Loading...
609286_OfficeEstimateProject Preliminary Design Estimate 104.TREE REMOVED - DIAMETER 24 INCHES AND OVER EA $4,500.000 5.000 $22,500.00 103.TREE REMOVED - DIAMETER UNDER 24 INCHES EA $1,800.000 30.000 $54,000.00 120.EARTH EXCAVATION CY $55.000 16075.000 $884,125.00 105.STUMP REMOVED EA $750.000 38.000 $28,500.00 102.55 ARBORIST HR *$170.000 100.000 $17,000.00 102.1 TREE TRIMMING FT $30.000 100.000 $3,000.00 102.521 TREE AND PLANT PROTECTION FENCE FT *$15.000 310.000 $4,650.00 102.511 TREE PROTECTION - ARMORING AND PRUNING EA *$500.000 20.000 $10,000.00 120.1 UNCLASSIFIED EXCAVATION CY $100.000 430.000 $43,000.00 145.DRAINAGE STRUCTURE ABANDONED EA $1,100.000 30.000 $33,000.00 141.1 TEST PIT FOR EXPLORATION CY $150.000 300.000 $45,000.00 121.CLASS A ROCK EXCAVATION CY $125.000 60.000 $7,500.00 144.CLASS B ROCK EXCAVATION CY $250.000 41.000 130.000 $42,750.00 142.CLASS B TRENCH EXCAVATION CY $50.000 820.000 2600.000 $171,000.00 Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm (HSIP) NORTHAMPTON - Other - Municipality (Non-Participating) Total Wednesday, February 28, 2024Measure System:E Description:NORTHAMPTON- DOWNTOWN COMPLETE STREETS CORRIDOR AND INTERSECTION IMPROVEMENTS ON MAIN STREET (ROUTE 9) Date: District:2 Extended Description: This is a complete street project consisting of right-of-way to right-of-way altering of Main Street (Route 9)and intersecting streets in downtown Northampton, from Market Street to Bedford Terrace. This project includes improvements to sidewalks, a new separated bike lane, installation of street furniture/tree belt, new curbing, pavement, pavement markings, crosswalks, and signage, along with adjustments at crossings and signalized intersections to be more bicycle and pedestrian friendly and to improve the functioning of intersections and the roadway. Project:609286 Project Preliminary Design Estimate 182.1 INSPECTION AND TESTING FOR ASBESTOS LS *$3,500.000 1.000 $3,500.00 182.2 REMOVAL OF ASBESTOS FT *$130.000 200.000 $26,000.00 181.12 DISPOSAL OF REGULATED SOIL - IN-STATE FACILITY TON *$143.000 100.000 $14,300.00 181.13 DISPOSAL OF REGULATED SOIL - OUT-OF-STATE FACILITY TON *$300.000 100.000 $30,000.00 181.14 DISPOSAL OF HAZARDOUS WASTE TON *$600.000 100.000 $60,000.00 151.01 GRAVEL BORROW - TYPE C CY $75.000 390.000 $29,250.00 151.2 GRAVEL BORROW FOR BACKFILLING STRUCTURES AND PIPES CY $55.000 1700.000 $93,500.00 153.CONTROLLED DENSITY FILL - EXCAVATABLE CY *$200.000 525.000 $105,000.00 181.11 DISPOSAL OF UNREGULATED SOIL TON *$112.000 200.000 $22,400.00 146.DRAINAGE STRUCTURE REMOVED EA $1,000.000 6.000 $6,000.00 151.GRAVEL BORROW CY $58.000 4270.000 $247,660.00 180.01 ENVIRONMENTAL HEALTH AND SAFETY PROGRAM LS *$10,000.00 0 1.000 $10,000.00 180.02 PERSONAL PROTECTION LEVEL C UPGRADE HR *$50.000 250.000 $12,500.00 180.03 LICENSED SITE PROFESSIONAL SERVICES HR *$172.000 40.000 $6,880.00 154.SAND BORROW CY $60.000 290.000 $17,400.00 156.CRUSHED STONE TON $65.000 730.000 $47,450.00 170.FINE