Loading...
Baatz-Northampton-EP BinderM.D.P.U. No. 1468 Canceling M.D.P.U. No. 1320 Sheet 104 of 170 STANDARDS FOR INTERCONNECTION OF DISTRIBUTED GENERATION Exhibit A ATTACHMENT 2 Certificate of Completion for Simplified Process Interconnections Installation Information:Check if owner-installed Interconnecting Customer Name (print): _____________________________________________ Contact Person: ________________________________________________________________ Mailing Address: _______________________________________________________________ City: ________________________________State: ________________ Zip Code: __________ Telephone (Daytime): __________________ (Evening): ________________________________ Facsimile Number: ____________________ E-Mail Address: ___________________________ Address of Facility (if different from above): Electrical Contractor’s Name (if appropriate): ________________________________________ Mailing Address: _______________________________________________________________ City: ________________________________State: ________________ Zip Code: __________ Telephone (Daytime): __________________ (Evening): ________________________________ Facsimile Number: ____________________ E-Mail Address: ___________________________ License number: _________________________ Date of approval to install Facility granted by the Company: _______________________ Application ID number: ______________________________ Inspection: The system has been installed and inspected in compliance with the local Building/Electrical Code of (City/County) Signed (Local Electrical Wiring Inspector, or attach signed electrical inspection): Name (printed): ________________________________________________________________ Date: ___________________ License # ________________________ M.D.P.U. No. 1468 Canceling M.D.P.U. No. 1320 Sheet 105 of 170 STANDARDS FOR INTERCONNECTION OF DISTRIBUTED GENERATION Exhibit A As a condition of interconnection you are required to send/fax a copy of this form along with a copy of the signed electrical permit to (insert Company’s name below): Name: _____________________ Company: __________________ Mail 1:_____________________ Mail 2:_____________________ City, State ZIP: ______________ Fax No.: ___________________ 01/05/2023 Alera Group, Inc. Webber & Grinnell Division 8 North King Street Northampton MA 01060 Kathy Parker (413) 586-0111 (413) 586-6481 kparker@webberandgrinnell.com Pioneer Valley PhotoVoltaics Cooperative, Inc. Attn: Kim Pinkham 311 Wells Street, Suite B Greenfield MA 01301 Ohio Casualty/Liberty 24074 Ohio Security/Liberty 24082 Continental Indemnity/AUW 28258 CL231519687 A BKS57072282 01/01/2023 01/01/2024 1,000,000 300,000 15,000 1,000,000 2,000,000 2,000,000 B BAS57072282 01/01/2023 01/01/2024 1,000,000 Underinsured motorist 300,000 A 10,000 USO57072282 01/01/2023 01/01/2024 5,000,000 5,000,000 C N 375928710105 01/01/2023 01/01/2024 1,000,000 1,000,000 1,000,000 A Commercial Property BKS57072282 01/01/2023 01/01/2024 Blanket BPP $1,483,977 Transportation $25,000 Installation $75,000 Worker's compensation includes MA and NY Proof of Insurance SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. INSURER(S) AFFORDING COVERAGE INSURER F : INSURER E : INSURER D : INSURER C : INSURER B : INSURER A : NAIC # NAME:CONTACT (A/C, No):FAX E-MAILADDRESS: PRODUCER (A/C, No, Ext):PHONE INSURED REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. OTHER: (Per accident) (Ea accident) $ $ N / A SUBR WVD ADDL INSD THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $ $ $ $PROPERTY DAMAGE BODILY INJURY (Per accident) BODILY INJURY (Per person) COMBINED SINGLE LIMIT AUTOS ONLY AUTOSAUTOS ONLY NON-OWNED SCHEDULEDOWNED ANY AUTO AUTOMOBILE LIABILITY Y / N WORKERS COMPENSATION AND EMPLOYERS' LIABILITY OFFICER/MEMBER EXCLUDED?