Loading...
20.126 PlanMichael Miller 2/4/2020Michael Miller 2/4/2020 71 King St.67 King St.65 King St.VV vv 72 King St.74 King St.Allen St.King St. 57 King St 200' Scope of Work • Starting at existing vault in front of #71, bore/trench under sidewalk pads installing 3" schedule 40 PVC conduit at a depth of 24"-30". Depending on other utility locations, Comcast is prepared to pull up concrete pads and replace to city standards. Install 3" PVC conduit into 2 nd existing vault in front of #65 King St. • Contractor to use Vacuum Excavation techniques in areas of concentrated utilities. • Maintain integrity of rock wall in front of #71 King St during construction. • On Western side of King St. in front of #60/#62 King St, intercept existing conduit and extend 3" PVC conduit onto private property. • Contractor to work with Parking Authority for contractor vehicles in work zone. • While working in sidewalk on NE side of King St. contractor will ensure walking and drive up access to businesses will be maintained. The same for work on NW side of King St. Verizon Verizon manholes Sidewalk Existing Comcast conduitNGRID 60/62 King St Comcast Proposed Path GasGas4" PVC Bituminous Top Bituminous Base CATV Caution Tape Flowable Fill30"Trench Detail 4" PVC Bituminous Top Bituminous Base CATV Caution Tape Flowable Fill30"Trench Detail Intercept existing conduit and extend to new vault. SidewalkSidewalk Asphalt cut/bore along edge of parking lotGasNGRIDDrain Drain Rock Wall along edge of sidewalk Sewer Water X Drain