16B-034 (4) BP-2023-1174
78 FERN ST COMMONWEALTH OF MASSACHUSETTS
Map:Block:Lot:
16B-034-001 CITY OF NORTHAMPTON
Permit: Solid Fuel
Appliance
PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
BUILDING PERMIT
Permit# BP-2023-1174 PERMISSION IS HEREBY GRANTED TO:
Project# WOOD STOVE 2023 Contractor: License:
Est. Cost: DOUGLAS L'ABBEE CSL9940I
Const.Class: Exp.Date: 01/06/2024
Use Group: Owner: JANE BRADLEY ELIZA
Lot Size (sq.ft.)
Zoning: URB Applicant: THE FIRE PLACE
Applicant Address Phone: Insurance:
100 STATE RD (413)397-3463
WHATLEY, MA 01093
ISSUED ON: 08/29/2023
TO PERFORM THE FOLLOWING WORK:
WOOD STOVE
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter: Footings:
Rough: Rough: House # Foundation:
Final: Final: Final: Rough Frame:
Gas: Fire Department Driveway Final: Fireplace/Chimney:
Rough: Oil: Insulation:
Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Sign atu re:
. �y
6
• . it
Fees Paid: $40.00
212 Main Street,Phone(413)587-1240,Fax: (413)587-1272
Office of the Building Commissioner
City of Northampton
- "gam ,,„ - c.•
` ''" -' Massachusetts 4,„ 1s',
A .tr: * ';G.
i ( 4; DEPARTMENT OF BUILDING INSPECTIONS
z A.
' 212 Main Street • Municipal Building 9 gib
\ 4'� Northampton, MA 01060 s --••
4k
APPLICATION FOR SOLID FUEL APPLIANCE INSTA LA ' 6 Ck.
400
Property Information Nt
Q9 CO
Owners Name: /Zk 'i a7/c y
t2 Toti bgsAF
D;Q6TI
Address: it Grin 5fi i,crend Aid oid6 2 ° S
(No.) / (Street Address)
Phone: Si -- 273- f90 Cell: Email:
Owners Signature: Date: /a/�--3
Contractor's Information (If Applicable)
Name: Dootlts A .- ��1.-- /fe ?7,fcc_ Phone: (//3 L?11 ,O6j
Construction Supervisor's License #: CSSL- o775/6/ Expiration: /-C
Home Impr. Contractor License #: /rC't/77 Expiration: /7-/ta9'
Stove Information
Type of Fuel (check all that apply): Wood X Pellet Coal
Location: /ids I ifa( Freestanding Insert
Manufacturer: Mersa Model: 3//,7
•
//7SXaf/.i"9 .c- ,5:-t/eii< - /kir714/ C'"(<.ss A- c-A f of fir,/
------------------FOR BUILDING DEPARTMENT USE ONLY------_----w_� p�
Permit# 6s // Date Applied: Total all Fees: $ Le U Ct't/€l3._3
Building Official: eu» / Kp�S Date Issued: 8.29-ZO Z 3
(Prim)
Signature of Building Official: f72____
1
' The Commonwealth of Massachusetts
-- Department of Industrial Accidents
=_ 1lb Office of Investigations
". =4lilil.� f` Lafayette City Center
:.IIII f
�� =• 2 Avenue de Lafayette, Boston, MA 02111-1750
= 'i`�y www.mass.gov/dia
Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers
Applicant Information Please Print Legibly
Name (Business/Organization/Individual):THE FIRE PLACE _
Address:100 STATE ROAD
City/State/Zip:WHATELY, MA 01093 Phone #:413.397.3463
Are you an employer? Check the appropriate box: Type of project (required):
1.U I am a employer with 10 4. ❑ I am a general contractor and I 6. ❑ New construction
employees (full and/or part-time).* have hired the sub-contractors
listed on the attached sheet. 7. ❑ Remodeling
2.❑ I am a sole proprietor or partner-
ship and have no employees These sub-contractors have 8. ❑ Demolition
working for me in any capacity. employees and have workers' 9, E Building addition
[No workers' comp. insurance comp. insurance.t
required.] 5. ❑ We are a corporation and its 10.0 Electrical repairs or additions
3.❑ I am a homeowner doing all work officers have exercised their 11.0 Plumbing repairs or additions
myself. [No workers' comp. right of exemption per MGL 12.E Roof repairs
insurance required.] t c. 152, §1(4), and we have no
employees. [No workers' 13.E Other
comp. insurance required.]
*Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information.
.i Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such.
tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have
employees. If the sub-contractors have employees,they must provide their workers'comp.policy number.
I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site
information.
Insurance Company Name: MA RETAIL MERCHANTS WC GROUP INC
Policy#or Self-ins. Lic. #:014000503301116 Expiration Date: 1-1-24
Job Site Address: Pr fern c City/State/Zip: Clare/Ice IAA A 47/66a
Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date).
Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a
fine up to $1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine
of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of
Investigations of the DIA for insurance coverage verification.
I do hereby certify nder the pains and pe alties of perjury that the information provided above is true and correct.
Signature: certify
.as•a3
Date:
Phone#: 413.397.3463
Official use only. Do not write in this area, to be completed by city or town official.
City or Town: Permit/License #
Issuing Authority (check one):
10Board of Health 2❑Building Department 3❑City/Town Clerk 4.1:Electrical Inspector 5❑Plumbing
Inspector 6.0Other
Contact Person: Phone#:
1.o Installation of your Morse) stove
Installation of woodburning stoves must be safe and legal.
If your Morsel stove is not installed correctly,it may cause a house fire.To reduce the risk
of fire,the installation instructions must be followed carefully.Contact the local building
officials about restrictions and installation inspection in your area.
Before you start installing your stove, make sure that:
- The stove and chimney connection are placed far enough from combustible materials to
meet all clearance requirements.
- The floor protection must be adequate and must be made correctly according to the re-
quirements.
All neccessary approvals are needed from the local building officials.
The data plate,which is located on the back of the stove, provides information regarding safety
testing information, name of certified testing laboratory,and installation requirements.
Installation requirements vary in different districts, and the local building officials have the final
authorization to approve your installation.You should discuss the installation with them before
beginning. Please ask your dealer for further information.
Do not connect to any air distribution duct or system.
Important: If the installation instructions are not followed carefully, it may cause dan-
gerous situations like chimney - and house fires. Follow the instructions carefully and
do not deviate from them as it may cause injuries to people or property.
�.� Checking loose parts in the stove
After unpacking, check that the center grate (in the centre of the fire bed) and the fire bricks
are firmly in position and have not shifted in transit.Check also that the air control works freely.
The stove is heavy and therefore it is strongly recommended that when lifting, it is under-
taken by two people.
Fitting instructions for Legs
Morse) 3112 B: After removing the outer packaging, flatten it and lay onto the floor close to
the stove; this can then act as protective work surface during the assembly process.
