31B-051 (37) BP-2024-061 I
135 KING ST -ANYTIME COMMONWEALTH OF MASSACHUSETTS
FITNESS
Map:Block:Lot: CITY OF NORTHAMPTON
31B-051-001
Permit: Alts Renovations
Repair
PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
BUILDING PERMIT
Permit# BP-2024-0611 PERMISSION IS HEREBY GRANTED TO:
Project# INTERIOR RENO 2024 Contractor: License:
DOUGLAS B THAYER DBA
DOUGLAS THAYER
Est.Cost: 90000 WOODWORKING 107699
Const.Class: Exp.Date: 04/07/2025
Use Group: Owner: INC MILL RIVER MUSIC
Lot Size (sq.ft.)
DOUGLAS B THAYER DBA DOUGLAS THAYER
Zoning: EB Applicant: WOODWORKING
Applicant Address Phone: Insurance:
P O BOX 60322 (413)530-4785 6HUBGR15002
FLORENCE, MA 01062
ISSUED ON: 06/12/2024
TO PERFORM THE FOLLOWING WORK:
INTERIOR ALTERATIONS
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter: Footings:
Rough: Rough: House # Foundation:
Final: Final: Final: Rough Frame:
Gas: Fire Department Driveway Final: Fireplace/Chimney:
Rough: Oil: Insulation:
Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.Signature: 6"2.
Fees Paid: $630.00
212 Main Street,Phone(413)587-1240,Fax:(413)587-1272
Office of the Building Commissioner
w 1.::.:
_: F
cry -- — pc) l(� P�
I _ ; ,I 7O (/11'L
MAY 1 5 2024 ;
j iTh Commonwealth of Massachusetts
If' IOfficeof Public Safety and Inspections
CFPT.OF BUILDING INSPECTIONS Massachusetts State Building Code(780 CMR)
N9 Tdui'd ng eimrt-Application for any Building other than aOne-or Two-Family Dwelling
(This Section For Official Use Only)
Building Permit Number'-(/1I Date Applied: Building Official:
SECTION 1:LOCATION
i 3s kips st 0 ► /o
No.and Street City/Town Zip Code Name of Building(if applicable)
051 —Olt
Assessors Map# Block#and/or Lot #
SECTION 2:PROPOSED WORK
Edition of MA State Code used If New Construction check here 0 or check all that apply in the two rows below
Existing Building 0 Repair❑ Alterations Addition 0 Demolition 0 (Please fill out and submit Appendix 2)
Change of Use 0 Change of Occupancy 0 Other 0 Specify:
Are building plans and/or construction documents being supplied as part of this permit application? Yes 0 No 0
Is an Independent Structural Engineering Peer Review required? Yes 0 No 0
Brief Description of Proposed Work:
Iiite,tid r le Al fedat1G.4) qs
pvoJidec4 G.
DvawiK J_
SECTION 3:COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATION,ADDITION,OR
CHANGE IN USE OR OCCUPANCY J
Check here if an Existing Buildinl Investigation and Evaluation is enclosed(See 780 CMR 34) 0
Existing Use Group(s): A __. Proposed Use Group(s): _
SECTION 4:BUILDING HEIGHT AND AREA
Existing Proposed
No.of Floors/Stories(include basement levels)&Area Per Floor(sq.ft) C a 5a 7 Y951
Total Area(sq.ft.)and Total Height(ft)
SECTION 5:USE GROUP(Check as applicable)
A: Assembly A-1 0 A-2 0 Nightclub 0 A-3 0 A-4 0 A-5 0 B: Business ❑ E: Educational 0
F: Factory F-1 0 F2 0 H: High Hazard H-1 0 H-2 0 H-3 0 H-4 0 H-5 0
I: Institutional I-1 0 I-2❑ 1-3 0 1-4 0 M: Mercantile 0 R: Residential R-10 R-2 0 R-3 0 R-4 0
S: Storage S-1 0 S-2❑ U: Utility 0 Special Use 0 and please describe below:
Special Use Description:
SECTION 6:CONSTRUCTION TYPE(Check as applicable)
IA 0 IB ❑ HA IIB ❑ IIIA ❑ IIIBI( IV 0 VA 0 VB 0
SECTION 7:SITE INFORMATION(refer to 780 CMR 105.3 for details on each item)
Trench Permit: Debris Removal:
Water Supply: Flood Zone Information: Sewage Disposal: Licensed Dis sal Site
Public'. Check if outside Flood Zone 0 Indicate municipa� A trench will not be Po A
requiredpQr trench ors ify:
Private 0 or indentify Zone: or on site system 0 permit is enclosed 0 Va l PJ ?petiliks
Railroad right-of-way: Hazards to Air Navigation: MA Historic Commission key iew Process:
Not Applicable Is Structure within airport approach area? Is their review completed?
or Consent to Build enclosed 0 Yes 0 or NA. Yes 0 No'
SECTION 8:CONTENT OF CERTIFICATE OF OCCUPANCY
Edition of Code: l S ICf t Use Group(s): Type of Construction: l it i3
Does the building contain an Sprinkler System?: 14 p Special Stipulations:
Design Occupant Load per Floor and Assembly space:_ I a S _
SECTION 9: PROPERTY OWNER AUTHORIZATION
Na and Ad ss of�Ptr^ (5d,le XiCsM4 piO6
opertyOwner r� �� �
Name(Print) No.and Str a City/Toinin Zip
Property Owner Contact Information:
to3- - a z LjZ.Zj ti$o.2 akid e,0,l ill rioiwow,
Title Telephone No.(busin s) Tel phone No. (cell) e-mail address o Cp 'n
If applicable,the property owner hereby authorizes:
Name Street Address City/Town State Zip
to apply for and act on the property owner's behalf,in all matters relative to work authorized by this building permit application.
SECTION 10:CONSTRUCTION CONTROL(Please fill out Appendix 1)
If a building is less than 35,000 cu.ft.of enclosed space and/or not under Construction Control then check here 0.
Otherwise provide construction control forms(see section 107 in the code)as required.
10.1 Registered Professional Responsible for Construction Control(the professional coordinating document submittals)
G eoNT J fb - '03 702.7 -MR 9 sa c16q
Name(Registrant) Telephone No. e-qtail address R gistration Nuber
1 Kc Q.a Pc h P. CO M Ps,SN �j�(e ' 1'� 0v
Street Address City/Town J State Zip Discipline Expiration Date
10.2 General Contractor
DOuhlaS I ha�er
Company Nam
poutlus The c C 5 10 7G 7°I
Name of Per n Responsible foT Construction License No. and Type if Applicable
'Po i3ex 6o3aa FIoreste 11 A 01066Z
Street Address City/Town State Zip
- - Y 1 -530- V7 k5 7oct�kGs i 1a tr @ y�R;I•co Ai
Telephone No.(business) Telephone No.(cell) e-mail address
SECTION 11:WORKERS COMPENSATION INSURANCE AFFIDAVIT(M.G.L c.152.§25C(6))
A Workers'Compensation Insurance Affidavit from the MA Department of Industrial Accidents must be completed and
submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit.
Is a signed Affidavit submitted with this application? Yes No 0
SECTION 12:CONSTRUCTION COSTS AND PERMIT FEE
Item Estimated Costs:(Labor (/�D n•
and Materials) Total Construction Cost(from Item 6)=$ Wn0
1.Building $ /� ,�^ Building Permit Fee=Total Construction Cost x, (Insert here
I 2.Electrical $ al 0 V appropriate municipal factor)=$ .
3.Plumbing $ /
4.Mechanical (I-IVAC) $ / 0 co Note:Minimum fee=$V 3[7' (contact municipality)
5.Mechanical (Other) $ J Enclose check payable to
6.Total Cost $ qo) 0 010 (contact municipality)and write check number here I 057
SECTION 13`SIGNATURE OF BUILDING PERMIT APPLICANT
By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this
application is true and accurate to the best of my knowledge and understanding.
flu las Thu �v y( $30- fc7Ss_ s/9A/
Please prim nd sign na Title Telephone No. qJ Date 1
Street Address City/Town, State Zip mail Address J
Pd (o ( Ga3p_ 1—IOvcitc4 ,144/ OIW .2 //
Municipal Inspector to fill out this section upon application approval: JL --- (�-1Z-24zi1
Name Date
Initial Construction Control Document
c( e To be submitted with the building permit application by a
Registered Design Professional
•
,47 for work per the ninth edition of the
.�F Massachusetts State Building Code, 780 CMR, Section 107
Project Title: Mill River Music Date: 4-12-24
Property Address: 135 King Street, Northampton,MA
Project: Check(x) one or both as applicable: New construction X Existing Construction
Project description: Project located in Zone CBg,lot# 31B-051. Change of use of a 52' x 122' Type IlI-B
building (non sprinklered), from A-3 Assembly(gymnasium) to M Mercantile(retail space),6,222 Gross
Building Area per property card, 6,250GSF measured from plans. Work includes interior fit out and creation
of interior mezzanines and listening/ practice rooms.
