Loading...
31B-285 (24) o "0, City of Northampton REQUIRED INSPECTIONS ti gA�!`'�- )► �. 1 . Footings and Walls � ,%yid r. s-�.� . J,- F T p "J' •'` BUILDING D_ .PARTMEN 2 • Structural Com onents in Place 3 . Complete Building No. 181 Office of the Building Inspector Date March 29, 19 89 BUILDING PERMIT THIS MAY CERTIFY THAT Oliver Iselin & Bob Reckman Insp. on Site — Foundations has permission to construct shell only 4556 sq. ft. Controlled Insp. of Plumbing — Rough Construction 127.0. Per ZBA Approval situated on 100 King Street Insp. of Plumbing — Finish provided that the person accepting this permit shall in every re- Insp. of Wiring — Rough spect conform to the terms of the application on file in this office, and to the provisions of the Statutes and the Ordinances relating Insp. of Wiring — Finish to the Construction, Maintenance and Inspection of Buildings in Insp. of Health (Septic Tanks) the City of Northampton. Any violation of any of the terms above noted is an immediate revocation of this permit. Expires six Building Insp. — Rough months from date. Building Insp. — Finish Note: A certificate of occupancy will be issued by this office upon return of this card signed by the Plumbing, Wiring and Building Smoke Detectors (Fire Dept.) Inspectors. Gas Inspection THIS CARD MUST BE DISPLAYED IN A CONSPIC OUS PL THE PREMISES Certificate of Occupancy Building Inspector � � PNINTnSNOP S ;; ; DEPT. OF BUILDING INSPECTIONS BUILDING `:j: 1! 212 Main Street � > Northampton, MA 01060 PERMIT JOB WEATHER CARD DATE 19 PERMIT NO. APPLICANT ADDRESS (NO.) (STREET) (CONTR'S LICENSE) NUMBER OF PERMIT TO (_) STORY DWELLING UNITS _. . (TYPE OF IMPROVEMENT) NO. (PROPOSED USE) ZONING AT (LOCATION) DISTRICT (ND.) (STREET) BETWEEN AND (CROSS STREET) (CROSS STREET) LOT SUBDIVISION LOT BLOCK SIZE 4 BUILDING IS TO BE FT. WIDE BY FT. LONG BY FT. IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS: L J AREA OR PERMIT VOLUME ESTIMATED COST $ FEE (CUBIC/SQUARE FEET) OWNER BUILDING DEPT. ADDRESS BY THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF. EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE AP- PROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL APPROVED PLANS MUST BE RETAINED ON JOB AND THIS WHERE APPLICABLE SEPARATE INSPECTIONS REQUIRED FOR CARD KEPT POSTED UNTIL FINAL INSPECTION HAS BEEN PERMITS ARE REQUIRED FOR ALL CONSTRUCTION WORK: ELECTRICAL, PLUMBING AND I. FOUNDATIONS OR FOOTINGS. MADE. WHERE A CERTIFICATE OF OCCUPANCY IS RE- MECHANICAL INSTALLATIONS. 2. PRIOR TO COVERING STRUCTURAL QUIRED,SUCH BUILDING SHALL NOT BE OCCUPIED UNTIL M (RE TO LATH). FINAL INSPECTION HAS BEEN MADE. 3. FININAALL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS 1 1 1 OTHER 2 2 WORK SHALL NOT PROCEED UNTIL THE INSPECTIONS INDICATED ON THIS CARD PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION INSPECTOR HAS APPROVED THE VARIOUS CAN BE ARRANGED FOR BY TELEPHONE STAGES OF CONSTRUCTION. WORK IS NOT STARTED WITHIN SIX MONTHS OF DATE THE OR WRITTEN NOTIFICATION. PERMIT IS ISSUED AS NOTED ABOVE. PINT P ti t l/� ;' "% DEPT. OF BUILDING INSPECTIONS BUILDING Z° �-(' ; .:;,•1!.* 212 Main Street o< 0C) ` Northampton, MA 01060 PERMIT io- 31B - 285 VALIDATION DATE March 29, t9 89. PERMIT O. 181 APPLICANT Oliver Iselin & Bob RecmagDDRESS 36 Service Centerd. u.�9073 (NO.) (STREET) (CONTR'S LICENSE) PERMIT TO New Buildin (X X (shellslroRY Office & Res .