38C-016 Earle St- application decision-- _ ~ ~ _ _ _ STORIVIWATER MANAGEMENT PERMIT
~ , ~
°"' APPLICATION DECISION ~~
City of Northampton
Department of Public Works
Project /Site Narne: Earle Street Reconstruction
Project Street or Location /Assessor ID: Earle Street -Route 10 to Route 66
Applicant Narne: Ga~liarducci Construction Inc. -
Applicant Adci`ress/Phone:295 Pasco Road, Sprri~field~ MA 01151 / 413-543-6978
Owner Name: City of Northampton -
Application Submission Date: 5/13/2008
THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC
WORKS HAS BEEN TAKEN ON THIS APPLICATION BASED Olv INFORMATION
PRESENTED: -
d~~
Disapproval of the Stormwater Management Permit Application based on a
determination within seven days of the receipt of the application that the
application is administratively incomplete (see attached documentation).
Approval of the Stormwater Management Permit Application.
X Approval of the Stormwater Management Permit Application subject.to any
conditions, modifications or restl~ictions required by the Department of.
Public Works (see below) -
Disapproval of the Stormwater Management Permit Application based upon
a determination that the proposed plan, as submitted, does not meet the
purposes set forth in the Northampton Stormwater Management.
Standard Permit Conditions:
1. All clearing, grading, drainage, construction, and development shall be conducted in
strict accordance with the following plans and information submitted with the application
and as amended by any conditions attached to this permit:
a. Earle Street Reconstruction Plans, Sheets 1-49, stamped 10/18/2007 by Fred L.
Douglas, P.E., VAi Transportaion Engineers & Planners.
b. Stormwater Pollution Prevention Plan for The Reconstruction of Earle Street,
Northampton, MA, prepared by Pioneer Environmental, Inc., approved by
Massachusetts Highway Department 6/10/2008.
M:\Stormwater Permits\Permits_new applications\Earle St Reconstruction.doc
-2. }The Northampton Department of Public Works (DPW) or its authorized representative
shalhbe provided access to the property to conduct inspections before, during, and after
construction activities as necessary. The applicant shall arrange with the DPW to
schedule the following inspections: Initial Inspection, Erosion Control Inspection, Bury
Inspection, and Final Inspection. The DPW may also conduct random inspections to
ensure effective control of erosion and sedimentation during all phases of construction.
3. At the completion of the work, including construction of stormwater management
facilities and landscaping, the applicant shall submit a statement to the DPW from a
professional engineer of record in the Commonwealth of Massachusetts certifying that
the materials and construction of the stormwater management system was constructed in
accordance with the approved plans and will function as designed. All changes to the
approved stormwater facilities shall be documented by a professional engineer of record
in the Commonwealth of Massachusetts and approved by the DPW prior to submission of
the certification statement described above.
4. If construction of the proposed stormwater system has not started within five years of the
issue date of this permit, then the permit will expire and a new permit will be required.
Construction is defined as clearing, grading, excavation, filling, and installation of
drainage structures on the lots specified in this permit.
Specific Permit Conditions:
1. The contractor, Gagliarducci Construction, Inc., shall provide adequate protection of all
existing and proposed catch basins, inlets and storm drain outlets so that no sediment is
discharged to the Mill River.
_ ~ ti~ (~
' ature of t Engineer Date
cc. Planning Board c/o Office of Planning and Development
Building Department
Conservation Commission c/o Office of Planning and Development
M:\stormwater Permits\Permits_new applications\Earle St Reconstruction.doc
Page 2 of 2