Loading...
23A-232 BP-2024-0796 139 NONOTUCK ST COMMONWEALTH OF MASSACHUSETTS Map:Block:Lot: 23A-232-001 CITY OF NORTHAMPTON Permit: Solar Build PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) BUILDING PERMIT Permit # BP-2024-0796 PERMISSION IS HEREBY GRANTED TO: .Project# SOLAR 2024 Contractor: License: TRINITY HEATING& AIR INC DBA Est. Cost: 32000 TRINITY SOLAR 088684 Const.Class: Exp.Date: 07/06/2024 Use Group: Owner: MADELEINE HUBBELL Lot Size (sq.ft.) TRINITY HEATING& AIR INC DBA TRINITY Zoning: URB Applicant: SOLAR Applicant Address Phone: Insurance: 4 OPEN SQUARE WAY, SUITE 410 (413)203-9088(1522) WC 13588107 HOLYOKE, MA 01040 ISSUED ON: 06/26/2024 TO PERFORM THE FOLLOWING WORK: INSTALL 19 PANEL 7.79 KW ROOF MOUNT SOLAR SYSTEM WITH STRUCTURAL UPGRADES (NO BATTERY) POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Final: Final: Final: Rough Frame: Gas: Fire Department Driveway Final: Fireplace/Chimney: Rough: Oil: Insulation: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS.Signature: l�/[iI � Fees Paid: $75.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Office of the Building Commissioner /^ The Commonwealth of Massachuse s Board of Building Regulations and S dar• ✓N w U`,/ Massachusetts State Building Code, :0 Jo.: ? to, CIPA ITYUS . Building Permit Application To Construct,Repair,Reno• • _•�s, -• olish a Re ised ar 2011 One-or Two-Family Dwelling �'q /,V This Section For Official Use Only ••M% s Building Permit Number:i O'24te 79Q Date Applied: K t+� " s //i%G- �-ZG Zozy Building Official(Print Name) Signature Date SECTION 1: SITE INFORMATION 1.1 Property Address: 1.2 Assessors Map&Parcel Numbers 139 Nonotuck St Florence MA 01062 1.1a Is this an accepted street?yesFIL no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Residential-Solar Zoning District Proposed Use Lot Area(sq ft) Frontage(it) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply: (M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public 0 Private 0 Zone: _ Outside Flood Zone? Municipal 0 On site disposal system 0 Check if ycs❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner'of Record: Madeleine Hubbell Florence MA 01062 Name(Print) City,State,ZIP 139 Nonotuck St (617)417-1055 cieverhart6Agmail.com No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORK2(check all that apply) New Construction 0 Existing Building 0 Owner-Occupied 0 Repairs(s) 0 Alteration(s) 0 Addition Cl Demolition 0 Accessory Bldg.0 Number of Units Other ESpccify:solar Brief Description of Proposed Work2: Install 7.79 kW DC solar on roof(19 panels) Will not exceed building footprint, but will add 6"to roof height. Structural upgrades as described in engineering letter. SECTION 4:ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: Official Use Only (Labor and Materials) 1.Building $10,000 1. Building Permit Fee: $ Indicate how fee is determined: 2.Electrical $22,000 ❑Standard City/Town Application Fee ❑Total Project Cost3(Item 6)x multiplier x 3.Plumbing $ 2. Other Fees: $ 4.Mechanical (HVAC) $ List: 5.Mechanical (Fire Suppression) $ Total All Fe�ejj: 1 Check No.ISt'ih Check Amount: 1 Cash Amount: 6.Total Project Cost: $32,000 ❑Paid in Full 0 Outstanding Balance Due: • SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisorticense(CSL) - CS-088684 7/6/2024 Michael S Blanchard ` " License Number Expiration Date Name of CSL Hold,;' List CSL Type(see below) U 142 Nelson Street No.and Street Type Description U Unrestricted(Buildings up to 35,000 cu.ft.) West Springfield,MA 01089 R Restricted 1&2 Family Dwelling City/Town,State,Z M Masonry _ RC Roofing Covering x �`( '/7G /� L���(/l WS Window and Siding SF Solid Fuel Burning Appliances 413-203-9088 x applications.westma@trinity-solar.com I Insulation Telephone Email address D Demolition 5.2 Registered Home Improvement Contractor(HIC) 170355 to Trinity Solar Inc DBA Trinity Solar HIC Registration Number Expiration t io Date HIC Company Name or HIC Registrant Name 20 Patterson Brook Road-Unit 10 applications.westma@trinity-solar.com No.and Street Email address West Wareham MA 02576 413-203-9088 x City/Town,State,ZIP Telephone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes 181 No 0 SECTION 