Next, remove the legs and bolts from inside the stove. Gently lay the stove onto its back and
unscrew it from the wooden pallet. Using the bolts supplied, now screw the legs into position
on the underside of the base.The stove should now be lifted and moved into the upright posi-
tion,avoiding excess load on the back legs.
Morse) 3142 B: After removing the outer packaging, the stove should now be lifted
and moved into the position.
4
How to position the baffle and access baffle 1 2
Make sure that the upper baffle plate (2) is located into its correct
position. It should be placed on top of the rear (fixed) baffle sec-
tion and secured into position against the 2 upstanding cast lugs.
Note:The access baffle (3) must always be fitted when the stove 3
is in use, as it not only assists the combustion process, but also I
gives essential protection to the stove's top plate.
Standard Accessories I � -1
Standard .
�.,,�p■■�� iE.
Poker, ceramic flue connection gasket and riddling tool are standard
accessories,and can usually be found in the ashpan or firebox area.
1.2 The chimney / flue system
Note that the flue system must be independently secured and must
not rely on the stove for support.
The stove must not be connected to a chimney flue serving any other appliance.
(Several flues may run up a single chimney stack; use one flueway per appliance).
Use a residential type masonry or listed type HT factory-built chimney.
High Temperature (H.T.) Chimney Standard UL-103-1985 (2100° F.)for the USA,and High
Temperature (650°C) Standard ULC S-629 for Canada.
The internal dimensions of the chimney connector and chimney must not be less than 6 inch-
es diameter(or equivalent cross section), and should not be significantly larger than this.Too
large a section will tend to allow the flue gases to cool excessively, causing sluggishness or
unpredictability in the stove's performance.
We recommend the length of the chimney system should be at least i6 feet (not required)
above the stove in normal domestic situations, measured from the flue collar to the top of
the chimney. Local conditions like for example - roof constructions, large trees nearby and
high altitude, may influence the chimney draft and height. Therefore, contact the local pro-
fessional chimney sweep or your Morso dealer.
Typical factory-built or masonry chimney installations
101.1 r.• a
orEli
_l it
3
11
1 �! Clayalew 3 ■�
awe-- Nerlin.r = �
•
Ontario')
Ceding reed (Exterior) ..
g supported Well supported
•Masonry Chimney
5
1.3 Flue Connection
The stove is supplied from the factory with a flue collar fitted to the top plate and a round
blanking plate blocking off the rear flue exit (behind the rear shield plate).
Use a 24 MSG black or blue chimney connector or listed double wall chimney connector. Re-
fer to local codes and the chimney manufacturer's instructions for precautions required for
passing a chimney through a combustible wall or ceiling. Remember to secure the chimney
connector with a minimum of three screws to the product and to each adjoining section.
Where a rear flue installation is required, simply knock out the top steel plate in the rear heat
convection panel.This is best done by applying gentle hammer taps immediately onto the small
"bridges"in the circular cut-outs.Once the knock-outs have been removed unbolt the cast iron
blanking plate and install it into the top of the stove.The flue collar can then be bolted over the
rear flue outlet using the bolts and clamps provided.
The cast iron blanking plate can also function as an extra clean-out access whilst perform-
ing the annual cleaning service of the stove and chimney.
Wear gloves and protective eyewear when drilling, cutting or joining sections of chim-
ney connector.
1.4 Connection to the existing chimney
A chimney connector is the double-wall or single-wall pipe that connects the stove to the chim-
ney.The chimney itself is the masonry or prefabricated structure that encloses the flue.Chim-
ney connectors are used only to connect the stove to the chimney.
Double-wall connectors must be tested and listed for use with solid-fuel burning applianc-
es. Single-wall connectors should be made of 24 gauge or heavier gauge steel. Do not use
galvanized connector; it cannot withstand the high-temperatures that smoke and exhaust
gases can reach, and may release toxic furnes under high heat. The connector must be 6
inches (i5omm) in diameter.
If possible,do not pass the chimney connector through a combustible wall or ceiling.
If passage through a combustible wall is unavoidable,refer to the sections on Wall Pass-
Throughs.Do not pass the connector through an attic,a closet or similar concealed space
when installing the chimney connectors.
It is important to keep the flue gases moving smoothly in the right direction. Do not vent
into a large void at this location; rather form one continuous section all the way up. Use mild
bends(e.g.45°vs. go°) rather than sharp angles where a change of direction is required.All
parts of the venting must be accessible for cleaning purposes.
In horizontal runs of chimney, maintain a distance of i8 inches from the ceiling. Keep it as
short and direct as possible, with no more than two go degree turns. Slope horizontal runs
of connector upward-1/4 inch per foot (2o mm per metre)going from the stove toward the
chimney.The recommended maximum length of a horizontal run is 3 feet(i metre),and the
total length should be no longer than 8 feet (2.5 metres).
Information on assembling and installing connectors is provided by the manufacturer's in-
structions exactly as you assemble the connector and attach it to the stove and chimney.
Be sure the installed stove and chimney connector are correct distances from near by
combustible materials. See the clearance paragraph page 8.
6
Chimney Connector Systems and Clearances from Combustible Walls for Residential Heating Appliances
Minimum chimney clearance to brick
and combustibles 2 in.(51 mm)
Col
NI
Oesieei�� I- - Minimum clearance
_�� 12 in.(905 mm) A Minimum 3.5-in thick brick masonry all framed
- - of brick
into combustible wall with a minimum of I2-in
MIIIIIIIIIIIIMMI
brick separation from clay liner to combustibles.
SIMI MO MU
•N - Chimney The fireclay liner shall run from outer surface of
= - connector brick wall to,but not beyond,the inner surface
Minimum �� imp Fire clay of chimney flue liner and shall be firmly
12 in.(305 mm) Masonry chimney ►=e Irner
to combustibles constructed to cemented in place.
NFPA 211
Minimum Chimney clearance from
masonry Io sheet steel supports
and combustibles 2 in.(51 mm)
.. Minimum
C
'� 9 in.(229 mm)
Factory-builtI
LI
refractory late
chimney length Nonsoiue chimney B Solid-insulated, listed factory-built chimney
ri��N�.� connector length of the same inside diameter as the
) Chimney length
inside
Push with inside � chimney connector and having 1-in.or more
I' IIII of flue i Use chimney of insulation with a minimum 9-in.air space
nelm..2m W mfrs.parts to
III l Air sp ace 4"4 '\ attach connector between the outer wall of the chimney length
1 9 in.(229 mm)min. E_ securely and combustibles.