& Comm. NUMBER OF g DWELLING UNITS (TYPE OF IMPROVEMENT) NO. (PROPOSED USE) AT (LOCATION) 100 King Street ZONING LL1I DISTRICT lia (NO.) (STREET) BETWEEN AND (CROSS STREET) (CROSS STREET) LOT SUBDIVISION LOT _ BLOCK SIZE BUILDING IS TO BE FT. WIDE BY FT. LONG BY FT. IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) permit for the construction of the shell only for a new building to contain REMARKS: apartments WI LI)e Ltir'd fluur-, oifiLe bi.,aee orrti s eend floor, and a retail pet shop on the first floor. Per ZBA approval . Controlled construction 127.0 of the Mass. State Code. Shell AREA OR VOLUME a556 so ft ESTIMATED COST $ 225,000.00 Only FEEMIT $ 900.00 (CUBIC/SQUARE FEET) OWNER Alan Verson j BUILDING DE �� ADDRESS 508 Kennedy Rd , 1 PPrtc Macc n1n3 BYF., ,/,•le z WHITE - FILE COPY . GREEN - FIELD COPY • CANARY - APPLICANT COPY • PINK - ASSESSORS COPY P • " <• M CITY OF NORTHAMPTON VIII. ZONING PLAN EXAMINERS NOTES ,� • MASSACHUSETTS • DISTRICT —rAp� , iv„,l OFFICE of the INSPECTOR of BUILDINGS Ms1 `:.` . APPLICATION FOR �` Page r;?�� Plot USE ZONING PERMIT INSPECTOR BUILDING PERMIT FRONT YARD z IMPORTANT - Applicant to complete all items in sections: 1, II, Ill, IV, and IX. ' / 0 SIDE YARD SIDE YARD ,l°C le' ..a 3 fi. ZONING j�{� I. AT (LOCATION) ! DISTRICT REAR YARD LOCATION (NO.) (STREET) /(7 /► OF BETWEEN /�Lt.'fA14 a„ f/ AND 1[J �( "' NOTES BUILDING (CROSS STREET) ( 0S5 STREET) LOT SUBDIVISION , _ LOT BLOCK SIZE N II. TYPE AND COST OF BUILDING — All applicants complete Parts A — D • -A P3 A. TYPE OF IMPROVEMENT D. PROPOSED USE - For"Wrecking" most recent use r^ m 1 New building Residential Nonresidential 2 I I Addition(If residential, enter number 12 [ I One family 18 1 Amusement, recreational of new housing units added, i/ any, 13 I I Two or more family - Enter 19 Li Church, other religious IX. SITE OR PLOT PLAN — For Applicant Use in Part D, 13) number of units- - - - p 3 I I Alteration (See 2 above) 20 I Industrial ...: i•! •:N\•Nx.....■! .I 4 Repair, replacement 14 I Transient hotel, motel, 21 Li Parking garage n• s• = \.N•.Nx .\ I P P or dormitory - Enter number '•'i• ::s•••�• ss'x. ■ us■sx.. u•Nrus x•sS_ 5 of units - -� 22 I Service station, repair garage ....q•x••iili . s... ••� u....SrangSS.n.l:n' : ':' : !• mi• ! [ I Wrecking (1/multifamily residential, .•■N•Nr•N■ Nxo xxxxN•xN \• ■ x■•• •si: ... _ . enter number of units in building in 15 I Garage 23 L I Hospital, institutional Oules i•A■ •If■\• • .s • • • ur ■ . su•ux..0 = Part D, 13) r. ■::l:.u..a.::::::x:sN.xx•'I•l•■.." I' iii••I•i••::l: ixr!•! II ! 16I I Carport P .s••IIsl::\N•.s■ 24 O,fice, bank, professional it:iis'ins::aiiiii::�::::::aTeloxl I•N•: ••••: III:UU■■I•nuSuuuNNx55 • :N.I 6 I I Moving (relocation) 17 / 1 i' : N • xsll •iin::::::il•x■■■.:_ :::Ilnxx•I:S:: N um urns!■ a. ! : 7 I 1 Foundation only I Other - Spect y 25 Public utility •::■:::�:::•::::: ••: :!� _fSj : : 26 I School, library, other educational •SSSUU iSSUUS•,�'��•'i" lilt �is! �� ■■••n.•�■�■�■/ .SI.u:li lassie:l:xNxx+fii:::::::li .rN•••••_•! B. OWNERSHIP 27 I Stores, mercantile U. 11 •:.�.•r :!r�iil.•USSis■i.I.SUUS..i■N•..S.S..:! :::!••:: •N I i:::! : * iii• •.•.•.N•.•u •u ••S•::::•••■••••....":::11:::::::::a ! 8 I 1 Private (individual, corporation,ss i!'�.�.�i�aS l r .__u!u�u.a i •!x •! N •• .i:r• •• ' l. in p 28 Tanks, towers :::"ISiGN: ••••.••:f••S.Liii::■::•la hiss;■=:::"1:: :In": _ !••■ '•�••� : nonprofit institution, etc.) _- 29 Li Other - Specify ���t��� :::..•r••N■■r::■.:lr !E •l.�.q�_ N•x■x..........u...S..1.