Loading...
36-387 (5) BP 022-0908 184EMERSON WAY COMMONWEALTH OF MASSACHUSETTS Map:Block:Lot: 36-387-001 CITY OF NORTHAMPTON Permit: Solar Build PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) BUILDING PERMIT _ Permit # BP 2022 0908 PERMISSION IS HEREBY GRANTED TO: Project# 2022 SOLAR BATTERY Contractor: License: PIONEER VALLEY Est. Cost: 37264 PHOTOVOLTAICS 111266 Const.Class: Exp.Date:03/14/2023 LOONIN, DEANNE B TRUSTEE ELIZ BETH A Use Group: Owner: RENUART TRUSTEE Lot Size (sq.ft.) Zoning: SR Applicant: PIONEER VALLEY PHOTOVOLTAICS Applicant Address Phone: Insurance: 311 WELLS ST - SUITE B (413)772-8788 375928710105 GREENFIELD, MA 01301 ISSUED ON:08/02/2022 TO PERFORM THE FOLLOWING WORK: INSTALL 2 BATTERIES IN BASEMENT TOTAL 10KW&SWAP OUT INVERTER FOR 10 KW ENERGY H POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Final: Final: Final: Rough Frame: Gas: Fire Department Driveway Final: Fireplace/Chimney: Rough: Oil: Insulation: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOL TION OF ANY OF ITS RULES AND REGULATIONS. Signature: - CROJI Fees Paid: $75.00 212 Main Street, Phone(413)587-1240,Fax:(413)587-1272 Office of the Building Commissioner The Commonwealth of Massachusetts r°ict Board of Building Regulations and Standards FOR Massachusetts State Building Code, 780 CMR MUNICIPALITY USE -_ Building Permit Application To Construct,Repair,Renovate Or Demolish a Revised Mar 2011 - D One-or Two-Family Dwelling j iv r" This S ction For Official Use Only Building Permit Number: 6 0- yl-a 0 6 Date Applied: 4.-VA-) d 5 //� 6-Z I ZDZZ Building Official(Print Name) Signature Date SECTION 1: SITE INFORMATION 1.1 Property Address: 1.2 Assessors Map&Parcel Numbe 184 Emerson Way,Northampton MA 01060 tC., 7 1.1 a Is this an accepted street?yes no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public 0 Private 0 Zone: — Outside Flood Zone? Municipal 0 On site disposal system 0 Check if yes❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner'of Record: Elizabeth Renuart Northampton,MA 01060 Name(Print) City,State,ZIP 184 Emerson Way 617-448-8919 eliz.renuart@gmail.com No.and Street • Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORK2(check all that apply) New Construction 0 Existing Building 0 Owner-Occupied 0 Repairs(s) ❑ Alteration(s) 0 Addition 0 Demolition 0 Accessory Bldg.0 Number of Units Other El Specify:PV Battery Storage Brief Description of Proposed Work2: Installation of(2.0)SolarEdge Energy Bank 9.7kWh Batteries(10kW-DC);swap original inverter for SolarEdge 10kW Energy Hub inverter SECTION 4:ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: (Labor and Materials) Official Use Only 1.Building $ 1. Building Permit Fee:$ Indicate how fee is determined: 2.Electrical $ ❑Standard City/Town Application Fee ❑Total Project Cost (Item 6)x multiplier 'x 3.Plumbing $ 2. Other Fees: $ 4.Mechanical (HVAC) $ List: 5.Mechanical (Fire $ Suppression) Total All Fees:$ Check No.! /31/Check Amount:75 Cash Amount: 6.Total Project Cost: $37,264 0 Paid in Full 0 Outstanding Balance Due: eau4 4 4 �� C PV Squared Solar I www.pvsquared.coop r1 Phone:413-772-8788 I Fax:413-772-8668 s� o- 311 Wells St.,Ste. B I Greenfield,MA 01301 'AT a 5o` MA Elec. Lic.A13764 I MA HIC 140077 Dear Town Inspections Officials, Please see our enclosed applications to permit a Solar Photovoltaic System in your jurisdiction. As you are likely aware, PV Squared is a worker-owned-cooperative B-Corp, employing 40+ people in Greenfield. We have installed thousands of PV Systems out of our Greenfield, MA Headquarters since 2002. PV Squared is committed to complying with all Commonwealth laws and regulations. Our worksite guidelines are created with the intention of exceeding all safety, electrical, and building requirements as defined by their respective jurisdictional entities. This includes the work of people from multiple disciplines, including electrical engineering, structural engineering, civil engineering, electricians, construction supervisors, roofers, and their associated helpers. We are a company that values training and education. We make certain that every individual is qualified for the roles and responsibilities that they assume. It is our policy to pay for the employees travel and training time and