ELKS Field Reports 2002.pdf780 CMR 116.0 CONSTRUCTION CONTROL
FIELD INSPECTION REPORT
ASSOCIATED BUILDERS, INC
4 INDUSTRIAL DRIVE
SOUTH HADLEY, MA 01075
(413)536-0021
Project
Job Location
Date
Time
Building Permit No.
NORTHAMPTON LODGE OF ELKS
17 SPRING ST., NORTHAMPTON, MA
6-20-2002
1:00 PM
BP-2002-0948
WEATHER: CLEAFY PARTIAL CLOUDY. 85"
EST. % OF COMPLETION 11o/o
CONSTRUCTION SUPERVISOR
PRESENT AT SITE 0-tn-*-PllL#lJf,|l}ru
Associated Builders (General Contractor)
T&M Equipment (site excavator, sub-contractor)
Paige Plumbing (plumbing, sub-contractor)
WORK IN PROGRESS
Rough grading of detention basin, parking lot, and open space areas. Installation of building floor drains, sink and
bathroom drains. Excavation and installation of electrical service connection and sanitary sewer service. Site,
utility, pavement and drainage survey layout. Backfill and compaction of foundation footings and walls.
WORK COMPLETED SINCE PREVIOUS INSPECTION
Site clearing and foundation excavation. Installation of foundation footings, walls and insulation. The stumped nas
been removed off site.
OBSERVATIONS
Erosion control haybale fence have been installed and is working as designed. No other deviations from the plans
noted.
INFORMATION OR ACTION REQUIRED
Work in progress is in general compliance with the plans and specifications.
ATTACHMENTS
wINSPECTION BY:
DATE:
P.E.)
I
sdB-yo
780 CMR 116.0 CONSTRUCTION CONTROL
FIELD INSPECTION REPORT ry
ASSOCIATED BUILDERS, INC
4 INDUSTRIAL DRIVE
SOUTH HADLEY, MA 01075
(413) 536-0021
Project NORTHAMPTON LODGE OF ELKS
Job Location 17 SPRING ST., NORTHAMPTON, MADate 7-17-2002Time 1:00 PM
Building Permit No. BP-2002'= ; ;; rF F{l qHs
WEATHER: Sunny,80.
EST. % OF COMPLETION 2s%
CONSTRUCTION SUPERVISOR s Inc.
PRESENT AT SITE
Associated Builders (General Contractor)
WORK IN PROGRESS
Grading and drainage system, layout for building framed walls
WORK COMPLETED SINCE PREVIOUS INSPECTION
Foundationinsu|atedandbackfi|leda|linteriorbelo
cured. Base coat of asphalt installed
OBSERVATIONS
7-5-02 (FAD) Subgrade inspected and concrete floor placement, mix design checked
7'12'02 Surveyor certified building is above the flood elevation, see certificate attached
INFORMATION OR ACTION REQUIRED
wcrk in progress is in general ccmpliailce with the plans anc specifications.
ATTACHMENTS
Elevation Certificate
INSPECTION BY:
DATE:
v,
JEB-rc'' { 7 t':.:it zg0 cMR 116.0 GoNSTRUGTIoN coNTRoL
FIELD INSPECTION REPORT
ASSOCIATED BUILDERS,INC Project NORTHAMPTON LODGE OF ELKS
4 INDUSTRIAL DRIVE Job Location 17 SPRING ST., NORTHAMPTON, MA
SOUTH HADLEY, MA 01075 Date 7-22-2002
(413) 536-0021 Time 1:00 PM
Building Permit No. BP-2002-0948
WEATHER: Sunny, B0o
EST. % OF COMPLETION 31o/o
CONSTRUGTIoN suPEKvtneR George A. Desgres6EsociaGdTt0ilders Inc.
PRESENT AT SITE
Associated Builders (General Contractor)
Professional Dry Wall (framing sub contractor) 5 labors
WORK IN PROGRESS
Building light gage framing exterior and interior bearing walls. Temp. Bracing has been instailed.
WORK COMPLETED SINCE PREVIOUS INSPECTION
Grading and drainage system, layout for building framed walls
OBSERVATIONS
Erosion control barrier is working as designed. Light gage fasteners quantity and type as designed. Structuralsteeltube header, columns and bar joist has been delivered to the site.
INFORMATION OR ACTTON REQUTRED
work in progress is in general compliance with the plans and specifications.
ATTACHMENTS
fNsPEcrfoN RY. Zn t4, A
-
ENGTNEER, ,7 / u"(14,{/ Etigw 6ern{rdin, P.E.DArE: 9{/zz /a 7,
-- FrankDeV(fftnis, p.E.DATE: 7-22-02
ffifir
780 CMR 116.0 CONSTRUGTION CONTROL'} } TIELD INSPEGTION REPORT
ASSOCIATED BUILDERS,INC Project NORTHAMPTON LODGE OF ELKS
4 INDUSTRIAL DRIVE Job Location 17 SPRING ST., NORTHAMPTON, MA
sourH HADLEY, MA 01075 -Date 9-9P?992(413) 536-0021 Building Permit No. BP-2002-0948
EST. % OF COMPLETION
CONSTRUCTTOITIiUPERVISOR George A. Desgress, Associated Builders Inc.
