609286_OfficeEstimateProject Preliminary Design Estimate
104.TREE REMOVED -
DIAMETER 24
INCHES AND
OVER
EA $4,500.000 5.000 $22,500.00
103.TREE REMOVED -
DIAMETER UNDER
24 INCHES
EA $1,800.000 30.000 $54,000.00
120.EARTH
EXCAVATION
CY $55.000 16075.000 $884,125.00
105.STUMP REMOVED EA $750.000 38.000 $28,500.00
102.55 ARBORIST HR *$170.000 100.000 $17,000.00
102.1 TREE TRIMMING FT $30.000 100.000 $3,000.00
102.521 TREE AND PLANT
PROTECTION
FENCE
FT *$15.000 310.000 $4,650.00
102.511 TREE
PROTECTION -
ARMORING AND
PRUNING
EA *$500.000 20.000 $10,000.00
120.1 UNCLASSIFIED
EXCAVATION
CY $100.000 430.000 $43,000.00
145.DRAINAGE
STRUCTURE
ABANDONED
EA $1,100.000 30.000 $33,000.00
141.1 TEST PIT FOR
EXPLORATION
CY $150.000 300.000 $45,000.00
121.CLASS A ROCK
EXCAVATION
CY $125.000 60.000 $7,500.00
144.CLASS B ROCK
EXCAVATION
CY $250.000 41.000 130.000 $42,750.00
142.CLASS B TRENCH
EXCAVATION
CY $50.000 820.000 2600.000 $171,000.00
Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm
(HSIP)
NORTHAMPTON - Other - Municipality
(Non-Participating)
Total
Wednesday, February 28, 2024Measure System:E
Description:NORTHAMPTON- DOWNTOWN COMPLETE STREETS CORRIDOR AND INTERSECTION
IMPROVEMENTS ON MAIN STREET (ROUTE 9)
Date:
District:2
Extended
Description:
This is a complete street project consisting of right-of-way to
right-of-way altering of Main Street (Route 9)and intersecting
streets in downtown Northampton, from Market Street to Bedford
Terrace. This project includes improvements to sidewalks, a new
separated bike lane, installation of street furniture/tree belt, new
curbing, pavement, pavement markings, crosswalks, and signage, along
with adjustments at crossings and signalized intersections to be
more bicycle and pedestrian friendly and to improve the functioning
of intersections and the roadway.
Project:609286
Project Preliminary Design Estimate
182.1 INSPECTION AND
TESTING FOR
ASBESTOS
LS *$3,500.000 1.000 $3,500.00
182.2 REMOVAL OF
ASBESTOS
FT *$130.000 200.000 $26,000.00
181.12 DISPOSAL OF
REGULATED SOIL
- IN-STATE
FACILITY
TON *$143.000 100.000 $14,300.00
181.13 DISPOSAL OF
REGULATED SOIL
- OUT-OF-STATE
FACILITY
TON *$300.000 100.000 $30,000.00
181.14 DISPOSAL OF
HAZARDOUS
WASTE
TON *$600.000 100.000 $60,000.00
151.01 GRAVEL BORROW
- TYPE C
CY $75.000 390.000 $29,250.00
151.2 GRAVEL BORROW
FOR
BACKFILLING
STRUCTURES AND
PIPES
CY $55.000 1700.000 $93,500.00
153.CONTROLLED
DENSITY FILL -
EXCAVATABLE
CY *$200.000 525.000 $105,000.00
181.11 DISPOSAL OF
UNREGULATED
SOIL
TON *$112.000 200.000 $22,400.00
146.DRAINAGE
STRUCTURE
REMOVED
EA $1,000.000 6.000 $6,000.00
