Loading...
45 Industrial Dr_Coca Cola_Revised Plans Letter_20130703Edward S. Huntley, P.E. Director July 3, 2013 ( ITY OF '.'iORTHAMPTOI\, MAS'-AUH'SETTS DEPARTMENT OF Pt:BLIC \VORKS 125 Locust Street 'iorthampton, MA 0101>11 413-587-1570 Fax 413-587-1576 Mr. Brent Sutter, P.E. & Jeffery Stearns, P.E. Woodard & Curran 980 Washington St, Suite 325 Dedham, MA 02026 Re. Modified Stormwater Management Plan -Coca-Cola Dear Mr. Sutter and Mr. Stearns, The Northampton Department of Public Works (DPW) has reviewed the following revised plans and documents for the proposed Coca-Cola Facility WWTP Upgrades: 1. Memorandum to Douglas McDonald, Northampton DPW, from Brent Sutter, P.E. and Jeffery Stearns, P.E., Woodard & Curran, Re: Modified Stormwater Management Plan -Coca-Cola, Dated June 18, 2013. 2. Form 11-Soil Suitability Assessment for On-Site Drainage, Dated 5/21/2013, completed by Anthony 0. Curd. 3. Revised HydroCAD Drainage Calculations, dated 6/18/2013, prepared by Woodard & Curran 4. Drawdown Calculations for Coca-Cola North America, Northampton, MA, dated 6/1/2013, completed by Jeffrey Stearns, P.E., Woodard & Curran. 5. Revised Site Plans for Coca-Cola Refreshments, Inc. Wastewater Treatment System Modifications, Northampton, MA, dated 6/18/2013, completed by Woodard & Curran. The DPW approves the revisions to the plans and documents noted above as being consistent with the Stormwater Management Permit Amendment issued on 4/24/2013 for the Coca-Cola North America, Filling line Addition. Coca-Cola may proceed with construction in accordance with the approved Stormwater Management Permit Amendment contingent on compliance with all conditions in said Permit Amendment. Please contact Doug McDonald at 587-1582 with any questions regarding the requirements of this letter and the Stormwater Management Permit for the project. Sincerely, (\ /1fV} v . II Ja~i?s R. Laurilf, P I Ctft Engineer i J i I ' ! / cc. Building De~rtment Planning Board Pg 112, Oocument1