I, MA Registration Number:952969 Expiration date:8/24,am a registered design professional,and I have
prepared or directly supervised the preparation of all design plans,computations and specifications concerning':
Architectural X Structural Mechanical
Fire Protection Electrical Other:
for the above named project and that to the best of my knowledge, information, and belief such plans,
computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780
CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my
designee) shall perform the necessary professional services and be present on the construction site on a regular
and periodic basis to:
1. Review, for conformance to this code and the design concept, shop drawings, samples and other
submittals by the contractor in accordance with the requirements of the construction documents.
2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Be present at intervals appropriate to the stage of construction to become generally familiar with the
progress and quality of the work and to determine if the work is being performed in a manner consistent
with the approved construction documents and this code.
Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107.
When required by the building official,I shall submit field/progress reports(see item 3.)together with pertinent
comments,in a form acceptable to the building official.
Upon completion of the work,I shall submit to the building official a'Final C ntrol Document'.
Enter in the space to the right a "wet" or "� AR
Fc,
electronic signature and seal: (
HA,..PTUN
Phone number:413-727-3382 Email:info@meetinghousearchitecture.c'M.. • niH
Building Official Use Only
Building Official Name: Permit No.: Date:
Appendix 1
Construction Documents are required for structures that must comply with 780 CMR 107. The
checklist below is a compilation of the documents that may be required. The applicant shall fill out
the checklist and provide the contact information of the registered professionals responsible for the
documents. This appendix is to be submitted with the building permit application.
Checklist for Construction Documents*
Mark"x"where applicable
No. Item Submitted Incomplete Not Required
1 Architectural
2 Foundation 1/
3 Structural
4 Fire Suppression
5 Fire Alarm(may require repeaters)
6 HVAC 1/
7 Electrical
8 Plumbing(include local connections) —
9 Gas(Natural,Propane,Medical or other) --
10 Surveyed Site Plan(Utilities,Wetland,etc.) �.
11 Specifications
12 Structural Peer Review 13 Structural Tests&Inspections Program —
14 Fire Protection Narrative Report --
15 Existing Building Survey/Investigation —
16 Energy Conservation Report
17 Architectural Access Review(521 CMR) —
18 Workers Compensation Insurance �J
19 Hazardous Material Mitigation Documentation
20 Other(Specify)
21 Other(Specify)
22 Other(Specify)
*Areas of Design or Construction for which plans are not complete at the time of application submittal must be identified herein.Work so identified
must not be commenced until this application has been amended and the proposed construction document amendment has been approved by the
authority having jurisdiction.
Registered Professional Contact Information
► i v rnPe K� he)((se• cc ivl
Name(Registrant) a Telephone No. e-mail address RegistrationNumber
Str�tMAddress Ci Town State Zip
Discipline Expiration Date
h/ p
Name(Registrant) Telephone No. e-mail address Registration Number
Street Address City/Town State Zip Discipline Expiration Date
Name(Registrant) Telephone No. e-mail address Registration Number
Street Address City/Town State Zip Discipline Expiration Date
Please follow this link for construction control forms to be used by Registered Design Professionals.
City of Northampton
Massachusetts tt ''4
(_ r ' s DEPARTMENT OF BUILDING INSPECTIONS ?\ #
'
_ �
212 Main Street • Municipal Building '`�
'' Northampton, MA 01060 �J ;
CONSTRUCTION DEBRIS AFFIDAVIT
(FOR ALL DEMOLITION AND RENOVATION PROJECTS)
In accordance of the provisions of MGL c 40, S54, a condition of Building Permit
Number is that all debris resulting from this work shall be disposed of in a
properly licensed waste disposal facility, as defined by MGL c 111, S 150A.
The debris will be disposed of in:
Location of Facility: Va ) 1,4 Cl
The debris will be transported by:
Name of Hauler: TIC/ \c/5 -Oc P "
lJ
YSignature of Applicant: , Date: 079-
The Commonwealth of Massachusetts
t' =" —0, Department of Industrial Accidents
., =Q1'.= 1 Congress Street,Suite 100
-_:t;i_`,.* Boston, MA 02114-2017
-` a=,t `'+ www.mas.goullp a
Workers'Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers.
TO BE PILED W I f t THE PERMITHNC AUTHORITY.
Applicant Information Please Print Legibly
Name(Busincs eOrganizatio IndividuaI): DOLth(e! S 7-I(CG.ev
Address: co 0-6, co )). J f
City/StatteiZip: F/ icie e II A Phone #: yi-5 — c3(i - y 7 s
Are yam an employee?Cheek IIYe appropriate[tax;
�,� (J Type of project(required):
f t am a employer with_ `, employ (full a '`oe part-time}.* 7. 0 New construction
2a lam a sole proprietor or partnership and have no employees working for me in S.)2E Remodeling
any capacity.[No workers'comp.insurance reunited.)
930lam a homeowner doing all work myself.[No workers'comp.insurance required.)` ❑Demolition
4.0 lam a homeowner and will be hiring cenl ors to conduct all week on my property_ I will !U Building addition
ensure that all contractors either have Worketx'compensation insurance ear am sole 11.Q Electrical repairs or additions
proprietors with no employees. 12_0 Plumbing repairs or additions
't I ant a general contractor and I have hired the sub-contractors listed on the attached sleet
These sub-contractors leave employees and hove workers'comp.insurance.[ 13.0Roof repairs 14.0°lila60 We are*corporation and its officers have exercised their rises°rexerrp+tion per WI L.
132,f 44),and we have no employees.[No workers'cramp.insurance requital
"Any applicant that cheeks box al rains also fell out the section below showing their workers'compensation policy informati n.
t Ilomeinvners who strhmii this affidavit indicating they are doing all work and then hire outside contractors mint submit a new affidavit radios ig such.
:Contractors that check this box must attached an additional sheet showing the name of the►adscontrac tors and state whether or not those entities have
employees. If the sub-contractors have ermloyeea,tl ev roust pn .iidetheir workers'comp.policy number.
l am an employer that is providing workers'compensation insurance for my employees. Below Is the policy and fob site
information.
Insurance Company Name: I VGj,et j.IJj —
Policy#or Self-ins.Lic.#: l� 14(k 6 R I o a rf— Expiration Date: ./.2ot b-5
Job Site Address: I'3 S ICI K S 7 City/State/Zip: NO J.dl ct=.t )A'tr itlf_i
Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date).
Failure to secure coverage as required under MOL c. 152,pm is a criminal violation punishable by a fine up to$1,500.00
and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a
day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance
coverage verification.
I do hereby certify under the pains andd nobles of perjury that the information provided above I true and correct.
Signature: //L I}ate: i//V a
c
—t
Phone#:
Official use only. Do not write in this area,to be completed by city or town official
City or Town: Permit/License#
Issuing Authority(circle one):
1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5. Plumbing Inspector
6.Other
Contact Person: Phone#:
•
r ,
■
Steven Rosinski,PE
413-244-7635
Steve@Rosbeam.com
5/8/2024
Re: Structural consult-For Permit Only To: Geoff Arthur
Mill River Music-Timber Mezzanines Geoff@MeetinghouseArchitecture.com
135 King St 413-727-3382
Northampton,MA 01060
Geoff,
You've reached out for structural consultation for the Mill River Music project regarding the addition of new timber framed mezzanines.This letter
corresponds with both the most recent draft plans dated 5/6/2024 as well as the calcs found on the following pages. My scope of work is limited to new
timber frame mezzanines and its support structure and does not include the remainder of the building whether new or existing nor shall the new
structure interfere with critical existing structural elements.
Based on discussions between us and also between you and the client,the building's use is to remain retail with no intent on using the mezzanines
for an assembly area or storage areas.Second floor usage(i.e.mezzanine only)for a retail facility will place us in a 75 PSF live load category with a
non-concurrent 1,000 lbs point load placed over a 2.5-ft x 2.5-ft area of the floor.All calculations provided reflect this loading criteria.
All timber frame elements are to be true in dimension eastern white pine#1 or Select Structural in grade with no exceptions for lower grades. If the
client wants an alternative species,an additional analysis will be required on a case-by-case basis.Timbers are not allowed to be notched and will
instead be hung from the side using hangers. Please note that all hangers will require a drawing approval process with the manufacturer for each
component due to the specific detailing requirements.
All timber framing element sizes are to be as follows:
Beams:All 8x14 with long dimension oriented vertically and hung from the side of posts using a concealed flange hanger consisting of 1/4"thick
A36 steel or higher grade with a minimum of(14)lag screws 1/2"dia.x 5"length.Further detailing for beam-to-post hangers will be required.
Posts: 10x10 extending beyond the mezzanine floor framing and above top-of-railing to provide a proper anchorage point for railings.Posts
that are offset to be adjacent to a wall will use one of the two offset footing choices provided in the calculations:one for corner posts and one
for intermediate bearing points. Post bases will also be required to be made by the manufacturer and will require a shop drawing review and
approval process.
Floor Joists:6x8 with the long dimension oriented vertically and hung from the side of 8x14 beams using 1/4"thick A36 steel with a minimum of
(6)lag screws 1/2"dia.x 4"length.
Decking:2x6 tongue-and-groove placed on-flat running continuously over floor joists below and fastened using(1)4"Headlok fasteners where
decking runs continuous over joists below and(2)4"Headlok fasteners at ends of decking for each deck board.Top of decking that's flush
with top of timber beams are to be fastened to a true 2x6 dropped ledger using(2)4"Headloks and the ledger fastened to the timber beam
using two rows of 5"Ledgerloks at 12"o.c.