■•N■■■••NNN..... l:x.•r.■....N..S U..a.�:::::::::nwi. ....Nrr• •u• •=N•• • .•:::::: ���r■.•Si 9 [ I Publlocal (Federal, State, or r} �j pp •I• _ :::.x:i:N.::l.:••x.xs:■■.■_■ ..... local government) t 1"-'1 `J�jf r /� ,/`rJ��• N:i ::••:::.•'■n::l:iiaili•x «•::i:::I I:xx=i•:l1i\"4 Sni•:lfq :•.n: Mese!■x•I• C. COST (Omit cents) Nonresidential - Describe in detail proposed use of buildings, e.g., food N• ■ • .NN ■••• N■■ U.S.... S... • • N • - : SUUN�u:SSN/ . • .N■•N .■■: : suss\: ' processing plant, machine shop, laundry building at hospital, elementary .■ne N� �m�•• ■sr••:•.:rlsuu■.N■: •■•!�■���•�■�!!!■N•••N•.N.•x■ : W.• ].rti.'0 a school, secondary school, college, parochial school, parkinggarage for, ::NNiii..a.....e :•':l:::I:•:••.u::::l:::::::: •••••••:::•••I•••'ii:: •... : 10. Cost of improvement $�■iD, 9 9 .•N ■.•Ns•\.11.I••xuNl:: _ department store, rental office building, office building at industrial plant. sm. f•' i==.■-�i ' ::a= •:=:u•l•••u�3 .:N .:=±l.I•t:•ialilllli•Nuu: : III ! Illuu■•rN::l f' To be installed but not included If use of existing building is being changed, enter proposed use. N ■ .. • s•! .!!l S!: :Irmo G :i in the above cost 1 !•a. •• • x.■••• ll�u■■x a. Electrical f d• r!•si_i..u... s•■.0 N s!'•■=...a.......s.n.a. •srsxr■su:: lI = a //�/ r� 1 t. / (•(( 7 k ..US\.•M:::aseesee:l=.i::i•■!.••.••••.easei ••I ! :owe: IO {/ r c. `VAR �H/YI W��+ 1. /` - �"' " i•= :=•=.!••NNN:ii :�:'sjl•lNN.!!!:• il•:::lxsli!' :! :..• !x•' _ _ ■■ b. Plumbing .::::: :sa::::: .s.. •�\r! •:: ! .,...,,E N•N■.•xx■ •■N• SUI:p•.....SUS ::::11■N.xN\N x• • .r■ � � w �J. �' �� J r�ln.NN.i�... ! !_ !!••LL•_• !'�Si:i:=:l::Gi:l:::::lxls •=swl:a::l:l:.s !a•••SUS•=_•! ! g. g •SN.n: ::nl:Uri::.S.ap N' ::::r.:..n ; c. Heating, air conditioning ley( �T !_! !! • '•rr..••..•■■•....•*� ::••••!••••••! u. : I ::a: ••• a• d. Other (elevator, etc.) .ii .i sib':isr.�■■.�•••q�nnnin:•:•sOOOO::x• x.■.: .. l l -- - ::: : 1:■ ::Nw.\ .lase: . : •I : n , ; _ —) ••••! :::!!': !iqa • ' •' """::::::..:::::Ill... 11. TOTAL COST OF IMPROVEMENT $ t'- '3' • `j,,/th/ji ,// ;G'-'� !!aP •• � .�.� i.•:5:.••• ll....L.. ■N . x•N■! ✓ - ' , / I L_" - - �C Utz.!!S.'•.• x:UIll ::::.55 i:ll111sell::l:llN::a:::Y•;.LC:si s!s'N■:••.rt:::sass!!: l III. SELECTED CHARACTERISTICS OF BUILDING — For new buildings said additions, complete Parts -(_ /2��1 :z.::•Ii s= :::: ' Is•.l..s.s .S.:i....sa!•••! !:•'•`••! !!•••_ :••••!' • ■ i■i for wrecking, complete only Port J, for all others' skip to IV r� .a .. •. .. snn: n:iUN �•.. ■. . ■. •. ... ..Ss... I.■•II.I•I '' ... .. • . N • xa•..•.a.a...Nsii■N.!•.l.s.■II : a :...::::::::1 S■■■II . ■.a ... . . :: 1::::::::::::::!:: : • . , r . ■r.r. ■x•s •• • . \ _ •=•III• i I.! ! •r ! aN: a•••!'l::S•'■!• ! 1 I..■•I■rI E. PRINCIPAL TYPE OF FRAME G. TYPE OF SEWAGE DISPOSAL J. DIMENSIONS •S:su:lll!•Sa:.i. •i:r .• .• •• Url.. =::I .:S::i:! a M.• .. a !!:■If■■I•s:..i..i.a • : 48. Number of stories : ::l I:••:l::l alas : sa : ■••' : = less: :•l 30 17 Masonry (wall bearing) 40 Public or private company �i �i s• : a........0 _•�•••• • •sI• I • re: 49. Total square feet of floor area, !s!:!!! •'iiii sl:: :lli::l.:I::■:�•••• :N=.ul ! �s.l:s! a•Is s : i:s..I : 31 Imo/ Wood frame 41 I� Private (septic tank, etc. A •• ii i ii L • ' ••_••• ••• • all floors, based on exterior !: • \■ .NN • • l:! :!! sass!\��■•■: •. :. ! •■ .. • a ■■■■ P =a 4:lii_!I. • u.S■s ::: !:: l! ••!■ ••:s ! • u■ _!