609286_Calc Book_1-28-2022SECTION PAGE CONSTRUCTION COST ESTIMATE 1-3 EARTHWORK QUANTITY SHEETS 4-7 SUMMARY SHEETS A-E 8-13 ITEMIZED CALCULATIONS Item 101.CLEARING AND GRUBBING 14 Item 102.1 TREE TRIMMING 15 Item 102.511 TREE PROTECTION – ARMORING & PRUNING 16 Item 102.521 TREE AND PLANT PROTECTION FENCE 17 Item 102.55 ARBORIST 18 Item 103.TREE REMOVED - DIAMETER UNDER 24 INCHES 19 Item 104.TREE REMOVED - DIAMETER 24 INCHES AND OVER 20 Item 105.STUMP REMOVED 21 Item 120.EARTH EXCAVATION 22 Item 121.CLASS A ROCK EXCAVATION 23 Item 141.1 TEST PIT FOR EXPLORATION 24 Item 142.CLASS B TRENCH EXCAVATION 25 Item 144.CLASS B ROCK EXCAVATION 26 Item 145.DRAINAGE STRUCTURE ABANDONED 27 Item 146.DRAINAGE STRUCTURE REMOVED 28 Item 151.GRAVEL BORROW 29 Item 151.01 GRAVEL BORROW - TYPE C 30 Item 151.2 GRAVEL BORROW FOR BACKFILLING STRUCTURES AND PIPES 31 Item 153.CONTROLLED DENSITY FILL - EXCAVATABLE 32 Item 154.SAND BORROW 33 Item 156.CRUSHED STONE 34 Item 170.FINE GRADING AND COMPACTING - SUBGRADE AREA 35-36 Item 201.CATCH BASIN 37 Item 202.MANHOLE 38 Item 204.GUTTER INLET 39 Item 210.SANITARY SEWER MANHOLE 40 Item 220.DRAINAGE STRUCTURE ADJUSTED 41 Item 220.2 DRAINAGE STRUCTURE REBUILT 42 Item 220.3 DRAINAGE STRUCTURE CHANGE IN TYPE 43 Item 220.5 DRAINAGE STRUCTURE REMODELED 44 Item 220.7 SANITARY STRUCTURE ADJUSTED 45 Item 222.31 FRAME AND GRATE MUNICIPAL STANDARD 46 Item 222.32 FRAME AND COVER MUNICIPAL STANDARD 47 Item 223.1 FRAME AND GRATE (OR COVER) REMOVED AND STACKED 48 Item 224.12 12 INCH HOOD 49 Item 227.3 REMOVAL OF DRAINAGE STRUCTURE SEDIMENT 50 Item 227.31 REMOVAL OF DRAINAGE PIPE SEDIMENT 51 Item 227.4 MASONRY PLUG 52 Item 238.04 4 INCH DUCTILE IRON PIPE - WATER 53-54 Item 238.06 6 INCH DUCTILE IRON PIPE - WATER 55 Item 238.08 8 INCH DUCTILE IRON PIPE - WATER 56 Item 238.10 10 INCH DUCTILE IRON PIPE - WATER 57 Item 238.12 12 INCH DUCTILE IRON PIPE - WATER 58 Item 238.12 12 INCH DUCTILE IRON PIPE - DRAINAGE 59 Item 238.16 16 INCH DUCTILE IRON PIPE - WATER 60 Item 238.18 18 INCH DUCTILE IRON PIPE - DRAINAGE 61 Item 241.12 12 INCH REINFORCED CONCRETE PIPE 62 Item 241.15 15 INCH REINFORCED CONCRETE PIPE 63 Item 241.18 18 INCH REINFORCED CONCRETE PIPE 64 ESTIMATE QUANTITY CALCULATION BOOK INDEX SECTION PAGE ESTIMATE QUANTITY CALCULATION BOOK INDEX Item 241.24 24 INCH REINFORCED CONCRETE PIPE 65 Item 241.36 36 INCH REINFORCED CONCRETE PIPE 66 Item 250.06 6 INCH POLYVINYL CHLORIDE SANITARY SEWER PIPE 67 Item 250.08 8 INCH POLYVINYL CHLORIDE SANITARY SEWER PIPE 68 Item 250.12 12 INCH POLYVINYLCHLORIDE SANITARY SEWER PIPE 69 Item 271.12 12 INCH AND UNDER PIPE REMOVED AND STACKED 70 Item 271.18 18 INCH PIPE REMOVED AND STACKED 71 Item 271.36 36 INCH PIPE REMOVED AND STACKED 72 Item 291.1 STORMWATER LANDSCAPE AREAS 73 Item 309.DUCTILE IRON FITTINGS FOR WATER PIPE 74 Item 347.1 1 INCH COPPER TUBING TYPE K 75 Item 350.06 6 INCH GATE AND GATE BOX 76 Item 350.08 8 INCH GATE AND GATE BOX 77 Item 350.12 12 INCH GATE AND GATE BOX 78 Item 350.16 16 INCH GATE AND GATE BOX 79 Item 358.GATE BOX ADJUSTED 80 Item 363.1 1 INCH CORPORATION COCK 81 Item 376.HYDRANT 82 Item 384.CURB STOP 83 Item 390.TEMPORARY WATER BY-PASS SYSTEM 84 Item 402.DENSE GRADED CRUSHED STONE FOR SUB-BASE 85 Item 415.2 PAVEMENT FINE MILLING 86 Item 431.HIGH EARLY STRENGTH CEMENT CONCRETE BASE COURSE 87 Item 440.CALCIUM CHLORIDE FOR ROADWAY DUST CONTROL 88 Item 443.WATER FOR ROADWAY DUST CONTROL 89 Item 450.22 SUPERPAVE SURFACE COURSE – 9.5 (SSC – 9.5)90 Item 450.23 SUPERPAVE SURFACE COURSE - 12.5 (SSC - 12.5)91 Item 450.31 SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC -12.5)92 Item 450.32 SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC - 19.0)93 Item 450.42 SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5)94 Item 451.HMA FOR PATCHING 95 Item 452.ASPHALT EMULSION FOR TACK COAT 96 Item 453.HMA JOINT SEALANT 97 Item 472.TEMPORARY ASPHALT PATCHING 98 Item 482.3 SAWCUTTING ASPHALT PAVEMENT 99 Item 504.GRANITE CURB TYPE VA4 - STRAIGHT 100 Item 504.1 GRANITE CURB TYPE VA4 - CURVED 101 Item 509.GRANITE TRANSITION CURB FOR PEDESTRIAN CURB RAMPS - STRAIGHT 102 Item 509.1 GRANITE TRANSITION CURB FOR PEDESTRIAN CURB RAMPS - CURVED 103 Item 516.GRANITE CURB CORNER TYPE A 104 Item 594.CURB REMOVED AND DISCARDED 105 Item 697.1 SILT SACK 106 Item 701.CEMENT CONCRETE SIDEWALK 107 Item 701.1 CEMENT CONCRETE SIDEWALK AT DRIVEWAYS 108 Item 701.2 CEMENT CONCRETE PEDESTRIAN CURB RAMP 109 Item 702.HOT MIX ASPHALT SIDEWALK OR DRIVEWAY 110 Item 706.7 CONCRETE UNIT PAVER 111 Item 706.8 PERMEABLE PAVER 112 Item 706.9 COBBLE PAVER 113 Item 707.1 PARK BENCH 114 Item 707.19 GRANITE BENCH 115 Item 707.2 TRASH RECEPTACLE 116 Item 707.9 BICYCLE RACK 117 SECTION PAGE ESTIMATE QUANTITY CALCULATION BOOK INDEX Item 740 ENGINEERS FIELD OFFICE AND EQUIPMENT (TYPE A)118 Item 745 PEDESTRIAN BUS SHELTER 119 Item 745.2 PEDESTRIAN BUS SHELTER REMOVED AND STACKED 120 Item 748.MOBILIZATION 121 Item 751.LOAM BORROW 122 Item 751.7 COMPOST BLANKET 123 Item 751.8 STRUCTURAL SOIL 124 Item 756.NPDES STORMWATER POLLUTION PREVENTION PLAN 125 Item 765.SEEDING 126 Item 767.7 FLEXIPAVE 127 Item 784 CANOPY TREE - 2.5-3 INCH CALIPER 128 Item 796.8 PERENNIAL 129 Item 811.36 ELECTRIC MANHOLE ADJUSTED 130 Item 811.37 ELECTRIC HANDHOLE ADJUSTED 131 Item 816.01 TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO. 1 132 Item 816.02 TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO. 2 133 Item 816.03 TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO. 3 134 Item 816.04 TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO. 4 135 Item 820.14 ROADWAY LIGHTING 136 Item 820.15 PEDESTRIAN LIGHTING 137 Item 823.71 HIGHWAY LIGHTING POLE AND LUMINAIRE REMOVED AND STACKED 138 Item 823.72 REMOVE CONCRETE FOUNDATION FOR ROADWAY LIGHTING 139 Item 832.WARNING-REGULATORY AND ROUTE MARKER - ALUMINUM PANEL (TYPE A)140 Item 847.1 SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST ASSEMBLY - STEEL 141 Item 850.41 ROADWAY FLAGGER 142 Item 852.SAFETY SIGNING FOR TRAFFIC MANAGEMENT 143 Item 852.11 TEMPORARY PEDESTRIAN BARRICADE 144 Item 852.12 TEMPORARY PEDESTRAIN RAMP 145 Item 856.ARROW BOARD 146 Item 856.12 PORTABLE CHANGEABLE MESSAGE SIGN 147 Item 859. REFLECTORIZED DRUM 148 Item 864.04 PAVEMENT ARROWS AND LEGENDS REFLECTORIZED WHITE (THERMOPLASTIC)149 Item 864.1 GREEN FRICTION SURFACE (THERMOPLASTIC)150 Item 864.15 RED FRICTION SURFACE (THERMOPLASTIC)151 Item 864.2 RAINBOW FRICTION SURFACE (THERMOPLASTIC)152 Item 866.106 6 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC)153 Item 866.112 12 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC)154 Item 866.124 24 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC)155 Item 867.106 6 INCH REFLECTORIZED YELLOW LINE (THERMOPLASTIC)156 Item 874.2 TRAFFIC SIGN REMOVED AND RESET 157 Item 877.1 SIGN POST REMOVED AND DISCARDED 158 1/28/2022 MASSDOT PROJECT NO.: 25%PROJECT DESCRIPTION: CALC BOOK NUMBER XXXXXX CK PROJECT LOCATION: SY ITEM QTY UNIT DESCRIPTION UNIT PRICE PARTICIPATING NON- PARTICIPATING 101. 1 A CLEARING AND GRUBBING $5,000.00 $5,000.00 102.1 100 FT TREE TRIMMING $30.00 $3,000.00 * 102.511 20 EA TREE PROTECTION – ARMORING & PRUNING $350.00 $7,000.00 102.521 310 FT TREE AND PLANT PROTECTION FENCE $15.00 $4,650.00 102.55 64 HR ARBORIST $300.00 $19,200.00 103. 30 EA TREE REMOVED - DIAMETER UNDER 24 INCHES $1,800.00 $54,000.00 104. 5 EA TREE REMOVED - DIAMETER 24 INCHES AND OVER $4,500.00 $22,500.00 105. 38 EA STUMP REMOVED $750.00 $28,500.00 120. 10400 CY EARTH EXCAVATION $34.00 $353,600.00 121. 40 CY CLASS A ROCK EXCAVATION $75.00 $3,000.00 141.1 400 CY TEST PIT FOR EXPLORATION $110.00 $44,000.00 142. 700 CY CLASS B TRENCH EXCAVATION $36.00 $25,200.00 144. 33 CY CLASS B ROCK EXCAVATION $156.00 $5,148.00 145. 26 EA DRAINAGE STRUCTURE ABANDONED $700.00 $18,200.00 146. 10 EA DRAINAGE STRUCTURE REMOVED $750.00 $7,500.00 151. 5250 CY GRAVEL BORROW $40.00 $210,000.00 151.01 720 CY GRAVEL BORROW - TYPE C $31.00 $22,320.00 151.2 2000 CY GRAVEL BORROW FOR BACKFILLING STRUCTURES AND PIPES $50.00 $100,000.00 * 153. 1600 CY CONTROLLED DENSITY FILL - EXCAVATABLE $175.00 $280,000.00 154. 240 CY SAND BORROW $50.00 $12,000.00 156. 765 TON CRUSHED STONE $52.00 $39,780.00 170. 13000 SY FINE GRADING AND COMPACTING - SUBGRADE AREA $15.00 $195,000.00 201. 72 EA CATCH BASIN $4,500.00 $324,000.00 202. 24 EA MANHOLE $5,000.00 $120,000.00 204. 5 EA GUTTER INLET $2,500.00 $12,500.00 210. 7 EA SANITARY SEWER MANHOLE $10,000.00 $70,000.00 220. 111 EA DRAINAGE STRUCTURE ADJUSTED $450.00 $49,950.00 220.2 15 FT DRAINAGE STRUCTURE REBUILT $500.00 $7,500.00 220.3 5 EA DRAINAGE STRUCTURE CHANGE IN TYPE $1,000.00 $5,000.00 220.5 2 EA DRAINAGE STRUCTURE REMODELED $800.00 $1,600.00 220.7 3 EA SANITARY STRUCTURE ADJUSTED $425.00 $1,275.00 * 222.31 56 EA FRAME AND GRATE MUNICIPAL STANDARD $1,000.00 $56,000.00 * 222.32 32 EA FRAME AND COVER MUNICIPAL STANDARD $100.00 $3,200.00 * 223.1 45 EA FRAME AND GRATE (OR COVER) REMOVED AND STACKED $100.00 $4,500.00 224.12 47 EA 12 INCH HOOD $500.00 $23,500.00 227.3 70 CY REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $255.00 $17,850.00 227.31 670 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $10.00 $6,700.00 227.4 70 SF MASONRY PLUG $120.00 $8,400.00 * 238.04 50 FT 4 INCH DUCTILE IRON PIPE - WATER $100.00 $5,000.00 238.06 1000 FT 6 INCH DUCTILE IRON PIPE - WATER $110.00 $110,000.00 * 238.08 600 FT 8 INCH DUCTILE IRON PIPE - WATER $110.00 $66,000.00 238.10 30 FT 10 INCH DUCTILE IRON PIPE - WATER $115.00 $3,450.00 238.12 750 FT 12 INCH DUCTILE IRON PIPE - WATER $160.00 $120,000.00 238.12 140 FT 12 INCH DUCTILE IRON PIPE - DRAINAGE $160.00 $22,400.00 238.16 3050 FT 16 INCH DUCTILE IRON PIPE - WATER $180.00 $549,000.00 238.18 130 FT 18 INCH DUCTILE IRON PIPE - DRAINAGE $185.00 $24,050.00 241.12 2270 FT 12 INCH REINFORCED CONCRETE PIPE $100.00 $227,000.00 241.15 450 FT 15 INCH REINFORCED CONCRETE PIPE $110.00 $49,500.00 241.18 630 FT 18 INCH REINFORCED CONCRETE PIPE $120.00 $75,600.00 241.24 50 FT 24 INCH REINFORCED CONCRETE PIPE $155.00 $7,750.00 241.36 70 FT 36 INCH REINFORCED CONCRETE PIPE $250.00 $17,500.00 * 250.06 75 FT 6 INCH POLYVINYL CHLORIDE SANITARY SEWER PIPE $150.00 $11,250.00 * 250.08 350 FT 8 INCH POLYVINYL CHLORIDE SANITARY SEWER PIPE $130.00 $45,500.00 * 250.12 400 FT 12 INCH POLYVINYLCHLORIDE SANITARY SEWER PIPE $120.00 $48,000.00 * 271.12 560 FT 12 INCH AND UNDER PIPE REMOVED AND STACKED $40.00 $22,400.00 * 271.18 50 FT 18 INCH PIPE REMOVED AND STACKED $50.00 $2,500.00 * 271.36 70 FT 36 INCH PIPE REMOVED AND STACKED $80.00 $5,600.00 * 291.1 1 LS STORMWATER LANDSCAPE AREAS $125,000.00 $125,000.00 309. 18000 LB DUCTILE IRON FITTINGS FOR WATER PIPE $10.00 $180,000.00 347.1 1000 FT 1 INCH COPPER TUBING TYPE K $70.00 $70,000.00 350.06 25 EA 6 INCH GATE AND GATE BOX $2,200.00 $55,000.00 350.08 7 EA 8 INCH GATE AND GATE BOX $2,500.00 $17,500.00 350.12 6 EA 12 INCH GATE AND GATE BOX $3,500.00 $21,000.00 350.16 16 EA 16 INCH GATE AND GATE BOX $6,000.00 $96,000.00 358. 29 EA GATE BOX ADJUSTED $270.00 $7,830.00 363.1 27 EA 1 INCH CORPORATION COCK $270.00 $7,290.00 376. 19 EA HYDRANT $6,000.00 $114,000.00SPEC PROVIDEDCONSTRUCTION COST ESTIMATE DATE:609286 DESIGN LEVEL:Main Street Reconstruction ESTIMATOR:Northampton CHECKED BY: 1/28/2022 MASSDOT PROJECT NO.: 25%PROJECT DESCRIPTION: CALC BOOK NUMBER XXXXXX CK PROJECT LOCATION: SY ITEM QTY UNIT DESCRIPTION UNIT PRICE PARTICIPATING NON- PARTICIPATINGSPEC PROVIDEDCONSTRUCTION COST ESTIMATE DATE:609286 DESIGN LEVEL:Main Street Reconstruction ESTIMATOR:Northampton CHECKED BY: 384. 27 EA CURB STOP $400.00 $10,800.00 390. 1 LS TEMPORARY WATER BY-PASS SYSTEM $100,000.00 $100,000.00 402. 1540 CY DENSE GRADED CRUSHED STONE FOR SUB-BASE $75.00 $115,500.00 415.2 14340 SY PAVEMENT FINE MILLING $7.50 $107,550.00 431. 520 SY HIGH EARLY STRENGTH CEMENT CONCRETE BASE COURSE $78.00 $40,560.00 440. 56700 LB CALCIUM CHLORIDE FOR ROADWAY DUST CONTROL $0.40 $22,680.00 443. 29 MGL WATER FOR ROADWAY DUST CONTROL $57.00 $1,653.00 450.22 490 TON SUPERPAVE SURFACE COURSE – 9.5 (SSC – 9.5)$140.00 $68,600.00 450.23 2160 TON SUPERPAVE SURFACE COURSE - 12.5 (SSC - 12.5)$140.00 $302,400.00 450.31 355 TON SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC -12.5)$175.00 $62,125.00 450.32 2480 TON SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC - 19.0)$135.00 $334,800.00 450.42 1715 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5)$140.00 $240,100.00 * 451. 1270 TON HMA FOR PATCHING $210.00 $266,700.00 * 452. 2590 GAL ASPHALT EMULSION FOR TACK COAT $8.00 $20,720.00 453. 31475 FT HMA JOINT SEALANT $1.00 $31,475.00 472. 1452 TON TEMPORARY ASPHALT PATCHING $210.00 $304,920.00 482.3 940 FT SAWCUTTING ASPHALT PAVEMENT $10.00 $9,400.00 504. 13000 FT GRANITE CURB TYPE VA4 - STRAIGHT $50.00 $650,000.00 504.1 1495 FT GRANITE CURB TYPE VA4 - CURVED $65.00 $97,175.00 509. 820 FT GRANITE TRANSITION CURB FOR PEDESTRIAN CURB RAMPS - STRAIGHT $60.00 $49,200.00 509.1 110 FT GRANITE TRANSITION CURB FOR PEDESTRIAN CURB RAMPS - CURVED $70.00 $7,700.00 516. 54 EA GRANITE CURB CORNER TYPE A $350.00 $18,900.00 594. 6025 FT CURB REMOVED AND DISCARDED $7.00 $42,175.00 * 697.1 107 EA SILT SACK $180.00 $19,260.00 701. 7640 SY CEMENT CONCRETE SIDEWALK $75.00 $573,000.00 701.1 150 SY CEMENT CONCRETE SIDEWALK AT DRIVEWAYS $80.00 $12,000.00 701.2 690 SY CEMENT CONCRETE PEDESTRIAN CURB RAMP $110.00 $75,900.00 702. 297 TON HOT MIX ASPHALT SIDEWALK OR DRIVEWAY $230.00 $68,310.00 706.7 670 SY CONCRETE UNIT PAVER $375.00 $251,250.00 706.8 950 SY PERMEABLE PAVER $417.00 $396,150.00 706.9 520 SY COBBLE PAVER $200.00 $104,000.00 707.1 40 EA PARK BENCH $3,000.00 $120,000.00 707.19 24 EA GRANITE BENCH $4,500.00 $108,000.00 707.2 30 EA TRASH RECEPTACLE $2,000.00 $60,000.00 707.9 70 EA BICYCLE RACK $1,800.00 $126,000.00 * 740 20 MO ENGINEERS FIELD OFFICE AND EQUIPMENT (TYPE A)$3,000.00 $60,000.00 745 2 EA PEDESTRIAN BUS SHELTER $17,000.00 $34,000.00 745.2 1 LS PEDESTRIAN BUS SHELTER REMOVED AND STACKED $8,000.00 $8,000.00 748. 1 LS MOBILIZATION $419,884.98 $419,884.98 751. 209 CY LOAM BORROW $55.00 $11,495.00 751.7 667 SY COMPOST BLANKET $12.00 $8,004.00 751.8 6682 TON STRUCTURAL SOIL $107.00 $714,974.00 * 756. 1 LS NPDES STORMWATER POLLUTION PREVENTION PLAN $10,000.00 $10,000.00 765. 210 SY SEEDING $3.50 $735.00 767.7 3820 SF FLEXIPAVE $20.00 $76,400.00 * 784 66 EA CANOPY TREE - 2.5-3 INCH CALIPER $3,500.00 $231,000.00 796.8 3840 LS PERENNIAL $24.00 $92,160.00 811.36 1 EA ELECTRIC MANHOLE ADJUSTED $375.00 $375.00 811.37 11 EA ELECTRIC HANDHOLE ADJUSTED $350.00 $3,850.00 816.01 1 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO. 1 $218,656.40 $218,656.40 816.02 1 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO. 2 $264,420.08 $264,420.08 816.03 1 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO. 3 $357,225.08 $357,225.08 816.04 1 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO. 4 $200,988.95 $200,988.95 820.14 1 LS ROADWAY LIGHTING $1,549,300.00 $1,549,300.00 820.15 1 LS PEDESTRIAN LIGHTING $315,700.00 $315,700.00 823.71 33 EA HIGHWAY LIGHTING POLE AND LUMINAIRE REMOVED AND STACKED $800.00 $26,400.00 823.72 33 EA REMOVE CONCRETE FOUNDATION FOR ROADWAY LIGHTING $1,500.00 $49,500.00 832. 505 SF WARNING-REGULATORY AND ROUTE MARKER - ALUMINUM PANEL (TYPE A) $15.00 $7,575.00 847.1 80 EA SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST ASSEMBLY - STEEL $160.00 $12,800.00 850.41 4380 HR ROADWAY FLAGGER $62.00 $271,560.00 852. 380 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $25.00 $9,500.00 852.11 7500 FT TEMPORARY PEDESTRIAN BARRICADE $12.00 $90,000.00 852.12 45 EA TEMPORARY PEDESTRAIN RAMP $250.00 $11,250.00 856. 550 DAY ARROW BOARD $10.00 $5,500.00 856.12 580 DAY PORTABLE CHANGEABLE MESSAGE SIGN $25.00 $14,500.00 859. 27500 DAY REFLECTORIZED DRUM $2.00 $55,000.00 864.04 1070 SF PAVEMENT ARROWS AND LEGENDS REFLECTORIZED WHITE (THERMOPLASTIC)$8.00 $8,560.00 * 864.1 2400 SF GREEN FRICTION SURFACE (THERMOPLASTIC)$20.00 $48,000.00 1/28/2022 MASSDOT PROJECT NO.: 25%PROJECT DESCRIPTION: CALC BOOK NUMBER XXXXXX CK PROJECT LOCATION: SY ITEM QTY UNIT DESCRIPTION UNIT PRICE PARTICIPATING NON- PARTICIPATINGSPEC PROVIDEDCONSTRUCTION COST ESTIMATE DATE:609286 DESIGN LEVEL:Main Street Reconstruction ESTIMATOR:Northampton CHECKED BY: 864.15 3700 SF RED FRICTION SURFACE (THERMOPLASTIC)$20.00 $74,000.00 864.2 200 SF RAINBOW FRICTION SURFACE (THERMOPLASTIC)$20.00 $4,000.00 866.106 7950 FT 6 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC)$1.25 $9,937.50 866.112 540 FT 12 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC)$3.60 $1,944.00 * 866.124 2450 FT 24 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC)$8.00 $19,600.00 867.106 4020 FT 6 INCH REFLECTORIZED YELLOW LINE (THERMOPLASTIC)$1.25 $5,025.00 * 874.2 105 EA TRAFFIC SIGN REMOVED AND RESET $117.00 $12,285.00 * 877.1 105 EA SIGN POST REMOVED AND DISCARDED $50.00 $5,250.00 PARTICIPATING SUBTOTAL $12,675,480.99 25% CONSTRUCTION CONTINGENCY $3,168,870.25 POLICE DETAIL $50,000.00 PARTICIPATING TOTAL $15,894,351.24 NON-PARTICIPATING SUBTOTAL $1,740,570.00 25% CONSTRUCTION CONTINGENCY $435,142.50 NON-PARTICIPATING TOTAL $2,175,712.50 TOTAL $18,070,063.74 Station Length (ft) Cut Area (sf) Avg. Cut Area (sf) Cut Vol (cy) Subtotal (cy) Fill Area (sf) Avg Fill Area (sf) Fill Vol (cy) Subtotal (cy) 10+50 12.80 0.00 11+00 50 12.60 12.70 23.52 0.00 0.00 0.00 11+50 50 43.60 12.60 23.33 0.00 0.00 0.00 12+00 50 21.50 43.60 80.74 0.00 0.00 0.00 12+50 50 48.00 32.55 60.28 0.00 0.00 0.00 13+00 50 109.60 34.75 64.35 0.00 0.00 0.00 13+50 50 117.60 78.80 145.93 0.00 0.00 0.00 14+00 50 54.10 113.60 210.37 0.00 0.00 0.00 14+50 50 73.30 85.85 158.98 0.00 0.00 0.00 15+00 50 15.00 63.70 117.96 0.00 0.00 0.00 15+50 50 63.10 44.15 81.76 0.00 0.00 0.00 16+00 50 63.90 39.05 72.31 0.00 0.00 0.00 16+50 50 67.70 63.10 116.85 0.00 0.00 0.00 17+00 50 73.80 63.90 118.33 0.00 0.00 0.00 17+50 50 72.70 65.80 121.85 0.00 0.00 0.00 18+00 50 93.90 70.75 131.02 0.00 0.00 0.00 18+50 50 93.70 73.25 135.65 0.00 0.00 0.00 19+00 50 104.70 83.30 154.26 0.00 0.00 0.00 19+50 50 76.8 93.80 173.70 0.00 0.00 0.00 20+00 50 76.7 99.20 183.70 0.00 0.00 0.00 20+50 50 31.20 72.35 133.98 0.00 0.00 0.00 21+00 50 156.00 93.60 173.33 0.00 0.00 0.00 21+50 50 146.70 151.35 280.28 0.00 0.00 0.00 22+00 50 133.30 140.00 259.26 0.00 0.00 0.00 22+50 50 68.40 100.85 186.76 0.00 0.00 0.00 23+00 50 107.30 87.85 162.69 0.00 0.00 0.00 23+50 50 133.90 120.60 223.33 3.40 1.70 3.15 24+00 50 149.20 141.55 262.13 0.00 1.70 3.15 24+50 50 115.30 132.25 244.91 0.00 0.00 0.00 25+00 50 104.70 110.00 203.70 0.00 0.00 0.00 25+50 50 106.60 105.65 195.65 0.00 0.00 0.00 26+00 50 93.39 100.00 185.18 0.00 0.00 0.00 26+50 50 21.40 57.40 106.29 0.00 0.00 0.00 27+00 50 43.70 32.55 60.28 0.00 0.00 0.00 27+50 50 50.40 47.05 87.13 0.00 0.00 0.00 28+00 50 52.40 51.40 95.19 0.00 0.00 0.00 28+50 50 0.00 26.20 48.52 0.00 0.00 0.00 29+00 50 20.80 10.40 19.26 0.00 0.00 0.00 29+50 50 66.70 43.75 81.02 0.00 0.00 0.00 30+00 50 67.00 66.85 123.80 0.00 0.00 0.00 30+50 50 60.60 63.80 118.15 0.00 0.00 0.00 31+00 50 60.50 60.55 112.13 0.00 0.00 0.00 31+50 50 32.60 46.55 86.20 0.00 0.00 0.00 32+00 50 19.40 26.00 48.15 0.00 0.00 0.00 32+50 50 44.10 31.75 58.80 0.00 0.00 0.00 33+00 50 26.90 35.50 65.74 0.00 0.00 0.00 33+50 50 26.40 26.65 49.35 0.00 0.00 0.00 34+00 50 30.20 28.30 52.41 0.00 0.00 0.00 EXCAVATION / EMBANKMENT QUANTITY SHEET Main Street - Northampton, MA Excavation (cut) Embankment (fill)Main Street4 34+50 50 21.70 25.95 48.06 0.00 0.00 0.00 35+00 50 58.20 39.95 73.98 0.00 0.00 0.00 35+50 50 51.80 55.00 101.85 0.00 0.00 0.00 SUBTOTAL CUT:6122 CY SUBTOTAL FILL:6 CY Station Length (ft) Cut Area (sf) Avg. Cut Area (sf) Cut Vol (cy) Subtotal (cy) Fill Area (sf) Avg Fill Area (sf) Fill Vol (cy) Subtotal (cy) 110+30 7.70 0.00 110+50 20 9.90 8.80 6.52 0.00 0.00 0.00 111+00 50 44.90 9.90 18.33 0.00 0.00 0.00 SUBTOTAL CUT:25 CY SUBTOTAL FILL:0 CY Station Length (ft) Cut Area (sf) Avg. Cut Area (sf) Cut Vol (cy) Subtotal (cy) Fill Area (sf) Avg Fill Area (sf) Fill Vol (cy) Subtotal (cy) 120+50 30.05 0.00 120+70 20 6.50 18.28 13.54 0.00 0.00 0.00 SUBTOTAL CUT:14 CY SUBTOTAL FILL:0 CY Station Length (ft) Cut Area (sf) Avg. Cut Area (sf) Cut Vol (cy) Subtotal (cy) Fill Area (sf) Avg Fill Area (sf) Fill Vol (cy) Subtotal (cy) 130+50 10.00 0.00 131+00 50 39.00 24.50 45.37 0.00 0.00 0.00 SUBTOTAL CUT:45 CY SUBTOTAL FILL:0 CY Station Length (ft) Cut Area (sf) Avg. Cut Area (sf) Cut Vol (cy) Subtotal (cy) Fill Area (sf) Avg Fill Area (sf) Fill Vol (cy) Subtotal (cy) 140+50 15 13.40 13.40 7.44 0.00 0.00 0.00 SUBTOTAL CUT:7 CY SUBTOTAL FILL:0 CY Station Length (ft) Cut Area (sf) Avg. Cut Area (sf) Cut Vol (cy) Subtotal (cy) Fill Area (sf) Avg Fill Area (sf) Fill Vol (cy) Subtotal (cy) SUBTOTAL CUT:114 CY SUBTOTAL FILL:0 CY Station Length (ft) Cut Area (sf) Avg. Cut Area (sf) Cut Vol (cy) Subtotal (cy) Fill Area (sf) Avg Fill Area (sf) Fill Vol (cy) Subtotal (cy) 190+50 4.60 0.00 190+70 20 30.30 17.45 12.93 0.00 0.00 0.00 160+25 29.60 0.00 160+50 25 43.30 36.45 33.75 0.00 0.00 0.00 161+00 50 29.30 43.30 80.19 0.00 0.00 0.00 SUBTOTAL CUT:13 CY SUBTOTAL FILL:0 CY Station Length (ft) Cut Area (sf) Avg. Cut Area (sf) Cut Vol (cy) Subtotal (cy) Fill Area (sf) Avg Fill Area (sf) Fill Vol (cy) Subtotal (cy) 50+80 7.10 7.70 51+00 20 8.90 8.00 5.93 6.50 7.10 5.26 King StreetMasonic Street7 0 Crafts Ave114 0Gothic Ave13 0State Street14 0 New South Street45 0 25 0West Street2763 0 5 51+50 50 14.30 8.90 16.48 0.00 3.25 6.02 SUBTOTAL CUT:22 CY SUBTOTAL FILL:11 CY Station Length (ft) Cut Area (sf) Avg. Cut Area (sf) Cut Vol (cy) Subtotal (cy) Fill Area (sf) Avg Fill Area (sf) Fill Vol (cy) Subtotal (cy) 60+70 20 13.40 13.40 9.93 0.00 0.00 0.00 SUBTOTAL CUT:10 CY SUBTOTAL FILL:0 CY Station Length (ft) Cut Area (sf) Avg. Cut Area (sf) Cut Vol (cy) Subtotal (cy) Fill Area (sf) Avg Fill Area (sf) Fill Vol (cy) Subtotal (cy) 210+50 20 36.50 36.50 27.04 0.00 0.00 0.00 SUBTOTAL CUT:27 CY SUBTOTAL FILL:0 CY Station Length (ft) Cut Area (sf) Avg. Cut Area (sf) Cut Vol (cy) Subtotal (cy) Fill Area (sf) Avg Fill Area (sf) Fill Vol (cy) Subtotal (cy) 220+25 0.50 0.75 220+60 35 10.40 5.45 7.06 2.00 1.38 1.78 221+00 40 12.50 10.40 15.41 5.60 3.80 5.63 SUBTOTAL CUT:22 CY SUBTOTAL FILL:7 CY TOTAL CUT:6422 CY TOTAL FILL:25 CYKing Street22 11 Hawley Street22 7Pleasant Street10 0 Market Street27 0 6 SUMMARY QUANTITY SHEET TOTAL CUT 6422 CY TOTAL FILL 25 CY 6422.3 CY Earthworks: 25.0 CY -160.6 CY Estimated Embankment: 25.0 CY -321.1 CY -321.1 CY 3.7 CY Available for Embankment: 5619.5 CY TOTAL Embankment Required 28.7 CY Additional Excavation for Structural Soil (751.8)4772.33 CY Available from Embankment -5619.5 CY Total 10391.84 CY WASTE: 5591 CY DEDUCT 5% (SHRINKAGE):PLUS 15% (Swell) EXCAVATION EMBANKMENT Estimated Excavation: DEDUCT 2.5% (BOULDERS): DEDUCT 5% (UNSUITABLE): Main Street - Northampton, MA FROM EARTHWORKS SHEETS: EXCAVATION EMBANKMENT 7 SY TYPE AREA (SF) Cem Conc WCR 4100 Bike Ramp 2080 TOTAL CONC WCR=4100 SF TOTAL CONC WCR=2080 SF TOTAL=687 SY SUMMARY A - WHEELCHAIR RAMP 8 SY TYPE AREA (SF) Cem Conc Driveway 1285 HMA Driveway 520 TOTAL CONC DW=1285 SF TOTAL ASPH DW=520 SF TOTAL=201 SY SUMMARY B - DRIVEWAYS 9 SY TYPE AREA (SF) Cem Conc Sidewalk 59520 Permeable Paver Amenity Zone/Tree Zone 8500 Cem Conc Sidewalk Buffer (Between BL and Curb)9229.00 Concrete Unit Paver Sidewalk Buffer (Between BL and Curb)5971 Bit Conc Sidewalk (Bike Lane)18470 CONC SW Subtotal=68749 SF HMA SW Subtotal=18470 SF Permeable Paver SW Subtotal=8500 SF Concrete Unit Paver SW Subtotal=5971 SF CONC SW TOTAL=68749 SF HMA SW TOTAL=18470 SF PERMEABLE PAVER SW TOTAL=8500 SF CONCRETE UNIT PAVER SW TOTAL=5971 SF CONC SW 7639 SY HMA SW 2052 SY PERMEABLE PAVER SW 944 SY CONCRETE UNIT PAVER 663 SY SUMMARY C - PROPOSED SIDEWALK 10 D SY AREA (SF) MILL & OVERLAY STREET NAME TOTAL=129059 SF MILL & OVERLAY TOTAL =14340 SY FULL DEPTH LESS THAN 4' WIDE STREET NAME SF FULL DEPTH ALONG CURB (ASSUME WIDTH OF 1') ITEM 504. GRANITE CURB TYPE VA4 - STRAIGHT 13000 SF ITEM 504.1 GRANITE CURB TYPE VA4 - CURVED 1494 SF ITEM 509. GRANITE TRANSITION CURB FOR WCRS - STRAIGHT 820 SF ITEM 509.1 GRANITE TRANSITION CURB FOR WCRS - CURVED 110 SF TOTAL=15424 SF FULL DEPTH ROADWAY FULL DEPTH REGRADING 53440 SF 68864 SF FULL DEPTH TOTAL =5938 SY SUMMARY D - PAVEMENT STATION 11 DRAIN/SEWER/WATER UTILITY TRENCH Width (in) Trench Width (Width + 3')Area (SF) ITEM 238.04 TOTAL LENGTH=50 FT 4 3.333333 166.66667 ITEM 238.06 TOTAL LENGTH=1000 FT 6 3.5 3500 ITEM 238.08 TOTAL LENGTH=600 FT 8 3.666667 2200 ITEM 238.10 TOTAL LENGTH=30 FT 10 3.833333 115 ITEM 238.12 TOTAL LENGTH=750 FT 12 4 3000 ITEM 238.16 TOTAL LENGTH=3050 FT 16 4.333333 13216.667 ITEM 238.18 TOTAL LENGTH=130 FT 18 4.5 585 ITEM 241.12 TOTAL LENGTH=0 FT 12 4 0 ITEM 241.15 TOTAL LENGTH=450 FT 15 4.25 1912.5 ITEM 241.18 TOTAL LENGTH=630 FT 18 4.5 2835 ITEM 241.24 TOTAL LENGTH=50 FT 24 5 250 ITEM 241.36 TOTAL LENGTH=70 FT 36 6 420 ITEM 250.06 TOTAL LENGTH=75 FT 6 3.5 262.5 ITEM 250.08 TOTAL LENGTH=350 FT 8 3.666667 1283.3333 ITEM 250.12 TOTAL LENGTH=400 FT 12 4 1600 31346.667 SF TOTAL AREA =31346.67 SF UTILITY TRENCH TOTAL =3483 SY CONDUIT TRENCH LENGTH (FT) LIGHTING CONDUIT LENGTH 4500 TRAFFIC CONDUIT LENGTH 4060 8560 FT CONDUIT TRENCH TOTAL LENGTH X 1.5' = 12840 SF CONDUIT TRENCH TOTAL = 1426.7 SY RAISED CROSSING RAISED CROSSING AREA =4012 SF TOTAL RAISED CROSSING AREA =445.8 SY 12 EItem #ItemUnit PriceTotal Quantity for LocationTotal Price for LocationTotal Quantity for LocationTotal Price for LocationTotal Quantity for LocationTotal Price for LocationTotal Quantity for LocationTotal Price for LocationTotal QuantityTotal Price819.00 TRAFFIC SIGNAL CONTROLLER AND CABINET20,000.00$ ** 1 20,000.00$ 1 20,000.00$ 1 20,000.00$ 1 20,000.00$ 4 80,000.00$ 817.10 SIGNAL POST AND BASE STANDARD - 8 FOOT1,300.00$ * 2 2,600.00$ 6 7,800.00$ 6 7,800.00$ 3 3,900.00$ 17 22,100.00$ 812.30 STANDARD SIGNAL POST FOUNDATION - SD3.030 1,500.00$ 2 3,000.00$ 6 9,000.00$ 6 9,000.00$ 3 4,500.00$ 17 25,500.00$ 817.60 SIGNAL MAST ARM 20 FEET - STEEL7,570.00$ 0 -$ 1 7,570.00$ 0 -$ 2 15,140.00$ 3 22,710.00$ 817.61 SIGNAL MAST ARM 25 FEET - STEEL8,000.00$ 1 8,000.00$ 1 8,000.00$ 0 -$ 2 16,000.00$ 4 32,000.00$ 817.62 SIGNAL MAST ARM 30 FEET - STEEL8,450.00$ 1 8,450.00$ 0 -$ 0 -$ 0 -$ 1 8,450.00$ 817.63 SIGNAL MAST ARM 35 FEET - STEEL9,700.00$ 0 -$ 2 19,400.00$ 1 9,700.00$ 0 -$ 3 29,100.00$ 817.64SIGNAL MAST ARM 40 FEET - STEEL10,700.00$ 0-$ 0-$ 221,400.00$ 0-$ 221,400.00$ 817.65SIGNAL MAST ARM 45 FEET - STEEL11,900.00$ 111,900.00$ 0-$ 111,900.00$ 0-$ 223,800.00$ 812.40SIGNAL MAST ARM FOUNDATION11,980.00$ *335,940.00$ 447,920.00$ 447,920.00$ 447,920.00$ 15179,700.00$ 818.42PEDESTRIAN SIGNAL HEAD687.50$ 42,750.00$ 64,125.00$ 85,500.00$ 85,500.00$ 2617,875.00$ 818.13SIGNAL HEAD 1 WAY, THREE SECTION 12 INCH LENS797.50$ *97,177.50$ 97,177.50$ 1411,165.00$ 75,582.50$ 3931,102.50$ 818.14SIGNAL HEAD 1 WAY, FOUR SECTION 12 INCH LENS875.00$ *0-$ 32,625.00$ 0-$ 0-$ 32,625.00$ 818.15SIGNAL HEAD 1 WAY, FIVE SECTION 12 INCH LENS925.00$ *0-$ 1925.00$ 1925.00$ 21,850.00$ 43,700.00$ 818.81BACK-PLATES FOR 12 INCH SIGNAL HEAD168.50$ 274,549.50$ 447,414.00$ 477,919.50$ 315,223.50$ 14925,106.50$ 819.02VEHICLE DETECTOR (MIOVISION 360 CAMERA SYSTEM)14,000.00$ **114,000.00$ 114,000.00$ 114,000.00$ 114,000.00$ 456,000.00$ 819.850PEDESTRIAN PUSH BUTTON165.00$ 4660.00$ 6990.00$ 81,320.00$ 81,320.00$ 264,290.00$ 811.30PULL BOX 8 X 23 INCHES - SD2.0301,193.00$ 44,772.00$ 89,544.00$ 55,965.00$ 44,772.00$ 2125,053.00$ 801.323 INCH ELECTRICAL CONDUIT - TYPE NM (DOUBLE)44.30$ 59026,137.00$ 130057,590.00$ 162071,766.00$ 55024,365.00$ 4060179,858.00$ 810.CONDUIT ENCASED IN CONCRETE - SD 4.041105.00$ **0-$ 0-$ 23024,150.00$ 0-$ 23024,150.00$ 813.79INTERCONNECT CABLE SYSTEM34,350.00$ *134,350.00$ 0-$ 134,350.00$ 0-$ 268,700.00$ 813.80SERVICE CONNECTION (OVERHEAD)2,700.00$ 0-$ 0-$ 0-$ 12,700.00$ 12,700.00$ 813.31SERVICE CONNECTION (UNDERGROUND)3,850.00$ 13,850.00$ 13,850.00$ 13,850.00$ 0-$ 311,550.00$ 819.04R&R TRANSIT SIGNAL PRIORITY EQUIPMENT1,000.00$ **11,000.00$ 11,000.00$ 11,000.00$ 11,000.00$ 44,000.00$ 819.05R&R EMERGENCY VEHICLE PREEMPTION EQUIP1,000.00$ **11,000.00$ 11,000.00$ 11,000.00$ 11,000.00$ 44,000.00$ SUBTOTAL190,136.00$ 229,930.50$ 310,630.50$ 174,773.00$ 905,470.00$ EQUIPMENT REMOVAL (10%)19,013.60$ 22,993.05$ 31,063.05$ 17,477.30$ 90,547.00$ WIRING/CONDUIT (5%)9,506.80$ 11,496.53$ 15,531.53$ 8,738.65$ 45,273.50$ TOTAL218,656.40$ 264,420.08$ 357,225.08$ 200,988.95$ 1,041,290.50$ 816.01TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO. 1218,656.40$ 816.02TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.2264,420.08$ 816.03TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.3357,225.08$ 816.04TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.4200,988.95$ *Unit price based on average of all MassDOT districts**MassDOT unit price not available816.04SUMMARY E - TRAFFIC SIGNAL ITEMS816.01816.02816.0313 101.A 1700 square feet of lawn to clear 0.04 no shrubs or groups of trees Lump Sum 0.04 TOTAL=0 A ITEM 101. SAY 1 A CLEARING AND GRUBBING 14 102.1 FT Station O/S Quantity STREET NAME Unknown locations XX+XX X' LT 100 Estimating light amount of limbing up for entire project SUBTOTAL=100 FT CONTINGENCY=0 FT TOTAL=100 FT ITEM 102.1 SAY 100 FT TREE TRIMMING 15 102.511 EA Station O/S Size (in)Quantity STREET NAME Elm 11+00 4 1 4 1 4 1 24 1 18 1 4 1 Masonic 17+00 15 1 6 1 4 1 6 1 9 1 18 1 Center 25+00 12 1 na 1 15 1 30 1 15 1 Hawley 36+00 36 1 3 1 30 1 SUBTOTAL=20 EA CONTINGENCY=0 EA TOTAL=20 EA ITEM 102.511 SAY 20 EA TREE PROTECTION – ARMORING & PRUNING All trees near to ROW so that canopy overhangs sidewalk 16 102.521 FT Length 305 Subtotal =305 TOTAL 305 FT TREE AND PLANT PROTECTION FENCE 17 102.55 HR Total =64 HR SUBTOTAL=64 HR TOTAL=64 HR ITEM 102.55 SAY 64 HR ARBORIST The arborist fee assumes decompaction for existing trees to be preserved. This could include air spading or other techniques that likely fall outside typical City arborist scope. 