Footings will consist of three different types of footings simply explained:footings where the post is to be placed squarely in the center,posts will be
placed offset from center due to a corner,and posts being placed offset from center due to an interior(such as parallel to a wall).Calculations shown
reflect what's required as well as rebar sizes.Offset footings will require additional top rebar to be determined on a case-by-case basis.
Let me know if you have any questions.
� N OF MgSs
``."
c7 STEVEN R tiG
•
ROSINSKIr+ Steven R Rosinski
MA
-' '545 ti j Steve@Rosbeam.com
y' 2024.05.0817:58:59-04'00'
;%/243:5/0NALOG
0 •: " • 4
Steven Rosinski,P.E. Project Title: Mill River Music
Steve@Rosbeam.com Engineer: Steven Rosinski, PE
413-244-7635 Project ID: 24036
Project Descr: Timber Frame Mezzanines
Project Information Project File:24036-Mill River Music Mezzanines-Northampton,MA_Calcs.ec6
LIC#:KW-06014544,Build:20.24.03.04 ROSBEAM,LLC (c)ENERCALC INC 1983-2023
Project Title : Mill River Music
Description :Timber Frame Mezzanines
I.D. :24036
Address : 135 King St, Northampton,MA
Project Leader :Steven Rosinski,PE
Phone : 413-244-7635 Fax : eMail : Steve@Rosbeam.com
Project Notes Scope of work is limited exclusively to newly added Mezzanines and its support structure
Steven Rosinski,P.E. Project Title: Mill River Music
' Steve@Rosbeam.com Engineer: Steven Rosinski, PE
413-244-7635 Project ID: 24036
Project Descr: Timber Frame Mezzanines
Wood Beam Project File:24036-Mill River Music Mezzanines-Northampton,MA_Calcs.ec6
LIC#:KW-06014544,Build:20.24.03.04 ROSBEAM,LLC (c)ENERCALC INC 1983-2023
DESCRIPTION: Worst Case Beam
CODE REFERENCES
Calculations per NDS 2015, IBC 2015, CBC 2016,ASCE 7-10
Load Combination Set: IBC 2015
Material Properties
Analysis Method: Allowable Stress Design Fb+ 875.0 psi E:Modulus of Elasticity
Load Combination: IBC 2015 Fb- 875.0 psi Ebend-xx 1,100.0ksi
Fc-PrIl 575.0 psi Eminbend-xx 400.0 ksi
Wood Species : Eastern White Pine Fc-Perp 350.0 psi
Wood Grade : No.1 Fv 125.0 psi
Ft 600.0 psi Density 22.470pcf
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
D(0.110)L(0.4125)
8.0X 14.0
P��N 0 F M4SS
Span= 16 50 ft $c. �(+
oz STEVEN R t,
m ROSINSKI
545 -'
�'� •
�,.
Applied Loads Service loads entered.Load Fail .� Epp"�, u.ations.
Beam self weight calculated and added to loading FSS/ONAL�"'\ 1GLl
Loads on all spans...
Uniform Load on ALL spans: D=0.020, L =0.0750 ksf, Tributary Width=5.50 ft 0 • ' • 4
DESIGN SUMMARY Desi!n OK
Maximum Bending Stress Ratio = 0.89a 1 Maximum Shear Stress Ratio = 0.411 : 1
Section used for this span 8.0 X 14.0 Section used for this span 8.0 X 14.0
lb:Actual = 843.80psi fv:Actual = 51.39 psi
F'b = 941.35psi F'v = 125.00 psi
Load Combination +D+L Load Combination +D+L
Location of maximum on span = 8.250ft Location of maximum on span = 0.000 ft
Span#where maximum occurs = Span#1 Span#where maximum occurs = Span#1
Maximum Deflection
Max Downward Transient Deflection 0.344 in Ratio= 575>=360 Span: 1 :L Only
Max Upward Transient Deflection 0 in Ratio= 0<360 n/a
Max Downward Total Deflection 0.450 in Ratio= 439>=240 Span: 1 :+D+L
Max Upward Total Deflection 0 in Ratio= 0<240 n/a
Overall Maximum Deflections
Load Combination Span Max.""Defl Location in Span Load Combination Max."+"Defl Location in Span
+D+L 1 0.4501 8.310 0.0000 0.000
Vertical Reactions Support notation:Far left is#1 Values in KIPS
Load Combination Support 1 Support 2
Max Upward from all Load Conditions 4.455 4.455
Max Upward from Load Combinations 4.455 4.455
Max Upward from Load Cases 3.403 3.403
D Only 1.052 1.052
+D+L 4.455 4.455
+D+0.750L 3.604 3.604
+0.60D 0.631 0.631
L Only 3.403 3.403
Steven Rosinski,P.E. Project Title: Mill River Music
Steve@Rosbeam.com Engineer: Steven Rosinski, PE
413-244-7635 Project ID: 24036
Project Descr: Timber Frame Mezzanines
Wood Beam Project File:24036-Mill River Music Mezzanines-Northampton,MA Calcs.ec6
LIC#:KW-06014544,Build:20.24.03.04 ROSBEAM,LLC (c)ENERCALC INC 1983-2023
DESCRIPTION: Worst Case Beam v2
CODE REFERENCES
Calculations per NDS 2015, IBC 2015, CBC 2016,ASCE 7-10
Load Combination Set: IBC 2015
Material Properties
Analysis Method: Allowable Stress Design Fb+ 875.0 psi E:Modulus of Elasticity
Load Combination: IBC 2015 Fb- 875.0 psi Ebend-xx 1,100.0ksi
Fc-Prll 575.0 psi Eminbend-xx 400.0 ksi
Wood Species : Eastern White Pine Fc-Perp 350.0 psi
Wood Grade : No.1 Fv 125.0 psi
Ft 600.0 psi Density 22.470pcf
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
D(0 36)L(1 4)
D(0.0950)L(0.3563)
D(0.1)L(0.375) •
8.0 X 14.0
Span=u.so ft ,4 k OF M4ss4 A.
c STEVEN R yam,
I ROSINSKI r^
Applied Loads Service loads entered. L .v act . -.•i5ppli y# calculations.
Beam self weight calculated and added to loading s�•
Loads on all spans... Z' a--
Uniform Load on ALL spans : D =0.020, L=0.0750 ksf, Tributary Width=4.750 ft fsS/ONALE-t°
Point Load : D=0.360, L= 1.40 k @ 8.0 ft, (Beam incoming) n
' '
Uniform Load : D=0.020, L=0.0750 ksf, Extent=0.0-->>8.0 ft, Tributary Width =5.0 ft, (Fro.
4
DESIGN SUMMARY Design OK
Maximum Bending Stress Ratio = 0.977: 1 Maximum Shear Stress Ratio = 0.543 : 1
Section used for this span 8.0 X 14.0 Section used for this span 8.0 X 14.0
fb:Actual = 919.30psi fv:Actual = 67.91 psi
F'b = 941.35psi F'v = 125.00 psi
Load Combination +D+L Load Combination +D+L
Location of maximum on span = 6.524ft Location of maximum on span = 0.000 ft
Span#where maximum occurs = Span#1 Span#where maximum occurs = Span#1
Maximum Deflection
Max Downward Transient Deflection 0.215 in Ratio= 696>=360 Span: 1 :L Only
Max Upward Transient Deflection 0 in Ratio= 0<360 n/a
Max Downward Total Deflection 0.277 in Ratio= 540>=240 Span: 1 :+D+L
Max Upward Total Deflection 0 in Ratio= 0<240 n/a
Overall Maximum Deflections
Load Combination Span Max."-"Defl Location in Span Load Combination Max."+"Defl Location in Span
+D+L 1 0.2773 6.296 0.0000 0.000
Vertical Reactions Support notation: Far left is#1 Values in KIPS
Load Combination Support 1 Support 2
Max Upward from all Load Conditions 6.147 5.272
Max Upward from Load Combinations 6.147 5.272
Max Upward from Load Cases 4.771 4.083
D Only 1.377 1.189
+D+L 6.147 5.272
+D+0.750L 4.955 4.251
+0.60D 0.826 0.714
Steven Rosinski, P.E. Project Title: Mill River Music
Steve@Rosbeam.com Engineer: Steven Rosinski, PE
413-244-7635 Project ID: 24036
Project Descr: Timber Frame Mezzanines
Wood Beam Project File:24036-Mill River Music Mezzanines-Northampton,MA_Calcs.ec6
LIC#:KW-06014544,Build:20.24.03.04 ROSBEAM,LLC (c)ENERCALC INC 1983-2023
DESCRIPTION: Worst Case Beam v2
Vertical Reactions Support notation:Far left is#1 Values in KIPS
Load Combination Support 1 Support 2
L Only 4.771 4.083
Steven Rosinski,P.E. Project Title: Mill River Music
Steve@Rosbeam.com Engineer: Steven Rosinski, PE
413-244-7635 Project ID: 24036
Project Descr: Timber Frame Mezzanines
Wood Beam Project File:24036-Mill River Music Mezzanines-Northampton,MA_Calcs.ec6
LIC#:KW-06014544,Build:20.24.03.04 ROSBEAM,LLC (c)ENERCALC INC 1983-2023
DESCRIPTION: Purlin joist
CODE REFERENCES
Calculations per NDS 2015, IBC 2015, CBC 2016,ASCE 7-10
Load Combination Set: IBC 2015
Material Properties
Analysis Method: Allowable Stress Design Fb+ 875.0 psi E:Modulus of Elasticity
Load Combination: IBC 2015 Fb- 875.0 psi Ebend-xx 1,100.0ksi
Fc-Prll 575.0 psi Eminbend-xx 400.0ksi
Wood Species : Eastern White Pine Fc-Perp 350.0 psi
Wood Grade : No.1 Fv 125.0 psi
Ft 600.0 psi Density 22.470pcf
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
D(0.060)L(0.2250)
60X80
\ OFA14S
Span= 10 0 ft 4c,Q s4�,
(i : %
v 545 -, _
Applied Loads Service loads entered. Loa a��s •• .,e a .li. y� Iculations.