cost of the education, including CSL and Journeyman and Master Electrician classes. As an electrical contractor we are furthermore guided by the January 30, 2009 Massachusetts Board of State Examiners of Electricians (BSEF)judgements, and rulings that have followed. We pay strict adherence to these mandates and all electrical work is conducted by an electrician and an electrician's apprentice in a 1:1 ratio. We also understand that non-electrical tasks associated with a Solar installation can be completed by non-electrical workers, such as CSLs and others. I have attached our installation policy for your review, as well as a list of example non-electrical tasks. Should you have any questions or concerns regarding this policy or delineation of work, please let us know. We are a learning organization that is always trying to improve on what we do. Respectfully, Maya Fulford Installation Manager SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) CS-111268 03/14/2023 Daniel Gomez-Gonzalez License Number Expiration Date Name of CSL Holder List CSL Type(see below) U 43 Hatfield Street No.and Street Type Description U Unrestricted(Buildings up to 35,000 cu.ft.) Northampton MA 01060 R Restricted l&2 Family Dwelling City/Town,State,ZIP M Masonry RC Roofing Covering WS Window and Siding SF Solid Fuel Burning Appliances 413-772-8788 BUILDINGPERMITS@PVSQUARED.COOP I Insulation Telephone Email address D Demolition 5.2 Registered Home Improvement Contractor(HIC) 140077 9/15/2023 PIONEER VALLEY PHOTOVOLTAICS COOP HIC Registration Number Expiration Date HIC Company Name or HIC Registrant Name 311 WELLS STREET BUILDINGPERMITS@PVSQUARED.000P No.and Street Email address GREENFIELD MA 01301 413-772-8788 City/Town, State,ZIP Telephone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152.§ 25C( )) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes 0 No ❑ SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize Pioneer Valley Photovoltalcs Coopertive to act on my behalf in all matters relative to work authorized by this building permit application. j SEE ATTACHMENT (Al SEE ATTACHMENT(A) Print Owner's Name(Electronic Signature) Date I SECTION 7b: OWNER' OR AUTHORIZED AGENT DECLARATION By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application' true and accurate to the best of my knowledge and understanding. 7/25/2022 Print Owner's or Authorized Agent Name(E ectronic Signature) Date NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L. c. 142A.Other important information on the HIC Program can be found at www.mass.gov/oca Information on the Construction Supervisor License can be found at www.mass.gov/dks 2. When substantial work is planned,provide the information below: Total floor area(sq. ft.) (including garage,finished basement/attics,decks or porch) Gross living area(sq.ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" Commonwealth of Massachusetts Division DI Professional Licensure Board ur Budding Regulations and Standards Consl06441;sor CS-111266 Expires: 03/1412023 DANIEL GOMEZ-GONZALEZ 43 HATFIELD STREET NORTHAMPTON MA 01060 ..`4 tt • Commissioner tb /'. ✓fir 1 -7 iA aa e14, Office of Consumer Affairs and Business Regulation 1000 Washington Street - Suite 710 Boston, Massachusetts 02118 Home Improvement.COgtractor Registration �. —. Type: Supplement Card PIONEER VALLEY PHOTOVOLTAICS COC)PFRATTVr IN(' Re xpiration 140077 Exprat+on 0911 5120 2 3 D/B/A PV SQUARED SOLAR 311 WELLS ST SUITE B GREENFIFI D.MA 01301 Update Address and Return Card. .6n.60-u1,Ce11VMPR c +1,1.114441/50.K�u�ld1•n HOME IMPROVEM!NT CONTRACTOR Registration valid for indw+dual use only TYPE:Suot4orrient Card before the expiration date. 1/found return to: RetliH►Dt!on Expiration Office of Consumer Affairs slness Regulation 14001i 09 15r2023 1000 Washington Street Lille 71 PIONEER VALLEY PHUTOVOI TAICS COOPERATIVE.INC. Boston.MA 02118 k D/B/A PV SQUARED SOt AR • MAYA FULFORD / 311 WELLS ST SUITE 8 04staL `— GREENFIELD,MA 01301 Undersecretary of valid Without signature A�oRL1 CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYri) 12/30/2021 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Kathy Parker NAME: Webber&Grinnell PHONE (413)586-0111 FAX (413)586-6481 (A/C,No,Est): (A/C,No); 8 North King Street E-MAIL