Loading...
Fairgrounds Phase 1_Amendment 1_20130612STORMWATER MANAGEMENT PERMIT Amendment to Permit City of Northampton Department of Public Works Project I Site Name: Three County Fairgrounds -Phase 1 Project Street or Location I Assessor ID: 59 Fair Street I Map 25C, Parcel 251 Owner Name: Bruce Shallcross, Hampshire Franklin and Hampden Agricultural Society Owner Address/Phone: 59 Fair Street, P.O. Box 305, Northampton, MA 01060 I 584-2237 Date of Original Permit Decision:-=3'"'""'/2=5"""'"/=2-=-0-"-1 O~------------------ THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC WORKS HAS BEEN TAKEN ON THIS APPLICATION FOR AN AMENDMENT OF AN ACTIVE PERMIT BASED ON INFORMATION PRESENTED: __ Approval of the Stormwater Management Permit Amendment. X Approval of the Stormwater Management Permit Amendment subject to any conditions, modifications or restrictions required by the Department of Public Works (see below) __ Disapproval of the Stormwater Management Permit Amendment based upon a determination that the proposed plan, as submitted, does not meet the purposes set forth in the Northampton Stormwater Management. Standard Permit Conditions: 1. All clearing, grading, drainage, construction, and development of the proposed Warm-Up Arena shall be conducted in strict accordance with the previously approved plans and information as referenced in the Stormwater Management Permit issued by the Northampton Department of Public Works (DPW) on March 25, 2010 and as amended by the following plans and information and as amended by any conditions attached to this permit amendment. a. Letter re. Three County Fairgrounds -Phase 1 from Jeff Squire, RLA, The Berkshire Design Group, Inc., dated June 10, 2013. b. Three County Fairgrounds, Phase 1 Spring 2013, Site Plan Asbuilt L.O.W. Warm- Up Arena, Sheet CN.3, dated May 14, 2013, stamped by Mark B. Darnold, P.E., The Berkshire Design Group, Inc. c. Three County Fairgrounds -Phase 1 Curve Number Analysis, May 14, 2013, prepared by The Berkshire Design Group, Inc. M:\Stormwater Management Permits\ I Stormwater Permits lnternal\Permits_Active\Fair St 59 Fairgrounds Phase I 3 _20 I 0\Fairgrounds Phase I _Amendment I .docx Page I of2 Specific Permit Conditions: 1. In accordance with Specific Permit Condition 2 of the Storm water Management Permit issued on March 25, 2010, prior to the start of construction the applicant must submit to the Northampton DPW for approval an erosion and sediment control plan for the proposed project as an amendment to the Stormwater Pollution Prevention Plan (SWPPP) for the Three County Fairgrounds Phase 1 project. cc. Planning Board c/o Office of Planning and Development Building Department ro/rz./ t3 Date Conservation Commission c/o Office of Planning and Development M:\Stormwater Management Pennits\I Stormwater Permits Internal\Permits_Active\fair St 59 Fairground s Phase I 3_2010\Fairgrounds Phase l_Amendment l.docx Page 2 of2