151.GRAVEL BORROW CY $58.000 4270.000 $247,660.00
180.01 ENVIRONMENTAL
HEALTH AND
SAFETY PROGRAM
LS *$10,000.00
0
1.000 $10,000.00
180.02 PERSONAL
PROTECTION
LEVEL C
UPGRADE
HR *$50.000 250.000 $12,500.00
180.03 LICENSED SITE
PROFESSIONAL
SERVICES
HR *$172.000 40.000 $6,880.00
154.SAND BORROW CY $60.000 290.000 $17,400.00
156.CRUSHED STONE TON $65.000 730.000 $47,450.00
170.FINE GRADING
AND COMPACTING
- SUBGRADE
AREA
SY $15.000 12200.000 $183,000.00
Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm
(HSIP)
NORTHAMPTON - Other - Municipality
(Non-Participating)
Total
Project Preliminary Design Estimate
220.3 DRAINAGE
STRUCTURE
CHANGE IN TYPE
EA $1,200.000 2.000 $2,400.00
220.2 DRAINAGE
STRUCTURE
REBUILT
FT $550.000 5.000 $2,750.00
220.5 DRAINAGE
STRUCTURE
REMODELED
EA $900.000 5.000 $4,500.00
201.7 12 INCH AREA
DRAIN
EA *$5,000.000 5.000 $25,000.00
201.6 OUTLET CONTROL
STRUCTURE
EA *$5,000.000 8.000 $40,000.00
202.MANHOLE EA $7,500.000 19.000 $142,500.00
201.8 10 INCH TRENCH
PAN DRAIN
EA *$5,000.000 2.000 $10,000.00
183.1 TREATMENT OF
CONTAMINATED
GROUNDWATER
GAL *$20.000 1000.000 $20,000.00
220.DRAINAGE
STRUCTURE
ADJUSTED
EA $500.000 101.000 $50,500.00
201.CATCH BASIN EA $7,500.000 52.000 $390,000.00
183.2 DISPOSAL OF
GRANULAR
ACTIVATED
CARBON
LB *$20.000 100.000 $2,000.00
210.1 SANITARY SEWER
MANHOLE
MUNICIPAL
STANDARD
EA *$20,000.00
0
2.000 $40,000.00
210.02 SANITARY SEWER
MANHOLE
REMOVED
EA *$5,000.000 2.000 $10,000.00
210.3 SANITARY SEWER
MANHOLE (14 TO
18 FOOT DEPTH)
EA *$30,000.00
0
2.000 $60,000.00
210.2 SANITARY SEWER
MANHOLE (9 TO
14 FOOT DEPTH)
EA *$25,000.00
0
2.000 $50,000.00
203.2 MANHOLE (5
FOOT DIAMETER)
EA *$10,000.00
0
9.000 $90,000.00
203.SPECIAL
MANHOLE
EA $10,500.00
0
5.000 $52,500.00
204.GUTTER INLET EA $4,000.000 5.000 $20,000.00
203.3 MANHOLE (DEEP
SUMP)
EA *$8,000.000 2.000 $16,000.00
Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm
(HSIP)
NORTHAMPTON - Other - Municipality
(Non-Participating)
Total
Project Preliminary Design Estimate
241.15 15 INCH
REINFORCED
CONCRETE PIPE
CLASS III
FT $130.000 180.000 $23,400.00
241.18 18 INCH
REINFORCED
CONCRETE PIPE
CLASS III
FT $200.000 1010.000 $202,000.00
238.18 18 INCH
DUCTILE IRON
PIPE
FT $240.000 160.000 $38,400.00
241.12 12 INCH
REINFORCED
CONCRETE PIPE
CLASS III
FT $140.000 1610.000 $225,400.00
222.31 FRAME AND
GRATE
MUNICIPAL
STANDARD
EA *$1,250.000 38.000 $47,500.00
222.32 FRAME AND
COVER
MUNICIPAL
STANDARD
EA *$1,250.000 9.000 $11,250.00
222.33 FRAME AND
GRATE - DOUBLE
EA *$2,500.000 2.000 $5,000.00
238.12 12 INCH
DUCTILE IRON
PIPE
FT $160.000 420.000 $67,200.00
220.7 SANITARY