GRADING AND COMPACTING - SUBGRADE AREA SY $15.000 12200.000 $183,000.00 Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm (HSIP) NORTHAMPTON - Other - Municipality (Non-Participating) Total Project Preliminary Design Estimate 220.3 DRAINAGE STRUCTURE CHANGE IN TYPE EA $1,200.000 2.000 $2,400.00 220.2 DRAINAGE STRUCTURE REBUILT FT $550.000 5.000 $2,750.00 220.5 DRAINAGE STRUCTURE REMODELED EA $900.000 5.000 $4,500.00 201.7 12 INCH AREA DRAIN EA *$5,000.000 5.000 $25,000.00 201.6 OUTLET CONTROL STRUCTURE EA *$5,000.000 8.000 $40,000.00 202.MANHOLE EA $7,500.000 19.000 $142,500.00 201.8 10 INCH TRENCH PAN DRAIN EA *$5,000.000 2.000 $10,000.00 183.1 TREATMENT OF CONTAMINATED GROUNDWATER GAL *$20.000 1000.000 $20,000.00 220.DRAINAGE STRUCTURE ADJUSTED EA $500.000 101.000 $50,500.00 201.CATCH BASIN EA $7,500.000 52.000 $390,000.00 183.2 DISPOSAL OF GRANULAR ACTIVATED CARBON LB *$20.000 100.000 $2,000.00 210.1 SANITARY SEWER MANHOLE MUNICIPAL STANDARD EA *$20,000.00 0 2.000 $40,000.00 210.02 SANITARY SEWER MANHOLE REMOVED EA *$5,000.000 2.000 $10,000.00 210.3 SANITARY SEWER MANHOLE (14 TO 18 FOOT DEPTH) EA *$30,000.00 0 2.000 $60,000.00 210.2 SANITARY SEWER MANHOLE (9 TO 14 FOOT DEPTH) EA *$25,000.00 0 2.000 $50,000.00 203.2 MANHOLE (5 FOOT DIAMETER) EA *$10,000.00 0 9.000 $90,000.00 203.SPECIAL MANHOLE EA $10,500.00 0 5.000 $52,500.00 204.GUTTER INLET EA $4,000.000 5.000 $20,000.00 203.3 MANHOLE (DEEP SUMP) EA *$8,000.000 2.000 $16,000.00 Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm (HSIP) NORTHAMPTON - Other - Municipality (Non-Participating) Total Project Preliminary Design Estimate 241.15 15 INCH REINFORCED CONCRETE PIPE CLASS III FT $130.000 180.000 $23,400.00 241.18 18 INCH REINFORCED CONCRETE PIPE CLASS III FT $200.000 1010.000 $202,000.00 238.18 18 INCH DUCTILE IRON PIPE FT $240.000 160.000 $38,400.00 241.12 12 INCH REINFORCED CONCRETE PIPE CLASS III FT $140.000 1610.000 $225,400.00 222.31 FRAME AND GRATE MUNICIPAL STANDARD EA *$1,250.000 38.000 $47,500.00 222.32 FRAME AND COVER MUNICIPAL STANDARD EA *$1,250.000 9.000 $11,250.00 222.33 FRAME AND GRATE - DOUBLE EA *$2,500.000 2.000 $5,000.00 238.12 12 INCH DUCTILE IRON PIPE FT $160.000 420.000 $67,200.00 220.7 SANITARY STRUCTURE ADJUSTED EA $470.000 3.000 $1,410.00 221.FRAME AND COVER EA $1,250.000 36.000 $45,000.00 227.3 REMOVAL OF DRAINAGE STRUCTURE SEDIMENT CY $400.000 30.000 $12,000.00 227.31 REMOVAL OF DRAINAGE PIPE SEDIMENT FT $20.000 840.000 $16,800.00 227.4 MASONRY PLUG SF $200.000 44.000 $8,800.00 223.2 FRAME AND GRATE (OR COVER) REMOVED AND DISCARDED EA $160.000 42.000 $6,720.00 224.12 12 INCH HOOD EA $750.000 39.000 $29,250.00 224.15 15 INCH HOOD EA $850.000 2.000 $1,700.00 Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm (HSIP) NORTHAMPTON - Other - Municipality (Non-Participating) Total Project Preliminary Design Estimate 250.12 12 INCH POLYVINYLCHLOR IDE SANITARY SEWER PIPE FT *$180.000 450.000 $81,000.00 252.12 12 INCH CORRUGATED PLASTIC PIPE FT $130.000 410.000 $53,300.00 269.06 6 INCH SLOT- PERFORATED CORRUGATED PLASTIC PIPE (SUBDRAIN) FT $90.000 210.000 $18,900.00 302.12 12 INCH DUCTILE IRON WATER PIPE (RUBBER GASKET) FT $250.000 1400.000 $350,000.00 250.06 6 INCH POLYVINYL CHLORIDE SANITARY SEWER PIPE FT *$150.000 200.000 $30,000.00 250.08 8 INCH POLYVINYL CHLORIDE SANITARY SEWER PIPE FT *$160.000 180.000 $28,800.00 302.06 6 INCH DUCTILE IRON WATER PIPE (RUBBER GASKET) FT $170.000 1080.000 $183,600.00 302.08 8 INCH DUCTILE IRON WATER PIPE (RUBBER GASKET) FT $190.000 600.000 $114,000.00 302.10 10 INCH DUCTILE IRON WATER PIPE (RUBBER GASKET) FT $200.000 40.000 $8,000.00 295.TEMPORARY SEWER BYPASS SYSTEM LS *$30,000.00 0 1.000 $30,000.00 302.03 3-INCH DUCTILE IRON PIPE (RUBBER GASKET) FT *$150.000 20.000 $3,000.00 302.04 4 INCH DUCTILE IRON WATER PIPE (RUBBER GASKET) FT $160.000 30.000 $4,800.00 Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm (HSIP) NORTHAMPTON - Other - Municipality (Non-Participating) Total Project Preliminary Design Estimate 371.06 6 INCH COUPLING EA *$4,500.000 9.000 $40,500.00 371.08 8 INCH COUPLING EA *$600.000 1.000 $600.00 371.10 10 INCH COUPLING EA *$5,600.000 5.000 $28,000.00 363.15 1-1/2 INCH CORPORATION COCK EA $1,800.000 1.000 $1,800.00 371.03 3 INCH COUPLING EA *$1,800.000 4.000 $7,200.00 371.04 4 INCH COUPLING EA *$1,350.000 3.000 $4,050.00 347.1 1 INCH COPPER TUBING TYPE K FT $100.000 1000.000 $100,000.00 347.125 1-1/4 INCH COPPER TUBING TYPE K FT $125.000 210.000 $26,250.00 347.15 1-1/2 INCH COPPER TUBING TYPE K FT $150.000 50.000 $7,500.00 363.125 1-1/4 INCH CORPORATION COCK EA $1,700.000 7.000 $11,900.00 302.16 16 INCH DUCTILE IRON WATER PIPE (RUBBER GASKET) FT $350.000 3050.000 $1,067,500.00 309.DUCTILE IRON FITTINGS FOR WATER PIPE LB $10.000 19800.000 $198,000.00 350.06 6 INCH GATE AND GATE BOX EA $3,000.000 35.000 $105,000.00 358.GATE BOX ADJUSTED EA $297.000 61.000 $18,117.00 358.2 SHUT OFF VALVE ADJUSTED EA *$500.000 1.000 $500.00 363.1 1 INCH CORPORATION COCK EA $1,600.000 23.000 $36,800.00 350.08 8 INCH GATE AND GATE BOX EA $4,000.000 7.000 $28,000.00 350.12 12 INCH GATE AND GATE BOX EA $6,000.000 6.000 $36,000.00 356.16 16 INCH BUTTERFLY VALVE AND BOX EA *$16,000.00 0 16.000 $256,000.00 Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm (HSIP) NORTHAMPTON - Other - Municipality (Non-Participating) Total Project Preliminary Design Estimate 384.01 1" CURB STOP & BOX EA *$1,100.000 23.000 $25,300.00 376.2 HYDRANT - REMOVED AND RESET EA $1,200.000 20.000 $24,000.00 384.015 1.5" CURB STOP & BOX EA *$1,400.000 1.000 $1,400.00 384.0125 1.25" CURB STOP & BOX EA *$1,300.000 7.000 $9,100.00 371.12 12 INCH COUPLING EA *$7,000.000 5.000 $35,000.00 450.31 SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC -12.5) TON $250.000 290.000 $72,500.00 376.HYDRANT EA $8,000.000 23.000 $184,000.00 371.16 16 INCH COUPLING EA *$1,700.000 1.000 $1,700.00 390.WATER FEATURE LS *$108,535.0 00 1.000 $108,535.00 443.WATER FOR ROADWAY DUST CONTROL MGL $80.000 36.000 $2,880.00 440.CALCIUM CHLORIDE FOR ROADWAY DUST CONTROL LB $0.400 88800.000 $35,520.00 450.23 SUPERPAVE SURFACE COURSE - 12.5 (SSC - 12.5) TON $205.000 2240.000 $459,200.00 450.22 SUPERPAVE SURFACE COURSE - 9.5 (SSC - 9.5) TON $300.000 375.000 $112,500.00 402.DENSE GRADED CRUSHED STONE FOR SUB-BASE CY $95.000 2810.000 $266,950.00 395.TEMPORARY WATER BY-PASS SYSTEM LS *$200,000.0 00 1.000 $200,000.00 431.HIGH EARLY STRENGTH CEMENT CONCRETE BASE COURSE SY $80.000 450.000 $36,000.00 415.2 PAVEMENT FINE MILLING SY $12.000 4455.000 $53,460.00 Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm (HSIP) NORTHAMPTON - Other - Municipality (Non-Participating) Total Project Preliminary Design Estimate 507.1 GRANITE CURB AT BIORETENTION AREA - CURVED FT *$220.000 95.000 $20,900.00 508.GRANITE BEVELED CURB - STRAIGHT FT *$200.000 2215.000 $443,000.00 507.GRANITE CURB AT BIORETENTION AREA - STRAIGHT FT *$175.000 570.000 $99,750.00 508.1 GRANITE BEVELED CURB - CURVED FT *$250.000 385.000 $96,250.00 508.4 GRANITE CHAMFERED CURB - CURVED FT *$110.000 155.000 $17,050.00 508.2 GRANITE BEVELED TRANSITION CURB FT *$500.000 425.000 $212,500.00 508.3 GRANITE CHAMFERED CURB - STRAIGHT FT *$90.000 440.000 $39,600.00 450.42 SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) TON $195.000 4115.000 $802,425.00 451.HMA FOR PATCHING TON $300.000 1090.000 $327,000.00 504.1 GRANITE CURB TYPE VA4 - CURVED FT $90.000 2110.000 $189,900.00 450.32 SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC - 19.0) TON $219.000 3215.000 $704,085.00 452.ASPHALT EMULSION FOR TACK COAT GAL $15.000 3500.000 $52,500.00 482.3 SAWCUTTING ASPHALT PAVEMENT FT $10.000 2205.000 $22,050.00 504.GRANITE CURB TYPE VA4 - STRAIGHT FT $75.000 4440.000 $333,000.00 453.HMA JOINT ADHESIVE FT $9.000 17275.000 $155,475.00 472.TEMPORARY ASPHALT PATCHING TON $250.000 1935.000 $483,750.00 Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm (HSIP) NORTHAMPTON - Other - Municipality (Non-Participating) Total Project Preliminary Design Estimate 517.5 GRANITE CORNER BLOCK AT BIORETENTION AREA EA *$240.000 48.000 $11,520.00 516.GRANITE CURB CORNER TYPE A EA $400.000 89.000 $35,600.00 655.11 METAL HANDRAIL FT *$200.000 955.000 $191,000.00 594.CURB REMOVED AND DISCARDED FT $9.000 6125.000 $55,125.00 508.5 GRANITE CHAMFERED TRANSITION CURB FT *$150.000 115.000 $17,250.00 701.1 CEMENT CONCRETE SIDEWALK AT DRIVEWAYS SY $100.000 170.000 $17,000.00 509.1 GRANITE TRANSITION CURB FOR PEDESTRIAN CURB RAMPS - CURVED FT $112.000 260.000 $29,120.00 509.GRANITE TRANSITION CURB FOR PEDESTRIAN CURB RAMPS - STRAIGHT FT $100.000 1510.000 $151,000.00 693.1 CONCRETE STAIRS WITH GRANITE TREAD LF *$500.000 115.000 $57,500.00 690.6 REBUILD GRANITE WALL CY *$350.000 30.000 $10,500.00 701.CEMENT CONCRETE SIDEWALK SY $100.000 7810.000 $781,000.00 697.1 SILT SACK EA *$160.000 94.000 $15,040.00 655.42 42" HT ORNAMENTAL METAL RAIL FT *$200.000 120.000 $24,000.00 655.12 12" HT ORNAMENTAL METAL RAIL FT *$125.000 335.000 $41,875.00 685.3 