORTATION Grou_Es Prink* Caul Trucks Main Street (Route 9) West Street (Ram 68) From EAU From Wet aloatT MN] Lae I Pacts RcM 99 1 3 0 2 0 83 105 77 0 0 0 80 24 28 109 82 0 0 0 103 18 19 112 89 0 0 0 92 24 17 425 f9T 2 0 ne 89 74 131 48 0 0 115 59 0 1 132 74 0 0 120 68 0 1 498 249 6 540 38.9 14.8 0 4 0.0 0.0 m Street (Route) Main Street (Rowe 9) El kght I Dr Total LINN I Thru Loft From Norm From East 11.1 to 06:45 PM Peek 1 or 1 04:30 PM 99 0 840 739 13.4 0.0 88.8 23 0 1e8 189 Trim 0.1 0.0 0 94 29 0 83 10 1 83 17 0 74 17 1 314 73 672 80.5 18.4 15 18 13 16 62 182 138 19.4 4,4 weft :trosT 60) _-APP. T Right 1 17:: LT Int. Top 487 258 0 725 0 372 81 64.4 35.6 0.0 0.0 82.1 17.9 109 82 0 191 0 103 18 04:30 PM 05:00 PM 109 82 0 191 0 94 29 0.949 File Name 01691AA Site Code 00003206 Start Date 09/06/20( Page No :1 LAI Pads Touji lndu. Total r Int Totsi Exriu. T 23 12 17 485 29 450 479 22 501 523 19 487 488 87 1886 103 22 27 21 21 91 470 479 424 402 1775 178 3881 3839 4.8 95.4 453 121 123 0.921 492 508 445 423 1888 1917 501 0.957 N: Drive To Active Building E /W: Prince Street City, State: Northampton, MA. Client: VAI /S. Kelly Drive 7o AcWa Building From Nash_ Start Tlme Right 1 Thru Left" Pods 07:00 And 1 0 0 07 :15 AM 1 0 0 0 07:30 AM 2 0 0 0 07:46 AM 2 0 2 0 Tote! 6 0 2 0 08:00 AM 1 0 0 2 2 08:15 AM 2 0 3 5 1 08:30 AM 0 0 1 0 2 08:46 AM 0 0 0 5 1 otal 3 0 1 4 12 6 (3rand Total 9 0 8 12 13 Apprch 60.0 0.0 40.0 21.3 Total 3.4 0.0 2.3 5.0 1160 Natick. MA 01760 PeDhone. 610 TRA NSPORTATION 508) 8St.122 ciATA OORPORATION Payer: (5) 600) 898-0763 Groups Printed- Cars Trucks Prince Street Anne' Street From Wost From Eoat Right Thru Left r Pees Right Thfu Let Pods 2 1 0 0 16 2 0 1 4 0 0 0 20 3 0 3 7 0 1 0 19 7 1 8 0 0 0 31 5 7 1999 0 1 88 17 7 7 a 7 29 48 78.7 18.3 DrM 1 o Active Etu1dtn0 Frwn North Start Time! 0ht I Thru Lot 1 A. Total enk Hou Fr P :00 AM to 08:45 AM 7 1 c4 1 Intersection 07:30 AM Volume 7 0 5 12 Percent 58.3 0.0 41.7 07:45 Volume 2 0 2 4 Peak Factor High Int 08:15 AM 07 :30 AM Volume 2 0 3 5 3 Peak Factor 0.600 0 0 0 0 0 0 O 0 O 0 0 0.0 0.0 0 25 0 21 0 13 0 18 77 0 183 23 4 0.0 87.8 12.4 0.0 62.2 8.8 7 27 0 34 0 96 20.8 79.4 0.0 0.0 87.3 1 8 0 7 0 31 07:45 AM 7 0 10 0 31 0.850 File Name 01691G Site Code 00003206 Start Date 09/06/20( Page No 1 Prince Street Prince Street From East From West Mot I_...... p. Tome Lett 1 "A �ioY 14 12.7 5 E,du. 7 Mau. Total I 111 Int. Toa1 23 23 O 29 29 1 38 39 O 47 47 1 137 135 2 38 38 7 35 42 2 27 29 5 27 32 18 125 141 17, 262 279 8.1 93.9 Int. Tad 110 158 38 47 0.830 5 38 0.764 SW Tiphopiwne. (509) 651.16i0 TRANSPORTATION Fax! (508) 651.1229 CATA COFIPORATION Pager: (8OO) 998-0TM N: Main Drive E/W: West Street (Route 9) City, State: Northampton, MA Client: VAX/S. Kelly Gross Printed- C.ars Trucks Main Drive We treet Wet S (Route 9) West Street (Rout. 9) Frorn Nonn From East Front West Snort TIme Rig1711 Thr TIT Ltd Tr Poc19 Right Left Peas Right I ThruT Lett 1 Peels 07:00 AM 0 0 1 0 1 2 0 0 0 0 07:15 AM 1 0 2 0 4 27 0 0 0 85 1 0 07:30 AM 1 0 0 0 2 20 0 1 0 63 0 0 07:45 AM 1 '0 2 1 1 25 0 0 0 107 1 0 Total 3 0 5 1 08:00 AM 0 0 1 2 3 23 0 0 0 108 1 08:15 AM 1 0 4 e 5 28 0 1 0 100 2 08:30 AM 0 0 1 2 0 27 0 0 0 75 4 08:45 AM 0 0 1 4 7 30 0 0 0 68 1 Total 1 0 7 14 15 108 0 1 34 8 Grand Total 4 0 12 15 23 202 0 2 0 844 10 0 Apprch 25.0 0.0 75.0 10.2 89.8 0.0 0.0 98.5 1.5 Total 0,4 0.0 1.3 2.8 22.6 0.0 0,0 72.0 1.1 Statt Time West (Rout 0) Right j t Link Apx... Total J.. Left ThL7.11 Lett J__ Ap2 total Int. tote+ Fm North Main bm;43 Street e 111 From East F West Street (Route rom West Peak Hour From 07:00 AM to 0946 AM Peak 1 or 1 Intersection 07:45 AM Volume Percent D8:15 Volume Peak Factor High Int. Volume Peak Factor 2 20.0 1 0 0.0 0 08:15 AM 1 0 8 60,0 4 4 10 5 5 0.500 9 8.0 5 103 92.0 28 0 0.0 0 112 33 08:15 AM 5 28 0 33 0.848 0 0.0 0 390 98.0 100 08:00 AM 0 108 FiTh Name 01691F Site Code 00003206 Start Date 09/06/2001 Page No :1 E T xcl °th Indu. Tots; I Int, Total] 0 84 Ai 0 100 100 1 88 87 1 137 138 2 407 4i5 01 2 0 7 0 4 0 15 0 2 17 895 912 1.9 98.1 8 398 2.0 2 102 1 109 0.913 138 138 140 147 107 109 105 109 488 520 140 0.929 N/S: Chapel St/Rocky Hill Rd (Route 66) E: Grove Street City, State: NortJaarnpton, MA Client: VAT/S. Kelly _J 7 1 L fl L_ 3tert Time 67:5b AM 07:15 AM 07:30 AM 07:45 AM Total 08:00 AM 08:15 AM 08:30 AN 08:45 AM Total Grand Total Apprch Total Right 0 0,0 0.0 Chapel Street Moues 613) From North 0 14 0 21 0 21 O 12 O 68 Thru Left Reds O 18 2 O 21 0 O 22 1 0 18 2 O 79 5 147 94.2 19,5 9 5.8 1.2 0 0 1 0 1 0 2 0 4 0 0 0 0 0 0 0 1 13 39.4 1.7 0 0 1 0 2 0 4 0 7 0 0 0.0 0.0 4 2 2 2 10 L._ Chapel Streit (Rsete ae) 1 prose Strost Roy 1-16oad (Route 69) From North South From East Fn tslift Time RS I fhtirr Le App. Tot tt ft v ok1 Road e 1L Tbni teen App. TO Thru I Left App Peek Ham Fran 07:00KR AM -Peak 1 or 1 Intersection 07:30 AM Volume 0 72 5 77 8 0 Percent 0.0 93.5 6.5 31,6 0.0 08:15 Volume 0 21 0 21 1 0 Peak Factor High Int. 07:30 AM 07:45 AM Volume 0 21 1 22 4 0 Peak Factor 0.875 Groups Printed- Cam Trucks Grove 8emet Rooky H8 Roed (Rout. 66) From East Frown South Right I Thru I Lord Peas Right r Thnt1 Lri Pods 0 9 49 0 0 1 0 2 0 14 43 0 0 1 0 3 0 8 B3 0 0 4 0 4 0 12 67 0 0 8 0 10 1 Lip I hir Nand.. ',AA 01760 Telephone: (508)651.1610 TRANSPORTATION (506) 651.1229 GC* c9RPORATICN Paw: (BOO) 898-0763 0 1 0 0 1 20 1 60.6 2.7 10 15 10 16 51 72 0 0 78 0 0 58 0 0 41 0 0 247 0 0 9.4 489 18.7 83.3 0.0 12.5 62.4 0.0 File Name 01691D Site Code 00003206 Start Date 09/06/200' Page No :1 Exdu Indu. Toil Int. Total O 73 "73 0 82 82 0 97 97 0 101 101 353 353 O 106 106 1 117 118 0 93 93 0 83 83 1 399 400 1 752 753 0.1 99.9 Int Total 13 19 45 280 0 325 421 88.4 13.8 88.2 0.0 2 3 15 78 0 93 117 0.900 08:15 AM 4 8 15 78 0 93 0.594 0.874 N /S: State Street /New South St. (Rte 10) E /W: Main Street (Route 9) City, State: Northampton, MA Client VAI /S. Kelly State Street Main Street (Route 9) From North From East Start Time Right Thru Lee Pala Right Thru Lee Peda 67F(50 AM 12 Th 5 -2 3 29 3 3 2 47 24 3 30 2 11 4 40 21 8 AM 12 23 5 5 i 2 65 38 4 97 15 111 11 198 102 18 07:15 AM 17 07:30 AM 14 07:45 Total 55 08:00 AM 08:15 AM 08:30 AM 08:46 AM Total Grand Total Apprch Total Start Time 20 17 35 28 98 153 38.8 3.6 Right 23 41 36 32 132 229 38 27 54.8 8.8 5.4 0.9 hate treot From Norm 2 5 7 7 21 0( 5 5 6 16 APP. Thru Lot PeeK Hour From 51:00 Ana' 03:45 Al3':1 i? 1 inkrsecton 08:00 AM Volume 98 132 21 251 Percent 39.0 52.6 8.4 08:30 35 36 7 78 Volume Peen Factor H)gh Mt 08:30 AM Volume 35 38 7 78 Peak Factor 0.804 5 5 4 4 18 89 62 85 73 289 1 V ih d r moot ta"Vi roc/ TRANSPORTATION Telephone. (508) 851.1610 fax: (5O8 651 1229 DMA OORPOFiATiON Pager: (800) 898-0769 30 37 31 42 140 29 487 242 3.8 842 31.9 0.7 11.5 5.7 08:30 AM 4 85 Oroupe Printed Cars Trucks Nevi South Street (Routs 10) Math Street (Route 9) From South From Wnt 4 1 0 1 6 22 Right Alin Street ("outer) From Eclat Right Thru Lelt M T 18 289 140 447 4.0 64.7 31.3 4 85 31 120 Thru Left Pads 53 15 55 4 89 20 83 4 85 30 70 7 75 38 84 8 262 103 252 23 85 30 83 5 80 35 77 9 83 28 70 3 73 29 88 8 261 122 31 25 543 225 40.8 18.8 12.8 6.3 Right 688 48 42.5 13.4 08:15 AM 31 120 80 35 0.931 Right 68 95 108 114 386 97 98 102 87 3T34 769 44.8 18.2 Nem South Street (Route 10) From Scutt Thru 57 70 89 99 315 Trim Lett To tal 281 122 316 719 39.1 17.0 43.9 63 28 70 181 Lett Pads 22 0 22 21 33 98 103 27 1 106 32 10 103 39 4 88 37 7 400 135 22 715 233 25 41.8 13.8 18.9 5.5 Right 08:30 AM 77 192 102 103 0.938 File Name Site Code Start Date Page No 0 0 3 3 10 25 12 22 89 Yin Street (Route 9) From Watt 01691C :00003206 :09/06/2001 :1 u. otal1 1 Total Total J 9 372 381 10 481 471 14 494 508 20 588 588 X893 1P14 554 595 603 584 2338 584 620 815 808 2405 122 4229 4351 2.8 97.2 Thru Lalt Total Int. Total 384 400 135 919 2338 41.8 43.5 14.7 102 103 39 244 603 1 0.988 39 244 0.942 J N /S: Earle Street E/W: Texas Road /Grove Street City, State: Northampton, MA Client: VAI /S. Kelly Start Time Total 08:00 AM 08:15 AM 08:30 AM 08:45 AM Total Eerie Street From North Ripht f Thru' Lefl Pede 07:00 AM' 1 3 1 0 07:15 AM 0 3 0 0 07:30 AM 0 2 1 1 07:45 AM 4 5 2 0 Grand Total 8 33 7 1 Apprch 16.7 68.8 14.8 Total 1.7 8.9 1.5 Earle Street From North Sun Time R1pM Thru Loft Tom' Peek Hour From 07:00 A M to 015;1$• Lf- Reek 1 a 1 Intersection 07:45 AM Volume 4 18 5 Percent 14.8 68.7 18.5 07:45 4 5 2 11 Volume Peak Factor High Int. 07:45 AM Volume 4 5 2 11 Peak Factor 0.614 13 4 1 Groupe Printed- Can/ Trucks Texas Reed Eerie Street C5ra;e Sir oet 1 From East From Souttl Il From West t E Right". incur, Int Thru Left Peas bht Tnru eft Pods Right Thru Left Pod 1 TTotal Tom1 Toles O 1� 1 O R 3 L 5_ 0 9 0 1 0 1 T 3 1 3 0 5 8 10 1 19 1 2 0, 1 53 54 1 0 3 0 2 14 10 0 22 1 3 0) 1 59 60 2 0 4 0 5 22 9 0 17 1 2 01 0 73 73 6 2 11 0 15 51 34 1 87 3 8 01 2 219 221 O 4 1 0 0 1 4 0 0 5 2 0 1 1 1 0 O 4 0 0; 2 0 3 0 3 7 0 0-+ 0 0 2 0 3 20 01 3 To 0 9 4 21 0 26.5 11.8 81.8 1.9 0.8 4.4 Right 1 27 5 2 12 19 26.3 10.5 83.2 2 0 4 6 07:45 AM 2 0 V 16 Nalk:k, MA 01760 TRANSPORTATION TNepl o'* (508) 1. 29 1° QATA QORPORAT10N Pag Fey: {508)85 "e• B00) 898-070 Twos Rood From East Thru Left APP ToW 2 18 7 1 2 28 11 0 2 18 14 0 1 17 8 0 7 79 40 1 22 130 74 2 149 5 17 4 9.7 57.5 32.7 87.1 2.9 9.9 4.6 27.1 15.4 31.1 1.0 3.5 Rght 08:15 AM 4 8 2 28 0.792 Earle Street From South Thru I Left 1 11 84 41 136 8.1 81.8 30.1 5 22 9 38 20 1 2 1 20 0 1 0 19 1 2 2 2.3 0 4 1 82 2 9 4 File Name 01691B Site Code 00003206 Start Date 09/06/200' Page No 1 2 58 80 0 72 72 2 65 87 1 85 66 5 280 285 7 479 486 1:4 98.8 Grove 8treef From Wort; APP Toi Right l Thru 1 Left: Int. Total 1 76 3 7 86 268 88.4 3.5 8.1 17 1 2 20 73 1 08:00 AM 11 41 1 20 1 2 23 0.829 1 0.935 0.91 N: Elm Street (Route 9) E /W: Main St. (Rte 9)/West St. (Rte 66) City, State: Northampton, MA Client VAI /S. Kelly Elm Street (Route 9) Frmnt North Starn. Righ Stan Tl 1 Thru Left 07:00 AM ti 0 97 07:15 AM 18 0 127 07 :30 AM 22 0 142 07:45 AM 17 0 154 Total 81 0 520 08:00 AM 08:15 AM 08:30 AM 08 :45 AM Total Grand Total Apprch Total 13 0 19 0 22 0 13 0 67 0 128 10,3 4.0 0 0.0 0.0 133 152 184 143 5 §2 1112 89.7 34.7 Pede 0 1 2 4 7 0 5 6 17 28 35 Ekn Street (R 9) From North Start Time Right I Thru Lek j App, total Peek Hour From 07:00 AM to 08:4 AU'. Peak 1 or 1 Intersection 08:00 AM Volume 87 0 592 859 Percent 10.2 0.0 89.8 08:30 Volume 22 0 184 188 Peek Factor High Int 08:30 AM Volume 22 0 184 188 Peak Factor 0.888 Na4ck, I.tA 01760 TRANSPORTATION Fex P'of/e' raj 65;•i2 ,(TA CORPOR411CN Paper. (800) 898-0763 Gnxrpe Printed- Cars Trucks Motn .Stieet (Routs 9) We.t Street (Rout. 68) From East From West Right I ThruE Ldt Para Right l Thru ir 46 58 89 91 282 109 115 110 114 448 793 85.8 24.7 63 41 81 70 255 418 34.4 13.0 0 0 0 0 0 0 0 0 0 0 0 0.0 0.0 0 0.0 0.0 0 97 22 1 0 87 22 5 0 81 23 0 0 79 23 5 0 344 90 11 806 B0.2 18.9 150 23 19.8 4.7 Abe s r"3\ main Street (Route 9) West Street (Route 96) RIyM� Fm t Left App. Total 'rT1r Thru Ls1)_1 App. Total 448 255 0 703 0 344 63.7 38.3 0.0 0.0 79.3 110 81 0 191 0 81 08:30 AM 08 :00 AM 110 81 0 191 0 97 0.920 Pods 1 2 4 5 12 File Name 01691A Site Code 00003206 Start Date 09/06/200 Page No 1 6rdu. Totgt lndu. Total Int Total 1 282 283 3 341 344 8 374 380 9 432 441 19 1409 -Mr 1 437 10 438 8 481 22 442 39 1798 1.8 98.2 90 434 20.7 23 104 22 119 0.912 438 448 487 464 1835 58 3205 3283 Int Tatat 1798 481 0.933 FOR: EARTH TECH BY: NORTHEAST TRAFFIC COUNTS FILE: NH-CH-GR -E -R Z-59 (17csi) L:226 IN-542 CJ MANUAL TURN MOVEMENT COUNT 15 MINUTE SUMMARY SITE CODE NORTHHAMPTON, MASSACHUSETTS Major St. CHAPEL STREET Minor St. GROVE STREET A1-BL99 LOCATION 1 1 Date: THURSDAY APRIL 25, 1996 Sun Movements: ALL VEHICLES GROVE STREET CHAPEL STREET CHAPEL STREET TIME NORTHBOUND EASTBOUND SOUTHBOUND WESTBOUND VEHICLE BEGIN RT THRU LT TOT RT THRU LT TOT RT THRU LT TOT RT THRU LT TOT TOTAL 7:00 AM 2 0 4 6 4 30 0 34 0 0 0 0 0 6 1 7 47 7:15 1 0 5 6 4 31 0 35 0 0 0 0 0 8 0 8 49 1:30 12 0 12 24 5 45 0 50 0 0 0 0 0 12 0 12 86 7:45 6 0 8 14 7 38 0 45 0 0 0 0 0 10 1 11 70 HR TOTAL 21 0 29 50 20 144 0 164 0 0 0 0 0 36 2 38 252 8:00 AK 0 0 6 6 8 42 0 50 0 0 0 0 0 12 0 12 68 8:15 2 0 8 10 12 93 0 105 0 0 0 0 0 27 1 28 143 8:30 1 0 5 6 9 42 0 51 0 0 0 0 0 15 2 17 74 8:45 2 0 3 5 14 43 0 57 0 0 0 0 0 16 1 17 79 HR TOTAL 5 0 22. 27 43 220 0 263 0 0 0 0 0 70 4 14:.,,. 364 AM TOTAL 26 0 51 71 63 364 0 427 0 0 0 0 0 106 6 112 616 PEAK HOUR 7:30 -8:30 AM 367 4:00 PH 0 0 8 8 3 33 0 36 0 0 0 0 0 33 2 35 79 4:15 1 0 12 13 3 28 0 31 0 0 0 0 0 33 1 34 78 4:30 0 0 8 8 4 31 0 35 0 0 0 0 0 43 1 44 87 4:45 1 0 11 12 2 31 0 33 0 .0 0 0 0 53 1 54 99 HR TOTAL 2 0 39 41 12 123 0 135 0 0 0 0 0 162 5 161 343 5:00 PH 2 0 15 11 3 33 0 36 0 0 0 0 0 48 4 52 105 5:15 1 0 5 6 6 23 0 29 0 0 0 0 0 57 0 51 92 5:30 0 0 5 5 9 25 0 34 0 0 0 0 0 45 2 47 86 5:45 1 0 8 9 3 29 0 32 0 0 0 0 0 42 1 43 84 HR TOTAL 4 0 33 31 21 110 0 131 0 0 0 0 0 192 7 199 367 PM TOTAL 6 0 72 78 33 233 0 266 0 0 0 0 0 354 12 366 710 PEAK HOUR 4:30 -5:30 PM 383 HANCAI TURN MOVEMENT COUNT 15 MINUTE SUMMARY FOR: EARTH TECH BY: NORTHEAST TRAFFIC COUNTS FILE: NH-ER- SO-E-R Z-59 (17csi) L:226 1N -542 SITE CODE NORTRHAMPTON, MASSACHUSETTS Major St. EARLE STREET Minor St. SOUTH STREET A1-BL99 LOCATION 1 3 Date: THURSDAY APRIL 25, 1996 Sum Movements: ALL VEHICLES SOUTH STREET EARLE STREET SOUTH STREET TIME NORTHBOUND EASTBOUND SOUTHBOUND RESTBOUND VEHICLE BEGIN RT THRU LT TOT RT THRU LT TOT RT THRU LT TOT RT THRU LT TOT TOTAL 7:00 AM 0 0 0 0 0 95 2 97 5 0 8 13 4 45 0 49 159 7:15 0 0 0 0 0 110 1 111 7 0 12 19 3 51 0 54 184 7:30 0 0 0 0 0 121 5 126 7 0 14 21 7 60 0 67 214 7:45 0 0 0 0 0 132 3 135 9 0 12 21 8 58 0 66 222 HR TOTAL 0 0 0 0 0 458 11 469 28 0 46 14 22 214 0 236 719 8:00 AM 0 0 0 0 0 93 11 104 3 0 13 16 3 36 0 39 159 8:15 0 0 0 0 0 160 14 114 11 0 11 22 12 64 0 16 272 8:30 0 0 0 0 0 134 11 145 10 0 16 26 13 80 0 93 264 8:45 0 0 0 0 0 155 15 170 15 0 27 42 14 96 0 110 322 HR TOTAL 0 0 0 0 0 542 51 593 39 0 67 106 42 276 0 318 1017 AM TOTAL 0 0 0 0 0 1000 62 1062 61 0 113 180 64 490 0 554 1796 PEAK HOUR 8:00 -9:00 AM 1017 4:00 PH 0 0 0 0 0 113 15 128 26 0 11 31 15 148 0 163 328 4:15 0 0 0 0 0 122 9 131 18 0 6 24 17 168 0 185 340 4:30 0 0 0 0 0 111 8 119 25 0 11 42 18 180 0 198 359- 4:45 0 0 0 0 0 114 14 128 18 0 14 32 25 149 0 114 334 HR TOTAL 0 0 0 0 0 460 46 506 87 0 48 135 75 645 0 720 1361 5:00 PH 0 0 0 0 0 111 11 122 21 0 8 29 23 176 0 199 350 5:15 0 0 0 0 0 132 11 143 17 0 9 26 14 113 0 187 356 5:30 0 0 0 0 0 126 11 137 8 0 10 18 13 140 0 153 308 5:45 0 0 0 0 0 121 13 134 10 0 14 24 20 123 0 143 301 HR TOTAL 0 0 0 0 0 490 46 536 56 0 41 97 70 612 0 682 1315 PH TOTAL 0 0 0 0 0 950 92 1042 143 0 89 232 145 1251 0 1402 2676 PEAR HOUR 4:30-5:30 PM 1399 J J J J MANUAL TURN MOVEMENT COUNT 15 MINUTE SUMMARY FOR: EARTH TECH BY: NORTHEAST TRAFFIC COUNTS FILE: NH- PR -CH-ET Z -59 (17csi) 1:226 1N-542 SITE CODE NORTHBAMPTON, MASSACHUSETTS Major St. CHAPEL STREET Minor St. LAUREL STREET Al -BL99 LOCATION 1 4 Date: THURSDAY APRIL 25, 1996 Sum Movements: ALL VEHICLES LAUREL STREET CHAPEL STREET LAUREL STREET CHAPEL STREET TIME NORTHBOUND EASTBOUND SOUTHBOUND WESTBOUND VEHICLE BEGIN RT THRU LT TOT RT THRU LT TOT RT THRU LT TOT RT THRU LT TOT TOTAL 7:00 AN 1 1 1 3 0 32 1 33 0 2 0 2 0 8 0 8 46 7:15 0 2 0 2 1 48 0 49 1 3 0 4 0 9 0 9 64 7:30 0 4 1 5 0 51 0 51 1 1 0 2 1 14 0 15 73 7:45 3 6 1 10 1 62 1 64 1 5 1 7 0 18 0 18 99 HR TOTAL 4 13 3 20 2 193 2 197 3 11 1 15 1 49 0 50 282 8:00 AM 0 2 0 2 0 48 0 48 0 5 0 5 0 18 0 18 13 J 8:15 0 3 2 5 0 51 1 52 0 4 0 4 0 15 0 15 16 j 8:30 0 2 0 2 3 51 2 56 2 4 0 6 1 20 0 21 85 8:45 3 3 1 1 2 35 1 38 1 4 0 5 0 12 0 12 62 J HR TOTAL 3 10 3 16 5 185 4 194 3 17 0 20 1 65 0 66, 296 AM TOTAL 7 23 6 36 1 318 6 391 6 28 1 35 2 114 0 116 518 PEAK HOUR 7:45 -8:45 AM 333 4:00 PM 0 4 1 5 0 18 2 20 0 3 0 3 0 18 0 18 46 4:15 0 9 0 9 0 28 2 30 5 3 1 9 1 31 2 34 82 4:30 1 4 0 5 0 32 2 34 0 10 0 10 0 43 4 41 96 4:45 0 17 0 11 0 28 4 32 0 6 0 6 0 51 1 58 113 HR TOTAL 1 34 1 36 0 106 10 116 5 22 1 28 1 149 1 151 337 5:00 PM 0 5 0 5 0 32 4 36 1 10 2 13 0 47 0 47 101 5:15 0 10 1 11 1 28 1 30 2 3 0 5 0 49 2 51 97 5:30 1 9 1 11 0 18 1 19 2 1 0 3 0 54 1 55 88 5:45 2 9 1 12 1 27 2 30 1 2 0 3 0 41 0 41 86 HR TOTAL 3 33 3 39 2 105 8 115 6 16 2 24 0 191 3 194 372 PH TOTAL 4 67 4 75 2 211 18 231 11 38 3 52 1 340 10 351 709 PEAK HOUR 4:30 -5:30 PH 407 1. 1 NAIOAL TORN KOYENEIT CHIT 15 MUTE SMART FOR:. IA171 T1C1 1i: I01711AST TRAFFIC COO11S FILE: 11-PI -C8 -1T Z-59 (llcsij L:226 SITE CODE NORTRBANPTON, MASSACHUSETTS Major St. CRAP1 STREET Nieor St. PRINCE BYRES! TIME 11011 AN TOTAL 11.541 81.8199 LOCATION 1 2 Suu Movements: ALL VEHICLES Date: tHUR$DAT APRIL 25, 1996 CHAPBL STREET PRINCE STREET CRAP L STREI! NOR?K80VND EASTBOUND SOUTHB001D B1 THOUND VEHICLE RT TRIO LT TOT R! ?HRU LT TOT AT 7880 LT TOT R? T RU LT T0! 70785 7:00 111 0 0 0 0 1 8 0 9 5 0 6 11 0 3 15 18 38 7 :15 0 0 0 0 3 14 0 17 1 0 13 14 0 45 0 45 76 7:30 0 0 0 0 4 11 0 15 0 0 11 18 0 X 43 0 43 75 7:45 1 0 0 0 2 13 0 15 0 0 17 17 0 '45 0 46 78 11 TOTAL 0 0 0 0 10 46 0 56 5 0 54 60 0 137 15 152 268 1:00 AN 0- 0 0 0 S 17 0 22 1 0 21 29 0 63 0 63 114 1:15 0 0 0 0 10 18 0 21 1 0 17 11 0 55 0 55 101 1:30 0 0 0 0 2 21 0 23 1 0 13 14 0 50 0 50 87 1:45 0 0 0 0 5 12 0 17 0 0 12 12 0 32 0 32 61 11 TOTAL 0 0 0 0 22 68 0 90 3 0 70 13 0 200 0 200 363 0 0 0 0 32 114 0 146 9 0 174 133 0 137 15 352 631 6e. PEA!( 000! 7:45-8:45 AM 380 4:00 PN 0 0 0 0 19 39 0 58 0 0 16 16 0 ;30 0 30 104 4:15 0 0 0 0 8 41 0 49 1 0 12 13 0 .27 0 27 89 4:30 0 0 0 0 28 43 0 71 2 0 23 25 0 ;31 0 38 134 4:45 0 0 0 0 18 53 0 11 1 0 20 21 0 ;29 0 29 171 II TOTAL 0 0 0 0 73 176 0 249 4 0 11 75 0 124 0 124 448 5:00 PM 0 0 0 0 21 47 0 68 0 0 15 15 0 135 0 35 118 5 :15 0 0 0 0 27 47 0 14 1 0 12 13 0 j24 0 24 111 5:30 0 0 0 0 28 44 0 72 0 0 28 28 0 !25 0 25 125 5:45 0 0 0 0 .31 41 0 72 0 0 27 27 0 X27 0 27 126 N1 TOTAL 0 0 0 0 107 179 0 286 1 0 82 13 0 11 0 111 400 PM 10781 0 0 0 0 180 355 0 535 5 0 153 158 0 1!35 0 235 91 a r .0.c:::cec- PRA8 8008 4:30-5;79 PM 484 SA18AL TqI>< MOM EIT 0001T 16 M118T3 SMART POI: IART8 TECI IT: NORTHEAST TRAPPIC COUNTS /I1I: 1I-II-83-Ef 5-59 (llcsi) L:226 13-542 01-1639 SIT! CODI 1ORTRAAMPT0I, MASSACHUSETTS LOCATION 1 5 bate: TRURSDII! Major St. !AILI STREET APRIL 25, 1996 Minor St. t MIST STREET Sus Moveunts: ALL VIICLES EARLE STREET VEST STREET RPT STREET TIRE IORTRE008D gAS75OUND SOUT880URD 835780010 Y11I1CLR IICIM If TIRO LT TOT IT THRU LT TOT IT TIM LT TOT 4 TARO LT 707 TOTAL 7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 —1:15 9 0 0 9 0 40 0 40 0 0 0 0 12 4 16 65 1:30 13 0 1 19 4 18 0 82 0 0 0 0 26 10 36 137 7:45 20 .0 4 24 1 101 0 102 0 0 0 0 25 10 35 161 II TOTAL 41 0 5 52 5 219 0 224 0 0 0 0 63 24 17 363 1:00 114 18 0 1 19 0 85 0 85 0 0 0 0 0 28 4 32 136 8:15 21 0 1 27 0 99 0 99 0 0 0 0 1 26 11 37.. 151 1:30 18 0 0 18 0 63 0 63 0 0 0 0 26 9 35 116 1:45 19 0 1 20 I 66 0 61 0 0 0 1 27 10 31 124 83 TOTAL 76 0 3 19 1 313 0 314 0 0 0 1 i 101 34 141 534 111 TOTAL 123 0 8 131 6 532 0 538 0 0 0 0 110 SI 228 191 C 22:.22 P1A1 I00R 7:30.1:30 AM 592 4:00 PM 15 0 0 15 4 43 0 47 0 0 0 0 1 65 25 105 167 4:15 16 0 1 17 3 46 0 49 0 0 0 0 1 55 11 89 155 4:30 9 0 3 12 2 48 0 SO 0 0 D 0 1; 14 24 116 171 4:45 4 0 3 1 1 42 0 43 0 0 0 0 2 79 11 122 112 81 TOTAL 44 0 1 51 10 119 0 189 0 0 0 0 1 213 84 432 612 5 :00 PM 10 0 2 12 0 40 0 40 0 0 0 0 2 13 15 111 163 5:15 11 0 2 13 1 3i 0 31 0 0 0 0 1 14 15 113 163 5:30 9 0 2 11 3 35 0 31 0 0 0 0 11 65 6 84 133 5:45 6 0 1 7 2 49 0 51 0 0 0 0 2 19 15 114 172 88 TOTAL 36 0 7 43 6 160 0 166 0 0 0 0 71 301 51 422 631 PM TOTAL 80 0 14 94 16 339 0 355 0 0 0 0 14 574 135 154 1303 ...n.. n^•. rye cc:t cs: Pim 8008 4:30 =5 :30 PM 516 �nr nG kaavambroi 11, 11, 11 11 11 11 11 11 I L rl 1 U ACCIDENT DATA H (F- J 0 F_ W J W O Q W cu J ci) CL L' (n(ncn(n U1V)0) U)0) 0.) 0 JUUCi.. (n W N 2 2 CO J W (o Q O (0 CC0 I-IW -f DD D w co iii cc (0 E= W (OZ c W W W W I •F -F 00 0 F- QQf -I- O W 0()0() (0(1) 0) r JJa a'm a_ W W I 2 y W HF— F_ J 0 F— F- J J (0 (0 (0 OU)CO 0) ()0)07 c 0 0 n J W W W W W JJ a_ cKct 2 U Q QQ QQ 14 J J J J J Q Q Q _J 0 Q 2 W W W W W 2 2 2 00 W c C 0 0 3 3 3 ww t o L L L L L L L L O L D L L •D L L L CU CU O 0 0 0 0 0000 0 0 0 0 0 0 p N OC U Q) 5 0000 00 0 0 UULLO0 00 I; Y 2 N y J J (n .J J N a L O LL W CU CO C13 C13 4-, W U C r W 4,.. L OL LL mi ".i a+ 0) C 0) 0) 0) C 0 0) 2) 0 0) C 0 0) 0) ii, tT 0 U 0 0 (a co co co (s CO (U (6 (B C C CO (o .41 C.. ...30000 0000 0 0 0 0 00000 0 0 4)) rC a) o g A c z U 6 a' a' a'a'a' 0 C a' as a O F- (/)0000 0000 0 0 0000() 00 ct N 1 J N W W W a W W W W CCI r O F F— F— F- F— F— H F— t 0 0 0 0 0 0 0 0 0 CA o q c z 0 0 0 0 0 Z Z 0 Z al -ai a 0 CO J J J J 0[ 0' Q' W Z Z J 0 c 0 c,1 C) C Z Z Z Z W Z Z W W W Z Z Z Z Z W W W t M IZEQQQQ w<<r a_W a' 0 QQQQ= a_2 i 0000 O O O O 00 0 0 00000 O r RI I., p co co A 0 A N r O 0 0 O O 0 r r r N 0 N r 0 0 O 0 0 0 0 2 _8 C C C C C C D C C •8 0 C C C C 0. •5 000 000 5 5 0 5 5000 0. E U U U U CO Qt C C =Q QQ •C QQ•c• C C Q .c 0 Z' a 0 a n Z Z' Z' 0. Z' n Q E. a o 8-a0°- 2 0 0 0. 0 0 0 0 0 Z F"' Ca_a_a. a_ a. a. C C a_ C Ca. a_a_ a. u_ 2 222 2222 22 2 2 22222 22 a_a_a.a_ a_ a_ a. a. a_a_Qa.a Qa_ 0 (O o0 O N CO CO r- CO N CO 0 0) N N r- N O N O 2 O 0 r 0 O O r O r- 0 r 0 0 0 0 O r 0 i i i 1 1 1 1 N- N- 1- ti 1� ti ti t` t` I- ti t` ti h- ti ti ti h- O 0 CA 0) 0) 0) 0) 0) 0) 0) 0) O) 0) 0) CA (3) 0) 4) 0) 0) 0) 3 E a) W (n (A 0) 0) 0) (A O CT) 0) CA 0) C) (A CA CT) 0 0 00 N CO CO I- d' (n NCO (f) r O CO Cf) O CO r L Y CO 0 N 0 0 N` 0 N N N N N N` O (a CO CO N N 0 I.0 (f) N r r C*) 0) O N CO LL. 1 0 0 r r r 0 0 r 0 0 r O O 0 0 r r 0 O i GU rCU i 29-Dec-98 W- Jun -u en nrs i nal n C a: n a !1^J o Z O co c i C a? I V Jun 00 `)4_ I. no i o i oa 12- Feb -98 no WA..., nn I Uy HMI c n: 4n nnAI oo co v -mac --s• 6 ui rm n7 Il■ A c a 0: 1 09 AM ,injury Accident 1 Property Only I 'Property Only j INroperty Only I IF'roperty Only Irroperty only I Irroperty only L o i n Bury tcciaent j 11 Injury Accident i 2 0' injury Accident I 11 0 'injury Accident I 2' 0 'Property Only 1 OI 0 .o I O 1' 01UNKNOWN 0 __01ANGLE I 01 01 O 0 °1 01 0' UNKNOWN !HEADON (REAREND 1MVTRAF UNKNOWN j REAREND (REAREND 'UNKNOWN REAREND 'ANGLE OFFRDFIX_1 OTHER 1 LFI XOBJ OFFRDFIX 'OFFRDFIX r MVTRAF LMVTRAF 1MVTRAF MVTRAF 1MVTRAF 1 MVTRAF ',Snowy 1 ''Dry 1 ;Snowy ;Wet Wet 1 Dry (Dry (Wet ,ry ;Dry 1Dry D ry Dark(Road Lit) I UnLit) 1 Daylight ;Daylight [Daylight I Dark(Road Lit) Dark(Road Lit), Daylight Dark(Road Lit) !Daylight ,Daylight 1 Daylight (Snow 1 'Unknown1 Cloudy 1 (Clear 1 l Cloudy (Clear 'Clear Clear Cloudy 'Clear Clear 1Ceear 'Clear 'RT 66 /ROCKY HILL ROCKY HILL RD -RT I ;ROCKY HILL RD 1 T 66 I r TOLD SOUTH ST ;SOUTH ST c I I MAIN ST STATE ST v i MAIN ST (SOUTH ST MAIN ST (NEW S[)t 1TH ST 'MAIN ST IRT 10 NEW SOUTH 1 I (MAIN ST ISTATE ST ~-1 c c CD (0 io cD co co Ti o a c n� o CI) N f olo; Z�Z� 0� r rl m m «1 m m; 0 a) a) (0 (0 0 0 N c m r 0 O 0. 