STRUCTURE
ADJUSTED
EA $470.000 3.000 $1,410.00
221.FRAME AND
COVER
EA $1,250.000 36.000 $45,000.00
227.3 REMOVAL OF
DRAINAGE
STRUCTURE
SEDIMENT
CY $400.000 30.000 $12,000.00
227.31 REMOVAL OF
DRAINAGE PIPE
SEDIMENT
FT $20.000 840.000 $16,800.00
227.4 MASONRY PLUG SF $200.000 44.000 $8,800.00
223.2 FRAME AND
GRATE (OR
COVER) REMOVED
AND DISCARDED
EA $160.000 42.000 $6,720.00
224.12 12 INCH HOOD EA $750.000 39.000 $29,250.00
224.15 15 INCH HOOD EA $850.000 2.000 $1,700.00
Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm
(HSIP)
NORTHAMPTON - Other - Municipality
(Non-Participating)
Total
Project Preliminary Design Estimate
250.12 12 INCH
POLYVINYLCHLOR
IDE SANITARY
SEWER PIPE
FT *$180.000 450.000 $81,000.00
252.12 12 INCH
CORRUGATED
PLASTIC PIPE
FT $130.000 410.000 $53,300.00
269.06 6 INCH SLOT-
PERFORATED
CORRUGATED
PLASTIC PIPE
(SUBDRAIN)
FT $90.000 210.000 $18,900.00
302.12 12 INCH
DUCTILE IRON
WATER PIPE
(RUBBER
GASKET)
FT $250.000 1400.000 $350,000.00
250.06 6 INCH
POLYVINYL
CHLORIDE
SANITARY SEWER
PIPE
FT *$150.000 200.000 $30,000.00
250.08 8 INCH
POLYVINYL
CHLORIDE
SANITARY SEWER
PIPE
FT *$160.000 180.000 $28,800.00
302.06 6 INCH DUCTILE
IRON WATER
PIPE (RUBBER
GASKET)
FT $170.000 1080.000 $183,600.00
302.08 8 INCH DUCTILE
IRON WATER
PIPE (RUBBER
GASKET)
FT $190.000 600.000 $114,000.00
302.10 10 INCH
DUCTILE IRON
WATER PIPE
(RUBBER
GASKET)
FT $200.000 40.000 $8,000.00
295.TEMPORARY
SEWER BYPASS
SYSTEM
LS *$30,000.00
0
1.000 $30,000.00
302.03 3-INCH DUCTILE
IRON PIPE
(RUBBER
GASKET)
FT *$150.000 20.000 $3,000.00
302.04 4 INCH DUCTILE
IRON WATER
PIPE (RUBBER
GASKET)
FT $160.000 30.000 $4,800.00
Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm
(HSIP)
NORTHAMPTON - Other - Municipality
(Non-Participating)
Total
Project Preliminary Design Estimate
371.06 6 INCH
COUPLING
EA *$4,500.000 9.000 $40,500.00
371.08 8 INCH
COUPLING
EA *$600.000 1.000 $600.00
371.10 10 INCH
COUPLING
EA *$5,600.000 5.000 $28,000.00
363.15 1-1/2 INCH
CORPORATION
COCK
EA $1,800.000 1.000 $1,800.00
371.03 3 INCH
COUPLING
EA *$1,800.000 4.000 $7,200.00
371.04 4 INCH
COUPLING
EA *$1,350.000 3.000 $4,050.00
347.1 1 INCH COPPER
TUBING TYPE K
FT $100.000 1000.000 $100,000.00
347.125 1-1/4 INCH
COPPER TUBING
TYPE K
FT $125.000 210.000 $26,250.00
347.15 1-1/2 INCH
COPPER TUBING
TYPE K
FT $150.000 50.000 $7,500.00
363.125 1-1/4 INCH
CORPORATION
COCK
EA $1,700.000 7.000 $11,900.00
302.16 16 INCH
DUCTILE IRON
WATER PIPE
(RUBBER
GASKET)
FT $350.000 3050.000 $1,067,500.00
309.DUCTILE IRON
FITTINGS FOR
WATER PIPE
LB $10.000 19800.000 $198,000.00
350.06 6 INCH GATE
AND GATE BOX
EA $3,000.000 35.000 $105,000.00