Beam self weight calculated and added to loading F' '..- ���
Loads on all spans... ASS/ONAL���'
Uniform Load on ALL spans : D=0.020, L=0.0750 ksf, Tributary Width=3.0 ft 0 •. 4
DESIGN SUMMARY Desi t n OK
Maximum Bending Stress Ratio = 0.719t 1 Maximum Shear Stress Ratio = 0.318 : 1
Section used for this span 6.0 X 8.0 Section used for this span 6.0 X 8.0
fb:Actual = 685.52 psi fv:Actual = 39.70 psi
F'b = 953.75psi F'v = 125.00 psi
Load Combination +D+L Load Combination +D+L
Location of maximum on span = 5.000ft Location of maximum on span = 0.000 ft
Span#where maximum occurs = Span#1 Span#where maximum occurs = Span#1
Maximum Deflection
Max Downward Transient Deflection 0.181 in Ratio= 663>=360 Span: 1 :L Only
Max Upward Transient Deflection 0 in Ratio= 0<360 n/a
Max Downward Total Deflection 0.235 in Ratio= 510>=240 Span: 1 :+D+L
Max Upward Total Deflection 0 in Ratio= 0<240 n/a
Overall Maximum Deflections
Load Combination Span Max.""Defl Location in Span Load Combination Max."+"Defl Location in Span
+D+L 1 0.2351 5.036 0.0000 0.000
Vertical Reactions Support notation: Far left is#1 Values in KIPS
Load Combination Support 1 Support 2
Max Upward from all Load Conditions 1.462 1.462
Max Upward from Load Combinations 1.462 1.462
Max Upward from Load Cases 1.125 1.125
D Only 0.337 0.337
+D+L 1.462 1.462
+D+0.750L 1.181 1.181
+0.60D 0.202 0.202
L Only 1.125 1.125
Steven Rosinski,P.E. Project Title: Mill River Music
Steve@Rosbeam.com Engineer: Steven Rosinski, PE
413-244-7635 Project ID: 24036
Project Descr: Timber Frame Mezzanines
Wood Beam Project File:24036-Mill River Music Mezzanines-Northampton,MA_Calcs.ec6
LIC#:KW-06014544,Build:20.24.03.04 ROSBEAM,LLC (c)ENERCALC INC 1983-2023
DESCRIPTION: Planking
CODE REFERENCES
Calculations per NDS 2015, IBC 2015, CBC 2016,ASCE 7-10
Load Combination Set: IBC 2015
Material Properties
Analysis Method: Allowable Stress Design Fb+ 875.0 psi E:Modulus of Elasticity
Load Combination IBC 2015 Fb- 875.0 psi Ebend-xx 1,100.0ksi
Fc-Prll 575.0 psi Eminbend-xx 400.0 ksi
Wood Species : Eastem White Pine Fc-Perp 350.0 psi
Wood Grade : No.1 Fv 125.0 psi
Ft 600.0 psi Density 22.470 pcf
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
D(0.010)L(0.03750)
A 60X20 * 6.0X2.0
Span Span=3.0ft ��P\% OFA/,q`ss,4
P
o= STEVEN R yG
til
4 ROSINSKI r2.
v • 545 c-„"
Applied Loads Service loads entered.Load Factor• ' 4t r,�1 r' s.
Beam self weight NOT internally calculated and added FSS/ONAL0�'\
Loads on all spans... �___,_�
Uniform Load on ALL spans: D =0.020, L=0.0750 ksf, Tributary Width =0.50 ft 0 • • • 4
DESIGN SUMMARY Desi s n OK
Maximum Bending Stress Ratio = 0.19Q 1 Maximum Shear Stress Ratio = 0.082 : 1
Section used for this span 6.0 X 2.0 Section used for this span 6.0 X 2.0
fb:Actual = 160.31 psi fv:Actual = 10.24 psi
F'b = 841.75psi F'v = 125.00 psi
Load Combination +D+L Load Combination +D+L
Location of maximum on span = 3.000ft Location of maximum on span = 2.849ft
Span#where maximum occurs = Span#1 Span#where maximum occurs = Span#1
Maximum Deflection
Max Downward Transient Deflection 0.007 in Ratio= 5512>=360 Span: 1 :L Only
Max Upward Transient Deflection 0 in Ratio= 0<360 n/a
Max Downward Total Deflection 0.008 in Ratio= 4351>=240 Span: 1 :+D+L
Max Upward Total Deflection 0 in Ratio= 0<240 n/a
Overall Maximum Deflections
Load Combination Span Max.""Defl Location in Span Load Combination Max."+"Defl Location in Span
+D+L 1 0.0083 1.274 0.0000 0.000
+D+L 2 0.0082 1.743 0.0000 0.000
Vertical Reactions Support notation: Far left is#1 Values in KIPS
Load Combination Support 1 Support 2 Support 3
Max Upward from all Load Conditions 0.053 0.178 0.053
Max Upward from Load Combinations 0.053 0.178 0.053
Max Upward from Load Cases 0.042 0.141 0.042
D Only 0.011 0.037 0.011
+D+L 0.053 0.178 0.053
+D+0.750L 0.043 0.143 0.043
+0.60D 0.007 0.022 0.007
L Only 0.042 0.141 0.042
Steven Rosinski,P.E. Project Title: Mill River Music
Steve@Rosbeam.com Engineer: Steven Rosinski, PE -
413-244-7635 Project ID: 24036
Project Descr: Timber Frame Mezzanines
Wood Beam Project File:24036-Mill River Music Mezzanines-Northampton,MA_Calcs.ec6
LIC#:KW-06014544,Build:20.24.03.04 ROSBEAM,LLC (c)ENERCALC INC 1983-2023
DESCRIPTION: Planking v2
CODE REFERENCES
Calculations per NDS 2015, IBC 2015, CBC 2016,ASCE 7-10
Load Combination Set: IBC 2015
Material Properties
Analysis Method: Allowable Stress Design Fb+ 875.0 psi E:Modulus of Elasticity
Load Combination: IBC 2015 Fb- 875.0 psi Ebend-xx 1,100.0ksi
Fc-PrIl 575.0 psi Eminbend-xx 400.0 ksi
Wood Species : Eastern White Pine Fc-Perp 350.0 psi
Wood Grade : No.1 Fv 125.0 psi
Ft 600.0 psi Density 22.470pcf
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
D(0.010)
LOP16}}
60 X 2 0 A.
Span=2.670 ft =�O"\' F Mgs8
o STEVEN R yam, ~
i ROSINSKI
Applied Loads Service loads entered. Loa g orb.,j .:r Jr. ied V+ culations.
