Loading...
421 North Main St_Amendment 1City or Northampton Department or Public Works STORMW ATER MANAGEMENT PERMIT Amendment to Permit Project I Site Name: VA Medical Center Drainage Repair & Roadway Improvement Project Project Street or Location I Assessor ID: 421 North Main St, Leeds. MA I Map 11, Parcel 001 Applicant Name: .... B .... n ...... ·can ............ In .... c ______________________ _ Applicant Address/Phone: 155 State Street, Springfield. MA/ 413-737-4515 Owner Name: VA Medical Center Owner Address/Phone: 421 North Main St, Leeds. MA Date of Original Permit Decision: ..... Oc ......... to .... ber ............... 10 ..... ~2 ..... 0 ..... 13 ______________ _ Date of Permit Amendment Request: __ J __ ul ... y_.1'-'4 ...... 2-.0-..1'"""4.__ _____________ _ THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC WORKS HAS BEEN TAKEN ON THIS APPLICATION FOR AN AMENDMENT OF AN ACTIVE PERMIT BASED ON INFORMATION PRESENTED: __ Approval of the Stormwater Management Permit Amendment. X Approval of the Stormwater Management Permit Amendment subject to any conditions, modifications or restrictions required by the Department of Public Works (see below) __ Disapproval of the Stormwater Management Permit Amendment based upon a determination that the proposed plan, as submitted, does not meet the purposes set forth in the Northampton Stormwater Management. Standard Permit Conditions: 1. All clearing, grading, drainage, construction, and development of the proposed VA Medical Center Drainage Repair & Roadway Improvement Project shall be conducted in strict accordance with the previously approved plans and information as referenced in the Stormwater Management Permit issued by the Northampton Department of Public Works (DPW) on October 10, 2013 and as amended by the following plans and information and as amended by any conditions attached to this permit amendment. a. Supplemental Stormwater Management Plan for VA Northampton Medical Center, dated July 14, 2014, stamped by Jeffery C. Steams, P.E., Woodard and Curran. \\winO\engineering\Stonnwater Pennits\North Main St_ 421_ VA Roadway & Parking\421 North Main St_Amendment 1.docx Page I of2 b. Construction Plans, Stormwater Improvements for VA Project # 631-08-008, Veterans Administration Medical Center, Northampton, MA, dated 7/14/2014, Sheets G-001, G-002, C-001, C-100, C-101, C-200, C-201, stamped by Jeffery C. Steams, P .E., Woodard and Curran. c. Memorandum, Response to Stormwater Management Permit Application Decision-Specific Permit Conditions, dated 7/14/2014, from Jeffery Steams, P.E. & Paul Jacques, P.E., Woodard and Curran. d. Revised Stormwater Management System Operation, Maintenance, and Inspection Agreement, dated July 2014. Specific Permit Conditions: 1. Additional erosion and sediment control measures may be necessary for the project including, but not limited to: stabilized construction access (tracking pad) for infiltration basin construction, catch basin protection, additional erosion control barriers below the outlet structures, and other measures as necessary. cc. Planning Board c/o Office of Planning and Development Building Department ~1 Date \\winO\engineering\Stonnwater Pennits\North Main St_ 421_ VA Roadway & Parking\421 North Main St_Amendment I.docx Page2of2