Loading...
24D-345 W-SMUNICIPAL WATER AVAILABILITY APPLICATION Northampton Water Department 237 Prospect St. Northampton, MA 01060 413-587-1097 A Department of Public Works Trench Permit shall be required prior to any construction or connection activity associated with this application. Location: 38 STODDARD ST Inquiry Made By: JOHN HANDZEL/NU-WAY HOMES 413-563-0085 Name) Telephone Number) Date of Inquiry: 6125/2018 Fire Line _ Irrigation, Domestic X Number of Units: 1 Type of Units: Type of Ownership: Single Family X Private X Apartments_ Condo_ Muli-Family_ Rental_ Commercial Applicant to fill out the above) Municipal Water Main in Front of Location: Yes X No Existing service to site? Yes_Nope i YSizeofWaterMain: 6 Material: C 1 Age: /Q 3 Approximate Static Street Pressure: /00 Flow Test Conducted: Yes_ No If Flow test conducted attach results) Size of Service Connection: Suggested Meter Size: §If Comments: The Water Department cannot guarantee adequate water pressure during peak demand times at elevations above 320' A corresponding water enterance fee shall be paid prior to making any connection to the municipal water system. Arrangement of such installation shall be made with the Northampton Water Department within a minimum of 5 working days notification. All work shall conform to Northampton Water Department specifications. 6- a.6- IS Water Superintendent) Date) Water Entry$ eZ.00 Fire Line$ Meter$ 130 Radio Read$ 1 -35 cc: City of Northampton Building Dept./Commissioner NOTE: if this availablitiy is for a new construction,it must be hand delivered to the Building Inspector MUNICIPAL SEWER AVAILABILITY APPLICATION Northampton Streets Department 125 Locust Street Northampton, MA 01060 413-587-1570 A Department of Public Works Trench Permit and Sewer Entry Permit shall be required prior to any construction or connection activity associated with this application. Location: 38 STODDARD ST. Date of Inquiry: 06/25/18 Inquirer with contact info: JOHN HANDZEL/NU-WAY HOMES Reason for Request: NEW CONSTRUCTION Municipal Sewer Main in Front of Location: Yes No Size of Sewer Main: f Z Material: /}C Age: I }S Depth of Sewer Main: 5 6 Length of Sewer Main: 2• Z. f Size of Service Connection:G " Type of Service Connection: } Tie-in to Sanitary Main: Tie-in to Sanitary Stub: Tie-in to Private Sanitary: Tie-in to Existing Sanitary Service: Comments: City Requires 6" cleanout installed at City Property Line Note:If this availability is for new construction,this form must be hand delivered to Building Inspector. A corresponding"sewer entrance fee" shall be paid prior to making any connection to the municipal sewer system.Arrangements of such installation shall be made with the Northampton Streets Department with a minimum of 5 working days notificaiton. All work shall conform to Northampton Streets Department specifications. Date: 2[/y Sewer Dept. Foreman Sewer Entry$7"7) •00