Loading...
ELKS Field Reports 2002.pdf780 CMR 116.0 CONSTRUCTION CONTROL FIELD INSPECTION REPORT ASSOCIATED BUILDERS, INC 4 INDUSTRIAL DRIVE SOUTH HADLEY, MA 01075 (413)536-0021 Project Job Location Date Time Building Permit No. NORTHAMPTON LODGE OF ELKS 17 SPRING ST., NORTHAMPTON, MA 6-20-2002 1:00 PM BP-2002-0948 WEATHER: CLEAFY PARTIAL CLOUDY. 85" EST. % OF COMPLETION 11o/o CONSTRUCTION SUPERVISOR PRESENT AT SITE 0-tn-*-PllL#lJf,|l}ru Associated Builders (General Contractor) T&M Equipment (site excavator, sub-contractor) Paige Plumbing (plumbing, sub-contractor) WORK IN PROGRESS Rough grading of detention basin, parking lot, and open space areas. Installation of building floor drains, sink and bathroom drains. Excavation and installation of electrical service connection and sanitary sewer service. Site, utility, pavement and drainage survey layout. Backfill and compaction of foundation footings and walls. WORK COMPLETED SINCE PREVIOUS INSPECTION Site clearing and foundation excavation. Installation of foundation footings, walls and insulation. The stumped nas been removed off site. OBSERVATIONS Erosion control haybale fence have been installed and is working as designed. No other deviations from the plans noted. INFORMATION OR ACTION REQUIRED Work in progress is in general compliance with the plans and specifications. ATTACHMENTS wINSPECTION BY: DATE: P.E.) I sdB-yo 780 CMR 116.0 CONSTRUCTION CONTROL FIELD INSPECTION REPORT ry ASSOCIATED BUILDERS, INC 4 INDUSTRIAL DRIVE SOUTH HADLEY, MA 01075 (413) 536-0021 Project NORTHAMPTON LODGE OF ELKS Job Location 17 SPRING ST., NORTHAMPTON, MADate 7-17-2002Time 1:00 PM Building Permit No. BP-2002'= ; ;; rF F{l qHs WEATHER: Sunny,80. EST. % OF COMPLETION 2s% CONSTRUCTION SUPERVISOR s Inc. PRESENT AT SITE Associated Builders (General Contractor) WORK IN PROGRESS Grading and drainage system, layout for building framed walls WORK COMPLETED SINCE PREVIOUS INSPECTION Foundationinsu|atedandbackfi|leda|linteriorbelo cured. Base coat of asphalt installed OBSERVATIONS 7-5-02 (FAD) Subgrade inspected and concrete floor placement, mix design checked 7'12'02 Surveyor certified building is above the flood elevation, see certificate attached INFORMATION OR ACTION REQUIRED wcrk in progress is in general ccmpliailce with the plans anc specifications. ATTACHMENTS Elevation Certificate INSPECTION BY: DATE: v, JEB-rc'' { 7 t':.:it zg0 cMR 116.0 GoNSTRUGTIoN coNTRoL FIELD INSPECTION REPORT ASSOCIATED BUILDERS,INC Project NORTHAMPTON LODGE OF ELKS 4 INDUSTRIAL DRIVE Job Location 17 SPRING ST., NORTHAMPTON, MA SOUTH HADLEY, MA 01075 Date 7-22-2002 (413) 536-0021 Time 1:00 PM Building Permit No. BP-2002-0948 WEATHER: Sunny, B0o EST. % OF COMPLETION 31o/o CONSTRUGTIoN suPEKvtneR George A. Desgres6EsociaGdTt0ilders Inc. PRESENT AT SITE Associated Builders (General Contractor) Professional Dry Wall (framing sub contractor) 5 labors WORK IN PROGRESS Building light gage framing exterior and interior bearing walls. Temp. Bracing has been instailed. WORK COMPLETED SINCE PREVIOUS INSPECTION Grading and drainage system, layout for building framed walls OBSERVATIONS Erosion control barrier is working as designed. Light gage fasteners quantity and type as designed. Structuralsteeltube header, columns and bar joist has been delivered to the site. INFORMATION OR ACTTON REQUTRED work in progress is in general compliance with the plans and specifications. ATTACHMENTS fNsPEcrfoN RY. Zn t4, A - ENGTNEER, ,7 / u"(14,{/ Etigw 6ern{rdin, P.E.DArE: 9{/zz /a 7, -- FrankDeV(fftnis, p.E.DATE: 7-22-02 ffifir 780 CMR 116.0 CONSTRUGTION CONTROL'} } TIELD INSPEGTION REPORT ASSOCIATED BUILDERS,INC Project NORTHAMPTON LODGE OF ELKS 4 INDUSTRIAL DRIVE Job Location 17 SPRING ST., NORTHAMPTON, MA sourH HADLEY, MA 01075 -Date 9-9P?992(413) 536-0021 Building Permit