••:••"l"lasediim!i•s'=• • = 32 I I Structural steel dimensions 4/,(—,sb its i•g I� : .: N u • rs •••••__•• • .• ■ i• iss• Sa.u..■•\■i•saNs•�!!s•■.■ .I.uuis _ ___! N •i.■ .•i ••.•::l.! ram: 331 I Reinforced concrete H. TYPE OF WATER SUPPLY II,i S UUss. asaUSS:ssslr .•Ss s. n . I .k ■N r.l . ...l.... ..s...:. s • • • x• : • •; ■ •! •! x= •■ s 1 = is ■ :! s� ! !•a s!:::: • s■ \ nisi s■u s 1 50. Total land area, sq. ft. (l��6 �s s !S aS s s .� .. .. s s ! s ..S.a._... .s s sass._ .rx•. 3 iau Ui uiii liiaiUUIUUU'siSaUU.a.Ii..U.a.u......a:.5.U..u....I ••• ••• • ••• !! _ •:!•• I:l:::l:" r• • '• • •■ I 1...1.' 34 [ Other - Specify 42 Public or private company _ l • !•l l i l i s�iU •rI ux•si S•!I •• .. Ua.UU.i a. •a: • ••u •u : 43 [-J Private (well, cistern) K. NUMBER OF OFF-STREET I ! i l I i! �: slits s■• !: l:ln! • • i :!!!r!! ! :•!!:■•.■.■•x••••N..■ PARKING SPACES • �. . • �1 �s:: 1=i� a •.. ... u.se•lss•. .. : •s•sssss•' s••.. ••. I: s :suss!! r •••r 5I. ••ICI . . I . '::a •S•u•:. • .I .• . . . • : .. s.0 .0 r.s . • •u .0 ... a ! ! z sal ai : :l •s■:•:isi:■is:iisis .iini!�i.ln.a:nrs•.i III........I :. 51. Enclosed i��lue,:i�iiiii1 i�t-atmum:y I.: i iSli:imus!n!!i'n'tr!•!'iu•'•'•'!!:•••:nun:!!lI•I lI F. PRINCIPAL TYPE O F HEATING FUEL I. TYPE 0 F MECHANICAL ♦ •I • .. ♦ N • x. • x N.•\.•N .• .••suss! !.■:.rNl t1 }, !_� � : • ! � � : ! !:! • Is II u. sN ■• • • I 35 Gas Will there be central air 52. Outdoors 11/ ;, � # ,�; t �+t � i� Ua. ' a: sigiisuI5uusuSuSUu i:Cis..I conditioning? . ■•Hifi. . . ■ ■■ ■.■..• .■r\ t r + • }� }.. ji + • • Nx uu.r N 36 0 i I } ... +t:i (-{" j}i +T � rt{$ 3" .... i 1: `... ... -'! i •i ! _'•: .. . I. lili:asali:::...5 I.uI I r� L. RESIDENTIAL BUILDINGS ONLY r.I. .. 1,+ *f � � � �st T hai. imiuI:.:::::II:I'i:::x.x■ 37 I-� Electricity L t 44 Yes 45 No 1' ♦ } ## ttt ++-. * {{ 1 {{}'�? Simi, { _ --- 53. Number of bedrooms /67 +' 4 1 : +1/iiiii1 .. .. .�.1 .' ....}. ..r . .. ..11 .... 1'1- +' l �itl" ij..p si.N~• . l Emu": ill:hi 'illUU�$U'UUu5 OO S 11-41 . 38 [ 1 Coal r..tr+•- rr• , . ;. t •aye N • • N■x x x■x Specify Full _ ` 1-� '� -- U-'''I r•• •$ "-i. .�, rtrL.""1 , II IIMINIIIIIM:=11 !lllu::nuU.U�1;;;;I.n:!! ::::::i I 39 [ I Other - S rct Will there be an elevator/ // u 54. Number of 46 [ Yes 47 J No bathrooms POP P Partial • IV. IDENTIFICATION — To be completed by all applicants Name Mailing address - Number, street, city, and State ZIP code Tel. No. I /J/GM 3 /�G 04_etLi go,- eta c s 6 4Ni NOTES and Data — (For department use) Owner or Lessee 2. )t �f Buier's ( 'LZ 0/ V�f j✓r CC t_2Js i"Lr /v Gef" t� License No. Se I it Contractor J uCCA"*\ 3. Architect or ,�,�^ / _ 1 Z�3 �,S^t p Engineer ! /� C ITt''O-y ) 4 So b?.s 2f2 f !/ '-^ r' `-'-7 J a —_- / Q I hereby certify that the proposed work is authorized by the owner of record and that I have been authorized by the owner to make this application as his authorized agent and we agree to conform to all applicable laws of this jurisdiction. Signatur of plicant Address Application date DO NOT WRITE BELOW THIS LINE V. PLAN REVIEW RECORD — For office use Plans Review Re uired Check Plan Review Date Plans B Date Plans B Notes 9 Fee Started y Approved y BUILDING $ PLUMBING $ MECHANICAL $ ELECTRICAL $ OTHER $ VI. ADDITIONAL PERMITS REQUIRED OR OTHER JURISDICTION APPROVALS Date Date Permit or Approval Check Obtained Number By Permit or Approval Check Obtained Number By BOILER PLUMBING • CURB OR SIDEWALK CUT ROOFING ELEVATOR SEWER ELECTRICAL SIGN OR BILLBOARD FURNACE STREET GRADES GRADING USE OF PUBLIC AREAS OIL BURNER WRECKING OTHER OTHER VII. VALIDATION Building FOR DEPARTMENT USE ONLY Permit number Building �n Use Group Permit issued Y ►' \> - (T.