CT River Levee_Permit_20150729City of Northampton
Department of Public Works
STORMWATER MANAGEMENT PERMIT
APPLICATION DECISION
Project I Site Name: Connecticut River Levee Repair Project
Project Street I Location: Northampton, MA I 32C-323-001, 39A-039-001, 39A-038-001
Applicant Name: Northampton Department of Public Works
Applicant Address/Phone: 125 Locust Street, Northampton, MA 01060 I 587-1570
Application Submission Date:~7~/=28~/~2~0~15~-------------------
THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC
WORKS HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION
PRESENTED:
__ Disapproval of the Stormwater Management Permit Application based on a
determination within seven days of the receipt of the application that the
application is administratively incomplete (see attached documentation).
__ Approval of the Stormwater Management Permit Application.
X Approval of the Stormwater Management Permit Application subject to any
conditions, modifications or restrictions required by the Department of
Public Works (see below)
__ Disapproval of the Stormwater Management Permit Application based upon
a determination that the proposed plan, as submitted, does not meet the
purposes set forth in the Northampton Stormwater Management.
Standard Permit Conditions:
1. All clearing, grading, drainage, construction, and development shall be conducted in
strict accordance with the following plans and information submitted with the application
and as amended by any conditions attached to this permit:
a. Connecticut River Levee Repair Project, Northampton, MA, Plan Bid Set,
stamped 3/31/2015 by James R. Laurila, P .E., Northampton Department of Public
Works.
b. Storm water Pollution Prevention Plan (SWPPP) for Construction Activities at
Levee from east end of Hancock Street to Route 5, Northampton, MA, dated
M:\Stormwater Permits\DPW Projects\CT River Levee Repair\CT River Levee_Permit_20150728.docx.doc
Page 1 of2
6/24/2015, prepared for Kingsbury Construction Co, prepared by Holden
Engineering & Surveying, Inc.
2. The Northampton Department of Public Works (DPW) or its authorized representative
shall be provided access to the property to conduct inspections before, during, and after
construction activities as necessary. The applicant shall arrange with the DPW to
schedule the following inspections: Initial Inspection, Erosion Control Inspection, Bury
Inspection, and Final Inspection. The DPW may also conduct random inspections to
ensure effective control of erosion and sedimentation during all phases of construction.
3. If construction of the proposed storm water system has not started within five years of the
issue date of this permit, then the permit will expire and a new permit will be required.
Construction is defined as clearing, grading, excavation, filling, and installation of
drainage structures on the lots specified in this permit.
~?//J' ~· Date Signature of ~er L--
P/~f?.?~ o~f3J/I~ Mo
M:\Stormwater Permits\DPW Projects\CT River Levee Repair\CT River Levee_Permit_20150728.docx.doc
Page 2 of2