Loading...
Coca-Cola Permit Amendment 1 20130424STORMWATER MANAGEMENT PERMIT Amendment to Perntit City of Northampton Department of Public Works Project I Site Name: Coca-Cola North America, Filling Line Addition Project Street or Location I Assessor ID: ~4~5~In=d""-u""s'"""tr~ia=l'"""D~r""'"._/-=2-'-5~A~--"-18~5'-----------­ Applicant Name: Brent Sutter Woodard & Curran Applicant Address/Phone: 980 Washington St, Suite 325, Dedham, MA 020261781-251-0847 Owner Name: Dennis Williams, Coca-Cola Refreshments, Inc. Owner Address/Phone: 45 Industrial Dr, Northampton, MA 01060 I 413-250-6178 Date of Original Permit Decision:~J~an=u~ar=---v~l~4~, =2~0-"-10~---------------- Date of Permit Amendment Request: ..:;.A-=.ip=r-=il'-4'-'-'-=2-=-0=13;;__ ______________ _ THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC WORKS HAS BEEN TAKEN ON THIS APPLICATION FOR AN AMENDMENT OF AN ACTIVE PERMIT BASED ON INFORMATION PRESENTED: __ Approval of the Stormwater Management Permit Amendment. X Approval of the Stormwater Management Permit Amendment subject to any conditions, modifications or restrictions required by the Department of Public Works (see below) __ Disapproval of the Stormwater Management Permit Amendment based upon a determination that the proposed plan, as submitted, does not meet the purposes set forth in the Northampton Stormwater Management. Standard Permit Conditions: I. All clearing, grading, drainage, construction, and development of the proposed Coca Cola Wastewater Treatment System Modifications shall be conducted in strict accordance with the previously approved plans and information as referenced in the Stormwater Management Permit issued by the Northampton Department of Public Works (DPW) on January 14, 20 I 0 and as amended by the following plans and information and as amended by any conditions attached to this permit amendment. a. Coca-Cola Refreshments, Inc, Wastewater Treatment System Modifications, Northampton, MA, Site Plans, dated 3/29/2013, stamped by Brent R. Sutter, P .E., Woodard & Curran. M:\Stonnwater Management Pennits\I Stormwater Permits Intemal\Permits_Active\lndustrial Dr 45 Coca-Cola Filling Line Addition\45 Industrial Dr Amendment I .docx Page I of2 b. Stormwater Management Report for Coca Cola Refreshments, 45 Industrial Dr, Northampton, MA, dated April 3, 2013, stamped by Jeffrey C. Steams, P.E., Woodard & Curran. Specific Permit Conditions: 1. In accordance with Specific Permit Condition 1 of the Stormwater Management Permit issued on January 14, 2010 a Stormwater Operation, Maintenance, and Inspection Agreement was recorded on 10/25/2011 (See Book10697/Page 87, Hampshire Registry of Deeds). Prior to the start of construction and issuance of a building permit, the applicant must amend the previously recorded Stormwater Operation, Maintenance, and Inspection Agreement to include all inspection and maintenance tasks for the proposed stormwater management system. A draft of the proposed revisions must be submitted to the DPW for approval prior to recording of the changes. 2. Prior to construction of the infiltration systems, a report shall be submitted to the DPW by a Certified Soil Evaluator or Certified Professional Soil Scientist documenting the soils and elevation of seasonal high ground water in the location of the proposed infiltration system and confirming the proposed rate of infiltration and the appropriate separation to ground water for the proposed infiltration system. 3. During construction and prior to backfill of the proposed subsurface infiltration system, the applicant or the contractor shall notify the DPW for inspection of the system. 4. Additional erosion and sediment control measures and details are necessary for the project including, but not limited to: stabilized construction access (tracking pads), protection of the infiltration system from soil compaction and sedimentation during construction, and other measures as necessary. A revised Erosion Control Plan that includes all details and specifications shall be submitted to the DPW for approval prior to the start of construction. cc. Planning Board c/o Office of Planning and Development Building Department M:\Stormwater Management Pennits\1 Stormwater Pennits lntemal\Pennits_Active\lndustrial Dr 45 Coca-Cola Filling Line Addition\45 Industrial Dr Amendment I .docx Page2of2