Loading...
53 Union St Sewer AvailMUNICIPAL SEWER AVAILABILITY APPLICATION Northampton Public Works 125 Locust Street Northampton, MA 01060 413-587-1570 Director: A Department of Public Works Trench Permit and Sewer Entry Permit shall be required prior to any construction or connection activity associated with this application. Location: 53 UNION STREET Units # 1 Applicant: Backyard ADU's Kevin Whelan 207-713-1346 Date: 11 /7/2024 Reason for request : New accessory dwelling unit being placed at this address Connect second home to the existing sewer service in the main house For Office Use Only below line Municipal Sewer Main in front of Location: Yes Xi No Main: N/A Material: N/A� Age: NIA Depth of Sewer Main: N/A Length of Sewer Main: Size of Sewer Connection N1 NIA Type of Sewer Connection: Connect to existing house service. Comments: City Requires 6" Cleanout Installed at City Property Line A corresponding "sewer entrance fee" shall be paid prior to making any connection to the municipal sewer system. Arrangements of such installation shall be made with the Northampton Department of Public Works with a minimum of 5 working days notification. All work shall conform to Northampton Department of Public Works specifications. If this availability is for new construction, it must be submitted electronically or mailed to the Building Inspector. *Fees will be charged based on current fee structure at the time of entry, application page 2 Brendan Shea Sewer foreman Permit N 11/26/2024 Date f- �$ 1256 �� O Sewer entry fee � ? r dW :'u04dweyN imis uolunlkq sejjoj veld ayg deg y.eR r U. a iaa 1 r i 0 r mt 4� v g s 3 0 k' O < zo M Jaa3rRm ON 0�O -