° I 19 2? Building Fire Grading Permit Fee $ �lil 1 • Live Loading Certificate of Occupancy $ Occupancy Load Approved by: Drain Tile $ Plan Review Fee $ ' TITLE rd 7.1 I . 71,, 0 3 toi , . (CA•ti\ 2 iLtA'I-1r r)' Yk 4-7•- (0 t/4.,ZAJo-+ ;me-M.4 1 okt- 0•A-t- LASI' .14-et J\r- z_ • F) � I -t-tzR, ,,,4) im2 2.) , �-r-1 cr -C6 lx sue, `eAA-C-1.03J ''r Cc.4-f g. V n,� ► t/ Poc." �. �,.-(�C&.1e.J W '04 /0)" / ? y444 .... Z,.....(...„ (...". 11'4.4640 Cis:04 /o w. minnommemmwmagememsinnwrin t EC 29Earaf/I c$ lareA'%/k Coro/,bri Go BA'Am - Pyt 2 Ct• r° hf Set 't, ob•.. `. 0./7' , 0- 09!4v afgeuej 1: o [P, IWO A/ee A(14'M es lift 4%' • E//rff,E'Friel �e 8A /227-, 34o `e:isti _t7 9.26/sh-1 ��`tiv BA'/307- P¢..3/3 BX 570- icy. /95 _ Cecc%44 Drogon d.+�s73 - 279 /Ierbert Z. Ch//U'. Goer \ :V BA: /096 ••• ft'.// A b Leo / a AOr/ette Z. \°.h i( I3 _ / C, Lebeav 0 N. .5*/0/4 - P958 :.tp (//'d .7,etti 0)1i4, : 4 � 408_,,,:,..y. ... ,vart//ompton Coordinoto `'"Ftio / systeo ° .ra29,66.k/10 — - ss6 J,. y•2•,260.682 �o rim. If/•_soy ! /,_ ' 1 J`7� so 00°'"r'J c9 E4 7 '). • 1;e71°1° P .-021110 -14114A.)1b r---"arLe'rT (//qC /1/ NT 4; 01 5 6 . S -c N Q ,c 0 , 4,...::.j sezzz_401 -2_„:,.., Ai 7-,..„4--,,,ze,,-,75_, /7 p- N/ f.`..�t%�✓ /o 0 coo.—_-4 w o y/ v A G 1p 1 O 010 VA- it.o s, _ Po ' sS 4— , . 20'4.`P. /V - ,..,0 --41-crC3 /44/ 0/c-• N \.. ,. jk,,,j0i,cor,191. ' ? 6(< — -- _ (0,. --S-3 - + 3, b:'//G ; I H 6 3 7 A- 0 k - .line . GILLEN 2 ific GRAY �,+ l j FIELD REPORT FORM n I y Project: ve/f50N-/OO/1/4v6 ST. i./ Date: A°,Q,./�/9dy /vIR70�,o7o4 /�9. NOM Weather: Ceey i, Temperature: 37° Project No.: B4OO/ Time: e/5W Work in progress: ,p cy v�rio v o h/ocETE.o, /1 E,.af//o �o.Prl/ oa voyric/v. Observations: Gc/O.P.Yr1FN�ST�'Cl/NG FEiYcE?;.fovy,o �iTE• Information or action required: Items to verity: �/ ,� �- /)fyEA fco1/NG /X/DR TO / f/v/NG 4/9CC,S. Report by: WI/ /f ec: I A'JON A Enclosures: /l14 I/J 26 South Prospect Street,Amherst,Massachusetts 01002 413.25:3.2528 ❑ 15:3 Milk Street, Boston,Massachusetts 02109 617.426.4993 qz6 V-749/ st GILLEN •KUHN• RIDDLE 8c GRAY Ec4�IP• ... FIELD REP O tV'!'..11i1'III'fIC("I'ti /p� RT FORM Q Project: / Date: f/` eg lvE.fso/v MAY 5 089 /DO/1//✓G Jr. L Weather: DE TP OF BUILDING INSPECT NORTHAMP[ yt 1 ,. Temperature: �D Project No.700/ Time: /'..?D/f/Y Work in progress: � DOl/YG s /QUN.O7,./ON/OU.ef'EO, Firj7S �rit'/�oEp 47SFiVE-4,7%-544 re;o,QE.o. �dAvpr/0 V/l fyvy/,►',4/iy�.eao//-V6/",;o,7,0,6 2.Py.4 'j. Observalio►ls: / i / 9 f-/OZ , 6/ee6--4/ /�yy/ 4' 474crzfie's 7-12 l7/,vii7vr� ,QE->-7/l 4 �9,PT/9C 47 ee t--5TEC7/aN. 4/5 9.Qry s C,P9wc s,27c-E,� L' p /vo .�oo,Pw //o.P.-/foro.f 4-e.�yEy.O._40e,f f f/. �fE/cy v/�-/, �ysE.►,�,vr /14JE.' CJoo,P6✓yy�.Vl/C.t',yEy�o /.ero �o trsr�acr, ,DyrE,o irir/e 0,71' �• /�9,v -/, 9,vcyo,P floc r.s o O, C'/ aw79r."49s O /vOI'E• 7,vcyo-P,VOL7S /KS?' ,�E�7pc4 /? ~�o� �ES✓,00F,�9cyCEiYGr,, OF 70.xfG.0G C eoE,!f,". C9ff, �sJ/,Bef 0c ar/o v.' C/SE / C 9TE S Of 9DE9 .fTE G EA'61 V T fye,z2 Information or action required: 01---e- Iletns to �•erit;v �ps7y« fi-rsr�o ex'Ssr7VcqZe-YCE�-advprrovl4 czoeT Report : O,7 0.,f/Wiy Cirr� �lo v,CJf�G%-5/' o. /�r`c ! �o�y f C o,vszirecz o/-7.6P 0/9 ti '_'(i smil Ii 1'rosp.,•t St reet,Amherst,.11.