18 103.EA Diam QTY STREET NAME Varies X+XX X' LT 0 30 TOTAL=30 EA ITEM 103. SAY 30 EA TREE REMOVED - DIAMETER UNDER 24 INCHES 19 104.EA Diam QTY STREET NAME Varies X+XX X' LT 0 5 TOTAL=5 EA ITEM 104. SAY 5 EA TREE REMOVED - DIAMETER 24 INCHES AND OVER 20 105.EA Diam QTY STREET NAME Varies X+XX X' RT 0 35 CONTINGENCY=3 EA TOTAL=38 EA ITEM 105. SAY 38 EA STUMP REMOVED 21 120.CY FROM EARTHWORKS WORKSHEET: Volume (CY) CUT =10392 TOTAL=10392 CY ITEM 120. SAY 10400 CY EARTH EXCAVATION 22 121.CY Assume 0.5% of cut Excavation is Class A Rock FROM EARTHWORKS WORKSHEET: VOLUME (CY) CUT =6422 Class A Rock 0.5% 32 CY From Earthwork Summary TOTAL=32 CY ITEM 121. SAY 40 CY CLASS A ROCK EXCAVATION 23 141.1 CY Assume 4'x4'x4' per location and 80 locations Volume per location=125 CF # of Locations=85 Total Volume=10625 CF TOTAL=394 CY ITEM 141.1 SAY 400 CY TEST PIT FOR EXPLORATION 24 142.CY Baseline From Structure Start Ex. Depth (ft) To Structure End Ex. Depth (ft) Pipe Diameter (in) Pipe Length (ft) Avg Depth (ft) Trench Width (ft)Cut Vol (cf) Total Volume (cy) MAIN STREET 1 9.60 2 5.39 18 139 3.00 4.50 1873.37 69.38 MAIN STREET 2 5.49 3 4.71 18 52 0.60 4.50 140.40 5.20 MAIN STREET 3 7.13 4 5.34 18 71 1.74 4.50 554.33 20.53 MAIN STREET 4 5.44 5 4.69 18 17 0.57 4.50 43.22 1.60 WEST STREET 7 5.45 3 4.27 12 39 0.36 4.00 56.16 2.08 MAIN STREET 11 7.03 12 4.17 12 73 1.10 4.00 321.20 11.90 MAIN STREET 10 7.19 11 4.17 12 96 1.18 4.00 453.12 16.78 MAIN STREET 15 5.32 12 4.17 12 16 0.25 4.00 15.68 0.58 MAIN STREET 16 5.74 12 6.82 12 73 1.78 4 519.76 19.25 STATE STREET 12 6.92 13 6.75 12 86 2.34 4 803.24 29.75 MAIN STREET 20 4.53 21 6.09 15 175 0.81 4.25 602.44 22.31 MAIN STREET 21 6.19 22 6.58 15 103 1.89 4.25 825.16 30.56 MAIN STREET 22 6.68 23 6.5 18 103 2.09 4.5 968.72 35.88 MAIN STREET 23 6.60 24 6.42 18 65 2.01 4.5 587.93 21.78 MAIN STREET 24 7.71 25 3.81 18 122 1.26 4.5 691.74 25.62 MAIN STREET 33 4.17 22 4.93 12 65 0.05 4 13.00 0.48 MAIN STREET 35 4.17 23 5.2 12 32 0.19 4 23.68 0.88 MAIN STREET 36 4.17 23 5.47 12 17 0.32 4 21.76 0.81 MAIN STREET 38 4.80 24 6.52 12 35 1.16 4 162.40 6.01 MAIN STREET 39 4.17 24 6.52 12 42 0.85 4 141.96 5.26 MAIN STREET 40 5.10 41 4.17 12 55 0.14 4 29.70 1.10 MAIN STREET 42 5.64 43 4.17 12 185 0.40 4 299.70 11.10 KING STREET 43 7.65 44 4.71 18 141 1.68 4.5 1065.96 39.48 MAIN STREET 47 4.87 43 4.17 12 39 0.02 4 3.12 0.12 MAIN STREET 48 4.17 43 7.55 12 80 1.36 4 435.20 16.12 MAIN STREET 50 4.17 42 5.54 12 56 0.36 4 79.52 2.95 MAIN STREET 52 4.76 53 4.32 12 67 0.04 4 10.72 0.40 MAIN STREET 57 6.13 58 4.44 15 163 0.79 4.25 543.81 20.14 MAIN STREET 58 6.89 59 7.04 36 35 2.47 6 517.65 19.17 MAIN STREET 59 7.04 60 7.00 36 17 2.52 6 257.04 9.52 MAIN STREET 60 7.00 61 7.14 36 1 2.57 6 15.42 0.57 STRONG AVE 65 5.01 64 6.32 12 22 1.17 4 102.52 3.80 MAIN STREET 76 4.26 75 4.76 18 9 0.01 4.5 0.40 0.01 MAIN STREET 66 9.15 58 6.89 36 10 3.52 6 211.20 7.82 MAIN STREET 75 4.76 74 4.71 18 10 0.23 4.5 10.58 0.39 STRUCTURE QTY BOTTOM AREA (SF) DEPTH (FT) VOLUME (CY) DMH/CB BED CB 4.00 28.26 1.00 49.19 DMH 5.00 38.465 1.00 32.77 PIPE REMOVAL EXCAVATION CONTINGENCY 51.78 CY TOTAL 593.06 CONTIGENCY= 50 CY TOTAL=643 CY ITEM 142. SAY 700 CY CLASS B TRENCH EXCAVATION 25 144.CY ASSUME 5% OF 142. CY AS CONTINGENCY 32.153 CY CONTINGENCY 0 CY TOTAL 32.153 CY ITEM 144. SAY 33 CY CLASS B ROCK EXCAVATION 26 145.EA Street Type Station/Offset Quantity MAIN STREET CB 11+68 41.2' LT 1 MAIN STREET CB 11+79 35.5' RT 1 WEST STREET CB 110+49 17.2' LT 1 MAIN STREET CB 13+36 41.0' LT 1 MAIN STREET CB 13+81 32.5' RT 1 MAIN STREET CB 16+92 31.5' LT 1 MAIN STREET DMH 16+99 18.8' LT 1 MAIN STREET CB 17+55 31.7' LT 1 MAIN STREET CB 18+14 30.7' RT 1 MAIN STREET CB 18+51 29.7' LT 1 MAIN STREET DMH 18+76 15.0' LT 1 MAIN STREET CB 19+65 31.5' RT 1 MAIN STREET CB 20+32 49.8' RT 1 MAIN STREET DMH 19+86 18.3' RT 1 MAIN STREET DMH 21+69 41.6' RT 1 MAIN STREET DMH 21+82 66.9' RT 1 MAIN STREET CB 21+67 49.4' RT 1 MAIN STREET CB 22+70 1.0' LT 1 MAIN STREET CB 22+71 45.0' RT 1 MAIN STREET CB 26+07 45.9' RT 1 MAIN STREET CB 26+20 42.5' LT 1 MAIN STREET CB 28+04 38.8' LT 1 MAIN STREET CB 30+69 32.3' LT 1 MAIN STREET CB 31+75 28.6' RT 1 MAIN STREET CB 35+27 43.2' RT 1 MAIN STREET CB 35+54 22.0' RT 1 SUBTOTAL= 26 EA 26 EA ITEM 145. SAY 26 EA DRAINAGE STRUCTURE ABANDONED TOTAL= 27 146.EA Street Type Station/Offset Quantity MAIN STREET CB 12+75 48.7' RT 1 MAIN STREET CB 21+84 3.1' LT 1 MAIN STREET CB 24+66 4.2' LT 1 MAIN STREET DMH 24+66 9.8' RT 1 MAIN STREET DMH 26+56 33.7' LT 1 MAIN STREET CB 28+13 34.7' RT 1 PLEASANT ST CB 60+53 28.6' RT 1 MAIN STREET CB 32+29 39.6' RT 1 MAIN STREET CB 33+47 21.5' RT 1 KING STREET CB 50+59.97 24.8' RT 1 SUBTOTAL=10 EA TOTAL=10 EA ITEM 146. SAY 10 EA DRAINAGE STRUCTURE REMOVED 28 151.CY Depth(FT)Area(SF)Volume (CF) 0.67 4100 2733 From Wheelchair Ramp Summary Sheet "A" - Bike Ramp 0.67 2080 1387 From Driveway Summary Sheet "B" 0.67 1805 1209 0.67 59520 39680 From Sidewalk Summary Sheet "C" - Cem Conc SW Buffer 0.67 9229 6153 From Sidewalk Summary Sheet "C" - Cem Conc Unit Pavers 0.67 5971 4001 0.67 18470 12313 1.00 31347 31347 0.67 12840 8603 0.67 4012 2688 Roadway Median 0.67 4600 3082 SUBTOTAL= 113,195 CF SUBTOTAL=113195 CF SUBTOTAL=4192 CY ADD 25% SWELL=1048.1 CY TOTAL=5241 CY ITEM 151. SAY 5250 CY GRAVEL BORROW From Wheelchair Ramp Summary Sheet "A" - Cem Conc WCR From Sidewalk Summary Sheet "C" - Cem Conc SW From Pavement Summary Sheet "D" Full Depth Trench Total From Sidewalk Summary Sheet "C" - HMA SW (Bike Lane) From Pavement Summary Sheet "D" Raised Crossing Total From Pavement Summary Sheet "D" Conduit Trench Total 29 151.01 CY Curbing:Item No.Area (SF)Length (FT)Volume (CF) 504. 1.00 13000 13000 504.1 1.00 1494 1494 509. 1.00 820 820 509.1 1.00 110 110 SUBTOTAL= 15424 CF SUBTOTAL=15424 CF SUBTOTAL=571 CY ADD 25% SWELL=142.8 CY TOTAL=714 CY Gran. Curb - Curved Gran. Trans. - Straight Gran. Trans. - Curved GRAVEL BORROW - TYPE C Gran. Curb - Straight 30 151.2 CY Volume (CY) For Drainage Pipe Installation in Mill & Overlay Areas *Assume average depth of 4ft Length (ft)(in)Width (ft)Area (sf)Depth (ft)Volume (cy) Item 238.12 38 12 4.00 152.00 3.00 16 Item 238.18 127 18 4.50 571.50 3.50 66 Item 241.12 2292 12 4.00 9168.00 3.00 952 Item 241.15 446 15 4.25 1895.50 3.25 208 Item 241.18 629 18 4.50 2830.50 3.50 326 Item 241.24 50 24 5.00 250.00 4.00 31 Item 241.36 67 36 6.00 402.00 5.00 57 Total = 1655.39 COMPACTION 0.15 TOTAL= 1904 CY CONTINGENCY=20.0 CY TOTAL=1924 CY ITEM 151.2 SAY 2000 CY GRAVEL BORROW FOR BACKFILLING STRUCTURES AND PIPES 31 153.CY Volume (CY) For Abandoned Structures Item 145 27 Depth Diameter Area QTY (FT) (FT) (SF) (EA) 6 5 19.63 26 113 For Drainage Pipe Installation in Mill & Overlay Areas *Assume average depth of 4ft Length (ft)Pipe Diamter (in)Trench Width (ft)Area (sf)Depth (ft)Volume (cy) Item 238.12 140 12 4.00 560.00 4.00 83 Item 238.18 127 18 4.50 571.50 4.00 85 Item 241.12 1276 12 4.00 5104.00 4.00 756 Item 241.15 170 15 4.25 722.50 4.00 107 Item 241.18 463 18 4.50 2083.50 4.00 309 Item 241.24 50 24 5.00 250.00 4.00 37 Item 241.36 67 36 6.00 402.00 4.00 60 Total = 1436.07 TOTAL=1550 CY CONTINGENCY=50.0 CY TOTAL=1600 CY ITEM 153. SAY 1600 CY CONTROLLED DENSITY FILL - EXCAVATABLE 32 154.CY Depth(FT)Area(SF)Volume (CF) 0.50 12840 6420 SUBTOTAL= 6,420 CF SUBTOTAL= 6420 CF SUBTOTAL= 238 CY TOTAL=238 CY ITEM 154. SAY 240 CY SAND BORROW From Pavement Summary Sheet "D" Conduit Trench Total 33 156.TON *ASSUME 1.5 TONS CRUSHED STONE PER CUBIC YARD *ASSUME THAT A 6 IN. BED OF CRUSHED STONE IS REQUIRED UNDER ALL STRUCTURES *ASSUME THAT A 6 IN. BED OF CRUSHED STONE IS REQUIRED UNDER ALL PIPES DRAINAGE PIPES STRUCTURE DIAMETER AREA (SF) DEPTH (FT) VOLUME/EA (CF)Volume (CF) ITEM 201. 47 4.00 28.26 0.5 14.13 664.11 ITEM 202. 23 5.00 38.465 0.5 19.23 442.35 PIPE DIA (FT)TOTAL AREA (SF)DEPTH (FT)Volume (CF) ITEM 472.PIPE TRENCH VARIES 15582 0.5 7790.75 0.0812 Tons/CF TOTAL = 8897 CF TOTAL =722 TON CONTINGENCY= 40.00 TON TOTAL= 762.45 ITEM 156. SAY 765 TON CRUSHED STONE 34 170.SY Area (SF) 6180 From Driveway Summary Sheet "B" (Cem Conc. + HMA)1805 From Sidewalk Summary Sheet "C" (Cem Conc. + HMA + Buffer)93190 15424 TOTAL=116,599 SF TOTAL=12,955.44 SY ITEM 170. SAY 13000 SY FINE GRADING AND COMPACTING - SUBGRADE AREA From Pavement Summary Sheet "D" (Full Depth <4' Wide) From Wheelchair Ramp Summary Sheet "A" (WCR + Bike Ramp) 35 201.EA Structure Number Street Name Station Offset Rim Elev.Invert Elev.Quantity 6 West Street 111+05.62' 20.38' RT 167.02 162.62 1.29 7 West Street 110+99.67' 20.60' LT 168.66 162.65 1.54 8 Main Street 11+76.22' 18.95' RT 169.41 165.13 1.27 9 Main Street 11+80.17' 0.66' LT 169.62 165.13 1.31 10 Main Street 11+76.85' 40.39' LT 168.18 160.99 1.72 14 Main Street 12+92.69' 31.78' LT 161.84 157.25 1.32 15 Main Street 13+62.20' 38.21' LT 157.13 151.81 1.43 16 Main Street 14+14.88' 24.41' RT 155.89 150.15 1.50 17 State Street 121+34.08' 12.85' RT 151.67 147.50 1.26 18 Main Street 15+17.93' 20.41' LT 152.40 148.23 1.26 26 Main Street 16+86.47' 20.41' LT 149.27 145.10 1.26 27 Main Street 17+05.70' 20.41' RT 149.20 145.03 1.26 28 Main Street 17+63.60' 15.41' RT 148.94 144.77 1.26 29 Main Street 18+06.39' 22.41' LT 149.07 144.90 1.26 30 Main Street 18+06.40' 21.41' RT 149.09 144.92 1.26 31 Main Street 19+44.91' 21.40' RT 149.77 145.60 1.26 32 Main Street 19+73.47' 24.41' LT 149.89 145.72 1.26 33 Main Street 20+07.08' 17.47' RT 149.23 145.06 1.26 34 Main Street 20+71.54' 19.76' LT 149.89 145.72 1.26 35 Main Street 21+62.05' 34.94' RT 148.11 143.94 1.26 36 Main Street 21+92.08' 17.93' RT 147.76 143.59 1.26 37 Old South Street 171+19.22 21.10' LT 140.35 136.17 1.26 38 Main Street 22+82.42' 24.41' RT 