358.GATE BOX
ADJUSTED
EA $297.000 61.000 $18,117.00
358.2 SHUT OFF VALVE
ADJUSTED
EA *$500.000 1.000 $500.00
363.1 1 INCH
CORPORATION
COCK
EA $1,600.000 23.000 $36,800.00
350.08 8 INCH GATE
AND GATE BOX
EA $4,000.000 7.000 $28,000.00
350.12 12 INCH GATE
AND GATE BOX
EA $6,000.000 6.000 $36,000.00
356.16 16 INCH
BUTTERFLY
VALVE AND BOX
EA *$16,000.00
0
16.000 $256,000.00
Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm
(HSIP)
NORTHAMPTON - Other - Municipality
(Non-Participating)
Total
Project Preliminary Design Estimate
384.01 1" CURB STOP &
BOX
EA *$1,100.000 23.000 $25,300.00
376.2 HYDRANT -
REMOVED AND
RESET
EA $1,200.000 20.000 $24,000.00
384.015 1.5" CURB STOP
& BOX
EA *$1,400.000 1.000 $1,400.00
384.0125 1.25" CURB
STOP & BOX
EA *$1,300.000 7.000 $9,100.00
371.12 12 INCH
COUPLING
EA *$7,000.000 5.000 $35,000.00
450.31 SUPERPAVE
INTERMEDIATE
COURSE - 12.5
(SIC -12.5)
TON $250.000 290.000 $72,500.00
376.HYDRANT EA $8,000.000 23.000 $184,000.00
371.16 16 INCH
COUPLING
EA *$1,700.000 1.000 $1,700.00
390.WATER FEATURE LS *$108,535.0
00
1.000 $108,535.00
443.WATER FOR
ROADWAY DUST
CONTROL
MGL $80.000 36.000 $2,880.00
440.CALCIUM
CHLORIDE FOR
ROADWAY DUST
CONTROL
LB $0.400 88800.000 $35,520.00
450.23 SUPERPAVE
SURFACE COURSE
- 12.5 (SSC -
12.5)
TON $205.000 2240.000 $459,200.00
450.22 SUPERPAVE
SURFACE COURSE
- 9.5 (SSC -
9.5)
TON $300.000 375.000 $112,500.00
402.DENSE GRADED
CRUSHED STONE
FOR SUB-BASE
CY $95.000 2810.000 $266,950.00
395.TEMPORARY
WATER BY-PASS
SYSTEM
LS *$200,000.0
00
1.000 $200,000.00
431.HIGH EARLY
STRENGTH
CEMENT
CONCRETE BASE
COURSE
SY $80.000 450.000 $36,000.00
415.2 PAVEMENT FINE
MILLING
SY $12.000 4455.000 $53,460.00
Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm
(HSIP)
NORTHAMPTON - Other - Municipality
(Non-Participating)
Total
Project Preliminary Design Estimate
507.1 GRANITE CURB
AT
BIORETENTION
AREA - CURVED
FT *$220.000 95.000 $20,900.00
508.GRANITE
BEVELED CURB -
STRAIGHT
FT *$200.000 2215.000 $443,000.00
507.GRANITE CURB
AT
BIORETENTION
AREA -
STRAIGHT
FT *$175.000 570.000 $99,750.00
508.1 GRANITE
BEVELED CURB -
CURVED
FT *$250.000 385.000 $96,250.00
508.4 GRANITE
CHAMFERED CURB
- CURVED
FT *$110.000 155.000 $17,050.00
508.2 GRANITE
BEVELED
TRANSITION
CURB
FT *$500.000 425.000 $212,500.00
508.3 GRANITE
CHAMFERED CURB
- STRAIGHT
FT *$90.000 440.000 $39,600.00
450.42 SUPERPAVE BASE
COURSE - 37.5
(SBC - 37.5)
TON $195.000 4115.000 $802,425.00
451.HMA FOR
PATCHING
TON $300.000 1090.000 $327,000.00
504.1 GRANITE CURB
TYPE VA4 -
CURVED
FT $90.000 2110.000 $189,900.00
450.32 SUPERPAVE
INTERMEDIATE
COURSE - 19.0