0 m m r TJ co a) W o o o o 3 -i O z V N 0 73 D 2 -I o c 3 3 -1 m 121 m co O s0��i z o �.001 �1 _9 0 o j 0 O Q a. ,11' C C D D E R x Z 0 Z 0 Z O T.Z Z Z r r 1 0 0 m z zj L -I -I --I v m mlmfo 0 O Cl O 0 m cQ 0 N CO O 0 0 co co 0 ,v Co 0 CD 0) -I r a) c N O 0 m C) 0 co m r Co --I 1-1 m m< co co W 0 0 n (D co c m Co -1 -3 -I-1 71 m i 7J 73 co l a) a)+0)1 0 0) io co c as 0 Ti c. o o o `a 0 0 K co CO c o a h 0 hA 4 cc b m 0 0 in O 1 co csi az o 0 0) 0) i 0 Z 1 !IL LL LL N Q CC CC CC ww ww J J J J 0 Z Z Z Z 0 0 0 0 0 H J w Q -J (1) J w a Q C+5 0 N 4) U Q C a N Ig 1 1 1 .n ID i L) 1 '2 3 4 5 Total Entering Vehicles NB S8 E8 WB CITY/TOWN :NORTHAMPTON MAJOR STREET: ROUTE 9 (ELM STREET) INTERSECTION DIAGRAM (Label Approaches) APPROACH: DIRECTION TOTAL #DF ACCIDENTS 0.090 11 CRASH RATE CALCULATION: #DF YEARS MassilOwly CRASH RATE WORKSHEET INTERSECTION DATA MINOR STREET(S): ROUTE 66 (CHAPEL STREET/WEST STREET) APPROACH ADT: Peak Hour Volumes 3 RATE COUNT DATE 2001 North 740 450 725 4v r SkGNALIZED: AVERAGE OF (A (xoT X .11 Comments MHD USE ONLY Source ST ST ST ST ST N nsp# INTERSECTION 1 2 3 4 5 Total Entering NB SB EB WB Vehicles 580 320 1,020 620 NNW My CRASH RATE WORKSHEET J J CT J CITY/TOWN NORTHAMPTON DISTRICT 2 UNSIGNALIZED MAJOR STREET ROUTE 9 (MAIN STREET) MINOR STREET(S) ROUTE 10 (SOUTH STREET) STATE STREET INTERSECTION DIAGRAM (Label Approaches) APPROACH: DIRECTION VOLUMES (AM /PM) K FACTOR TOTAL OF ACCIDENTS CRASH RATE CALCULATION Comments North 1,020 320 580 620 0.090 16 APPROACH ADT OF YEARS INTERSECTION DATA Peak Hour Volumes 3 RATE COUNT DATE SIGNALIZED 28x2 AVERAGE OF ACCIDENTS (A' 1,000,000 ADT 365 2001 X ADT TOTAL VOU"K" FACT. 1 Et4 MHD USE ONLY Source ST ST ST ST ST REF INTERSECTION 1 2 3 4 5 Total Entering Vehicles NB SB EB WB 520 920 0 570 r CITY /TOWN NORTHAMPTON COUNT DATE 2001 DISTRICT 2 UNSIGNALIZED MAJOR STREET ROUTE 10 (SOUTH STREET) MINOR STREET(S) OLD SOUTH STREET INTERSECTION DIAGRAM (Label Approaches) APPROACH: DIRECTION VOLUMES (AM /PM) "K" FACTOR: TOTAL OF ACCIDENTS CRASH RATE CALCULATION Comments r CRASH RATE WORKSHEET INTERSECTION DATA SIGNALIZED lx North 0 920 520 570 Peak Hour Volumes 0.090 9 APPROACH ADT OF YEARS: 3 RATE AVERAGE OF ACCIDENTS (A 1,000,000 (ADT *365) ADT TOTAL VOLE K" FACT. 4 MHD USE ONLY Source ST ST ST ST ST INTERSECTION REF 1 2 3 4 5 Total Entering Vehicles NB SB EB WB 0 170 510 760 NORTHAMPTON r-, r DISTRICT 2 UNSIGNALIZED MAJOR STREET ROUTE 10 (SOUTH STREET) MINOR STREET(S) EARLE STREET INTERSECTION DIAGRAM (Label Approaches) APPROACH: DIRECTION VOLUMES (AM /PM) K FACTOR TOTAL OF ACCIDENTS 0.090 1 CRASH RATE CALCULATION Comments MasslDJiwiY CRASH RATE WORKSHEET North 510 170 760 APPROACH ADT OF YEARS: X INTERSECTION DATA Peak Hour Volumes 3 RATE COUNT DATE 2001 SIGNALIZED AVERAGE OF ACCIDENTS (A 1,000,000 (ADT 365) I.` ADT TOTAL VOU"K" FACT. 'VI try MHD USE ONLY Source ST ST ST ST ST INTERSECTION REF 1 2 3 4 5 Total Entering Vehicles NB SB EB WB 135 105 55 30 CITY/TOWN NORTHAMPTON COUNT DATE 2001 DISTRICT 2 UNSIGNALIZED MAJOR STREET EARLE STREET MINOR STREET(S) GROVE STREET TEXAS ROAD INTERSECTION DIAGRAM (Label Approaches) APPROACH DIRECTION VOLUMES (AM /PM) K FACTOR TOTAL OF ACCIDENTS Comments North 55 105 135 30 0.090 4 CRASH RATE CALCULATION CRASH RATE WORKSHEET APPROACH ADT OF YEARS: Afassitifirly X 1 INTERSECTION DATA Peak Hour Volumes 3 RATE SIGNALIZED AVERAGE OF ACCIDENTS (A 1,000,000 ADT 365 ADT TOTAL VOLP'K" FACT. MHD USE ONLY Source ST ST ST ST I' ST INTERSECTION REF 1 1 2 3 4 5 Total Entering Vehicles NB SB EB WB 0 40 40 95 CITY/TOWN NORTHAMPTON P I� I L E L. L DISTRICT 2 UNSIGNALIZED MAJOR STREET GROVE STREET MINOR STREET(S) LAUREL STREET INTERSECTION DIAGRAM (Label Approaches) APPROACH: DIRECTION VOLUMES (AM /PM) K FACTOR TOTAL OF ACCIDENTS Comments 0.090 0 CRASH RATE CALCULATION Mas*lws CRASH RATE WORKSHEET X INTERSECTION DATA APPROACH ADT OF YEARS: Peak Hour Volumes 3 RATE COUNT DATE 2001 SIGNALIZED North 40 40 95 AVERAGE OF ACCIDENTS (A 1,000,000 ADT *365) [ta lak r�r ADT TOTAL VOL/"K" FACT. q MHD USE ONLY Source ST ST ST ST ST INTERSECTION REF 1 2 3 4 5 Total Entering Vehicles NB SB EB WB 50 0 140 235 ..yy 25 CITY/TOWN NORTHAMPTON COUNT DATE 2001 DISTRICT 2 UNSIGNALIZED X MAJOR STREET ROUTE 66 CHAPEL STREET) MINOR STREET(S) GROVE STREET INTERSECTION DIAGRAM (Label Approaches) APPROACH: DIRECTION VOLUMES (AM /PM) K FACTOR TOTAL OF ACCIDENTS CRASH RATE CALCULATION Comments Masselfirsy CRASH RATE WORKSHEET INTERSECTION DATA 1 SIGNALIZED North 140 50 235 Peak Hour Volumes 0.090 6 APPROACH ADT OF YEARS: 3 RATE AVERAGE OF ACCIDENTS (A 1,000,000 (ADT *365) ADT TOTAL VOLP'K" FACT. MHD USE ONLY Source ST ST ST ST ST INTERSECTION REF 1 2 3 4 5 Total Entering Vehicles NB SB EB WB 40 35 115 215 1 U5. CITY/TOWN NORTHAMPTON DISTRICT 2 UNSIGNALIZED MAJOR STREET ROUTE 66 CHAPEL STREET) MINOR STREET(S) LAUREL STREET INTERSECTION DIAGRAM (Label Approaches) APPROACH: DIRECTION VOLUMES (AM /PM) "K" FACTOR: TOTAL OF ACCIDENTS 0.090 8 CRASH RATE CALCULATION Comments Mosseffiroy CRASH RATE WORKSHEET North 115 35 40 215 APPROACH ADT OF YEARS: IX INTERSECTION DATA Peak Hour Volumes 3 RATE COUNT DATE 2001 SIGNALIZED AVERAGE OF ACCIDENTS (A 1,000,000 ADT' 365 ADT TOTAL VOU"K" FACT. iff0 MHD USE ONLY Source ST ST ST ST ST INTERSECTION REF 1 2 3 4 5 Total Entering Vehicles NB SB EB WB 50 0 100 85 DISTRICT 2 UNSIGNALIZED MAJOR STREET LAUREL STREET MINOR STREET(S) BURTS PIT ROAD INTERSECTION DIAGRAM (Label Approaches) APPROACH: DIRECTION VOLUMES (AM /PM) K FACTOR TOTAL OF ACCIDENTS Comments 0.090 0 CRASH RATE CALCULATION MasaIttiw, CRASH RATE WORKSHEET CITY/TOWN NORTHAMPTON COUNT DATE OF YEARS: X INTERSECTION DATA North 100 50 85 APPROACH ADT Peak Hour Volumes 3 RATE SIGNALIZED AVERAGE OF ACCIDENTS (A 1,000,000 (ADT 365 2001 ADT TOTAL VOL/"K" FACT. _a. MHD USE ONLY Source ST ST ST ST ST INTERSECTION REF 1 2 3 4 5 Total Entering Vehicles NB SB EB WB 0 75 105 320 'f 3 I_ 1 CITY/TOWN NORTHAMPTON L_ 1 DISTRICT 2 UNSIGNALIZED r L r L MAJOR STREET ROUTE 66 CHAPEL STREET) MINOR STREET(S) PRINCE STREET INTERSECTION DIAGRAM (Label Approaches) APPROACH: DIRECTION VOLUMES (AM /PM) "K" FACTOR: TOTAL OF ACCIDENTS CRASH RATE CALCULATION Comments Missiliaway CRASH RATE WORKSHEET North 105 75 320 0.090 0 APPROACH ADT OF YEARS: X COUNT DATE INTERSECTION DATA Peak Hour Volumes 3 RATE SIGNALIZED tY4 47 AVERAGE OF ACCIDENTS (A 1,000,000 ADT *365) 2001 ADT TOTAL VOL/"K" FACT. INTERSECTION MHD USE ONLY Source ST ST ST ST ST REF 1 2 3 4 5 Total Entering Vehicles NB SB EB WB 45 0 175 370 CITY/TOWN NORTHAMPTON COUNT DATE 2001 DISTRICT 2 UNSIGNALIZED IX MAJOR STREET ROUTE 66 PRINCE STREET) MINOR STREET(S) EARLE STREET INTERSECTION DIAGRAM (Label Approaches) APPROACH: DIRECTION VOLUMES (AM /PM) K FACTOR TOTAL OF ACCIDENTS CRASH RATE CALCULATION Comments Massiarsyr CRASH RATE WORKSHEET INTERSECTION DATA SIGNALIZED North 175 45 370 0.090 2 APPROACH ADT OF YEARS: Peak Hour Volumes 3 RATE AVERAGE OF ACCIDENTS (A 1,000,000 (ADT 365 ADT TOTAL VOL/"K" FACT. 4 MHO USE ONLY Source ST ST ST ST ST INTERSECTION REF ni SEASONAL GROWTH DATA U 4&&Ammmmmm33af §m -44-;e4-;, m -I r ID G& /mm$6f 73 r C71 01 2 G$& mm§ $f E V. 3 CO 41 CO 0 0 G#&mmaW a f 2 lc2 co 000000 §0 f 27 -4 rm -1 r�� e r J333mmmm §3F y )33 3mmm$mmWWW< _�����er�er /,wr o. 2 §00 §01\\ A CJ CO 44 0,7 CA rn -o L 7 V. G 0 m Q U o 0 %6'E O 1 3842.081 I60'S61.E a) N c0 ch CO 0 0 3E n 0 0 81•LE 0 0 0 0) 0 d' 0 0 ig !E T N 0) 0 N 0 0 !E 0 aleJ 0 0 0 0 Location 'S /O West IW /O Grove Aluped 1 '3S lede401 !Rocky Hill Rd. Northampton Daily Traffic Count History L_I U L1 1 t_. L r1 I I CD N O 0 m �D 3 00 0 I 0 m -n m r o i- o of O O ZZZZZZC) 000000 2 2 2 2 5 2 D D D D D 0 71 71 Z 0 0 0 0 0 0 Z Z Z Z Z Z 79 O fitl'rI 0) m m -4 71 71 71 m m m0�0 00 000 0 nZMZ m *OD m to fn l D 71 Z 0) o -.4 (a V O A 0 N CO O O N O V O W O G) 0 O 0 CD 0 co 0 A s N 0 0 w o O O 0 v :0 V N 0 A W .W -0 0 O O W O O 00 O V 1, 1 (0 0) O (0 O CO (0 O O O 0 m ((0 CD O W O O 0 0 W 0 0 j (0 0 �m 0 CD 4,) CD 0 0 0 MI O O D m T_ 0 O V 0 (0 O co O p O (0 O 0 0 0 O 0 N O O m C) 0 O O O O O O p 0 (0 O (0 W W N C o o a (0 0 TRIP GENERATION/DISTRIBUTION CALCULATIONS 1990 U.S. CENSUS JOURNEY TO WORK DATA FOR CITY OF NORTHAMPTON Residence Northampton Northampton Northampton Northampton Northampton Northampton Northampton Northampton Northampton Northampton Northampton Northampton Northampton Northampton Northampton Northampton Northampton Northampton Northampton city city city city city city city city city city city city city city city city city city city Northampton city Northampton city Northampton city Northampton city Northampton city Northampton city Total Workplace Northampton city Amherst CDP Springfield city Holyoke city Remainder of Easthampton Remainder of Hadley town Remainder of Deerfield t Remainder of South Hadle Westfield city Chicopee city Remainder of Hatfield to Remainder of East Longme Hartford city West Springfield CDP Greenfield CDP Remainder of Southampton Remainder of Belchertown Remainder of Montague to Remainder of Enfield tow Remainder of Agawam town Worcester city Pittsfield city Remainder of Ludlow town Windsor Locks CDP (pt.) Remainder of Hampden tow Daily Peak Daily Peak 8977 4238 63.1% 58.2% 1334 739 9.4% 10.2% 1060 718 7.5% 9.9% 518 257 3.6% 3.5% 502 234 3.5% 3.2% 273 138 1.9% 1.9% 168 133 1.2% 1.8% 188 109 1.3% 1.5% 198 95 1.4% 1.3% 158 90 1.1% 1.2% 134 76 0.9% 1.0% 56 56 0.4% 0.8% 69 45 0.5% 0.6% 98 44 0.7% 0.6% 87 36 0.6% 0.5% 45 36 0.3% 0.5% 70 32 0.5% 0.4% 31 31 0.2% 0.4% 38 29 0.3% 0.4% 57 29 0.4% 0.4% 43 26 0.3% 0.4% 45 24 0.3 0.3% 30 22 0.2% 0.3% 20 20 0.1% 0.3% 28 20 0.2% 0.3% 14227 7277 100.0% 100.0% 1990 U.S. CENSUS JOURNEY TO WORK DATA FOR CITY OF NORTHAMPTON Workplace Residence Daily Peak Daily Peak Northampton city Northampton city 8977 4238 48.5% 43.6% Northampton city Remainder of Easthampton 2136 1220 11.5% 12.6% Northampton city Remainder of Hatfield to 550 350 3.0% 3 .6% Northampton city Remainder of Amherst tow 581 267 3.1% 2.7% Northampton city Remainder of Southampton 430 245 2.3% 2.5% Northampton city Remainder of Williamsbur 477 235 2.6% 2.4% Northampton city Remainder of Hadley town 403 213 2.2% 2.2% Northampton city Springfield city 349 196 1.9% 2.0% Northampton city Remainder of Westhampton 294 192 1.6% 2.0% Northampton city Remainder of Belchertown 268 174 1.4% 1.8% Northampton city Chicopee city 238 170 1.3% 1.7% Northampton city Remainder of South Hadle 256 165 1.4% 1.7% Northampton city Remainder of Deerfield t 222 158 1.2% 1.6% Northampton city Remainder of Chesterfiel 243 153 1.3% 1.6% Northampton city Holyoke city 353 150 1.9% 1.5% Northampton city Remainder of Goshen town 183 115 1.0% 1.2% Northampton city Remainder of Whately tow 144 90 0.8% 0.9% Northampton city South Amherst CDP 143 90 0.8% 0.9% Northampton city Remainder of Sunderland 152 83 0.8% 0.9% Northampton city Ware CDP 144 88 0.8% 0.9% Northampton city Remainder of Ashfield to 120 75 0.6% 0.8% Northampton city Remainder of Agawam town 105 74 0.6% 0.8% Northampton city North Amherst CDP 188 73 1.0% 0.8% Northampton city Longmeadow CDP 103 71 0.6% 0.7% Northampton city Greenfield CDP 92 68 0.5% 0.7% Northampton city Westfield city 165 68 0.9% 0.7% Northampton city Remainder of Cummington 91 61 0.5% 0.6% Northampton city Remainder of Granby town 116 61 0.6% 0.6% Northampton city Remainder of Worthington 92 61 0.5% 0.6% Northampton city Remainder of Huntington 86 56 0.5% 0.6% Northampton city West Springfield CDP 88 54 0.5% 0.6% Northampton city Remainder of Conway town 96 53 0.5% 0.5% Northampton city Remainder of Montague to 79 43 0.4% 0.4% Northampton city Remainder of Pelham town 66 40 0.4% 0.4% Northampton city Remainder of Leverett to 59 35 0.3% 0.4% Northampton city Remainder of Ludlow town 41 33 0.2% 0.3% Northampton city Remainder of Monson town 75 32 0.4% 0.3% Northampton city Remainder of Plainfield 49 29 0.3% 0.3% Northampton city Remainder of Shutesbury 69 26 0.4% 0.3% Northampton city Turners Falls CDP 45 25 0.2% 0.3% Northampton city Remainder of Buckland to 35 22 0.2% 0.2% Northampton city Remainder of Gill town 24 18 0.1% 0.2% Northampton city Southbridge CDP 22 16 0.1% 0.2% Northampton city Remainder of Northfield 31 15 0.2% 0.2% Northampton city Remainder of Hampden tow 15 15 0.1% 0.2% Total 18495 9716 100.0% 100.0% Towns using Interstate 91 North of the site Town Deerfield Hatfield Greenfield Montague Total 3.7 Towns using Route 9 East of the site Town Northampton Amherst Hadley South Hadley Belchertown Total 40 Towns using Route 9 West of the site Town Northampton Total Town Northampton Total Total 100 Residential Regional Route Distribution Percent 1.8 1 0.5 0.4 Percent 26 10.2 1.9 1.5 0.4 Percent 20 20 Percent 2 2 Towns using Interstate 91 South of the site Town Springfield Holyoke Chicopee E Longmeadow Hartford W Springfield Enfield Agawam Worcester Pittsfield Ludlow Windsor Locks Hampden Total Towns using Route 10 South of the site Town Easthampton Westfield Northampton Southampton Town Northampton Total Percent 9.9 3.5 1.2 0.8 0.6 0.6 0.4 0.4 0.4 0.4 0.3 0.3 0.3 19.1 Percent 3.2 1.3 1.2 0.5 Total 6.2 Towns using Route 66 West of the site Towns using State Street North of the site Percent 9 9 Towns using Interstate 91 North of the site Town Hatfield Deerfield Northampton Whately Greenfield Conway Montague Turners Falls Buckland Gill Northfield Total Towns using Route 9 East of the site Town Northampton Amherst Hadley Belchertown South Hadley South Amherst Sunderland Ware North Amherst Granby Pelham Leverett Shutesbury Total Towns using Route 66 West of the site Town Northampton Westhampton Southampton Huntington Percent 1.6 1.6 1.4 0.9 0.7 0.5 0.4 0.3 0.2 0.2 0.2 8 Percent 7.4 2.7 2.2 1.8 1.7 0.9 0.9 0.9 0.8 0.6 0.4 0.4 0.3 21 Percent 7.4 2 1 0.6 Total 11 Total 100 Workplace Regional Route Distribution Towns using Interstate 91 South of the site Town Springfield Chicopee Holyoke Agawam Northampton Longmeadow W Springfield Ludlow Monson Southbridge Hampden Total 9 Towns using Route 9 West of the site Town Northampton Williamsburg Chesterfield Goshen Ashfield Cummington Worthington Plainfield Total 27 Towns using Route 10 South of the site Town Northampton Easthampton Southampton Westfield Total 20 Towns using State Street North of the site Town Northampton Hatfield Total Percent 2 1.7 1.5 0.8 0.7 0.7 0.6 0.3 0.3 0.2 0.2 Percent 19.5 2.4 1.6 1.2 0.8 0.6 0.6 0.3 Percent 5.2 12.6 1.5 0.7 Percent 2 2 4 Li 1 n 7 U Northampton State Hospital Phase I Redevelopment Light Industrial Generation (47,000SF) Small Retail Generation 19,000SF Enter Exit Total Enter Exit Total Morning 38 5 43 Morning 8 6 14 Evening 6 41 46 Evening 21 28 49 Weekday Daily 164 164 328 Weekday Daily 386 386 772 Office Generation (86,000SF) Total Aggregate Uses Enter Exit Total Enter Exit Total Morning 130 18 147 Morning 176 28 204 Evening 24 117 141 Evening 51 186 237 Weekday Daily 518 518 1035 Weekday Daily 1068 1068 2135 Business Park Generation 152,000SF) Difference Aggregate Uses Vs. Business Park Enter Exit Total Enter Exit Total Morning 181 37 218 Morning 5 9 14 Evening 33 184 217 Evening -18 -2 -20 Weekday Daily 1190 1190 2380 Weekday Daily 122 122 245 Total Residential 109 Units) Total Project Generation Enter Exit Total Enter Exit Total Morning 18 67 85 Morning 194 95 289 Evening 70 37 107 Evening 121 223 344 Weekday Daily 515 515 1030 Weekday Daily 1583 1583 3165 Institute of Transportation Engineers (ITE) Land Use Code (LUC) 210 Single Family Detached Housing Average Vehicle Trips Ends vs: Dwelling Units Independent Variable (X): 20 AVERAGE WEEKDAY DAILY L.n T 0.920 Ln (X) 2.707 Ln T 0.920 Ln 20 (2.707) Ln T 5.46 T 235.82 T 236 vehicle trips with 50% 118 vpd) entering and 50% 118 vpd) exiting. WEEKDAY MORNING PEAK HOUR OF ADJACENT STREET TRAFFIC T 0.700 (X) 9.477 T 0.700 20 (9.477) T 23.48 T 23 vehicle trips with 25% 6 vph) entering and 75% 17 vph) exiting. WEEKDAY EVENING PEAK HOUR OF ADJACENT STREET TRAFFIC Ln T 0.901 Ln (X) 0.527 Ln T 0.901 Ln 20 (0.527) Ln T 3.23 T 25.18 T 25 vehicle trips with 64% 16 vph) entering and 36% 9 vph) exiting. SATURDAY DAILY Ln T 0.956 Ln (X) 2.540 Ln T 0.956 Ln 20 (2.540) Ln T 5.40 T 222.28 T 222 vehicle trips with 50% 111 vpd) entering and 50% 111 vpd) exiting. SATURDAY MIDDAY PEAK HOUR OF GENERATOR T= 0.886 (X) 11.065 T 0.886 20 (11.065) T 28.79 T 29 vehicle trips with 54% 16 vph) entering and 46% 13 vph) exiting. Confidential Vanasse Associates, Inc. Trip Generations.xls Institute of Transportation Engineers (ITE) Land Use Code (LUC) 210 Single Family Detached Housing Average Vehicle Trips Ends vs: Dwelling Units Independent Variable (X): 22 AVERAGE WEEKDAY DAILY Ln T 0.920 Ln (X) 2.707 Ln T 0.920 Ln 22 (2.707) Ln T 5.55 T 257.43 T 258 vehicle trips with 50% 129 vpd) entering and 50% 129 vpd) exiting. WEEKDAY MORNING PEAK HOUR OF ADJACENT STREET TRAFFIC T 0.700 (X) 9.477 T 0.700 22 (9.477) T 24.88 T 25 vehicle trips with 25% 6 vph) entering and 75% 19 vph) exiting. WEEKDAY EVENING PEAK HOUR OF ADJACENT STREET TRAFFIC Ln T 0.901 Ln (X) 0.527 Ln T 0.901 Ln 22 (0.527) Ln T 3.31 T 27.44 T 27 vehicle trips with 64% 17 vph) entering and 36% 10 vph) exiting. SATURDAY DAILY Ln T 0.956 Ln (X) 2.540 Ln T 0.956 Ln 22 (2.540) Ln T 5.50 T 243.48 T 244 vehicle trips with 50% 122 vpd) entering and 50% 122 vpd) exiting. SATURDAY MIDDAY PEAK HOUR OF GENERATOR T 0.886 (X) 11.065 T 0.886 22 (11.065) T 30.56 T 31 vehicle trips with 54% 17 vph) entering and 46% 14 vph) exiting. Confidential Vanasse Associates, Inc. Trip Generations.xls Institute of Transportation Engineers (ITE) Land Use Code (LUC) 220 Apartment Average Vehicle Trips Ends vs: Dwelling Units Independent Variable (X): 67 AVERAGE WEEKDAY DAILY T 5.994 (X) 134.114 T 5.994 67 (134.114) T 535.71 T 536 vehicle trips with 50% 268 vpd) entering and 50% 268 vpd) exiting. WEEKDAY MORNING PEAK HOUR OF ADJACENT STREET TRAFFIC T 0.497 (X) 3.238 T 0.497 67 (3.238) T 36.54 T 37 vehicle trips with 16% 6 vph) entering and 84% 31 vph) exiting. WEEKDAY EVENING PEAK HOUR OF ADJACENT STREET TRAFFIC T 0.541 (X) 18.743 T 0.541 67 (18.743) T 54.99 T 55 vehicle trips with 67% 37 vph) entering and 33% 18 vph) exiting. SATURDAY DAILY T 7.852 (X) 256.189 T 7.852 67 (256.189) T 269.90 T 270 vehicle trips with 50% 135 vpd) entering and 50% 135 vpd) exiting. SATURDAY MIDDAY PEAK HOUR OF GENERATOR T 0.520 (X) T= 0.520* 67 T 34.84 T 35 vehicle trips with 50% 18 vph) entering and 50% 17 vph) exiting. Confidential Vanasse Associates, Inc. 220 UNITS.xls rl LJL Institute of Transportation Engineers (1TE) Land Use Code (LUC) 110 General Light Industrial Average Vehicle Trips Ends vs: 1000 Sq. Feet Gross Floor Area Independent Variable (X): 152 AVERAGE WEEKDAY DAILY T 6.970 (X) T 6.970 152 T 1059.44 T 1,060 vehicle trips with 50% 530 vpd) entering and 50% 530 vpd) exiting. WEEKDAY MORNING PEAK HOUR OF ADJACENT STREET TRAFFIC T 0.920 (X) T 0.920 152 T 139.84 T 140 vehicle trips with 88% 123 vph) entering and 12% 17 vph) exiting. WEEKDAY EVENING PEAK HOUR OF ADJACENT STREET TRAFFIC T 0.980 (X) T 0.980 152 T 148.96 T 149 vehicle trips with 12% 18 vph) entering and 88% 131 vph) exiting. SATURDAY DAILY T 1.320 (X) T 1.320 152 T 200.64 T 200 vehicle trips with 50% 100 vpd) entering and 50% 100 vpd) exiting. SATURDAY MIDDAY PEAK HOUR OF GENERATOR T 0.140 (X) T 0.140 152 T 21.28 T 21 vehicle trips with 47% 10 vph) entering and 53% 11 vph) exiting. Confidential Vanasse Associates, Inc. 110 SF.xls Institute of Transportation Engineers (ITE) Land Use Code (LUC) 710 General Office Building Average Vehicle Trips Ends vs: 1000 Sq. Feet Gross Floor Area Independent Variable (X): 152 AVERAGE WEEKDAY DAILY Ln T 0.768 Ln (X) 3.654 Ln T 0.768 Ln 152 (3.654) Ln T 7.51 T 1830.49 T 1,830 vehicle trips with 50% 915 vpd) entering and 50% 915 vpd) exiting. WEEKDAY MORNING PEAK HOUR OF ADJACENT STREET TRAFFIC Ln T 0.797 Ln (X) 1.558 Ln T 0.797 Ln 152 (1.558) Ln T 5.56 T 260.35 T 260 vehicle trips with 88% 229 vph) entering and 12% 31 vph) exiting. WEEKDAY EVENING PEAK HOUR OF ADJACENT STREET TRAFFIC T= 1.121 *(X) +79.295 T 1.121 152 (79.295) T 249.69 T 250 vehicle trips with 17% 43 vph) entering and 83% 207 vph) exiting. SATURDAY DAILY T 2.370 (X) T 2.370 152 T 360.24 T 360 vehicle trips with 50% 180 vpd) entering and 50% 180 vpd) exiting. SATURDAY MIDDAY PEAK HOUR OF GENERATOR T 0.410 (X) T 0.410 152 T 62.32 T 62 vehicle trips with 54% 33 vph) entering and 46% 29 vph) exiting. Confidential Vanasse Associates, Inc. 710 SF.xls Confidential Institute of Transportation Engineers (ITE) Land Use Code (LUC) 814 Specialty Retail Center Average Vehicle Trips Ends vs: 1,000 Sq. Feet Gross Floor Area Independent Variable (X): 19.0 AVERAGE WEEKDAY DAILY T 40.670 (X) T 40.670 19 T 772.73 T 772 vehicle trips with 50% 386 vpd) entering and 50% 386 vpd) exiting. WEEKDAY MORNING PEAK HOUR OF ADJACENT STREET TRAFFIC ITE LUC 820 Weekday Morning Trip Rate .ITE LUC 814 Weekday Morning Trip Rate ITE LUC 820 Weekday Evening Trip Rate ITE LUC 814 Weekday Evening Trip Rate 1.03 3.74 T= Y* 19.0 T 13.55 T 14 vehicle trips with 61 8 vph) entering and 39% 6 vph) exiting. (same distribution split as ITE LUC 820 during the weekday moming peak hour of adjacent street traffic) WEEKDAY EVENING PEAK HOUR OF ADJACENT STREET TRAFFIC T 2.590 (X) T= 2.590* 19.0 T 49.21 T 49 vehicle trips with 43% 21 vph) entering and 57% 28 vph) exiting. SATURDAY DAILY T 42.040 (X) T 42.040 19 T 798.76 T 798 vehicle trips with 50% 399 vpd) entering and 50% 399 vpd) exiting. SATURDAY MIDDAY PEAK HOUR ITE LUC 820 Saturday Midday Trip Rate ITE LUC 814 Saturday Midday Trip Rate ITE LUC 820 Saturday Daily Trip Rate ITE LUC 814 Saturday Daily Trip Rate 4.97 49.97 (Y) 2.59 (Y) 42.04 Y 0.7132888 Y 4.1812848 T= Y* 19.0 T 79.44 T 79 vehicle trips with 52% 41 vph) entering and 48% 38 vph) exiting. (same distribution split as ITE LUC 820 during the Saturday midday peak hour of generator) Vanasse Associates, Inc. Trip Generations.xls SYNCHRO ANALYSIS r HCM Signalized Intersection Capacity Analysis 2001 Weekday AM Existing Conditions 9/21/2001 3: Route 9 Route 66 Lane Configurations Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Fit Permitted Satd. Flow (perm) 1710 4.0 0.95 0.99 1.00 3138 1.00 3138 Volume (vph) 590 Peak -hour factor, PHF 0.90 Adj Flow (vph) 656 Lane Group Flow (vph) 728 Turn Type Protected Phases 2 Permitted Phases Actuated Green, G (s) 18.8 Effective Green, g(s) 18.8 Actuated g/C Ratio 0.33 Clearance Time (s): 4.0 Vehicle Extension (s) 3.0 Lane "Grp.Cap (vph) 1044 v/s Ratio Prot c0.23 Nits Ratio Perm v/c Ratio 0.70 Uniform Delay,,d1 16:4 Progression Factor 1.00 Incrernental'Delay, d2 2.1 Delay (s) 18.4 Level of. Service B Approach Delay (s) 18.4 Approach LOS B HcM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length; (s) Intersection Capacity Utilization c Critical Lane Group 4--- 4 1710 1710 4.0 1.00 1.00 0.95 1593 0.95 1593 65 255 0.90 0.90 72 283 0 283 r 1710 1710 1710 4.0 4.0 4.0 1.00 1.00 1.00 1.00 1.00 0.85 1.00 0.95 1.00 1676 1593 1425 1.00 0.95 1.00 1676 1593 1425 450 90 345 0.90 0.90 0.90 500 100 383 500 100 383 Prot pm +ov 1 6 8 1 8 16.3 39.1 9.4 25.7 16.3 39.1 9.4 25.7 0.29 0.69 0.17 0.45 4.0 4.0 4.0 4.0 3.0 3.0 3.0 3.0 460 1160 265 749 c0.18 0.30 0.06 c0.15 0.12 0.62 0.43 0.38 0.51 17.4 3.8 20.9 10.9 1.00 1.00 1.00 1.00 2.4 0.3 0.9 0.6 19.8 4.1 21.8 11.5 B A CB 9.8 13.7 A B S: \Jobs \3206 \Synchro \Northampton AM EX.sy6 SDH vanassando -ff51 13.9 HCM Level of Service B 0.60 56.5 Sum of lost time (s) 56.3% ICU Level of Service 8.0 A Synchro 5 Report Page 1 Queues 3: Route 9 Route 66 4- 4 f* Lane Configurations Volume (vph) 590 255 450 90 345 Lane Group Flow (vph) 728 283 500 100 383 Turn Type Prot pm +ov Protected Phases 2 1 6 8 1 Permitted Phases 8 Detector Phases 2 1 6 8 1 Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 19.0 8.0 19.0 19.0 8.0 Total Split (s) 59.0 42.0 101.0 19.0 42:0 Total Split 49% 35% 84% 16% 35% Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 Lead /Lag Lead Lag Lag Lead -Lag Optimize? Yes Yes Yes Recall. Mode None None None Min None Queue Length 50th (ft) 93 78 53 29 35 Queue Length 95th (ft) 221 208 129 99 129 Internal Link Dist (ft) 420 220 621 50th Up Block Time 95th Up Block Time 3% Turn Bay Length (ft) 50th Bay Block Time 95th Bay Block Time Queuing Penalty (veh) Cycle Length: 120 Actuated Cycle Length: 57.4 Natural Cycle: 60 Control Type: Actuated- Uncoordinated Splits and Phases: 3: Route 9 Route 66 S \Jobs \3206 \Synchro \Northampton AM EX.sy6 SDH vanassando -ff51 2001 Weekday AM Existing Conditions 9/21/2001 Synchro 5 Report Page 1 4 01 08 -'r" m2 59 s 12142 s 12 4-- 06 101 s Igv 119 s 1 MI Queues 3: Route 9 Route 66 4- 4 f* Lane Configurations Volume (vph) 590 255 450 90 345 Lane Group Flow (vph) 728 283 500 100 383 Turn Type Prot pm +ov Protected Phases 2 1 6 8 1 Permitted Phases 8 Detector Phases 2 1 6 8 1 Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 19.0 8.0 19.0 19.0 8.0 Total Split (s) 59.0 42.0 101.0 19.0 42:0 Total Split 49% 35% 84% 16% 35% Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 Lead /Lag Lead Lag Lag Lead -Lag Optimize? Yes Yes Yes Recall. Mode None None None Min None Queue Length 50th (ft) 93 78 53 29 35 Queue Length 95th (ft) 221 208 129 99 129 Internal Link Dist (ft) 420 220 621 50th Up Block Time 95th Up Block Time 3% Turn Bay Length (ft) 50th Bay Block Time 95th Bay Block Time Queuing Penalty (veh) Cycle Length: 120 Actuated Cycle Length: 57.4 Natural Cycle: 60 Control Type: Actuated- Uncoordinated Splits and Phases: 3: Route 9 Route 66 S \Jobs \3206 \Synchro \Northampton AM EX.sy6 SDH vanassando -ff51 2001 Weekday AM Existing Conditions 9/21/2001 Synchro 5 Report Page 1 r^ L_ r HCM Signalized Intersection Capacity Analysis 2001 Weekday AM Existing Conditions 9/21/2001 5: Route 9 State Street Lane Configurations Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Fit Protected Satd. Flow (prot) Flt Permitted Satd. Flow. (perm) Volume (vph) Peak -hour factor, PHF Adj. Flow (vph) Lane Group Flow. (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio:Prot v/s Ratio Perm v /c: Ratio Uniform Delay, dl Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delays) Approach LOS HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization c Critical Lane Group 38.1 0.81 85.2 80.5% S: \Jobs \3206 \Synchro \Northampton AM EX.sy6 SDH vanassando -ff51 1710 1710 1710 1710 1710 1710 1710 1710 1710 10 12 10 10 12 10 12 12 12 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 1.00 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.85 0.95 1.00 1.00 0.95 1.00 1.00 0.97 1.00 1486 318.5 1330 1486 1676 1330 1618 1425 0.95 1.00 1.00 0.95 1.00 1.00 0.97 1.00 1486 3185 1330 1486 1676 1330 1618 1425 135 400 385 140 290 20 315 120 280 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 150 444 428 156 322 22 350 133 311 150:. 