' 1�
U Solid-insulated,
listed factory-built
Masonry chimney % chimney length
constructed to
NFPA211 Sheet steel supports
Minimum chimney clearance
to sheet steel supports and
combustibles 2 In.(51 mm) C Sheet steel chimney connector,minimum 24
gauge in thickness,with a ventilated thimble,
I ® Two air channels minimum 24 gauge in thickness,having two
Ell each 1 In.(25 4 rim)
1-in.air channels,separated from combustibles
Ces—� Chimney by a minimum of 6-in.of glass fiber insulation.
connectorOpening shall be covered,and thimble supported
8 ..�l with a sheet steel support,minimum 24 gauge in
' 'j Minimum 5 In.
_ } 152 mm)glass thickness.
Two ventilated aIr U f =�
fiber insulation
channels each
1 In,(25.4 mm).
COnstructlon of Masonry chimney Sheet steel
sheet steel. constructed to supports
NFPA 211
D Solid insulated, listed factory-built chimney
Minimum chimney clearance length with an inside diameter 2-in. larger than
to sheet steel supports
and combustibles Minimum clearance the chimney connector and having 1-in.or more
Sheet steel 2 in.(51 mm) 2In.(51 mm) of insulation,serving as a pass-through for a single
supports
it 1-In.(25.4•mm) wall sheet steel chimneyconnector of minimum
PM/ air space to
Chimney �, chimney length 24 gauge thickness,with a minimum 2-in,air space
Dal section �� between the outer wall of chimney section and
e Chimney
III 1
combustibles. Minimum length of chimney section
.41.11
connector p_,,,,�� shall be 12-in.chimney section spaced 1-in.away
,�. ��p" V chimney from connector using sheet steel support plates
►�� S r '� connector on both ends of chimney section. Opening shall be
Air space Chimney length
2 in.(51 mm) covered,and chimney section supported on both
Masonry chimney Sheet steel
constructed supports sides with sheet steel supports securely fastened to
to NFPA 211 wall surfaces of minimum 24 gauge thickness.
Fasteners used to secure chimney section shall not
penetrate chimney flue liner.
7
1.5 Positioning the stove
Distance to walls and lintel
When the stove is positioned near combustible materials, observe all current local and na-
tional building regulations with regards to clearances. Whatever regulations apply to your
area,do not in any case install the stove within 8 inches of combustible materials around the
sides or 16 inches above the top of the stove. These distances may need to be increased if
the materials are sensitive to heat. Note also that wall paper and other decorative materials
may become detached with the effects of heat and care should be taken to ensure that they
do not fall towards the stove in such an event.
When the stove is positioned near non-combustible materials, a gap of 4 inches or more is
recommended for cleaning purposes and to ensure that heat circulates around the stove
and out into the room.
MINIMUM CLEARANCES TO COMBUSTIBLES:
DEGAGEMENTS MINIMAUX AUX MATERIAUX COMBUSTIBLES:
BACKWALL/KIR ARSE ADJACENT WALL NUR ADJACENT
w D E4,B 45' F c�
o •
U " STOVE m
co .'A POELE C s=+
ooc F
zn
= y r
CLEARANCE REQUIREMENTS STANDARD RESIDENTIAL INSTALLATION
SINGLEWALL CONNECTOR
3112 B 3142 B
A. Sidewall to unit 20"(508 mm) 16"(406 mm)
B. Backwall to unit 12"(305 mm) g"(228 mm)
C. Cornerwall to unit 17"(432 mm) 13"(33o mm)
D. Sidewall to connector 25"(635 mm) 23"(584 mm)
E. Backwall to connector 14.5"(368 mm) 12"(305 mm)
F. Cornerwall to connector 23"(584 mm) 19"(483 mm)
CLEARANCE REQUIREMENTS STANDARD RESIDENTIAL INSTALLATION
DOUBLEWALL CONNECTOR
3112 B 3142 B
A. Sidewall to unit 20"(508 mm) 16"(406 mm)
B. Backwall to unit 8"(203 mm) 7"(178 mm)
C. Cornerwall to unit 15"(381 mm) ii"(279 mm)
D. Sidewall to connector 25"(635 mm) 23"(584 mm)
E. Backwall to connector 10.5"(267 mm) 10"(254 mm)
F. Cornerwall to connector 21"(533 mm) 17"(432 mm)
D D
Rear vent out the back configuration
STOVE
POE10
CLEARANCE REQUIREMENTS STANDARD RESIDENTIAL INSTALLATION
rear vent out the back-doublewall connector
3112 B 3142 B
A. Sidewall to unit 20"(508 mm) 16"(406 mm)
B. Backwall to unit g"(229 mm) 8"(203 mm)
D. Sidewall to connector 25"(635 mm) 23"(584 mm)
8
ALCOVE INSTALLATION/INSTALLATION ALCOVE
BACKWALL/MURARRIERE .
L1.1
• `
D E •'B
. Jo G H
av » 0 a°
o STOVE w wo
oa A PORE L'¢ O
"'� STOVE
POELE
'Maximum alcove depth must be no more than 36"(914 mm):
La protondeur maximum de I'alcove n.peut depasser36"(914 mm)
CLEARANCE REQUIREMENTS ALCOVE INSTALLATION
WITH DOUBLEWALL CONNECTOR
3112 B 3142 B
A. Sidewall to unit 20"(508 mm) 16"(406 mm)
B. Backwall to unit 9"(229 mm) 8"(203 mm)
D. Sidewall to connector 25"(635 mm) 23"(584 mm)
E. Backwall to connector 11.5"(292 mm) ii"(279 mm)
G. Unit to ceiling 33"(838 mm) 33"(838 mm)
H. Floor to ceiling 60"(1524 mm) 62"(1575 mm)
Flooring requirements
Combustible floor must be protected with non-combustible material beneath the unit and extend-
ing 16-in (450-mm Canada)to the front and 6-in(too-mm Canada)beyond each side of the fuel/
ash removal opening. For horizontal cimney connectors, non-combustible material must be place
beneath the connector and 2-in to each side.
You must ensure that the floor can hold the weight of the stove comfortably.
If using rear exit the floor protection must extend beneath the chimney connector and 2-in
beyond each side.
NON-COMBUSTIBLE FLOOR PROTECTOR FLOOR PROTECTOR MUST BE NONCOMBUSTIBLE
Distance to furniture PROTECTOR OE PUNCHER INCOMBUSTIBLE MATERIAL IT MUST EXTDO BENEATH HEATER,AND
TO THE FRONT/SIDES/REARAS INDICATED.
The recommended minimum dis- "MIN.
tance from stove to furniture is 3o 0
inches. Note that some furniture is 6" STOVE 6" LE PROTECTEUR OE PLAtrCHER NIT ETRE 011N
more easily affected by heat and (gym•) (MIN. MATERIAL
OESsousDECAPPAAREILEETT UcemlrMaob arts ETA
may need to be moved to a greater • L''wAICAEDEL'"PPAREIL COMM INDIOut.
distance.This is your responsibility. 1ti"MIN.
(4sarwn)
In addition other combustible materials, away from the stove. In general, a distance of 3o
inches must be maintained between the stove and moveable combustible item such as dry-
ing clothes, newspapers, firewood etc.
