Loading...
10B-057 38 Mulberry St PlanningPlacement and Construction of a Straw Bale Barrier straw bale trencn 1. Excavate a trench stance 2. Place and stake 4" deep and the straw bales, binding 1� i'(' two stakes per width of a Straw wire or - width of ba a bale. twine •' �,,, bale. -. T '� :rv. - ^.� -� i . Vii" i` ,. . packed _.. straw 3. Wed loose straw plan ,. D between vales to Create a continuous barrier. t tro % �p �� \� s� SEWER BENCHMARK= NORTHEA T ` �F LINE CORNER OF FLAG POLE BASE. ELEV. = 359.01'- \ � W � / \ + 100' BUFFER ZONE RIGHT OF WAY IN FAVOR OF - THE CITY OF NORTHAMPTON - I WATERSHED PROTECTION= DISTRICT BOUNDARY (A I 1 \ j 3 O ' 0 i �G •, 11 C WATER LINc F EXIT ONLY compacted backfill 4. Backfill and compact the excavated soil as shown on the ia�'►,�, uphill side of the barrier to prevent piping. �Z b•.Mr - j am .' .� t.T ! � +. b Y• � ,. ''[ ' `r ;.:.� Placement and Construction of a Synthetic Filter Barrier i{ 1. Set posts and 2. Staple the Posts excavate a 6 "x6" Fire wire mesh i' trench, set post fencing '�.• fencing to Angle 10 downslope. end post. upslope for �• ' stability and , self cleaning. t ,1. ' i00° =lit �►;i - >rt_' � _>>� = 1 � I � �,'11 ='1� ,' _ Mi = to 12" min. - i��rt� • =��;a depth =- tllpl Filter V 3. Attach filter fabric 1 '' 4, Backfill the Fabric ►� to the wire fencing + trench and and extend it to compact the the trench. excavated soil. �I Com acted .,• ,i ' Bac�fill a i . _=1:r_c, 1,J�1•• 1V =1! + += t�i�Jil:th '.11' l� ="= I 111Z SEEDING SPECIFICATIONS i i i li ` � — ` j V � Nk�. .359 018181111 imia 'Iwo /104 1� � � } (D C.B. � „ RIM 356.3 — INV. 354.0 , �� - LEACHING CHAMBERS . — — — — — — _ — — — — — — — _ _ SEDIMENT ��• � \ FILTtR ��P� (SEE -•) 1NV 352.9 INV. 353.4 12 PVC SDR 35 ' � —�' 000 SLOPE = 0.05 � TOP 0 F APPROX. DEFINED BANK/ _ , \ wom 11 domonew '— APPROX. I NG VEGETATED WETLAND •_ — I / ROBERTS 00k • \ 1 ` Catc' was.', To :,;•.th Gra.1-ng l' 8" 2' jl ---- 56 11211 3 2 12 .1 C 1 �11 1211 PLAN VIEW SPEC,: 1c.� :0 N5 1 . Corc -e .e - 4000 PS1 23 Days 2. Rei_-_'orciag as ; er AS:M " -ec. ^• A- 15 -5, vG ++ +' -�j Ao 1 jl.V l:G.. G.. Dp _. Cove: ;. Sectic:a May Be A�dec - .c - :crease %.ne Cap acity Rec• _fed. LEACHING CHAMBER DETAIL GIN NOT TO SCALE �� . — � t ► 16.1 11 1 /2 11 t 8 11 ' Frame & Grate .. j Cross Section for 6 Bituratnous Curb 1,76C lb��. Av. Wz. TYPICAL CATCH BASIN NOT TO SCALE NOTE CATCH BASIN MUST HAVE MINIMUM 3' SUMP ENVIRONMENTAL COMPLIANCE SERVICES INC. 588 SILVER STREET AG AWAM , MA. 01001 NOTES Site Pion prepared from a plan titled Is TOPOGRAPHIC PLAN OF LAND IN NORTHAMPTON Prepared for MARL( BRADFORD. Doted Feb. 1991, Scale :l' =20' by HAROLD L. EATON 8 ASSOC. INC. Locations of all utilities shown are approx only The contractor shal I contact DIG - .SAFE (1 prior to performing any excavation work relating to this site plan. Seeding Mixture by Weight Red Fescue 70% Kentucky Bluegrass 20% Perennial ryegrass 10% 1000 Sq.Ft. Seeding pates 2 lbs. April 1 -June 15 or Aug. 14- Oct.15. Road cuts b fills Kentucky Tall Fescue 80% 1h lbs. April 1 -June 15 or Aug. 14 -Sept. 30 Diversion ditches Annual Ryegrass 20% Ili lbs. April 1 -June 15 or Aug. 14 -Sept. 30 Very sheep slopes Crownvetch 60% ;j lb. April 1 -June 15 or Aug. 14 -Sept. 30 No maintenance areas Perennial ryegrass 40% ;1 lb. April 1 -June 15 or Aug. 14 -Sept. 30 If trees are to be retained, the seed mix should be adapted for shady conditions. 7. Temporary seeding: to protect the soil over the winter. Seeding Mixture Rate /1000 Sq.Ft. Seeding Dates Annual Ryegrass or Perennial RMrass 14 lbs. Mar. 15 to June 15 - Aug. 15 to Oct. 15. Sudan Grass or Millet 1 lb. Aug. 15 to Oct. 15. Winter Rye or Gates 3 lbs. A". Ira- to Oct. 15. Y 41 14 11 Establishing Vegetative Cover on Disturbed Areas 1. Scarify surface of all areas to be topsoiled and place a miniwum of 4" topsoil an all areas to be seeded. 2. Apply lime at a rate of two tons of ground limestone per acre. (100 lbs /1000 Sq.Ft.) 3. Fertilize A. For spring seeding, apply 10 -10 -10 fertilizer at a rate of 300 lbs. per acre (7 lbs /1+0000 Sq. Ft.) and Wort Into soil. Six to eight weeks later, apply an additional 300 lbs per acre on the surface. B. For fail seeding, apply 10 -10 -10 fertilizer at a rate of 600 lbs. per acre (14 lbs /1000 Sq.Ft.) and work into soil. 4. Smooth and fire seedbed, apply seeds uniformly at the rate specified for the seed type and cover seed With not wore than k" of soil . 5. Mulch immediately with hay free from weed seeds, at a rate of 3 bales per 1000 Sq.Ft. 6. Permanent seedings, where an area will be exposed for more than one year, or when final grading is complete: Area Where Seed Mix Applies All lawn areas Digitized f;har: M