444 428 156 322 22 0 483 311 Prot pm +ov Prot Perm Split pm +ov 5 2 8 1. 6 8 8 1 2 6 8 12.1 18.1 44.3 12.3 18.3 18.3 26.2 38.5 12.1 18.1 44.3 12.3 18.3 18.3 26.2 38.5 0.14 0.21 0.52 0.14 0.21 0.21 0.31 0.45 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 30 30' 30. '3.0 3.0 3.0 3.0 3.0 211 677 692 215 360 286 498 711 0.10 0.14 0:19 c0.10 c0.19 c0.30 0.06 0.13 0.02 0.16 0.71 -0.66: 0.62 0:73 0:89 0.08 0.97 0.44 34.9 30.7 14.5 34.8 32.5 26.7 29.1 16.0 1.00 1:00 1:00 1.00 1.00 1.00 1.00 1.00 10.7 2.3 1.7 11.5 23.4 0.1 32.2 0.4 45.6 33:0 16.1 46.3 55.9 .26.8 61.4 16.4 D C BD EC E B 27 :8. 51.6 43.7 C D D HCM Level of Service Sum of lost time (s) ICU Level of Service D 12.0 D 4 r 1710 1710 1710 12 12 12 4.0 4.0 1.00 1.00 1.00 0.85 0.99 1.00 1665 1425 0.95 1.00 1593 1425 20 130 100 0.90 0.90 0.90 22 144 111 0- 166 111 Perm pm +ov 4 5 4 4 12.6 24.7 12.6 24.7 0.15 0.29 4.0 4.0 3.0 3.0 236 413 0.04 c0.10 0.04 0.70 0.27 34.5 23.3 1.00 1.00 9.1 0.4 43.7 23.6 D C 35.6 D Synchro 5 Report Page 2 SI o1 02 04 08 "TO' 18 s I 1 23 s MI 19 s i aI30 s 05 06 18 s 1 123 s K„ :'1 Queues 5: Route 9 State Street Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split Yellow Time (s) Ali -Red Time (s) Lead /Lag Lead -Lag Optimize? Recall Mode Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) 50th Up Block Time 95th Up Block Time Turn Bay Length (ft) 50th Bay Block Time 95th Bay Block Time Queuing Penalty (veh) rr 135 400 385 150 444 428 Prot pm +ov 5 2 8 2 5 2 8 4.0 4.0 4.0 8.0 19.0 19.0 18.0 23.0 30.0 20% 26% 33% 3.0 3.0 3.0 1.0 1.0 1.0 Lead Lag Yes Yes None None 81 121 #159 174 220 Cycle Length: 90 Actuated Cycle Length: 85.3 Natural Cycle: 90 Control Type: Actuated Uncoordinated Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles: Splits and Phases: 5: Route 9 State Street S: \Jobs \3206 \Synchro \Northampton AM EX.sy6 SDH vanassando -ff51 4' r 120 280 483 311 pm +ov 6 8 1 6 8 1 6 6 8 1 4.0 4.0 4.0 4.0 4.0 8.0 19.0 19.0 19.0 8.0 18.0 23.0 23.0 30.0 18.0 20% 26% 26% 33% 20% 3.0 3.0 3.0 3.0 3.0 1.0 1.0 1.0 1.0 1.0 Lead Lag Lag Lead Yes Yes Yes Yes Min None None None Min None 12 84 179 10 -295 0 37 #169 #336 30 #487 41 620 920 140 156 Prot 1 1' 290 322 20 22 Perm 2001 Weekday AM Existing Conditions 9/21/2001 4, 4 r 20 130 100 0 166 111 Perm pm +ov 4 5 4 4 4 4 5 4.0 4.0 4.0 19.0 19.0 8.0 19.0 19.0 18.0 21% 21% 20% 3.0 3.0 3.0 1.0 1.0 1.0 Lead Yes None None None 89 5 #159 19 447 25 62% 71% 5% 74 4 Synchro 5 Report Page 2 i L HCM Signalized Intersection Capacity Analysis 2001 Weekday AM Existing Conditions 9/21/2001 7: Old South Street State Street t Lane Configurations Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Volume (vph) Peak -hour factor, PHF Adj. Flow (vph) Lane Group Flow (vph) Turn TYPe Protected Phases Permitted Phases. Actuated Green, G (s) Effective Green, g`(s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph):_`- v/s Ratio Prot v/s Ratio Perm v/c Ratio 1710 4.0 1.00 1.00 0:95 1593 0.95 1593 115 0.90 `128 128 pr +ov 8 1 -8 9.5 35.5 9.5 35.5 0.12 0.45 4s0 ::40. 3.0 3.0 c0.08 HCM :Average Contro Delay HCM Volume to Capacity ratio Actuated •Cycle Length (s) Intersection Capacity Utilization c Critical Lane Group 1710 4.0 1.00 0.85 1.00 1425 1.00 1425 180 0.90 200 200 32.2 32:2 0.40 4.0 3.0 1710 1710 4.0 4.0 1.00 1.00 1.00 0.85 1.00 1:00 1676 1425 1.00 1.00 1676 1425 535 310 0.90 0.90 594 344 594 344 pm +ov 2 8 2 41.7 41.7 0.52 4.0 3.0 677 817 0.09 c0.35 0.05 0:05 0.19 0.67 0.28 0.88 0.42 Uniform Delay, d1 33 6 44 0 21.9 11 Progression Factor 1.00 1.00 1.00 1.00 Incremental Delay;. d2. 9.1 0:2- 12:3 0 :4 Delay (s) 42.7 14.2 34.2 12.0 Level of Service D B C B Approach Delay (s) 25.3 26.1 Approach LO C .:C 0.85 •79:7 80.7% S: \Jobs \3206 \Synchro \Northampton AM EX.sy6 SDH vanassando -ff51 1710 4.0 1.00 1.00 0.95 1593 0.95 1593 410 0.90 456 456 Pro f 1 6 26.0 26.0 0.33 4.0 3.0 1710 4.0 1.00 1.00 1.00 1676 1.00 1676 245 0.90 272 272 62.2 62.2 0.78 4.0 3.0 =520 1308: c0 0.16 0.88 0.21 25 3 '.2.3 1.00 1.00 15.3 0.1 40.6 2.4 D ;A 26.3 C: HCM LeVelof Service Sum of lost time (s) ICU Level of Service 12.0 D Synchro 5 Report Page 3 01 1 02 1 #1 08 34 s I147 s MI >r 06 81 s I. ;:1114 s 1 1 Queues 7: OId South Street State Street 50th Up Block Time 95th Up Block Time Turn Bay Length (ft) 50th Bay Block Time 95th Bay" Block Time Queuing Penalty (veh) Lane Configurations f Volume (vph) 115 180 535 310 410 245 Lane Group Flow (vph) 128 200 594 344 456 272 Turn Type pm +ov pm +ov Prot Protected Phases 8 1 2 8 1 6 Permitted Phases 8 2 Detector Phases 8 1 2 8 1 6 Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 14.0 8.0 19.0 14.0 8.0 19.0 Total Split (s) 14.0 34.0 47.0 14.0 34.0 81.0 Total Split 15% 36% 49% 15% 36% 85% Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 Lead /Lag Lead Lag Lead Lead -Lag Optimize? Yes Yes Yes Recall Mode None None Min None None Min Queue Length 50th (ft) 70 1 294 46 231 27 Queue Length 95th (ft) #171 38 441 95 #447 43 Internal Link Dist (ft) 520 419 920 9 Cycle Length: 95 Actuated Cycle Length: 80.3 Natural Cycle: 80 Control Type: Actuated- Uncoordinated 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 7: OId South Street State Street S: \Jobs \3206 \Synchro \Northampton AM EX.sy6 SDH vanassando -ff51 2001 Weekday AM Existing Conditions 9/21/2001 Synchro 5 Report Page 3 HCM Signalized Intersection Capacity Analysis 2001 Weekday PM Existing Conditions 7: Old South Street State Street 9/21/2001 J J Lane Configurations Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Fit Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Volume. (vph) Peak -hour factor, PHF Adj. Flow (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS 1710 4.0 1.00 1.00 0.95 1593 0.95 1593 295 0.90 328 328 HCM' Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization c Critical Lane Group rr 1710 4.0 1.00 0.85 1:00 1425 1.00 1425 275 0.90 306 306 pm+ov 8 1 8 17.5 36.4 17.5 36.4 0.26 0.54 4.0 .4.0 3.0 3.0 415. 858 c0.21 0.10 0`11 0.79 0.36 23:1. 8.7 1.00 1.00 9.9 0,3 33.0 9.0 C .A 21.4 C, 1710 4.0 1.00 1.00 1.00 1676 1.00 1676 305 0.90 0.90 339 239 339 239 18.7 18.7 0.28 4:0 3.0 467 0.20 0.73 2'1:9 1.00 5.5 27.4 C 19.6 B 0.72 67:1 71.9% S: \Jobs13206 \Synchro \Northampton PM EX.sy6 SDH vanassando -ff51 1710 4.0 1.00 0.85 1.00 1425 1.00 1425 215 pm+ov 2 8 2 36.2 36.2 0.54 4.0 3.0 854 0.07 0 :09 0.28 8.4 1.00 0.2 8.6 A 1710 4.0 1.00 1.00 0.95 1593 0.95 1593 320 0.90 356 356 672 Prot 18.9 18.9 0.28 4.0 3.0 449 c0.22 0.79 22.3i 1.00 9.3 31.6 1' 1710 4.0 1.00 1.00 1.00 1676 1.00 1676 605 0.90 672 41.6 41.6 0.62 4.0 3.0 1039_ c0.40 0.65 1.00 1.4' 9.5 :A 17.1 HCM E f Service Sum of lost `.fime (s) ICU Level of Service Synchro 5 Report Page 3 031 t m2 �f 08 27 s i1a a 34 s 1. 1 06 61 s 1-�� I, 24 s Queues 7: Old South Street State Street 2001 Weekday PM Existing Conditions 9/21/2001 Lane Configurations l i r t r Volume (vph) 295 275 305. 215 320 Lane Group Flow (vph) 328 306 339 239 356 Turn Type pm +ov pm +ov Prot Protected Phases 8 1 2 8 1 6 Permitted Phases 8 2 Detector Phases 8 1 2 8 1 6 Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 14.0 8.0 19.0 14.0 8.0 19.0 Total Split (s) 24:0 27.0 34.0 240 27:0 61.0 Total Split 28% 32% 40% 28% 32% 72% Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 Lead /Lag Lead Lag Lead Lead -Lag Optimize? Yes Yes Yes Recall Mode None None Min None None Min Queue Length 50th (ft) 141 0 145 8 146 172 Queue Length 95th (ft) #315 34 231 33 #320 268 Internal Link Dist (ft) 520 419 920 50th -Up Block Time 95th Up Block Time Turn _Bay Length.(ft); 50th Bay Block Time 95th! Bay Block Time Queuing Penalty (veh) Cycle Length: 85 Actuated Cycle Length °'67.6 Natural Cycle: 60 Control Type:- Actuated- Uncoordinated 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 7: Old South Street State Street S: \Jobs 13206 \Synchro \Northampton PM EX.sy6 SDH vanassando -ff51 605 672 Synchro 5 Report Page 3 P L HCM Signalized Intersection Capacity Analysis 2001 Weekday PM Existing Conditions 9/21/2001 3: Route 9 Route 66 Lane Configurations Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Volume (vph) Peak -hour factor, PHF Adj. Flow (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp. Cap (vpt) v/s Ratio Prot v/s =Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS 1121 459 1196 245 724 c0.26 c0.18 0.31 0.06 c0.16 0::12 0.73 0.63 0.43 0.36 0.57 16.8 18.7 3.6 22:9 12.6 1.00 1.00 1.00 1.00 1.00 2.5 2.7 0.3 09 1.0 19.3 21.4 3.8 23.8 13.6 B C A ..0 B 19.3 10.1 15.4 B B HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization c Critical Lane Group r 1710 1710 1710 1710 1710 1710 4.0 4.0 4.0 4.0 4.0 0.95 1.00 1.00 1.00 1.00 0.98 1.00 1.00 1.00 0.85 1.00 0.95 1.00 0.95 1.00 3121 1593 1676 1593 1425 1.00 0.95 1.00 0.95 1.00 3121 1593 1676 1593 1425 640 100 260 465 80 370 0.90 0.90 0.90 0.90 0.90 0.90 711 111 289 517 89 411 822 0 289 517 89 411 Prot pm +ov 2 1 6 8 1 8 21.7 17.4 43.1 9.3 26.7 21.7 17.4 43.1 9.3 26.7 0.36 0.29 0.71 0.15 0.44 4.0 4.0 4.0 4.0 4.0 3.0 3.0 3.0 3.0 3.0 14.9- 0.64 60.4 60.7% S: \Jobs \3206 \Synchro \Northampton PM EX.sy6 SDH vanassando -ff51 HCM Level of:Service Sum of lost time (s) ICU Level of Service B- 8:0 B Synchro 5 Report Page 1 Queues 3: Route 9 Route 66 Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phases Minimum Initial (s) Minimum Split (s) Total_ Split (s) Total Split Yellow Time (s) All -Red Time (s) Lead /Lag Lead -Lag Optimize? Recall Mode Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) 50th Up Block Time 95th Up Block Time Turn_Bay Length (ft) 50th Bay Block Time 95th =Bay Block Time Queuing Penalty (veh) 9% Cycle Length: 120 Actuated Cycle Length: 61.5 Natural Cycle: 60 Control Type: Actuated Uncoordinated ft414.1r1 640 260 465 80 370 822 289 517 89 411 Prot pm +ov 2 1 6 8 1 8 2 1 6 8 1 4.0 4.0 4.0 4.0 4.0 19.0 8.0 19.0 19.0 8.0 59.0 42.0 101:0 19.0 42.0 49% 35% 84% 16% 35% 3.0 3.0 3.0 3.0 3.0 1.0 1.0 1.0 1.0 1.0 Lead Lag Lag Yes Yes Yes None None None Min None 111 85 55 28 51 264 232 132 99 182 420 220 621 Splits and Phases: 3: Route 9 Route 66 S: \Jobs \3206 \Synchro \Northampton PM EX.sy6 SDH vanassando-ff51 50 11% 45% 34% 13 92 40 2001 Weekday PM Existing Conditions 9/21/2001 Synchro 5 Report Page 1 rat 01 l' 08 1419 Ik=I -0 '02 59 s l°I42 s is`61,I� 06 101 s Queues 3: Route 9 Route 66 Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phases Minimum Initial (s) Minimum Split (s) Total_ Split (s) Total Split Yellow Time (s) All -Red Time (s) Lead /Lag Lead -Lag Optimize? Recall Mode Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) 50th Up Block Time 95th Up Block Time Turn_Bay Length (ft) 50th Bay Block Time 95th =Bay Block Time Queuing Penalty (veh) 9% Cycle Length: 120 Actuated Cycle Length: 61.5 Natural Cycle: 60 Control Type: Actuated Uncoordinated ft414.1r1 640 260 465 80 370 822 289 517 89 411 Prot pm +ov 2 1 6 8 1 8 2 1 6 8 1 4.0 4.0 4.0 4.0 4.0 19.0 8.0 19.0 19.0 8.0 59.0 42.0 101:0 19.0 42.0 49% 35% 84% 16% 35% 3.0 3.0 3.0 3.0 3.0 1.0 1.0 1.0 1.0 1.0 Lead Lag Lag Yes Yes Yes None None None Min None 111 85 55 28 51 264 232 132 99 182 420 220 621 Splits and Phases: 3: Route 9 Route 66 S: \Jobs \3206 \Synchro \Northampton PM EX.sy6 SDH vanassando-ff51 50 11% 45% 34% 13 92 40 2001 Weekday PM Existing Conditions 9/21/2001 Synchro 5 Report Page 1 HCM Signalized Intersection Capacity Analysis 2001 Weekday PM Existing Conditions 9/21/2001 5: Route 9 State Street Lane Configurations Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Fit Protected Satd. ;Flow; (prot) Flt Permitted Satd. Flow (perm) Volume (vph) Peak- hour:factor PHF Adj. Flow (vph) Lane Group:' Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, .G (s) 15.4 Effective Green, g (s) 15.4 Actuated g/C Ratio 0:18 Clearance Time (s) 4.0 Vehicle Extension;,(s) 3:0.: Lane Grp Cap (vph) 264 u/s Ratio Prot 0:12 v/s Ratio Perm v/c Ratio 0.67 Uniform Delay, d1 33.3 Progression_ Factor 1.00 Incremental Delay, d2 6.6 Delay (s). 39.9 Level of Service D Approach Delay (s) Approach LOS HCM Average Control Delay HCM :Volumeto Capacity. ratio. Actuated Cycle Length (s) Intersection Capacity Utilization c Critical Lane Group 1710 10 4.0 1.00 1.00 0.95 1486 0.95 1486: 160 0.90 178 178 Prot 5 1710 1710 12 10 4.0 4.0 0.95 1.00 1.00 0.85 1.00 1.00 3185 1330 1.00 1.00 3.1.85 .1330 370 490 0.90 0.90 411 544 411. 544 pm +ov 2 8 2 14.2 37.3 14.2 37.3 0.16 0.43 4.0 4.0 3.0: 3.0 522 573 0.13. 0.25 0.16 0.95 23.7 1.00 25.3 49.0 D 0.79 34.8 1.00 7.7 42.5 D 452- D 53.5 0 :92 86.6 84 :7 S: \Jobs \3206 \Synchro \Northampton PM EX.sy6 SDH vanassando -ff51 1710 10 4.0 1.00 1.00 0.95 1486 0.95 1486 260 0.90 289 289 Prot 1 6 19.6 19.6 0.23 4.0 3.0 336 c0.19 0.86 32.2 1.00 19.5 51.7 D 1710 12 4.0 1.00 1.00 1.00 1676 1.00 1676 330 0.90 367 367 18.4 18.4 0.21 4.0 3.0 356 c0.22 -1 :03 34.1 1.00 55.9 90.0 F 70 E k 4 1710 10 4.0 1.00 0.85 1.00 1330 1.00 1330 30 0.90 33 33 Perm 6 18.4 18.4 0.21 4.0 3.0 283 0.02 0.12 27.5 1.00 0.2 27.7 C HCM Level of Service Sum of lost time (s) ICU Level of Service 4 1710 1710 12 12 4.0 1.00 1.00 0.97 1620 0.97 1620. 270 115 0.90 0.90 300 128 0 428 Split pm +ov 8 8 1 8 23.1 42.7 23.1 42.7 0.27 0.49 4.0 4.0 3.0 3.0. 432 768 c0.26 0.06 0.09 0.99 _0.28 31.6 12.9 1.00 1 :00 40.7 0.2 72.4 13.1 E B 52.4 D 1710 12 4.0 1.00 0.85 1.00 1425 1.00 1425 195 0.90 217 217 12.0 D 4 r 1710 1710 1710 12 12 12 4.0 4.0 1.00 1.00 1.00 0.85 0.99 1.00 1666 1425 0.95 1.00 1593 1425 25 175 115 0.90 0.90 0.90 28 194 128 0 222 128 Perm pm +ov 4 5 4 4 13.7 29.1 13.7 29.1 0.16 0.34 4.0 4.0 3.0 3.0 252 479 0.05 c0.14 0.04 0.88 0.27 35.7 21.0 1.00 1.00 28.0 0.3 63.7 21.3 E C 48.2 D Synchro 5 Report Page 2 01 o4 4 o8 o2 26s P119 i V118s R1127 154 05 -41-t- o6 26 s i4r 119 s i Queues 5: Route 9 State Street Lane Configurations Volume (vph) 160 Lane Group Flow (vph) 178 Turn Type Protected Phases Permitted Phases Detector Phases 5 Minimum Initial (s) 4.0 Minimum Split (s) 8.0 Total Split (s) 26.0 Total Split 29% Yellow Time (s) 3.0 All -Red Time (s) 1.0 Lead /Lag Lead Lead -Lag Optimize? Yes Recall Mode None Queue Length 50th (ft) 96 Queue Length 95th (ft) 152 Internal Link Dist (ft) 50th Up Block Time 95th Up Block Time Turn Bay Length (ft) 50th Bay Block Time 95th Bay Block Time Queuing Penalty (veh) Prot 5 +1 r q r 370 490 260 330 30 115 195 411 544 289 367 33 428 217 pm +ov Prot Perm pm +ov 2 8 1 6 8 1 2 6 8 2 8 1 6 6 8 1 4.0 4.0 4.0 4.0 4.0 4.0 4.0 19.0 19.0 8.0 19.0 19.0 19.0 8.0 19.0 27.0 26.0 19.0 19.0 27.0 26.0 21% 30% 29% 21% 21% 30% 29% 3.0 3.0 3.0 3.0 3.0 3.0 3.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lag Lead Lag Lag Lead Yes Yes Yes Yes Yes None Min None None None Min None 118 47 155 206 15 -264 0 #185 #213 #284 #441 43 #445 31 220 620 920 7% 100 100 31% 43% 53% :':71% 18 167 164 Cycle Length: 90 Actuated Cycle Length: 86.6 Natural Cycle: 90 Control Type: Actuated Uncoordinated Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 5: Route 9 State Street S: \Jobs13206 \Synchro \Northampton PM EX.sy6 SDH vanassando -ff51 2001 Weekday PM Existing Conditions 9/21/2001 4 r 25 175 115 0 222 128 Perm pm +ov 4 5 4 4 4 4 5 4.0 4.0 4.0 18.0 18.0 8.0 18:0 18:0 26:0 20% 20% 29% 3.0 3.0 3:0 1.0 1.0 1.0 Lead Yes None None None 125 0 #257 25 447 25 69% 78% 8 93 9 Synchro 5 Report Page 2 HCM Signalized Intersection Capacity Analysis 3: Route 9 Route 66 P1 P1 L r Lane Configurations Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected. Satd. Flow (prot) Fit Permitted Satd. Flow (perm) Volume (vph) Peak -hour factor, PHF Adj. Flow (vph) Lane Group Flow (vph) Turn Type Protected Phases 2 Permitted _Phases Actuated Green, G (s) 55.3 Effective Green,.g "(s) 56:3 Actuated g/C Ratio 0.51 Clearance.Time (s) 5:0 Vehicle Extension (s) 3.0 Lane =Grp Cap'(vph) v/s Ratio Prot v/s Ratio Perm" v/c Ratio Uniform Delay; d1 Progression Factor Incremental D:ela y, d2_ Delay (s) Level_of Service: Approach Delay (s) Approach LOTS 1710 1710 1710 4.0 4.0 0.95 1.00 0.98 1.00 1.00 0.95 3137 1593 1.00 0.95 3137 1593 620 70 270 0.90 0.90 0.90 689 78 300 767 0 300 Prot 1 c0.24 0.48 17:3_ 1 .00 1.0 18.4 B 18.4 27.0 28.0 0.25 5.0 3.0 405:` c0.19 0.74 37;7 0.81 44 34.9 C tI 1710 4.0 1.00 1.00 1.00 1676 1,00 1676 475 0.90 528 528 87.3 88.3 0.80 5.0 3.0 1345 0.31 0.39 31 0.26 0.1 0.9 A 13.2 S: \Jobs \3206 \Synchro \Northampton AM NB OPT.sy6 SDH vanassando -ff51 1' 1710 4.0 1.00 0.85 1.00 1425 1.00 1425 365 0.90 406 406 pm +ov 6 8 1 8 12.7 39.7 13.7 41.7 0.12 0.38 5.0 5.0 3.0 3.0 198 592 0.07 c0.17 0.11 0.69 28:7 1.00 3.3 31.9 C 1710 4.0 1.00 1.00 0.95 1593 0.95 1593 0.90 111 111 0.56 45:3 1.00 3 :6 48.9 D 35.6 2006 Weekday AM No Build 9/21/2001 verage?Control De ay' 20 6 HCM Level 'of Service HCM Volume to Capacity ratio 0.58 Actuated Cyble Length (s): 110.0 Sum of lost time (s) Intersection Capacity Utilization 59.2% ICU Level of Service Critical Lane Group 8.0 A Synchro 5 Report Page 1 Queues 3: Route 9 Route 66 Lane Configurations t vi r Volume (vph) 620 270 475 100 365 Lane Group Flow (vph) 767 300 528 111 406 Turn Type Prot pm +ov Protected Phases 2 1 6 8 1 Permitted Phases 8 Detector Phases 2 1 6 8 1 Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 27.0 27.0 27.0 19.0 27.0 Total Split (s) 53.0 32.0 85.0 25.0 32.0 Total Split 48% 29% 77% 23% 29% Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 All -Red Time (s) 2.0 2.0 2.0 2.0 2.0 Lead /Lag Lead Lag Lag Lead -Lag Optimize? Yes Yes Yes Recall Mode Coord None None Min None Queue Length 50th (ft) 173 167 16 75 135 Queue Length 95th (ft) 248 m218 m29 127 213 Internal Link Dist (ft) 420 220 621 50th Up. Block Time 95th Up Block Time 5% Turn (ft) 50th Bay Block Time 95th Bay Block Time Queuing Penalty (veh) 7 Cycle Length: 110 Actuated Cycle Length: 110 Offset: 57 (52 Referenced to phase 2:EBT, Start of Green Natural Cycle: 75 Control Type: Actuated Coordinated m Volume for 95th percentile queue is metered by upstream_ signal. Splits and Phases: 3: Route 9 Route 66 02 53 s 4- 06 85 s p I'F je 01 S: \Jobs \3206 \Synchro\Northampton AM NB OPT.sy6 SDH vanassando -ff51 2006 Weekday AM No Build 9/21/2001 08 25 s Synchro 5 Report Page 1 HCM Signalized Intersection Capacity Analysis 5: Route 9 State Street Lane Configurations Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Fit Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Volume (vph) Peak -hour factor, PHF Adj. Flow (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio 0 :13 0 :23 Clearance Time (s) 5.0 5.0 Vehicle Extension (s) Lane Grp Cap (vph) 195 730 v/s Ratio Prot c010 0 :15 v/s Ratio Perm v /c: Ratio 0:80 0 :64 Uniform Delay, d1 46.4 38.3 Progression Factor 087 0 :95 Incremental Delay, d2 18.4 3.8 Delay (s) 58 5 40:1 Level of Service E D Approach Delay: (s) 30.9 Approach LOS C HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization c Critical Lane Group 1710 10 4.0 1.00 1.00 0.95 1486 0.95 1486 140 0.90 rr 1710 1710 12 10 4.0 4.0 0.95 1.00 1.00 0.85 1.00 1.00 3185 1330 1.00 1.00 3185 ..1330 420 405 0.90 0 :90 156 467 450 156 467 450 Prot pm +ov 5 2 8 2 13.4 24.2 59.4 14.4 25.2 61.4 0.56 5.0 3 i 742 0:20 0.14 0:61 16.2 0.64 1.2 11 :6 B 41.1 .0.85 110.0 83.5% S: \Jobs \3206 \Synchro \Northampton AM NB OPT.sy6 SDH vanassando -ff51 1710 1710 10 12 4.0 4.0 1.00 1.00 1.00 1.00 0.95 1.00 1486 1676 0.95 1.00 1486 1 145 305 0.90: 0.90 161 339 161 .339 Prot 1 1710 10 4.0 1.00 0.85 1.00 1330 1.00 1330 20 0.90 22 22 pm +ov Split 6.. 4.'. 8 6 26.9 41.4 27.9 43.4 0.25 0.39 5.0 5.0 16:1 17.1 0.16 5.0 3 :0 231 425 573 0:1.1 'c0 :20 0.01 0.01 0 :70 0 80 0.04 44.0 38.4 20.5 1.00 1 :00 1.00 8.8 14.4 0.0 52-.8 52.8 -20.5 b b c HCM Level of Service Sum of lost time (s) ICU`Level of Service 2006 Weekday AM No Build 9/21/2001 r 1710 1710 1710 1710 12 12 12 12 4.0 4.0 1.00 1.00 1.00 0.85 0.97 1.00 1618. 1425 0.97 1.00 1618 1425. 330 125 295 20 0:90 0.90 0.90 0.90 367 139 328 22 0 506 328- 0 pm +ov Split 1 8 35.2 .51 ":3 36.2 53.3 0.33 0 :48 5.0 5.0 3:0 3 :0 532 742 c0.31 0.07 0.16 09 0.44 36.0 18.6 1.00: `1.00 27.1 0.4 63 :2 19.0 E B 45 8 D 16.0 D 4 1710 12 4.0 1.00 1.00 0.99 166 0.99 1666 135 0.90 150 1 1710 12 4.0 1.00 0.85 1.00 1425 1.00 1425 105 0.90 117 117 pm +ov 4: .4.. 5 4 14:5 27.9 15.5 29.9 0.1.4 '0.27 5.0 5.0 3'0. 3:0 235 387 c0:10 0:04 0.04 .73 0.30 45.3 31.8 1.00 1:00 11.1 0.4 56.4 32.2 E c 46:6- D Synchro 5 Report Page 2 Queues 5: Route 9 State Street Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split Yellow Time (s) All -Red Time (s) Lead /Lag Lead -Lag Optimize? Recall Mode Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) 50th -Up Block Time 95th Up Block Time 4% 20% Turn Bay Length (ft) 50th Bay Block Time 95th. Bay Block Time Queuing Penalty (veh) r 140 420 405 156 467 450 Prot pm +ov 5 2 8 2 5 2 8 4.0 4.0 4.0 19.0 20.0 25.0 19.0 23.0 41.0 17% 21% 37% 3.0 3.0 3.0 2.0 2.0 2.0 Lead Lag Yes Yes None Coord 111 160 #218 #255 220 45 Cycle Length: 110 Actuated Cycle Length: 110 Offset: 0 (0 Referenced to phase 2:EBT and 6:WBT, Start of Green, Master Intersection Natural Cycle: 95 Control Type: Actuated Coordinated 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 5: Route 9 State Street 01 1'�' 02 25 s 23 s I 21 s 41s I1 05 06 19 s I?' 29 s S: \Jobs13206 \Synchro \Northampton AM NB OPT.sy6 SDH vanassando -ff51 2006 Weekday AM No Build 9/21/2001 r r 4 r 145 305 20 125 295 135 105 161 339 22 506 328 172 117 Prot pm +ov pm +ov pm +ov 1 6 4 8 1 4 5 6 8 4 1 6 4 8 1 4 5 4.0 4.0 4.0 4.0 4.0 4.0 4.0 20.0 20.0 20.0 25.0 20.0 20.0 19.0 25.0 29.0 21.0 41.0 25.0 21.0 19.0 23% 26% 19% 37% 23% 19% 17% 3.0 3.0 3.0 3.0 3.0 3.0 3.