9
Selkirk Chimney Systems (USA Only - See separate instructions for Canada)
Sheet GS Installation Instructions
Covering - General Installation Instructions
& Owner's Maintenance Guide
A MAJOR CAUSE OF CHIMNEY-RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED
CLEARANCES (AIR SPACES) TO COMBUSTIBLE MATERIALS. IT IS OF THE UTMOST
IMPORTANCE THAT THIS CHIMNEY BE IN- A WARNING
STALLED ONLY IN ACCORDANCE WITH Failure to follow these Installation Instructions could
THESE INSTRUCTIONS. cause FIRE,CARBON MONOXIDE POISONING,OR DEATH.If
you are unsure of Installation requirements, call the
SELKIRK CHIMNEY SYSTEMS-MODELS, PART NAMES AND Phone Number listed on the back of these instructions.
NUMBERS
Selkirk Chimney Systems(SCS)consist of the following Models-UT(Ultra fully enclosed at 2 inches minimum AIR SPACE clearance to combustibles,
Temp),ST(Sure Temp),GT(Galva Temp),SG Plus and SSII. including framing lumber,drywall,plaster,plywood and other building mate-
The complete part number is prefixed with the ID size, in inches,followed rials classed as combustible.For support framing,see table on back page.
by one or two letters identifying the system to which it belongs, followed AIR SPACE ONLY
by the actual part identifier. The minimum clearance to Selkirk Chimney System pipe means AIR SPACE
All accessory parts for the Selkirk Chimney System(all models)include a ONLY.The 2 inch clearance to pipe,and the spaces around supports must not
letter"T" in the prefix and may be used with all Models unless otherwise be filled with any type of insulation.In attics with blown-in or batt insulation,
indicated. the chimney must either be fully enclosed or an Attic Insulation Shield must
All Model UT,ST and GT chimney sections(straight lengths,tees,elbows) be used to create and maintain the proper minimum airspace.
contain the letters"UT", "ST", and"GT", respectively in the prefix. SIZES AND APPLICATIONS
All Model SG Plus chimney sections (straight lengths, tees, elbows)con- The Selkirk Chimney System is made in 5",6",7",8",10",12",and 14"sizes.
tain the letters"GP"in the prefix. The four smaller sizes conform to the current edition of UL-103 Standard Type
Fig. 1,2,and 3 show the names and locations of commonly used chimney HT requirements.All seven sizes comply fully with the requirements of the 9th
parts. These figures use only the last portion of the part number. The Edition of UL Standard 103. Chimneys installed in accordance with these
complete part number is prefixed with I.D.size,followed by chimney model instructions will comply with national safety standards such as NFPA 31,54
and part number. and 211.The Selkirk Chimney System may be used for gas,wood and liquid
fuel fired stoves,fireplace stoves,central furnaces,floor furnaces,steam and
hot water boilers, unit heaters and water heaters. It may also be used for
IMPORTANT:Chimney sizes 5",6",7"and 8"are Type HT and carry a"T" masonry fireplaces.
in the part number.Larger sizes use an"S"in the part number. These Selkirk Chimney Systems are designed for gravity venting only.They
FOR EXAMPLE are usable on any appliance having a power burner(such as oil furnace)if that
Model UT appliance operates with neutral or negative draft at its outlet.
Inside Diameter I 36"Pipe Length Non-residential appliances which may cause positive pressure in the chimney
should use a Selkirk Model PS or IPS system.
The Selkirk Chimney Systems,sizes 10", 12",14",are ideal for venting gas
(natural and LP),#2 oil,and open front wood burning appliances.
Model ST
Inside Diameter I Insulated Tee
DETAIL INSTRUCTION SHEETS
Details for the installation of all chimney parts must be observed by refer-
All Models ring to other instructions as follows:
Inside Diameter I Wall Support Kit Finish or Ceiling Supports*,Connectors S-1
Fire Stops,Attic Insulation Shields' S-2
Round Top`, Flashing,Spark Arrester S-3
NOTE:Use only Selkirk Chimney System Listed components Roof Support Package',Anchor Plate' S-4
and accessories. Do not use pipe by itself or attempt to fabricate Insulated Tee',Wall Support Kit' S-5
your own support or accessories. Insulated Elbow',Interior Resupport' S-5
CAUTION:IF YOU ARE BURNING COAL Firestop/Joist Shield' S-7
Some types of coal in certain designs of stoves may, in rare instances, Support Box' S-9
cause corrosion of the inner parts of the Selkirk Chimney System.Inspect and 'If you are installing any of these parts in packages marked', you should
clean your chimney frequently to keep it free of coal,ash and soot deposits. receive the proper instructions in the package. You may also request a
Also see"Sizes and Applications"section.If damage to the flue is observed, complete set of instructions from your dealer.This sheet of general instruc-
contact your Selkirk dealer or Selkirk Customer Service(1-800-992-VENT) tions is furnished with all UL listed chimney supports. It covers important
with a description of your chimney problem. safety precautions in the installation, operation and maintenance of your
The Selkirk Chimney System is not recommended if you are burning ocean appliance and chimney. Anyone installing a chimney should review this
driftwood.The salt in this wood may cause product failure. sheet as well as those furnished with the other parts of the chimney
system.Selkirk chimney parts LISTED and produced under the Factory In-
MINIMUM CLEARANCE spection and Follow-Up program of Underwriters'Laboratories,Inc.carry the
Where installed within buildings,the Selkirk Chimney System may be LISTING MARK illustrated here.
SPECIAL WARNING ON CELLULOSE INSULATION
Cellulose insulation in direct contact with a hot chimney can ignite and smolder,and can set fire to ordinary wood framing LISTE0
materials. The AIR SPACE ONLY precaution applies to all blown-in or loose fill insulations, but is especially applicable to
cellulose insulation,which may be made from old newspapers or other cellulose materials. The Attic Insulation Shield or a
suitable enclosure with appropriate fire stops must be used to keep all insulation the proper distance away from the chimney.
