Loading...
44-014-002 (3) BP-2022-0182 254OLD WILSON RD COMMONWEALTH OF MASSACHUSETTS Map:Block:Lot: 44-014-002 CITY OF NORTHAMPTON Permit: Ails Renovations Repair PERSONS CONTRACTING WITH UNREGI TERED CONTRACTORS DO NOT HAVE ACCESS TO THE GUARAI ITY FUND (MGL c.142A) BUILDING PERMIT Permit# BP-2022-0182 PERMISSION IS HEREBY GRANTED TO: Project# ANTENNAS Contractor: License: Est.Cost: 35000 HEIDREA COMM !CATIONS LLC 109212 Const.Class: Exp.Date:04/I7/202 BROADBENT, ERICSSON & SUSAN LEIGH Use Group: Owner: MACR ' MAIL: SBA COMMUNICATIONS CORP Lot Size(sq.ft.) Zoning: SC t/rp/icaot: HEIDR 'A COMMUNICATIONS LLC Applicant Address Phone: Insurance: 1 WILLIAMS WAY W('-14220923 BELLINGHAM, MA 02019 ISSUED ON:03/01/2022 TO PERFORM THE FOLLOWING WORK: ALTERATIONS TO EQUIPMENT AT CE1.1. SITE POST THIS CART)SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: See%ice: Meter: Footings: Rough: Rough: House# Foundation: Gas: Final: Final: Rough Frame: Rough: Fire Department Driveway Final: Fireplace/Chimney: Final: oil: Insulation: Smoke: Final: O y /a3 j 3411/ THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Signature: I i )2 TAR , . ir . Fees Paid: S2-15.00 212 Main Street, Phone(413)587-1240,Fax-(4l 3)51i 7-1272 Office of the Building Commissioner Final Construction Control Document !/, To be submitted at completion of construction by a \ i Registered Design Professional Ifor work per the ninth edition of the Massachusetts State Building Code,780 CMR, Section 107 Project Title: Verizon Wireless—Pine Grove MA(Site ID:468256—Fuze ID: 16649744)(Permit No.:BP-2022-0182) Property Address: 254 Old Wilson Road,Northampton,MA 01060 Date: 04/19/2023 Project: Check(x)one or both as applicable: ❑ New construction ® Existing Construction Project description: Alteration of an existing wireless communications facility including modification of tower mounted RF equipment,mounting hardware,feedlines and ground level equipment within an existing fenced compound, (excluding equipment shelter interior)as shown in the construction drawings prepared by ProTerra Design Group,LLC revised through 12/29/2021,(RevO). I Jesse M.Moreno MA Registration Number: 47315 Expiration date: 06/30/2024,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning': ❑ Entire Project(Site Plan) ❑ Architectural ❑ Structural ❑ Mechanical ❑ Fire Protection ❑ Electrical ® Other: Telecommunications Alteration for the above named project. I,or my designee,have performed the necessary professional services,in accordance with the Professional Standard of Care, and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents.Such review shall not diminish or relieve the contractor of its submittal and other responsibilities. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code.The contractor is responsible for the performance of the work in accordance with the contract documents and shall be exclusively responsible for its construction means, methods, sequences and procedures,and for construction safety. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet"or electronic signature and seal: Ivys 1, JESSEMORE M. G MORENO �/► I \ CIVIL " LL. 7315 S ? 1 Phone number: (413)320-491 ��� ti3 Email:_jmoreno( proterra-design.com Building Official Use Only Building Official Name: Permit No.: Date: Version O1 Ol 2018 1 1 PrtsTerra FIELD INSPECTION REPORT INSPECTION DATE December 29, 2022 ' JOB NO. 17-017 DESIGN GROUP, LLC REPORT ISSUE DATE REVISON COMMENTS January 31, 2023 0 Field Inspection Report PREPARED BY: ProTerra Design Group, LLC 4 Bay Road Building A; Suite 200 PROJECT Hadley, MA 01035 Verizon equipment upgrade on existing water tank Building Permit#: BP-2022-0182 SUBMITTED TO: Site ID:468256 Jonathan Flagg Fuze ID: 16649744 Building Department Site Name: Pine Grove MA Municipal Building Site Address: 254 Old Wilson Road 212 Main St. Northampton, MA 01060 Northampton, MA 01060 CONTRACTOR EQUIPMENT OWNER Heidrea Communications, LLC Verizon PRESENT AT SITE ORGANIZATION Tupac Branche ProTerra Design Group, LLC Pursuant to the Massachusetts State Building Code, 780 CMR 9`h edition (IBC 2015 with amendments) the following report documents a visual inspection from ground level of completed construction for general conformance with the construction drawings prepared by ProTerra Design Group, LLC issued December 29, 2021 (Revl)for the above referenced project. 1) Twelve (12) existing panel antennas have been removed per plan. 2) Six (6) proposed antennas have been installed on side-by-side mounts in general conformance with the construction drawings, (typical of 2 per sector,total of 6). It was noted during review that there were open (unused) brackets in the middle position of the new antennas. Verizon issued additional brackets for this site and the contractor returned to install them where needed. 3) Three (3) new Verizon MT6407-77A panel antennas, (1 per sector) installed as shown in the construction drawings. 4) Three (3) new CBRS RRHs with clip-on antenna were installed per plans, (1 per sector total of 3). 5) Nine (9) existing RRHs were removed as described in plans. 6) Three(3) 700/850 RRHs and three (3) AWS/PCS RRHs, (6 RRHs total)were installed to the back side of the antenna mounting pipes as shown in the construction drawings. 7) Two (2) surge suppressors remained in position as specified in plans. 8) A Post Modification Inspection, (PMI) review has been completed by Maser Consulting/Colliers Engineering and Design dated December 30, 2022 which found in their opinion, that the equipment installation and any required mount modifications have been satisfactorily completed. Site ID:468256 Page 1 of 3 Field Inspection Report Site Name: Pine Grove MA December 29, 2022 The comments in this field report are a record of observations made on site. If there are any errors or omissions please notify ProTerra Design Group, LLC in writing or all comments and all parties shall consider this report factual and acceptable. COPIES TO: File SUBMITTED:_ -'Jf �� Peter Nute, Project Engineer REVIEWED: / /1I Jess ,Moreno, P.E. Managing Partner i 1 Site ID:468256 Page 2 of 3 Field Inspection Report Site Name: Pine Grove MA December 29, 2022 t , 0 RU 14 .$ �,.U1 1..!mi V ...*" ., X tiling. i all � � 1 ' Will $. I.�((1 � , Olt I . \:- .„--- A P ' ''''441 . .J. • , H. )'!: if , i Dual-mounted antennas Typical CBRS with clip-on antenna Verizon MT6407-77A panel antenna (prior to installing the middle bracket) i !k I'' :414:: 771: 111 1fL I r#1� r: } � hi �, t 1 ; hitt .bT . I At ct'; `J r 4 Middle bracket installed on dual-mounted antennas Typical RRHs installed on back of antenna mount pipes 1. iiirpo 1, A Ole ll ' 4 `.`• d ♦ ) \ \� - • ,.. - I Ill; 1 ' •,:t, •., \ ': 4 `.1 e, , 1, It 1 Overall Verizon antenna array(bottom array) Overall Verizon antenna array Site ID:468256 Page 3 of 3 Field Inspection Report Site Name: Pine Grove MA December 29, 2022 verizori1 c,llicr, &Desig nnh Colliers Engineering & Design 160 Federal Street, 11th Floor Boston, MA 02110 617.330.8000 peter.albano@collierseng.com Antenna Mount Post-Modification Inspection Report PM! SMART Tool Project#: 10126640 Colliers Engineering & Design Project#: 21781171A December 30, 2022 Site Information Site ID: 468256-VZW/PINE GROVE MA Site Name: PINE GROVE MA Carrier Name: Verizon Wireless Address: 254 Old Wilson Road Northampton, Massachusetts 01060 Hampshire County Latitude: 42.295472° Longitude: -72.667389° Structure Information Tower Type: 170-Ft Monopole Mount Type: 13.58-Ft Platform FUZE ID # 16649744 Inspection Result: Pass Report Prepared By: Frank Centone Mount Post-Modification Inspection Report December 30, 2022 (1) 13.58-Ft Platform Site ID: 468256-VZW/PINE GROVE MA Page 12 Executive Summary: The objective of this re ort is to confirm that the proposed mount modification has been completed in accordance with the aunt modification documents referenced below. Colliers Engineering &Design did not visit the site and was not present during construction. Based on our review of the provided modification photos and documents, it is our opinion that the modification has been completed in accordance with the proposed mount