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lead Lag. Lead Lead Yes Yes Yes Yes Min None Coord None Min None None None 0 108 233 9 343 0 116 15 55 175 #399 25 #551 38 #202 40 620 920 447 25 68% 75% 25% 83 21 Synchro 5 Report Page 2 HCM Signalized Intersection Capacity Analysis .7: Old South Street State Street Ak Lane Configurations r' r 1' Ideal Flow (vphpl) 1710 1710 1710 1710 1710 1710 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.85 1.00 0.85 1.00 1.00 Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00 Satd. Flow (prot) 1593 1425 1676 1425 1593 1676 Flt Permitted 0.95 1:00 1.00 1.00 0.95 1.00 Satd. Flow (perm) 1593 1425 1676 1425 1593 1676 Volume (vph) 120 190 560 340 430 255 Peak -hour factor, PHF 0.90 0:90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 133 211 622 378 478 283 Lane Group Flow (vph) 133 211 622 378 478 283 Turn Type pm +ov pm +ov Prot Protected Phases 8 1 2 8 1 6 Permitted. Phases 8 2 Actuated Green, G (s) 11.4 39.7 34.6 46.0 28.3 66.9 Effective Green, g (s) 11.4 39.7 34.6 46.0 28.3 66.9 Actuated g/C Ratio 0.13 0.46 0.40 0.53 0.33 0.78 Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp-Cap (vph) 210 722 672 826 522 :1299 v/s Ratio Prot c0.08 0.10 c0.37 0.06 c0.30 0.17 v/s -Ratio Perm 0.05 0.20 v/c Ratio 0.63 0.29 0.93 0.46 0.92 0.22 Uniform Delay, d1 35.5 14:5 24:6 12:4 27.9 2:6 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 6.1 02 '18.7 0.4 20.7 0.1 Delay (s) 41.6 14.8 43.3 12.8 48.6 2.7 Level of Service D B D B D A Approach Delay (s) 25.1 31.8 31.5 Approach LOS C C C HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization c Critical Lane Group 30.6 0.88 86.3 84.0% S: \Jobs \3206 \Synchro \Northampton AM NB OPT.sy6 SDH vanassando -ff51 HCM Level of`Seniice Sum of lost time. (s) ICU Level of Service 2006 Weekday AM No Build 9/21/2001 12.0 D Synchro 5 Report Page 3 01 f"' 02 i 11 08 l }'I 35s MI lz 06 77s FA18s Queues 7: OId South Street State Street Lane Configurations +r Volume (vph) 120 190 560 340 430 255 Lane Group Flow (vph) 133 211 622 378 478 283 Turn Type pm +ov pm +ov Prot Protected Phases 8 1 2 8 1 6 Permitted Phases 8 2 Detector Phases 8 1 2 8 1 6 Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 14.0 8.0 19.0 14.0 8.0 19.0 Total Split (s) 18.0 35.0 42.0 18.0 35.0 77.0 Total Split 19% 37% 44% 19% 37% 81% Yellow Time (s) 3.0 3.0 3:0 3.0 3.0 3.0 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 Lead /Lag Lead Lag Lead Lead -Lag Optimize? Yes Yes Yes Recall Mode None None Min None None Min Queue Length 50th (ft) 76 21 345 59 271 36 Queue Length 95th (ft) 136 58 #573 119 #467 60 Internal Link Dist (ft) 520 419 920 50th Up Block Time 95th Up Block Time Turn -Bay Length (ft) 50th Bay Block Time 95th Bay Block Time Queuing Penalty (veh) I 28% Cycle Length: 95 Actuated Cycle Length: 86.6 Natural Cycle: 90 Control Type: Actuated- Uncoordinated 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles: Splits and Phases: 7: OId South Street State Street S: \Jobs \32061Synchro \Northampton AM NB OPT.sy6 SDH vanassando -ff51 2006 Weekday AM No Build 9/21/2001 Synchro 5 Report Page 3 HCM Signalized Intersection Capacity Analysis 3: Route 9 Route 66 Lane Configurations Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Volume (vph) Peak -hour factor, PHF Adj. Flow (vph) Lane Group Flow (vph) Turn Type Phases Permitted-Phases Actuated Green, G (s) Effective. Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) 1710 1710 1710 1710 1710 1710 4.0 4.0 4.0 4.0 4.0 0.95 1.00 1.00 1.00. 1.00 0.98 1.00 1.00 1.00 0.85 1.00 0.95 1.00 0.95 1.00 3118 1593 1676 1593 1425 1.00 0.95 1.00 0.95 1.00 3118 1593 1676 1593 1425 675 110 275 490 85 390 0.90 0.90 0.90 0.90 0.90 0.90 750 122 306 544 94 433 872 0 306 544 94 433 Prot pm +ov 2 1 6 8 1 8 54.6 29.0 88.6 11.4 40.4 55.6 30.0 89.6 12.4 42.4 0.51 0.27 0.81 0.11 0.39 5.0 5.0 5.0 5.0 5.0 3.0 3.0 3.0 3.0 3.0 Lane :Grp Cap. (vph) 1576 434. 1365 180 601 v/s Ratio Prot c0.28 0.19 0.32 0.06 c0.20 v /s Ratio Perm 0.11 v/c Ratio 0.55 0.71 0.40 0.52 0.72 Uniform Delay,-d1 18.7 36:0 2.8 46.0 28.8 Progression Factor 1.00 0.73 0.38 1.00 1.00 Incremental Delay, d2 1.4 3.0 0.1 2.7 4.2 Delay (s) 20.1 29.4 1.2 48.7 33.0 Level of .Service C C AD C Approach Delay (s) 20.1 11.3 35.8 Approach LOS C B D HCM ::Average; Control Delay; HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization c Critical Lane Group 20:5 0.63 110.0 63.8% S: \Jobs \3206 \Synchro \Northampton PM NB OPT.sy6 SDH vanassando -ff51 HCM Level of Service Sum of lost time (s) ICU Level of Service 2006 Weekday PM No Build 9/21/2001 C. 8.0 B Synchro 5 Report Page 1 Queues 3: Route 9 Route 66 Lane Configurations 'fir Volume (vph) 675 275 490 85 390 Lane Group Flow (vph) 872 306 544 94 433 Turn Type Prot pm +ov Protected Phases 2 1 6 8 1 Permitted Phases 8 Detector Phases 2 1 6 8 1 Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 20.0 9.0 19.0 19.0 9.0 Total Split (s) 45.0 34.0 79.0 31.0 34.0 Total Split 41% 31% 72% 28% 31% Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 All -Red Time (s) 2.0 2.0 2.0 2.0 2.0 Lead /Lag Lead Lag Lag Lead -Lag Optimize? Yes Yes Yes Recall Mode Coord None None Min None Queue Length 50th (ft) 208 137 25 64 201 Queue Length 95th (ft) 294 m181 m46 113 294 Internal Link Dist (ft) 420 220 621 50th Up Block Time 95th Up Block Time 1% Turn. Bay Length (ft) 50th Bay Block Time 95111 Bay Block Time Queuing Penalty (veh) 50 23% 44% 49% 45 157 83 Cycle Length: 110 Actuated Cycle Length: 110 Offset: 57 (52 Referenced to phase 2:EBT, Start of Green Natural Cycle: 60 Control Type: Actuated Coordinated m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 3: Route 9 Route 66 S: \Jobs \3206 \Synchro \Northampton PM NB OPT.sy6 SDH vanassando -ff51 2006 Weekday PM No Build 9/21/2001 Synchro 5 Report Page 1 02 tf m1 lC 1 8 -01 45 s 1; I34 s 1 06 .4— 79 s 1`° 31 s mil Queues 3: Route 9 Route 66 Lane Configurations 'fir Volume (vph) 675 275 490 85 390 Lane Group Flow (vph) 872 306 544 94 433 Turn Type Prot pm +ov Protected Phases 2 1 6 8 1 Permitted Phases 8 Detector Phases 2 1 6 8 1 Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 20.0 9.0 19.0 19.0 9.0 Total Split (s) 45.0 34.0 79.0 31.0 34.0 Total Split 41% 31% 72% 28% 31% Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 All -Red Time (s) 2.0 2.0 2.0 2.0 2.0 Lead /Lag Lead Lag Lag Lead -Lag Optimize? Yes Yes Yes Recall Mode Coord None None Min None Queue Length 50th (ft) 208 137 25 64 201 Queue Length 95th (ft) 294 m181 m46 113 294 Internal Link Dist (ft) 420 220 621 50th Up Block Time 95th Up Block Time 1% Turn. Bay Length (ft) 50th Bay Block Time 95111 Bay Block Time Queuing Penalty (veh) 50 23% 44% 49% 45 157 83 Cycle Length: 110 Actuated Cycle Length: 110 Offset: 57 (52 Referenced to phase 2:EBT, Start of Green Natural Cycle: 60 Control Type: Actuated Coordinated m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 3: Route 9 Route 66 S: \Jobs \3206 \Synchro \Northampton PM NB OPT.sy6 SDH vanassando -ff51 2006 Weekday PM No Build 9/21/2001 Synchro 5 Report Page 1 r iJ HCM Signalized Intersection Capacity Analysis 5: Route 9 State Street Lane Configurations Ideal =Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Fit Protected Satd Flow. (prot) Flt Permitted SatdFlow(perm) Volume (vph) Peak =hour, factor, PHF Adj. Flow (vph) Lane _Group :Flow (vph) Turn Type Protected Phases Permitted Phases Actuated. Green, G (s) Effective Green, g (s) Actuated.g /C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression= Factor Incremental Delay, d2 Delay(s) Level of Service Approach Delay (s) Approach LOS HCM Average Control Delay HCM;Volume.to Capacity, ratio Actuated Cycle Length (s) Intersection Capacity Utilization c Critical Lane Group -r `fir 1710 10 4.0 1.00 1.00 0.95 1486 0.95 1486 170 0.90: 189 189 Prot 5 15.4 16.4 0.15 5.0 30 222 0.13` 0.14 0.85 -0:77 45.6 43.2 0.89 0 :97 22.5 8.5 62.9. :50.5 E D 44:1 D r 1710 1710 12 10 4.0 4.0 0.95 1.00 1.00 0.85 1.00 1.00 3185 1330 1.00 1.00 3185 1330 390 515 0.90 0.90 433 572 433.. 572 pm +ov 2 8 2 18.4 49.2 19.4 51.2 0.18 0:47 5.0 5.0 3,0 30 562 619 0.27 0.16 0:9 27.6 0.57 17.4 33.1 C 51.4 0:90 110.0 88.4% 1710 10 4.0 1.00 1.00 0.95 1486 0.95 1486 275 0.90 306 306 Prot 1 24.8 25.8 0.23 5.0 3 :0 349 c0.21 0.88 40.6 1.00 21.1 61.6 E S: \Jobs \3206 \Synchro \Northampton PM NB OPT.sy6 SDH vanassando -ff51 1710 12 4.0 1.00 1.00 1.00 1676 4 1710 10 4.0 1.00 0.85 1.00 1330 1.00 1.00 1676 1330_ 345 30 0.90 0 :90 383 33 383 33 pm +ov 6 4 6 27.8 43.8 28.8 45.8 0.26 0.42 5.0 5.0 3.0 0_ 439 602 c023. 0 :01 0.02 0.87 .0.05 38.8 19.2 1.00 1:00 20.6 0.0 59:5 19.2 E B 58:5 E HCM Level of Service Sum of lost time (s) ICU Level of Service 2006 Weekday PM No Build 9/21/2001 r 1710 1710 1710 12 12 12 4.0 4.0 1.00 1.00 1.00 0.85 0.97 1.00 1619 1425 0.97 1.00 1619 1425 285 120 205 0.90 0.90 0.90 317 133 228 0 450 228 Split pm +ov 8 8 1 8 30.8 55.6 31.8 57.6 0.29 0.52 5.0 5.0 3.0. 3.0 468 798 c0.28 .0.07 0.09 0.96 0.29 38.5 14.7 1.00 1.00 31.8 0.2 70.2 14.9 E B 51.6 D 1 `r► 4, 4/ D 12.0 D r 1710 1710 1710 12 12 12 4.0 4.0 1.00 1.00 1.00 0.85 0.99 1.00 1667 1425 0.99 1.00 1667 1425 25 185 120 0.90 0.90 0.90 28 206 133 0 234 133 Split pm +ov 4 4 5 4 16 :0 31.4 17.0 33.4 0.15 0.30 5 :0 5.0 3.0 3.0 258 433 c0.14 0.05 0.05 0.91 0.31 45.7 29.4 1.00 1.00 32.3 0.4 78.0 29.8 E C 60.5 E Synchro 5 Report Page 2 Queues 5: Route 9 State Street J Lane Configurations I I r 1 r 4 r 4 ri Volume (vph) 170 390 515 275 345 30 120 205 185 120 Lane Group Flow (vph) 189 433 572 306 383 33 450 228 234 133 Turn Type Prot pm +ov Prot pm +ov pm +ov pm +ov Protected Phases 5 2 8 1 6 4 8 1 4 5 Permitted Phases 2 6 8 4 Detector Phases 5 2 8 1 6 4 8 1 4 5 Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 9.0 20.0 25.0 9.0 20.0 18.0 25.0 9.0 18.0 9.0 Total Split (s) 21.0 21.0 36.0 32.0 32.0 21.0 36.0 32.0 21.0 21.0 Total Split 19% 19% 33% 29% 29% 19% 33% 29% 19% 19% Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All -Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lead /Lag Lead Lag Lead Lag Lead Lead Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Recall Mode None Coord Min None Coord None Min None None None Queue Length 50th (ft) 136 155 13 204 262 13 312 0 164 16 Queue Length 95th (ft) #258 #249 #169 #346 #437 32 #515 31 #311 37 Internal Link Dist (ft) 220 620 920 447 50th Up Block Time 95th Up Block Time 18% 14% Turn Bay Length (ft) 50th Bay Block Time 95th Bay Block Time Queuing Penalty (veh) 17 30 11J S: \Jobs \3206 \Synchro \Northampton PM NB OPT.sy6 SDH vanassando -ff51 100 41% 48% 55% 60% 200 165 100 Splits and Phases: 5: Route 9 State Street t} 08 ,l 01 02 i 04 32 s 1} 21 s 11 21 s 1 36s 4= 05 06 21 s l 32s 2006 Weekday PM No Build 9/21/2001 lee Cycle Length: 110 Actuated Cycle Length: 110 Offset: 0 (0 Referenced to phase 2:EBT and 6:WBT, Start of Green, Master Intersection Natural Cycle: 90 Control Type: Actuated Coordinated 95th percentile volume exceeds capacity, queue may longer. Queue shown is maximum after two cycles. 4, 25 72% 79 29% 100 34 Synchro 5 Report Page 2 FICM Signalized Intersection Capacity Analysis 7. Old South Street State Street Lane Configurations Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Volume (vph) Peak-hour factor, PHF Adj. Flow (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) 1710 4.0 1.00 1.00 0.95 1593 0.95 1593 -325 0.90 361- 361 1710 4.0 1.00 0.85 1.00 1425 1.00 1425 295 0.90 328 328 ni+bv 8 1 19.5 39.5 19.5 39.5 0.27 0.55 4.0 4.0 3.0 3.0 1 1710 4.0 1.00 1.00 1.00 1676 1.00 1676 320 0.90 356 356 1710 4.0 1.00 0.85 1.00 1425 1.00 1425 225 0.90 250 250 S:\Jobs\3206\Synchro\Northampton PM NB OPT.sy6 SDH vanassando-ff51 19 1710 4.0 1.00 1.00 0.95 1593 0,95 1593 335 0.90 372 372 1' 1710 4.0 1.00 1.00 1.00 1676 1.00 1676 635 0.90 706 706 prn+ov. Prot 2 8 1 6 19.8 39.3 20.0 43.8 19.8 39.3 20.0 43.8 0.28 0.55 0.28 0.61 4.0 4.0 4.0 4.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 4 -36 -465 865 10.30 v/s Ratio Prot c0.23 0.11 0.21 0.08 c0.23 c0.42 v/s Ratio Perm s 6" .12. d;:to v/c Ratio 0.83 0.38 0.77 0.29 0.83 0.69 Uniform Delay, 01- .24,3 9:0- 23.8 8:5 24.1 9.2 Progression Factor 1.00 1.00 1.60 1.00 1.00 1.00 Incremental Delay, d2 12 0.3 7.4 0.2 12.5 1.9 Delay (s) 36.5 9.2 31.0 8.7 36.6 11.1 Level of Service D A C A D B Approach Delay (s) 23.5 21.8 19.9 Approach LOS'. C C. HCM AVerdgaCOntrol-Dalay:Y-r _Hcm-Lecre•otsoide HCM Volume to Capacity ratio 0.76 Actuated Cycle Length (s) 71.3 Sum of lost time (s) Intersection Capacity Utilization 75.9% ICU Level of Service c Critical Lane Group 2006 Weekday PM No Build 9/21/2001 Synchro 5 Report Page 3 01 t' 02 fr 08 27 s 01133 y: l s L 06 60s I_ I25s 1 `il Queues 7: Old South Street State Street Splits and Phases: 7: Old South Street State Street S: \Jobs13206 \Synchro \Northampton PM NB OPT.sy6 SDH vanassando -ff51 2006 Weekday PM No Build 9/21/2001 Lane Configurations r ter v t Volume (vph) 325 295 320 225 335 635 Lane Group Flow (vph) 361 328 356 250 372 706 Turn Type pm +ov pm +ov Prot Protected Phases 8 1 2 8 1 6 Permitted Phases 8 2 Detector Phases 8 1 2 8 1 6 Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 14.0 8.0 19.0 14.0 8.0 19.0 Total Split (s) 25.0 27.0 33.0 25.0 27.0 60.0 Total Split 29% 32% 39% 29% 32% 71 Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 Lead /Lag Lead Lag Lead Lead -Lag Optimize? Yes Yes Yes Recall Mode None None Min None None Min Queue Length 50th (ft) 163 8 157 13 163 195 Queue Length 95th (ft) #350 47 249 40 #343 305 Internal Link Dist (ft) 520 419 920 50th Up Block Time 95th Up Block Time Turn Bay Length (ft) 50th Bay Block Time 95th Bay. Block Time Queuing Penalty (veh) Cycle Length: 85 Actuated Cycle Length: 71.7 Natural Cycle: 70 Control Type: Actuated Uncoordinated 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Synchro 5 Report Page 3 HC ?.1 Signalized Intersection Capacity Analysis R.Dute 9 Route 66 Lane Configurations Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Volurne (vph) Peak -hour factor, PHF Adj. Flow (vph) Lane Group Flow (vph) Turn Type Protected Phases 2 Permitted Phases Actuated Green, G (s) 54.0 Effective-Green, g (s) 55.0 Actuated g/C Ratio 0.50 Clearance Time (s) 5.0 Vehicle Extension (s) 3.0 Lane.Grp Cap (vph) 1554 Ratio Prot c0. v /sRatio Perm v/c Ratio 0.53 Uniform Delay d1 18:7 Progression Factor 1.00 Incremental Delay, d2 1.3 Delay (s) 20.0 Level of Se rvice B Approach Delay (s) 20.0 Approach LOS. B HCM :Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization c Critical Lane Group 1710 4.0 0.95 0.98 1.00 3108 1.00 3108 620 0.90 689 822 1710 1710 4.0 1.00 1.00 0.95 1593 095 1593 120 293 0.90 0.90 133 326 0 326 Prot 1 1710 4.0 1.00 1.00 1.00 1676 1.00 1676 475 0.90 528 528 S: \Jobs \3206 \Synchro \Northampton AM BU OPT.sy6 SDH vanassando -ff51 �S 1710 4.0 1.00 1.00 0.95 1593 0.95 1593 118 0.90 131 131 1710 4.0 1.00 0.85 1.00 1425 1.00 1425 381 0.90 423 423 pm +ov 6 8 1 8 27.0 86.0 14.0 41.0 28.0 87.0 15.0 43:0 0.25 0.79 0.14 0.39 5:0 5.0 5.0 5.0 3.0 3.0 3.0 3.0 405 1326 217 609 c0.20 0.31 0.08 c0.18 0.80 0.40 0.60 0.69 38'4 35 44.7 28:0 0.80 0.29 1.00 1.00 68 0.1 4.7 3.4 37.7 1.1 49.4 31.4 D A DC 15.1 35.7 22:0 0.63 110.0 64.0% HCM Level of Service Sum of lost time (s) ICU Level of Service 2006 Weekday AM Build 10/11/2001 8.0 B Synchro 5 Report Page 1 Queues 3: Route 9 Route 66 c 4— 4 Lane Configurations 'r r Volume (vph) 620 293 475 118 381 Lane Group Flow (vph) 822 326 528 131 423 Turn Type Prot pm +ov Protected Phases 2 1 6 8 1 Permitted Phases 8 Detector Phases 2 1 6 8 1 Minimum Initial (s) 4.0 4.0 4.0 4:0 4.0 Minimum Split (s) 27.0 27.0 27.0 19.0 27.0 Total Split (s) 53.0 32.0 85.0 25.0 32:0 Total Split 48% 29% 77% 23% 29% Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 All -Red Time (s) 2.0 2.0 2.0 2.0 2.0 Lead /Lag Lead Lag Lag Lead -Lag Optimize? Yes Yes Yes Recall Mode Coord None None Min None Queue Length 50th (ft) 193 188 19 88 143 Queue Length 95th (ft) 280 m240 m53 144 219 Internal Link Dist (ft) 420 220 621 50th Up Block Time 2% 95th Up Block Time 7% Turn; Bay Length (ft) 50th Bay Block Time 95th Bay Block Time Queuing Penalty (veh) Cycle Length: 110 Actuated Cycle Length: 110 Offset: 57 (52 Referenced to phase 2:EBT, Start of Green Natural Cycle: 75 Control Type: Actuated Coordinated m Volume for 95th percentile queue is metered by upstream signal. 12 Splits and Phases: 3: Route 9 Route 66 0 2 53 s 1-- 06 85 s 01 32s S: \Jobs \3206 \Synchro \Northampton AM BU OPT.sy6 SDH vanassando -ff51 08 I 25 s 2006 Weekday AM Build 10/11/2001 Synchro 5 Report Page 1 HCM Signalized Intersection Capacity Analysis 5: Route 9 State Street Lane Configurations Ideal Flow (vphpl) Lane Width Total. Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow. (prot) Flt Permitted Satd: Flow (perm) Volume (vph) Peak -hour factor, PHF Adj. Flow (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Veticl.e Extension'(s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm Vic Ratio Uniform Delay, d1 Progression` Factor Incremental Delay, d2 Delay (s)': Level of Service Approach Delay (s) Approach LOS 1710 10 4.0 1.00 1.00 0.95 1486 0.95 1486 147 0.90 163 163. Prot 5 13.5 14.5 0.13 5.0 3:0. 196 c0 :11'. 0:83 46.6 0.85 21.9 61.6 E HCM Average Control Delay HCM .Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization c Critical Lane Group p r 1710 1710 12 10 4.0 4.0 0.95 1.00 1.00 0.85 1.00 1.00 3185 1330 1.00 1.00 3185 1330 428 405 0:90 0.90 476 450 476 450 pm +ov 2 8 2 24.0 59.4 25.0 61.4 0.23 0.56 5.0 5.0 3.0 3.0 724 742 0.15 0.20 0.14 0:66 0.61 38.6 16.2 0.94 0.92 4.0 1.2 40.3 16.1 D B 33.5 C tt 42.4 0.86 110.0 84.9% 1710 10 4.0 1.00 1.00 0.95 1486 0.95 1486 145 0.90 161 161 Prot 1 16.1 17.1 0.16 5.0 3.0 231 0.11 0.70 44.0 1.00 8.8 52.8 D S: \Jobs \3206 \Synchro \Northampton AM BU OPT.sy6 SDH vanassando -ff51 1710 1710 12 10 4.0 4.0 1.00 1.00 1.00 0.85 1.00 1.00 1676 1330 1.00 1.00 1676 1330 319 20 0.90 0.90 354 22 354 22 pm +ov 6 4 6 26.6 41.1 27.6 43.1 0.25 0.39 5.0 5.0 3.0 3.0 421 569 c0.21 0.01 0.01 0.84 0.04 39.1 20.7 1.00 1.00 18.0 0.0 57.2 20.7 E C 54.4 D 4 HCM Level of Service Sum of lost time (s) ICU Level of Service ir 4 r 1710 1710 1710 12 12 12 4.0 4.0 1.00 1.00 1.00 0.85 0.97 1.00 1618 1425 0.97 1.00 1618 1425 330 125 295 0.90 0.90 0.90 367 139 328 0 506 328 Split pm +ov 8 8 1 8 35.4 51.5 36.4 53.5 0.33 0.49 5.0 5.0 3.0 3.0 535 745 c0.31 0.07 0.16 0.95 044 35.8 18.5 1.00 1.00 25.8 0.4 61.6 18.9 E B 44.8 D 2006 Weekday AM Build 10/11/2001 D 16.0 D 4 ff 1710 1710 1710 12 12 12 4.0 4.0 1.00 1.00 1.00 0.85 0.99 1.00 1666 1425 0.99 1.00 1666 1425 20 135 114 0 :90 0.90 0.90 22 150 127 0 172 127 Split pm +ov 4 4 5 4 14.5 28.0 15.5 30.0 0.14 0.27 5.0 5.0 3.0 30 235 389 c0.1:0 0:04 0.05 0.73 0.33 45.3 31.9 1.00 1.00 11.1 0.5 56:4 32:4 E C D Synchro 5 Report Page 2 Queues 5: Route 9 State Street Lane Configurations ft r 4 r 4 r 4 r Volume (vph) 147 428 405 145 319 20 125 295 135 114 Lane Group Flow (vph) 163 476 450 161 354 22 506 328 172 127 Turn Type Prot pm +ov Prot pm +ov pm +ov pm +ov Protected Phases 5 2 8 1 6 4 8 1 4 5 Permitted Phases 2 6 8 4 Detector Phases 5 2 8 1 6 4 8 1 4 5 Minimum Initial (s) 4.0 4.0 4,0 4.0 4.0 4.0 4.0 4:0 4.0 4.0 Minimum Split (s) 19.0 20.0 25.0 20.0 20.0 20.0 25.0 20.0 20.0 19.0 Total Split (s) 19.0 23.0 41,0 25.0 29.0 21:0 41:0 25.0 21.0 19.0 Total Split 17% 21% 37% 23% 26% 19% 37% 23% 19% 17% Yellow Time (s) 3.0 3.0 30 3.0 3.0 3:0 3.0 3:0 3.0 3.0 All -Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lead /Lag Lead Lag Lead Lag Lead Lead Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Recall Mode None Goord Min None Coord None Min None None None Queue Length 50th (ft) 116 163 0 108 246 9 343 0 116 17 Queue Length 95th (ft) #230 #263 86 175 #424 25 #551 38 #202 43 Internal Link Dist (ft) 220 620 920 447 50th Up Block Time 95th Up Block Time 10% 24% Turn Bay Length (ft) 25 50th Bay Block Time 68% 95th Bay -Block Time 75% 28% Queuing Penalty (veh) 8 57 90 24 Cycle Length: 110 Actuated Cycle Length: 110 Offset: 0 (0 Referenced to phase 2:EBT and 6:WBT, Start of Green, Master Intersection Natural Cycle: 95 Control Type: Actuated Coordinated 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 5: Route 9 State Street 01 x' 02 1 0 04 J 08 25 s 1 23s s 41 s 05 06 19 s I s. 29 s S: \Jobs \3206 \Synchro \Northampton AM BU OPT.sy6 SDH vanassando -ff51 2006 Weekday AM Build 10/11/2001 PA Synchro 5 Report Page 2 I n I L._ r J HCM Signalized Intersection Capacity Analysis 7: Old South Street State Street Lane Configurations Ideal. Flow (vphpl) Total Lost time (s) Lane.Util. Factor Frt Flt Protected Satd. Flow (prot) Fit Permitted Satd. Flow (perm) S \Jobs\3206 \Synchro \Northampton AM BU OPT.sy6 SDH vanassando -ff51 HCM Average Control Delay 34:8 HC HCM Volume to Capacity ratio 0.92 Actuated Cycle Length (s) 89.1 Intersection Capacity Utilization 88.4% c Critical:: Lane Group 1710 1710 1710 1710 1710 1710 4.0 4.0 4.0 4.0 4.0 4.0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1.00 0.85 1.00 1.00 0 :95 1.00 1.00 1.00 0.95 1.00 1593 1425 1676 1425 1593 1676 0.95: 1.00 1.00 1.00 0.95 1.00 1593 1425 1676 1425 1593 1676 Volume (vph} 1:84 19.0 560 384 430 255 Peak -hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Add ::Flow (vph) 204 211 622 427- 478 283 Lane Group Flow (vph) 204 211 622 427 478 283 Turn Type pm ±ov pm +ov Prot Protected Phases 8 1 2 8 1 6 Pertitted:Phases 8 Actuated Green, G (s) 13.3 42.0 35.1 48.4 28.7 67.8 Effective Green, g (s) 13:3 42.0 35.1 48.4 28.7 67.8 Actuated g/C Ratio 0.15 0.47 0.39 0.54 0.32 0.76 Clearance Time. (s) 4.0 4:0 4 :0 4 :0 4.0 4.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Lane'Grp Cap (kph) 238 736 660° 838 513 1275 v/s Ratio Prot c0.13 0.09 c0.37 0.08 c0.30 0.17 v/s Ratio Perm 0.06. 0:22 v/c Ratio 0.86 0.29 0.94 0.51 0.93 0.22 Uniform Dela y d1- 3 0 14.4 26 0 12:9: Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 24.9 '0 2 21.9 0 :5 23.9. 0.1 Delay (s) 61.8 14.6 47.9 13.3 53.2 3.2 Level.of Sery ice' E: B D B. D A Approach Delay (s) 37.8 33.8 34.6 40-76.0014-.. S D C C 2006 Weekday AM Build 10/11/2001 Sum of lost time (s) ICU Level of Service 12.0 D Synchro 5 Report Page 3 Queues 7: Old South Street State Street Lane Configurations Volume (vph) 184 190 560 384 Lane Group Flow (vph) 204 211 622 427 Turn Type pm +ov pm +ov Protected Phases 8 1 2 8 Permitted Phases 8 2 Detector Phases 8 1 2 8 1 6 Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 14.0 8.0 19.0 14.0 8.0 19.0 Total Split (s) 18.0 35.0 42.0 18.0 35.0 77.0 Total Split 19% 37% 44% 19% 37% 81% Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 Lead /Lag Lead Lag Lead Lead -Lag Optimize? Yes Yes Yes Recall Mode None None Min None None Min Queue Length 50th (ft) 122 21 351 78 275 38 Queue Length 95th (ft) #249 58 #573 147 #467 60 Internal Link Dist (ft) 520 419 920 50th Up Block Time 95th Up Block Time Turn Bay Length (ft) 50th Bay Block Time 95th Bay Block Time Queuing Penalty (veh) 28% Cycle Length: 95 Actuated Cycle Length: 89.2 Natural Cycle: 90 Control Type: Actuated Uncoordinated 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 7: Old South Street State Street S: \Jobs \3206 \Synchro \Northampton AM BU OPT.sy6 SDH vanassando -ff51 7 t 430 478 Prot 1 6 255 283 2006 Weekday AM Build 10/11/2001 Synchro 5 Report Page 3 01 r02 08 35 s 1A42 s I:1 06 77 s 1='= '`118 s l Queues 7: Old South Street State Street Lane Configurations Volume (vph) 184 190 560 384 Lane Group Flow (vph) 204 211 622 427 Turn Type pm +ov pm +ov Protected Phases 8 1 2 8 Permitted Phases 8 2 Detector Phases 8 1 2 8 1 6 Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 14.0 8.0 19.0 14.0 8.0 19.0 Total Split (s) 18.0 35.0 42.0 18.0 35.0 77.0 Total Split 19% 37% 44% 19% 37% 81% Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 Lead /Lag Lead Lag Lead Lead -Lag Optimize? Yes Yes Yes Recall Mode None None Min None None Min Queue Length 50th (ft) 122 21 351 78 275 38 Queue Length 95th (ft) #249 58 #573 147 #467 60 Internal Link Dist (ft) 520 419 920 50th Up Block Time 95th Up Block Time Turn Bay Length (ft) 50th Bay Block Time 95th Bay Block Time Queuing Penalty (veh) 28% Cycle Length: 95 Actuated Cycle Length: 89.2 Natural Cycle: 90 Control Type: Actuated Uncoordinated 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 7: Old South Street State Street S: \Jobs \3206 \Synchro \Northampton AM BU OPT.sy6 SDH vanassando -ff51 7 t 430 478 Prot 1 6 255 283 2006 Weekday AM Build 10/11/2001 Synchro 5 Report Page 3 HCM Signalized Intersection Capacity Analysis 3: Route 9 Route 66 Lane Configurations Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Fit Permitted Satd. Flow (perm) Volume (vph) Peak -hour factor, PHF Add.. Flow (vph) Lane Group Flow (vph) Turn 7;ype Protected Phases Permitted Phases Actuated G (s) Effective Green, g (s) Actuated g/C Ratio Clearance:Time (s) Vehicle Extension (s) 1710 1710 4.0 0:95 0.98 1.00 3108 1.00 3108 675 130 0.90 0.90 750 144 894 0 50.4 51.4 0.47 5.0 3.0 Lane;Grp Cap (vph) v/s Ratio Prot c0.29 v/s Ratio Perm v/c Ratio 0.62 Uniform Delay, d1' Progression Factor 1.00 Incremental D elay :d2 2.0 Delay (s) 23.9 Level of Service C Approach Delay (s) 23.9 Approach LOS_ erage'Confrol De HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization c Criticali Lane Group t 1710 1710 1710 4.0 4.0 4.0 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 0.95 1593 1676 1593 0.95 1.00 095- 1593 1676 1593 295 490 141 0.90 0.90 0.90 328 544 157 328 544 157 Prot pm +ov 1 6 8 1 8 29.0 84.4 15.6 44.6 30.0 85.4 16:6 46.6 0.27 0.78 0.15 0.42 5.0 5:0 50 5.0. 