1$ SELKIRK
3050 Corporate Exchange Blvd. SE, Grand Rapids, MI 49512 1-800-433-6341 SELKIRK CORPORATION
Round Top(CT) Opp a —Round Top(CT)
ChimneyStorm Collar(SC) / • Flashing(AF)or(TF)
Pipe
— --
/Roof Shield with TF
Storm Collar(SC) •A.,
IFA � Interior Resupport(IR)
/ \ . Full Enclosure or Attic
' I 4#4* Attic Insulation shield
AV, — Area / \
Locking Band(LB) I ���
or Screws Chimney Pipe Insulated Elbow(EL) '� \Firestop/Joist Shield(JS)
Below Framing
410 MAXIMUM
OFFSET Maximum inclined Length:
IAttic Insulation Shield(AIS) AT 30° —g6"unless resupported at
/� ANGLE/ 48"intervals
Fire Stop/Joist Shield(JS)—\ // Opening Framed On 3/ _Full Enclosure,
All Four Sides 2"Minimum Air Space Clearance
f Insulated Elbow(EL)
Locking Band(LB)
or Screws CHIMNEY MUST BE
ENCLOSED Finish Support(FSP)or
Ceiling Support(CSP)
Chimney Pipe FIG 3 THIRTY DEGREE OFFSET WITH ENCLOSURE AT 2"
Finish Support(FSP)or CLEARANCE(MAXIMUM OF TWO SEPARATE OFFSETS PER SYSTEM)
Ceiling Support(CSP) �/0 1 � WHEN INSTALLING YOUR CHIMNEY AND
�� WOODBURNING STOVE OR
Dripless Smoke Pipe Adapter—\� � FIREPLACE SYSTEM,REMEMBER...
(DSA)or(DSAC) SAFETY FIRST
6",7",8"only or 5"-14"Chimney You may well have a basic knowledge of carpentry and the use of hand
Pipe Adapter(CPA) tools. However it is important that you also review the rules of safety on
FIG1 VERTICAL CHIMNEY THROUGH ONE the following pages. If you have any doubt about your ability to complete
STORY AND ATTIC your installation in a workmanlike manner,you should arrange for a profes-
sional installation.
RULES FOR SAFETY DURING INSTALLATION
1. Read all installation sheets.Look for them in the cartons,or ask your
dealer for a complete set or download from www.Selkirkinc.com.Keep the
N � — Wall Band(WB) instructions handy and save them for future reference.
Combustible Wall— Every 8 Feet If 2. Check your local building or fire code for all requirements affecting the
Not Enclosed fuel-burning appliance and its chimney.
— Use Locking Bands 3.Obtain a building permit for both the appliance and the chimney.Contact
(LB)on All Joints local building or fire officials about restrictions and installation inspection in
your area.
Max Chimney Height 4.Be very careful around electrical wiring and be sure it is secured at least
50 Feet 5", 6", 7"8"Size 2 inches away from any part of the chimney. If wiring must be relocated,
40 Feet 10", 12", 14"Size hire a professional electrician.
Min.Clearance _....I 2.. 5.Be sure that ladders are in good condition and always rest on a level firm
To Combustibles Full Enclosure surface.
ii Recommended. 6. Wear cut resistant gloves when handling sheet metal parts with sharp
ii Both Indoors edges.
and Outdoors 7. Be sure that electrically powered tools are properly grounded.
Min.Thru Wall 4-1/2" ii„.„, I CHIMNEY HEIGHT AND SIZE
These instructions contain a "Selector Chart"so you can pick the exact
Selkirk Insulated Tee(IT) combination of length increments.A chimney for one or more gas appli-
Chimney ances must conform to size and height recommendations in the"Selkirk Gas
Section Wall Support Kit(WSK) Vent and Chimney Sizing Handbook."Heights above the roof as given in the
Wall Thimble =� next paragraph are minimum;greater heights may be needed for reasons
(IWT)Shield ._.s:am
given.
Wall Thimble(IWT)/ Capped Cleanout and Before beginning installation of the chimney,be sure that the selected size
Face Plate Retainers is adequate for the appliance and the selected height of the Chimney
Lag Screws Brace Round Top termination is high enough to conform to building code require-
Into Structure I ments. Chimneys are required to extend at least 3 feet above the highest
point where they pass through the roof of a building,and at least two feet
I Pad higher than any portion of a building within 10 feet.(National Fire Protection
Association Standards Nos.31, 54,and 211.)See Fig.4.
FIG 2 INSULATED TEE THROUGH
COMBUSTIBLE WALL
_ / _71--
2 FT. , 3.Appliance Support,with the Selkirk Chimney System starting at the
appliance outlet.This is permissible if this method is shown in the appliance
_ I instructions, or with masonry fireplaces.
1 — 4.Wall Support with Insulated Tee.See Sheet S-5.
2 FT. 5.Support Box. See Sheet S-9.
10 FT. 6. Proper lateral support is also necessary and may be provided by wall
1‘.
bands, firestops, roof braces and/or all the supports listed above. Maxi-
mum spacing between components providing lateral support is 8 ft (See
11
sheets S-2, S-3,and S-5).
— 4- �� Because of thermal expansion problems,only one of these support meth-
3 FT. ods should be used for a vertical installation.For example:Do Not use both
' \ a ceiling support and a roof support for the same chimney.
1 ) OBSERVE CLEARANCE TO COMBUSTIBLE MATERIAL AND SLOPE
FOR CONNECTOR OR SMOKE PIPE
Fig.4 RULES FOR CHIMNEY The connector or smoke pipe is the sheet metal pipe between the appliance
HEIGHT ABOVE THE ROOF and the chimney. Different types of fuels and appliances have different
CHOOSING YOUR HEATING APPLIANCE connector clearances to combustible walls and ceilings.These clearances
There are three important rules for selecting a woodburning stove, fire- will be shown in the appliance instructions.
place or heater. Whatever clearances and connector arrangements are shown in the appli-
ance instructions,must be followed rather than the arbitrary 18 inch dimen-
FIRST Look for a label or nameplate attached to the appliance which bears sion.This is important if tests have shown that more than 18 inches clear-
the mark or name of a well-known safety testing organization* or labora- ance is necessary, or if the location of the stove or heater necessitates
tory. more clearance.See Fig.5.
SECOND Don't buy an appliance which is bigger than necessary. Combustible materials include such things as framing lumber, plywood,
THIRD Look or ask for complete installation, operating and mainte- drywall (sheet rock, plaster board, lath and plaster, gypsum board) and
nance instructions for the appliance. If you can't get these, buy one that also furniture and curtains. Building insulation of any kind, including batts,
gives you all these very important details. foams, boards and especially loose fill cellulose fiber, must also be kept
away from the chimney in the same manner as combustible materials.
