1006 FLORENCE RD 2015-09-14Proposal
~fC!Al.llfNG iN IIEAflN6 & All( CCNDJnCNlNS CONTRfJI.$
4 Berard Circle Springfield, MA 01128
Phone # 413-782-2290
Date Proposal #
9/1112015 1367
Name I Address
MATIIIAS KAINDL
108B DAMON RD
NORTHAMPTON, MA 01000
aty Description Total
PRfCE FINISH TIlE JOB AT 1006 FLORENCE RD, NORTIJAMPTON. AT THIS TIME TIlE SECOND FLOOR 7,200.00
DUCTWORK WAS INSTALLED FROM TIlE CELLAR CElLlNG IN TIlE BASEMENT UP THREW A CHASE TO
TIlE ATTIC AND SUPPLIED TIlE SECOND FLOOR CElLlNGS IN EACH ROOM. TIlE GlBSON FURNACE AND
AlC COIL WAS LEFT IN TIlE BASEMENT. TIlE ELECTRICIAN ( TIlE WIRING) AND PLUMBER ( TIlE GAS
PIPING) HOOKED UP TIlEIR PART ON TIlE FURNACE. TIlERE WAS SOME DUCTWORK FITTINGS LEFT IN
TIlE BASEMENT. AT THIS TIME MY PRfCE IS TO INCLUDE INSTALLING ALL TIlE SUPPLY AND RETIJRN
REGISTERS THREW OUT TIlE HOUSE ( 1 ST AND 2ND FLOOR). TO INSTALL ALL THE DUCTWORK IN TIlE
BASEMENT TO THE GAS FURNACE, ALL DUCTWORK WILL BE INSULATED IN BASEMENT, TO INSTALL
AND PROVIDE A 3 TON 13 SER GlBSON AlC UNIT OUTDOORS, INCLUDING TIlE REFRfGERANT PIPING,
FLUE PIPING, LOW VOLTAGE WIRING, T-STAT ON THE FIRST FLOOR, INCLUDING TIlE SHEET METAL
PERMIT TO DO TIlE WORK.
TOTALPRfCE $7,200.00
TOTAL PRfCE DOWN TO START $4,200.00 -\
TOTAL PRfCH DO ON COMPLETION OF THE JOB $3,000.00
Total $7,200.00
Customer Signature: 'J1t~IvJI an KOv1(nvt( Installer Sig.~;?"~