(SIC - 19.0)
TON $219.000 3215.000 $704,085.00
452.ASPHALT
EMULSION FOR
TACK COAT
GAL $15.000 3500.000 $52,500.00
482.3 SAWCUTTING
ASPHALT
PAVEMENT
FT $10.000 2205.000 $22,050.00
504.GRANITE CURB
TYPE VA4 -
STRAIGHT
FT $75.000 4440.000 $333,000.00
453.HMA JOINT
ADHESIVE
FT $9.000 17275.000 $155,475.00
472.TEMPORARY
ASPHALT
PATCHING
TON $250.000 1935.000 $483,750.00
Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm
(HSIP)
NORTHAMPTON - Other - Municipality
(Non-Participating)
Total
Project Preliminary Design Estimate
517.5 GRANITE CORNER
BLOCK AT
BIORETENTION
AREA
EA *$240.000 48.000 $11,520.00
516.GRANITE CURB
CORNER TYPE A
EA $400.000 89.000 $35,600.00
655.11 METAL HANDRAIL FT *$200.000 955.000 $191,000.00
594.CURB REMOVED
AND DISCARDED
FT $9.000 6125.000 $55,125.00
508.5 GRANITE
CHAMFERED
TRANSITION
CURB
FT *$150.000 115.000 $17,250.00
701.1 CEMENT
CONCRETE
SIDEWALK AT
DRIVEWAYS
SY $100.000 170.000 $17,000.00
509.1 GRANITE
TRANSITION
CURB FOR
PEDESTRIAN
CURB RAMPS -
CURVED
FT $112.000 260.000 $29,120.00
509.GRANITE
TRANSITION
CURB FOR
PEDESTRIAN
CURB RAMPS -
STRAIGHT
FT $100.000 1510.000 $151,000.00
693.1 CONCRETE
STAIRS WITH
GRANITE TREAD
LF *$500.000 115.000 $57,500.00
690.6 REBUILD
GRANITE WALL
CY *$350.000 30.000 $10,500.00
701.CEMENT
CONCRETE
SIDEWALK
SY $100.000 7810.000 $781,000.00
697.1 SILT SACK EA *$160.000 94.000 $15,040.00
655.42 42" HT
ORNAMENTAL
METAL RAIL
FT *$200.000 120.000 $24,000.00
655.12 12" HT
ORNAMENTAL
METAL RAIL
FT *$125.000 335.000 $41,875.00
685.3 GRANITE BLOCK
SEAT STEPS
FT *$600.000 100.000 $60,000.00
655.48 48" HT
ORNAMENTAL
METAL RAIL
FT *$200.000 120.000 $24,000.00
Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm
(HSIP)
NORTHAMPTON - Other - Municipality
(Non-Participating)
Total
Project Preliminary Design Estimate
707.15 PARK BENCH
REMOVED AND
RESET
EA *$2,000.000 4.000 $8,000.00
707.16 WOOD PLATFORM
72"X72"X18"
EA *$8,000.000 3.000 $24,000.00
707.14 METAL TABLE EA *$1,000.000 23.000 $23,000.00
707.13 METAL CHAIR EA *$2,000.000 33.000 $66,000.00
707.17 WOOD PLATFORM
18"X18"X12"
EA *$4,000.000 8.000 $32,000.00
707.2 TRASH
RECEPTACLE
EA *$1,500.000 18.000 $27,000.00
707.71 RESET STATUE EA *$4,000.000 1.000 $4,000.00
706.01 BRICK PAVERS
ON BITUMINOUS
BASE
SY *$250.000 930.000 $232,500.00
706.02 BRICK PAVERS
ON CONCRETE
BASE
SY *$300.000 1880.000 $564,000.00
702.HOT MIX
ASPHALT
SIDEWALK OR
DRIVEWAY
TON $300.000 339.000 $101,700.00
707.12 CONCRETE BENCH
WOODEN TOP
FT *$500.000 210.000 $105,000.00
701.2 CEMENT
CONCRETE
PEDESTRIAN
CURB RAMP
SY $160.000 860.000 $137,600.00
706.03 PERMEABLE
BRICK PAVERS
ON AGGREGATE