*Such as Underwriters' Laboratories, Inc. or Intertek Testing Services. �,
APPLIANCE SAFETY If.,
Use Locking51
Be sure to follow all details of the instructions for your solid fuel burning Bands at Every—��t e' Minimum
appliance. You should give preference to the purchase of an appliance Joint "s; f Clearance
which either has a label or includes detailed instructions showing all re- %i % z
quired clearances to floor and walls. If necessary, these clearances may Ei E
be reduced by use of a tested and"Listed"(by UL,for example)protection El f.Ei
ISZ
system,or by one of the methods described in NFPA Standard 211. \, 1 f l J
For the chimney connector, the appliance instructions take prece- X 'si f X
deuce over the 18 inch clearance shown in these instructions (or in See Note j� x
building codes).The 18 inch minimum clearance dimension applies only if Below `Ceilin Support
there is no other information for the connector. Follow A \ppliance (FSP)(CSP)g pp
Instructions For
When protecting walls or ceilings from the heat of a connector, be sure to Clearance. If Dripless Smoke
leave at least a 1 inch ventilated air space between the protection material 18t Given, Use Pipe Adapter
and combustible construction. It is ineffective and possibly dangerous to (DSA or DSAC)
apply ordinary brick,or any similar dense material directly to a wood framed
ce
wall for the purpose of reducingsafe clearances. • Instru•
Folloctions
bonApps or
P P Instructions For
EACH SOLID FUEL APPLIANCE SHOULD HAVE ITS OWN CHIMNEY I Clearance. If
Connector(Or Not Given, Use
• Stoves of air-tight or controlled combustion design may be difficult to Smoke Pipe) / - 18"
operate if some other appliance is connected to the same chimney. Drip-Free Cap on Cleanout Tee
* Open front, freestanding or built-in fireplaces may need all the draft NOTE:The purpose of the diagonal arrows is to show that the 18 inch clearance DOES NOTAPPLYto the
produced by a minimum height of chimney. Interconnecting them or their vertical connector entering a Finish Support.This support is actually tested with a bare vertical
chimney with another appliance may be prohibited by their instructions and connector and must pass theULtestswithveryhotgasesentenngthebaresinglewallpipe.
may cause smoking problems. FIG.5 CONNECTOR CLEARANCES
*Never connect a gas-burning appliance into a chimney for any woodburning
stove,heater or fireplace.This is extremely dangerous because a chimney Passing a bare smoke pipe or connector of a wood burning appliance through
blocked with creosote (or anything else) may cause the connected gas a combustible stud wall is not recommended,as the entire inside of the wall
appliance to produce poisonous carbon monoxide. must be cut away to get 18 inch clearance(usually at least a 40 inch circle).
• For these and other reasons, don't ever inter-connect your solid fuel Wherever possible,locate the Selkirk Chimney to avoid penetrating a wall with
appliance with anything else, not even another solid fuel appliance.There a single wall connector.Besides following the appliance instructions for con-
are simply too many things that can go wrong if you do. nectors,other rules for solid fuel appliance connectors are:
GENERAL INSTALLATION INSTRUCTIONS 1.Never enclose vertical single wall pipe,even at 18 inches clearance.
A correct easily-maintained chimney installation has five important parts: 2. Never run it through ceilings or floors, or windows.
1. Proper support, both vertical and lateral,with access for inspection and 3. Don't use single wall pipe outdoors.
maintenance. 4.Always secure all single wall pipe joints with at least 3 screws.
2.Adequate clearance to combustible materials for single wall connector 5. Obtain proper attachment parts for the appliance end and for the entry
or smoke pipe. to the chimney.See the Selkirk Chimney System catalog for the proper
3.AIR SPACE clearance of 2 inches for insulated chimney parts. size Dripless Smoke Pipe Adapter(DSA)or(DSAC),or Chimney Pipe Adap-
4.All vertical intermediate ceiling or floor penetrations completely framed tor(CPA).
and firestopped with specified chimney parts. 6. Locate and support the connector to avoid accidental contact or dam-
5.All connector and chimney joints completely secured against unlocking age.
with three screws or with locking bands. See diagram for screw location. 7. Caps or plugs for tees should be secured against falling out and de-
signed so signed so they can't leak creosote or rain.
8. Heavy weight single wall pipe lasts longer. Use 24 gauge if possible.
Vertical chimneys may be supported in these ways: 9. Porcelain enamel is the best high temperature protective finish but re-
1. Ceiling Support with all chimney stacked above.See sheet S-1. quires careful handling and may be difficult to assemble securely except in
2.Roof Support,with one or more lengths suspended below and with total a vertical position and could produce noxious odors if overheated.
height limits depending on factors such as roof pitch and height.See sheet 10.Galvanized steel pipe is no better than plain black or painted steel
S-4.
because the galvanized zinc coating is ineffective once it has been over- Mall Attic Insulation
heated. Shield(AIS)
11.Operating Operating the stove, heater or fireplace when the connector is red hot Attic
is very dangerous.This indicates overfiring or a chimney fire. Stop firing,
close the dampers,let things cool off,and keep watching for problems on
nearby walls and furnishings. GA
VA
12.The slope of the horizontal portion of a connector of 1/4 inch per foot is Cl CA Maximum
sometimes a building code requirement.This slope will have little effect on r) VA Insulation
safety or appliance operation. If the connector is vertical, it should be Nail Flanges va Height 10"
GA
installed with the crimped end down. If it can be sloped between the stove To Framing (1 r'I Above Framing
VGA
and chimney, use 45 degree one piece leakproof elbows (such as the \ rA VA
corrugated type), and try to maintain sufficient slope so that any conden- rA va Ti
sate liquid runs back toward the appliance.To keep liquids from coming out 1 3 r1 1
connector joints,the small (or crimped)end should always be down-or
toward the stove or fireplace. vA va
CLEARANCES FOR SELKIRK CHIMNEY SYSTEM INSULATED 1 rA v? !
PIPE
Selkirk
All insulated Selkirk Chimney Systems'gas-carrying chimney parts Chimney Fire Stop/Joist Shield(JS)
are marked with important safety information confirming minimum Section
airspace clearance to combustibles. This minimum airspace clear- FIG 6 FIRE STOP/JOIST SHIELD(JS)USED
ance to combustibles is important in order to keep combustible mate- WITH ATTIC INSULATION SHIELD
rials from overheating and creating a fire hazard.Never fill required If the enclosure is exterior, without penetration of the building enclosure,
airspace with insulation or even non-combustible material,since such wall bands should be used to provide the necessary lateral stability.
actions could cause overheating.If you are uncertain about a particu- Regardless of the benefits of the exterior enclosure, better chimney and
lar installation,contact Selkirk at the number referenced at the end appliance operation will be obtained if the chimney is located entirely inside
of these instructions. the heated part of the building (except of course for the part above the
roof).
Such parts as Fire Stops and ceiling supports are intended to be attached Enclosures of ordinary wood framing with gypsum drywall or plywood
directly to the framing or to ceiling,or floors.These auxiliaries,which are in walls may be built only in one and two-family dwellings. For other types of
contact with wood or other combustibles, are designed and tested to buildings, multiple occupancies or high rise construction, additional fire
assure that they do not overheat at points of contact. resistance is required for enclosures as follows:
A factory-built chimney that extends through any zone above that on which
The instruction sheets for individual parts and the table on the back page the connected appliance is located is to be provided with an enclosure
give proper framing dimensions,which in turn define the proper clearance. having a fire resistance rating equal to or greater than that of the floor or
Wherever these instructions illustrate the use of a required spacer or fire roof assemblies through which it passes.
stop, the purpose of the part is to maintain and assure the proper clear-
ance. Even with a fire resistance rated enclosure,the use of Fire Stops at
every floor level is recommended to stabilize the chimney and to retard
Remember that the most important clearance requirement is that it must be possible fire spread external to the chimney.