149.16 144.36 1.35 39 Old South Street 170+39.30' 12.75' RT 148.49 144.32 1.26 40 Main Street 24+17.22' 27.91' LT 149.28 144.18 1.40 45 Main Street 24+67.59' 34.91' RT 147.87 143.70 1.26 46 Main Street 25+97.85' 22.91' LT 143.71 139.05 1.33 47 Main Street 27+81.29' 24.41' LT 136.96 132.09 1.36 48 Main Street 29+01.20' 25.67' LT 132.70 128.53 1.26 49 Center Street 180+72.25' 12.72' LT 147.46 143.29 1.26 50 Gothic Street 190+84.74 15.40' LT 141.52 137.28 1.27 51 Main Street 27+80.54' 27.41' RT 136.83 132.66 1.26 54 Main Street 28+15.41' 27.42' RT 135.30 131.11 1.26 55 Main Street 29+48.90' 18.37' RT 133.04 128.87 1.26 62 Main Street 31+28.53' 27.12' LT 129.09 124.92 1.26 63 Main Street 31+50.59' 10.65' RT 128.53 124.36 1.26 65 Strong Avenue 200+50.09 20.45' LT 125.51 120.35 1.41 67 Main Street 33+16.59' 22.94' LT 122.3 118.13 1.26 68 Main Street 33+16.61' 23.19' RT 121.96 117.79 1.26 69 Main Street 33+41.59' 22.86' LT 122.14 117.97 1.26 70 Main Street 33+41.61' 23.09' RT 121.85 117.68 1.26 CATCH BASIN 36 71 Main Street 33+61.60' 23.13' RT 121.93 117.76 1.26 72 Main Street 33+61.60' 22.87' LT 122.08 117.91 1.26 77 Main Street 35+63.55' 16.50' LT 127.14 122.97 1.26 78 Main Street 35+44.95' 20.02' RT 126.77 122.60 1.26 79 Market Street 210+48.19' 9.42' LT 125.41 121.24 1.26 80 Market Street 210+53.35' 15.76' RT 125.86 121.69 1.26 83 King Street 50+59.97 24.80' RT 131.07 126.70 1.29 TOTAL=62 EA x 1.15 for 7.5' catch basins 71.6 EA ITEM 201. SAY 72 EA 37 202.EA Structure Number Street Station Offset Rim Elev.Invert Elev.Quantity Rounded 2 Main Street 11+78.13' 9.14' RT 169.26 163.77 0.84 1 3 Main Street 12+30.09' 22.51' RT 166.72 159.59 1.10 1.10 4 Main Street 12+91.05' 53.91' RT 162.83 157.39 0.84 1 11 Main Street 12+92.45' 38.83' LT 161.32 154.29 1.08 1.08 13 State Street 121+35.74' 17.93' LT 151.94 148.60 0.51 1 19 Main Street 16+86.47' 0.00' RT 149.72 145.45 0.66 1 20 Main Street 17+81.00' 1.08' LT 149.10 144.57 0.70 1 21 Main Street 19+60.25' 5.69' LT 149.79 143.60 0.95 1 22 Main Street 20+70.02' 5.19' LT 149.67 142.99 1.03 1.03 23 Main Street 21+77.57' 2.60' RT 148.98 142.38 1.02 1.02 24 Main Street 22+46.04' 11.45' RT 148.48 140.77 1.19 1.19 41 Main Street 24+70.77' 9.61' LT 147.26 142.98 0.66 1 42 Main Street 26+30.80' 3.88' LT 142.54 136.90 0.87 1 43 Main Street 28+20.15' 5.49' LT 135.68 128.03 1.18 1.18 52 Main Street 28+15.41' 7.06' RT 135.66 130.90 0.73 1 56 Main Street 29+71.25' 6.40' LT 132.07 127.90 0.64 1 57 Main Street 31+40.03' 8.37' LT 128.81 122.68 0.94 1 58 Main Street 33+08.80' 8.85' LT 122.38 115.35 1.08 1.08 59 Main Street 33+48.29' 11.48' LT 122.19 115.18 1.08 1.08 66 Main Street 32+99.92' 19.08' LT 122.47 115.40 1.09 1.09 75 Main Street 35+62.46' 6.79' LT 127.11 122.35 0.73 1 76 Main Street 35+70.36' 18.15' LT 126.66 122.40 0.66 1 81 Main Street 34+70.65' 36.08' LT 125.40 121.23 0.64 1 Total =23.83 EA ITEM 202. SAY 24 EA MANHOLE 38 204.EA For use at locations where utility conflicts prevent installation of a deep sump catch basin. QTY Contingency 5 Number Rim Elev.Quantity TOTAL=5 EA ITEM 204. SAY 5 EA Contractor may adjust gutter inlet and invert elevations as needed to avoid underground utilities that may be encountered in the field. GUTTER INLET Station/Offset Note: 39 210.EA Quantity 7 TOTAL=7 EA ITEM 210. SAY 7 EA Contractor may adjust gutter inlet and invert elevations as needed to avoid underground utilities that may be encountered in the field. SANITARY SEWER MANHOLE Note: 40 220.EA STREET NAME Structure #Station O/S Type Quantity MAIN STREET 1 10+36.95 6.40' LT DMH 1 MAIN STREET 5 13+05.85 64.9' RT DMH 1 MAIN STREET 12 13+83.03 46.6' LT DMH 1 KING STREET 44 50+57.29 1.1' RT DMH 1 KING STREET EX CB 50+91.50 23.2' LT CB 1 KING STREET EX CB 50+59.97 24.8' RT CB 1 PLEASANT STREET 53 60+61.50 13.0' RT DMH 1 MAIN STREET 64 32+05.92 34.2' RT DMH 1 MAIN STREET EX DMH 32+55.67 18.4' LT DMH 1 MAIN STREET EX DMH 33+75.62 4.3' LT DMH 1 MAIN STREET 73 34+50.50 22.0' LT DMH 1 Total 11 CIT Proposed MH 23 Proposed CB 47 Proposed GI 5 Rebuilt 15 (Structures ADJ more than once) Contingency 10 TOTAL=111 EA ITEM 220. SAY 111 EA DRAINAGE STRUCTURE ADJUSTED 41 220.2 FT Contingency 15 TOTAL=15 FT ITEM 220.2 SAY 15 FT DRAINAGE STRUCTURE REBUILT 42 220.3 EA Structure Number Street Station Offset Type Quantity 25 Old South Street 171+27.78 12.00' RT CB TO DMH 1 60 Main Street 33+68.00' 19.46' LT CB TO DMH 1 61 Main Street 33+77.00' 19.88' LT CB TO DMH 1 74 Main Street 35+55.23' 18.93' LT CB TO DMH 1 82 Main Street 17+32.27'30.42 ' RT CB TO DMH 1 SUBTOTAL=5 EA TOTAL=5 EA ITEM 220.3 SAY 5 EA DRAINAGE STRUCTURE CHANGE IN TYPE 43 220.5 EA Structure Street Station/Offset Type Quantity CB-X X+XX X' RT CB 0 Contingency 2 SUBTOTAL=2 EA TOTAL=2 EA ITEM 220.5 SAY 2 EA DRAINAGE STRUCTURE REMODELED 44 220.7 EA Station Offset Type Quantity STREET NAME X+XX X' RT SMH 3 TOTAL=3 EA ITEM 220.7 SAY 3 EA SANITARY STRUCTURE ADJUSTED 45 222.31 EA Item Type Quantity 201.Grate 47 204.Grate 5 CONTINGENCY=4 EA TOTAL=56 EA ITEM 222.31 SAY 56 EA FRAME AND GRATE MUNICIPAL STANDARD All new catch basins and gutter inlets receive new Frame & Grate; All new manholes and CIT receive new Frame and Cover. 46 222.32 EA Item Type Quantity 202.Cover 23 220.3 Cover 5 CONTINGENCY=4 EA TOTAL=32 EA ITEM 222.32 SAY 32 EA FRAME AND COVER MUNICIPAL STANDARD All new catch basins and gutter inlets receive new Frame & Grate; All new manholes and CIT receive new Frame and Cover. 47 223.1 EA Quantity Item 145 DRAINAGE STRUCTURE ABANDONED 26 Item 146 DRAINAGE STRUCTURE REMOVED 10 Item 220.3 DRAINAGE STRUCTURE CHANGE IN TYPE 5 CONTINGENCY 4 TOTAL=45 EA ITEM 223.1 SAY 45 EA Casting is removed and stacked when changing type of structure. Abandoned and removed structures will also have their castings removed and stacked. FRAME AND GRATE (OR COVER) REMOVED AND STACKED 48 224.12 EA Station O/S Type Quantity Item 201 Proposed CB 47 CONTINGENCY=0 EA TOTAL=47 EA ITEM 224.12 SAY 47 EA 12 INCH HOOD 49 227.3 CY This includes all proposed and adjusted structures QTY Qty+Adjusted depth Area Volume Adjusted Volume (x.2) Structures (Catch basins, Drain Manholes)(ft)(sf)(cy)(cy) Catch Basin 47 47 8 12.6 174.91 35 Manhole 23 23 5 12.6 53.496 11 Change In Type 5 5 8 12.6 18.607 4 Removed 10 10 5 12.6 23.259 5 Contingency 15 Total 70 ITEM 227.3 SAY 70 CY Includes removing the accumulated dirt, refuse, and other debris, as directed by the Engineer, as necessary for the contractor to perform relevant items of work under this contract, from each drainage structure, including gutter mouth of curb inlets, and disposing of materials removed. REMOVAL OF DRAINAGE STRUCTURE SEDIMENT 50 227.31 FT Assume approx. 20 ft. of sediment per new manhole QTY FT Item 271.12 551 Item 271.18 45 Item 271.36 65 Total =661 ITEM 227.31 SAY 670 FT REMOVAL OF DRAINAGE PIPE SEDIMENT Includes removing the accumulated dirt, refuse, and other debris, as directed by the Engineer, as necessary for the contractor to perform relevant items of work under this contract, from each drainage pipe. 51 227.4 SF Structure #Street Station O/S Quantity Pipe Diameter (in)Area (sf)Area (sf) 1 MAIN STREET X+XX L/R 1 12 0.79 0.00 9 MAIN STREET 2 12 1.57 8 MAIN STREET 6 0.00 EX CB MAIN STREET 11+79 35.6' RT 3 6 0.59 EX CB WEST STREET 110+49 17.5' LT 6 0.00 EX CB WEST STREET 110+49 17.5' LT 6 0.00 4 MAIN STREET 2 18 3.53 10 MAIN STREET 8 0.00 11 MAIN STREET 2 8 0.70 12 MAIN STREET 1 6 0.20 EX CB MAIN STREET 13+81 32.5' RT 1 6 0.20 EX CB MAIN STREET 16+99 18.8' LT 3 8 1.05 EX CB MAIN STREET 16+91 31.5' LT 1 8 0.35 0.00 EX CB MAIN STREET 17+55 31.7' LT 1 6 0.20 EX CB MAIN STREET 17+55 31.7' LT 1 8 0.35 EX CB MAIN STREET 17+32 30.4' RT 1 12 0.79 30 MAIN STREET 2 12 1.57 EX CB MAIN STREET 18+14 30.7' RT 1 12 0.79 29 MAIN STREET 2 8 0.70 EX CB MAIN STREET 18+52 29.7' LT 1 12 0.79 EX DMH MAIN STREET 18+76 15.0' LT 3 8 1.05 31 MAIN STREET 2 12 1.57 EX CB MAIN STREET 19+65 31.5' RT 1 12 0.79 EX DMH MAIN STREET 19+86 18.5' RT 2 12 1.57 33 MAIN STREET 2 12 1.57 EX CB MAIN STREET 20+32 49.8' RT 1 8 0.35 EX DMH MAIN STREET 21+69 41.6' RT 2 8 0.70 EX DMH MAIN STREET 21+69 41.6' RT 3 12 2.36 EX CB MAIN STREET 21+67 49.4' RT 1 12 0.79 25 OLD SOUTH STREET 1 12 0.79 EX DMH MAIN STREET 21+82 66.9' RT 3 12 2.36 EX DMH MAIN STREET 21+82 66.9' RT 1 8 0.35 23 MAIN STREET 2 12 1.57 EX CB MAIN STREET 22+70 11.0' RT 1 8 0.35 38 MAIN STREET 2 8 0.70 EX CB MAIN STREET 22+71 45.0' RT 2 8 0.70 EX CB MAIN STREET 24+66 4.2' LT 2 6 0.39 EX DMH MAIN STREET 24+66 9.8' RT 1 6 0.20 41 MAIN STREET 4 6 0.79 EX CB MAIN STREET 26+07 45.9' RT 1 12 0.79 EX CB MAIN STREET 26+20 42.5' LT 1 12 0.79 EX DMH MAIN STREET 26+56 33.7' LT 3 12 2.36 EX CB MAIN STREET 28+04 38.9' LT 2 12 1.57 EX CB KING STREET 50+60 24.8' LT 1 12 0.79 EX CB MAIN STREET 30+69 32.3' LT 1 10 0.55 63 MAIN STREET 2 10 1.09 EX CB MAIN STREET 31+75 29.3' RT 1 10 0.55 EX DMH MAIN STREET 32+56 18.4' LT 2 36 14.14 MASONRY PLUG 52 EX CB MAIN STREET 35+27 43.2' RT 1 6 0.20 EX CB MAIN STREET 35+27 43.2' RT 1 8 0.35 EX CB MAIN STREET 35+27 43.2' RT 1 12 0.79 EX CB MAIN STREET 35+54 22.0' RT 1 8 0.35 EX CB MAIN STREET 35+54 22.0' RT 1 12 0.79 74 MAIN STREET 1 8 0.35 78 MAIN STREET 2 8 0.70 Contingency 10.00 Total 69.17 ITEM 227.4 SAY 70 SF 53 238.04 FT Type Length Water 50 Subtotal =50 TOTAL 50 FT ITEM 238.04 SAY 50 FT 4 INCH DUCTILE IRON PIPE - WATER 54 238.06 FT Type Length Water 1000 Subtotal =1000 TOTAL 1000 FT ITEM 238.06 SAY 1000 FT 6 INCH DUCTILE IRON PIPE - WATER 55 238.08 FT Type Length Water 600 Subtotal =600 TOTAL 600 FT ITEM 238.08 SAY 600 FT 8 INCH DUCTILE IRON PIPE - WATER 56 238.10 FT Type Length Water 30 Subtotal =30 TOTAL 30 FT ITEM 238.10 SAY 30 FT 10 INCH DUCTILE IRON PIPE - WATER 57 238.12 FT Type Length Water 750 Subtotal =750 TOTAL 750 FT ITEM 238.12 SAY 750 FT 12 INCH DUCTILE IRON PIPE - WATER 58 238.12 (2)FT Begin Structure Station Offset End Structure Station Offset Length 37 22+16 120.3' RT 25 21+81 119.1' RT 33 27 17+05 