BAS
SY *$425.000 110.000 $46,750.00
706.9 FLUSH
COBBLESTONE
MEDIAN
SY *$270.000 450.000 $121,500.00
707.BENCH EA *$4,000.000 14.000 $56,000.00
706.718 18"X18"
GRANITE PAVERS
ON CONCRETE
BASE
$*$450.000 10.000 $4,500.00
706.11 MATCH EXISTING
WALKWAY
MATERIAL
SY *$400.000 30.000 $12,000.00
706.712 12"X12"
GRANITE PAVER
BAND ON
BITUMINOUS
BASE
SY *$400.000 70.000 $28,000.00
Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm
(HSIP)
NORTHAMPTON - Other - Municipality
(Non-Participating)
Total
Project Preliminary Design Estimate
757.08 BIORETENTION
AREA #8
LS *$20,000.00
0
1.000 $20,000.00
765.SEEDING SY $3.500 360.000 $1,260.00
761.3 PLANTING SOIL CY *$140.000 1620.000 $226,800.00
745.PEDESTRIAN BUS
SHELTER
EA *$30,250.00
0
3.000 $90,750.00
740.ENGINEER'S
FIELD OFFICE
AND EQUIPMENT
(TYPE A)
MO *$3,000.000 38.000 $114,000.00
748.MOBILIZATION LS $675,934.2
90
1.000 $675,934.29
745.2 PEDESTRIAN BUS
SHELTER
REMOVED AND
STACKED
LS *$8,000.000 1.000 $8,000.00
715.1 MAIL BOX
REMOVED AND
RESET
EA *$2,000.000 4.000 $8,000.00
707.72 RESET MEMORIAL EA *$6,000.000 1.000 $6,000.00
757.07 BIORETENTION
AREA #7
$*$50,000.00
0
1.000 $50,000.00
707.9 BICYCLE RACK EA *$1,860.000 45.000 $83,700.00
707.73 RESET
NEWSPAPER
CONDO
EA *$1,000.000 1.000 $1,000.00
757.04 BIORETENTION
AREA #4
LS *$20,000.00
0
1.000 $20,000.00
757.03 BIORETENTION
AREA #3
LS *$20,000.00
0
1.000 $20,000.00
757.06 BIORETENTION
AREA #6
LS *$30,000.00
0
1.000 $30,000.00
757.05 BIORETENTION
AREA #5
LS *$40,000.00
0
1.000 $40,000.00
757.02 BIORETENTION
AREA #2
LS *$15,000.00
0
1.000 $15,000.00
751.8 STRUCTURAL
SOIL CELLS
CF *$6.850 118344.000 $810,656.40
751.LOAM FOR
ROADSIDES
CY $75.000 578.000 $43,350.00
757.01 BIORETENTION
AREA #1
LS *$20,000.00
0
1.000 $20,000.00
756.NPDES
STORMWATER
POLLUTION
PREVENTION
PLAN
LS *$25,000.00
0
1.000 $25,000.00
Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm
(HSIP)
NORTHAMPTON - Other - Municipality
(Non-Participating)
Total
Project Preliminary Design Estimate
794.731 SUMMERSWEET
SHRUB 18-24
INCH / #2
EA $108.000 40.000 $4,320.00
796.100 WINDFLOWER EA *$33.000 200.000 $6,600.00
796.150 MOSS PHILOX EA *$30.000 300.000 $9,000.00
794.600 DWARF
FOTHERGILLA
EA *$126.000 90.000 $11,340.00
794.400 SWEETGALE EA *$99.000 96.000 $9,504.00
794.500 DWARF EUROPEAN
CRANBERRY
EA *$135.000 30.000 $4,050.00
796.200 PERENNIAL
GRASS #1
EA $31.500 200.000 $6,300.00
777.200 FIRESTARTER'
BLACK TUPELO
EA *$1,395.000 11.000 $15,345.00
777.240 OAK - SCARLET
1.5-2 INCH
CALIPER
EA $1,425.000 9.000 $12,825.00
777.300 SHAWNEE BRAVE'
BALD CYPRESS
EA *$1,980.000 5.000 $9,900.00
777.138 OAK - PIN 2-