7a:OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize Please See Attached to act on my behalf,in all matters relative to work authorized by this building permit application. Print Owner's Name(Electronic Signature) Date SECTION 7b:OWNER'OR AUTHORIZED AGENT DECLARATION By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this appli atio is e and accurate to the best of my knowledge and understanding. X %"I IC(4 4 * owl (./4In/c 06/20/2024 Print Owner's or Authorized Agent's Name(Electronic Signature) Date NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at www.mass.gov/oca Information on the Construction Supervisor License can be found at www.mass.gov/dps 2. When substantial work is planned,provide the information below: Total floor area(sq.ft.) (including garage,finished basement/attics,decks or porch) Gross living area(sq.ft.) Habitable room count • Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" City of Northampton y'A4 Massachusetts :<wS A. �'��. i 1: A ) !I.` DEPARTMENT OF BUILDING INSPECTIONS �' �I 4 212 Main Street • Municipal Building L; P� Northampton, MA 01060 ss'�- ���` CONSTRUCTION DEBRIS AFFIDAVIT (FOR ALL DEMOLITION AND RENOVATION PROJECTS) In accordance of the provisions of MGL c 40, S54, a condition of Building Permit Number is that all debris resulting from this work shall be disposed of in a properly licensed waste disposal facility, as defined by MGL c 111, S 150A. The debris will be disposed of in: Location of Facility: 139 Nonotuck St The debris will be transported by: Name of Hauler: • Trinity Solar Signature of Applicant: Mk •�/ki i ,- Date: 6/20/24 SC)L�A6Friaity Northampton, MA June 18, 2024 212 Main St. Northampton, MA 01060 RE: HUBBELL, MADELEINE; EVERHART, CARLY J Trinity Solar No. 139 Nonotuck St 2024-05-1075718 Florence, MA 01062 To the Building Official: The following information constitutes a summary of the relevant design criteria and recommendations for the support of a new photovoltaic [PV] system on the existing roof framing components at the above-referenced location. Criteria is as follows: 1. Existing roof framing: Conventional roof framing at R1 is 2x6 at 16 o.c.; existing rafter span= 14'0"; (horizontal projection) 2. Roof Loading: • 3.0psf dead load (pounds per square foot-PV panels, mounting rails&hardware) • 5.7psf-existing roof loads(1.7 psf-2x6 framing, 1.5psf roof sheathing, 2.5 psf shingles) • Ground Snow Load-40psf-per AHJ (Authority Having Jurisdiction) • Wind criteria- Exposure Category B, 117 mph wind 3. Existing roof modification at R1 -provide 2x4 (@16"o.c.)"knee wall"reinforcing to limit the maximum span of the existing rafter to 10'- 8". Locate bottom of"knee wall"within one foot of existing bearing wall below.Alternatively, existing roof rafters may be"sistered"with the new 2x8 rafters extending the full length of the existing rafters and terminated before the existing rafter support connection. Sister nailing to consist of 10d nails top and bottom at 8"o.c. This installation design is in general conformance with the manufacturers' specifications and complies with all applicable laws, codes, and ordinances—specifically the International Building Code (2015 edition)and the International Residential Code (2015 edition), including all Massachusetts regulations and amendments. The spacing of the mounting brackets-the ClickFit Smart Foot and/or Rocklt Smart Slide by EcoFasten®(or approved equal)-cannot exceed a maximum of 48"o.c. between mounting brackets and will be fastened using#14x3"long (min.)lag screws per bracket(2 min.)for a rail system or#12x3"long (min.)lag screws per bracket(2 min.)for a rail-less system.The minimum thread penetration (embedment) is 2'/2"beyond all roofing materials-this is adequate to resist all stated demand loads above, including wind shear. In order to evenly distribute the PV load across the roof framing, in multi-row PV layouts there shall be a minimum of 2 mounting brackets per rafter/truss chord. Pilot holes for EcoFasten self-drilling screws are not required. Regards, Thor Bojcun, PE Structural Engineer-Trinity Solar r �. . r Cat,: ;1",/- MA License No.56687 Trinity Solar 14 Open Square Way,Suite 410 I Holyoke, MA I(413)203-9088