Loading...
10 HAWLEY A5.2 4-7-20EGRND FLR -EAST2' -0"REINFORCED CONCRETEFOUNDATION WALLS ANDFOOTINGS -SEESTRUCTURAL DRAWINGSFOR DETAILSFIBERGLASS INSULATEDDOOR -SEE DOORSELEVATION AND SCHEDULESIDEWALK -SEE SITEIMPROVEMENTS DRAWINGS4" CONCRETE SLAB ON 10MIL VAPOR BARRIER & 2"RIGID INSULATION -SEESTRUCTURAL DRAWINGSFOR DETAILSALUMINUM THRESHOLD SETON BEAD OF EXTERIORGRADE SEALANT4MIN.TYP.6"CONTINUOS SILL GASKETSET ON SEALANTCONTINUOUS JOINTSEALANTSCHEDULED BASE -SEEROOM SCHEDULE FORDETAILSSCHEDULED FLOORING -SEE ROOM SCHEDULE FORDETAILS4" CONCRETE SLAB ON 10MIL VAPOR BARRIER & 2"RIGID INSULATION -SEESTRUCTURAL DRAWINGSFOR DETAILS2x6 PT WOOD SILL PLATESET ON TWO CONTINUOUSBEADS OF SEALANT3/4" SIDING VENT WITHINSECT SCREENFIBER-CEMENT CLAPBOARDW/ 5" EXPOSURE1X4 WOOD FURRING STRIP1X10 POLY-ASH MUD BOARDPT'DCONTINUOUS METAL BASEWALL FLASHINGZIP SYSTEM TAPE OVERADHESIVE BACKEDFLASHINGCONTINUOS Z FLASHINGSTARTER STRIPDENSE PACK CELLULOSE INEXTERIOR WALL CAVITY,R-224FIBER-CEMENT CLAPBOARDW/ 5" EXPOSURE1X4 WOOD FURRING STRIPZIP R WALL SHEATHING, R-6LAMINATED VENEERLUMBER -SEE STRUCTURALDRAWINGS2X6 WOOD TOP PLATE2X6 WOOD STUDS AT 16"O.C.DENSE PACK CELLULOSE INEXTERIOR WALL CAVITY,R-225/8"GWB PT'DCONTINUOUS JOINTSEALANT1X4 WOOD FURRING STRIPNEW GWB CEILING ON 1XFURRING, SHIM TO PROVIDELEVEL SURFACESHOP-FABRICATED 14"DEEP WOOD FLOORTRUSSES, SEESTRUCTURAL DRAWINGSFOR DETAILS3/4" T&G CDX PLYWOODSUBFLOORSCHEDULED FLOORING -SEE ROOM SCHEDULE FORDETAILSCONTINUOUS JOINTSEALANTSCHEDULED BASE -SEEROOM SCHEDULE FORDETAILSCLOSED CELL FOAM FLASHCOAT AT BAND JOIST47"DENSE PACK CELLULOSE INEXTERIOR WALL CAVITY,R-22CERTAINTEED "MEMBRAIN"CONTINUOUS AIR BARRIER& SMART VAPOR RETARDER5/8"GWB PT'D2X6 WOOD BLOCKINGCORNER BEAD5/8"GWB PT'DCONTINUOUS JOINTSEALANT2X4 WOOD BLOCKINGCONTINUOUS JOINTSEALANTMARVIN ALL-ULTREXWINDOWS, SEE WINDOWSCHEDULE FOR DETAILSCONTINUOUS JOINTSEALANT1X6 WOOD BLOCKING1x POLY-ASH FASCIA BOARDPT'DCONTINUOUS METAL BASEWALL FLASHING1X4 WOOD FURRING STRIPSTARTER STRIP3/8"5 1/2"48 1/4"5 1/2"3/8"SOLID SURFACE WINDOW SILLCONTINUOUS SEALANT3/4" PLYWOOD2X6 WOOD BLOCKINGDENSE PACK CELLULOSE INEXTERIOR WALL CAVITY,R-22CERTAINTEED "MEMBRAIN"CONTINUOUS AIR BARRIER& SMART VAPOR RETARDER5/8"GWB PT'DZIP R WALL SHEATHING, R-6FIBER-CEMENT CLAPBOARDW/ 5" EXPOSURE ORFIBER-CEMENT PANEL W/BATTEN AS INDICATED ONEXTERIOR ELEVATIONS1X6 WOOD BLOCKINGPOLY-ASH TRIM BOARD PT'DCONTINUOUS JOINTSEALANT1" FIBERGLASS FRAMEEXPANDERMARVIN ALL-ULTREXWINDOWS, SEE WINDOWSCHEDULE FOR DETAILS7"45/8"GWB PT'DZIP R WALL SHEATHING, R-62X6 WOOD STUDS AT 16"O.C.DENSE PACK CELLULOSE INEXTERIOR WALL CAVITY,R-221X4 WOOD FURRING STRIPFIBER-CEMENT CLAPBOARDW/ 5" EXPOSUREA1X4 WOOD FURRING STRIPZIP R WALL SHEATHING, R-6LAMINATED VENEERLUMBER -SEE STRUCTURALDRAWINGS2X6 WOOD TOP PLATE2X6 WOOD STUDS AT 16"O.C.DENSE PACK CELLULOSE INEXTERIOR WALL CAVITY,R-225/8"GWB PT'DCONTINUOUS