Loading...
West St_Smith Athletic_Amendment 1City of Northampton Department of Public Works STORMWATER MANAGEMENT PERMIT Amendment to Permit Project I Site Name: Smith College Athletic Field Improvements Project Street or Location I Assessor ID: West Street. Northampton I Map 31 C, Parcel 15 Applicant Name: The Berkshire Desigq Group, Inc Applicant Address/Phone: 4 Allen Place, Northampton, MA 01060 I 413 582-7000 Owner Name I Address: Smith College, 126 West Street, Northampton, MA 01063 Date of Original Permit Decision:_..M=arc=h-=2-.6 • ._.2=0 __ 0=9 _______________ _ Date of Permit Amendment Request: .... J .... un_.e--=-20 ____ 2 __ 0 __ 14......_ ______________ _ THE FOLLOWING ACTION BY THE NORTHA~TON DEPARTMENT OF PUBLIC WORKS HAS BEEN TAKEN ON THIS APPLICATION FOR AN AMENDMENT OF AN ACTIVE PERMIT BASED ON INFORMATION PRESENTED: __ Approval of the Stormwater Management Permit Amendment. X Approval of the Stormwater Management Permit Amendment subject to any conditions, modifications or restrictions required by the Department of Public Works (see below) __ Disapproval of the Stormwater Management Permit Amendment based upon a determination that the proposed plan, as submitted, does not meet the purposes set forth in the Northampton Stormwater Management. Standard Permit Conditions: 1. All clearing, grading, drainage, construction, and development of the proposed Smith College Athletic Field Improvements shall be conducted in strict accordance with the previously approved plans and information as referenced in the Stormwater Management Permit issued by the Northampton Department of Public Works (DPW) on March 26, 2009 and as amended by the following plans and information and as amended by any conditions attached to this permit amendment. a. Letter to the Northampton DPW regarding Smith College Tennis Court Improvements, Amendment to 2009 Stormwater Permit, dated June 20, 2014, from Michael Y. Liu, The Berkshire Design Group, Inc. b. Smith College Tennis Court Improvements, Site Plans, Sheet L2 revision dated June 20, 2014, Sheet LI & L3 dated April 29, 2009, The Berkshire Design Group, Inc. M:\Stonnwater Management Pennits\West St Smith College Athletic Fields\ West St_Smith Athletic_Amendment l.docx Page I of2 Specific Permit Conditions: 1. Additional erosion and sediment control measures and details are necessary for the project including, but not limited to: stabilized construction access (tracking pad), catch basin protection, erosion control barrier, and other measures as necessary. An Erosion Control Plan that includes all details and specifications shall be submitted to the DPW for approval prior to the start of construction. 2. The plans for the Tennis Court Improvements specify proposed grading and paving of the gravel parking lot southeast of the tennis courts, installation of a catch basin, and repair of the eroded slope and cleaning of the existing catch basin on the adjacent property. Additional measures may be necessary to correct the drainage problem to the adjacent property and clean up the sediment on that property. The applicant should coordinate all work on the adjacent property with the owner of that property and notify the DPW when this work is to be started. cc. Planning Board c/o Office of Planning and Development Building Department 1_ J z1.1/ IL/ ~ M:\Stonnwater Management Pennits\West St Smith College Athletic Fields\ West St_ Smith Athletic_Amendment l.docx Page 2 of2