Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
44-014 (25)
• y 254 OLD WILSON RD BP-2005-0752 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 44-014 CITY OF NORTHAMPTON Lot: -001 Permit: Building Category: BUILDING PERMIT Permit# BP-2005-0752 Project# JS-2005-1054 Est. Cost: $130000.00 Fee: $650.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: Homeowner as Contractor Lot Size(sq.ft.): 43560.00 Owner: VERRILLO GIL F Zoning: SR Applicant: BRIGHENTI SIMON J JR AT: 254 OLD WILSON RD Applicant Address: Phone: Insurance: 1350 MAIN ST (413) 747-1773 O. SPRINGFIELDMA01103 ISSUED ON:5/17/05 0:00:00 TO PERFORM THE FOLLOWING WORK:CONSTRUCT 150' CELL TOWER & ASSOCIATED EQUIPMENT POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector -lam,-ea b/o1/4.51-4 Underground: Service: (o u 3" Meter: P7/y/O )" Footings: r 31.D6--1�% Rough: Rough: House# Foundation: 9/T �,z. bh Driveway Final: Final: Final: 6514_a( Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final:OA' 9.4 . „ THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. i , _,- --," crd-,--- — "/" . ,,,. -• -.4r.irf-- Certificate of Occupancy i� e-t — e- Signature: s� FeeType: Date Paid: Amount: Building 5/17/05 0:00:00 $650.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Building Commissioner-Anthony Patillo 6 A • „( gp it' 3017-11 o f r f e S. • SERVICE$ JGI • Geotechriical • Environmental C E'`I C gy • • Construction Monitoring J�;, • Materials Testing EASTERN,Inc. August 26, 2005 Mr. Dennis Teichert Berkshire Wireless, Inc. 480 Pleasant Street Lee, MA 02138 Advance Copy by Email Re: Omnipoint Northampton Northampton, Massachusetts Project No. 05180C Dear Mr. Teichert: JGI EASTERN, Inc. (JGI) is pleased to provide Berkshire Wireless, Inc. with this certification for the Omnipoint project in Northampton, Massachusetts. Specifically, JGI was involved in the observation and testing of concrete and soils at the site. Daily field reports documenting activities and test results for those days JGI was on-site have been forwarded to you separately. Based on our part-time observations and test results,JGI certifies that the construction activities that occurred while we were on-site were completed in general accordance with the project specifications. In accepting this certification, Berkshire Wireless, Inc. and other concerned parties must recognize that despite proper sampling and testing procedures,and despite proper interpretation of results,JGI cannot assure the existence of conditions inferred to exist. JGI's certification must be taken as a statement or declaration of a professional opinion of conditions based on observations, sampling, and testing at specific locations. JGI's certification of conditions in no way relieves any party from meeting requirements imposed by contract or other means,including commonly accepted industry practices. If you have questions,or require additional information please contact our office. We thank you for the opportunity to have been of service to you, and look forward to working with you again. Very truly yours, JGI EASTERN, Inc. y N of,'0y;; ,ry G 1( tiiato- ir /l William J. lsze�-ski awrence J. wyer, Np.sae64 Construction Project Manager President isTE�`�©, i FSS IUAI EN6 /cjd Practical, responsive solutions to our clients' needs 177 Sundial Avenue,Suite 401W ❑114 Woodlawn Road ❑15 Holly Street, Unit 105 Manchester, NH 03103 Berlin,CT 06037-1535 Scarborough,ME 04070 (603)647-9700 Fax 647-4432 (860) 829-1725 Fax 829-1745 (207) 396-5374 Fax 396-5394 www.jgieastern.com Printed on 100%Recycled Paper