3.0 3.0 3.0 3.0 4 1_301 c0.21 0.32 0.76 36 6 0.72 4.2. 30.7 C 2.7 0.67 110 :0 68.0% 0.42 0.41 0.1 1.8 12.7 S: \Jobs \3206 \Synchro \Northampton PM BU OPT.sy6 SDH vanassando -ff51 240. :656 0.10 c0.19 0.13:.. 0.71 1.00 3..7 29.9 C 0.65 440. 1.00 6 3- 50.3 D. 35.0 1710 4.0 1.00 0.85 1.00 1425 1.00 1425 421 0.90 468 468 evel of Service" Sum: of lost time (s) ICU Level of Service 2006 Weekday PM Build 10/11/2001 8:0 B Synchro 5 Report Page 1 Queues 3: Route 9 Route 66 4 P 2006 Weekday PM Build 10/11/2001 Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split Yellow Time (s) All -Red Time (s) Lead /Lag Lead Lead -Lag Optimize? Yes Recall Mode Coord 50th Up Block Time 95th Up Block Time Turn Bay Length (ft) 50th Bay Block Time 95th :Bay Block Time Queuing Penalty (veh) r 675 295 490 141 421 894 328 544 157 468 Prot pm +ov 2 1 6 8 1 8 2 1 6 8 1 4.0 4.0 4.0 4.0 4.0 20.0 9.0 19.0 19.0 9.0 45.0 34.0 79.0 31.0 34.0 41% 31% 72% 28% 31% 3.0 3.0 3.0 3.0 3.0 2.0 2.0 2.0 2.0 2.0 Lag Lag Yes Yes None None Min None Queue Length 50th (ft) 234 152 28 106 213 Queue Length 95th (ft) 336 m195 m70 165 296 Internal Link Dist (ft) 420 220 621 3% Splits and Phases: 3: Route 9 Route 66 S: \Jobs \3206 \Synchro \Northampton PM BU OPT.sy6 SDH vanassando -ff51 50 47% 42% 57% 41% 244 129 Cycle Length: 110 Actuated Cycle Length: 110 Offset: 57 (52 Referenced to phase 2:EBT, Start of Green Natural Cycle: 60 Control Type: Actuated Coordinated m: Volume for 95th percentile queue is metered by upstream signal. Synchro 5 Report Page 1 02 SI m1 Y') 08 45 s t."` 34 s m6 1— 79 s I'` 31 s NO Queues 3: Route 9 Route 66 4 P 2006 Weekday PM Build 10/11/2001 Lane Configurations Volume (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split Yellow Time (s) All -Red Time (s) Lead /Lag Lead Lead -Lag Optimize? Yes Recall Mode Coord 50th Up Block Time 95th Up Block Time Turn Bay Length (ft) 50th Bay Block Time 95th :Bay Block Time Queuing Penalty (veh) r 675 295 490 141 421 894 328 544 157 468 Prot pm +ov 2 1 6 8 1 8 2 1 6 8 1 4.0 4.0 4.0 4.0 4.0 20.0 9.0 19.0 19.0 9.0 45.0 34.0 79.0 31.0 34.0 41% 31% 72% 28% 31% 3.0 3.0 3.0 3.0 3.0 2.0 2.0 2.0 2.0 2.0 Lag Lag Yes Yes None None Min None Queue Length 50th (ft) 234 152 28 106 213 Queue Length 95th (ft) 336 m195 m70 165 296 Internal Link Dist (ft) 420 220 621 3% Splits and Phases: 3: Route 9 Route 66 S: \Jobs \3206 \Synchro \Northampton PM BU OPT.sy6 SDH vanassando -ff51 50 47% 42% 57% 41% 244 129 Cycle Length: 110 Actuated Cycle Length: 110 Offset: 57 (52 Referenced to phase 2:EBT, Start of Green Natural Cycle: 60 Control Type: Actuated Coordinated m: Volume for 95th percentile queue is metered by upstream signal. Synchro 5 Report Page 1 r- r HCM Signalized Intersection Capacity Analysis 5: Route 9 State Street c Lane Configurations Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Volume (vph) Peak- hour :factor PHF Adj. Flow (vph) Lane_ Group: Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated -g /C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression, Factor Incremental Delay, d2 Delays) Level of Service Approach Delay (s) Approach LOS 1710 10 4.0 1.00 1.00 0.95 1486 0.95 1-486. 181 0.90 201 201 0.89 45.7 0.85 27.2 659 E HCM Average Control Delay HCM Volume to Capacity Actuated Cycle Length (s) Intersection Capacity Utilization c Critical Lane Group ft 1710 12 4.0 0.95 1.00 1.00 3185 1.00 3185 410 171.0 10 4.0 1.00 0.85 1.00 1330 1.00 1330 515 1710 10 4.0 1.00 1.00 0.95 1486 0.95 1466, 275 S: \Jobs \3206 \Synchro \Northampton PM BU OPT.sy6 SDH vanassando -ff51 0.81 0.92 43.5 27.6 0 :94 0 :90 10.0 16.8 51.1 41.6 D D 49:1 D 54.2 0.90 110.0 89.9% 1710 12 4.0 1.00 1.00 1.00 167.6 0.90 0.90 0.90 0.90 0.90. 456 572 306 397 33 456 572 306 :397 33 Prot pm +ov Prot pm +ov 5 2 8 1 4 2 6 15.7 18.4 49.2 24.8 27.5 43.5 16.7 19.4 51.2 25.8 28.5 45.5 0.15 0.18 0.47 0.23 0.26 0.41 5.0 5.0 5.0 5.0 5.0 5.0 =30 .3.0 .30 226 562 619 349 434 599 0.14 0.14 0.27 c0 21 c0 24 0.16 0:88 0.91 40.6 1.00 21.1 61:6 E 39.6 1.00 26.4 65.9 E 1710 10 4.0 1.00 0.85 1.00 1330 1.00 1.00 t676 1:330 357 30 285 0.02 19.4 1.00 0.0 194 B HCM Level of Service Sum of lost time (s) ICU Level of Service 2006 Weekday PM Build 10/11/2001 t r" 1 1 r 1710 1710 1710 1710 12 12 12 12 4.0 4.0 1.00 1.00 1.00 0.85 0.97 1.00 1619: 1425 0.97 1.00 1619 1425 120 205 25 0.90 0:90 0.90 0.90 317 133 228 28 0 450 228: 0 Split pm +ov Split 8 8 1 4 8 30.8 55.6 31.8 57.6 0.29 0.52 5.0 5.0 3.0 30 468 798 c0.28` 0.07< 0.69 0:95 38.5 1.00.. 31.8 70,2: E 516: 14.7 0.2 149:: B D 4 1710 12 4.0 1.00 1.00 0.99 1667 0.99 1667 185 0.90 1710 12 4.0 1.00 0.85 1.00 1425 1.00 1425 128 0.90 206 142 234 142 pm +ov 4 5 4 16.0 31.7 17.0 33.7 0.15 0.31 5.0 5.0 3:0 30 258 437 c0.14 0.0 0.05 0:91 0.32 45.7 29.4 1.00 1.00 32.3 0.4 78.0 29:8 E C 59.8. E Synchro 5 Report Page 2 Queues 5: Route 9 State Street Lane Configurations 1 f triltr 4r 4 rf Volume (vph) 181 410 515 275 357 30 120 205 185 128 Lane Group Flow (vph) 201 456 572 306 397 33 450 228 234 142 Turn Type Prot pm +ov Prot pm +ov pm +ov pm +ov Protected Phases 5 2 8 1 6 4 8 1 4 5 Permitted Phases 2 6 8 4 Detector Phases 5 2 8 1 6 4 8 1 4 5 Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 9.0 20.0 25.0 9.0 20.0 18.0 25.0 9.0 18.0 9.0 Total Split (s) 21.0 21.0 36.0 32.0 32.0 21:0 36.0 32.0 21.0 21.0 Total Split 19% 19% 33% 29% 29% 19% 33% 29% 19% 19% Yellow Time (s) 3:0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 All -Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lead /Lag Lead Lag Lead Lag Lead Lead Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Recall Mode None Coord Min None. Coord None Min None None None Queue Length 50th (ft) 145 165 51 204 275 13 312 0 164 17 Queue Length 95th (ft) #272 #268 #203 #346 #462 32 #515 31 #311 39 Internal Link Dist (ft) 220 620 920 447 50th Up Block Time 95th Up Block Time 18% 28% 4% Turn Bay Length-(ft) 50th Bay Block Time 95th Bay Block -Time Queuing Penalty (veh) 100 41% 49% 55 '61 18 64 10 206 169 Cycle Length: 110 Actuated Cycle- Length: 110 Offset: 0 (0 Referenced to phase 2:EBT and 6:WBT, Start of Green, Master Intersection Natural Cycle: 90 Control Type: Actuated- Coordinated 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 5: Route 9 State Street 32 s 05 21 s J 'T. 02 1 21 06 l "t' 32s S: \Jobs \3206\Synchro \Northampton PM BU OPT.sy6 SDH vanassando -ff51 100 4 04 J 08 lx 21 s l 36 s 2006 Weekday PM Build 10/11/2001 25 72% 1% 79% 31% 107 36 Synchro 5 Report Page 2 Ll n rl U HCM Signalized Intersection Capacity Analysis 7: Old South- Street State Street Lane Configurations Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Fit Permitted Satd. Flow (perm) Volume(vpF) Peak -hour factor, PHF Adj. Flow (vph) Lane Group Flow (vph) 1710 4.0 1.00 1.00 0.95 1593 0.95 1593 377 0.90 419 419 Turn Type pm +ov pm +ov Prot Protected Phases 8 1 2 8 1 6 Permitted Phases 8 2 Actuated Green, G (s) 21.4 41.8 20.1 41.5 20.4 44.5 Effective Green, g (s) 21.4 41.8 20.1 41.5 20.4 44.5 Actuated g/C Ratio 0.29 0.57 0.27 0.56 0.28 0.60 Clearance 'Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap _(vph) 461 883 456 877 440 1009 v/s Ratio Prot c0.26 0.10 0.21 0.11 c0.23 c0.42 Ws Ratio Perm` 0.13 0.12 v/c Ratio 0.91 0.36 0.78 0.38 0.85 Uniform Deley,:d1 25.3 8:8 24.9 9.0 25.3 Progression Factor 1.00 1.00 1.00 1.00 1.00 incremental Delay, d2 21:5 0.3 8.4 0.3 13:9 Delay (s) 46.8 9.0 33.3 9.3 39.1 Level':. of Service D A C AD Approach Delay (s) 30.4 21.7 Approach LOS'. C C HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization c Critical.Lane Group 1710 4.0 1.00 0.85 1.00 1425 1.00 1425 290 0.90 322 322 1710 4.0 1.00 1.00 1.00 1676 1.00 1676 320 0.90 356 356 242 0.80 73.9 79.5% 1710 4.0 1.00 0.85 1.00 1425 1.00 1425 299 0.90 332 332 S: \Jobs \3206 \Synchro \Northampton PM BU OPT.sy6 SDH vanassando -ff51 1710 4.0 1.00 1.00 0.95 1593 0.95 1593 335 0.90 372 372 1710 4.0 1.00 1.00 1.00 1676 1.00 1676 635 0.90 706 706 0.70 10.1 1.00 2.1 12.3 B 21.5 HCM Level .of Service Sum of lost time (s) ICU Level of Service 2006 Weekday PM Build 10/11/2001 8.0 C Synchro 5 Report Page 3 Queues 7: Old South Street State Street Lane Configurations r r h Volume (vph) 377 290 320 299 335 635 Lane Group Flow (vph) 419 322 356 332 372 706 Turn Type pm +ov pm +ov Prot Protected Phases 8 1 2 8 1 6 Permitted Phases 8 2 Detector Phases 8 1 2 8 1 6 Minimum. Initial- (s) 4.0 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 14.0 8.0 19.0 14.0 8.0 19.0 Total Split (s) 25.0 27.0 33.0 25.0 27.0 60.0 Total Split 29% 32% 39% 29% 32% 71% Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 Lead/Lag Lead Lag Lead Lead -Lag Optimize? Yes Yes Yes Recall Mode None None Min None None Min Queue Length 50th (ft) 198 7 157 30 163 195 Queue Length 95th (ft) #425 45 249 65 #343 305 Internal Link Dist (ft) 520 419 920 50th- Up Block Time 95th Up Block Time Turn,Bay Length (ft) 50th Bay Block Time 95th_Bay Block Time Queuing Penalty (veh) Cycle Length: 85 Adtuated Cycle Length: 74.1 Natural Cycle: 75 Control Type Actuated- Uncoordinated 95th percentile volume exceeds capacity, queue may be longer. Queue shown is' after two cycles: Splits and Phases: 7: Old South Street State Street S: \Jobs \3206 \Synchro \Northampton PM BU OPT.sy6 SDH vanassando -ff51 2006 Weekday PM Build 10/11/2001 Synchro 5 Report Page 3 01 1' 02 "if o8 27s Ings33 s igil 06 60 s [0425s Queues 7: Old South Street State Street Lane Configurations r r h Volume (vph) 377 290 320 299 335 635 Lane Group Flow (vph) 419 322 356 332 372 706 Turn Type pm +ov pm +ov Prot Protected Phases 8 1 2 8 1 6 Permitted Phases 8 2 Detector Phases 8 1 2 8 1 6 Minimum. Initial- (s) 4.0 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 14.0 8.0 19.0 14.0 8.0 19.0 Total Split (s) 25.0 27.0 33.0 25.0 27.0 60.0 Total Split 29% 32% 39% 29% 32% 71% Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 All -Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 Lead/Lag Lead Lag Lead Lead -Lag Optimize? Yes Yes Yes Recall Mode None None Min None None Min Queue Length 50th (ft) 198 7 157 30 163 195 Queue Length 95th (ft) #425 45 249 65 #343 305 Internal Link Dist (ft) 520 419 920 50th- Up Block Time 95th Up Block Time Turn,Bay Length (ft) 50th Bay Block Time 95th_Bay Block Time Queuing Penalty (veh) Cycle Length: 85 Adtuated Cycle Length: 74.1 Natural Cycle: 75 Control Type Actuated- Uncoordinated 95th percentile volume exceeds capacity, queue may be longer. Queue shown is' after two cycles: Splits and Phases: 7: Old South Street State Street S: \Jobs \3206 \Synchro \Northampton PM BU OPT.sy6 SDH vanassando -ff51 2006 Weekday PM Build 10/11/2001 Synchro 5 Report Page 3 r HCS ANALYSIS T WO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Earle St Route 10 Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2001 Analysis Time Period AM Peak Project ID 3206 East/West Street: Earle Street North /South Street: Route 10 South Street Intersection Orientation: North- Study Period (hrs): 1.00 South ehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R olume 70 595 0 0 300 65 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 70 595 0 0 300 65 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Westbound Eastbound• Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 75 0 50 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 75 0 50 Percent Heavy ehicles 0 0 0 0 0 0 file: /C: \WINDOWS \TEMP \u2k304.TMP 9/20/01 Percent Grade 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 70 125 C (m) (vph) 1205 320 /c 0.06 0.39 95% queue length 0.18 1.89 Control Delay 8.2 23.4 LOS A C pproach Delay 23.4 pproach LOS HCS2000 Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k304.TMP 9/20/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Earle St Grove St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2001 Analysis Time Period AM Peak Project ID 3206 East/West Street: Grove Street North /South Street: Earle Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 5 80 0 0 45 90 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 5 80 0 0 45 90 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 40 0 5 Peak -Hour Factor, PH F 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 40 0 5 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 Flared Approach N I N l j fl r-- J 1 file: /C: \WINDOWS \TEMP \u2k2062.TMP 9/25/01 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, an d Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 5 45 C (m) (vph) 1462 826 /c 0.00 0.05 95% queue length 0.01 0.17 Control Delay 7.5 9.6 LOS A A pproach Delay 9 6 pproach LOS A HCS2000TM Copyright CO 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k2062.TMP 9/25/01 TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Earle St Texas Rd Agency/Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2001 Analysis Time Period AM Peak Project ID 3206 EastNVest Street: Texas Road North/South Street: Earle Street Intersection. Orientation: East-West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 0 10 110 10 10 0 Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 10 110 10 10 0 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 125 0 10 0 0 0 Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 125 0 10 0 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 Flared Approach I N I 1 N fl r fl r r 1 file://C:\WINDOWS\TEMP\u2k4274.TMP 9/25/01 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue L ength, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 10 135 C (m) (vph) 1480 910 /c 0.01 0.15 95% queue length 0.02 0.52 Control Delay 7.4 9.6 LOS A A pproach Delay 9.6 pproach LOS A HCS2000 Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k4274.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Earle St Laurel St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2001 Analysis Time Period AM Peak Project ID 3206 EastNVest Street: Laurel Street North /South Street: Earle Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L. T R olume 0 55 0 0 30 20' Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00. Hourly Flow Rate, HFR 0 55 0 0 30 20,:, Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration .LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 25 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 25 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 Flared Approach I N I I N I file: /C: \WINDOWS \TEMP \u2k52D5.TMP 9/25/01 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, an d Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 0 25 C (m) (vph) 1570 909 /c 0.00 0.03 95% queue length 0.00 0.08 Control Delay 7.3 9.1 LOS A A pproach Delay 9.1 pproach LOS A HCS2000 Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k52D5.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Route 66 Grove St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2001 Analysis Time Period AM Peak Project ID 3206 East/West Street: Route 66 Chapel Street North /South Street: Grove Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 0 290 50 5 100 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 290 50 5 100 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 20 0 10 0 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 20 0 10 0 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 file: /C: \WINDOWS \TEMP \u2k6285.TMP 9/25/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes. 0 0 0 0 0 0 Configuration LR Delay, Queue L ength, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 5 30 C (m) (vph) 1230 629 lc 0.00 0.05 95% queue length 0.01 0.15 Control Delay 7.9 11.0 LOS A B pproach Delay 11.0 pproach LOS B HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k6285.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection. Route 66 Laurel St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2001 Analysis Time Period AM Peak Project ID 3206 EastNVest Street: Route 66 Chapel Street North /South Street: Laurel Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 5 285 5 0 95 5. Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1:00' Hourly Flow Rate, HFR 5 285 5 0 95 5 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 5 10 5 0 20 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 5 10 5 0 20 5 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 L L L L L file: /C: \WINDOWS TEMP \u2kB353.TMP 9/19/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Delay, Queue L ength, an d Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LTR LTR LTR LTR (vph) 5 0 20 25 C (m) (vph) 1505 1283 581 593 /c 0.00 0.00 0.03 0.04 95% queue length 0.01 0.00 0.11 0.13 Control Delay 7.4 7.8 11.4 11.3 LOS A A B B pproach Delay 11.4 11.3 pproach LOS B B HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2kB353.TMP 9/19/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Burts Pit Rd Laurel St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2001 Analysis Time Period AM Peak Project ID 3206 East/West Street: Burts Pit Road Prince Street North /South Street: Laurel Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 0 115 25 0 30 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1:00' Hourly Flow Rate, HFR 0 115 25 0 30 0. Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound. Southbound Movement 7 8 9 10 11 12 L T R L T R olume 20 0 0 0 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 20 0 0 0 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 file: /C: \WINDOWS \TEMP \u2k7234.TMP 9/25/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 0 20 C (m) (vph) 1456 838 /c 0.00 0.02 95% queue length 0.00 0.07 Control Delay 7.5 9.4 LOS A A pproach Delay 9.4 pproach LOS A HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k7234.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Site Drive Prince St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2001 Analysis Time Period AM Peak Project ID 3206 East/West Street: Prince Street North /South Street: Site Driveway Intersection Orientation: East -West Study Period (hrs):. 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 15 100 0 0 25 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 15 100 0 0 25 5 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration. LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R_ L T R olume 0 0 0 5 0 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 5 0 5 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 Flared Approach I N I I N file: /C: \WINDOWS \TEMP \u2k8301.TMP 9/25/01 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 15 10 C (m) (vph) 1596 928 /c 0.01 0.01 95% queue length 0.03 0.03 Control Delay 7.3 8.9 LOS A A pproach Delay 8.9 pproach LOS A HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k8301.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Route 66 Prince St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2001 Analysis Time Period AM Peak Project ID 3206 East/West Street: Route 66 Chapel Street North /South Street: Prince Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R" olume 0 290 0 0 95 30 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 290 0 0 95 30 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 100 0 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 100 0 5 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 file: /C: \WINDOWS \TEMP \u2k9375.TMP 9/25/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 0 105 C (m) (vph) 1474 621 /c 0.00 0.17 95% queue length 0.00 0.61 Control Delay 7.4 12.0 LOS A B pproach Delay 12.0 pproach LOS B HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k9375.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Main Drive Route 66 Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2001 Analysis Time Period AM Peak Project ID 3206 East/West Street: Route 66 (Chapel Street) North /South Street: Main Driveway Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R. olume 10 380 0 0 115 10. Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00" Hourly Flow Rate, HFR 10 380 0 0 115 10'° Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 10 0 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 10 0 5 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 file: /C: \WINDOWS \TEMP \u2kA 1 B5.TMP 9/25/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 10 15 C (m) (vph) 1474 607 /c 0.01 0.02 95% queue length 0.02 0.08 Control Delay 7.5 11.1 LOS A B pproach Delay 11.1 pproach LOS B HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \W[NDOWS \TEMP \u2kA1B5.TMP 9/25/01 T WO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Route 66 Earle St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2001 Analysis Time Period AM Peak Project ID 3206 East/West Street: Route 66 Chapel Street North /South Street: Earle Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R. L T R olume 0 380 5 40 120 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1. Hourly Flow Rate, HFR 0 380 5 40 120 0 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 Lanes 0 1 0 0 1 Configuration TR LT Upstream Signal 0 0 Minor Street N orthbound Southbound Movement 7 8 9 10 11 12 L T R L T olume 5 0 80 0 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 5 0 80 0 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 file: /C: \WINDOWS \TEMP \u2kB 103.TMP 9/25/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 40 85 C (m) (vph) 1185 653 /c 0.03 0.13 95% queue length 0.10 0.45 Control Delay 8.1 11.3 LOS A B pproach Delay 11.3 pproach LOS B HCS2000TM Copyright CO 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2kB 103.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Earle St Route 10 Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2001 Analysis Time Period PM Peak Project ID 3206 East/VVest Street: Earle Street North /South Street: Route 10 South Street Intersection Orientation: North- Study Period (hrs): 1.00 South ehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6. L T R L T R olume 45 470 0 0 680 85 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 45 470 0 0 680 85 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 60 0 105 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 60 0 105 Percent Heavy ehicles 0 0 0 0 0 0 n fl i L file: /C: \WINDOWS \TEMP \u2k 1115.TMP 9/25/01 Percent Grade 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 45 165 C (m) (vph) 857 280 lc 0.05 0.59 95% queue length 0.17 4.02 Control Delay 9.4 35.9 LOS A E pproach Delay 35.9 pproach LOS E HCS2000 Copyright CO 2000 University of Florida, All Rights Reserved Version 4.1 file://C: \WINDOWS \TEMP\u2k 1 1 15.