Beam self weight NOT internally calculated and added • '/
Loads on all spans... �j •� '•'� ..er
Uniform Load on ALL spans: D=0.020 ksf, Tributary Width=0.50 ft FSS/17NALOC'
Uniform Load : L=0.160 , Tributary Width= 1.0 ft, (Point Load Live Load) 0 . . a 4
DESIGN SUMMARY Desi•n OK
Maximum Bending Stress Ratio = 0.54Q 1 Maximum Shear Stress Ratio = 0.199 : 1
Section used for this span 6.0 X 2.0 Section used for this span 6.0 X 2.0
fb:Actual = 454.47psi fv:Actual = 24.85 psi
Fb = 841.75psi F'v = 125.00 psi
Load Combination +D+L Load Combination +D+L
Location of maximum on span = 1.335ft Location of maximum on span = 2.504 ft
Span#where maximum occurs = Span#1 Span#where maximum occurs = Span#1
Maximum Deflection
Max Downward Transient Deflection 0.042 in Ratio= 766>=360 Span: 1 :L Only
Max Upward Transient Deflection 0 in Ratio= 0<360 n/a
Max Downward Total Deflection 0.044 in Ratio= 721>=240 Span: 1 :+D+L
Max Upward Total Deflection 0 in Ratio= 0<240 n/a
Overall Maximum Deflections
Load Combination Span Max."--Defl Location in Span Load Combination Max."+"Defl Location in Span
+D+L 1 0.0444 1.345 0.0000 0.000
Vertical Reactions Support notation:Far left is#1 Values in KIPS
Load Combination Support 1 Support 2
Max Upward from all Load Conditions 0.227 0.227
Max Upward from Load Combinations 0.227 0.227
Max Upward from Load Cases 0.214 0.214
D Only 0.013 0.013
+D+L 0.227 0.227
+D+0.750L 0.174 0.174
+0.60D 0.008 0.008
L Only 0.214 0.214
•
Steven Rosinski,P.E. Project Title: Mill River Music
• Steve@Rosbeam.com Engineer: Steven Rosinski, PE
413-244-7635 Project ID: 24036
Project Descr: Timber Frame Mezzanines
General Footing Project File:24036-Mill River Music Mezzanines-Northampton,MA_Calcs.ec6
LIC#:KW-06014544,Build:20.24.03.04 ROSBEAM,LLC (c)ENERCALC INC 1983-2023
DESCRIPTION: Worst case offset footing
Code References
Calculations per ACI 318-14, IBC 2015, CBC 2016,ASCE 7-10
Load Combinations Used : IBC 2015
General Information
Material Properties Soil Design Values
fc:Concrete 28 day strength = 3.0 ksi Allowable Soil Bearing = 2.0 ksf
fy:Rebar Yield = 60.0 ksi Soil Density = 110.0 pcf
Ec:Concrete Elastic Modulus = 3,122.02 ksi Increase Bearing By Footing Weight = Yes
Concrete Density = 145.0 pcf Soil Passive Resistance(for Sliding) = 250.0 pcf
W Values Flexure = 0.90 Soil/Concrete Friction Coeff. = 0.30
Shear = 0.750 Increases based on footing Depth
Analysis Settings Footing base depth below soil surface = 1.0 ft
Min Steel%Bending Reinf. = Allow press.increase per foot of depth = ksf
Min Allow%Temp Reinf. = 0.00180 when footing base is below = ft
Min.Overturning Safety Factor = 1.0 : 1
Min.Sliding Safety Factor = 1.0 : 1 Increases based on footing plan dimension
Add Ftg Wt for Soil Pressure Yes Allowable pressure increase per foot of depth
Use ftg wt for stability,moments&shears Yes = ksf
Add Pedestal Wt for Soil Pressure No when max.length or width is greater than
ft
Use Pedestal wt for stability,mom&shear No
Dimensions
Width parallel to X-X Axis = 1.50 ft
Length parallel to Z-Z Axis = 6.50 ft Z
Footing Thickness = 12.0 in P�. OF AIlSS
Load location offset from footing center... ..41. q0
ex:PrIl to X-X Axis = -4 in o= STEVEN R
Ln
= in I ROSINSKI
Pedestal dimensions... o x v ,.,• 545 --''
px:parallel to X-X Axis = 10.0 in zo • j
pz:parallel to Z-Z Axis = 10.0 in '�j 4" .•=�- 'gal'
Height - in FSSIONAL ''
Rebar Centerline to Edge of Concrete... ii _,,_
at Bottom of footing = 3.0 in •• 0 • + • 4
• :o
w
CZ
Reinforcing _ 1 Z."_ W
Bars parallel to X-X Axis
Number of Bars - 9.0
Reinforcing Bar Size = # 4
Bars parallel to Z-Z Axis -
Number of Bars = 2.0
Reinforcing Bar Size = # 4 9 -#4 Bars ,
Bandwidth Distribution Check (ACI 15.4.4.2) -
Direction Requiring Closer Separation - zas«��,�ow.pw.x
Bars along X-X Axis X-X Section Looking to +Z
#Bars required within zone 37.5
#Bars required on each side of zone 62.5%
Applied Loads
D Lr L S W E H
P:Column Load = 1.80 6.40 k
OB:Overburden = ksf
M-xx = k-ft
M-zz = k-ft
V-x = k
V-z = k
Steven Rosinski,P.E. Project Title: Mill River Music ,
Steve@Rosbeam.com Engineer: Steven Rosinski, PE
413-244-7635 Project ID: 24036
Project Descr: Timber Frame Mezzanines
General Footing Project File:24036-Mill River Music Mezzanines-Northampton,MA_Calcs.ec6
LIC#:KW-06014544,Build:20.24.03.04 ROSBEAM,LLC (c)ENERCALC INC 1983-2023
DESCRIPTION: Worst case offset footing
DESIGN SUMMARY Design OK
Min.Ratio Item Applied Capacity Governing Load Combination
PASS 0.9818 Soil Bearing 2.106 ksf 2.145 ksf +D+L about Z-Z axis
PASS n/a Overturning-X-X 0.0 k-ft 0.0 k-ft No Overturning
PASS n/a Overturning-Z-Z 0.0 k-ft 0.0 k-ft No Overturning
PASS n/a Sliding-X-X 0.0 k 0.0 k No Sliding
PASS n/a Sliding-Z-Z 0.0 k 0.0 k No Sliding
PASS n/a Uplift 0.0 k 0.0 k No Uplift
PASS 0.001924 Z Flexure(+X) 0.02093 k-ft/ft 10.877 k-ft/ft +1.20D+1.60L
PASS 0.0 Z Flexure(-X) 0.0 k-ft/ft 0.0 k-ft/ft No Moment v,\V\OF AI4Ss
PASS 0.4868 X Flexure(+Z) 5.104 k-ft/ft 10.486 k-ft/ft +1.20D+1.6.• �C.P 40
PASS 0.4868 X Flexure(-Z) 5.104 k-ft/ft 10.486 k-ft/ft +1.20D+1.:'J ? STEVEN R "S
PASS n/a 1-way Shear(+X) 0.0 psi 82.158 psi n/a I ROSINSKI ""
PASS 0.0 1-way Shear(-X) 0.0 psi 0.0 psi n/a v /,., 545 -1
PASS 0.2981 1-way Shear(+Z) 24.494 psi 82.158 psi +1.20D+1.:
PASS 0.2981 1-way Shear(-Z) 24.494 psi 82.158 psi +1.20D+1 a •, ./,AN .4
PASS n/a 2-way Punching 0.7105 psi 82.158 psi +1.40D FSS/ONAL \' 'G
Top reinforcing mat required(see'Bending'tab). 0 *• 4
Hand check required for anchor pullout.
Detailed Results
Soil Bearing
Rotation Axis& Xecc Zecc Actual Soil Bearing Stress @ Location Actual/Allow
Load Combination... Gross Allowable (in) Bottom,-Z Top,+Z Left,-X Right,+X Ratio
X-X,D Only 2.145 n/a 0.0 0.3296 0.3296 n/a n/a 0.154
X-X,+D+L 2.145 n/a 0.0 0.9860 0.9860 n/a n/a 0.460
X-X,+D+0.750L 2.145 n/a 0.0 0.8219 0.8219 n/a n/a 0.383
X-X,+0.60D 2.145 n/a 0.0 0.1978 0.1978 n/a n/a 0.092
Z-Z, D Only 2.145 -2.240 n/a n/a n/a 0.5733 0.08592 0.267
Z-Z,+D+L 2.145 -3.412 n/a n/a n/a 2.106 0.0 0.982
Z-Z,+D+0.750L 2.145 -3.294 n/a n/a n/a 1.720 0.0 0.802
Z-Z,+0.60D 2.145 -2.240 n/a n/a n/a 0.3440 0.05155 0.160
Footing Flexure
Flexure Axis&Load Combination Mu Side Tension As Req'd Gym.As Actual As Phi*Mn Status
