CPA Beaver Brook Bridge closeout 11.25.2015    Beaver Brook Bridge Rehabilitation (54)  Planning and Sustainability (Account #3100932-593218-12) Northampton Community Preservation Act  Closeout Report (November, 2015)    We are pleased to close out the CPA grant for the rehabilitation of the historic railroad arch Beaver  Brook Bridge in Leeds.    The work consisted of several phases (see expenditures below for fiscal details):  1. Structural Study (Whetstone Engineering):  We commissioned a structural study of the bridge to  identify what work needed to be done to add a century of life to the deteriorating bridge.  2. Design, bidding, and construction oversight (ProTerra Design):  We commissioned construction  drawings and specifications, bid documents, and then construction oversight.  This charges  represent the bridge portion of a larger project.  3. State Matching Grant (Registry of Deeds): We received grant funds that supported this project.  The  only charge for this grant is recording the required project agreement.  4. Construction (Gagliarducci): We removed all vegetation from the bridge and immediate buffer,  including roots that went deep into the bridge, that came from 60 years of absolutely no  maintenance between when the railroad was discontinued until the city purchase the bridge.  We  then reset a few small rocks and one very large capstone rock that had been moved by root action  and frost/thaw cycles.  We placed concrete blankets and riprock on the sides of the bridge. We  installed a concrete cap to the bridge, to both carry trail traffic but more importantly to prevent  water from going through the bridge, and the mandated safety railings.  The final part of the work  was seeding and mulching to stabilize any exposed soil.    Thank you for making the preservation and reuse of one of the oldest and most important bridges in  Northampton possible.    Date Description Balance   Initial Balance $104,000.00  9/12/13 Whetstone Engineering, Structural Study $925.00  9/19/14 ProTerra Design (bridge portion of larger project) $1,700.00  12/30/14 Registry of Deeds ‐ LWCF Grant Agreement $75.00  5/29/15 ProTerra Design (#3392) bridge portion of larger project $4,300.00  6/30/15 ProTerra Design ‐ bid documents $373.16  10/19/15 ProTerra Design ‐ Item 2, Phase 1, task F ‐ 1/3 billing $1,006.67  9/30/15 Gagliarducci $71,534.24  11/6/15 Gagliarducci  $20,000.00  11/20/15 Project closed out. Returned to CPA Budgeted Reserve $4,085.93  Balance $0.00