No. BP-2002-0948 EST. % OF COMPLETION CONSTRUCTTOITIiUPERVISOR George A. Desgress, Associated Builders Inc. PRESENT AT SITE Associated Builders (General Contractor) 3 Labors WORK IN PROGRESS Building roof deck and bar joist installation. WORK COMPLETED SINGE PREVIOUS INSPECTION Interior light gage wall partions, structural steeltube stock header installation, Light gage exterior cross bracing. Parking lot bituminous concrete pavement base course. OBSERVATIONS Erosion control barrier is working as designed. Exterior sheathing, dense glas has been delivered to the site. INFORMATION OR ACTION REQUIRED Work in progress is in general compliance with the plans and specifications. 4 ATTAGHMENTS il tNsPECTfO ""ENGINEER:Mt] DATE:DATE: -rb re'\*i NL:12-b AAB -+a 780 CMR 116.0 CONSTRUCTION CONTROL FIELD INSPECTION REPORT fi,y ASSOCIATED BUILDERS, INC Project NORTHAMPTON LODGE OF ELKS 4 INDUSTRIAL DRIVE Job Location 17 SPRING ST., NORTHAMPTON, MA SOUTH HADLEY, MA 01075 Date 9-12-2002 (413) 536-0021 Buirdins ,"r,",I'ilLl li--or%8yon.u WEATHER: Sunny, TO' EST. % OF COMPLETION TSyo coNSTRUcrloN suPERvlsoR George A. Desgi'ess, Associated Buitders Inc. PRESENT AT SITE Associated Builders (General Contractor) 3 Labors McCormack-Allum (HVAC Sub) Professional Drywall Construction (Erection Sub) Clayton Masonry Paige Plumbing Rivet Roofing WORK IN PROGRESS Roughp|umbingandroughHVAcinsta||ation.Thebui|dinginsu|ationnas interior walls. The roofing insulation, membrane roofing system and parapet end walls has been constructed.Exterior Masonry fascia and dense glass sheathing, storefront glass through out building has been installed.Gypsum wallboard construction has been started. WORK COMPLETED SINCE PREVIOUS INSPECTION Building roof deck and bar joist installation. Light gage metal bracing. OBSERVATIONS Erosion control barrier is working as designed. Bituminous concrete base pavement is stable. INFORMATION OR ACTION REQUIRED work in progress is in general compliance with the plans and specifications. ATTACHMENTS - 'rtn4-(-Frank DeMarinis. P.E. e-12-n2 INEER: ,4/", " ,,. v Eric M. Beihardin, p.E. DATE: 9-12-02 INSPECTION BY: DATE: / ffi'.'{iH8'* U-S'UF,t ,l \$ii;<-'" rliJffi s JdB-Vo 780 CMR 116.0 CONSTRUCTION CONTROL FIELD INSPECTION REPORT {1\\l iltlil)tlrl I I I ASSOCIATED BUILDERS, INC 4 INDUSTRIAL DRIVE SOUTH HADLEY, MA 01075 (413) 536-0021 Project Job Location Date Time Building Permit No. NORTHAMPTON LODGE OF ELKS 17 SPRING ST., NORTHAMPTON, MA 10-21-2002 1:30 PM BP-2002-0948 WEATHER: Sunny,54' EST. % OF COMPLETION -t I i I I IJ rIS CONSTRUCTION SUPERVISOR George A. Desgress, Associated Builders Inc. PRESENT AT SITE Associated Builders (General Contractor) Gustafson Electric Inc. (Electrical Contractor) T&M Equipment Corp. (Site, Excavating) WORK IN PROGRESS Completion of HVAC installation pending on gas hook-up later this week. Electrical work including lights, alarms, etc. in progress. Exit signage for egress currently being installed with electrical connections provided for. Painting in progress. Final coats, accent wall and door frames still need to be painted. Excavation for detention pond was in progress. Placement of stones around perimeter of building was in progress. Preparation for landscaping and paving underway. VCT partially installed in toilet rooms. WORK COMPLETED SINCE PREVIOUS INSPECTION Plumbing fixtures installed. Gypsum wallboard construction completed. Lights installed. Concrete sidewalks poured. Bollard lighting in place. OBSERVATIONS Gypsum wallboard was properiy consiructed and iaped. Exit signage in process of being instalied. INFORMATION OR ACTION REQUIRED Work in progress is in general compliance with the plans and specifications. ATTACHMENTS ., ffffi ENGTNEER futgL- Eric Mhern-tdir1,DATE: 10-21-02 5S@!Br INSPECTION BY: Anna DATE:10-21-02