(Mandatory in NH) DESCRIPTION OF OPERATIONS belowIf yes, describe under ANY PROPRIETOR/PARTNER/EXECUTIVE $ $ $ E.L. DISEASE - POLICY LIMIT E.L. DISEASE - EA EMPLOYEE E.L. EACH ACCIDENT EROTH-STATUTEPER LIMITS(MM/DD/YYYY)POLICY EXP(MM/DD/YYYY)POLICY EFFPOLICY NUMBERTYPE OF INSURANCELTRINSR DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) EXCESS LIAB UMBRELLA LIAB $EACH OCCURRENCE $AGGREGATE $ OCCUR CLAIMS-MADE DED RETENTION $ $PRODUCTS - COMP/OP AGG $GENERAL AGGREGATE $PERSONAL & ADV INJURY $MED EXP (Any one person) $EACH OCCURRENCEDAMAGE TO RENTED $PREMISES (Ea occurrence) COMMERCIAL GENERAL LIABILITY CLAIMS-MADE OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: POLICY PRO-JECT LOC CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) CANCELLATION AUTHORIZED REPRESENTATIVE ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved. CERTIFICATE HOLDER The ACORD name and logo are registered marks of ACORD HIREDAUTOS ONLY The Commonwealth of Massachusetts Department of Industrial Accidents 1 Congress Street, Suite 100 Boston, MA 02114-2017 www.mass.gov/dia Workers’ Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Legibly Name (Business/Organization/Individual):______________________________________________________ Address:__________________________________________________________________________ City/State/Zip:_____________________________ Phone #:________________________________ *Any applicant that checks box #1 must also fill out the section below showing their workers’ compensation policy information.†Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such.‡Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees, they must provide their workers’ comp. policy number. I am an employer that is providing workers’ compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:____________________________________________________________________________ Policy # or Self-ins. Lic. #:__________________________________________ Expiration Date:____________________ Job Site Address: City/State/Zip:______________________ Attach a copy of the workers’ compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152, §25A is a criminal violation punishable by a fine up to $1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a day against the violator. A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct. Signature: Date: Phone #: Official use only. Do not write in this area, to be completed by city or town official. City or Town: ___________________________________ Permit/License #_________________________________ Issuing Authority (circle one): 1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector 6. Other ______________________________ Contact Person:_________________________________________ Phone #:_________________________________ Type of project (required): 7. New construction 8. Remodeling 9. Demolition 10 Building addition 11. Electrical repairs or additions 12. Plumbing repairs or additions 13. Roof repairs 14. Other____________________ 1. I am a employer with _________employees (full and/or part-time).* 2. I am a sole proprietor or partnership and have no employees working for me in any capacity. [No workers’ comp. insurance required.] 3. I am a homeowner doing all work myself. [No workers’ comp. insurance required.] † 4. I am a homeowner and will be hiring contractors to conduct all work on my property. I will ensure that all contractors either have workers’ compensation insurance or are sole proprietors with no employees. 5. I am a general contractor and I have hired the sub-contractors listed on the attached sheet. These sub-contractors have employees and have workers’ comp. insurance.‡ 6. We are a corporation and its officers have exercised their right of exemption per MGL c. 152, §1(4), and we have no employees. [No workers’ comp. insurance required.] Are you an employer? Check the appropriate box: J-Box INV #1 UTILTIY XMFR 120/240V, 1PHASE INVERTER INTEGRATED DC DISCONNECT INTERNET CONNECTION (EXISTING LAN) D 1 CBA 2 21 - MODULES / 21 - OPTIMIZERS STRING (1) = 10 OPTIMIZERS STRING (2) = 11 OPTIMIZERS ARRAY & STRING SIZING NOTES: ·MIN (8) MODULES PER STRING, (6) IF USING P505 OR S500B ·MAX (14) MODULES PER STRING (6000 WATTS DC) ·IF THE ARRAY AND STRINGS ARE SPLIT BETWEEN MULTIPLE ROOF PLANES. USE EXTRA ROOF BOXES/CONDUITS TO JOIN ROOF PLANES/STRINGS AS NEEDED. ·KEEP MIN NUMBER OF MODULES WITHIN EACH STRING WITHIN 90° AZIMUTH OF EACH OTHER. ·DO NOT EXCEED THE MAXIMUM DC POWER PER STRING AND INVERTER. 3 POINT OF SOLAR INTERCONNECTION SOLAR PV UTILITY ACCESSIBLE RAPID SHUTDOWN DISCONNECT 3 E F 4 G EXISTING EQUIPMENT NEW EQUIPMENT OUTSIDE - ON ROOF INSIDE - BASEMENT UTILITY SPACE OUTSIDE - HOUSE WITHIN 10' OF METER OUTSIDE - BUILDING SERVICEINSIDE - BASEMENT UTILITY SPACE POINT OF COMMON COUPLING TO UNIT 18A UNIT 18B METER #1551026681 M M UTILITY METER 40A-2P LOADS LOADS LOADS MAIN LOAD CENTER 200A-2P 200A-2P INVERTER GRID TRIP SETTINGS FREQUENCY & VOLTAGE - IEEE 1547-2018 and UL 1741 SB TRIP FUNCTIONS PICKUP RANGE CLEARING TIMES Under Frequency (81U)< 56.5 Hz 0.16 Under Frequency (81U)< 58.5 Hz 300 Over Frequency (81O)61.2 Hz < f <62.0Hz 300 Over Frequency (81O)> 62.0 Hz 0.16 Under Voltage (27)< 50% of Nom.1.1 Under Voltage (27)50% <V< 88% of Nom.3 Over Voltage (59)110% <V< 120% of Nom.2 Over Voltage (59)≥ 120% of Nom.0.16 INTERCONNECTION CALCULATIONS ITEM VALUE POWER PHASE 1 Phase NOMINAL GRID VOLTAGE (V)240 INVERTER(S) MAX CONTINUOUS AC OUTPUT CURRENT PER PHASE (A)31.67 TOTAL MAX AC OUTPUT CURRENT WITH CON. USE (*1.25%)(A)39.58 INVERTER(S) INTERCONNECTION OCPD USED (A)40 MAIN OCP DISCONNECT (A)200 *MAIN PANEL BUSS AMPACITY (A)200 NEC ALLOWABLE (PANEL BUSS) BACKFEED AMPS AT 120% (A)40 *LOAD SIDE BREAKER INTERCONNECTION (IN MAIN LOAD CENTER) SYSTEM OVERVIEW 8.505 kW - DC SOLAR 7.6 kW - AC SOLAR EQUIPMENT (21) Hanwha Q Cell 405 BLK Q PEAK DUO G10+ (21) SolarEdge S440 [Alt.Opti, P505, S440, S500, S440, S500B] (1) SolarEdge 7.6kW HD-Wave w/ RGM UTILITY / AHJ / CODE: NGrid Jurisdiction Of Northampton 2023 NEC CONDUCTOR SCHEDULE & CALCULATIONS KEY DESCRIPTION QTY CONDUCTORS CONDUIT COND (A)TERM (A)REQ'D (A)OCP LENGTH VDROP% 1 DC - OPTIMIZER TO JBOX (PV SOURCE)4 #10 - PV WIRE/USE-2 90°C (CU) FREE AIR 32A 40A 13.29A 15A 100ft 0.69% EGC 1 #6 - BARE WIRE (CU) 2 DC - JBOX TO INVERTER 4 #10 - THHN/THWN-2 90°C (CU) .75" - EMT 32A 40A 13.29A 15A 100ft 0.69% EGC 1 #10 - THHN/THWN-2 90°C (CU) 3 AC - INVERTER OUTPUT 2 #8 - THHN/THWN-2 90°C (CU) .75" - EMT 55A 50A 39.59A 40A 50ft 1.03%EGC 1 #10 - THHN/THWN-2 90°C (CU) NEUTRAL 1 #8 - THHN/THWN-2 90°C (CU) 4 AC - SERVICE CONDUCTORS 2 #4/0 - XHHW/THWN 75°C (AL) CABLE - SER 180A 180A 166A 200A 15ft 0.25%EGC 1 #4 - XHHW/THWN 75°C (AL) NEUTRAL 1 #4/0 - XHHW/THWN 75°C (AL) EQUIPMENT SCHEDULE KEY QTY DESCRIPTION DATA / MAKE / MODEL A 21 SOLAR MODULE Hanwha , Hanwha Q Cell 405 BLK Q PEAK DUO G10+, Q.Peak DUO BLK ML-G10+ 405, 405-Watts, 45.34V-Voc, 11.17A-Isc, (53.95V-Calculated Voc) B 21 POWER OPTIMIZER SolarEdge S440 [Alt.Opti, P505, S440, S500, S440, S500B] C 2 ARRAY MOUNTED JUNCTION BOX SOLADECK, NEMA-3R, ROOF JUNCTION BOX (2 STRING), 0799-5B D 1 SOLAR INVERTER SolarEdge 7.6kW HD-Wave w/ RGM, 1 Phase, 240V, 32A, 7.6kW AC (on grid) Max E 1 SOLAR, UTILITY ACCESSIBLE, RAPID SHUTDOWN DISCONNECT SqD, DU222RB, 60A, 240V, NON-Fusible, NEMA-3R (Outdoor), 2P, General Duty, Disconnect F 1 MAIN LOAD PANEL EXISTING: 1PHASE, 120/240V, 200A MLO (EATON) NEED: (1) Eaton, BR240, 40A, double pole breaker G 1 UTILITY SERVICE METER EXISTING: 1PHASE, 120/240V, 200A/200A, UG GENERAL NOTES ALL (DC/AC) CONDUCTORS TO BE 600V MIN. RATED UNLESS OTHERWISE NOTED. ARRAY ELECTRICAL BONDING THROUGH LISTED RACKING GROUNDING SYSTEM. SOLAR PV EQUIPMENT CONNECTED TO SERVICE GROUNDING ELECTRODE SYSTEM INSTALLATION SUBJECT TO CHANGE BASED ON FIELD CONDITIONS INSTALLATION SUBJECT TO AHJ APPROVAL WIRE AND CONDUIT SIZES SHOULD BE ADJUSTED FOR VOLTAGE DROP/RISE AS NEEDED. TOTAL VOLTAGE DROP/RISE FOR SERIES CONNECTED WIRING (PV TO POINT OF INTERCONNECTION) SHOULD BE LESS THAN: (DC < ~2%) (AC < ~1.25%) MAX RATE OF POWER EXPORT TO THE POCC IS LIMITED BY THE TOTAL INVERTER(S) AC RATING ALL UTILITY EQUIPMENT AND CUSTOMER DISCONNECTING MEANS WILL BE 24/7 UTILITY ACCESSIBLE, LOCKABLE, GROUPED WITH ANY METERING AND LOCATED OUTSIDE. LABELS / VALUES PHOTOVOLTAIC DC DISCONNECT MAX DC SYSTEM VOLTS 480 OPERATING DC VOLTS 400 OPERATING DC AMPS (@INV)21.26 PHOTOVOLTAIC AC DISCONNECT RATED AC OUTPUT CURRENT 31.67 NOMINAL AC OPERATING VOLTAGE 240 311 WELLS STREET, SUITE B GREENFIELD, MA 01301 WWW.PVSQUARED.COOP 413-772-8788 SIZE: PV SQUARED SOLAR SCALE: DATE: BY: REV: PROJECT: CLIENT: SITE: BAATZ NORTHAMPTON BARBARA BAATZ ERIC BAATZ 117 OLANDER DR #18B NORTHAMPTON, MA 01060 0 7/24/2023 ROBIN CREAMER ELECTRICAL SINGLE LINE NO SCALE 11x17 PV-E1 BREAKING THE 20 % EFFICIENCY BARRIER Q.ANTUM DUO Z Technology with zero gap cell layout boosts module efficiency up to 20.9 %. THE MOST THOROUGH TESTING PROGRAMME IN THE INDUSTRY Q CELLS is the first solar module manufacturer to pass the most comprehen- sive quality programme in the industry: The new “Quality Controlled PV” of the independent certification institute TÜV Rheinland. INNOVATIVE ALL-WEATHER TECHNOLOGY Optimal yields, whatever the weather with excellent low-light and temperature behavior. ENDURING HIGH PERFORMANCE Long-term yield security with Anti LID Technology, Anti PID Technology1, Hot-Spot Protect and Traceable Quality Tra.Q™. EXTREME WEATHER RATING High-tech aluminum alloy frame, certified for high snow (5400 Pa) and wind loads (4000 Pa). A RELIABLE INVESTMENT Inclusive 25-year product warranty and 25-year linear performance warranty2. 1 APT test conditions according to IEC / TS 62804-1:2015, method A (−1500 V, 96 h) 2 See data sheet on rear for further information. THE IDEAL SOLUTION FOR: Rooftop arrays on residential buildings Q.PEAK DUO BLK ML-G10+ 385-405 ENDURING HIGH PERFORMANCE 76.4 in 1940 mm 43.3 in 1100 mm 48.0 in 1220 mm 1656 lbs 751 kg 24 24 32 α [% / K]+0.04 β [% / K]−0.27 γ [% / K]−0.34 NMOT [°F]109 ± 5.4 (43 ± 3 °C) Hanwha Q CELLS America Inc. 400 Spectrum Center Drive, Suite 1400, Irvine, CA 92618, USA | TEL +1 949 748 59 96 | EMAIL inquiry@us.q-cells.com | WEB www.q-cells.us [V]1000 (IEC) / 1000 (UL)Class II [A DC]20 TYPE 2 [lbs/ft2]75 (3600 Pa) / 55 (2660 Pa) −40 °F up to +185 °F (−40 °C up to +85 °C)[lbs/ft2]113 (5400 Pa) / 84 (4000 Pa) 3 See Installation Manual 385 390 395 400 405 [W]385 390 395 400 405 [A]11.04 11.07 11.10 11.14 11.17 [V]45.19 45.23 45.27 45.30 45.34 [A]10.59 10.65 10.71 10.77 10.83 [V]36.36 36.62 36.88 37.13 37.39 [%]≥ 19.6 ≥ 19.9 ≥ 20.1 ≥ 20.4 ≥ 20.6 [W]288.8 292.6 296.3 300.1 303.8 [A]8.90 8.92 8.95 8.97 9.00 [V]42.62 42.65 42.69 42.72 42.76 [A]8.35 8.41 8.46 8.51 8.57 [V]34.59 34.81 35.03 35.25 35.46 53' 40' HC CertifiedUL 61730 MECHANICAL SPECIFICATION Format 74.0 in × 41.1 in × 1.26 in (including frame)(1879 mm × 1045 mm × 32 mm) Weight 48.5 lbs (22.0 kg) Front Cover 0.13 in (3.2 mm) thermally pre-stressed glass with anti-reflection technology Back Cover Composite film Frame Black anodized aluminum Cell 6 × 22 monocrystalline Q.ANTUM solar half cells Junction Box 2.09-3.98 in × 1.26-2.36 in × 0.59-0.71 in (53-101 mm × 32-60 mm × 15-18 mm), IP67, with bypass diodes Cable 4 mm² Solar cable; (+) ≥ 49.2 in (1250 mm), (−) ≥ 49.2 in (1250 mm) Connector Stäubli MC4; IP68 Note: Installation instructions must be followed. See the installation and operating manual or contact our technical service department for further information on approved installation and use of this product. Specifications subject to technical changes © Q CELLS Q.PEAK DUO BLK ML-G10+_385-405_2021-05_Rev01_NAELECTRICAL CHARACTERISTICS POWER CLASS MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS, STC1 (POWER TOLERANCE +5 W / −0 W)MinimumPower at MPP1 PMPP Short Circuit Current1 ISC Open Circuit Voltage1 VOC Current at MPP IMPP Voltage at MPP VMPP Efficiency1 η MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS, NMOT2 MinimumPower at MPP PMPP Short Circuit Current ISC Open Circuit Voltage VOC Current at MPP IMPP Voltage at MPP VMPP 1Measurement tolerances PMPP ± 3 %; ISC; VOC ± 5 % at STC: 1000 W/m2, 25 ± 2 °C, AM 1.5 according to IEC 60904-3 • 2800 W/m², NMOT, spectrum AM 1.5 Q CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE At least 98 % of nominal power during first year. Thereafter max. 0.5 % degradation per year. At least 93.5 % of nominal power up to 10 years. At least 86 % of nominal power up to 25 years. All data within measurement toleranc- es. Full warranties in accordance with the warranty terms of the Q CELLS sales organisation of your respective country.Typical module performance under low irradiance conditions in comparison to STC conditions (25 °C, 1000 W/m²) TEMPERATURE COEFFICIENTS Temperature Coefficient of ISC Temperature Coefficient of VOC Temperature Coefficient of PMPP Nominal Module Operating Temperature PROPERTIES FOR SYSTEM DESIGN Maximum System Voltage VSYS PV module classification Maximum Series Fuse Rating Fire Rating based on ANSI / UL 61730 Max. Design Load, Push / Pull3 Permitted Module Temperature on Continuous DutyMax. Test Load, Push / Pull3 NA DETAIL A 0.63" (16 mm) 0.33" (8.5 mm)0.96" (24.5 mm) 42.8" (1088 mm) 74.0" (1879 mm) 4 × Mounting slots (DETAIL A) Frame 41.1" (1045 mm) 39.2" (996 mm) 1.26" (32 mm) 8 × Drainage holes 15.6“ (395.5 mm) 4 × Grounding points ø 0.18" (4.5 mm) Label ≥49.2" (1250 mm) ≥49.2" (1250 mm) EN RELATIVE EFFICIENCYCOMPARED TO NOMINAL POWER [%]YEARS Q CELLSIndustry standard for linear warranties* *Standard terms of guarantee for the 10 PV companieswith the highest production capacity in 2014 (as at: September 2014) 100 95 90 85 80 155 2520010 98 86 200 400 600 800 1000 110 100 90 80RELATIVE EFFICIENCY [%]IRRADIANCE [W/m²] QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION UL 61730, CE-compliant, Quality Controlled PV - TÜV Rheinland, IEC 61215:2016, IEC 61730:2016, U.S. Patent No. 9,893,215 (solar cells), QCPV Certification ongoing. Horizontal packaging pallets pallets modules INVERTERSsolaredge.com Optimized installation with HD-Wave technology Specifically designed to work with power optimizers Built-in module-level monitoring Optional: Faster installations with built-in consumption metering (1% accuracy) and production revenue grade metering (0.5% accuracy, ANSI C12.20) Record-breaking 99% weighted efficiency Quick and easy inverter commissioning directly from a smartphone using the SolarEdge SetApp Fixed voltage inverter for longer strings UL1741 SA certified, for CPUC Rule 21 grid compliance Integrated arc fault protection and rapid shutdown for NEC 2014, NEC 2017 and NEC 2020 per article 690.11 and 690.12 Small, lightweight, and easy to install both outdoors or indoors Single Phase Inverter with HD-Wave Technology for North America SE3000H-US / SE3800H-US / SE5000H-US / SE6000H-US / SE7600H-US / SE10000H-US / SE11400H-US 12-25 YEARWARRANTY MODEL NUMBER SE3000H-US SE3800H-US SE5000H-US SE6000H-US SE7600H-US SE10000H-US SE11400H-US APPLICABLE TO INVERTERS WITH PART NUMBER SEXXXXH-XXXXXBXX4 OUTPUT Rated AC Power Output 3000 3800 @ 240V3300 @ 208V 5000 6000 @ 240V5000 @ 208V 7600 10000 11400 @ 240V10000 @ 208V VA Maximum AC Power Output 3000 3800 @ 240V3300 @ 208V 5000 6000 @ 240V5000 @ 208V 7600 10000 11400 @ 240V10000 @ 208V VA AC Output Voltage Min.-Nom.-Max. (211 - 240 - 264)Vac AC Output Voltage Min.-Nom.-Max. (183 - 208 - 229)----Vac AC Frequency (Nominal)59.3 - 60 - 60.5(1)Hz Maximum Continuous Output Current @240V 12.5 16 21 25 32 42 47.5 A Maximum Continuous Output Current @208V -16 -24 --48.5 A Power Factor 1, Adjustable - 0.85 to 0.85 GFDI Threshold 1 A Utility Monitoring, Islanding Protection, Country Configurable Thresholds Yes INPUT Maximum DC Power @240V 4650 5900 7750 9300 11800 15500 17650 W Maximum DC Power @208V -5100 -7750 --15500 W Transformer-less, Ungrounded Yes Maximum Input Voltage 480 Vdc Nominal DC Input Voltage 380 400 Vdc Maximum Input Current @240V(2)8.5 10.5 13.5 16.5 20 27 30.5 Adc Maximum Input Current @208V(2)-9 -13.5 --27 Adc Max. Input Short Circuit Current 45 Adc Reverse-Polarity Protection Yes Ground-Fault Isolation Detection 600k Sensitivity Maximum Inverter Efficiency 99 99.2 % CEC Weighted Efficiency 99 99 @ 240V98.5 @ 208V % Nighttime Power Consumption < 2.5 W (1) For other regional settings please contact SolarEdge support (2) A higher current source may be used; the inverter will limit its input current to the values stated SE3000H-US / SE3800H-US / SE5000H-US / SE6000H-US/ SE7600H-US / SE10000H-US / SE11400H-US Single Phase Inverter with HD-Wave Technology for North America MODEL NUMBER SE3000H-US SE3800H-US SE5000H-US SE6000H-US SE7600H-US SE10000H-US SE11400H-US ADDITIONAL FEATURES Supported Communication Interfaces RS485, Ethernet, ZigBee (optional), Cellular (optional) Revenue Grade Metering, ANSI C12.20 Optional(3)Consumption metering Inverter Commissioning With the SetApp mobile application using Built-in Wi-Fi Access Point for Local Connection Rapid Shutdown - NEC 2014, NEC 2017 and NEC 2020, 690.12 Automatic Rapid Shutdown upon AC Grid Disconnect STANDARD COMPLIANCE Safety UL1741, UL1741 SA, UL1699B, CSA C22.2, Canadian AFCI according to T.I.L. M-07 Grid Connection Standards IEEE1547, Rule 21, Rule 14 (HI) Emissions FCC Part 15 Class B INSTALLATION SPECIFICATIONS AC Output Conduit Size / AWG Range 1'' Maximum / 14-6 AWG 1'' Maximum /14-4 AWG DC Input Conduit Size / # of Strings / AWG Range 1'' Maximum / 1-2 strings / 14-6 AWG 1'' Maximum / 1-3 strings / 14-6 AWG Dimensions with Safety Switch (HxWxD)17.7 x 14.6 x 6.8 / 450 x 370 x 174 21.3 x 14.6 x 7.3 / 540 x 370 x 185 in / mm Weight with Safety Switch 22 / 10 25.1 / 11.4 26.2 / 11.9 38.8 / 17.6 lb / kg Noise < 25 <50 dBA Cooling Natural Convection Operating Temperature Range -40 to +140 / -40 to +60(4)˚F / ˚C Protection Rating NEMA 4X (Inverter with Safety Switch) (3) Inverter with Revenue Grade Meter P/N: SExxxxH-US000BNC4; Inverter with Revenue Grade Production and Consumption Meter P/N: SExxxxH-US000BNI4 . For consumption metering, current transformers should be ordered separately: SEACT0750-200NA-20 or SEACT0750-400NA-20. 20 units per box(4) Full power up to at least 50˚C / 122˚F; for power de-rating information refer to: https://www.solaredge.com/sites/default/files/se-temperature-derating-note-na.pdf Single Phase Inverter with HD-Wave Technology for North America SE3000H-US / SE3800H-US / SE5000H-US / SE6000H-US/ SE7600H-US / SE10000H-US / SE11400H-US How to Enable Consumption Monitoring By simply wiring current transformers through the inverter's existing AC conduits and connecting them to the service panel, homeowners will gain full insight into their household energy usage helping them to avoid high electricity bills © SolarEdge Technologies, Inc. All rights reserved. SOLAREDGE, the SolarEdge logo, OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies, Inc. All other trademarks mentioned herein are trademarks of their respective owners. Date: 12/2020/V01/ENG NAM. Subject to change without notice. solaredge.com Power Optimizer For North America S440 / S500B / S650B PV power optimization at the module level Specifically designed to work with SolarEdge residential inverters Detects abnormal PV connector behavior, preventing potential safety issues Module-level voltage shutdown for installer and firefighter safety Superior efficiency (99.5%) Mitigates all types of module mismatch loss, from manufacturing tolerance to partial shading Faster installations with simplified cable management and easy assembly using a single bolt Flexible system design for maximum space utilization Compatible with bifacial PV modules Meets NEC requirements for arc fault protection (AFCI) and Photovoltaic Rapid Shutdown System (PVRSS) POWER OPTIMIZER 25 YEAR WARRANTY © SolarEdge Technologies, Ltd. All rights reserved. SOLAREDGE, the SolarEdge logo, OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies, Inc. All other trademarks mentioned herein are trademarks of their respective owners. Date: April 3, 2023 DS-000018-NA. Subject to change without notice. Power Optimizer For North America S440 / S500B / S650B S440 S500B S650B INPUT Rated Input DC Power(1) 440 500 650 W Absolute Maximum Input Voltage (Voc) 60 125 85 Vdc MPPT Operating Range 8 – 60 12.5 – 105 12.5 – 85 Vdc Maximum Short Circuit Current (Isc) of Connected PV Module 14.5 15 Adc Maximum Efficiency 99.5 % Weighted Efficiency 98.6 % Overvoltage Category II OUTPUT DURING OPERATION (POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER) Maximum Output Current 15 Adc Maximum Output Voltage 60 80 Vdc OUTPUT DURING STANDBY (POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR INVERTER OFF) Safety Output Voltage per Power Optimizer 1 ± 0.1 Vdc STANDARD COMPLIANCE Photovoltaic Rapid Shutdown System NEC 2014, 2017 & 2020 EMC FCC Part 15 Class B, IEC61000-6-2, IEC61000-6-3 Safety IEC62109-1 (class II safety), UL1741 Material UL94 V-0, UV Resistant RoHS Yes Fire Safety VDE-AR-E 2100-712:2013-05 INSTALLATION SPECIFICATIONS Maximum Allowed System Voltage 1000 Vdc Dimensions (W x L x H) 129 x 155 x 30 / 5.07 x 6.10 x 1.18 129 x 165 x 45 / 5.07 x 6.49 x 1.77 mm / in Weight 720 / 1.6 790 / 1.74 gr / lb Input Connector MC4(2) Input Wire Length 0.1 / 0.32 m / ft Output Connector MC4 Output Wire Length (+) 2.3, (-) 0.10 / (+) 7.54, (-) 0.32 m / ft Operating Temperature Range(3) -40 to +85 ˚C Protection Rating IP68 / NEMA6P Relative Humidity 0 – 100 % (1) Rated power of the module at STC will not exceed the power optimizer Rated Input DC Power. Modules with up to +5% power tolerance are allowed. (2) For other connector types please contact SolarEdge. (3) Power de-rating is applied for ambient temperatures above +85°C / +185°F for S440, and for ambient temperatures above +75°C / 167°F for S500B. Refer to the Power Optimizers Temperature De-Rating Technical Note for more details. PV System Design Using a SolarEdge Inverter SolarEdge Home Wave/Hub - Single Phase Three Phase for 208V Grid Three Phase for 277/480V Grid Minimum String Length (Power Optimizers) S440 8 10 18 S500B, S650B 6 8 14 Maximum String Length (Power Optimizers) 25 50(4) Maximum Nominal Power per String 5700 6000 12750 W Maximum Allowed Connected Power per String(5) (In multiple string designs, the maximum is permitted only when the difference in connected power between strings is 1,000W or less) SE6000H: 5700 SE7600H and above: 6000 One string: 7200 15000 W Two strings or more: 7800 Parallel Strings of Different Lengths or Orientations Yes (4) A string with more than 30 optimizers does not meet NEC rapid shutdown requirements; safety voltage will be above the 30V requirement. (5) If the inverters rated AC power ≤ maximum nominal power per string, then the maximum power per string will be able to reach up to the inverters maximum input DC power. Refer to the Single String Design Guidelines Application Note for more details. (6) It is not allowed to mix S-series and P-series Power Optimizers in new installations. S440 (Flat Bracket) S500B, S650B (Bent Bracket)