2.5 INCH
CALIPER
EA $1,140.000 1.000 $1,140.00
794.331 SUMAC SHRUB -
FRAGRANT-GRO-
LOW 2-3 FEET /
#2
EA $105.000 10.000 $1,050.00
767.6 AGED PINE BARK
MULCH
CY $98.000 110.000 $10,780.00
777.100 AUTUMN' GOLD
GINKGO
EA *$1,650.000 9.000 $14,850.00
785.200 RUSSIAN
CYPRESS
EA *$108.000 40.000 $4,320.00
794.100 LOW SCAPE
MOUND ARONIA
EA *$120.000 46.000 $5,520.00
794.200 COMPACT
LEATHERLEAF
EA *$120.000 135.000 $16,200.00
785.100 GEM BOX
INKBERRY
EA *$132.000 170.000 $22,440.00
777.400 PATRIOT'S
PRINCETON ELM
EA *$1,455.000 10.000 $14,550.00
781.284 HAWTHORN -
COCKSPUR 1.5-2
INCH CALIPER
EA $1,035.000 9.000 $9,315.00
782.533 REDBUD -
EASTERN 4-5
FEET
EA $1,230.000 9.000 $11,070.00
Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm
(HSIP)
NORTHAMPTON - Other - Municipality
(Non-Participating)
Total
Project Preliminary Design Estimate
816.02 TRAFFIC SIGNAL
RECONSTRUCTION
LOCATION NO. 2
LS $341,163.6
00
1.000 $341,163.60
816.04 TRAFFIC SIGNAL
RECONSTRUCTION
LOCATION NO. 4
LS *$240,017.6
50
1.000 $240,017.65
816.03 TRAFFIC SIGNAL
RECONSTRUCTION
LOCATION NO. 3
LS $450,051.9
30
1.000 $450,051.93
796.600 ASTER EA *$30.750 200.000 $6,150.00
796.500 DAYLILY HAPPY
RETURNS
EA *$33.000 200.000 $6,600.00
796.800 CARDINAL
FLOWER
EA *$33.750 200.000 $6,750.00
796.700 LILYTURF EA *$31.500 541.000 $17,041.50
796.400 JOE-PYE WEED EA *$33.000 200.000 $6,600.00
796.250 BLACK EYED
SUSAN
EA *$33.000 110.000 $3,630.00
816.01 TRAFFIC SIGNAL
RECONSTRUCTION
LOCATION NO. 1
LS $256,149.2
80
1.000 $256,149.28
796.350 CREEPING THYME EA *$18.000 162.000 $2,916.00
796.300 PURPLE
CONEFLOWER
EA *$34.500 200.000 $6,900.00
811.34 GENERAL
MANHOLE
ADJUSTED
EA *$1,000.000 1.000 $1,000.00
797.500 PRARIE
DROPSEED
EA *$36.000 267.000 $9,612.00
811.37 ELECTRIC
HANDHOLE
ADJUSTED
EA $400.000 26.000 $10,400.00
811.36 ELECTRIC
MANHOLE
ADJUSTED
EA $1,100.000 16.000 $17,600.00
797.400 CHEYENNE SKY
SWITCHGRASS
$*$36.000 151.000 $5,436.00
797.200 BLUE ZINGER'S
EDGE
EA *$36.000 291.000 $10,476.00
796.900 WALKER'S LOW
CATMINT
EA *$33.000 237.000 $7,821.00
797.300 ‘BURGUNDY
BUNNY’,
FOUNTAIN GRASS
EA *$37.500 74.000 $2,775.00
797.250 ICE DANCE'S
EDGE
EA *$36.000 352.000 $12,672.00
Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm
(HSIP)
NORTHAMPTON - Other - Municipality
(Non-Participating)
Total
Project Preliminary Design Estimate
852.12 TEMPORARY
PEDESTRIAN
RAMP
EA *$263.000 45.000 $11,835.00
854.016 TEMPORARY
PAVING
MARKINGS - 6
INCH (PAINTED)
FT $2.230 6700.000 $14,941.00
852.SAFETY SIGNING
FOR TRAFFIC
MANAGEMENT
SF $30.000 1130.000 $33,900.00
852.11 TEMPORARY
PEDESTRIAN
BARRICADE
FT *$13.000 22500.000 $292,500.00