k-ft Surface in^2 in^2 in^2 k-ft
X-X,+1.40D 1.037 +Z Bottom 0.2592 ACI 7.6.1.1 0.2667 10.486 OK
X-X,+1.40D 1.037 -Z Bottom 0.2592 ACI 7.6.1.1 0.2667 10.486 OK
X-X,+1.20D+1.60L 5.104 +Z Bottom 0.2592 ACI 7.6.1.1 0.2667 10.486 OK
X-X,+1.20D+1.60L 5.104 -Z Bottom 0.2592 ACI 7.6.1.1 0.2667 10.486 OK
X-X,+1.20D+0.50L 2.206 +Z Bottom 0.2592 ACI 7.6.1.1 0.2667 10.486 OK
X-X,+1.20D+0.50L 2.206 -Z Bottom 0.2592 ACI 7.6.1.1 0.2667 10.486 OK
X-X,+1.20D 0.8892 +Z Bottom 0.2592 ACI 7.6.1.1 0.2667 10.486 OK
X-X,+1.20D 0.8892 -Z Bottom 0.2592 ACI 7.6.1.1 0.2667 10.486 OK
X-X,+0.90D 0.6669 +Z Bottom 0.2592 ACI 7.6.1.1 0.2667 10.486 OK
X-X,+0.90D 0.6669 -Z Bottom 0.2592 ACI 7.6.1.1 0.2667 10.486 OK
Z-Z,+1.40D 0.0 -X Top 0.2592 ACI 7.6.1.1 0.2769 10.877 OK
Z-Z,+1.40D 0.003546 +X Bottom 0.2592 ACI 7.6.1.1 0.2769 10.877 OK
Z-Z,+1.20D+1.60L 0.0 -X Top 0.2592 ACI 7.6.1.1 0.2769 10.877 OK
Z-Z,+1.20D+1.60L 0.02093 +X Bottom 0.2592 ACI 7.6.1.1 0.2769 10.877 OK
Z-Z,+1.20D+0.50L 0.0 -X Top 0.2592 ACI 7.6.1.1 0.2769 10.877 OK
Z-Z,+1.20D+0.50L 0.007542 +X Bottom 0.2592 ACI 7.6.1.1 0.2769 10.877 OK
Z-Z,+1.20D 0.0 -X Top 0.2592 ACI 7.6.1.1 0.2769 10.877 OK
Z-Z,+1.20D 0.003040 +X Bottom 0.2592 ACI 7.6.1.1 0.2769 10.877 OK
Z-Z,+0.90D 0.0 -X Top 0.2592 ACI 7.6.1.1 0.2769 10.877 OK
Z-Z,+0.90D 0.002280 +X Bottom 0.2592 ACI 7.6.1.1 0.2769 10.877 OK
One Way Shear X
Load Combination... Vu @-X Vu @+X Vu:Max Phi Vn Vu/Phi*Vn Status
+1.40D 0.00 psi 0.00 psi 4.98 psi 82.16 psi 0.06 OK
Steven Rosinski,P.E. Project Title: Mill River Music
• Steve@Rosbeam.com Engineer: Steven Rosinski,PE
413-244-7635 Project ID: 24036
Project Descr: Timber Frame Mezzanines
General Footing Project File:24036-Mill River Music Mezzanines-Northampton.MA_Calcs.ec6
LIC#:KW-06014544,Build:20.24.03.04 ROSBEAM,LLC (c)ENERCALC INC 1983-2023
DESCRIPTION: Worst case offset footing
One Way Shear X
Load Combination... Vu @-X Vu @+X Vu:Max Phi Vn Vu/Phi Vn Status
+1.20D+1.60L 0.00 psi 0.00 psi 24.49 psi 82.16 psi 0.30 OK
+1.20D+0.50L 0.00 psi 0.00 psi 10.59 psi 82.16 psi 0.13 OK
+1.20D 0.00 psi 0.00 psi 4.27 psi 82.16 psi 0.05 OK
+0.90D 0.00 psi 0.00 psi 3.20 psi 82.16 psi 0.04 OK
One Way Shear Z
Load Combination... Vu @-Z Vu @+Z Vu:Max Phi Vn Vu/Phi'Vn Status
+1.40D 4.98 psi 4.98 psi 4.98 psi 82.16 psi 0.06 OK
+1.20D+1.60L 24.49 psi 24.49 psi 24.49 psi 82.16 psi 0.30 OK
+1.20D+0.50L 10.59 psi 10.59 psi 10.59 psi 82.16 psi 0.13 OK
+1.20D 4.27 psi 4.27 psi 4.27 psi 82.16 psi 0.05 OK
+0.90D 3.20 psi 3.20 psi 3.20 psi 82.16 psi 0.04 OK
Two-Way"Punching"Shear All units k
Load Combination... Vu Phi`Vn Vu/Phi*Vn Status
+1.40D 0.71 psi 164.32psi 0.004324 OK
+1.20D+1.60L 0.71 psi 164.32psi 0.004324 OK
+1.20D+0.50L 0.71 psi 164.32psi 0.004324 OK
+1.20D 0.71 psi 164.32psi 0.004324 OK
+0.90D 0.71 psi 164.32psi 0.004324 OK
=�0P`‘HOFMgss1
c STEVEN R yam,
ROSINSKI
f ":
I 4t'SS/ONAt.t0
0 • . • 4
Steven Rosinski,P.E. Project Title: Mill River Music
Steve@Rosbeam.com Engineer: Steven Rosinski,PE
413-244-7635 Project ID: 24036
Project Descr: Timber Frame Mezzanines
General Footing Project File:24036-Mill River Music Mezzanines-Northampton,MA_Calcs.ec6
LIC#:KW-06014544,Build:20.24.03.04 ROSBEAM,LLC (c)ENERCALC INC 1983-2023
DESCRIPTION: Worst case interior footing
Code References
Calculations per ACI 318-14, IBC 2015, CBC 2016,ASCE 7-10
Load Combinations Used : IBC 2015
General Information
Material Properties Soil Design Values
fc:Concrete 28 day strength = 3.0 ksi Allowable Soil Bearing = 2.0 ksf
fy:Rebar Yield = 60.0 ksi Soil Density = 110.0 pcf
Ec:Concrete Elastic Modulus = 3,122.02 ksi Increase Bearing By Footing Weight = Yes
Concrete Density = 145.0 pcf Soil Passive Resistance(for Sliding) = 250.0 pcf
(P Values Flexure = 0.90 Soil/Concrete Friction Coeff. = 0.30
Shear = 0.750 Increases based on footing Depth
Analysis Settings Footing base depth below soil surface = 1.0 ft
Min Steel%Bending Reinf. = Allow press.increase per foot of depth = ksf
Min Allow%Temp Reinf. = 0.00180 when footing base is below = ft
Min.Overturning Safety Factor = 1.0 : 1
Min.Sliding Safety Factor = 1.0 : 1 Increases based on footing plan dimension
Add Ftg Wt for Soil Pressure Yes Allowable pressure increase per foot of depth
Use ftg wt for stability,moments&shears Yes = ksf
Add Pedestal Wt for Soil Pressure No when max.length or width is greater than
= ft
Use Pedestal wt for stability,mom&shear No
Dimensions
Width parallel to X-X Axis = 2.0 ft
Length parallel to Z-Z Axis = 2.0 ft Z
Footing Thickness = 12.0 in �P�-0 OF Al4sS4c
o' STEVEN R tiG
- - = ROSINSKI r2,
Pedestal dimensions... X x v - _545
px:parallel to X-X Axis = 10.0 in o �/ / `%,pz:
parallel to Z-Z Axis = 10.0 in �, 4' ::::'‘.Hei ht - in f G\Rebar Centerline to Edge of Concrete... 0 SS/ON �
at Bottom of footing = 3.0 in " 0 • + 0 4
z •
_ . . .o
m
Reinforcing 2.-0" w
Bars parallel to X-X Axis
Number of Bars - 3.0
Reinforcing Bar Size = # 4
Bars parallel to Z-Z Axis
Number = 3.0 3 #4 Bars3 #4 Bars
Reinforcingcing Bar Bar Size = # 4 - - Z?
Bandwidth Distribution Check (ACI 15.4.4.2) = -
Direction Requiring Closer Separation CO M '
n/a X-X Section Looking to +Z Z-Z Section Looking to +X
#Bars required within zone n/a
#Bars required on each side of zone n/a
Applied Loads
D Lr L S W E H
P:Column Load = 1.50 5.60 k
OB:Overburden = ksf
M-xx = k-ft
M-zz = k-ft
V-x = k
V-z = k
Steven Rosinski, P.E. Project Title: Mill River Music
Steve@Rosbeam.com Engineer: Steven Rosinski, PE
413-244-7635 Project ID: 24036
Project Descr: Timber Frame Mezzanines
General Footing Project File:24036-Mill River Music Mezzanines-Northampton,MA_Calcs.ec6
LIC#:KW-06014544,Build:20.24.03.04 ROSBEAM,LLC (c)ENERCALC INC 1983-2023
DESCRIPTION: Worst case interior footing
DESIGN SUMMARY Design OK
Min.Ratio Item Applied Capacity Governing Load Combination
PASS 0.8951 Soil Bearing 1.920 ksf 2.145 ksf +D+L about Z-Z axis
PASS n/a Overturning-X-X 0.0 k-ft 0.0 k-ft No Overturning
PASS n/a Overturning-Z-Z 0.0 k-ft 0.0 k-ft No Overturning
PASS n/a Sliding-X-X 0.0 k 0.0 k No Sliding
PASS n/a Sliding-Z-Z 0.0 k 0.0 k No Sliding
PASS n/a Uplift 0.0 k 0.0 k No Uplift
PASS 0.03894 Z Flexure(+X) 0.4577 k-ft/ft 11.753 k-ft/ft +1.20D+1.60 ���.���F MASS4