kparker@webberandgrinnell.com ADDRESS: INSURER(S)AFFORDING COVERAGE NAIC# Northampton MA 01060 INSURER A: Ohio Casualty/Liberty 24074 INSURED INSURER B: Ohio Security/Liberty 24082 Pioneer Valley PhotoVoltaics Cooperative,Inc. INSURER c: Continental Indemnity/AUW 28258 Attn:Kim Pinkham INSURER D: 311 Wells Street,Suite B INSURER E: Greenfield MA 01301 INSURER F: COVERAGES CERTIFICATE NUMBER: CL21123017215 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL SUER POLICY EFF POLICY EXP TYPE OF INSURANCE LTR INSD WVD POLICY NUMBER (MM/DD/YYYY) (MMIDD/YYYY) LIMITS X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE • $ 1,000'000 DAMAGE RETE CLAIMS-MADE X OCCUR PREMISESO(Ea occur ence) $ 300,000 X XCU Included MED EXP(Any one person) $ 15,000 A BKS57072282 01/01/2022 01/01/2023 PERSONAL&ADVINJURY ,_ $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY X JE8_ LOC PRODUCTS-COMP/OP AGG $ 2,000,000 OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000 (Ea accident) ANY AUTO BODILY INJURY(Per person) $ B OWNED '/ SCHEDULED BAS57072282 01/01/2022 01/01/2023 BODILY INJURY(Per accident) $ AUTOS ONLY /". AUTOS X HIRED NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY X AUTOS ONLY (Per accident) X $1 k Coll Ded X $1 k Comp de Underinsured motorist $ 300,000 UMBRELLA LIAR WREN E 5,000,000 X X OCCUR EACH OCCURRENCE $ A EXCESS LIAB CLAIMS-MADE US057072282 01/01/2022 01/01/2023 AGGREGATE $ 5,000,000 10,000 I DED X RETENTION $ $ WORKERS COMPENSATION X STATUTE OTH- ER AND EMPLOYERS'LIABILITY Y/N 1,000,000 C ANY PROPRIETOR/PARTNER/EXECUTIVE N N/A 375928710105 01/01/2022 01/01/2023 E.L.EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? (Mandatory In NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under 1,000,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ Business Personal Prop $1,820,700 Commercial Property A BKS57072282 01/01/2022 01/01/2023 Installation $25,000 Transportation $75,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Worker's compensation includes MA and NY CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN Evidence of Insurance ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE I ©1988-2015 ACORD CORPORATIO4. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD The Commonwealth of Massachusetts Department of Industrial Accidents ��=' l1171 I Congress Street, Suite 100 Boston, MA 02114-2017 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers. TO BE FILED WiTH THE PERMITTING AUTHORITY. Applicant information Please Print Legibly Name (Business/organization/Individual): Pioneer Valley PhotoVoltaics Cooperative Inc. DBA PV Squared Solar Address:311 Wells Street, SuiteB City/State/Zip:Greenfield MA 01301 Phone #:413-772-8788 Are you an employer?Check the appropriate box: Type of project(required): LEII am a employer with 48 employees(full and/or part-time).* 7. ❑ New construction am a sole proprietor or partnership and have no employees working for me in 2.0 I l 8. Remodeling any capacity.[No workers'comp.insurance required.] 3.0 I am a homeowner doing all work myself.[No workers'comp.insurance required.] 9. ❑Demolition 10 ❑Building addition 4.0 I am a homeowner and will be hiring contractors to conduct all work on my property. I will ensure that all contractors either have workers'compensation insurance or arc sole 1 1.1:Electrical repairs or additions proprietors with no employees. 12.❑Plumbing repairs or additions 5.0 i am a general contractor and I have hired the sub-contractors listed on the attached sheet. ]3.0Roof repairs These sub-contractors have employees and have workers'comp.insurance.: 6.❑we arc a corporation and its officers have exercised their right of exemption per MGL c. 14.❑OtherSolar PV 152,§1(4),and we have no employees.[No workers'comp.insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they arc doing all work and then hire outside contractors must submit a new affidavit indicating such. :Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:Ohio Casualty& Security/Liberty,and Continental Indemnity/AUW Policy#or Self-ins.Lic. #:37-592871-01-05 Expiration Date:01/01/2023 Job Site Address: 184 Emerson Way City/State/Zip:Northampton, MA 01060 Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152, §25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby cer :r t e s and penalties of perjury that the information provided above is true and correct. Signatu %tA 4101. Date: 7/25/2022 Phone#:413-7 -87 8 Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): I.Board of Health 2.Building Department 3.City/Town Clerk 4. Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: DocuSign Envelope ID:EA69888D-E174-4423-A2AE-D1C18629CE89 Attachment A PV Squared is committed to providing a high quality product and service and we look forward to working with you on the project. Sincerely, Pioneer Valley PhotoVoltaics Cooperative Jonathan Child Design and Sales Team Attachments: General Terms and Conditions Right of Rescission AUTHORIZATION TO PROCEED AND SERVE AS AUTHORIZED AGENT I hereby agree to the Project as set out above, and I agree to pay the contract price according to the Terms of Payment. I further agree to the Terms and Conditions attached hereto as a part of this Proposal and Agreement. I hereby authorize Pioneer Valley PhotoVoltaics Cooperative to proceed with the above-referenced Project in accordance with this Agreement. I further authorize Pioneer Valley PhotoVoltaics Cooperative, or its designated representative, to obtain required permits for this project on behalf of the Owner. I will allow any photographs or videos of this project to be used by Pioneer Valley PhotoVoltaics Cooperative for marketing purposes. A check for the First Payment is enclosed and I am returning this Agreement within 21 days of the Proposal date. Elizabeth Renuart 12/3/2021 19:34 AM EST Printed Name Date —DDocuSignedby: �" 'u �'� f tifil J9('bu, he v tarl MS L4 h ASnB IAbU14S,1 Signature Title Make a Payment Online Proposal and Agreement#00016918 Page 5 of 10 Elizabeth Renuart and Deanne Loonin-November 30,2021 0°1244. 4 PLAQUE NOTES: f�^ �� • RED BACKGROUND WITH WHITE TEXT AND LINES r 1 • ADHESIVE ON BACK OF PLAQUE irAir ' 1 • NUMBER NEEDED:2 PV SQUARED SOLAR 311 WELLS STREET.SUITE 8 DESIGN NOTES:(VERSION 2022-2-6) 5• X GREENFIELD,MA 01301 WW W.PVSOUARED COOP 1. SET PLAQUE TEXT TO.PV ONLY I PV&ESS/ESS ONLY 413-772-8T88 2. PLAQUE MUST BE SINGLE COLOR EXCEPT RED CUT LINE #2 3. SAVE AS SINGLE PAGE PDF(GENERAL SETTINGS) sl` (DC ONLY LOONIPTONA GE) WARNING NO TARHMPTON LAYERS tBA EMERSON WAY • PV_L-BLOCK(PLAQUE BLOCK) MULTIPLE SOURCES OF POWER NORTHAMPTON • PV_L-CUT-LINE(RED LINE,EDGE OF PLAQUE) • PV_L-PLAQUE-LINES(VISIBLE LINES AND ELEMENTS) WITH DISCONNECTS LOCATED AS SHOWN: • PV_L-TEXT(ALL TEXT&LEADERS) • PV_L-PLAQUE-LINES(VISIBLE ENGRAVED LINES) • PV_G-LOGO(LOGO) UTILITY SERVICE METER EXPORT SETTINGS MAIN SERVICE DISCONNECT • X SOLAR PV(SMART)METER SOLAR PV/ESS DISCONNECT (OUTSIDE) TO WORK ON: • RED CUT LINE SHOULD BE-003 PTS(CAN BE CHANGED BY ENGRAVER) ESS LI-ION BATTERY • SEE IF WE CAN MAKE THE TEXT VECTOR OBJECTS? MAIN SERVICE PANEL • LOGO-CURRENTLY IS A PICTURE-SEE IF WE CAN CHANGE SETTINGS (BASEMENT) TO MAKE THE VECTOR COPY WORK `0 .11 00 I ____ rrC SOLAR ARRAY - �O (ROOF) FOR SERVICE AND OPERATION OF •�i,• SOLAR PV&BATTERY/ESS SYSTEMS CONTACT PV SQUARED(413)772-8788 _ S SITE PLAQUE REV 0-INTERCONNECTION DATE-. 2222022 BY: MAYA FULFORD SCALE. NO SCALE SIZE: 11a17 PV-P1 Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 INSTALLATION CREW OPERATING POLICY This policy applies to all PV Squared employees in Massachusetts, but is particularly directed at those involved in the installation of solar electric and other renewable nergy systems (licensed electrician, learner/apprentice electrician, licensed constructor supervisor, supervised carpenter and laborer). When engaged in this work as an employee of PV Squared on a PV Squared project s te, activities of PV Squared employees are covered under the General Liability Insuranc maintained by the Cooperative. It is the intent of this policy to provide clarity to installation situations where the applicable codes and regulations are unclear, ambiguous, or silent. It is possible that a municipal building or electrical inspector could interpret the codes and regulations in a manner that differs from what appears here. But this policy sets out, in writing, how the cooperative interprets legal work requirements and unclear details. It is an internal consensus working model, intended to be revised and