856.ARROW BOARD DAY $10.000 1095.000 $10,950.00
856.12 PORTABLE
CHANGEABLE
MESSAGE SIGN
DAY $25.000 1125.000 $28,125.00
820.14 ROADWAY
LIGHTING
LS *$1,645,749
.020
1.000 $1,645,749.02
820.16 STRING
LIGHTING
LS *$26,900.00
0
1.000 $26,900.00
850.41 ROADWAY
FLAGGER
HR $69.000 8640.000 $596,160.00
816.81 TEMPORARY
TRAFFIC
CONTROL SIGNAL
LS *$250,000.0
00
1.000 $250,000.00
823.71 HIGHWAY
LIGHTING POLE
AND LUMINAIRE
REMOVED AND
STACKED
EA *$1,100.000 33.000 $36,300.00
832.WARNING-
REGULATORY AND
ROUTE MARKER -
ALUMINUM PANEL
(TYPE A)
SF $16.000 560.000 $8,960.00
847.1 SIGN SUP
(N/GUIDE)+RTE
MKR W/1 BRKWAY
POST ASSEMBLY
- STEEL
EA $240.000 80.000 $19,200.00
823.72 REMOVE
CONCRETE
FOUNDATION FOR
ROADWAY
LIGHTING
EA *$800.000 33.000 $26,400.00
824.221 FLASHING
WARNING BEACON
TYPE D (SOLAR
POWERED)
LS *$15,000.00
0
1.000 $15,000.00
Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm
(HSIP)
NORTHAMPTON - Other - Municipality
(Non-Participating)
Total
Project Preliminary Design Estimate
867.106 6 INCH
REFLECTORIZED
YELLOW LINE
(THERMOPLASTIC
)
FT $1.500 6370.000 $9,555.00
874.2 TRAFFIC SIGN
REMOVED AND
RESET
EA *$200.000 105.000 $21,000.00
866.124 24 INCH
REFLECTORIZED
WHITE LANE
(THERMOPLASTIC
)
FT *$10.000 1900.000 $19,000.00
859.1 REFLECTORIZED
DRUMS WITH
SEQUENTIAL
FLASHING
WARNING LIGHTS
DAY *$0.500 197100.000 $98,550.00
864.PAVEMENT ARROW
REFLECTORIZED
WHITE
(PAINTED)
SF $15.000 1580.000 $23,700.00
866.112 12 INCH
REFLECTORIZED
WHITE LINE
(THERMOPLASTIC
)
FT $6.000 1040.000 $6,240.00
859.REFLECTORIZED
DRUM
DAY $0.210 335100.000 $70,371.00
866.106 6 INCH
REFLECTORIZED
WHITE LINE
(THERMOPLASTIC
)
FT $1.500 6500.000 $9,750.00
866.108 8 INCH
REFLECTORIZED
WHITE LINE
(THERMOPLASTIC
)
FT *$3.750 450.000 $1,687.50
864.04 PAVEMENT
ARROWS AND
LEGENDS
REFLECTORIZED
WHITE
(THERMOPLASTIC
)
SF $10.000 1650.000 $16,500.00
864.1 GREEN FRICTION
SURFACE
(THERMOPLASTIC
)
SF *$35.000 1600.000 $56,000.00
Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm
(HSIP)
NORTHAMPTON - Other - Municipality
(Non-Participating)
Total
Project Preliminary Design Estimate
955.1 WOOD DECK ON
STRUCTURAL
STEEL FRAME
SY *$2,250.000 65.000 $146,250.00
901.14 CEMENT
CONCRETE EDGE
FT *$150.000 350.000 $52,500.00
874.41 TRAFFIC SIGN
REMOVED AND
DISCARDED
EA *$50.000 1.000 $50.00
901.11 CEMENT
CONCRETE WALL
FT *$500.000 110.000 $55,000.00
874.4 TRAFFIC SIGN
REMOVED AND
STACKED
EA *$50.000 1.000 $50.00
Total Amount $19,461,725.17 $3,745,352.00 $23,207,077.17
Item #Description Units Type Unit Price FA - Hwy Safety Improvement Prgm
(HSIP)
NORTHAMPTON - Other - Municipality
(Non-Participating)
Total