20.41'RT 82 17+32 30.42'RT 25 28 17+63 15.41RT 82 17+33 30.42'RT 31 27 17+05 20.41'RT 19 16+86 0.0' 25 28 17+63 15.42'RT 20 17+81 1.08'LT 21 Subtotal =135 Contingency 5 Subtotal =5 TOTAL 140 FT ITEM 238.12 (2) SAY 140 FT 12 INCH DUCTILE IRON PIPE - DRAINAGE 59 238.16 FT Type Length Water 3050 Subtotal =3050 TOTAL 3050 FT ITEM 238.16 SAY 3050 FT 16 INCH DUCTILE IRON PIPE - WATER 60 238.18 FT Begin Structure Station Offset End Structure Station Offset Length 24 22+46 11.4' RT 25 21+81 119.1' RT 121 Subtotal =121 Contingency for Gutter Inlets 0 Subtotal =0 TOTAL 121 FT ITEM 238.18 SAY 130 FT 18 INCH DUCTILE IRON PIPE - DRAINAGE 61 241.12 FT Begin Structure Station Offset End Structure Station Offset Length 6 111+05.62 20.38' RT 3 111+37.61 8.59' RT 33 7 111+00.16 -15.99' LT 3 111+37.61 8.59' RT 39 11 12+92.45 -38.83' LT 12 13+83.03 -46.59' LT 73 10 11+76.85 -40.39' LT 11 12+92.45 -38.83' LT 96 14 12+92.69 -31.78' LT 11 12+92.45 -38.83' LT 3 15 13+62.20 -38.21' LT 12 13+83.03 -46.59' LT 15 16 14+14.88 24.41' RT 12 13+83.03 -46.59' LT 73 18 15+17.93 -20.41' LT 19 16+86.47 0.00'166 19 16+86.47 0.00'20 17+81.00 -1.08' LT 91 35 21+62.05 34.94' RT 23 21+77.57 2.60' RT 31 34 20+71.54 -19.76' LT 22 20+70.02 -5.19' LT 11 26 16+86.47 -20.41' LT 19 16+86.47 0.00'16 29 18+06.39 -22.41' LT 20 17+81.00 -1.08' LT 29 30 18+06.40 21.41' RT 20 17+81.00 -1.08' LT 30 31 19+44.91 21.40' RT 21 19+60.25 -5.69' LT 27 32 19+73.47 -24.41' LT 21 19+60.25 -5.69' LT 18 33 20+07.08 17.47' RT 22 20+70.02 -5.19' LT 64 36 21+92.08 17.93' RT 23 21+77.57 2.60' RT 17 38 22+82.42 24.41' RT 24 22+46.04 11.45' RT 34 39 170+39.30 12.75' RT 24 170+06.19 -19.43' LT 42 41 24+70.77 -9.61' LT 42 26+30.80 -3.88' LT 156 42 26+30.80 -3.88' LT 43 28+20.15 -5.49' LT 184 49 180+72.25 -12.72' LT 41 181+13.76 3.69' RT 41 45 24+67.59 34.91' RT 41 24+70.77 -9.61' LT 41 46 25+97.85 -22.91' LT 42 26+30.80 -3.88' LT 34 50 26+66.19 -52.65' LT 42 26+30.80 -3.88' LT 56 47 27+81.29 -24.41' LT 43 28+20.15 -5.49' LT 39 51 27+80.54 27.41' RT 52 28+15.41 7.06' RT 36 56 29+71.25 -6.40' LT 57 31+40.03 -8.37' LT 165 55 29+48.90 18.37' RT 56 29+71.25 -6.40' LT 29 62 31+28.53 -27.12' LT 57 31+40.03 -8.37' LT 18 63 31+50.59 10.65' RT 57 31+40.03 -8.37' LT 18 65 200+43.59 -20.45' LT 64 200+34.43 3.46' RT 22 67 33+16.59 -22.94' LT 58 33+08.80 -8.85' LT 12 68 33+16.61 23.19' RT 58 33+08.80 -8.85' LT 28 69 33+41.59 -22.86' LT 59 33+48.29 -11.48' LT 9 70 33+41.61 23.09' RT 59 33+48.29 -11.48' LT 31 71 33+61.60 23.13' RT 59 33+48.29 -11.48' LT 33 72 33+61.60 -22.87' LT 60 33+68.00 -19.46' LT 3 79 210+48.19 -9.42' LT 81 210+38.67 0.00'9 80 210+53.35 15.76' RT 81 210+38.67 0.00'18 78 35+44.95 20.02' RT 75 35+62.46 -6.79' LT 27 77 35+63.55 -16.50' LT 74 35+55.23 -18.93' LT 5 8 11+76.22 18.95' RT 2 11+78.13 9.14' RT 6 9 11+80.17 -0.66' LT 2 11+78.13 9.14' RT 6 17 121+34.08 12.85' RT 13 121+35.74 -17.93' LT 27 52 28+15.41 7.06' RT 53 28+59.29 62.48' RT 67 54 28+15.41 28.01' RT 52 28+15.41 7.06' RT 16 40 24+17.22 -28.49' LT 41 24+70.77 -9.61' LT 54 48 29+01.17 -25.65' LT 43 28+20.15 -5.49' LT 79 81 34+70.65 -36.08' LT 73 34+50.50 -22.03' LT 21 83 50+59.97 24.80' RT 44 50+57.29 1.10' RT 20 Subtotal =2218 contingency=50 TOTAL 2268 FT ITEM 241.12 SAY 2270 FT 12 INCH REINFORCED CONCRETE PIPE 62 241.15 FT Begin Structure Station Offset End Structure Station Offset Length 20 17+81.00 -1.08' LT 21 19+60.25 -5.69' LT 174 21 19+60.25 -5.69' LT 22 20+70.02 -5.19' LT 102 57 31+40.03 -8.37' LT 58 33+08.80 -8.85' LT 162 CONTINGENCY 6 Subtotal =444 TOTAL 444 FT ITEM 241.15 SAY 450 FT 15 INCH REINFORCED CONCRETE PIPE 63 241.18 FT Begin Structure Station Offset End Structure Station Offset Length 1 10+36.95 -6.37' LT 2 11+78.13 9.14' RT 139 2 11+78.13 9.14' RT 3 12+30.09 22.51' RT 52 3 12+30.09 22.51' RT 4 12+91.05 53.91' RT 71 4 12+91.05 53.91' RT 5 13+05.85 64.87' RT 17 22 20+70.02 -5.19' LT 23 21+77.57 2.60' RT 102 23 21+77.57 2.60' RT 24 22+46.04 11.45' RT 64 43 51+95.38 44.94' RT 44 50+57.29 1.13' RT 140 76 35+70.36 -18.15' LT 75 35+62.46 -6.79' LT 10 75 35+62.46 -6.79' LT 74 35+55.23 -18.93' LT 9 CONTINGENCY 25 Subtotal =629 TOTAL 629 FT ITEM 241.18 SAY 630 FT 18 INCH REINFORCED CONCRETE PIPE 64 241.24 FT CONTINGENCY 50 FT Subtotal =50 TOTAL 50 FT ITEM 241.24 SAY 50 FT 24 INCH REINFORCED CONCRETE PIPE 65 241.36 FT Begin Structure Station Offset End Structure Station Offset Length 58 33+08.80 -8.85' LT 59 33+48.29 -11.48' LT 35 59 33+48.29 -11.48' LT 60 33+68.00 -19.46' LT 17 66 32+99.92 -19.08' LT 58 33+08.80 -8.85' LT 9 CONTINGENCY 6 Subtotal =67 TOTAL 67 FT ITEM 241.36 SAY 70 FT 36 INCH REINFORCED CONCRETE PIPE To attach to Gutter Inlets in shallow cover areas and as noted below. 66 250.06 FT Type Length Sewer 75 Subtotal =75 TOTAL 75 FT ITEM 250.06 SAY 75 FT 6 INCH POLYVINYL CHLORIDE SANITARY SEWER PIPE 67 250.08 FT Type Length Sewer 350 Subtotal =350 TOTAL 350 FT ITEM 250.08 SAY 350 FT 8 INCH POLYVINYL CHLORIDE SANITARY SEWER PIPE 68 250.12 FT Type Length Sewer 400 Subtotal =400 TOTAL 400 FT ITEM 250.12 SAY 400 FT 12 INCH POLYVINYLCHLORIDE SANITARY SEWER PIPE 69 271.12 FT Structure Station/Offset Length 1 10+37 6.0' LT 20 9 11+80 0.7' LT 20 10 11+76 40.4' LT 20 2 11+78 9.1' RT 20 11 12+92 38.8' LT 20 26 16+86 20.4' LT 20 29 18+06 22.4' LT 20 30 18+06 21.4' RT 20 EX DMH 18+76 15.0' LT 10 31 19+45 21.4' RT 20 33 20+07 17.5' RT 20 23 21+78 2.6' RT 20 35 21+62 36.0' RT 10 --170+59 5.8' LT 10 38 22+82 24.4' RT 20 41 24+71 9.6' LT 20 42 26+30 3.9' LT 20 42 26+30 3.9' LT 34 EX DMH 26+56 33.7' LT 10 54 28+15 27.4' RT 30 53 60+61 13.0' RT 20 63 31+51 10.6' RT 20 64 32+6 34.0' RT 12 70 33+42 23.1' RT 20 71 33+61 24.0' RT 5 74 35+55 18.9' LT 38 77 35+64 16.5' LT 12 78 35+45 21.3' RT 20 83 50+59.97 24.8' RT 20 Subtotal =551 TOTAL 551 FT ITEM 271.12 SAY 560 FT 12 INCH AND UNDER PIPE REMOVED AND STACKED 70 271.18 FT Structure Station/Offset Length 4 12+91 53.9' RT 45 Subtotal =45 TOTAL 45 FT ITEM 271.18 SAY 50 FT 18 INCH PIPE REMOVED AND STACKED 71 271.36 FT Structure Station/Offset Length 66 33+00 19.1' LT 65 Subtotal =65 TOTAL 65 FT ITEM 271.36 SAY 70 FT 36 INCH PIPE REMOVED AND STACKED 72 291.1 LS CONTINGENCY 1 LS ASSUME 20 AREAS, ASSUME 250 SF 5000 SF ASSUME COST = $25/SF $125000 TOTAL=1 LS ITEM 291.1 SAY 1 LS STORMWATER LANDSCAPE AREAS 73 309.LB QTY 18000 LB TOTAL=18000 LB ITEM 309. SAY 18000 LB DUCTILE IRON FITTINGS FOR WATER PIPE 74 347.1 FT Type Length Water 1000 Subtotal =1000 TOTAL 1000 FT ITEM 347.1 SAY 1000 FT 1 INCH COPPER TUBING TYPE K 75 350.06 EA Type Quantity WATER 25 SUBTOTAL 25 EA TOTAL 25 EA ITEM 350.06 SAY 25 EA 6 INCH GATE AND GATE BOX 76 350.08 EA Type Quantity WATER 7 SUBTOTAL 7 EA TOTAL 7 EA ITEM 350.08 SAY 7 EA 8 INCH GATE AND GATE BOX 77 350.12 EA Type Quantity WATER 6 SUBTOTAL 6 EA TOTAL 6 EA ITEM 350.12 SAY 6 EA 12 INCH GATE AND GATE BOX 78 350.16 EA Type Quantity WATER 16 SUBTOTAL 16 EA TOTAL 16 EA ITEM 350.16 SAY 16 EA 16 INCH GATE AND GATE BOX 79 358.EA Station O/S Type Quantity STREET NAME 29 SUBTOTAL 29 EA *CONTINGENCY=0 EA TOTAL=29 EA ITEM 358. SAY 29 EA GATE BOX ADJUSTED 80 363.1 EA Type Quantity WATER 27 SUBTOTAL 27 EA TOTAL 27 EA ITEM 363.1 SAY 27 EA 1 INCH CORPORATION COCK 81 376.EA Street Station O/S Quantity 19 SUBTOTAL=19 EA CONTINGENCY=0 EA TOTAL=19 EA ITEM 376. SAY 19 EA HYDRANT 82 384.EA Quantity 27 SUBTOTAL 27 EA CONTINGENCY 0 EA TOTAL=27 EA ITEM 384. SAY 27 EA CURB STOP 83 390.LS For Maintanence of Water Service During Construction TOTAL=1 LS ITEM 390. SAY 1 LS TEMPORARY WATER BY-PASS SYSTEM 84 402.CY Depth(FT)Area(SF)Volume (CF) 0.33 68864 22932 0.33 4012 1336 1.33 12840 17116 SUBTOTAL= 41,383 CF SUBTOTAL=41383 CF SUBTOTAL=1533 CY TOTAL=1533 CY ITEM 402. SAY 1540 CY DENSE GRADED CRUSHED STONE FOR SUB-BASE From Pavement Summary Sheet "D" Conduit Trench From Pavement Summary Sheet "D" HMA Full Depth From Pavement Summary Sheet "D" Raised Crossing 85 415.2 SY FROM AREA SUMMARY PAGE 1: From Area Summary Area Mill & Overlay = 14,340 SY TOTAL=14,340 SY ITEM 415.2 SAY 14340 SY PAVEMENT FINE MILLING 86 431.SY Area 4,600 SF 4,600 SF TOTAL=511 SY ITEM 431. SAY 520 SY HIGH EARLY STRENGTH CEMENT CONCRETE BASE 87 440.LB Area (SF)Area (SY) From Wheelchair Ramps Sheet "A" (WCR + Bike Ramp) 6180 686.67 From Driveways Sheet "B" (Cem Conc + HMA) 1805 200.56 From Sidewalk Sheet "C" (Cem Conc + HMA) 93190 10354.44 From Roadway Sheet "D" Full Depth Roadway 68864 7651.56 SUBTOTAL = 18893.22 SY Calcium Chloride Application Rate = 1.5LB/SY 28339.833 LB Assume 2 Applications 56679.667 LB TOTAL=56680 LB ITEM 440. SAY 56700 LB CALCIUM CHLORIDE FOR ROADWAY DUST CONTROL 88 443.MGL Area (SF) Area (SY) 129059 14339.89 Water Application Rate = 1 GAL Water/1 SY 14339.89 GAL Assume 2 Applications 28679.77778 GAL (1 MGL = 1000 GAL) 28.67977778 MGL TOTAL=28.7 MGL ITEM 443. SAY 29 MGL From Pavement Sheet "D" WATER FOR ROADWAY DUST CONTROL 89 450.22 TON CONVERSION: 17.86 SY*IN=1 TON 0.056 TON/(SY*IN) Depth (IN) Area (SF) Area (SY) Wt (TON) HMA Sidewalk (Bike Lane)1.5 18470 2052 172.4 Utility Trench 1.0 31347 3483 195.0 Conduit Trench 1.0 12840 1427 79.9 HMA Driveway 1.5 520 58 4.9 Raised Crossing 1.5 4012 446 37.4 TOTAL= 490 TON ITEM 450.22 SAY 490 TON SUPERPAVE SURFACE COURSE – 9.5 (SSC – 9.5) 90 450.23 TON CONVERSION: 17.86 SY*IN=1 TON 0.056 TON/(SY*IN) Depth (IN) Area (SF) Area (SY) Wt (TON) Full Depth Roadway From Sheet "D"1.75 68864 7652 749.9 MILL & OVERLAY From Sheet "D"1.75 129059 14340 1405.3 TOTAL= 2155 TON ITEM 450.23 SAY 2160 TON SUPERPAVE SURFACE COURSE - 12.5 (SSC - 12.5) 91 450.31 TON CONVERSION: 17.86 SY*IN=1 TON 0.056 TON/(SY*IN) Depth (IN) Area (SF) Area (SY) Wt (TON) HMA Sidewalk (Bike Lane)2.0 18470 2052 229.8 HMA Driveway 2.5 520 58 8.1 Raised Crossing 4.5 4012 446 112.3 TOTAL= 350 TON ITEM 450.31 SAY 355 TON SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC -12.5) 92 450.32 TON CONVERSION: 17.86 SY*IN=1 TON 0.056 TON/(SY*IN) Depth (IN) Area (SF) Area (SY) Wt (TON) Full Depth Roadway From Sheet "D"2.25 68864 7652 964.1 Utility Trench 5.5 31347 3483 1072.8 Conduit Trench 5.5 12840 1427 439.4 TOTAL= 2476 TON ITEM 450.32 SAY 2480 TON SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC - 19.0) 93 450.42 TON CONVERSION: 17.86 SY*IN=1 TON 0.056 TON/(SY*IN) Depth (IN) Area (SF) Area (SY) Wt (TON) Full Depth Roadway From Sheet "D"4.0 68864 7652 1713.9 TOTAL= 1714 TON ITEM 450.42 SAY 1715 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) 94 451.TON For Utility trenches in full depth pavement Average Width = 4 feet Includes SSC 9.5 and SIC-19.0 Depth of Pavement =6.5 inches Item Number Length (FT)Width (FT)Depth (in)Area (SF)Area (SY)Wt (TON) DIP 238.04 50 3.33 6.5 167 18.5 6.73 238.06 1000 3.5 6.5 3500 388.9 141.56 238.08 600 3.67 6.5 2202 244.7 89.06 238.1 30 4 6.5 120 13.3 4.85 238.12 750 4 6.5 3000 333.3 121.33 238.16 3050 4.33 6.5 13207 1467.4 534.13 238.18 130 4.5 6.5 585 65.0 23.66 PVC 250.06 75 3.5 6.5 263 29.2 10.62 250.08 350 3.67 6.5 1285 142.7 51.95 250.12 400 4 6.5 1600 177.8 64.71 RCP 241.12 0 4 6.5 0 0.0 0.00 241.15 450 4.33 6.5 1949 216.5 78.81 241.18 630 4.5 6.5 2835 315.0 114.66 241.24 50 5 6.5 250 27.8 10.11 241.36 70 6 6.5 420 46.7 16.99 SUBTOTAL=1269.2 TON TOTAL=1269 TON Patches after M&O Contingency for Full Patches after Milling & Overlay 0 TON TOTAL=0 TON ITEM 451. SAY 1270 TON HMA FOR PATCHING 95 452.GAL Application Area (SY) Rate (gal/SY) Total (GAL) Area of HMA from Item 472.