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Earle St Grove St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2001 Analysis Time Period PM Peak Project ID 3206 East/West Street: Grove Street North /South Street: Earle Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 5 70 0 0 95 45 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 5 70 0 0 95 45 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0' Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 85 3 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 85 0 5 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 Flared Approach I N I I N I i1 L r I file: /C: \WINDOWS \TEMP \u2k2065.TMP 9/25/01 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 5 90 C (m) (vph) 1456 799 /c 0.00 0.11 95% queue length 0.01 0.38 Control Delay 7.5 10.1 LOS A B pproach Delay 10.1 pproach LOS B HCS2000TM Copyright 2000 Univers'ty of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k2065.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Earle St Texas Rd Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2001 Analysis Time Period PM Peak Project ID 3206 EastNVest Street: Texas Road North /South Street: Earle Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 0 10 145 20 10 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 10 145 20 10 0 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 130 0 5 0 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 130 0 5 0 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 Flared Approach I N I I N I P r L LJ file: /C: \WINDOWS \TEMP \u2k2315.TMP 9/25/01 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 20 135 C (m) (vph) 1438 859 /c 0.01 0.16 95% queue length 0.04 0.56 Control Delay 7.5 10.0 LOS A A pproach Delay 10.0 pproach LOS A HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k2315.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Earle St Laurel St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2001 Analysis Time Period PM Peak Project ID 3206 East/West Street: Laurel Street North /South Street: Earle Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 0 35 0 0 55 40 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 35 0 0 55 40 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 40 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 40 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 Flared Approach N I I N ri r-� 1 P i u file: /C: \WINDOWS \TEMP \u2k4162.TMP 9/19/01 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 0 40 C (m) (vph) 1512 892 /c 0.00 0.04 95% queue length 0.00 0.14 Control Delay 7.4 9.2 LOS A 1 A pproach Delay 9 2 pproach LOS A HCS2000 Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k4162.TMP 9/19/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Route 66 Grove St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2001 Analysis Time Period PM Peak Project ID 3206 East/West Street: Route 66 Chapel Street North /South Street: Grove Street Intersection Orientation: East -West Stud Period hrs 1.00 Ma'or Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 0 110 25 10 205 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 110 25 10 205 0 Percent Heavy ehicles 0 0 Median T pe Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Confi uration TR LT U•stream Si•nal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 45 0 5 0 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 45 0 5 0 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 file: /C: \WINDOWS \TEMP \u2k5023.TMP 9/19/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 10 50 C (m) (vph) 1462 670 /c 0.01 0.07 95% queue length 0.02 0.24 Control Delay 7.5 10.8 LOS A B pproach Delay 10.8 pproach LOS B HCS2000TM Copyright CO 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINTDOWS \TEMP \u2k5023.TMP 9/19/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Route 66 Laurel St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2001 Analysis Time Period PM Peak Project ID 3206 East/West Street: Route 66 Chapel Street North /South Street: Laurel Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 10 100 5 10 205 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 10 100 5 10 205 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 5 35 0 5 25 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 5 35 0 5 25 5 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 file: /C: \WINDOWS \TEMP \u2k4340.TMP 9/25/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Delay, Queue Length, an d Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LTR LTR LTR LTR (vph) 10 10 40 35 C (m) (vph) 1378 1499 571 595 /c 0.01 0.01 0.07 0.06 95% queue length 0.02 0.02 0.23 0.19 Control Delay 7.6 7.4 11.8 11.4 LOS A A B B pproach Delay 11.8 11.4 pproach LOS 8 8 HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k4340.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Burts Pit Rd Laurel St Agency /Co. VAI Date Performed 9/6/01 Jurisdiction Analysis Time Period PM Peak Analysis Year 2001 Project ID 3206 East/West Street: Burts Pit Road Prince Street North /South Street: Laurel Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 0 70 35 0 85 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 70 35 0 85 0 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 45 0 0 0 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 45 0 0 0 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 r-- file: /C: \WINDOWS \TEMP \u2k32B 1.TMP 9/19/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 0 45 C (m) (vph) 1499 822 /c 0.00 0.05 95% queue length 0.00 0.17 Control Delay 7.4 9.6 LOS A A pproach Delay 9.6 pproach LOS A HCS2000 Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file://C:\WINDOWS\TEMP\u2k32B 1.TMP 9/19/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Site Drive Prince St Agency /Co. VAI Date Performed 9/6/01 Jurisdiction Analysis Time Period PM Peak Analysis Year 2001 Project ID 3206 East/West Street: Prince Street North /South Street: Site Driveway Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 5 65 0 0 70 5 Peak -Hour Factor, PHF 1,00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 5 65 0 0 70 5 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement '7 8 9 10 11 12 L T R L T R olume 0 0 0 10 0 15 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 10 0 15 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 Flared Approach I N I I N n I n r n T L L r-- file: /C: \WINDOWS \TEMP \u2k42A4.TMP 9/19/01 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue L ength, an d Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 5 25 C (m) (vph) 1537 931 /c 0.00 0.03 95% queue length 0.01 0.08 Control Delay 7.3 9.0 LOS A A pproach Delay 9.0 pproach LOS HCS2000 Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k42A4.TMP 9/19/01 T WO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Route 66 Prince St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2001 Analysis Time Period PM Peak Project ID 3206 East/West Street: Route 66 Chapel Street North /South Street: Prince Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 0 105 0 0 210 75 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 105 0 0 210 75, Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street N orthbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 70 0 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 70 0 5 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 ri L LJ L r file: /C: \WINDOWS \TEMP \u2k6095.TMP 9/25/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue L ength, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 0 75 C (m) (vph) 1289 657 lc 0.00 0.11 95% queue length 0.00 0.39 Control Delay 7.8 11.2 LOS A B pproach Delay 11.2 pproach LOS B HCS2000T M Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k6095.TMP 9/25/01 T WO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Main Drive Route 66 Agency /Co. VAl Jurisdiction Date Performed 9/6/01 Analysis Year 2001 Analysis Time Period PM Peak Project ID 3206 East/West Street: Route 66 (Chapel Street) North /South Street: Main Driveway Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 5 170 0 0 275 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 5 170 0 0 275 5 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R T R Volume 0 0 0 10 0 10 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 10 0 10 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade 0 0 file: /C: \WINDOWS \TEMP \u2k63 86.TMP 9/25/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 5 20 C (m) (vph) 1294 649 /c 0.00 0.03 95% queue length 0.01 0.10 Control Delay 7.8 10.7 LOS A g pproach Delay 1 0. 7 pproach LOS B HCS2000 Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k6386.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Route 66 Earle St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2001 Analysis Time Period PM Peak Project ID 3206 East/West Street: Route 66 Chapel Street North /South Street: Earle Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R~ olume 0 170 5 75 270 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 170 5 75 270 0 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 10 0 35 0 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 10 0 35 0 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade (°/0) 0 0 L n LJ P r L n U file: /C: \WINDOWS \TEMP \u2k7313.TMP 9/25/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB No_ rthbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 75 45 C (m) (vph) 1414 723 /c 0.05 0.06 95% queue length 0.17 0.20 Control Delay 7.7 10.3 LOS A B pproach Delay 10.3 pproach LOS B HCS2000T M Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k7313.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Earle St Route 10 Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period AM No Build Project ID 3206 East/Vl/est Street: Earle Street North /South Street: Route 10 South Street Intersection Orientation: North- South Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R olume 75 625 0 0 315 70 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 75 625 0 0 315 70 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 95 0 55 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 95 0 55 Percent Heavy ehicles 0 0 0 0 0 0 file: /C: \WINDOWS \TEMP \u2k3372.TMP 9/21/01 Percent Grade /0) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 75 150 C (m) (vph) 1185 288 /c 0.06 0.52 95% queue length 0.20 3.12 Control Delay 8.2 30.9 LOS A D pproach Delay 30.9 pproach LOS D HCS2000TM Copyright CO 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k3372.TMP 9/21 /01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Earle St Grove St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period AM No Build Project ID 3206 East/West Street: Grove Street North /South Street: Earle Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 5 100 0 0 45 95, Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 5 100 0 0 45 95 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 40 3 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 40 0 5 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 Flared Approach I N I 1 N file: /C: \WINDOWS \TEMP \u2k8233 .TMP 9/25/01 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, an d Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 5 45 C (m) (vph) 1456 805 /c 0.00 0.06 95% queue length 0.01 0.18 Control Delay 7.5 9.7 LOS A A pproach Delay 9' 7 pproach LOS A HCS2000TM Copyright CO 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k8233.TMP 9/25/01 T WO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Earle St Texas Rd Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period AM No Build Project ID 3206 EastNVest Street: Texas Road North /South Street: Earle Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 0 10 130 10 10 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1:00 1.00 1.00 Hourly Flow Rate, HFR 0 10 130 10 10 0- Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound 10 11 12 Movement 7 8 9 L T R L T R olume 130 0 10 0 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 130 0 10 0 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 Flared Approach I N I N I file: /C: \WINDOWS \TEMP \u2k91B5.TMP 9/25/01 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, an d Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 10 140 C (m) (vph) 1456 898 /c 0.01 0.16 95% queue length 0.02 0.55 Control Delay 7.5 9.7 LOS A A pproach Delay 9.7 pproach LOS HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k91B5.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Grove St Laurel St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period AM No Build Project ID 3206 East/West Street: Laurel Street North /South Street: Grove Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 0 60 0 0 30 20 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 60 0 0 30 20 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound 10 11 12 Movement 7 8 9 L T R L T R olume 0 0 0 40 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 40 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 Flared Approach I N I 1 N file: /C: \WINDOWS \TEMP \u2kA2F3 .TMP 9/25/01 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 0 40 C (m) (vph) 1570 904 /c 0.00 0.04 95% queue length 0.00 0.14 Control Delay 7.3 9.2 LOS A A pproach Delay 9 2 pproach LOS A HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2kA2F3.TMP 9/25/01 T WO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Route 66 Grove St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period AM No Build Project ID 3206 East/West Street: Route 66 Chapel Street North /South Street: Grove Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 0 305 55 5 105 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 305 55 5 105 0 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 I 9 10 11 12 L T R L T R olume 20 0 10 0 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 20 0 10 0 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 file: /C: \WINDOWS \TEMP \u2kB292.TMP 9/25/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 1 0 1 0 0 0 Configuration L R Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT L R (vph) 5 20 10 C (m) (vph) 1210 571 714 /c 0.00 0.04 0.01 95% queue length 0.01 0.11 0.04 Control Delay 8.0 11.5 10.1 LOS A B B pproach Delay 11.1 pproach LOS B HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2kB292.TMP 9/25/01 T WO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Route 66 Laurel St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period AM No Build Project ID 3206 East/West Street: Route 66 Chapel Street North /South Street: Laurel Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 5 300 5 0 100 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 5 300 5 0 100 5 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 5 10 5 0 35 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 5 10 5 0 35 5 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 file: /C: \WINDOWS \TEMP \u2kB3 80.TMP 9/21/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Delay, Queue Length, an d Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LTR LTR LTR LTR (vph) 5 0 20 40 C (m) (vph) 1499 1267 562 559 /c 0.00 0.00 0.04 0.07 95% queue length 0.01 0.00 0.11 0.23 Control Delay 7.4 7.8 11.6 11.9 LOS A A B B pproach Delay 11.6 11.9 pproach LOS B B HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2kB380.TMP 9/21/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Buds Pit Rd Laurel St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period AM No Build Project ID 3206 East/West Street: Burts Pit Road Prince Street North /South Street: Laurel Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 0 125 40 0 30 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 125 40 0 30 0 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Movement 7 8 9 10 11 12 L T R L T R olume 20 0 0 0 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 20 0 0 0 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 n r- L_ L file://C: \WINDOWS \TEMP \u2kC3 2 1 .TMP 9/25/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 0 20 C (m) (vph) 1426 819 /c 0.00 0.02 95% queue length 0.00 0.08 Control Delay 7.5 9.5 LOS A A pproach Delay 9.5 pproach LOS A HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2kC321.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Site Drive Prince St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period AM No Build Project ID 3206 East/West Street: Prince Street North /South Street: Site Driveway Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement .1 2 3 4 5 6 L T R L T R olume 15 110 0 0 25 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 15 110 0 0 25 5 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 5 0 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 5 0 5 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 Flared Approach 1 N I N I file: /C: \WINDOWS \TEMP \u2kE040.TMP 9/25/01 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue L ength, an d Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 15 10 C (m) (vph) 1596 921 lc 0.01 0.01 95% queue length 0.03 0.03 Control Delay 7.3 9.0 LOS A A pproach Delay 9.0 pproach LOS A HCS2000 Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2kE040.TMP 9/25/01 T WO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Main Drive Route 66 Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period AM No Build Project ID 3206 East/West Street: Route 66 (Chapel Street) North /South Street: Main Driveway Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 10 405 0 0 120 10 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 10 405 0 0 120 10 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 10 0 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 10 0 5 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 file: /C: \WINDOWS \TEMP \u2kE314.TMP 9/25/01 Flared Approach N N Storage 0 0 RI Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue L ength, and Level of Service pproach EB WB No_ rthbound Southbound 10 11 12 Movement 1 4 7 8 9 Lane Configuration LT LR (vph) 10 15 C (m) (vph) 1468 588 /c 0.01 0.03 95% queue length 0.02 0.08 Control Delay 7.5 11.3 LOS A B pproach Delay 11.3 pproach LOS 8 HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2kE314.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information (Site Information Analyst SDH Intersection Route 66 Earle St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period AM No Build Project ID 3206 East/West Street: Route 66 Chapel Street North /South Street: Earle Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 0 405 5 40 125 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 405 5 40 125 0 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 5 0 85 0 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 5 0 85 0 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade (°/o) 0 0 file://C: WIND OWS \TEMP \u2 kF 1 D 4 TMP 9/25/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 1 0 1 0 0 0 Configuration L R Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT L R (vph) 40 5 85 C (m) (vph) 1160 443 648 /c 0.03 0.01 0.13 95% queue length all 0.03 0.45 Control Delay 8.2 13.2 11.4 LOS A B B pproach Delay 11.5 pproach LOS B HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file://C \WINDOWS \TEMP \u2kF 1 D4.TMP 9/25/01 T WO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Earle St Route 10 Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period PM No Build Project ID 3206 East/VVest Street: Earle Street North /South Street: Route 10 South Street Intersection Orientation: North- South Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6.,.. L T R L T .R_ olume 45 495 0 0 715 105— Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 45 495 0 0 715 105 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R Volume 0 0 0 65 0 110 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 65 0 110 Percent Heavy Vehicles 0 0 0 0 0 0 r-, n L r file: /C: \WINDOWS \TEMP \u2kCO32.TMP 9/25/01 Percent Grade 0 0 Flared Approach I N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Confi uration LR Delay, Queue Length, and Level of Service pproach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 45 175 C (m) (vph) 818 256 /c 0.06 0.68 95% queue length 0.17 5.68 Control Delay 9.7 48.0 LOS A E pproach Delay 48.0 pproach LOS E HCS2000 Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2kCO32.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Earle St Grove St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period PM No Build Project ID 3206 East/West Street: Grove Street North /South Street: Earle Street Intersection Orientation: East -West Study Period 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 5 75 0 0 115 45 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 5 75 0 0 115 45`' Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound 10 11 12 Movement 7 8 9 L T R L T R olume 0 0 0 90 3 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 90 0 5 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 Flared Approach I N I J N I file: /C: \WINDOWS \TEMP \u2kC325.TMP 9/25/01 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Confi uration LT LR (vph) 5 95 C (m) (vph) 1432 774 /c 0.00 0.12 95% queue length 0.01 0.42 Control Delay 7.5 10.3 LOS A B pproach Delay 10.3 pproach LOS B HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2kC325.TMP 9/25/01 T WO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Earle St Texas Rd Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period PM No Build Project ID 3206 East/West Street: Texas Road North /South Street: Earle Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 0 10 155 20 10 0° Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 10 155 20 10 0 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 150 0 5 0 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 150 0 5 0 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 Flared Approach I N I I N file: /C: \WINDOWS TEMP \u2kE093.TMP 9/25/01 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 20 155 C (m) (vph) 1426 852 /c 0.01 0.18 95% queue length 0.04 0.67 Control Delay 7.6 10.2 LOS A B pproach Delay 10.2 pproach LOS B HCS2000 Copyright CO 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2kE093.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Grove St Laurel St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period PM No Build Project ID 3206 EastNVest Street: Grove Street North /South Street: Laurel Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 0 35 0 0 60 45 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 35 0 0 60 45 4-.,. Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound 10 11 12 Movement 7 8 9 L T R L T R olume 0 0 0 40 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 40 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 Flared Approach I N I I N file: /C: \WINDOWS \TEMP \u2kE370.TMP 9/24/01 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue L ength, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 0 40 C (m) (vph) 1499 884 /c 0.00 0.05 95% queue length 0.00 0.14 Control Delay 7.4 9.3 LOS A A pproach Delay 9.3 pproach LOS A HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2kE370.TMP 9/24/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Route 66 Grove St Agency /Co. VAI Date Performed 9/6/01 Jurisdiction Analysis Time Period PM No Build Analysis Year 2006 Project ID 3206 East/West Street: Route 66 Chapel Street North /South Street: Grove Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6~ L T R L T R olume 0 115 25 10 215 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 1.15 25 10 215 0 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 45 0 5 0 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 45 0 5 0 0 0 Percent Heavy ehicles 0 0 0 0 0 Percent Grade 0 0 file: /C: \WINDOWS \TEMP \u2k53 50.TMP 9/21/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 1 0 1 0 0 0 Configuration L R Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT L R (vph) 10 45 5 C (m) (vph) 1456 636 927 lc 0.01 0.07 0.01 95% queue length 0.02 0.23 0.02 Control Delay 7.5 11.1 8.9 LOS A B A pproach Delay 10.9 pproach LOS B HCS2000T Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k5350.TMP 9/21, 01 TWO -WAY STOP CO NTROL SUMMARY General Information Site Information Analyst SDH Intersection Route 66 Laurel St Agency /Co. VAI Date Performed 9/6/01 Jurisdiction Analysis Time Period PM No Build Analysis Year 2006 Project ID 3206 EastNVest Street: Route 66 Chapel Street North /South Street: Laurel Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T olume 10 105 5 10 215 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1 :00 Hourly Flow Rate, HFR 10 105 5 10 215 0' Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 5 50 0 5 25 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 5 50 0 5 25 5 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade (/o 0 0 n LJ fl l_J file: /C: \WINDOWS \TEMP \u2kF03 3 .TMP 9/25/01 Flared Approach N N Storage 0 0 RT Channelized 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Delay, Queue Length, and Level of Service pproach EB WB No rthbound Southbound 10 11 12 Movement 1 4 7 8 9 Lane Configuration LTR LTR LTR LTR (vph) 10 10 55 35 C (m) (vph) 1367 1493 558 580 lc 0.01 0.01 0.10 0.06 95% queue length 0.02 0.02 0.33 0.19 Control Delay 7.7 7.4 12.2 11.6 LOS A A B B pproach Delay 12.2 11.6 pproach LOS B B HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2kF033.