AIR SPACE.
FIRESTOPPING
ENCLOSURE:Interior or exterior residential chimneys should be enclosed (See Also Sheet S-2)
where they extend through closets, storage areas, or habitable spaces A fire stop is any part of the building structure which prevents the spread of a
where the surface of the chimney could be contacted by persons or fire or circulation of air.Where a Selkirk Chimney System is enclosed and
combustible materials. The space between the enclosure and chimney framed at 2"clearance,a Firestop/Joist Shield(JS)or Fire Stop/Wall Spacer
should be at least the required 2"minimum airspace clearance to combus- (WS)is the proper firestop to use at every floor.Part"JS"may be used with all
tibles.(SEE SHEET S-2 FOR PROPER USE OF FIRESTOPS IN AN ENCLO- Selkirk Chimney System models. Part"WS"may be used only with Model
SURE). Enclosures may be built of ordinary drywall or plywood at the
required minimum of 2 INCHES AIR SPACE CLEARANCE.While properly SSII.
installed firestops or supports help maintain the necessary clearances to If the enclosure or space around the chimney is larger than usual, or
combustibles at ceilings or joist areas,there are no special parts to maintain irregular in shape, attach galvanized metal plates 28 gauge or heavier all
clearance to inside surfaces of walls or enclosures;therefore, the builder around the edges of the Fire Stop/Joist Shield(JS)or Firestop/Wall Spacer
and the chimney installer should take all necessary precautions to assure (WS)as necessary.These should be wide enough so that when installed,
that this 2 inch minimum clearance or more is maintained. the gap is closed to vertical air circulation around the chimney and the pipe
is securely spaced and centered.
In unoccupied attics, it is very important to be sure that blown-in or other
insulation does not come in contact with the chimney.A full enclosure built For firestopping to be fully effective,all ceiling and floor penetrations should
in the attic should extend to the roof;however,it need only be finished well be fully framed and closed on all four vertical sides. This framing helps
enough to keep insulation and stored furnishings away from the chimney. delay horizontal spread of fire and controls unnecessary horizontal air
If a full enclosure is not built,an Attic Insulation Shield(AIS)MUST be used. leakage through intermediate floors.
See Fig.6.
CHIMNEY JOINT SECURITY
A chimney enclosure is also highly recommended for any outdoor,exterior- All Selkirk chimney joints must be reinforced with either of 2 choices:
mounted chimney located outside of the building wall.This enclosure can 1. Locking Bands (LB). These are furnished with pipe and elbows.
be helpful in reducing internal condensation, creosote build-up and metal or
deterioration. Also the enclosure, by protecting the chimney from cold 2. Stainless steel sheet metal screws (3 minimum)per joint,these are an
outdoor temperatures, may improve draft and appliance operation. optional extra.
At the upper end of this outdoor enclosure,the chimney should be flashed The stainless steel sheet metal screws, size #8 x 1/2" must be evenly
with the flashing/storm collar termination shown in Sheet S-3. spaced around the joint and 1/2 inch above the joint separation. Before
installing either the screws or the Locking Band, the joint should be
which combine with expelled moisture to form creosote. The creosote
;7 V vapors condense in the relatively cool chimney flue of a slow-burning fire.
4+ 6. As a result,creosote residue accumulates on the flue lining.When ignited,
Enclosure— 4 r,
e+ G: this creosote makes an extremely hot fire.
�i
v;-2= Minimum Clearance
Back-Up ,; elkirk Chirrtiiey With coal which can burn with a smoky fire,this smoke also condenses in
Strip ,ripe Y; the chimney to form soot.
�C1:1/
The chimney should be inspected at least once every 2 weeks during the
;; V. heating season to determine if a creosote or soot buildup has occurred.
;i G: If creosote or soot has accumulated, it should be removed to reduce the
�; risk of chimney fire.
‘- ;' y'
Ceiling %) t"��Fire Stop/Joist t Creosote causes many problems.Some are visible while others are not. It
Shield(JS)
2"Minimum Clearance =1-2("•; can make trouble if:
•Sidewall material may be N Enclosure•, 1. It runs down the outside of the pipe to damage the finish on the
more readily supported using Dry Wall, metal.
back-up strips at upper and Plywood, Etc. 2. It drips out of joints,damaging floors or furnishings.
lower ends of an enclosure. 3.It plugs up the chimney to cause poor combustion,smoking,soiling walls
FIG 7 FIRE STOP/JOIST SHIELD(JS)WITH and indoor air pollution.
FULL ENCLOSURE 4. It catches fire in the chimney to cause possible chimney damage and
securely twist locked together.The diagram,Fig.8,illustrates these points. damage to your home.
Screws or locking bands are needed to prevent accidental disengagement If you see deposits more than 1/16 inch thick,clean all of the chimney parts
during chimney cleaning, and to reinforce the chimney whenever it is mechanically. This means using brushes, scraping or equivalent. Don't
outdoors, along walls, or above the roof. start a chimney fire!With only slight deposits,try a hot fire to see if the black
deposits change to light ash or fall down the chimney. You can hear the
sound of falling deposits when temperature conditions are right.After-
wards reinspect the chimney and the inside of the appliance for deposits.
Female End-Outer Wall Do not use chemical cleaners,they may corrode the inside of the chimney.
They may or may not prevent or remove creosote. When they are used
,/ Use Minimum 3 Screws together with a hot fire, it is probably the fire that is doing the work.
%r' / Per Joint Depending on the rate of buildup, as you learn what is going on in the
, chimney, you can adjust your cleaning schedule.
Use 1/8"Drill Here for If you have any doubts about your ability to clean the chimney, or if the
011*�� 8 x 1/2" deposits are very heavy and hard to remove, call a professional chimney
FIG 8 DRILLING ,/ Stainless Steel Screw sweep. Do not try to burn them off.
DIAGRAM !
(Close up,Cross-Section/' 1/2 inch It doesn't matter how careful you are with loading, fuel wood selection or
of Chimney Joint) 7� draft control, you should observe the above precautions with any wood
�� stove or chimney installation.
/—Male End-Outer Wall CHIMNEY FIRES AND WHAT TO DO ABOUT THEM
CAUTION: Do Not Drill Your Selkirk Chimney System is not intended or designed for use as a
e More Than o Deep combustion or fire chamber.It is very easy to over fire your woodbuming appliance
1 with kindling,scrap lumber,brush or any fast burning fuel.This can produce
flames and high temperatures all the way up the chimney,and may cause
chimney damage.