►tis:u•husetts 01002 41:3•'253.2528 1 15:I Milk street, Itosttun, Massa4•husetts 02109 G17•-1'2(1.499 3 --)<ED CONSTRUCT eorikP Ali A SSOCI A T E 5 , 1 N C QUALITY DESIGN&CONSTRUCTION 36 SERVICE CENTER, NORTHAMPTON, MA 01060 • 413/584-1224 April 20, 1989` IfIY is . n Mr. William Gillen G° Gillen and Gray 26 South Prospect St. APR 2 4 1989 Amherst , Mass. Dear Mr. Gillen • G! LEN & GRAY, INC. ' AMHERST I am writing at the request of Alan Verson to inform you of several changes we have made in the plans for the building at 100 King St, Northampton . The current plans are different from the drawings prepared by your office in the following areas: -- The concrete foundation walls will be 8" thick . -- The rear bulkhead access to the basement has been eliminated and replaced with an interior stairway from the first floor unit to the basement. This stairway will be located parallel to the rear wall of the building immediately adjacent to the former bulkhead location . -- The first floor floor framing system will be constructed of 2x10 spruce joists set 16" on center and bearing on two parallel rows of lolly column supported beams running the length of the building . The maximum span for the joists will be about 13 feet . -- The second floor floor framing system will be a combination of 12" deep Truss-Joist products ( TJI 35s and 11 7/8" Microlam ) hung on a central lolly column supported microlam beam running the length of the building . Truss-Joist is preparing a full set of framing plans for this floor and the one above to accommodate the code required loads. Your office is welcome to review these plans if you wish. Please let us know if you have any questions about or problems with these changes. We plan to begin framing the first week of May. Sincerely yours ; Robert C . Reckman GILLEN •KUHN• RIDDLE & GRAY INC.ARc tuT► 'Ts FIELD REPORT FORM Project: !/ .A,jo V Date:41, /�//d7 /DO, \SP Weather: (f7.4 /14'.Pryy/vPraN,i 4, Temperature:0 ° Project No.: 6',90O/ Time: 2.'/9/V Work in progress: /► ,4 > ,4 ;.9�'E�TEsPS C,ovs>vcT/NG ACJa,e � �C.JE9ivs /4V e,,,z-72;7 .✓,w Observations: /ST /Goa t'/1:1:9/vi4/6/5M7-/,✓ lee, .P,0 //77 M.✓S. Information or action required: Co v7,f, e>o.P /vv%dE��/.yf.P/Mo 4 y/rEcr dJ4ly z,C�vS 1/✓� S•rc/i•ie 7/4✓S of./1;fsr/".00,ci Xr-1.1e/✓6, Items to verify: �F OF //es7/4-e e,Q!`101M/.✓6 /7;/ i er /!.".v000 Co,F��a/,f441,siV43; Report t►�:���i ce: 9C9N 14",Qs0,✓ Enclos res: .Bc,oc /v5/0, C'iry of'/gm7:7 2,,r,o,7v v r� C'orsr.Pvcr L(26 Soi►t h Prospect Street,Amherst,Massachusetts 01002 41:3.253.2528 ❑ 15:3 Milk Street, Boston,Massachusetts 02109 617.426.499:3 r GILLEN Q ON & GRAY SUN 2 91989 INC. ARCHITECTS DEPT. Of BUILDING INSPECTIONS NORTHAMPTON MA 01060 June 26, 1989 Alan Verson, Esq. 56 Main St. Amherst, MA 01002 RE: Verson Building — 100 King St. JOB NO. : 89001 Dear Alan: I have received your information concerning the first floor framing for this project. A Massachusetts registered engineer must certify that all loads for the first floor comply with the state building code for a business. Also required are stamped engineer's plans of second floor structural plan. Sincerely, Michael Brennan RJ;89OO1177.1 WG: cc: Construct Associates Bruce Palmer, Northampton Building Inspector Mary Clark 26 South Prospect Street• Amherst, Massachusetts 01002 •(413) 253-2528 GILLEN 3 6. ag� •KUHN. ,-� �`' r RIDDLE to GRAY I INC.