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Burts Pit Rd Laurel St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period PM No Build Project ID 3206 East/West Street: Burts Pit Road Prince Street North /South Street: Laurel Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 J 5 6 R° L T R L T olume 0 75 35 0 95 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 75 35 0 95 0 f Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 60 0 0 0 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 60 0 0 0 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 �J LJ j J file: /C: \WINDOWS \TEMP \u2k6245.TMP 9/21/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 0 60 C (m) (vph) 1493 807 /c 0.00 0.07 95% queue length 0.00 0.24 Control Delay 7.4 9.8 LOS A A pproach Delay 9.8 pproach LOS A HCS2000 Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k6245.TMP 9/21/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Site Drive Prince St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period PM No Build Project ID 3206 East/West Street: Prince Street North /South Street: Site Driveway Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 5 70 0 0 80 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00: Hourly Flow Rate, HFR 5 70 0 0 80 5 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street N orthbound Southbound 10 11 12 Movement 7 8 9 L T R L T R olume 0 0 0 10 0 15 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 10 0 15 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 Flared Approach N I I N I r r f 7 fl Li P L it r r file: /C: \WINDOWS \TEMP \u2k9226.TMP 9/21/01 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 5 25 C (m)(vph) 1524 916 /c 0.00 0.03 95% queue length 0.01 0.08 Control Delay 7.4 9.0 LOS A A pproach Delay 9.0 pproach LOS A HCS2000 Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k9226.TMP 9/21/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Route 66 Prince St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period PM No Build Project ID 3206 East/West Street: Route 66 Chapel Street North /South Street: Prince Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 0 110 0 0 220 85 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 110 0 0 220 85` Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0. 80 0 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 80 0 5 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 file: /C: \WINDOWS \TEMP \u2k 172.TMP 9/25/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 1 0 1 Configuration L R Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound 10 11 12 Movement 1 4 7 8 9 Lane Configuration LT L R (vph) 0 80 5 C (m) (vph) 1267 633 782 /c 0.00 0.13 0.01 95 %queue length 0.00 0.43 0.02 Control Delay 7.8 11.5 9.6 LOS A B A pproach Delay 11.4 pproach LOS 8 HCS2000T M Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k172.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Main Drive Route 66 Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period PM No Build Project ID 3206 East/West Street: Route 66 (Chapel Street) North /South Street: Main Driveway Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T olume 5 185 0 0 290 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 5 185 0 0 290 5 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 10 0 10 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 10 0 10 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 file: /C: \WINDOWS \TEMP \u2k2145.TMP 9/25/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 5 20 C (m) (vph) 1278 629 /c 0.00 0.03 95% queue length 0.01 0.10 Control Delay 7.8 10.9 LOS A g pproach Delay 10.9 pproach LOS B HCS2000T M Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k2145.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Route 66 Earle St Agency /Co. VAI Date Performed 9/6/01 Jurisdiction Analysis Time Period PM No Build Analysis Year 2006 Project ID 3206 East/West Street: Route 66 Chapel Street North /South Street: Earle Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R. olume 0 180 5 75 290 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1 :00" Hourly Flow Rate, HFR 0 180 5 75 290 0` Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street N orthbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 10 0 35 0 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 10 0 35 0 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 file: /C: \WINDOWS \TEMP \u2k3124.TMP 9/25/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 1 0 1 0 0 0 Configuration L R Delay, Queue Length, and Level of Service pproach EB WB No rthbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT L R (vph) 75 10 35 C (m) (vph) 1402 430 866 /c 0.05 0.02 0.04 95% queue length 0.17 0.07 0.13 Control Delay 7.7 13.6 9.3 LOS pproach Delay 10.3 pproach LOS B HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k3124.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Earle St Route 10 Agency /Co. VAI Date Performed 9/6/01 Jurisdiction Analysis Time Period AM Build Analysis Year 2006 Project ID 3206 East/V1/est Street: Earle Street North /South Street: Route 10 South Street Intersection Orientation: North- Study Period (hrs): 1.00 South ehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6.,. L T R L T R. olume 112 625 0 0 315 134 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 112 625 0 0 315 134 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 139 0 65 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 139 0 65 Percent Heavy ehicles 0 0 0 0 0 0 file: /C: \WINDOWS \TEMP \u2k3195.TMP 10/11/01 Percent Grade 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 112 204 C (m) (vph) 1122 232 /c 0.10 0.88 95% queue length 0.33 11.84 Control Delay 8.6 102.6 LOS A F pproach Delay 102.6 pproach LOS F HCS Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k3195.TMP 10/11/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Earle St Grove St Agency /Co. VAI Date Performed 9/6/01 Jurisdiction Analysis Time Period AM Build Analysis Year 2006 Project ID 3206 East/West Street: Grove Street North /South Street: Earle Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 12 131 0 0 54 187 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 12 131 0 0 54 187 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 62 3 6 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 62 0 6 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade /o) 0 0 Flared Approach N I N file: /C: \WINDOWS \TEMP \u2k4341.TMP 10 1 1 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue L ength, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 12 68 C (m) (vph) 1337 702 lc 0.01 0.10 95% queue length 0.03 0.32 Control Delay 7.7 10.7 LOS A B pproach Delay 10.7 pproach LOS B HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k4341.TMP 10/11/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Earle St Texas Rd Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period AM Build Project ID 3206 EastNVest Street: Texas Road North /South Street: Earle Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 0 10 183 10 10 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 10 183 10 10 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 231 0 10 0 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 231 0 10 0 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 Flared Approach N I 1 N file://C: \WINDOWS\TEMP\u2kA28 1 .TMP 10 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue L ength, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 10 241 C (m) (vph) 1392 865 /c 0.01 0.28 95% queue length 0.02 1.15 Control Delay 7.6 '10.8 LOS A 8 pproach Delay 10.8 pproach LOS B HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: WINDOWS \TEMP \u2kA281.TMP 10 /11 /01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Grove St Laurel St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period AM Build Project ID 3206 East/West Street: Laurel Street North /South Street: Grove Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 0 76 0 0 35 25 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 76 0 0 35 25 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 61 0 0 Peak -Hour Factor, PH F 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 61 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 Flared Approach I N I N file: /C: \WINDOWS \TEMP \u2kB 1 DO.TMP 9/25/01 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue L ength, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 0 61 C (m) (vph) 1556 876 /c 0.00 0.07 95% queue length 0.00 0,22 Control Delay 7.3 9.4 LOS A A pproach Delay 9.4 pproach LOS A HCS2000 Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS TEMP \u2kB 1 DO.TMP 9/25/01 TWO -WAY STOP CO NTROL SUMMARY General Information Site Information Analyst SDH Intersection Route 66 Grove St Agency /Co. VAI Date Performed 9/6/01 Jurisdiction Analysis Time Period AM Build Analysis Year 2006 Project ID 3206 East/West Street: Route 66 Chapel Street North /South Street: Grove Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R° olume 0 321 71 5 110 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 321 71 5 110 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 25 0 10 0 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 25 0 10 0 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 file: /C: \WINDOWS \TEMP \u2k91.TMP 9/25/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 1 0 1 0 0 0 Configuration L R Delay, Queue Length, and Level of Service A pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT L R (vph) 5 25 10 C (m) (vph) 1178 549 693 /c 0.00 0.05 0.01 95% queue length 0.01 0.14 0.04 Control Delay 8. 11.9 10.3 LOS A B B A pproach Delay 11.4 pproach LOS B HCS2000 Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k91.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Route 66 Laurel St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period AM Build Project ID 3206 East/West Street: Route 66 Chapel Street North /South Street: Laurel Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 .2 3 4 5 6 L T R L T R olume 5 316 5 11 104 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1:0"0 Hourly Flow Rate, HFR 5 316 5 11 104 5.'. Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 5 13 7 0 46 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 5 13 7 0 46 5 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 file /C: \WINDOWS \TEMP \u2k6323 .TMP 9/21/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Delay, Queue Length, and Level of Service pproach EB WB No rthbound Southbound 10 11 12 Movement 1 4 7 8 9 Lane Configuration LTR LTR LTR LTR (vph) 5 11 25 51 C (m) (vph) 1494 1250 533 520 /c 0.00 0.01 0.05 0.10 95% queue length 0.01 0.03 0.15 0.33 Control Delay 7.4 7.9 12.1 12.7 LOS A A B B pproach Delay 12.1 12.7 pproach LOS B B HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 .file: /C: \WINDOWS \TEMP \u2k6323.TMP 9/21/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Burts Pit Rd Laurel St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period AM Build Project ID 3206 East/West Street: Burts Pit Road Prince Street North /South Street: Laurel Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 0 125 40 11 30 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1":00`" Hourly Flow Rate, HFR 0 125 40 11 30 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 20 0 3 0 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 20 0 3 0 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade (/o 0 0 file: /C: \WINDOWS \TEMP \u2k 1205.TMP 9/25/01 Flared Approac N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 11 23 C (m) (vph) 1426 804 lc 0.01 0.03 95% queue length 0.02 0.09 Control Delay 7.5 9.6 LOS A A pproach Delay 9.6 pproach LOS A HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k 1 205.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Site Drive Burt's Pit Rd Agency /Co. VAI Date Performed 9/6/01 Jurisdiction Analysis Year 2006 Analysis Time Period AM Build Project ID 3206 East/West Street: Burt's Pit Road North /South Street: Site Driveway Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 3 115 0 0 30 1.:, Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 3 115 0 0 30 1 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 2 0 11 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 2 0 11 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 Flared Approach N I N I file: /C: \WINDOWS \TEMP \u2k2320.TMP 9/25/01 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 3 13 C (m) (vph) 1595 1012 l c 0.00 0.01 95% queue length 0.01 0.04 Control Delay 7.3 8.6 LOS A A pproach Delay 8.6 pproach LOS A HCS2000 Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k2320.TMP 9/25/01 LI General Information Analyst Agency /Co. Date Performed Analysis Time Period SDH VAI 9/6/01 AM Build East/West Street: Prince Street North /South Street: Site Driveway Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Movement Volume Peak -Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type RT Channelized Lanes Configuration Upstream Signal Minor Street Movement Volume Peak -Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade Flared Approach TWO -WAY STOP CONTROL SUMMARY Eastbound 1 L 15 1.00 15 0 0 LT 7 L 0 1.00 0 2 T 112 1.00 112 1 0 Northbound T 0 1.00 0 0 Site Information Intersection Jurisdiction Analysis Year Project ID Site Drive Prince St 2006 3206 R 0 1.00 0 Undivided 0 0 9 R 0 1.00 0 0 0 N Westbound 4 L 0 1.00 0 0 0 10 L 5 1.00 5 0 5 T 26 1.00 26 1 0 11 T 0 1.00 0 0 R 1.00 0 0 TR Southbound 12 R 5 1.00 5 0 0 N I file: /C: \WINDOWS \TEMP \u2k3164.TMP 9/25/01 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue L ength, and Level of Service pproach EB WB Northbound Southbound 10 11 12 Movement 1 4 7 8 9 Lane Configuration LT LR (vph) 15 10 C (m) (vph) 1595 920 /c 0.01 0.01 95% queue length 0.03 0.03 Control Delay 7.3 9.0 LOS A A pproach Delay 9.0 pproach LOS A HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k3164.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Route 66 Prince St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period AM Build Project ID 3206 EastNVest Street: Route 66 Chapel Street North /South Street: Prince Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 T R L T R olume 0 323 0 0 115 31 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 323 0 0 115 31 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 112 0 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 112 0 5 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade /a) 0 0 file: /C: \WINDOWS \TEMP \u2k4083 .TMP 9/25/01 Dela Queue Len th and Level of Service =gyred Approach HCS2000TM Copyright 2000 University of Florida, All Rights Reserved file: /C: WINDOWS \TEMP \u2k4083.TMP Version 4.1 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Main Drive Route 66 Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period AM Build Project ID 3206 East/West Street: Route 66 (Chapel Street) North /South Street: Main Driveway Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 15 414 5 55 122 46 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 15 414 5 55 122 46' Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 1 0 10 42 0 17 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 1 0 10 42 0 17 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 file: /C: \WINDOWS \TEMP \u2kB3B 1.TMP 10/11/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LTR LTR LTR LTR (vph) 15 55 11 59 C (m) (vph) 1422 1151 590 404 /c 0.01 0.05 0.02 0.15 95% queue length 0.03 0.15 0.06 0.51 Control Delay 7.6 8.3 11.2 15.4 LOS A A 8 C pproach Delay 11.2 15.4 pproach LOS 8 C HCS2000 Copyright 0 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2kB3B 1.TMP 10/11/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection East Site Drive Prince St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period AM Build Project ID 3206 East/West Street: Route 66 (Prince Street) North /South Street: East Site Driveway Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R. olume 0 462 4 41 218 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1:00' Hourly Flow Rate, HFR 0 462 4 41 218 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 1 0 5 0 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00. Hourly Flow Rate, HFR 1 0 5 0 0 0 Percent Heavy ehicles 0 0 0 0 0 Percent Grade 0 0 file: /C: \WINDOWS \TEMP \u2k 1002.TMP 10/11/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, an d Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 41 6 C (m) (vph) 1106 542 /c 0.04 0.01 95% queue length 0.12 0.03 Control Delay 8.4 11.7 LOS A B pproach Delay 11.7 pproach LOS B HCS2000 Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k 1002.TMP 10/11/01 fl Li P P General Information olume Peak -Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type RT Channelized Lanes Configuration Upstream Signal Minor Street Movement Volume Peak -Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade TWO -WAY STOP CONTROL SUMMARY Analyst Agency /Co. Date Performed Analysis Time Period SDH VAI 9/6/01 AM Build East/West Street: Route 66 Chapel Street Intersection Orientation: East -West ehicle Volumes and Adjustments Major Street Movement Eastbound 1 L 0 1.00 0 0 0 7 L 66 1.00 66 0 2 T 439 1.00 439 0 Northbound 8 T 0 1.00 0 0 Site Information Intersection Jurisdiction Analysis Year Project ID Route 66 Earle St 2006 3206 North /South Street: Earle Street Study Period (hrs): 1.00 3 R 23 1.00 23 Undivided 0 0 TR 9 R 85 1.00 85 0 0 Westbound 4 L 40 1.00 40 0 0 LT 10 L 0 1.00 0 0 5 T 198 1.00 198 1 0 11 T 0 1.00 0 0 6 1 0 0 0 0 Southbound 12 R 0 1.00 0 0 0 file: /C: \WINDOWS \TEMP \u2k 12D0.TMP 10/11 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 1 0 1 0 0 0 Configuration L R Delay, Queue L ength, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT L P, (vph) 40 66 85 C (m) (vph) 1110 379 613 /c 0.04 0.17 0.14 95% queue length 0.11 0.63 0.48 Control Delay 8.4 16.5 11.8 LOS A C B pproach Delay 13.9 pproach LOS B HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k12D0.TMP 10/11/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Earle St Site Driveway Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period AM Build Project ID 3206 East/West Street: Site Driveway North /South Street: Earle Street Intersection Orientation: North- Study Period (hrs): 1.00 South ehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R olume 38 161 0 0 63 0. Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1 :00 Hourly Flow Rate, HFR 38 161 0 0 63 0' Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7' 8 9 10 11 12 L T R L T R olume 0 0 0 0 0 5 Peak -Hour Factor, PHF 1.00 1. .00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 0 0 5 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 r-- r J file //C \WINDOWS \TEMP \u2k2194. TMP 10/11/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 3 8 5 C (m) (vph) 1553 1007 c 0.02 0.00 95% queue length 0.08 0.01 Control Delay 7.4 8.6 LOS A A pproach Delay 8.6 pproach LOS A HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k2194.TMP 10/11/01 T WO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Earle St Route 10 Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period PM Build Project ID 3206 East/West Street: Earle Street North /South Street: Route 10 South Street Intersection Orientation: North- Study Period (hrs): 1.00 South ehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6. L T R L T R olume 59 495 0 0 715 157 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 59 495 0 0 715 15.7 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 139 0 149 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 139 0 149 Percent Heavy ehicles 0 0 0 0 0 0 file: /C: \WIN DOWS \TEMP \u2k8264.TMP 10 /11 /01 Percent Grade 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue L ength, and Level of Service pproach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 59 288 C (m) (vph) 782 213 /c 0.08 1.35 95% queue length 0.24 46.74 Control Delay 10.0- 715.0 LOS A F pproach Delay 715.0 pproach LOS F HCS2000 Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2k8264.TMP 10/11/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Earle St Grove St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period PM Build Project ID 3206 EastNVest Street: Grove Street North /South Street: Earle Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 7 92 0 0 146 79 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 7 92 0 0 146 79 Percent Heavy ehicles 0 0 Median Type Undivided 1 RT Channelized 0 0` Lanes 0 1 0 0 1- 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 186 3 12 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 186 0 12 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 Flared Approach I N I I N r-- file: /C: \WINDOWS \TEMP \u2k91 D 1.TMP 10/11/01 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 7 198 C (m) (vph) 1356 707 lc 0.01 0.28 95% queue length 0.02 1.16 Control Delay 7.7 12.1 LOS A B pproach Delay 12 pproach LOS B HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \Wf DOWS \TEMP \u2k91 D 1.TMP 10/11/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Earle St Texas Rd Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period PM Build Project ID 3206 East/West Street: Texas Road North /South Street: Earle Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 0 10 268 20 10 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 10 268 20 10 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 215 0 5 0 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 215 0 5 0 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 Flared Approach I N I I N I file: /C: \WINDOWS \TEMP \u2kA 195 .TMP 10/11/01 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 20 220 C (m) (vph) 1296 789 /c 0.02 0.28 95% queue length 0.05 1.16 Control Delay 7.8 11.3 LOS A B pproach Delay 11.3 pproach LOS B HCS2000 Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2kA 195.TMP 10/11/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Grove St Laurel St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period PM Build Project ID 3206 East/West Street: Grove Street North /South Street: Laurel Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 0 41 0 0 76 77' Peak -Hour Factor, PH F 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 41 0 0 76 777 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound 10 11 12 Movement 7 8 9 L T R L T R olume 0 0 0 52 0 0 Peak -Hour Factor, PH F 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 52 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 Flared Approach I N I 1 N n fl r file: /C: \WINDOWS \TEMP \u2kC390.TMP 9/25/01 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 0 52 C (m) (vph) 1440 841 /c 0.00 0.06 95% queue length 0.00 0.20 Control Delay 7.5 9.6 LOS A A pproach Delay 9.6 pproach LOS A HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2kC390.