* 1604 0.07 225 Item 450.23 - Mill & Overlay 14340 0.09 1291 Item 450.23 - Full Depth Pavement 7652 0.07 536 Item 450.32 - Full Depth Pavement 7652 0.07 536 * assumes 2 applications are needed TOTAL (GAL)=2586 GAL ITEM 452. SAY 2590 GAL ASPHALT EMULSION FOR TACK COAT 96 453.FT Length (FT) From Total Curb Installed (Summary Page D) x2 30848 At limits of paving STREET NAME Elm 55 West 39 State 38 New South 49 Masonic 34 Mayor Sean 12 Crafts 32 Old South 36 Center 26 Gothic 34 King 63 Pleasant 48 Strong Ave 45 Market 33 Bridge 36 Hawley 31 TOTAL=31459 FT ITEM 453. SAY 31475 FT HMA JOINT SEALANT 97 472.TON CONVERSION:17.86 SY*IN = 1 TON 0.056 TON/(SY*IN) Temp Ramps (assume 15 SF each)Depth (in)Area (SF)Area (SY)Wt (TON) # Ramps 51 4 765 85 19 TEMP RAMP SUBTOTAL =19 TON Length (LF)Volume (CF)Area (SY*IN)Wt (TON) DW-1 4 80 60 80 4 item Diamter Depth (in)Length Width Area (SY)Wt (TON) 238.12 12 4 890 4 396 89 238.18 18 4 130 5 65 15 241.12 12 4 2268 4 1008 226 241.15 15 4 444 4 210 47 241.18 18 4 629 5 315 70 241.24 24 4 50 5 28 6 241.36 36 4 67 6 45 10 CONTINGENCY 40 TON PIPE SUBTOTAL =463 TON DRIVEWAY SUBTOTAL =970 TON TOTAL=1451 TON ITEM 472. SAY 1452 TON To be used for temporary patching for access at drives and wheelchair ramps Driveways (assume 0.75 SF Cross Section) TEMPORARY ASPHALT PATCHING To be used for temporary patching for pipe installation 98 482.3 FT Quantity (FT) 940 TOTAL= 940 FT ITEM 482.3 SAY 940 FT SAWCUTTING ASPHALT PAVEMENT 99 504.FT Length (FT) Roadway Edge Curb 4420 Bike Lane Curb 6486 Landscape Curb 709 Median Curb 1100 Raised Crossing Curb 285 TOTAL=13000 FT TOTAL NEW STRAIGHT CURB =13000 ITEM 504. SAY 13000 FT GRANITE CURB TYPE VA4 - STRAIGHT 100 504.1 FT Length (FT) Roadway Edge Curb 1080 Bike Lane Curb 414 TOTAL=1494 FT ITEM 504.1 SAY 1495 FT GRANITE CURB TYPE VA4 - CURVED 101 509. FT AT DRIVEWAYS AND WHEELCHAIR RAMPS 820 FT WHEELCHAIR RAMP SUBTOTAL=820 FT TOTAL= 820 FT ITEM 509. SAY 820 FT GRANITE TRANSITION CURB FOR PEDESTRIAN CURB RAMPS - STRAIGHT 102 509.1 FT AT DRIVEWAYS AND WHEELCHAIR RAMPS Length 110 FT WHEELCHAIR RAMP SUBTOTAL=110 FT TOTAL= 110 FT ITEM 509.1 SAY 110 FT GRANITE TRANSITION CURB FOR PEDESTRIAN CURB RAMPS - CURVED 103 516.EA Quantity (EA) 54 TOTAL= 54 EA ITEM 516. SAY 54 EA GRANITE CURB CORNER TYPE A 104 594.FT 6020 FT TOTAL 6020 FT ITEM 594. SAY 6025 FT CURB REMOVED AND DISCARDED 105 697.1 EA Existing Proposed Catch basins on STREET NAME 55 47 CONTINGENCY 5 EA TOTAL=102 EA ITEM 697.1 SAY 107 EA SILT SACK 106 701.SY Area (SF) From Sidewalk Summary Sheet "C" 68749 TOTAL=68749 SF TOTAL=7639 SY ITEM 701. SAY 7640 SY CEMENT CONCRETE SIDEWALK 107 701.1 SY Area (SF) From Driveway Summary "B" 1285 TOTAL=1285 SF TOTAL=143 SY ITEM 701.1 SAY 150 SY CEMENT CONCRETE SIDEWALK AT DRIVEWAYS 108 701.2 SY Area (SF) From WCR Summary Sheet "A" - WCR + Bike Ramps 6180 TOTAL=6180 SF TOTAL=687 SY ITEM 701.2 SAY 690 SY CEMENT CONCRETE PEDESTRIAN CURB RAMP 109 702.TON Area (SF) From Driveway Summary Sheet "B" 520 From Sidewalk Summary Sheet "C"18470 SUBTOTAL=18990 SF TOTAL=2110 SY 2.5 inches .0562 tons/sy*in TOTAL=296.5 TON ITEM 702. SAY 297 TON HOT MIX ASPHALT SIDEWALK OR DRIVEWAY 110 706.7 SY Area (SF) From Sidewalk Summary Sheet "C" 5971 Price includes labor, setting bed, and asphalt base TOTAL=5971 SF TOTAL=663 SY ITEM 706.7 SAY 670 SY CONCRETE UNIT PAVER 111 706.8 SY Area (SF) From Sidewalk Summary Sheet "C" 8500 Price includes labor and: Joints and 2" setting bed of ASTM No 8 stone 6" ASTM No 57 stone 16" ASTM No 2 stone TOTAL=8500 SF TOTAL=944 SY ITEM 706.8 SAY 950 SY PERMEABLE PAVER 112 706.9 SY Area (SF) Median in roadway 4600 Price includes labor, cobble paver, and gravel borrow base Concrete reinforcement accounted for under: 431. HIGH EARLY STRENGTH CEMENT CONCRETE BASE TOTAL=4600 SF TOTAL=511 SY ITEM 706.9 SAY 520 SY COBBLE PAVER 113 707.1 EA Quantity (EA) Locations to be determined for 75% submission 40 TOTAL=40 EA ITEM 782.423 SAY 40 EACH PARK BENCH 707.19 EA Quantity (EA) Locations to be determined for 75% submission 24 TOTAL=24 EA ITEM 782.423 SAY 24 EACH GRANITE BENCH Assume installation near City Hall/Station 20 and in plaza near First Churches/Station 25 707.2 EA Quantity (EA) Locations to be determined for 75% submission 30 TOTAL=30 EA ITEM 782.423 SAY 30 EACH TRASH RECEPTACLE 707.9 EA Station O/S Quantity (EA) STREET NAME X+XX X' RT 70 TOTAL=70 EA ITEM 782.423 SAY 70 EACH BICYCLE RACK 740 MO 18 MO 2 MO TOTAL=20 MO ITEM 740 SAY 20 MO PLUS 2 ADDITIONAL MONTHS FOR ADDITIONAL BEFORE/AFTER CONSTRUCTION= EXPECTED CONSTRUCTION DURATION= ENGINEERS FIELD OFFICE AND EQUIPMENT (TYPE A) 118 745 EA Quantity (EA) Locations to be determined for 75% submission 2 TOTAL=2 EA ITEM 782.423 SAY 2 EACH PEDESTRIAN BUS SHELTER 745.2 LS Station O/S Quantity (EA) STREET NAME X+XX X' RT 1 TOTAL=1 EA ITEM 782.423 SAY 1 EACH PEDESTRIAN BUS SHELTER REMOVED AND STACKED 748.LS Assume 1 Lump Sum = 3% Total Cost ITEM 748. SAY 1 LS MOBILIZATION 121 751.CY CONTINGENCY 0 CY Loam & Seed Areas 1850 SF 205.5556 SY Stormwater Areas 6000 SF 666.6667 SY 4" deep 22.8372 CY 10" deep 185.178 CY using as a stand-in for rainwater garden soil TOTAL 208.015 CY TOTAL=208 CY ITEM 751. SAY 209 CY LOAM BORROW 122 751.7 SY CONTINGENCY 0 SY 6000 SF 666.6667 SY using as a stand-in for rainwater garden soil TOTAL=667 SY ITEM 751.7 SAY 667 SY COMPOST BLANKET 123 751.8 TON CONTINGENCY 0 TON 42951 SF 3 feet deep 128853 CF 4772.33 CY TOTAL 6681.27 TON TOTAL=6681 TON ITEM 751.8 SAY 6682 TON STRUCTURAL SOIL 124 756.LS CONTINGENCY 1 LS TOTAL=1 LS ITEM 756. SAY 1 LS NPDES STORMWATER POLLUTION PREVENTION 125 765.SY CONTINGENCY 0 SY Loam & Seed Areas 1850 SF TOTAL 1850 SF 205.556 SY TOTAL=206 SY ITEM 765. SAY 210 SY SEEDING 126 767.7 SF CONTINGENCY 0 SF Quantity 3815 SF TOTAL 3815 SF TOTAL=3815 SF ITEM 767.7 SAY 3820 SF FLEXIPAVE 127 784 EA Quantity (EA) 66 TOTAL=66 EA ITEM 782.423 SAY 66 EACH CANOPY TREE - 2.5-3 INCH CALIPER 796.8 LS Quantity (EA) 3840 assumes plugs or other perennial for stormwater planting beds and mulch TOTAL=3840 EA ITEM 782.423 SAY 3840 EACH PERENNIAL 811.36 EA Item is for adjusting existing Fire Alarm covers in addition to EMH's 1 Contingency 0 TOTAL=1 EA ITEM 811.36 SAY 1 EA ELECTRIC MANHOLE ADJUSTED 130 811.37 EA Item is for adjusting existing Fire Alarm handholes in addition to electric handholes Quantity 11 CONTINGENCY 0 TOTAL=11 EA ITEM 811.37 SAY 11 EA ELECTRIC HANDHOLE ADJUSTED 131 816.01 LS Item #Item Unit Price Quantity Total 819.00 TRAFFIC SIGNAL CONTROLLER AND CABINET 20,000.00$ 1 EA 20,000.00$ 817.10 SIGNAL POST AND BASE STANDARD - 8 FOOT 1,300.00$ 2 EA 2,600.00$ 812.30 STANDARD SIGNAL POST FOUNDATION - SD3.030 1,500.00$ 2 EA 3,000.00$ 817.60 SIGNAL MAST ARM 20 FEET - STEEL 7,570.00$ 0 EA -$ 817.61 SIGNAL MAST ARM 25 FEET - STEEL 8,000.00$ 1 EA 8,000.00$ 817.62 SIGNAL MAST ARM 30 FEET - STEEL 8,450.00$ 1 EA 8,450.00$ 817.63 SIGNAL MAST ARM 35 FEET - STEEL 9,700.00$ 0 EA -$ 817.64 SIGNAL MAST ARM 40 FEET - STEEL 10,700.00$ 0 EA -$ 817.65 SIGNAL MAST ARM 45 FEET - STEEL 11,900.00$ 1 EA 11,900.00$ 812.40 SIGNAL MAST ARM FOUNDATION 11,980.00$ 3 EA 35,940.00$ 818.42 PEDESTRIAN SIGNAL HEAD 687.50$ 4 EA 2,750.00$ 818.13 SIGNAL HEAD 1 WAY, THREE SECTION 12 INCH LENS 797.50$ 9 EA 7,177.50$ 818.14 SIGNAL HEAD 1 WAY, FOUR SECTION 12 INCH LENS 875.00$ 0 EA -$ 818.15 SIGNAL HEAD 1 WAY, FIVE SECTION 12 INCH LENS 925.00$ 0 EA -$ 818.81 BACK-PLATES FOR 12 INCH SIGNAL HEAD 168.50$ 27 EA 4,549.50$ 819.02 VEHICLE DETECTOR (MIOVISION 360 CAMERA SYSTEM)14,000.00$ 1 EA 14,000.00$ 819.850 PEDESTRIAN PUSH BUTTON 165.00$ 4 EA 660.00$ 811.30 PULL BOX 8 X 23 INCHES - SD2.030 1,193.00$ 4 EA 4,772.00$ 801.32 3 INCH ELECTRICAL CONDUIT - TYPE NM (DOUBLE)44.30$ 590 FT 26,137.00$ 810.CONDUIT ENCASED IN CONCRETE - SD 4.041 105.00$ 0 FT -$ 813.79 INTERCONNECT CABLE SYSTEM 34,350.00$ 1 LS 34,350.00$ 813.80 SERVICE CONNECTION (OVERHEAD)2,700.00$ 0 LS -$ 813.31 SERVICE CONNECTION (UNDERGROUND)3,850.00$ 1 LS 3,850.00$ 819.04 R&R TRANSIT SIGNAL PRIORITY EQUIPMENT 1,000.00$ 1 LS 1,000.00$ 819.05 R&R EMERGENCY VEHICLE PREEMPTION EQUIP 1,000.00$ 1 LS 1,000.00$ SUBTOTAL 190,136.00$ EQUIPMENT REMOVAL (10%)19,013.60$ WIRING/CONDUIT (5%)9,506.80$ TOTAL 218,656.40$ ITEM 816.01 SAY 1 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO. 1 Main Street at West Street/Elm Street 132 816.02 LS Item #Item Unit Price Quantity Total 819.00 TRAFFIC SIGNAL CONTROLLER AND CABINET 20,000.00$ 1 EA 20,000.00$ 817.10 SIGNAL POST AND BASE STANDARD - 8 FOOT 1,300.00$ 6 EA 7,800.00$ 812.30 STANDARD