JOINTSEALANTSCHEDULED FLOORING -SEE ROOM SCHEDULE FORDETAILSCONTINUOUS JOINTSEALANTSCHEDULED BASE -SEEROOM SCHEDULE FORDETAILSSHOP-FABRICATED 14"DEEP WOOD FLOORTRUSSES, SEESTRUCTURAL DRAWINGSFOR DETAILSNEW GWB CEILING ON 1XFURRING, SHIM TO PROVIDELEVEL SURFACECLOSED CELL FOAM FLASHCOAT AT BAND JOISTICE AND WATER SHIELD -PROVIDE COMPLETEROOFING SHEATHINGCOVERING-TURN UPTOPWALL 16" MIN.ROOFING MEMBRANE TURNUP TO WALL 16" MIN.3/4" PLYWOOD SHEATHING2X8 WOOD JOIST16" ICE AND WATER SHIELDMIN.8"J CHANNELQUARTER ROUND MOLDINGBEADBOARD PANELING1X4 WOOD FURRING STRIP1/4" 12"11 1/2"CONTINUOUS 2X3 PT WOODBLOCK CUT TO FITHOT AIR-WELDED ROOFINGFLASHING MEMBRANECONTINUOUS METAL DRIPEDGE2X8 FASCIA WOODBLOCKING1x POLY-ASH FASCIA BOARDPT'D5/4 POLY-ASH FASCIABOARD PT'D2X8 WOOD JOISTROOFING MEMBRANEICE AND WATER SHIELD -PROVIDE COMPLETEROOFING SHEATHINGCOVERING-TURN UPTOPWALL 16" MIN.3/4" PLYWOOD SHEATHINGALUMINUM GUTTER5/4 POLY-ASH FASCIABOARD PT'DPOLY-ASH TRIM BOARD PT'DPOLY-ASH TRIM BOARD PT'DBEADBOARD PANELING1/2"1/2"ZIP R WALL SHEATHING, R-6FIBER-CEMENT PANEL W/BATTEN1X4 WOOD FURRING STRIPFIBER-CEMENT CLAPBOARDW/ 5" EXPOSURE1X8 POLY-ASH RABBETEDBELLY BOARD PT'D5/4 POLY-ASH RABBETEDFRIEZE BOARD PT'DCONTINUOS Z FLASHINGDENSE PACK CELLULOSE INEXTERIOR WALL CAVITY,R-222X6 WOOD STUDS AT 16"O.C.5/8"GWB PT'D48 1/4"ZIP R WALL SHEATHING, R-61X4 WOOD FURRING STRIPFIBER-CEMENT CLAPBOARDW/ 5" EXPOSURE ORFIBER-CEMENT PANEL W/BATTEN AS INDICATED ONEXTERIOR ELEVATIONS1X6 WOOD BLOCKINGPOLY-ASH TRIM BOARD PT'DCONTINUOUS JOINTSEALANTMARVIN ALL-ULTREXWINDOWS, SEE WINDOWSCHEDULE FOR DETAILSCONTINUOUS JOINTSEALANTCONTINUOUS JOINTSEALANT5/8"GWB PT'D2X6 WOOD BLOCKING2X4 WOOD BLOCKINGDENSE PACK CELLULOSE INEXTERIOR WALL CAVITY,R-225/8"GWB PT'DCERTAINTEED "MEMBRAIN"CONTINUOUS AIR BARRIER& SMART VAPOR RETARDER5 1/2"3/8"7"c Kuhn Riddle Architects, Inc.KUHN RIDDLEA R C H I T E C T S28 AMITY ST. SUITE 2BA M H E R S TMASSACHUSETTS 010024 1 3 2 5 9 1 6 3 0www . kuhnriddle . comThis drawing is not intended nor shall it be used for construction purposes unless the signed professional seal of a registered architect employed by Kuhn Riddle Architects, Inc., is affixed above.Keynotes/General Notes:Date:Drawn By:Project:Scale:ADBC1234512345ADBCNOT FOR CONSTRUCTION4/3/2020 5:41:53 PMAs indicated4/3/20AuthorEXTERIOR DETAILSA5.210 HAWLEY STNORTHAMPTON, MAHAWLEY STREET RESIDENTIALDEVELOPMENT190541 1/2" = 1'-0"THRESHOLD AT GROUID LEVEL EXTERIOR DOORD11 1/2" = 1'-0"TYPICAL TOP OF FOUNDATION WALLD21 1/2" = 1'-0"TYPICAL FLOOR/CEILING AT EXTERIOR WALLB2Rev. No. Description Date3" = 1'-0"TYPICAL WINDOW HEAD (JAMB SIMILAR)A43" = 1'-0"TYPICAL WINDOW SILLD41 1/2" = 1'-0"TYPICAL EXTERIOR WALLC21 1/2" = 1'-0"ROOF CONNECTION BETWEEN BUILDINGSC11 1/2" = 1'-0"CONNECTOR ROOF BETWEEN BUILDINGS - ROOF EDGESA11 1/2" = 1'-0"LAP SIDING TO BEAD BOARD TRANSITION DETAILA23" = 1'-0"TYPICAL WINDOW JAMB DETAILC4