Warning:The chimney pipe and its fittings must be assembled with metal-to-
If you see your appliance or the smoke pipe glowing red, you are risking
metal joints as furnished.Do not use tape or any sealing compound(such as chimney damage,or a fire.The creosote may be burning inside the chim-
tar, mastic, putty or silicone)at the outer joints. Sealers in the joints may ney.If you see flames coming out the top,you are either overfiring or there
cause the insulation to accumulate moisture and will cause corrosion or freez-
is a chimney fire.
ing failures.
CAUTION:DO NOT USE SELKIRK CHIMNEY SYSTEM PIPE WITH DAM- If the fire in your heater has gotten out of control, or if you suspect a
AGED ENDS chimney fire for any reason, follow these steps:
Both the inner and outer pipe must join properly to avoid leakage and
accidental disengagement. Slight eccentricity of the inner pipe will not 1. Immediately close all dampers and/or air entrance openings to your
affect operation provided that the joint goes together completely. Minor appliance.This includes doors on Franklin type stoves. Block off fireplace
dents or irregularity of the outer pipe will not have any perceptible effect on openings.
temperature safety. 2.Alert your family to the possible danger.
CHIMNEY OPERATION AND MAINTENANCE 3. Inspect your appliance and chimney surroundings for possible fire. If in
The need for chimney maintenance depends on the kind of appliance and doubt, alert your fire department.
4. Do not continue to use your appliance until it and your chimney have
how it is operated.Gas and oil-burning appliances may need very little,but been thoroughly inspected.Overheating can cause metal parts to expand,
wood and coal-burning appliances may need a great deal of chimney buckle and crack. If you are not certain, have a qualified heating person
maintenance.Open front fireplaces without doors usually dilute their smoke disassemble all parts so they can be inspected and replaced.
with large amounts of air.Thus the buildup of chimney deposits is generally 5. Do not use salt or water on the fire in your appliance. Salt is corrosive
very low. "Air tight" or controlled draft wood stoves and heaters produce and water will cause a dangerous steam explosion.You might be able to
dense smoke if they are loaded for long duration or overnight fires,and can control the fire by using ashes, sand or baking soda,since baking soda is
rapidly produce heavy, thick creosote deposits. It is possible, by having a an ingredient used for dry chemical fire extinguishers.
short duration daily hot fire,to burn off these deposits or prevent them from 6.After a chimney fire, when it is safe to do so, check internal locations
building up to dangerous levels.This takes skillful operation and an appre- such as the attic and under the roof and keep watching for two or three
ciation of how to get the correct temperature. hours.There may be delayed smoldering and subsequent ignition,even if
CREOSOTEAND SOOT FORMATION AND NEED FOR REMOVAL the fire inside the chimney has been controlled.
When wood is burned slowly, it produces tar and other organic vapors,
FRAMING DIMENSIONS FOR SELKIRK CHIMNEY SYSTEMS
TO MAINTAIN 2 INCH AIR SPACE CLEARANCE
CHIMNEY SIZE:(Inside Diem.) 5" 6" 7" 8" 10" 12" 14"
TYPE HT TYPE HT TYPE HT TYPE HT TYPE HT TYPE HT TYPE HT
CEILING OR FINISH SUPPORT" 11-1/4"X11-1/4" 12-1/4"X12-1/4" 13-1/4"X13-1/4" 14-1/4"X14-1/4" 16-1/4"X16-1/4" 18-1/4"X18-1/4" 20-1/4"X20-1/4
CEILING PENETRATIONS" 11"X 11" 12"X 12" 13"X 13" 14"X 14" 16"X 16" 18"X 18" 20"X 20"
FLOOR OPENINGS" .. 44 <,
ROOF OPENINGS" 44 44 .. 46 44 44 «
WALL OPENINGS' 44 44 44 44 44 46 <. •
*All framing dimensions may be up to 1/2"more, but not less than the above values.Check support dimensions before using.
MAXIMUM HEIGHT(OR LENGTH)OF CHIMNEY FOR SUPPORTS
SIZE
5", 6", 7", 8" 10", 12", 14"
FEET OF FEET OF
SUPPORT TYPE PART NO. CHIMNEY CHIMNEY
ANCHOR PLATE AP 85 85
FINISH OR CEILING SUPPORT FSP,CSP 50 50
INSULATED TEE IT 50 40
WALL SUPPORT KIT WSK 50 40
ROOFSUPPORT(A) RSP 30 30
INTERIORRESUPPORT IR 18 18
SUPPORT BOX SB 20 —
NOTE: (A) 20 feet of chimney may be suspended below a roof support with all
joints securely threaded, using locking bands or screws
CHIMNEY PIPE LENGTH SELECTOR CHART
Pipe Length 6 9 12 18 24 36 48 Pipe Length 6 9 12 18 24 36 48
Total Installed Height 43/4 71 103/4 163/4 223/4 343/4 46/ Total !retailed Height 43 744 103/4 161 223/4 3414 4614
Ft. In. Inches NUMBER OF CHIMNEY PIPE SECTIONS Ft. In. Inches NUMBER OF CHIMNEY PIPE SECTIONS
—43/4 43/4 1 9 2 1/4 110 1/4 1 2
—7 3/4 73/4 1 9 81/4 1161/4 1 2
—103/4 103/4 1 10 81/4 128 1/4 1 2
1 1/2 121/2 1 1 9 7 115 1 3
1 43/4 163/4 1 10 1 121 1 3
1 61/2 181/2 1 1 10 7 127 1 3
1 10 3/4 22 3/4 1 11 81/4 1401/4 3
1 11 1/4 231/4 1 1 1 12 7 151 1 3
2 103/4 34 3/4 1 13 1 157 1 3
2 11 1/4 351/4 1 1 1 13 7 163 1 3
3 31/2 391/2 1 1 14 7 175 1 3
3 61/2 421/2 1 1 11 7 139 4
3 9 1/2 451/2 1 1 12 11 3/4 1553/4 1 4
3 10 3/4 46 3/4 1 13 53/4 161 3/4 1 4
4 21/4 501/4 1 1 1 15 7 187 4
4 31/2 511/2 1 1 16 11 3/4 203 3/4 1 4
4 31/2 511/2 1 1 17 5 3/4 209 3/4 1 4
4 61/2 541/2 1 1 18 5 3/4 221 3/4 1 4
4 91/2 571/2 1 1 14 5 3/4 173 3/4 5
5 31/2 631/2 1 1 16 41/2 1961/2 1 5
5 91/2 691/2 1 1 19 5 3/4 233 3/4 5
5 91/2 691/2 2 21 4 1/2 2561/2 1 5
6 91/2 811/2 1 1 22 4 1/2 2681/2 1 5
7 21/4 861/4 1 2 17 41/2 2081/2 6
7 8 1/4 921/4 1 2 19 3 1/4 231 1/4 1 6
7 81/4 921/4 1 2 23 4 1/2 280 1/2 6
7 91/2 931/2 2 25 31/4 3031/4 1 6
8 81/4 1041/4 1 2 26 31/4 3151/4 1 6
0015110-0712