modification documents. Protect Closeout Documents: Document Type Remarks Proposed Mount Modification Maser Consulting Project#:21781171A, Dated January 6, 2022 Signed PMI Requirements Checklist Provided by Heidrea Communications LLC., Dated December 21, 2022 Contractor As-Built Drawings Not Provided Modification Photos Provided by Heidrea Communications LLC., Dated December 21, 2022 Material Packing List/Invoice Not Provided * Documents & Photos Required from Contractor. Post-Modification Inspection Summary: Modifications: Antenna: • Install (6) MX06FRO860-03 antenna, (2) per sector • Install (3) MT6407-77A antenna, (1) per sector • Install (3)XXDWMM-12.5-65 antenna, (1) per sector • Install (3) RF4439d-25A radio, (1) per sector • Install (3) RF4440d-13A radio, (1) per sector Steel: • Replace the position 3 mount pipe in all sectors with a P2.5 STD • Install new MSK3 pipe to pipe kits on the position 1 mount pipe of Alpha sector and the position 3 mount pipe of Beta sector • All existing pipe to pipe connections to be removed Deviations: Antenna: • Dual mounted panel antennas installed in position 4 instead of position 3 of Beta sector -Approved • Radio installed in position 2 of Gamma sector instead of position 4-Approved Steel: • MSK3 pipe to pipe kits not installed—Approved • Existing mount pipes relocated - Approved Comments: Deviations are approved and will not affect the results of this analysis Mount Desktop — Post Modification Inspection (PMI) Report Requirements Documents & Photos Required from Contractor— Passing Mount Analysis Passing Mount Analysis requires a PMI due to a modification in loading. Electronic pdf version of this can be downloaded at https://pmi.vzwsmart.com. For additional questions and support, please reach out to pmisupport@colliersengineering.com PSLC #: 468256 SMART Project #: 10126340 Fuze Project ID: 16649744 Purpose—to provide SMART Tool structural vendor the proper documentation in order to complete the required Mount Desktop review of the Post Modification Inspection Report. • Contractor is responsible for making certain the photos provided as noted below provide confirmation that the installation was completed in accordance with this Passing Mount Analysis. • Contractor shall relay any data that can impact the performance of the mount, this includes safety issues. Base Requirements: • If installation will cause damage to the structure, the climbing facility, or safety climb if present or any installed system, SMART Tool vendor to be notified prior to install. Any special photos outside of the standard requirements will be indicated on the drawings. • Provide "as built mount drawings" showing contractor's name, contact information, preparer's signature, and date. Any deviations from the drawings (Proposed modification) shall be shown. NOTE: If loading is different than what is conveyed in the passing mount analysis (MA) contact the SMART Tool vendor immediately. • Each photo should be time and date stamped • Photos should be high resolution. • Contractor shall ensure that the safety climb wire rope is supported and not adversely impacted by the install of the modification components. This may involve the install of wire rope guides, or other items to protect the wire rope. If there is conflict, contact the SMART Tool engineer for recommendations. • The PMI can be accessed at the following portal: https://pmi.vzwsmart.com Photo Requirements: • Photos taken at around level o Photo of Gate Signs showing the tower owner, site name, and number. o Overall tower structure after installation. o Photos of the mount after installation; if the mounts are at different rad elevations, pictures must be provided for all elevations that equipment was installed. • Photos taken at Mount Elevation o Photos showing the safety climb wire rope above and below the mount prior to installation. o Photos showing the climbing facility and safety climb if present. o Photos showing each individual sector after installation. Each entire sector shall be in one photo to show the interconnection of members.