improved from time to time. As a general matter, a city's or town's Building Commissioner is charged with enforcing the State Building Code, Plumbing and Gas Code, Electrical Code and Architectural Access Code. The commissioner addresses concerns about the safety, accessibility and security of construction of homes and businesses. The commissioner also enforces zoning bylaws. In accordance with Massachusetts General Law, employees of the cooperative who perform electrical tasks and activities must hold a Massachusetts journeymen's electrician license or be under the direct supervision of such licensed personnel. These tasks and activities include installing electrical wiring, conduits, apparatus, devices, fixtures or other appliances for carrying or using the electricity associated with Renewable Energy Generators (electrically active solar photovoltaic modules, wind turbine-generators, hydroelectric generators, etc.). In no circumstances shall the Massachusetts licensed journeymen have more than one learner or apprentice working with him/her or under his/her supervision. Mounting structures come in a variety of configurations and have differing functional and physical characteristics. A structural component or assembly becomes associated with electrical work as the Renewable Energy Generator is electrically bonded to the mounting structure. Unless otherwise noted in M.G.L. c.143 §§3 through §§60 inclusive, all structural work defined as follows shall not be required to be performed by a Massachusetts licensed journeymen electrician: • Structural improvements • Elements of a Renewable Energy Generator's support structure that fall under a building permit (e.g., assembly of top-of-pole mounting structure on steel pole with concrete foundation prior to execution of any required electrical bonding of the support structure and associated renewable energy generator (solar electric module) to the support structure Policy # 9 Installation Crew Operating Policy Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 • Roof-top mounting support structures including but not limited to posts, stand-offs, flashings, feet, and mounting rails • Operation of heavy equipment involved in moving, hoisting, digging and other tasks • Earth work, excavation and concrete work • Manual labor involved in moving loading and unloading of equipment • Moving, hoisting, and attaching an electrically bonded panel assembly (defined as one or more assembled and electrically bonded solar electric modules) to an existing structural support designed to host the panel assembly. Note however that construction of a panel assembly is an electrical task due to the required electrical bonding activities. Repair and Servicing of Installed Equipment Repair or replacement of an electrically bonded and/or energized renewable energy generator (e.g., installed solar electric panel) will be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician. Replacement of an installed inverter must be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician, if the work requires removal of AC and/or DC conduit and associated wiring that originates outside of the installed inverter (e.g., removal of external AC conduit and wiring between the inverter and point of interconnection with the on-site electrical service). Note that this activity may require a wiring permit in some local jurisdictions. This requirement also applies to the servicing of an installed inverter that involves replacement or repair of components and wiring internal to the pre-manufacturer inverter (i.e., factory installed components that were originally shipped with the inverter) even though such activity may not require a wiring permit. Replacement of an installed inverter may also be performed by a qualified technician who may or may not be a licensed electrician or properly supervised learner or apprentice working with a licensed electrician if the inverter is of a "plug and play" design. Such a qualified technician can also performed other tasks that include installation and servicing inverter-based performance monitoring systems (e.g., replacing internal communication cards, making "plug and play" ethernet connections, etc.), assuming these activities do not require creation of a new