SIGNAL POST FOUNDATION - SD3.030 1,500.00$ 6 EA 9,000.00$ 817.60 SIGNAL MAST ARM 20 FEET - STEEL 7,570.00$ 1 EA 7,570.00$ 817.61 SIGNAL MAST ARM 25 FEET - STEEL 8,000.00$ 1 EA 8,000.00$ 817.62 SIGNAL MAST ARM 30 FEET - STEEL 8,450.00$ 0 EA -$ 817.63 SIGNAL MAST ARM 35 FEET - STEEL 9,700.00$ 2 EA 19,400.00$ 817.64 SIGNAL MAST ARM 40 FEET - STEEL 10,700.00$ 0 EA -$ 817.65 SIGNAL MAST ARM 45 FEET - STEEL 11,900.00$ 0 EA -$ 812.40 SIGNAL MAST ARM FOUNDATION 11,980.00$ 4 EA 47,920.00$ 818.42 PEDESTRIAN SIGNAL HEAD 687.50$ 6 EA 4,125.00$ 818.13 SIGNAL HEAD 1 WAY, THREE SECTION 12 INCH LENS 797.50$ 9 EA 7,177.50$ 818.14 SIGNAL HEAD 1 WAY, FOUR SECTION 12 INCH LENS 875.00$ 3 EA 2,625.00$ 818.15 SIGNAL HEAD 1 WAY, FIVE SECTION 12 INCH LENS 925.00$ 1 EA 925.00$ 818.81 BACK-PLATES FOR 12 INCH SIGNAL HEAD 168.50$ 44 EA 7,414.00$ 819.02 VEHICLE DETECTOR (MIOVISION 360 CAMERA SYSTEM)14,000.00$ 1 EA 14,000.00$ 819.850 PEDESTRIAN PUSH BUTTON 165.00$ 6 EA 990.00$ 811.30 PULL BOX 8 X 23 INCHES - SD2.030 1,193.00$ 8 EA 9,544.00$ 801.32 3 INCH ELECTRICAL CONDUIT - TYPE NM (DOUBLE)44.30$ 1300 FT 57,590.00$ 810.CONDUIT ENCASED IN CONCRETE - SD 4.041 105.00$ 0 FT -$ 813.79 INTERCONNECT CABLE SYSTEM 34,350.00$ 0 LS -$ 813.80 SERVICE CONNECTION (OVERHEAD)2,700.00$ 0 LS -$ 813.31 SERVICE CONNECTION (UNDERGROUND)3,850.00$ 1 LS 3,850.00$ 819.04 R&R TRANSIT SIGNAL PRIORITY EQUIPMENT 1,000.00$ 1 LS 1,000.00$ 819.05 R&R EMERGENCY VEHICLE PREEMPTION EQUIP 1,000.00$ 1 LS 1,000.00$ SUBTOTAL 229,930.50$ EQUIPMENT REMOVAL (10%)22,993.05$ WIRING/CONDUIT (5%)11,496.53$ TOTAL 264,420.08$ ITEM 816.02 SAY 1 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO. 2 Main Street at New South Street/State Street 133 816.03 LS Item #Item Unit Price Quantity Total 819.00 TRAFFIC SIGNAL CONTROLLER AND CABINET 20,000.00$ 1 EA 20,000.00$ 817.10 SIGNAL POST AND BASE STANDARD - 8 FOOT 1,300.00$ 6 EA 7,800.00$ 812.30 STANDARD SIGNAL POST FOUNDATION - SD3.030 1,500.00$ 6 EA 9,000.00$ 817.60 SIGNAL MAST ARM 20 FEET - STEEL 7,570.00$ 0 EA -$ 817.61 SIGNAL MAST ARM 25 FEET - STEEL 8,000.00$ 0 EA -$ 817.62 SIGNAL MAST ARM 30 FEET - STEEL 8,450.00$ 0 EA -$ 817.63 SIGNAL MAST ARM 35 FEET - STEEL 9,700.00$ 1 EA 9,700.00$ 817.64 SIGNAL MAST ARM 40 FEET - STEEL 10,700.00$ 2 EA 21,400.00$ 817.65 SIGNAL MAST ARM 45 FEET - STEEL 11,900.00$ 1 EA 11,900.00$ 812.40 SIGNAL MAST ARM FOUNDATION 11,980.00$ 4 EA 47,920.00$ 818.42 PEDESTRIAN SIGNAL HEAD 687.50$ 8 EA 5,500.00$ 818.13 SIGNAL HEAD 1 WAY, THREE SECTION 12 INCH LENS 797.50$ 14 EA 11,165.00$ 818.14 SIGNAL HEAD 1 WAY, FOUR SECTION 12 INCH LENS 875.00$ 0 EA -$ 818.15 SIGNAL HEAD 1 WAY, FIVE SECTION 12 INCH LENS 925.00$ 1 EA 925.00$ 818.81 BACK-PLATES FOR 12 INCH SIGNAL HEAD 168.50$ 47 EA 7,919.50$ 819.02 VEHICLE DETECTOR (MIOVISION 360 CAMERA SYSTEM)14,000.00$ 1 EA 14,000.00$ 819.850 PEDESTRIAN PUSH BUTTON 165.00$ 8 EA 1,320.00$ 811.30 PULL BOX 8 X 23 INCHES - SD2.030 1,193.00$ 5 EA 5,965.00$ 801.32 3 INCH ELECTRICAL CONDUIT - TYPE NM (DOUBLE)44.30$ 1620 FT 71,766.00$ 810.CONDUIT ENCASED IN CONCRETE - SD 4.041 105.00$ 230 FT 24,150.00$ 813.79 INTERCONNECT CABLE SYSTEM 34,350.00$ 1 LS 34,350.00$ 813.80 SERVICE CONNECTION (OVERHEAD)2,700.00$ 0 LS -$ 813.31 SERVICE CONNECTION (UNDERGROUND)3,850.00$ 1 LS 3,850.00$ 819.04 R&R TRANSIT SIGNAL PRIORITY EQUIPMENT 1,000.00$ 1 LS 1,000.00$ 819.05 R&R EMERGENCY VEHICLE PREEMPTION EQUIP 1,000.00$ 1 LS 1,000.00$ SUBTOTAL 310,630.50$ EQUIPMENT REMOVAL (10%)31,063.05$ WIRING/CONDUIT (5%)15,531.53$ TOTAL 357,225.08$ ITEM 816.03 SAY 1 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO. 3 Main Street at King Street/Pleasant Street 134 816.04 LS Item #Item Unit Price Quantity Total 819.00 TRAFFIC SIGNAL CONTROLLER AND CABINET 20,000.00$ 1 EA 20,000.00$ 817.10 SIGNAL POST AND BASE STANDARD - 8 FOOT 1,300.00$ 3 EA 3,900.00$ 812.30 STANDARD SIGNAL POST FOUNDATION - SD3.030 1,500.00$ 3 EA 4,500.00$ 817.60 SIGNAL MAST ARM 20 FEET - STEEL 7,570.00$ 2 EA 15,140.00$ 817.61 SIGNAL MAST ARM 25 FEET - STEEL 8,000.00$ 2 EA 16,000.00$ 817.62 SIGNAL MAST ARM 30 FEET - STEEL 8,450.00$ 0 EA -$ 817.63 SIGNAL MAST ARM 35 FEET - STEEL 9,700.00$ 0 EA -$ 817.64 SIGNAL MAST ARM 40 FEET - STEEL 10,700.00$ 0 EA -$ 817.65 SIGNAL MAST ARM 45 FEET - STEEL 11,900.00$ 0 EA -$ 812.40 SIGNAL MAST ARM FOUNDATION 11,980.00$ 4 EA 47,920.00$ 818.42 PEDESTRIAN SIGNAL HEAD 687.50$ 8 EA 5,500.00$ 818.13 SIGNAL HEAD 1 WAY, THREE SECTION 12 INCH LENS 797.50$ 7 EA 5,582.50$ 818.14 SIGNAL HEAD 1 WAY, FOUR SECTION 12 INCH LENS 875.00$ 0 EA -$ 818.15 SIGNAL HEAD 1 WAY, FIVE SECTION 12 INCH LENS 925.00$ 2 EA 1,850.00$ 818.81 BACK-PLATES FOR 12 INCH SIGNAL HEAD 168.50$ 31 EA 5,223.50$ 819.02 VEHICLE DETECTOR (MIOVISION 360 CAMERA SYSTEM)14,000.00$ 1 EA 14,000.00$ 819.850 PEDESTRIAN PUSH BUTTON 165.00$ 8 EA 1,320.00$ 811.30 PULL BOX 8 X 23 INCHES - SD2.030 1,193.00$ 4 EA 4,772.00$ 801.32 3 INCH ELECTRICAL CONDUIT - TYPE NM (DOUBLE)44.30$ 550 FT 24,365.00$ 810.CONDUIT ENCASED IN CONCRETE - SD 4.041 105.00$ 0 FT -$ 813.79 INTERCONNECT CABLE SYSTEM 34,350.00$ 0 LS -$ 813.80 SERVICE CONNECTION (OVERHEAD)2,700.00$ 1 LS 2,700.00$ 813.31 SERVICE CONNECTION (UNDERGROUND)3,850.00$ 0 LS -$ 819.04 R&R TRANSIT SIGNAL PRIORITY EQUIPMENT 1,000.00$ 1 LS 1,000.00$ 819.05 R&R EMERGENCY VEHICLE PREEMPTION EQUIP 1,000.00$ 1 LS 1,000.00$ SUBTOTAL 174,773.00$ EQUIPMENT REMOVAL (10%)17,477.30$ WIRING/CONDUIT (5%)8,738.65$ TOTAL 200,988.95$ ITEM 816.04 SAY 1 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO. 4 Main Street at Market Street/Hawley Street 135 820.14 LS LIGHT FIXTURES & ELECTRICAL Item Quantity Unit Price Subtotal 25' height, 6' arm, roadway fixture 64 EA 21,750.00$ 1,392,000.00$ Item Quantity Unit Price Subtotal Concrete footing per fixture 64 EA 700.00$ 44,800.00$ Conduit 4500 LF 25.00$ 112,500.00$ TOTAL 1,549,300.00$ TOTAL=1 LS ITEM 820.14 SAY 1 LS ROADWAY LIGHTING 136 820.15 LS LIGHT FIXTURES & ELECTRICAL Item Quantity Unit Price Subtotal 16' height pedestrian post fixture 26 EA 4,000.00$ 260,000.00$ Item Quantity Unit Price Subtotal Concrete footing per fixture 26 EA 700.00$ 18,200.00$ Conduit 1500 LF 25.00$ 37,500.00$ TOTAL 315,700.00$ TOTAL=1 LS ITEM 820.15 SAY 1 LS PEDESTRIAN LIGHTING 137 823.71 EA Item Quantity Existing roadway lighting fixture 33 EA must assume overhead wire cost in price TOTAL=33 EA ITEM 823.71 SAY 33 EA HIGHWAY LIGHTING POLE AND LUMINAIRE REMOVED AND STACKED 138 823.72 EA Item Quantity Existing roadway light foundation 33 EA TOTAL=33 EA ITEM 823.72 SAY 33 EA REMOVE CONCRETE FOUNDATION FOR ROADWAY LIGHTING 139 832.SF Sign Station Area (SF) STREET NAME X+XX X' RT 501.15 TOTAL=501 SF ITEM 832. SAY 505 SF O/S WARNING-REGULATORY AND ROUTE MARKER - 140 847.1 EA Sign Station Quantity STREET NAME X+XX X' RT 80 TOTAL=80 EA ITEM 847.1 SAY 80 EA Offset SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST ASSEMBLY - STEEL 141 850.41 HR ASSUME A FLAGGER IS REQUIRED FOR 18 MONTHS PERIOD. Total =4380 HR SUBTOTAL=4380 HR TOTAL=4380 HR ITEM 850.41 SAY 4380 HR ROADWAY FLAGGER 142 852.SF Sign Unit Area (SF)Quantity Total Area (SF) 5.00 0 375.00 TOTAL=375.00 SF ITEM 852. SAY 380 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT 143 852.11 FT ASSUME 1 SETUP NEEDED AT A TIME, REFER TO TRAFFIC MANAGEMENT PLAN ASSUME TOTAL LENGTH IS 500 FT ASSUME THE SYSTEM NEEDS TO BE RESET APPROXIMATLEY 15 TIMES 7500 FT TOTAL=7500 FT ITEM 852.11 SAY 7500 FT TEMPORARY PEDESTRIAN BARRICADE 144 852.12 EA Number of Temporary Ramps Needed = 45 Ramps TOTAL=45 EA ITEM 852.12 SAY 45 EA TEMPORARY PEDESTRAIN RAMP 145 856.DAY Time (Day) During Construction 550 TOTAL=550 DAY ITEM 856. SAY 550 DAY ARROW BOARD 146 856.12 DAY Time (Day) During Construction 550 1 month before Construction 30 TOTAL=580 DAY ITEM 856.12 SAY 580 DAY For use at the start and end of the project. For use to alert the public of the raised intersection work at XX/XX PORTABLE CHANGEABLE MESSAGE SIGN 147 859.DAY Quantity Time (Days) 50 550 X Drums x X days= 27500 DAYS TOTAL=27500 DAY ITEM 859. SAY 27500 DAY REFLECTORIZED DRUM 148 864.04 SF All Arrows and Legends are Shared Lane Use Markings "Sharrows" Type Qty Area Per Ea (SF)Area (SF) Bike Lane Symbol 32 11 352 Bike Box Symbol 2 5 10 Yield Line Symbols (Bike Lane)104 0.25 26 Accessible Parking Symbols 7 7 49 Through Arrow 6 14 84 Left/Right Arrow 16 16 256 Thru/Turn Arrow 4 27 108 Bus Symbol 6 30 180 TOTAL=1065 SF ITEM 864.04 SAY 1070 SF PAVEMENT ARROWS AND LEGENDS REFLECTORIZED 149 864.1 SF Type Legnth Width Area (SF) Bike Cross 920 6 1840 Bike Cross 135 8 360 Bike Cross 32 10 107 Bike Box TOTAL=2306.667 SF ITEM 864.1 SAY 2400 SF GREEN FRICTION SURFACE (THERMOPLASTIC) 150 864.15 SF Type Legnth Width Area (SF) Bus Lane 3602.5 TOTAL=3602.5 SF ITEM 864.15 SAY 3700 SF RED FRICTION SURFACE (THERMOPLASTIC) 151 864.2 SF Type Area (SF) Rainbow Crosswalk 140 TOTAL=140 SF ITEM 864.2 SAY 200 SF RAINBOW FRICTION SURFACE (THERMOPLASTIC) 152 866.106 FT Type Length (FT) STREET NAME X+XX X+XX SWL 6050 DWL 325 bike conflict DWL 613.333333 Bike SL/crosswalks 924.5 TOTAL=7912.8333 FT ITEM 866.106 SAY 7950 FT Station 6 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC) 153 866.112 FT Type Length (FT) STREET NAME X+XX X+XX SL 480 chevrons 5 60 TOTAL=540 FT ITEM 866.112 SAY 540 FT Station 12 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC) 154 866.124 FT 24" CW BARS Length (FT) 24" CW bars 2450 TOTAL =2450 FT ITEM 866.124 SAY 2450 FT 24 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC) 155 867.106 FT Type Length (FT) Dix St X+XX X+XX YL 4015 TOTAL=4015 FT ITEM 867.106 SAY 4020 FT Station 6 INCH REFLECTORIZED YELLOW LINE (THERMOPLASTIC) 156 874.2 EA Sign Station Quantity STREET NAME X+XX X'LT 105 Subtotal=105 EA CONTINGENCY=0 EA TOTAL=105 EA ITEM 874.2 SAY 105 EA O/S TRAFFIC SIGN REMOVED AND RESET 157 877.1 EA Sign Station Quantity STREET NAME X+XX X'RT 105 Subtotal=105 EA CONTINGENCY=0 EA TOTAL=105 EA ITEM 877.1 SAY 105 EA O/S SIGN POST REMOVED AND DISCARDED 158