2015.10.08 Staff Report To: Conservation Commission From: Sarah LaValley RE: Staff Report, October 8 Commission Meeting Date: October 7, 2015 5:30 PM – Continuation: Notice of Intent for installation of a stormwater outfall related to the Hinckley St reconstruction project within riverfront (Mill River), and buffer zone. Northampton Dept of Public Works, 122 Federal St, Map ID 30B-85 The applicant has requested a continuation, with no discussion to be held at this meeting, until October 22, 2015, at 5:30 PM Recommendation: Continue the hearing to allow the applicant to continue alternatives analysis. MassDEP has suggested that when the hearing resumes, the NOI presentation be started from the beginning. This will allow new Commissioners to participate. 5:30 PM – Request for Determination of Applicability to determine if soil removal related to an oil release is subject to the Wetlands Protection Act or Northampton Wetlands Ordinance. Applicant Szawloski Potato Farms, DCR Norwottuck Rail Trail Property off Damon Road, Map ID 25A-176 Application Overview: The application proposes to remove soil contaminated by an oil spill in an outflow to the Connecticut River. Soil will be excavated as needed to achieve acceptable limits, and stone and sand placed in the excavated area. An absorbent boom will be used to prevent any oil from entering the River, and the water in the swale will be diverted around the work area. The applicant has indicated that recent testing has indicated that contamination is still readily apparent in the sediment and that removal is necessary. A vactor truck will be parked next to the bike path and suction hose will be extended down the slope to the excavation area. Contractors will excavate by hand into buckets then suctioned into the vactor truck Consistency with the Wetlands Protection Act and Northampton Wetlands Ordinance The work as proposed should not constitute an alteration to the riverfront, and the measures taken during construction will prevent any contamination from migrating. Staff Recommendations: Staff’s primary concerns were whether removal of the soil were necessary given the time elapsed since the spill, and access to the area, due to the steep slopes. The work area has already been disturbed in prior stabilization efforts. The Commission should discuss whether stone is necessary given the small amount of soil to be removed. Issue a negative determination by checking box 2, to indicate that the work is within an area subject to protection (riverfront) but will not constitute an alteration. Include the following conditions: NHESP signoff must be received prior to work on the project All heavy equipment shall remain at the top of the slope. The Commission shall be notified 48 hours prior to work occurring, and again when work is complete. Conservation Commission Staff Report 1 October 8, 2015