��xcri►TF:rrs//// FIELD REPORT FORM Project: Ke-R.SO/V SEPT. :�,� OEPT.OF eu a�I O6� Date: �,vf 3a,7�� NORTHAMH, . /00 �yG �T : Weather: Cefyf 4/0,1•77M207ON, "4 Ternperatitre: (5Z o Project No.: 6140/ Time: 9:lO2i9.' Work in progress: �� , /PO 6o.QA- /�/�p PoGzrEs S, J7Ell Observations: /. //s,s /srs ///579ee ',o 2,Y,O f'i f4?f or es, Aer4 ,57ree.E.o /9�/y6 C o/./oz orfo 4 °oe/G*4Pe,x" , r s, oaf ; ;7 ,HG Z,e2r/sryelEo- f 41/tvod.o Sy‘""7ry/4/6 f/qy 6'7,O// o o 32//G TAdSS /O/,Sl S /� � 9 /140./e/-Y(, O-`Ci ze Sy��Ty/,t'G �l/irs�/f,�' C ;4./s, , b,'c /fe v-Ern'fTio,v- 2-3/Gys, //Ft-o #,w"Y//O/�f."9/e/.4G Info rttlath)tI or actionrequired: �avr,Pyc7a,f or�oF�. �.vF�,p .Syp2,�,e ,p/v r es o Zeiss vois7S /o 1A"CyiT,ECT. �fD 4?, vd/;fO,y/ :/yy6Cf,.C-i►t6/,geere /f f'S1ioer7 ive/Ks? Items to verify: ,��// /e/cJoo, 4 e.e:o /C ep d Report by: // tv,( ✓l !L` (•(• �r�Df/,9ryy, oro,Y,eaeoirG�s� Enclosures: $: South Prospect Street,Amherst,Massachusetts 01002 41:3 • 25:3 • 2528 LJ 186 South Street,Boston,Massachusetts 02111 017• 4211 • 199:3 w 3/ ' GILLEN �&5 'KUHN• C E I V E.. RIDDLE ( JUL t t 1989 & GRAY INC.ARCH IT ECTS Transmittal Record •NORTHAMPTON,MA.01060 To: Alan Verson Subject: 100 King t. Project No.: 89001 Enclosures:eilerewith ❑ Under separate cover For: ieleAs noted below ❑ Your review&comments ❑Your request ❑Progress ❑Distribution Delivered by:P'Mail ❑Messenger ❑Other: ❑26 South Prospect Street,Amherst,Massachusetts 01002 413 • 253 •2528 ❑186 South Street,Boston,Massachusetts 02111617•426•4993 Comments: Enclosed: Copy of engineer review by Richard Nagle, P.E. , of first floor struc- tural system. (0 Paragraph 4: 1/290 deflection is unacceptable. 1/360 is acceptable. Socor/o,v. l90,0 /Poo'rio,v9e •=coo.e vo/ars (2} Solution for main carrying beams is to install additional lally columns. Note: Per state code, minimum column footing size is 30" x 30" x 12" deep. Transmittal copies sent to: Transtnittal copies with enclosures sent to: Construct Associates; N'ton. Bldg. Inspecto Scat by: Michael Brennan Date: 7/6/89 WG: `a bL Re: 3-S'Kuc-tclvw 4".' t — as or ENGINEERING DESIGN ASSOCIATES INC. g.ei.001 , . ey, Structural - Civil Engineers t4L. .iuI 62 Bloomfield Avenue Windsor. CT 0609 . (203) 688-8756 C ' V a JUL III9 June 30, 1989 DEPT.OF BUILDING INS G3 D WObuye NORIMAM . ) 11 r.. ui Gillen & Gray Inc. q 26 South Prospect Street JUL 6 - 1a � Amherst, Massachusetts 01002 Attention: Mr. Michael Brennan GILLEN & GRAY, INC. AMHERST Reference: Structural Review - First Floor Framing Plan 100 King Street, Northampton, Massachusetts Dear Mr. Brennan: I have reviewed the first floor framing plan for the above referenced project as prepared by Construct Associates, Inc. and dated April 24, 1989. My review has found the following: (1) The plan and accompanying literature indicate that the floor joists are 2" x 10" spaced at 16" o.c. with Fb = 925 psi (1050 psi for repetitive use). The Design Load Table for "Floor Joists: 50 lb Live Load" shows that for 2" x 10" at 16" o.c. with an Fb = 1100 psi a span of 14'-0" is allowable. This table is based on a live load of 50 psf and a dead load of 10 psf for a total load of 60 psf. The 50 psf live load is correct. However, the Massachusetts Building Code under section 704.3 states: Partition load: In structures where subdividing partitions may be subsequently erected, rearranged or relocated, provisions shall be made to support the weight of such partitions where they occur, or for an equivalent uniform load, which shall be assumed not less than twenty (20) pounds