2012 CPA Report #542012 CPA Annual Report
CPA #54 - Nton OPD - Beaver Brook Bridge Restoration
In 2012, once we received the contract from CPA, we:1. Hired Bob Leet, PE, to identify exactly what work needs to be doneand design the bid specifications for the project.In 2013:1.
Bob Leet will complete the design and bid specifications(approximately $2,650)2. We will apply for and obtain the necessary wetlands permit for the project.3. We will go to bid
and hire a contractor who will repoint thebridge and make the highest priority repairs.4. If there are funds available after the most critical work, we willhire a contractor to seal
the top of the bridge (asphalt or concrete)We expect to complete the vast majority of the work in 2013, butreserve using the opportunity to extend the project into 2014 if fundsremain
to allow us to seal the top of the bridge and if we can't do itin 2014.Thanks.