Installation Report - Borawski (003) Installation Date: 3/5/2024 - 3/6/2024
250 psi
North
Post #
Post
Type
Head
Pressure
Axial
Capacity Depth*
Above
Grade (in)
South
Post #
Post
Type
Head
Pressure
Axial
Capacity Depth*
Above
Grade (in)
1 CF-7 1,400 9,120 69''18 1 CF-7 1,400 9,120 69''18
2 CF-7 1,700 11,744 69''18 2 CF-7 1,500 9,960 69''18
3 CF-10 1,800 12,583 60''66 3 CF-7 1,800 12,583 69''18
4 CF-7 1,800 12,583 69''18 4 CF-7 1,700 11,744 69''18
5 CF-7 1,500 9,960 69''18 5 CF-7 2,000 14,155 69''18
6 CF-7 1,800 12,583 69''18 6 CF-7 2,000 14,155 69''18
7 CF-10 1,800 12,583 60''66 7 CF-10 1,800 12,583 60''66
8 CF-7 1,700 11,744 69''18
9 CF-10 1,500 9,960 60''66
The Solar Foundations USA system installed at the above location was installed, inspected and reported as per all
manufacturer’s specifications and requirements. All work was performed by technicians trained and certified by the
manufacturer. This Installation Data Sheet contains all relevant information required by the manufacturer.
* Depth indicated is as installed in reference to existing grade at time of installation.
Project Description:
Northeast Solar Design Associates
1142 River Road
New Castle, DE 19720
855-738-7200
Certified Installation Data Sheet
Borawski Residence
10 Pinebrook Curve
Ground Mount Solar Support Structure Installation
Northampton, MA 01060
Job Site Address:
Certified Installer
Signature:
Engineer
(If Applicable):
Pile Installation Field Data
Sketch of Worksite
Permit #:
Installer: Brandon Hicks
Planetary: L5K Motor: X WR130 □ WR160 □ WR200 Back Pressure: