Loading...
Installation Report - Borawski (003) Installation Date: 3/5/2024 - 3/6/2024 250 psi North Post # Post Type Head Pressure Axial Capacity Depth* Above Grade (in) South Post # Post Type Head Pressure Axial Capacity Depth* Above Grade (in) 1 CF-7 1,400 9,120 69''18 1 CF-7 1,400 9,120 69''18 2 CF-7 1,700 11,744 69''18 2 CF-7 1,500 9,960 69''18 3 CF-10 1,800 12,583 60''66 3 CF-7 1,800 12,583 69''18 4 CF-7 1,800 12,583 69''18 4 CF-7 1,700 11,744 69''18 5 CF-7 1,500 9,960 69''18 5 CF-7 2,000 14,155 69''18 6 CF-7 1,800 12,583 69''18 6 CF-7 2,000 14,155 69''18 7 CF-10 1,800 12,583 60''66 7 CF-10 1,800 12,583 60''66 8 CF-7 1,700 11,744 69''18 9 CF-10 1,500 9,960 60''66 The Solar Foundations USA system installed at the above location was installed, inspected and reported as per all manufacturer’s specifications and requirements. All work was performed by technicians trained and certified by the manufacturer. This Installation Data Sheet contains all relevant information required by the manufacturer. * Depth indicated is as installed in reference to existing grade at time of installation. Project Description: Northeast Solar Design Associates 1142 River Road New Castle, DE 19720 855-738-7200 Certified Installation Data Sheet Borawski Residence 10 Pinebrook Curve Ground Mount Solar Support Structure Installation Northampton, MA 01060 Job Site Address: Certified Installer Signature: Engineer (If Applicable): Pile Installation Field Data Sketch of Worksite Permit #: Installer: Brandon Hicks Planetary: L5K Motor: X WR130 □ WR160 □ WR200 Back Pressure: