4 NORTH MAIN ST 4 NORTH MAIN ST WB-2023-0083
Map:Block:Lot: COMMONWEALTH OF M SSACHUSETTS
340010J000000540
Permit: Alts Renovations TOWN OF WILLI SBURG
Repair Williamsburg
PERSONS CONTRACTING WITH UNREGI TERED CONTRACTORS
DO NOT HAVE ACCESS TO THE GUARA TY FUND (MGL c.142A)
BUILDING PERMIT
Permit# WB-2023-0083 PERMISSION S HEREBY GRANTED TO:
Project# ROOF 2023 Contractor: License:
PEAK.PERFORMAN U E ROOFING
Est. Cost: 49130 LLC CS-103061
Const.Class: Exp.Date: 09/21/202'
Use Group: Owner:
Lot Size (sq.ft.)
Zoning: Applicant: PEAK P RFORMANCE ROOFING LLC
Applicant Address Phone: Insurance:
1 LOVEFIELD ST 413-203-5888 R2WC342657
EASTHAMPTON, MA 01027
ISSUED ON: 07/20/2023
TO PERFORM THE FOLLOWING WORK:
STRIP AND REROOF
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter: Footings:
Rough: Rough: House# Foundation:
Driveway Final: Final: Final: Rough Frame:
Gas: Fire Department Fireplace/Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Certificate of Occupancy Signature:
el • >2 .
II
Fees Paid: $70.00
212 Main Street,Phone(413)587-1240,Fax: 1413)587-1272
Louis Hasbrouck—Building Commis.ioner
DocuSign Envelope ID:748E6439-0D15-4388-A6DF-F03D78D29B1 04/(,&dif 9Z(N
The Commonwealth of Mas:ach etts✓G Vik/
TOWN of WILLIAM ; 10 �0
c' Massachusetts State Building Code( 80 CMR) 4 ition
Building Permit Application for any Building other than a O • „st o-Fam<Dw ling
(This Section For Official Use Only) 04, tis
Building Permit Number:2 r3 g3 Date Applied: Building Inspector: 47,/� ri
SECTION 1:LOCATION(Please indicate Block#and Lot#for locations for which a street address o}ava'.able)
4 N Main St. Williamsburg 01096 Fir on•re•ational h.r .
No.and Street City/Town Zip Code Name of Building(if applicable)
SECTION 2:PROPOSED WORK
If New Construction check here 0 or check all that apply in the two rows below
Existing Building 0 Renovation Of Alteration 0 Addition 0 Demolition 0 (Please fill out and submit Appendix 1)
Change of Use 0 Change of Occupancy 0 Other OiSpecify: roofing
Are building plans and/or construction documents being supplied as part of the permit application? Yes 0 No 0
Is an Independent Structural Engineering Peer Review required? Yes 0 No 0
Brief Description of Proposed Work:
Strip and replace asphalt roof.
SECTION 3:COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATION,ADDITION,OR
CHANGE IN USE OR OCCUPANCY
Check here if an Existing Building Evaluation is enclosed(See 780 CMR 3402.0, 0
Existing Use Group(s): Proposed Use Group(s):
Existing Hazard Index 780 CMR 34: Proposed Hazard Index 780 CMR 34:
SECTION 4:BUILDING HEIGHT AND AREA
Existing Proposed
No.of Floors/Stories(include basement levels)&Area Per Floor(sq.ft.)
Total Area(sq.ft.)and Total Height(ft.)
SECTION 5:USE GROUP(Check as applicable)
A: Assembly A-1 0 A-2r 0 A-2nc 0 A-3 0 A-4 0 A-5 0 B: Business 0 E: Educational 0
F: Factory F-1 0 F2❑ H: High Hazard H-1 0 H-2 0 H-3 0 H-4 0 H-5 0
I: Institutional I-1 0 I-2❑ I-3 0 I-4 0 M: Mercantile 0 R: 1 esidential R-10 R-2 0 R-3 0 R-4 0
S: Storage S-1 0 S-2 0 U: Utility 0 Spe al Use 0 and please describe below:
Special Use:
SECTION 6:CONSTRUCTION TYPE(Check as applicable)
IA 0 IB ❑ IIA ❑ IIB 0 IIIA ❑ IIIB ❑ IV 0 VA 0 VB 0
SECTION 7:SITE INFORMATION(refer to 780 CMR 111.0 for details on each item)
Water Supply: Flood Zone Information: Sewage Disposal: Trench Permit Debris Removal:
Public 0 Check if outside Flood Zone CIIndicate municipal 0 A trench will not be Licensed Disposal Site 0
d
Private 0 or indentify Zone: or on site system 0 ae i t i 0 or trench or specify:
perr mit is enclosed 0 _
Railroad right-of-way: Hazards to Air Navigation: MA Historic Commission Review Process:
Not Applicable 0 Is Structure within airport approach area? Is their review completed?
or Consent to Build enclosed 0 Yes 0 or No 0 Yes 0 No 0
SECTION 8:CONTENT OF CERTIFICATE OF OCCUPANCY
Edition of Code: Use Group(s): Type of Construction: Occupant Load per Floor:
Does the building contain an Sprinkler System?: Special Stipulations:
DocuSign Envelope ID:748E6439-0D15-4388-A6DF-F03D78D29B1 E
ACTIVITY DESCRIPTION OTY RATE AMOUNT
8. Complete all necessary(lashings including new LIFETIME pipe boots and
base flashing around chimney.
Remove all debris from premises, and throughout the job, continue cleanup and
keep the premises undamaged. WE ARE NOT RESPONSIBLE FOR DEBRIS
THAT MAY FALL INTO ATTIC/INTERIOR.
Please use reasonable caution during the installation process: do not walk or
drive under active work or on areas of potential roofing debris. Installations are
weather permitting; inclement weather will cause scheduling delays.
Peak Performance Roofing LLC will obtain the building permit.
Warranty confirmation shall be provided upon final payment. Installation and
manufacturer warranties are not in effect until Paid In Full.
Includes CertainTeed Lifetime Limited Warranty (Transferable) with 10 year
SureStart period.
https://www.certainteed.com/resources/Asphalt_Warranty CTR3782 1912 E.pdf
AREA 1=$19,450
AREA 2=$29,680
TOTAL: $49,130
A one-third deposit of $16,376 will secure contract, permitting, material order,
and priority scheduling.
The balance shall be due upon completion, within 10 days of invoice. Accounts
outstanding over 30 days subject to 2%finance charge monthly.
TOTAL $49,130_00
DocuSIgned by:
UVU/. (PGSt 6/30/2023
—9DFF39CD32EC4D8
Accepted By ...
Accepted Date
DocuSign Envelope ID:748E6439-0D15-4388-A6DF-F03D78D29B1E
SECTION 9: PROPERTY OWNER AUTHORIZATION
Name and Address of Property Owner
First Congregational Church 4 North Main St. Wil iamsburg 01096
Name(Print) No.and Street City/ own Zip
Property Owner Contact Information:
do Linda West - - 413522-45 5 burgychurch a(�gmail.com
Title Telephone No.(business) Telephone . (cell) e-mail address
If applicable,the property owner hereby authorizes
James J._Flannery 1 Lovefield St. E tham ton MA 01027
Name Street Address C ty/Town State Zip
to act on the property owner's behalf,in all matters relative to work authorized by this building permit application.
SECTION 10:CONSTRUCTION CONTROL(Please fill out Appendix 2)
(If building is less than 35,000 cu.ft.of enclosed space and/or not under Construction Control then check here Mand skip Section 10.1)
10.1 Registered Professional Responsible for Construction Control
Name(Registrant) Telephone No. e-mail address Registration Number
Street Address City/Town State Zip Discipline Expiration Date
10.2 General Contractor
Peak Performance Roofing LLC
Company Name:
James J. Flannery CS-103061 Unrestricted Exp. 09/21/2024
Name of Person Responsible for Construction License No. and Type if Applicable
1 Lovefield St. Easthampton MA 01027
Street Address City/Town State Zip
413-203-5888 508 294-4052 PeakPerformanceRoofingLLCc cjmail.com
Telephone No.(business) Telephone No. (cell) e-mail address
SECTION 11:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152.§ 25C(6))
A Workers'Compensation Insurance Affidavit from the MA Department of Industrial Accidents must be completed and
submitted with this application. Failure to provide this affidavit will result ir the denial of the' suance of the building permit.
Is a signed Affidavit submitted with this application? Yes g No ❑
SECTION 12:CONSTRUCTION COSTS AND PERMIT FEE
Item Estimated Costs:(Labor
and Materials) Total Conrtr tion Cost(from Item 6)=$
1.Building $ 49130 Building Permit Fee=Total Constructio• "i st x r.ert here
2.Electrical $ appr priate municipal fact,r) `:7 .
3.Plumbing $
4.Mechanical (HVAC) $ Note:M' ' um fee=$ (conta municipality)
5.Mechanical (Other) $ Enclose check ayable to
6.Total Cost $ 49130 (contact municipa ity)and write check number here "4 - -
SECTION 13:SIGNATURE OF BUILDING PERMIT APPLICANT
By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this
application is true and accurate to the best of my knowledge and understandin .
James J. Flannery cam ffannerit Contract r 413.203-5888 6/21/2023
Please print and sign name Title Telephone No. Date
1 Lovefield St. Easthampton MA 01027
Street Address City/Town State Zip
e.
Municipal Inspector to fill out this section upon application approval: ______/ -7-)61-ZOZ3
Name Date
DocuSign Envelope ID:748E6439-0D15-4388-A6DF-F03D78D29B1E
Appendix 1
For the demolition of structures the building code requires action on service connections.
CHECK IF NOT APPLICABLE
780 CMR 112.0 DEMOLITION OF STRUCTURES
112.1 Service Connections. Before a building or structure is demolished or removed, the owner or
agent shall notify all utilities having service connections within the structure such as water, electric,
gas, sewer and other connections. A permit to demolish or remove a building or structure shall not be
issued until a release is obtained from the utilities, stating that their respective service connections
and appurtenant equipment, such as meters and regulators, have been removed or sealed and
plugged in a safe manner. All debris shall be disposed of in accordance with 780 CMR 111.5.
Please fill in the information below and submit this appendix with the building permit
application. The building permit applicant attests under the pains and penalties of perjury that
the following is true and accurate.
Property Location (Please indicate Block # and Lot # for locations for which a street address is not
available)
No. and Street City/Town Zip Name of Building(if applicable)
For the above described property the following action was taken:
Water Shut Off? Yes 0 No 0 Provider notified and Release obtained? Yes 0 No 0
Gas Shut Off? Yes 0 No 0 Provider notified and Release obtained? Yes 0 No 0
Electricity Shut Off? Yes 0 No 0 Provider notified and Release obtained? Yes 0 No 0
Yes 0 No 0 Provider notified and Release obtained? Yes 0 No 0
Other (if applicable)
Yes 0 No 0 Provider notified and Release obtained? Yes 0 No 0
Other(if applicable)
DocuSign Envelope ID:748E6439-0D15-4388-A6DF-F03D78D29B1 E
The Roofing Process : What to Expect
When will my roof be scheduled? Once the contract, deposit, and building permit
are all in place, we can proceed with installing your roof. Roofing is hazardous and the safety of
our crew is a priority. We must work around the weather forecast; here in New England, this
means we can't plan our schedule very far in advance, and can't promise specific installation
dates. Long stretches of inclement weather will cause delays. We appreciate your flexibility and
patience in our dealings with Mother Nature!
Your project manager will contact you a few days before they wish to proceed. Our crews are
hardworking and efficient; most residential installations take only 1-2 days to install.
Do I need to do anything to prepare? As noted on your contract, we are not
responsible for dirt/debris that may fall into the attic. Depending on the condition of the
plywood, you may see little to no debris, or it could be more substantial. If you store items in the
attic, we recommend covering with plastic sheeting.
Do I need to notify my neighbors? If your home is extremely close to other homes
or driveways, there's a possibility we may need to be on their property temporarily to lay
protection or collect debris. In this case, yes, please notify your neighbors. Otherwise, it is a
courtesy. Your neighbors will likely appreciate notification of the noise/traffic.
Materials and Dumpster Delivery: The materials and dumpster may arrive the day
before the scheduled installation (especially if your installation is taking place on a weekend).
Depending on your home's layout and driveway(s), we may need vehicles moved at this point.
Parking: On the day of the installation, we ask that you move ALL vehicles out of ALL
driveways, and away from the house, to avoid any damage, and for our access.
How early will you start? Our crews will begin as early as 7.30am. They will work a
long day, often until dark if necessary. We aim to have the installation completed in as few days
as possible to minimize disruption to you and your neighbors.
Do I need to be home? It's up to you. Some customers like to keep an eye on what's
going on. Others would rather not be home because of the noise. Be aware that roofing is loud
(banging, nail guns, etc) so you may need to make arrangements for residents, tenants or pets.
Please do not plan on outdoor activities while we are working, for safety's sake. Please keep
pets inside, or on a leash away from the roofing activities.
DocuSign Envelope ID:748E6439-0D15-4388-A6DF-F03D78D29B1 E
What if I have an urgent question? If you have an urgent issue outside of regular
office hours, call or text your project manager directly on his cell.
Unforeseen Issues: Once we remove the existing roofing, we can inspect the underlying
sheathing. Your contract states we will replace a small amount of plywood at no additional cost
if needed. If more serious issues are found, the project manager will contact you to explain.
There may need to be an upcharge on the final bill, consistent with the per sheet or square foot
amount quoted in your estimate.
Cleanup: No way around it, roofing is messy work. Rest assured that when the job is done,
we will pickup all debris and do magnetic sweeps. Since we may work until dark, the main crew
may need to leave before cleaning up, or if the job ends midday, they may leave to start another
job. Another staff person will come later or the next day for more cleaning.
There are materials left over. Did I get charged for those?
Your job is priced according to the measurements. We always bring extra material for the
jobsite, just to be safe. You were not charged for those and we will be collecting them. One of
our staff will pick up the extra material after the installation crew is gone, usually within 1-2 days.
When will the dumpster be removed? The dumpster is usually removed the next
business day after the main crew has finished. Weekends or holidays may delay pickup.
The dumpster company should check for any debris after removal, but please do a visual check
before walking or driving over the area where the dumpster was located. If you see any debris
there, please let us know.
The job is done but I have concerns, what should I do?
Please be aware that even after the main installation crew has left, that doesn't mean our job is
done. The project manager will be coming by as soon as possible to do a final inspection, and a
staff person will come by to do a final sweep, and pickup leftover items. Depending on our
schedule, all of the final touchups, cleaning & pickups are usually completed in about 1-3 days
after main installation is complete. If you have any other questions, please let us know.
Thank you for choosing Peak Performance Roofing!
We will do our very best to make this major home improvement a smooth experience for you!
DocuSigned by.
(jt/ A (ki f 6/30/2023
9DFF39CD32EC4D8 .
1 Lovefield St., Easthampton MA 01027
p E H:
,: • 413-203-5888 M-F 9am-4pm
P E R F O R �� =� CE
ROOFING peakperformanceroofingllc@gmaiLcom
DocuSign Envelope ID:748E6439-0D15-4388-A6DF-F03D78D29B1E
Peak Performance Roofing LLC
1 Lovefield St.
Easthampton, MA 01027
413-203-5888
peakperformanceroofingllc@gmail.com PER 1C
Q R C E
ROOFING
MA HIC#183698 MA CSL#103061
ADDRESS
First Congregational Church
ATTN: Linda West
4 North Main St.
Williamsburg, MA 01096
burgychurch@gmail.com
413-522-4545
10988 06/21/2023
JOB LOCATION
4 N. Main St.,Williamsburg
AC €r.W l M (,#``.].I.
Asphalt Peak Performance Roofing will provide the labor and materials to perform the 1 49,130.00 49,130.00
Commercial following:
SEE EMAIL FOR VISUAL.
1. Remove the existing roofing shingles.
2. Inspect the sheathing for any rot or deterioration. Any new plywood necessary
will be $60 per sheet installed. Any new roofing boards will be $6 per foot
installed. (Wood prices subject to change based on market fluctuations).
3. Install six feet of ice and water shield on eaves, three feet in any valleys, and
three feet around all penetrations.
4. Cover remaining roof with synthetic underlayment.
5. Install new 8" aluminum drip edge on all eaves and rake edges.
6. Install architectural shingles by CertainTeed:
Landmark PRO: COLOR TBD
https://www.certainteed.com/residential-roofing/products/landmark-pro/
7. Install Shingle Vent II ridge vent on peaks of roof (where applicable).
https://www.certainteed.com/residential-roofing/products/certainteed-ridge-vent-
12-filtered/
City of Northampton 212 Main Street, Northampton, MA 01060
Solid Waste Disposal Affidavit
In accordance of the provisions of MGL c 40, S54, I acknowledge that as
a condition of the building permit all debris resulting from the construction
activity governed by this Building Permit shall be disposed of in a properly
licensed solid waste disposal facility, as defined by MGL c 111 , S 150A.
Address of the work: 4 North Main St. , Williamsburg
The debris will be transported by: Aaron's 24/7 Towing and Roll-On
The debris will be received by: Valley Recycling
Building permit number:
Name of Permit Applicant Peak Performance Roofing LLC/James Flannery
7/3/2023 James Flannery aw\esament
Date Signature of Permit Applicant
The Commonwealth of Massa'husetts
►2=.g,, Department of Industrial Acc'dents
Liz 1 Congress Street, Suite 110
.4 _ Boston,MA 02114-201
www.mass.gov/dia
Workers'Compensation Insurance Affidavit:Builders/Co i tractors/Electricians/Plumbers.
TO BE FILED WITH THE PERMITTING . UTHORITY.
A 8 I licant Information Please Print Le.ibl
Name (Business/Organization/Individual): PEAK PERFORMANCE ROOFING, LLC
Address: 1 LOVEFIELD STREET
City/State/Zip:EASTHAMPTON, MA 01027 Phone #:413-203-5888
Are you an employer?Check the appropriate box: Type of project(required):
LID ID I am a employer with 4 employees(full and/or part-time).* 7. ❑New construction
?.❑I am a sole proprietor or partnership and have no employees working for me in 8. 0 Remodeling
any capacity.[No workers'comp.insurance required.]
3.0 I am a homeowner doing all work myself.[No workers'comp.insurance required.]t
9. El Demolition
10 Q Building addition
4.❑I am a homeowner and will be hiring contractors to conduct all work on my property. I will
ensure that all contractors either have workers'compensation insurance or are sole 11.❑Electrical repairs or additions
proprietors with no employees.
12.❑Plumbing repairs or additions
5.❑I am a general contractor and I have hired the sub-contractors listed on the attached sheet. 13.0 Roof repairs
These sub-contractors have employees and have workers'comp.insurance.t
6.❑We are a corporation and its officers have exercised their right of exemption per MGL c. 14.['Other
152,§1(4),and we have no employees.[No workers'comp.insurance required.]
*Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information.
t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such.
tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have
employees. If the sub-contractors have employees,they must provide their workers'comp.policy number.
I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site
information.
Insurance Company Name:BERKSHIRE HATHAWAY GUARD
Policy#or Self-ins.Lic.#:R2WC202869 Expiration Date:04/27/2024
5 North Main St. ty •p:Williamsburg, MA
Job Site Address:5 ..._... _-_ City/State/Zip:
9�
Attach a copy of the workers' compensation policy declaration page(show'ng the policy number and expiration date).
Failure to secure coverage as required under MGL c. 152, §25A is a criminal v'olation punishable by a fine up to$1,500.00
and/or one-year imprisonment,as well as civil penalties in the form of a STOP-WORK ORDER and a fine of up to$250.00 a
day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance
coverage verification.
I do hereby certify under the pains and penalties of perjuty that the information provided above is true and correct
Signature: James J Flannery Date: 7/3/2023
Phone#:413-203-5888
Official use only. Do not write in this area, to be completed by city or towns official.
City or Town: Permit/License#
Issuing Authority(circle one):
1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector
6.Other
Contact Person: Phone#:
et,,Amiiefvelt-etife:/e(
Office of Consumer Affairs and Business Regulation
1000 Washington Street- Suite 710
Boston, Massachusetts 02118
Home Improvement Contractor Registration
Type: LLC
Registration: 183698
PEAK PERFORMANCE ROOFING,LLC, Expiration, 11/03/2023
1 LOVEFIELD ST.
EASTHAMPTON,MA 01027
Update Address and Return Card
SCA 1 0 20.445,17
_/ rifot,i,//4
Office of Consumer Affairs a usIness'Fbagutatlert
HOME IMPROVEMENT CONTRACTOR Registration valid for individual use only
TYPE;LLC before the expiration date. If found return to:
Registration EXpiratiort Office of Consumer Affairs and Business Regulation
183698 11/03/2023 1000 Washington Street -Suite 710
iEAK PERFORMANCE ROOFING,LLC. Boston,MA 02118
JAMES FLANNERY
LOVEFIELD ST.
EASTHAMPTON,MA 01027 Undersecretary Not valid without signature
Commonwealth of Massachusetts
Division of Occupational Licensure
Board of Building Relations and Standards
Cons sSIANrvisor
CS-103061 445, E;t4,3ires: OW2112024
JAMES Ft f ;
-4
1 LOVEFIEL T
a 0
E.ASTHAMPTqN MA F
vok °
.4*
t*,4
.Tf
Ir.4%Ines te.r.<4 "we .12
1$.