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Route 66 Grove St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period PM Build Project ID 3206 East/West Street: Route 66 Chapel Street North /South Street: Grove Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 0 120 31 10 231 0' Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 120 31 10 231 0 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 61 0 5 0 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 61 0 5 0 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 file: /C: \WINDOWS \TEMP \u2kF 122.TMP 9/25/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 1 0 1 0 0 0 Configuration L R Delay, Queue L ength, an d Level of Service pproach EB WB No rthbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT L (vph) 10 61 5 C (m) (vph) 1442 616 918 /c 0.01 0.10 0.01 95% queue length 0.02 0.33 0.02 Control Delay 7.5 11.5 8.9 LOS A B A pproach Delay 11.3 pproach LOS B HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2kF 122.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Route 66 Laurel St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period PM Build Project ID 3206 EastNVest Street: Route 66 Chapel Street North /South Street: Laurel Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 10 110 5 16 231 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 10 110 5 16 231 0 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 5 60 13 5 31 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 5 60 13 5 31 5 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 file: /C: \WINDOWS \TEMP \u2kC2C5.TMP 9/25/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Delay, Queue Length, an d Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LTR LTR LTR LTR (vph) 10 16 78 41 C (m) (vph) 1349 1487 575 547 c 0.01 0.01 0.14 0.07 95% queue length 0.02 0.03 0.47 0.24 Control Delay 7.7 7.4 12.2 12.1 LOS A A B B pproach Delay 12.2 12.1 pproach LOS B B HCS2000 Copyright CO 2000 University of Florida, All Rights Reserved Version 4.1 file://C: \WINDOWS \TEMP \u2kC2C5 .TMP 9/25/01 TWO -WAY STOP CO NTROL SUMMARY General Information Site Information Analyst SDH Intersection Burts Pit Rd Laurel St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period PM Build Project ID 3206 East/West Street: Burts Pit Road Prince Street North /South Street: Laurel Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 0 75 35 6 95 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.06 Hourly Flow Rate, HFR 0 75 35 6 95 0 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 60 0 10 0 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 60 0 10 0 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 file: /C: \WINDOWS \TEMP \u2kF200.TMP 9/25/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 6 70 C (m) (vph) 1493 813 /c 0.00 0.09 95% queue length 0.01 0.28 Control Delay 7.4 9.8 LOS A A pproach Delay 9.8 pproach LOS A HCS2000 Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2kF200.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Site Drive Burt's Pit Rd Agency /Co. VAI Date Performed 9/6/01 Jurisdiction Analysis Time Period PM Build Analysis Year 2006 Project ID 3206 East/West Street: Burt's Pit Road North /South Street: Site Driveway Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 10 75 0 0 95 2. Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 10 75 0 0 95 2 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 1 0 6 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 1 0 6 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 Flared Approach I N 1 I N I file: /C: \WINDOWS \TEMP \u2kF273 .TMP 9/25/01 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, an d Level of Service pproach EB WB No rthbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 10 7 C (m) (vph) 1509 938 /c 0.01 0.01 95% queue length 0.02 0.02 Control Delay 7.4 8.9 LOS A A pproach Delay 8.9 pproach LOS A HCS2000 Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2kF273.TMP 9/25/01 T WO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Site Drive Prince St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period PM Build Project ID 3206 East/West Street: Prince Street North /South Street: Site Driveway Intersection Orientation: East -West Study. Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T' R olume 5 71 0 0 82 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 5 71 0 0 82 5 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 10 0 15 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 10 0 15 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 Flared'Approach I N I I N file: /C: \WINDOWS \TEMP \u2kF3 83 .TMP 9/25/01 Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 5 25 C (m) (vph) 1522 913 lc 0.00 0.03 95% queue length 0.01 0.08 Control Delay 7.4 9.1 LOS A A pproach Delay 9.1 pproach LOS A HCS2000T M Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2kF3 83.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Route 66 Prince St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period PM Build Project ID 3206 East/West Street: Route 66 Chapel Street North /South Street: Prince Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R' olume 0 128 0 0 243 117 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 128 0 0 243 117 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 81 0 5 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 81 0 5 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 file: /C: \WINDOWS \TEMP \u2kE062.TMP 9/25/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 1 0 1 Configuration L R Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT L R (vph) 0 81 5 C (m) (vph) 1210 586 742 /c 0.00 0.14 0.01 95% queue length 0.00 0.48 0.02 Control Delay 8.0 12.1 9.9 LOS A B A pproach Delay 12.0 pproach LOS B HCS2000 Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2kE062.TMP 9/25/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Main Drive Route 66 Agency /Co. VAI Jurisdiction Date. Performed 9/6/01 Analysis Year 2006 Analysis Time Period PM Build Project I D 3206 East/West Street: Route 66 (Chapel Street) North /South Street: Main Driveway Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 20 189 1 21 298 47 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1:00 Hourly Flow Rate, HFR 20 189 1 21 298 47 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 7 0 58 61 0 20 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 7 0 58 61 0 20 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 file: /C: \WINDOWS \TEMP \u2kC001:TMP 10/1 1/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LTR LTR Delay, Queue Length, and Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LTR LTR LTR LTR (vph) 20 21 65 81 C (m) (vph) 1225 1396 759 415 lc 0.02 0.02 0.09 0.20 95% queue length 0.05 0.05 0.28 0.72 Control Delay 8.0 7.6 10.2 15.8 LOS A A B C pproach Delay 10.2 15.8 pproach LOS B C HCS2000 Copyright CO 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2kC001.TMP 10/11/01 T WO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection East Site Drive Prince St Agency /Co. VAl Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period PM Build Project ID 3206 East/West Street: Route 66 (Prince Street) North /South Street: East Site Driveway Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 0 301 1 7 368 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 301 1 7 368 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 3 0 38 0 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 3 0 38 0 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 file: /C: \WINDOWS \TEMP \u2kC362.TMP 10/11/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, an d Level of Service pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 7 41 C (m) (vph) 1270 702 /c 0.01 0.06 95% queue length 0.02 0.19 Control Delay 7.9 10.4 LOS A B pproach Delay 10.4 pproach LOS B HCS2000 Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: WINDOWS \TEMP \u2kC362.TMP 10/11/01 TWO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Route 66 Earle St Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period PM Build Project ID 3206 EastNVest Street: Route 66/ Chapel Street North /South Street: Earle Street Intersection Orientation: East -West Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume 0 268 66 75 335 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 268 66 75 335 0, Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0. 1 0 0 1 0 Configuration TR LT Upstream Signal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume 40 0 35 0 0 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 40 0 35 0 0 0 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 file: /C: \WINDOWS \TEMP \u2kD220.TMP 1 0/1 1/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 1 0 1 0 0 0 Configuration L R Delay, Queue L ength, and Level of Service pproach EB WB No rthbound Southbound 10 11 12 Movement 1 4 7 8 9 Lane Configuration LT L R (vph) 75 40 35 C (m) (vph) 1237 342 743 lc 0.06 0.12 0.05 95% queue length 0.19 0.40 0.15 Control Delay 8.1 16.9 10.1 LOS A C B pproach Delay 13.7 pproach LOS B HCS2000 Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2kD220.TMP 10/11/01 T WO -WAY STOP CONTROL SUMMARY General Information Site Information Analyst SDH Intersection Earle St Site Driveway Agency /Co. VAI Jurisdiction Date Performed 9/6/01 Analysis Year 2006 Analysis Time Period PM Build Project ID 3206 East/West Street: Site Driveway North /South Street: Earle Street Intersection Orientation: North- South Study Period (hrs): 1.00 ehicle Volumes and Adjustments Major Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R olume 6 75 0 0 141 0 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 6 75 0 0 141 0 Percent Heavy ehicles 0 0 Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 Configuration LT TR Upstream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 0 0 41 Peak -Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Hourly Flow Rate, HFR 0 0 0 0 0 41 Percent Heavy ehicles 0 0 0 0 0 0 Percent Grade 0 0 file /C: \WINDOWS \TEMP \u2kE 1 02.TMP 10/11/01 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 Configuration LR Delay, Queue Length, an d Level of Service pproach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 6 41 C (m) (vph) 1455 912 /c 0.00 0.04 95% queue length 0.01 0.14 Control Delay 7.5 9.1 LOS A A pproach Delay 9 1 pproach LOS A HCS2000TM Copyright 2000 University of Florida, All Rights Reserved Version 4.1 file: /C: \WINDOWS \TEMP \u2kE 102.TMP 10/11/01 SIGNAL WARRANT ANALYSIS MIN. REQUIREMENT DISTANCE TO NEAREST ESTABLISHED CRWLK FULFILLED 150 Feet WE ft S/W ft Yes No 17 I n T u T l-- l.� L �l L Traffic Manual TRAFFIC SIGNALS AND LIGHTING WARRANT 1 Minimum Vehicular Volume Figure 9•1A TRAFFIC SIGNAL WARRANTS CALC SP K DATE 91Z1101 CHK K DATE 9121101 DIST CO RTE PM Major St: Soo S TELL -E1 (itour 10) Critical Approach Speed ya mph Minor St: EA',.1, 51 REET Critical Approach Speed ZS mph Critical speed of major street traffic>40 mph RURAL (R) In built up area of isolated community of 10,000 pop. URBAN (U) 100% SATISFIED YES N0 80% SATISFIED YES NO APPROACH LANES Both Apprche. Major Street Highest Apprch, Minor Street* MINIMUM REQUIREMENTS te0% SHOWN IN BRACKETS) U 600 (400) 150 (120) R 350• (280) 105 (6 U 2ormore �.Qpµ AiA)11 -1041- 404) /IZar+ZIjt Z Pt/ -S pet 600 (480) 200 (160) R 420 (338) 140 (112) q i-6 1 Mi I 112 `16� foci gg� 121 X60 IZZ IZ3 1 133 APPROACH LANES Both Apprcha. Major Street Highest Apprch Minor Street' MINIMUM REQUIREMENTS (eo% SHOWN IN BRACKETS) U I R 750 (600) 76 (60) "625 (420) 53 (42) U I 2 or more 900 (720) 100 (60► 630 TO (58) 1- TkiA -'.15- jo t I rh/ LPr"� -3 P1 T31 11� 916 1z6 '191 112 (01 Z3 0 1 Z Sko 9* 12.3 133 Hour NOTE: Heavier left turn movement from Major Street Included when LT-phasing Is proposed WARRANT 2 Interruption of Continuous Traffic 100% SATISFIED YES NO 80% SATISFIED YES NO Hour *NOTE: Heavier left turn movement from Major Street Included when LT- phasing 1s proposed WARRANT 3 Minimum Pedestrian Volume 100% SATISFIED YES NO 80% SATISFIED YES NO MINIMUM REQUIREMENTS (e0% SHOWN IN BRACKETS) No Median Both Major Street Volume Raised 4' Median Pods On Highest Volume X -Walk Xing Major Street U 1000 (600) 150 (120) R 420 (338) 700 (580) 106 (84) N/A IF MIDBLOCK SIGNAL PROPOSED 0 Hour The satisfaction of a warrant la not necessarily Justification for a signal. Delay, congestion, confusion or other evidence of the need for right of way assignment must be shown. Figure 2 -9 Sample warrant analysis form. (Source: State of California, Traffic Manual) 17 8-6 TRAFFIC SIGNALS AND LIGHTING Traffic Manual 12 -1t1E WARRANT 4 School Crossings WARRANT 5 Progressive Movement MINIMUM REQUIREMENTS 1000 h N S ON ONE WAY ISOLATED ST. OR ST. WITH ONE WAY TRAFFIC SIGNIFICANCE AND ADJACENT SIGNALS ARE SO FAR APART THAT NECESSARY PLATOONING SPEED CONTROL WOULD BE LOST ON 2 -WAY ST. WHERE ADJACENT SIGNALS DO NOT PROVIDE NECESSARY PLATOONING SPEED CONTROL PROPOSED SIGNALS COULD CONSTITUTE A PROGRESSIVE SIGNAL SYSTEM SATISFIED YES NO'X WARRANT 8 Accident Experience REQUIREMENT ONE WARRANT SATISFIED BO% WARRANT 7 Systems Warrant MREQUIREMENT E 600 VEH /HR Figure 9-1B TRAFFIC SIGNAL WARRANTS Not Applicable WARRANT WARRANT 1 MINIMUM VEHICULAR VOLUME See School Crossings Warrant Sheet SATISFIED YES NO. DISTANCE TO NEAREST SIGNAL ft,E k,W OR WARRANT 2 INTERRUPTION OF CONTINUOUS TRAFFIC WARRANT 3 MINIMUM PEDESTRIAN VOLUME SIGNAL WILL NOT SERIOUSLY DISRUPT PROGRESSIVE TRAFFIC FLOW ADEQUATE TRIAL OF LESS RESTRICTIVE REMEDIES HAS FAILED TO REDUCE ACC. FRED. ACC WITHIN A 12 MON. PERIOD SUSCEPTIBLE OF CORR INVOLVING INJURY OR 800 DAMAGE N MINIMUM REQUIREMENT UMBER OF ACCIDENTS 6 OR MORE' NOTE: Lett turn accidents can be Included when LT- phasing is proposed SATISFIED YES NO ENTERING VOLUMES- ALL APPROACHES DURING TYPICAL WEEKDAY PEAK HOUR R DURING EACH OF ANY 6 HRS OF A SATURDAY AND /OR SUNDAY CHARACTERISTICS OF MAJOR ROUTES HWY SYSTEM SERVING AS PRINCIPLE NETWORK FOR THROUGH TRAFFIC CONNECTS AREAS OF PRINCIPLE TRAFFIC GENERATION RURA L OR SUBURBAN HWY OUTSIDE OF, ENTERING, OR TRAVERSING A CITY HAS SURFACE STREET FWY OR EXPWAY RAMP TERMINALS MINOR ST vI'A FULFILLED YES NO FULFILLED FULFILLED YES NO MAJOR ST APPEARS AS MAJOR ROUTE ON AN OFFICIAL PLAN El ANY MAJOR ROUTE CHARACTERISTICS MET, BOTH STS. The satisfaction of a warrant Is not necessarily Justification for a signal. Delay, congestion, confusion or other evidence of the need for right of way assignment must be shown. Figure 2 -9 (Cont.) 18 REQUIREMENT WARRANT FULFILLED TWO WARRANTS SATISFIED SO% 1 MINIMUM VEHICULAR VOLUME YES gl NO 2 INTERRUPTION OF CONTINUOUS TRAFFIC q_3 3 u_r 3- MINIMUM PEDESTRIAN VOLUME Both Approaches Major Street 9413 1D 1152- I(7- HWhest Approichee Mbar Street 133 pit 1 •u q_3 3 u_r f 6 k --L r J I L 7 LJ L_ LJ r� L r Traffic Manual TRAFFIC SIGNALS AND LIGHTING 9-7 WARRANT 8 Combination of Warrants WARRANT 9 Four Hour Volume WARRANT 10- Peak Hour Delay Figura 9-1C TRAFFIC SIGNAL WARRANTS SATISFIED YES tl NO roach Lanes 2 or One more *Refer to Fig. 9- 2A.(URBAN AREAS) or Figure 9 -2B (RURAL AREAS) to determine if this warrant is satisfied. SATISFIED YES NO )g( 1. The total delay experienced for traffic on one minor street approach controlled by a STOP sign equals or exceeds four vehicle -hours for a one -lane approach and five vehicle -hours for a two-lane approach; and 35.6 sec/ue(^ 4 165 vtl,1l,r 581 -L1 1,1,3 <`I 2. The volume on the same minor street approach equals or exceeds 100 vph for one moving lane of traffic or 150 vph for two moving lanes; and SATISFIED' YES NO Hour 12 -1986 YES NO )81;. YES NO 3. The total entering volume serviced during the hour equals or exceeds 800 vph for Intersections with four or more approaches or 650 vph for Intersections with three approaches. YES NO WARRANT 11 -Peak Hour Volume Approach Lanes 2 or One more Both Approaphea Mafor Street Hlpheat Approachea Minor Street II '4 169 SATISFIED* YES gl NO Hour 5. 0 0 ;01Po" *Refer to Fig. 9-2C (URBAN AREAS) or Figure 9 -2D (RURAL AREAS) to determine If this warrant Is satisfied The satisfaction of a warrant Is not necessarily justification for a signal. Delay, congestion, confusion or other evidence of the need for right of way assignment must be shown. Figure 2 -9 (Cont.) 19 z 0 cp m rr r C r C rr T 71 c 31 68IE 'Aeld MINOR STREET HIGH VOLUME APPROACH VPH O O O. O O O O O 9'7 G, 00 0 c C 0 C Z •2 OR M 11, 1 NESfr1 L MORE LAI I 5-4 H-5 P N�- EEt1 LAN Z-'3 P,t z 0 cp m rr r C r C rr T 71 c 31 68IE 'Aeld MINOR STREET HIGH VOLUME APPROACH VPH O O O. O O O O O 9'7 G, 00 0 c C 0 C Z LILJ CC CC Cr CC ig CC CC F CC I 0 o a CC C z .Y .a 0 o O O CIS z 1LU CC h— cI) CD W Rev. 3/89 4C -10 2 0 0 0 0 d' M N HdA HO` OUddV minion HDIH 1331:I1S bJONIW 0 o co I I— ac 0 w 5Z w N P'0< I cn ww 0 W Z cc O 2 ab <2 0 0 cc =,0 o 0 1I cc Q1 0 `t X 0 o 0) L >�a_ p 0 Q 00 m ozw 0o V- I 0 wwI- J CCZ(n 0 I__ I-- -I 0 0 CC w z H Lj o 0 02< I J I-- =000 W H O LU 0 0 CC j cn wI_ O o °C 0 `Zr Q <00 0 >cc CY' 0a1 H 0 z <b9 `ou` 3 N`d1 11 NES 8 E LANE 1 FM FP' i 1 pan LILJ CC CC Cr CC ig CC CC F CC I 0 o a CC C z .Y .a 0 o O O CIS z 1LU CC h— cI) CD W Rev. 3/89 4C -10 2 0 0 0 0 d' M N HdA HO` OUddV minion HDIH 1331:I1S bJONIW 0 o co I I— ac 0 w 5Z w N P'0< I cn ww 0 W Z cc O 2 ab <2 0 0 cc =,0 o 0 1I cc Q1 0 `t X 0 o 0) L >�a_ p 0 Q 00 m ozw 0o V- I 0 wwI- J CCZ(n 0 I__ I-- -I 0 0 CC w z H Lj o 0 02< I J I-- =000 W H O LU 0 0 CC j cn wI_ O o °C 0 `Zr Q <00 0 >cc CY' 0a1 H 0 z L I L P b MITIGATION ANALYSIS Mitigated Intersection 3: Route 10 (South Street) Earle Street Lane Configurations Ideal Flow (vphpl)`: Total Lost time (s) Lane Factor Frt Flt _Protecte_d. Satd. Flow (prot) Flt Permitted.: Satd. Flow (perm) Volume (Vph) Peak -hour factor, PHF Ad) Flow (vph) Lane Group Flow (vph) Protected Phases Pet ittpd Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio C,leararf_ce Time (s) Vehicle Extension (s) v/s Ratio Prot v/c Ratio Uhiferrn Delay_ Progression Factor r rxienta1Dela Delay (s) Level of Service Approach Delay (s) App 1900 1:12 0.90 0 Reriii t3 0:, OM DOM HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization c Critical Lane Group 4 1900 4.0 1.00 1.00 :0.99 1849 .0:86 1603 625 0.90 694 818 4 30.2 30.2 312 31.2 0.60 0.60 -.50 50. 3.0 3.0 0.85 0.46 S: \Jobs \3206 \Earle Rt10 AM MIT.sy6 SDH vanassando -ff51 1900 4.0 1.00 0.96 1.00 1788 1.00 1788 31.5: 0.90 350. 499 0.28 0.76 93.9% 1900 1900 1900 4.0 1`.00 0.96 .-.0:97 1724 097 1724 0.90 149 0 1 0.90 154 226 11.7 0.24 50 3.0 c0.13 0.54 1.00 13 18.3 B 18.3 0.90 0 Sum of lost -time (s) ICU Level of Service 2006 Weekday AM Build 10/11/2001 80 E Synchro 5 Report Page 1 Mitigated Intersection 3: Route 10 (South Street) Earle Street Lane Configurations Volume (vph) 112 Lane Group Flow (vph) 0 Turn Type Perm 4 I 625 315 818 499 139 226 Protected Phases 4 8 6 Permitted Phases 4 Detector Phases 4 4 8 6 Minimum Initial 4:0 4.0 4.0 4:0 Minimum Split (s) 30.0 30.0 30.0 20.0 Total Split (s) 44-:0 44:0 44 0 21 0 Total Split 68% 68% 6 8% 32% YeItow Time 3.0 30 3:0 30 All -Red Time (s) 2.0 2.0 2.0 2.0 Lead /Lag Lead -Lag Optimize? Regal(' Mode None None None Min Queue Length 50th (ft) 185 76 71 Queue Length 95th (ft) #477 150 13 Internal Link Dist (ft) 940 932 439 50111 "Up Block Time;( 95th Up Block Time Turn Bay Length (ft) 50th Bay Block Time Oft Queuing Penalty (veh) 06 21 s S: \Jobs \3206 \Earle Rt10 AM MIT.sy6 SDH vanassando -ff51 2006 Weekday AM Build 10/11/2001 Cycle Length: 65 Actuated C ycle Lengtr 52.8 Natural Cycle: 60 Control Type:Actuated U ncoordinated 95th percentile volume exceeds capacity, queue may longer. Queue stsown is maximum after two vole Splits and Phases: 3: Route 10 (South Street) Earle Street 04 44 s 1-- I 44 s 08 Synchro 5 Report Page 1 _J L L Mitigated Intersection 3: Route 10 (South Street) Earle Street Lane Configurations Ideal Flow.(vphpl) Total Lost time (s) L a ne. Util F act or. Frt FitProtected Satd. Flow (prot) FIt Permitted: Satd. Flow (perm) 41.01 Peak -hour factor, PHF l Flow::(vph) Lane Group Flow (vph) Protected Phases ed. hase: Actuated Green, G (s) ective Green, s Actuated g/C Ratio clearance Time (s) Vehicle Extension (s) v/s Ratio Prot v/c Ratio upi�) a C HUM Volume to Capacity ratio lctuated Cycle Lengt Intersection Capacity Utilization c Cr Lane Group 4 1900 190 4.0 1.00 1.00 0.99 1853 _0.58 1087 S: \Jobs \3206 \Earle Rt10 PM MIT.sy6 SDH vanassando -ff51 4 1900 1900 1900: 1900 4.0 4.0 1.00 1:00 0.98 0.93 100 1818 1692 :1.00 0 98 1818 1692 1e9 0.90 0.90 0.90 0.90 0.90 ,154.; 0 616 968 0 320 'erm 4; 3.0 8 36.5 36.5 37:5 37:5 0.62 0.62 3.0 0.53 0.92 0.86 Progression Factor iltacreme -M-0 Delay (s) ve f of Service Approach Delay (s) 27.5 16.5 27.5 16.5 14.2 152. 0.25 3.0 60.19 0.75 28.5 28.5 2006 Weekday PM Build 10/11/2001 0 t of lost time (s); ICU Level of Service Synchro 5 Report Page 1 Mitigated Intersection 3: Route 10 (South Street) Earle Street Lane Configurations Valume (vpl Lane Group Flow (vph) Turn Type Protected Phases P-ertn"itted Phases Detector Phases Minimum Initial (s) Minimum Split (s) •TTtal plat s) Total Split Y�II OWTime (s.) All -Red Time (s) Want' g Lead -Lag Optimize? ea lI Mode Queue Length 50th (ft) Queue.Length 95tf (ft) Internal Link Dist (ft) 5Ot1490B1ock Time(°70) 95th Up Block Time ir L 7L.en h= 50th Bay Block Time 95th TiriMk,'Time Queuing Penalty (veh) 21 s Splits and Phases: 59 495 715 139 0 616 968 320 Perm 4 8 6 4 4 4 8 6 4.0 40 4.0 40 25.0 25.0 25.0 15.0 4? 0 440 4:4.0 21.0 68% 68% 68% 32% 3:0 3 .0 3:0 10 2.0 2.0 2.0 2.0 None None None Min 197 274 115 #428 #555 #224 940 932 439 S: \Jobs \3206 \Earle Rt10 PM MIT.sy6 SDH vanassando -ff51 2006 Weekday PM Build 10/11/2001 Cycle Length: 65 wale Natural Cycle: 65 Con.:61 pe ctuatetl Uncoordinated. 95th percen volume exceeds capacity, queue may be longer ue tae sh tile maximum after tinr� cycles: 3: Route 10 (South Street) Earle Street O" 0 44 s 1 44 s 08 Synchro 5 Report Page 1 Mitigated Intersection 3: Grove Street Earle Street Lane Configurations Sign :Control= Volume (veh /h) Peak-Hour Factor Hourly flow rate (veh /h) i 44-- 12 0.92 13 Volume Total (vph) V olume Lofl (vph) Volume Right (vph) Departure Headway (s) egree Utilization= Capacity (veh /h) Approach Delay (s) 155 22 262 13 1'1 137 5.,.. 798 8�1 8.1 .2 4.7 003 549 A 7.8 S: \Jobs \3206 \Texas Grove AM BU.sy6 SDH vanassando -ff51 stop. 5 126 0:92 0 :92 5 137 4.4 789 9.5 10 5 0 0. 11 5 74 4.6 749 s 0 k 4 Stop 5 49 182 0:92 0:92 0 :92 5 53 198 2006 Weekday AM Build 1o/11/2001 •t/ 10 0:92 11 5 0.92 5 4 Stop 57 0.92 62 6 0.92 7 Synchro 5 Report Page 1 Mitigated Intersection 3: Grove Street Earle Street Lane Configurations Sign Control Stop Volume (veh /h) 7 5 Peak Hour Factor 0.92 0.92 Hourly flow rate (veh /h) 8 5 Volume Total (vph) Volume Left (vph). Volume Right (vph) =rad {s) Departure Headway (s) degree Utilization, x Capacity (veh /h) Control Delay,(s) Approach Delay (s) Apprgh LOS= Delay'': HCM Level of Service Intersection Capacity: f ili�aton S: \Jobs \3206 \Texas Grove PM BU.sy6 SDH vanassando -ff51 87 0:92 95 108 33 239 215 8 22. :153 5- 5 5 13 4 0.1 0.0 4.5 4.7 4.6 4.5 013 0:04 0.31 0.27 738 552 757 773 8'1 7.9 8.1 7.9 9.6 9.1 A_'. Stop 20 5 5 092 092 0:92 22 5 5 141 0.92 153 ev_eI of Service Stop 74 0.92 80 2006 Weekday PM Build 10/11/2001 5 0.92 5 5 0.92 5 Stop 181 0.92 197 12 0 :92 13 Synchro 5 Report Page 1