PRESENT AT SITE
Associated Builders (General Contractor) 3 Labors
WORK IN PROGRESS
Building roof deck and bar joist installation.
WORK COMPLETED SINGE PREVIOUS INSPECTION
Interior light gage wall partions, structural steeltube stock header installation, Light gage exterior cross bracing.
Parking lot bituminous concrete pavement base course.
OBSERVATIONS
Erosion control barrier is working as designed. Exterior sheathing, dense glas has been delivered to the site.
INFORMATION OR ACTION REQUIRED
Work in progress is in general compliance with the plans and specifications.
4
ATTAGHMENTS il
tNsPECTfO ""ENGINEER:Mt]
DATE:DATE:
-rb
re'\*i
NL:12-b
AAB -+a
780 CMR 116.0 CONSTRUCTION CONTROL
FIELD INSPECTION REPORT fi,y
ASSOCIATED BUILDERS, INC Project NORTHAMPTON LODGE OF ELKS
4 INDUSTRIAL DRIVE Job Location 17 SPRING ST., NORTHAMPTON, MA
SOUTH HADLEY, MA 01075 Date 9-12-2002
(413) 536-0021 Buirdins ,"r,",I'ilLl li--or%8yon.u
WEATHER: Sunny, TO'
EST. % OF COMPLETION TSyo
coNSTRUcrloN suPERvlsoR George A. Desgi'ess, Associated Buitders Inc.
PRESENT AT SITE
Associated Builders (General Contractor) 3 Labors
McCormack-Allum (HVAC Sub)
Professional Drywall Construction (Erection Sub)
Clayton Masonry
Paige Plumbing
Rivet Roofing
WORK IN PROGRESS
Roughp|umbingandroughHVAcinsta||ation.Thebui|dinginsu|ationnas
interior walls. The roofing insulation, membrane roofing system and parapet end walls has been constructed.Exterior Masonry fascia and dense glass sheathing, storefront glass through out building has been installed.Gypsum wallboard construction has been started.
WORK COMPLETED SINCE PREVIOUS INSPECTION
Building roof deck and bar joist installation. Light gage metal bracing.
OBSERVATIONS
Erosion control barrier is working as designed. Bituminous concrete base pavement is stable.
INFORMATION OR ACTION REQUIRED
work in progress is in general compliance with the plans and specifications.
ATTACHMENTS
- 'rtn4-(-Frank DeMarinis. P.E.
e-12-n2
INEER: ,4/", " ,,.
v Eric M. Beihardin, p.E.
DATE: 9-12-02
INSPECTION BY:
DATE: /
ffi'.'{iH8'*
U-S'UF,t
,l
\$ii;<-'"
rliJffi
s JdB-Vo
780 CMR 116.0 CONSTRUCTION CONTROL
FIELD INSPECTION REPORT
{1\\l
iltlil)tlrl
I
I
I
ASSOCIATED BUILDERS, INC
4 INDUSTRIAL DRIVE
SOUTH HADLEY, MA 01075
(413) 536-0021
Project
Job Location
Date
Time
Building Permit No.
NORTHAMPTON LODGE OF ELKS
17 SPRING ST., NORTHAMPTON, MA
10-21-2002
1:30 PM
BP-2002-0948
WEATHER: Sunny,54'
EST. % OF COMPLETION
-t
I
i
I
I
IJ
rIS
CONSTRUCTION SUPERVISOR George A. Desgress, Associated Builders Inc.
PRESENT AT SITE
Associated Builders (General Contractor)
Gustafson Electric Inc. (Electrical Contractor)
T&M Equipment Corp. (Site, Excavating)
WORK IN PROGRESS
Completion of HVAC installation pending on gas hook-up later this week. Electrical work including lights, alarms,
etc. in progress. Exit signage for egress currently being installed with electrical connections provided for. Painting
in progress. Final coats, accent wall and door frames still need to be painted. Excavation for detention pond was
in progress. Placement of stones around perimeter of building was in progress. Preparation for landscaping and
paving underway. VCT partially installed in toilet rooms.
WORK COMPLETED SINCE PREVIOUS INSPECTION
Plumbing fixtures installed. Gypsum wallboard construction completed. Lights installed. Concrete sidewalks
poured. Bollard lighting in place.
OBSERVATIONS
Gypsum wallboard was properiy consiructed and iaped. Exit signage in process of being instalied.
INFORMATION OR ACTION REQUIRED
Work in progress is in general compliance with the plans and specifications.
ATTACHMENTS
.,
ffffi ENGTNEER futgL- Eric Mhern-tdir1,DATE: 10-21-02
5S@!Br
INSPECTION BY:
Anna
DATE:10-21-02