per square foot (psf) of floor area, in addition to the specified uniformly distributed live load. The Design Load Table also indicated that for the size and spacing selected an "E" Modulus of Elasticity) of 1.249 is required for a 14 foot span. The materials indicated have an "E" value of 1.0. This translates into an deflection of 1/290 vs the 1/360 usually required for floors. (2) A review of the sizes of the main carrying beams finds that 3 - 2" x 12" members are not adequate to carry the loads where the span exceeds 10 feet. If you have any questions or require further Information on this matter, please do not hesitate to contact us. V truly yours *SA •-C. ENGINEERING DESIGN S CIATES INC. RIchard L. Nagle P.E. GILLLN -; r6 — 2--p5 tic GRAY IN( ..1111'I11TE(Ts FIELD REPORT"!)RT '!)RM Pr(tieet: O,R./0"/ Date: J? y// 767 /ea/<%yG‘57,- Wi.satIIer:c 7,..:,I'C,/sr M.4P.Y#W/Ve/t . , Project No.: d7D61/ 'fine:1••0'f?/s Work in progress: / 74)00,o • �04f p-; .E'�,�C.f'� �/.t't JA'SP '�Fs:7 L,rPF40/a/f./ L.'4i0'4 \;/,*v,),/,4" 6- /tJ .e' /t'7f6,P/ry Observations: /)fY/E.!2444 Z1//3V B/E, /'#' L i vrr�Jc�' s�ir'�'w'4 /i '6 2 M,,e ,, c/5,r C;WE.PS",7/✓.v &ry ,�<=- . 4- ( 7,4,44/.9PE //rP 0.r/e /;47e77' 6,(3-1-tc` �p� X, 4i6 �C. ' t,s /—O ��C ,t�J-s'/197//✓C . :ec! ¢/4,v7-7.>.7 f,!ac.9Pic4, IttroruuUion or action required: �/�yG�f-G//�G �U�%8�,.r�; d/srs /��',oe/ce- //zoo ../#7.: ‘: . Items to verify: ` ' ` Co vSr,Pacr I'.I1111„IIFPS: •C�toc�,v� t�i�y of//o.P1y.9i�l�ro.✓ Ie_I;S ,ttl li I'r1„111.,•I 5111.,.I..\ull1,'I St.Jla„u,•Itutil.ltti 111U1)::•11:1 • ':,i:l •2320 �_1 1110 S001 0 S11'141, lin,luu, 1I:1,,:1,•h1tti1N I,I)''111 1;17•-126 •-1993 ( ILLEN MEMORANDUM SEP 819% DEPT. OF BUILDING INSPECTIONS RE: Verson Property - 101 King St. NORTHAMPTON, MA 01060 SUBJECT: Construction Review DATE: August 28, 1989 JOB NO. : 89001 1. Windows: All exterior windows have been installed. 2. Exterior roofing: Complete except for first floor porch roof (now under construction). 3. Second floor porch/fire escape: Framing has been installed. Work to date has been according to plans and alterations approved by structural engineer. 4. Engineering plans of roof trusses: Received by Mike Brennan. To be reviewed by structural engineer and then distributed to all parties con- cerned. 5. Rough wiring: Building is ready for completion of rough wiring and plumbing, and installation of insulation. 6. Prior to any drywall, G&G will review construction. Michael Brennan RJ;89OO1241.1 WG: �tiL K cc: Alan Verson 2 copies to MB • , a,4 f . • _. •,r,t i. A,.LA Ai 4. If-' AA G I LI & EN GRAY INC. ARCHITECTS MEMORANDUM RE: Verson Building — 101 King Street SUBJECT: Field report DATE: October 20, 1989 JOB NO. : 89001 1. Weather: Raining very hard for the past several days. 2. There has therefore been some seepage of water between the foundation wall of the basement in two places on the north wall. 3. Some additional leakage on that wall apparently due to the incompletion of the siding. This has caused leakage on all floors along the north wall. 4. Progress: a. Top floor installation of homosote being installed. b. Interior painting at 99%. c. Prehung prefinished doors are on the site. d. Work proceeding in a workmanlike manner. William V. Gillen RJ;89O01299.1 cc: Alan Verson Construct Northampton Building Inspector • Main Street Station •403 Main Street •Amherst MA 1 1002-2311 William V. Gillen, AIA, NCARB • Dennis J. Gray, ASL , AIA, IFRAA