GRANITE BLOCK SEAT STEPS FT *$600.000 100.000 $60,000.00 655.48 48" HT ORNAMENTAL METAL RAIL FT *$200.000 120.000 $24,000.00 Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm (HSIP) NORTHAMPTON - Other - Municipality (Non-Participating) Total Project Preliminary Design Estimate 707.15 PARK BENCH REMOVED AND RESET EA *$2,000.000 4.000 $8,000.00 707.16 WOOD PLATFORM 72"X72"X18" EA *$8,000.000 3.000 $24,000.00 707.14 METAL TABLE EA *$1,000.000 23.000 $23,000.00 707.13 METAL CHAIR EA *$2,000.000 33.000 $66,000.00 707.17 WOOD PLATFORM 18"X18"X12" EA *$4,000.000 8.000 $32,000.00 707.2 TRASH RECEPTACLE EA *$1,500.000 18.000 $27,000.00 707.71 RESET STATUE EA *$4,000.000 1.000 $4,000.00 706.01 BRICK PAVERS ON BITUMINOUS BASE SY *$250.000 930.000 $232,500.00 706.02 BRICK PAVERS ON CONCRETE BASE SY *$300.000 1880.000 $564,000.00 702.HOT MIX ASPHALT SIDEWALK OR DRIVEWAY TON $300.000 339.000 $101,700.00 707.12 CONCRETE BENCH WOODEN TOP FT *$500.000 210.000 $105,000.00 701.2 CEMENT CONCRETE PEDESTRIAN CURB RAMP SY $160.000 860.000 $137,600.00 706.03 PERMEABLE BRICK PAVERS ON AGGREGATE BAS SY *$425.000 110.000 $46,750.00 706.9 FLUSH COBBLESTONE MEDIAN SY *$270.000 450.000 $121,500.00 707.BENCH EA *$4,000.000 14.000 $56,000.00 706.718 18"X18" GRANITE PAVERS ON CONCRETE BASE $*$450.000 10.000 $4,500.00 706.11 MATCH EXISTING WALKWAY MATERIAL SY *$400.000 30.000 $12,000.00 706.712 12"X12" GRANITE PAVER BAND ON BITUMINOUS BASE SY *$400.000 70.000 $28,000.00 Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm (HSIP) NORTHAMPTON - Other - Municipality (Non-Participating) Total Project Preliminary Design Estimate 757.08 BIORETENTION AREA #8 LS *$20,000.00 0 1.000 $20,000.00 765.SEEDING SY $3.500 360.000 $1,260.00 761.3 PLANTING SOIL CY *$140.000 1620.000 $226,800.00 745.PEDESTRIAN BUS SHELTER EA *$30,250.00 0 3.000 $90,750.00 740.ENGINEER'S FIELD OFFICE AND EQUIPMENT (TYPE A) MO *$3,000.000 38.000 $114,000.00 748.MOBILIZATION LS $675,934.2 90 1.000 $675,934.29 745.2 PEDESTRIAN BUS SHELTER REMOVED AND STACKED LS *$8,000.000 1.000 $8,000.00 715.1 MAIL BOX REMOVED AND RESET EA *$2,000.000 4.000 $8,000.00 707.72 RESET MEMORIAL EA *$6,000.000 1.000 $6,000.00 757.07 BIORETENTION AREA #7 $*$50,000.00 0 1.000 $50,000.00 707.9 BICYCLE RACK EA *$1,860.000 45.000 $83,700.00 707.73 RESET NEWSPAPER CONDO EA *$1,000.000 1.000 $1,000.00 757.04 BIORETENTION AREA #4 LS *$20,000.00 0 1.000 $20,000.00 757.03 BIORETENTION AREA #3 LS *$20,000.00 0 1.000 $20,000.00 757.06 BIORETENTION AREA #6 LS *$30,000.00 0 1.000 $30,000.00 757.05 BIORETENTION AREA #5 LS *$40,000.00 0 1.000 $40,000.00 757.02 BIORETENTION AREA #2 LS *$15,000.00 0 1.000 $15,000.00 751.8 STRUCTURAL SOIL CELLS CF *$6.850 118344.000 $810,656.40 751.LOAM FOR ROADSIDES CY $75.000 578.000 $43,350.00 757.01 BIORETENTION AREA #1 LS *$20,000.00 0 1.000 $20,000.00 756.NPDES STORMWATER POLLUTION PREVENTION PLAN LS *$25,000.00 0 1.000 $25,000.00 Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm (HSIP) NORTHAMPTON - Other - Municipality (Non-Participating) Total Project Preliminary Design Estimate 794.731 SUMMERSWEET SHRUB 18-24 INCH / #2 EA $108.000 40.000 $4,320.00 796.100 WINDFLOWER EA *$33.000 200.000 $6,600.00 796.150 MOSS PHILOX EA *$30.000 300.000 $9,000.00 794.600 DWARF FOTHERGILLA EA *$126.000 90.000 $11,340.00 794.400 SWEETGALE EA *$99.000 96.000 $9,504.00 794.500 DWARF EUROPEAN CRANBERRY EA *$135.000 30.000 $4,050.00 796.200 PERENNIAL GRASS #1 EA $31.500 200.000 $6,300.00 777.200 FIRESTARTER' BLACK TUPELO EA *$1,395.000 11.000 $15,345.00 777.240 OAK - SCARLET 1.5-2 INCH CALIPER EA $1,425.000 9.000 $12,825.00 777.300 SHAWNEE BRAVE' BALD CYPRESS EA *$1,980.000 5.000 $9,900.00 777.138 OAK - PIN 2- 2.5 INCH CALIPER EA $1,140.000 1.000 $1,140.00 794.331 SUMAC SHRUB - FRAGRANT-GRO- LOW 2-3 FEET / #2 EA $105.000 10.000 $1,050.00 767.6 AGED PINE BARK MULCH CY $98.000 110.000 $10,780.00 777.100 AUTUMN' GOLD GINKGO EA *$1,650.000 9.000 $14,850.00 785.200 RUSSIAN CYPRESS EA *$108.000 40.000 $4,320.00 794.100 LOW SCAPE MOUND ARONIA EA *$120.000 46.000 $5,520.00 794.200 COMPACT LEATHERLEAF EA *$120.000 135.000 $16,200.00 785.100 GEM BOX INKBERRY EA *$132.000 170.000 $22,440.00 777.400 PATRIOT'S PRINCETON ELM EA *$1,455.000 10.000 $14,550.00 781.284 HAWTHORN - COCKSPUR 1.5-2 INCH CALIPER EA $1,035.000 9.000 $9,315.00 782.533 REDBUD - EASTERN 4-5 FEET EA $1,230.000 9.000 $11,070.00 Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm (HSIP) NORTHAMPTON - Other - Municipality (Non-Participating) Total Project Preliminary Design Estimate 816.02 TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO. 2 LS $341,163.6 00 1.000 $341,163.60 816.04 TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO. 4 LS *$240,017.6 50 1.000 $240,017.65 816.03 TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO. 3 LS $450,051.9 30 1.000 $450,051.93 796.600 ASTER EA *$30.750 200.000 $6,150.00 796.500 DAYLILY HAPPY RETURNS EA *$33.000 200.000 $6,600.00 796.800 CARDINAL FLOWER EA *$33.750 200.000 $6,750.00 796.700 LILYTURF EA *$31.500 541.000 $17,041.50 796.400 JOE-PYE WEED EA *$33.000 200.000 $6,600.00 796.250 BLACK EYED SUSAN EA *$33.000 110.000 $3,630.00 816.01 TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO. 1 LS $256,149.2 80 1.000 $256,149.28 796.350 CREEPING THYME EA *$18.000 162.000 $2,916.00 796.300 PURPLE CONEFLOWER EA *$34.500 200.000 $6,900.00 811.34 GENERAL MANHOLE ADJUSTED EA *$1,000.000 1.000 $1,000.00 797.500 PRARIE DROPSEED EA *$36.000 267.000 $9,612.00 811.37 ELECTRIC HANDHOLE ADJUSTED EA $400.000 26.000 $10,400.00 811.36 ELECTRIC MANHOLE ADJUSTED EA $1,100.000 16.000 $17,600.00 797.400 CHEYENNE SKY SWITCHGRASS $*$36.000 151.000 $5,436.00 797.200 BLUE ZINGER'S EDGE EA *$36.000 291.000 $10,476.00 796.900 WALKER'S LOW CATMINT EA *$33.000 237.000 $7,821.00 797.300 ‘BURGUNDY BUNNY’, FOUNTAIN GRASS EA *$37.500 74.000 $2,775.00 797.250 ICE DANCE'S EDGE EA *$36.000 352.000 $12,672.00 Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm (HSIP) NORTHAMPTON - Other - Municipality (Non-Participating) Total Project Preliminary Design Estimate 852.12 TEMPORARY PEDESTRIAN RAMP EA *$263.000 45.000 $11,835.00 854.016 TEMPORARY PAVING MARKINGS - 6 INCH (PAINTED) FT $2.230 6700.000 $14,941.00 852.SAFETY SIGNING FOR TRAFFIC MANAGEMENT SF $30.000 1130.000 $33,900.00 852.11 TEMPORARY PEDESTRIAN BARRICADE FT *$13.000 22500.000 $292,500.00 856.ARROW BOARD DAY $10.000 1095.000 $10,950.00 856.12 PORTABLE CHANGEABLE MESSAGE SIGN DAY $25.000 1125.000 $28,125.00 820.14 ROADWAY LIGHTING LS *$1,645,749 .020 1.000 $1,645,749.02 820.16 STRING LIGHTING LS *$26,900.00 0 1.000 $26,900.00 850.41 ROADWAY FLAGGER HR $69.000 8640.000 $596,160.00 816.81 TEMPORARY TRAFFIC CONTROL SIGNAL LS *$250,000.0 00 1.000 $250,000.00 823.71 HIGHWAY LIGHTING POLE AND LUMINAIRE REMOVED AND STACKED EA *$1,100.000 33.000 $36,300.00 832.WARNING- REGULATORY AND ROUTE MARKER - ALUMINUM PANEL (TYPE A) SF $16.000 560.000 $8,960.00 847.1 SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST ASSEMBLY - STEEL EA $240.000 80.000 $19,200.00 823.72 REMOVE CONCRETE FOUNDATION FOR ROADWAY LIGHTING EA *$800.000 33.000 $26,400.00 824.221 FLASHING WARNING BEACON TYPE D (SOLAR POWERED) LS *$15,000.00 0 1.000 $15,000.00 Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm (HSIP) NORTHAMPTON - Other - Municipality (Non-Participating) Total Project Preliminary Design Estimate 867.106 6 INCH REFLECTORIZED YELLOW LINE (THERMOPLASTIC ) FT $1.500 6370.000 $9,555.00 874.2 TRAFFIC SIGN REMOVED AND RESET EA *$200.000 105.000 $21,000.00 866.124 24 INCH REFLECTORIZED WHITE LANE (THERMOPLASTIC ) FT *$10.000 1900.000 $19,000.00 859.1 REFLECTORIZED DRUMS WITH SEQUENTIAL FLASHING WARNING LIGHTS DAY *$0.500 197100.000 $98,550.00 864.PAVEMENT ARROW REFLECTORIZED WHITE (PAINTED) SF $15.000 1580.000 $23,700.00 866.112 12 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC ) FT $6.000 1040.000 $6,240.00 859.REFLECTORIZED DRUM DAY $0.210 335100.000 $70,371.00 866.106 6 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC ) FT $1.500 6500.000 $9,750.00 866.108 8 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC ) FT *$3.750 450.000 $1,687.50 864.04 PAVEMENT ARROWS AND LEGENDS REFLECTORIZED WHITE (THERMOPLASTIC ) SF $10.000 1650.000 $16,500.00 864.1 GREEN FRICTION SURFACE (THERMOPLASTIC ) SF *$35.000 1600.000 $56,000.00 Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm (HSIP) NORTHAMPTON - Other - Municipality (Non-Participating) Total Project Preliminary Design Estimate 955.1 WOOD DECK ON STRUCTURAL STEEL FRAME SY *$2,250.000 65.000 $146,250.00 901.14 CEMENT CONCRETE EDGE FT *$150.000 350.000 $52,500.00 874.41 TRAFFIC SIGN REMOVED AND DISCARDED EA *$50.000 1.000 $50.00 901.11 CEMENT CONCRETE WALL FT *$500.000 110.000 $55,000.00 874.4 TRAFFIC SIGN REMOVED AND STACKED EA *$50.000 1.000 $50.00 Total Amount $19,461,725.17 $3,745,352.00 $23,207,077.17 Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm (HSIP) NORTHAMPTON - Other - Municipality (Non-Participating) Total