PASS 0.03894 Z Flexure(-X) 0.4577 k-ft/ft 11.753 k-ft/ft +1.20D+1.6' ' 0
PASS 0.03894 X Flexure(+Z) 0.4577 k-ft/ft 11.753 k-ft/ft +1.20D+1.:(o`er STEVEN R :.ei, ,
PASS 0.03894 X Flexure(-Z) 0.4577 k-ft/ft 11.753 k-f/ft +1.20D+1. Ug ROSINSKI ',
PASS n/a 1-way Shear(+X) 0.0 psi 82.158 psi n/a ,5 '�,•,.545 ti -
PASS 0.0 1-way Shear(-X) 0.0 psi 0.0 psi n/aPASS n/a 1-way Shear(+Z) 0.0 psi 82.158 psi n/a '�",.A
PASS n/a 1-way Shear(-Z) 0.0 psi 82.158 psi n/a '`6:570NALC-*
PASS n/a 2-way Punching 5.663 psi 82.158 psi +1.20D+1.60L ID •; 4
Detailed Results
Soil Bearing
Rotation Axis& Xecc Zecc Actual Soil Bearing Stress @ Location Actual I Allow
Load Combination... Gross Allowable (in) Bottom,-Z Top,+Z Left,-X Right,+X Ratio
X-X,D Only 2.145 n/a 0.0 0.520 0.520 n/a n/a 0.242
X-X,+D+L 2.145 n/a 0.0 1.920 1.920 n/a n/a 0.895
X-X,+D+0.750L 2.145 n/a 0.0 1.570 1.570 n/a n/a 0.732
X-X,+0.60D 2.145 n/a 0.0 0.3120 0.3120 n/a n/a 0.146
Z-Z,D Only 2.145 0.0 n/a n/a n/a 0.520 0.520 0.242
Z-Z,+D+L 2.145 0.0 n/a n/a n/a 1.920 1.920 0.895
Z-Z,+D+0.750L 2.145 0.0 n/a n/a n/a 1.570 1.570 0.732
Z-Z,+0.60D 2.145 0.0 n/a n/a n/a 0.3120 0.3120 0.146
Footing Flexure
Flexure Axis&Load Combination Mu Side Tension As Req'd Gwn.As Actual As Phi'Mn Status
k-ft Surface in^2 in^2 in^2 k-ft
X-X,+1.40D 0.08932 +Z Bottom 0.2592 ACI 7.6.1.1 0.30 11.753 OK
X-X,+1.40D 0.08932 -Z Bottom 0.2592 ACI 7.6.1.1 0.30 11.753 OK
X-X,+1.20D+1.60L 0.4577 +Z Bottom 0.2592 ACI 7.6.1.1 0.30 11.753 OK
X-X,+1.20D+1.60L 0.4577 -Z Bottom 0.2592 ACI 7.6.1.1 0.30 11.753 OK
X-X,+1.20D+0.50L 0.1957 +Z Bottom 0.2592 ACI 7.6.1.1 0.30 11.753 OK
X-X,+1.20D+0.50L 0.1957 -Z Bottom 0.2592 ACI 7.6.1.1 0.30 11.753 OK
X-X,+1.20D 0.07656 +Z Bottom 0.2592 ACI 7.6.1.1 0.30 11.753 OK
X-X,+1.20D 0.07656 -Z Bottom 0.2592 ACI 7.6.1.1 0.30 11.753 OK
X-X,+0.90D 0.05742 +Z Bottom 0.2592 ACI 7.6.1.1 0.30 11.753 OK
X-X,+0.90D 0.05742 -Z Bottom 0.2592 ACI 7.6.1.1 0.30 11.753 OK
Z-Z,+1.40D 0.08932 -X Bottom 0.2592 ACI 7.6.1.1 0.30 11.753 OK
Z-Z,+1.40D 0.08932 +X Bottom 0.2592 ACI 7.6.1.1 0.30 11.753 OK
Z-Z,+1.20D+1.60L 0.4577 -X Bottom 0.2592 ACI 7.6.1.1 0.30 11.753 OK
Z-Z,+1.20D+1.60L 0.4577 +X Bottom 0.2592 ACI 7.6.1.1 0.30 11.753 OK
Z-Z,+1.20D+0.50L 0.1957 -X Bottom 0.2592 ACI 7.6.1.1 0.30 11.753 OK
Z-Z,+1.20D+0.50L 0.1957 +X Bottom 0.2592 ACI 7.6.1.1 0.30 11.753 OK
Z-Z,+1.20D 0.07656 -X Bottom 0.2592 ACI 7.6.1.1 0.30 11.753 OK
Z-Z,+1.20D 0.07656 +X Bottom 0.2592 ACI 7.6.1.1 0.30 11.753 OK
Z-Z,+0.90D 0.05742 -X Bottom 0.2592 ACI 7.6.1.1 0.30 11.753 OK
Z-Z,+0.90D 0.05742 +X Bottom 0.2592 ACI 7.6.1.1 0.30 11.753 OK
One Way Shear X
Load Combination... Vu @-X Vu @+X Vu:Max Phi Vn Vu I Phi*Vn Status
+1.40D 0.00 psi 0.00 psi 0.00 psi 82.16 psi 0.00 OK
+1.20D+1.60L 0.00 psi 0.00 psi 0.00 psi 82.16 psi 0.00 OK
+1.20D+0.50L 0.00 psi 0.00 psi 0.00 psi 82.16 psi 0.00 OK
+1.20D 0.00 psi 0.00 psi 0.00 psi 82.16 psi 0.00 OK
+0.90D 0.00 psi 0.00 psi 0.00 psi 82.16 psi 0.00 OK
Steven Rosinski, P.E. Project Title: Mill River Music ,
Steve@Rosbeam.com Engineer: Steven Rosinski, PE
413-244-7635 Project ID: 24036
Project Descr: Timber Frame Mezzanines
General Footing Project File:24036-Mill River Music Mezzanines-Northampton,MA_Calcs.ec6
LIC#:KW-06014544,Build:20.24.03.04 ROSBEAM,LLC (c)ENERCALC INC 1983-2023
DESCRIPTION: Worst case interior footing
One Way Shear Z
Load Combination... Vu @-Z Vu @+Z Vu:Max Phi Vn Vu I Phi*Vn Status
+1.40D 0.00 psi 0.00 psi 0.00 psi 82.16 psi 0.00 OK
+1.20D+1.60L 0.00 psi 0.00 psi 0.00 psi 82.16 psi 0.00 OK
+1.20D+0.50L 0.00 psi 0.00 psi 0.00 psi 82.16 psi 0.00 OK
+1.20D 0.00 psi 0.00 psi 0.00 psi 82.16 psi 0.00 OK
+0.90D 0.00 psi 0.00 psi 0.00 psi 82.16 psi 0.00 OK
Two-Way"Punching"Shear All units k
Load Combination... Vu Phi*Vn Vu I Phi*Vn Status
+1.40D 1.11 psi 164.32psi 0.006726 OK
+1.20D+1.60L 5.66 psi 164.32psi 0.03447 OK
+1.20D+0.50L 2.42 psi 164.32psi 0.01473 OK
+1.20D 0.95 psi 164.32psi 0.005766 OK
+0.90D 0.71 psi 164.32psi 0.004324 OK
=mac,\"\" OF
MASsi
o STEVEN R G
ROSINSKI �,
v �;. 545 Z,',j,
FSS/ONALIA'\
Steven Rosinski,P.E. Project Title: Mill River Music
Steve@Rosbeam.com Engineer: Steven Rosinski, PE
413-244-7635 Project ID: 24036
Project Descr: Timber Frame Mezzanines
General Footing Project File:24036-Mill River Music Mezzanines-Northampton,MA_Calcs.ec6
LIC#:KW-06014544,Build:20.24.03.04 ROSBEAM,LLC (c)ENERCALC INC 1983-2023
DESCRIPTION: Worst case corner offset footing
Code References
Calculations per ACI 318-14, IBC 2015, CBC 2016,ASCE 7-10
Load Combinations Used : IBC 2015
General Information
Material Properties Soil Design Values
Pc:Concrete 28 day strength = 3.0 ksi Allowable Soil Bearing = 2.0 ksf
fy: Rebar Yield = 60.0 ksi Soil Density = 110.0 pcf
Ec:Concrete Elastic Modulus = 3,122.02 ksi Increase Bearing By Footing Weight = Yes
Concrete Density = 145.0 pcf Soil Passive Resistance(for Sliding) = 250.0 pcf
(P Values Flexure = 0.90 Soil/Concrete Friction Coeff. = 0.30
Shear = 0.750 Increases based on footing Depth
Analysis Settings Footing base depth below soil surface = 1.0 ft
Min Steel%Bending Reinf. = Allow press.increase per foot of depth = ksf
Min Allow%Temp Reinf. = 0.00180 when footing base is below = ft
Min.Overtuming Safety Factor = 1.0 : 1
Min.Sliding Safety Factor = 1.0 : 1 Increases based on footing plan dimension
Add Ftg Wt for Soil Pressure Yes Allowable pressure increase per foot of depth
Use ftg wt for stability,moments&shears Yes = ksf
Add Pedestal Wt for Soil Pressure No when max.length or width is greater than
= ft
Use Pedestal wt for stability,mom&shear No
Dimensions
Width parallel to X-X Axis = 3.50 ft
Length parallel to Z-Z Axis = 3.50 ft Z
Footing Thickness = 12.0 in ��Nk OF M�4S
Load location offset from footing center... 2��P S�CyG
ex:Prll to X-X Axis = -18 in o STEVEN R 0
in = ROSINSKI
Pedestal dimensions... x X v �vi545 ;�.
px:parallel to X-X Axis = 10.0 in /21 �„,,.4, %,
ti
pz:parallel to Z-Z Axis = 10.0 in FSSI 'ECG'
Height in OVAL
Rebar Centerline to Edge of Concrete... `; 0 ♦ : ♦ 4
at Bottom of footing = 3.0 in N
•
Z co
v
Reinforcing 3'-6• . W
Bars parallel to X-X Axis
Number of Bars - 5
Reinforcing Bar Size = # 4
Bars parallel to Z-Z Axis
Number of Bars = 5 .
