21.197 REVISED National Grid Petition for Installation of Underground Conduit on Damon Road April 6, 2021 City Council Town of Northampton To Whom It May Concern: Enclosed please find the revised petition of NATIONAL GRID covering the installation of underground facilities. If you have any questions regarding this permit, please contact: Daniel Lopez-Velez 774-235-2603 If this petition meets with your approval, please return an executed copy to: National Grid: Lisa Ayres; 1101 Turnpike Street; North Andover, MA 01845 (978)725-1418 Very truly yours, Jim Kehrer/lla Jim Kehrer Name: Distribution Design Supervisor Supervisor, Distribution Design Enclosures Questions contact – Daniel Lopez-Velez 774-235-2603 Petition of the Massachusetts Electric Company d/b/a NATIONAL GRID Of NORTH ANDOVER, MASSACHUSETTS For Electric Conduit Location: To the City Council of Northampton, Massachusetts Respectfully represents the Massachusetts Electric Company d/b/a NATIONAL GRID of North Andover, Massachusetts, that it desires to construct a line of underground electric conduits, including the necessary sustaining and protecting fixtures, under and across the public way or ways hereinafter named. Wherefore it prays that after due notice and hearing as provided by law, it be granted permission to excavate the public highways and to run and maintain underground electric conduits, together with such sustaining and protecting fixtures as it may find necessary for the transmission of electricity, said underground conduits to be located substantially in accordance with the plan filed herewith marked – Damon Rd. - Northampton, Massachusetts. The following are the streets and highways referred to: 23303524 Damon Rd. - beginning at a point approximately 213 feet northeast of the centerline of the intersection of Industrial Dr. and Damon Rd. and continuing approximately 377 feet in a northeast direction, National Grid to install MH 1 Damon Rd., install MH 2 Damon Rd., install 45' of 2-5" Conduit from P7-25 Damon Rd to MH 1 Damon Rd., install ~377' of 6-5" Conduit from MH 1 to MH 2 Damon Rd., and install ~37' of 2-5" Conduit from P7-50 Damon Rd to MH 2 Damon Rd. Location approximately as shown on plan attached. Massachusetts Electric Company d/b/a NATIONAL GRID Jim Kehrer/lla BY _____________________________________ Engineering Department Dated: April 6, 2021 ORDERED: Notice having been given and public hearing held, as provided by law, that the Massachusetts Electric Company d/b/a NATIONAL GRID be and it is hereby granted permission to excavate the public highways and to run and maintain underground electric conduits, together with such sustaining and protecting fixtures as said company may deem necessary, in the public way or ways hereinafter referred to, and to make the necessary house connections along said extensions, as requested in petition with said company dated the 6th day of April 2021. Said underground electric conduits shall be located substantially in accordance with the plan filed herewith marked – Damon Rd. - Northampton, Massachusetts 23303524 The following are the public ways or part of ways along which the underground electric conduits above referred to may be laid: Damon Rd. - beginning at a point approximately 213 feet northeast of the centerline of the intersection of Industrial Dr. and Damon Rd. and continuing approximately 377 feet in a northeast direction, National Grid to install MH 1 Damon Rd., install MH 2 Damon Rd., install 45' of 2-5" Conduit from P7-25 Damon Rd to MH 1 Damon Rd., install ~377' of 6-5" Conduit from MH 1 to MH 2 Damon Rd., and install ~37' of 2-5" Conduit from P7-50 Damon Rd to MH 2 Damon Rd. I hereby certify that the foregoing order was adopted at a meeting of the ………………………… ……………………………………………………………………………………………………… ………………, held on the ……………………..… day of …………………………., 20 ……….. ………………………………………………, …………………………., 20 ……….. Received and entered in the records of location orders of the City/Town of Book ………………………. Page ………………………….. Attest: ……………………………… ………….. hereby certify that on ………………………………20….., at ……….. o’clock, ….M at ………………………………………………., a public hearing was held on the petition of Massachusetts Electric Company d/b/a NATIONAL GRID for permission to construct the underground electric conduits described in the order herewith recorded, and that I mailed at least seven days before said hearing a written notice of the time and place of said hearing to each of the owners of real estate (as determined by the last preceding assessment for taxation) along the ways or parts of ways upon which the Company is permitted to construct the underground electric conduits under said order. And that thereupon said order was duly adopted. ………………………………………………... ………………………………………………... ………………………………………………... ORDERED: Notice having been given and public hearing held, as provided by law, that the Massachusetts Electric Company d/b/a NATIONAL GRID be and it is hereby granted permission to excavate the public highways and to run and maintain underground electric conduits, together with such sustaining and protecting fixtures as said company may deem necessary, in the public way or ways hereinafter referred to, and to make the necessary house connections along said extensions, as requested in petition with said company dated the 6th day of April 2021. Said underground electric conduits shall be located substantially in accordance with the plan filed herewith marked – Damon Rd. - Northampton, Massachusetts 23303524 The following are the public ways or part of ways along which the underground electric conduits above referred to may be laid: Damon Rd. - beginning at a point approximately 213 feet northeast of the centerline of the intersection of Industrial Dr. and Damon Rd. and continuing approximately 377 feet in a northeast direction, National Grid to install MH 1 Damon Rd., install MH 2 Damon Rd., install 45' of 2-5" Conduit from P7-25 Damon Rd to MH 1 Damon Rd., install ~377' of 6-5" Conduit from MH 1 to MH 2 Damon Rd., and install ~37' of 2-5" Conduit from P7-50 Damon Rd to MH 2 Damon Rd. I hereby certify that the foregoing order was adopted at a meeting of the ………………………… ……………………………………………………………………………………………………… ………………, held on the ……………………..… day of …………………………., 20 ……….. ………………………………………………, …………………………., 20 ……….. Received and entered in the records of location orders of the City/Town of Book ………………………. Page ………………………….. Attest: ……………………………… ………….. hereby certify that on ………………………………20….., at ……….. o’clock, ….M at ………………………………………………., a public hearing was held on the petition of Massachusetts Electric Company d/b/a NATIONAL GRID for permission to construct the underground electric conduits described in the order herewith recorded, and that I mailed at least seven days before said hearing a written notice of the time and place of said hearing to each of the owners of real estate (as determined by the last preceding assessment for taxation) along the ways or parts of ways upon which the Company is permitted to construct the underground electric conduits under said order. And that thereupon said order was duly adopted. ………………………………………………... ………………………………………………... ………………………………………………...