AC power source circuit to operate the communication system(s). Policy # 9 Installation Crew Operating Policy Non Electrical Work at a typical PV Squared installation: • All Material Handling tasks o Module prep and moving o Ladder lift set up o Ladder set up o Trash/recycling removal and sorting • Structural Improvements o All carpentry work • Roof Mount Array o Fall protection anchor setup and removal o Layout and mounting bases o Racking up to but not including"bonding/grounding related activities" o Leveling of racking o Sealing seams/patching roofing/additional flashing • Ground mount array o Site work,earth moving o Trenching/digging o Construction of racking up to but not including "bonding/grounding related activities" • Conduit run o Making holes in structure o Fire blocking, sealing penetrations o Stickers • Power Board o Build wall, hang plywood o Stickers • Interconnection o Stickers • Monitoring o Wifi options o Any"plug and play"devices o Programming of monitoring devices o Computer based activities • Installation completion o Final building inspections o Install pictures-See checklist o Update one line and roof drawings to reflect as built o Completion checklist o Notes for others o COC left onsite • Misc o Truck Organizing o Material List,ordering o Daily check-in o Customer interaction and training activities SolarEdge EnergyBank 10kWh Battery m 10 W YEAR WARRANTY solar,:-- C • • Optimized for SolarEdge Energy Hub Inverterso> / Maximized system performance, gaining / Solar, storage, EV charging, and smart devices more energy to store and use for on-grid all monitored and managed by a single app to and backup power applications optimize solar production, consumption and backup power / Integrates with the complete SolarEdge residential offering, providing a single point / Wireless communication to the inverter, reducing of contact for warranty, support,training, and wiring, labor and risk of installation faults simplified logistics&operations / Simple plug and play installation,with automatic / DC coupled battery featuring superior SetApp-based configuration using predefined profiles overall system efficiency,from PV to battery to grid / Includes multiple safety features for battery protection at all times / Scalable solution for increased power and capacity with multiple SolarEdge inverters and batteries solaredge.com solar • • I SolarEdge Energy Bank 10kWh Battery BAT-10K1PSOB-01 BATTERY SPECIFICATION Usable Energy 9700(100%depth of discharge) Wh Continuous Output Power _ 5000 W Peak Output Power 7500(for 10 seconds) W Peak Roundtrip Efficiency >94.5 Warranty'' 10 Years Voltage Range 350-450 Vdc Communication Interfaces Wireless/RS485 Batteries per Inverter Up to 30l STANDARD COMPLIANCE Safety UL7642,UL1973,UL9540,UN38.3 Emissions FCC Part 15 Class B MECHANICAL SPECIFICATIONS Dimensions(WaHxD) 31.1a46.4x9.84/790x1179x250 in/mm Weight 267/121 lb/kg Mountinglel Wal mount and floor stand mountnl Operating Temperature +14 to+122/-10 to+50 •F/'C Storage Temperature(more than 3 months) +14 to+86/-10 to+30 •F Storage Temperature(less than 3 months) -22 to+140/-30 to+60 •F/•C Altitude 6562/2000 ft/m Enclosure Protection IP65/NEMA 3R-indoor and outdoor(water and dust protection) Cooling Natural convection Noise <25 dBA (I)Please refer to the SolarEdge Energy Bank battery compatible inverters app note. ((For warranty details please refer to the SolarEdge Energy Bank battery Limited Warranty. (3)Installations with multiple SolarEdge Energy Bank batteries connected to a single inverter require a pair of branch connectors(DC and DC-)per battery excluding the last battery. The branch connectors should be purchased separately. (4)Installation and mounting requires handles that should be purchased separately.Please refer to the Accessories'PN table below. (5)The floor stand is purchased separately.One floor stand is required per SolarEdge Energy Bank battery.Please refer to the Accessories'PN table below. SolarEdge Energy Bank Battery Accessories(purchased separately) Accessory PN Floor stand IAC-RBAT-FLRSTD-01 Branch connectors set(includes a pair of DC+and DC-connectors). Required for installations with multiple SolarEdge Energy Bank batteries with a single inverter IAC-RBAT-USYCBL-01 Handles