Reinforcing Bar Size = # 4 5-#4 Bars 5-#4 Bars c
Bandwidth Distribution Check (ACI 15.4.4.2)
M M
Direction Requiring Closer Separation X-X Section Looking to+Z Z-Z Section Looking to+X
n/a
#Bars required within zone n/a
#Bars required on each side of zone n/a
Applied Loads
D Lr L S W E H
P:Column Load = 0.90 3.30 k
OB:Overburden = ksf
M-xx = k-ft
M-zz = k-ft
V-x = k
V-z = k
Steven Rosinski, P.E. Project Title: Mill River Music
Steve@Rosbeam.com Engineer: Steven Rosinski, PE
413-244-7635 Project ID: 24036
Project Descr: Timber Frame Mezzanines
General Footing Project File:24036-Mill River Music Mezzanines-Northampton,MA_Calcs.ec6
LIC#:KW-06014544,Bu,Id:20.24.03.04 ROSBEAM,LLC (c)ENERCALC INC 1983-2023
DESCRIPTION: Worst case corner offset footing
DESIGN SUMMARY Design OK
Min.Ratio Item Applied Capacity Governing Load Combination
PASS 0.7562 Soil Bearing 1.622 ksf 2.145 ksf +D+L about Z-Z axis
PASS n/a Overturning-X-X 0.0 k-ft 0.0 k-ft No Overturning
PASS n/a Overturning-Z-Z 0.0 k-ft 0.0 k-ft No Overturning
PASS n/a Sliding-X-X 0.0 k 0.0 k No Sliding
PASS n/a Sliding-Z-Z 0.0 k 0.0 k No Sliding
PASS n/a Uplift 0.0 k 0.0 k No Uplift
PASS 0.02586 Z Flexure(+X) 0.2899 k-ft/ft 11.211 k-ft/ft +1.20D+1.60L
PASS 0.0 Z Flexure(-X) 0.0 k-ft/ft 0.0 k-ft/ft No Moment
PASS 0.04116 X Flexure(+Z) 0.4615 k-ft/ft 11.211 k-ft/ft +1.20D+1.60L �N OF M
PASS 0.04116 X Flexure(-Z) 0.4615 k-ft/ft 11.211 k-ft/ft +1.20D+1.60 �,P\' ASS
PASS 0.02339 1-way Shear(+X) 1.922 psi 82.158 psi +1.20D+1.60. Zyc•
o STEVEN R o
PASS 0.0 1-way Shear(-X) 0.0 psi 0.0 psi n/a I PASS 0.03482 1-way Shear(+Z) 2.860 psi 82.158 psi +1.20D+1.6 `ROSIN SKI r.,5 Z,",PASS 0.03482 1-way Shear(-Z) 2.860 psi 82.158 psi +1.20D+1.6- / i • /0
PASS n/a 2-way Punching 0.9995 psi 82.158 psi +1.40D X j• .,.,:.SIN 4
Top reinforcing mat required(see'Bending'tab). F"IONAt�e a
G\
Hand check required for anchor pullout. 0 • • • 4
Detailed Results
Soil Bearing
Rotation Axis& Xecc Zecc Actual Soil Bearing Stress @ Location Actual/Allow
Load Combination... Gross Allowable (in) Bottom,-Z Top,+Z Left,-X Right,+X Ratio
X-X,D Only 2.145 n/a 0.0 0.2185 0.2185 n/a n/a 0.102
X-X,+D+L 2.145 n/a 0.0 0.4879 0.4879 n/a n/a 0.228
X-X,+D+0.750L 2.145 n/a 0.0 0.4205 0.4205 n/a n/a 0.196
X-X,+0.60D 2.145 n/a 0.0 0.1311 0.1311 n/a n/a 0.061
Z-Z,D Only 2.145 -6.053 n/a n/a n/a 0.4055 0.03144 0.189
Z-Z,+D+L 2.145 -12.650 n/a n/a n/a 1.622 0.0 0.756
Z-Z,+D+0.750L 2.145 -11.793 n/a n/a n/a 1.269 0.0 0.592
Z-Z,+0.60D 2.145 -6.053 n/a n/a n/a 0.2433 0.01886 0.113
Footing Flexure
Flexure Axis&Load Combination Mu Side Tension As Req'd Gym.As Actual As Phi•Mn Status
k-ft Surface in"2 in^2 in^2 k-ft
X-X,+1.40D 0.09143 +Z Bottom 0.2592 ACI 7.6.1.1 0.2857 11.211 OK
X-X,+1.40D 0.09143 -Z Bottom 0.2592 ACI 7.6.1.1 0.2857 11.211 OK
X-X,+1.20D+1.60L 0.4615 +Z Bottom 0.2592 ACI 7.6.1.1 0.2857 11.211 OK
X-X,+1.20D+1.60L 0.4615 -Z Bottom 0.2592 ACI 7.6.1.1 0.2857 11.211 OK
X-X,+1.20D+0.50L 0.1981 +Z Bottom 0.2592 ACI 7.6.1.1 0.2857 11.211 OK
X-X,+1.20D+0.50L 0.1981 -Z Bottom 0.2592 ACI 7.6.1.1 0.2857 11.211 OK
X-X,+1.20D 0.07837 +Z Bottom 0.2592 ACI 7.6.1.1 0.2857 11.211 OK
X-X,+1.20D 0.07837 -Z Bottom 0.2592 ACI 7.6.1.1 0.2857 11.211 OK
X-X,+0.90D 0.05878 +Z Bottom 0.2592 ACI 7.6.1.1 0.2857 11.211 OK
X-X,+0.90D 0.05878 -Z Bottom 0.2592 ACI 7.6.1.1 0.2857 11.211 OK
Z-Z,+1.40D 0.0 -X Top 0.2592 ACI 7.6.1.1 0.2857 11.211 OK
Z-Z,+1.40D 0.07579 +X Top 0.2592 ACI 7.6.1.1 0.2857 11.211 OK
Z-Z,+1.20D+1.60L 0.0 -X Top 0.2592 ACI 7.6.1.1 0.2857 11.211 OK
Z-Z,+1.20D+1.60L 0.2899 +X Top 0.2592 ACI 7.6.1.1 0.2857 11.211 OK
Z-Z,+1.20D+0.50L 0.0 -X Top 0.2592 ACI 7.6.1.1 0.2857 11.211 OK
Z-Z,+1.20D+0.50L 0.1554 +X Top 0.2592 ACI 7.6.1.1 0.2857 11.211 OK
Z-Z,+1.20D 0.0 -X Top 0.2592 ACI 7.6.1.1 0.2857 11.211 OK
Z-Z,+1.20D 0.06496 +X Top 0.2592 ACI 7.6.1.1 0.2857 11.211 OK
Z-Z,+0.90D 0.0 -X Top 0.2592 ACI 7.6.1.1 0.2857 11.211 OK
Z-Z,+0.90D 0.04872 +X Top 0.2592 ACI 7.6.1.1 0.2857 11.211 OK
One Way Shear X
Load Combination... Vu @-X Vu @+X Vu:Max Phi Vn Vu/Phi'Vn Status
+1.40D 0.00 psi 0.06 psi 0.57 psi 82.16 psi 0.01 OK
Steven Rosinski,P.E. Project Title: Miil River Music
Engineer: Steven Rosinski, PE
Stev
413-2@-7635 .com Project ID: 24036
413 244 7635 Project Descr: Timber Frame Mezzanines
Protect File:24036-Mill River Music Mezzanines-Northampton,MA Calcs.ec6
General Footing ROSBEAM,LLC (0)ENERCALC INC 1983-2023
LIC#:KW-06014544,Build:20.24.D3.04
DESCRIPTION: Worst case comer offset footing
One Way Shear X Vu X Vu @+X Vu:Max Phi Vn Yu/Phi*Yn Status
Load Combination... 0.00 psi 1.92 psi 2.86 psi 82.16 psi 0.03 OK
+1.20D+1. 0.00 psi 0.35 psi 1.23 psi 82.16 psi 0.01 OK
+1.20D+0.50L 4t 0.00 psi 0.05 psi 0.49 psi 82.16 psi 0.01 OK
+1.20D 0.00 Psi 0.04 psi 0.36 psi 82.16 psi 0.00 OK
+0.90D
One Way Shear Z Vu Vu +Z Vu:Max Phi Vn Vu/Phi*1/n Status
Load Combination... 0.57 psi 0.57 psi 0.57 psi 82.16 psi 0.01 OK
+1.40D 2.86 psi 2.86 psi 2.86 psi 82.16 psi 0.03 OK
+1.20D+1.60L1.23 psi 1.23 psi 1.23 psi 82.16 psi 0.01 OK
+1.20D+0.5 0L 0.49 psi 0.49 psi 0.49 psi 82.16 psi 0.01 OK
+0.90D 0.36 psi 0.36 psi 0.36 psi 82.16 psi All000s k OK
+0.90D
Two-Way"Punching"Shear Vu(Phi*Vn Status
Vu Phi*Vn OK
Load Combination... 1.00 psi 164 32psi 0.006083 OK
+1.40D 164.32psi 0.006083 OK
1.00 psi 0.006083
+1.20D+1.50L 164.32psi OK
1.00 psi 0.006083
+1.20D+0.50L 164.32 psi OK
+1.90D 1.00 psi 0.006083
1.00 psi 164.32psi
+o.soD i �pF MASs4�ti STEVEN R s
4 ROSINSKI 2,
c' , 545
�'
�fSS�ONAL \
0