for wall mount installation IAC-RBAT-HANDLE-01 SolarEdge Technologies Ltd.All rights reserved.SOLAREDGE.the SolarEdge logo,OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies,Ltd. C E Ro H S All other trademarks mentioned herein are trademarks of their respective owners.Date.OS/2021 DS-000026-3.3-NA.Subject to change without notice. Backup Interface for North America Q BI-EUSGN-01 / BI-NUSGN-01 m 12 YEAR WARRANTY m a (:)/ b • e Backup Interface for Flexible Backup / Automatically provides backup power to / Built-in Auto Transformer and Energy home loads in the event of grid interruption Meter for easier and faster installation / Full flexibility in which loads to backup - / Seamless integration with the Energy Hub Inverter the entire home or selected loads with Prism Technology to manage and monitor both PV generation and energy storage / Scalable solution to support higher power& higher capacity(') / Generator connection support(') (') Requires supporting inverter firmware solaredge.com solar - se :- / Backup Interface for North America BI-EUSGN-01 / BI-NUSGN-01 BI-EUSGN-01 BI-NUSGN-01 INPUT FROM GRID AC Current Input 200 A AC Output Voltage(Nominal) 240 Vac AC Output Voltage Range 211-264 Vac AC Frequency(Nominal) 60 Hz AC Frequency Range 59.3-60.5 Hz Microgrid Interconnection Device Rated Current 200 A Service Side AC Main Circuit Breaker Rated Current 200 N/A A Service Side AC Main Circuit Breaker Interrupt Current 10k N/A A Grid Disconnection Switchover Time <100 ms OUTPUT TO MAIN DISTRIBUTION PANEL Maximum AC Current Output 200 A AC L-L Output Voltage(Nominal) 240 Vac AC L-L Output Voltage Range 211-264 Vac AC Frequency(Nominal) 60 Hz AC Frequency Range 59.3-60.5 Hz Maximum Inverters AC Current Output in Backup Operation 78 A Imbalance Compensation in Backup Operation 5000 W AC L-N Output Voltage in Backup(Nominal) 120 V AC L-N Output Voltage Range in Backup 105-132 V AC Frequency Range in Backup 55-65 Hz INPUT FROM INVERTER Number of Inverter Inputs 3 Rated AC Power 7,600 W Maximum Continuous Input Current @ 240V 32 A Rated AC Power in Continuous Backup Operation 6,100 W Maximum Continuous Input Current in Backup Operation 26 A Peak AC Power(<10 sec)in Backup Operation 7,000 W Peak AC Current(<10 sec)in Backup Operation 30 A Inverter Input AC Circuit Breaker 40 A Upgradability Up to 3 X 63A Cr GENERATOR(z) Maximum Rated AC Power 15,000 W Maximum Continuous Input Current 63 Adc Dry Contact Switch Voltage Rating 250/30 Vac/Vdc Dry Contact Switch Current Rating 5 A 2-wire Start Switch Yes ADDITIONAL FEATURES Installation Type Suitable for use as service equipment For main lug only Number of Communication Inputs 2 Communication RS485 Energy Meter(for Import/Export) 1%accuracy Manual Control Over Microgrid Interconnection Device Yes (1)Each 40A CB supports up to one 7.6kW inverter,with each 63A CB supporting one 10kW and one 11.4kW inverter The CB upgrade kit is available with the following part numbers:for 40A CB,CB-UPG-40.01;for 63A,CB CB-UPC-63-01 (2)Requires supporting inverter firmware / Backup Interface for North America BI-EUSGN-01 / BI-NUSGN-01 BI-EUSGN-01 BI-NUSGN-01 STANDARD COMPLIANCE UL1741,CSA 22.2 NO.107 Safety UL869A N/A Emissions FCC part 15 class B • INSTALLATION SPECIFICATIONS Supported Inverters StorEdge single phase inverter,_ Single phase Energy Hub inverter with Prism technology AC From Grid Conduit Size/AWG Range 2"conduits/*0-4/0 AWG AC Inverter Conduit Size/AWG Range 1"conduit/14-4 AWG AC Generator Input Conduit Size/AWG Range 1"conduit/8-3 AWG Communication Conduit Size/AWG Range 3/4"/24-10 AWG Weight 73/33 lb/Kg Cooling Fan(user replaceable) Noise <50 dBA Operating Temeprature Range -40 to+122/-40 to+50 'F/'C Protection Rating NEMA 3R,IP44 Dimensions(HxWxD) 20.59 x 13.88 x 8.62/523.5 x 352.5 x 219 in/mm PV dir Grid 41111101r # D ❑ Power optimizers Loads111 -e DC AC • • Backup • Energy Hub Interface • Inverter with Prism Technology AC AC Monitoring Platform Battery AC ar DC I±] — Generator SolarEdge Technologies,Ltd.All rights reserved.SOLAREDGE,the SolarEdge logo,OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies,Inc.All C E n I:(other trademarks mentioned herein are trademarks of their respective owners.10/2020N01/ENG NA.Subject to change without notice.