rpt-chartpak-recon_fin_20220630.pdf 1 Site Reconnaissance and Preliminary Design for Dam Removal – Chartpak Dam Village of Leeds, Northampton, MA June 30, 2022 Prepared for: Massachusetts Division of Ecological Restoration Attn: Chris Hirsch 251 Causeway Street, Suite 400 Boston, Massachusetts 02114 Prepared by: Stantec Consulting Services Inc. 136 West Street, Suite 203 Northampton, Massachusetts 01060 Project Number 195602327.200 SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM 1 Revision Description Author Quality Check Independent Review A Draft For Review MRC 2022.05.23 GEC 2022.05.24 RES 2022.05.27 B Final MRC 2022.06.23 GEC 2022.06.27 RES 2022.06.28 SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM 1 This document entitled Site Reconnaissance and Preliminary Design for Dam Removal – Chartpak Dam was prepared by Stantec Consulting Services Inc. (“Stantec”) for the account of Massachusetts Division of Ecological Restoration (the “Client”). Any reliance on this document by any third party is strictly prohibited. The material in it reflects Stantec’s professional judgment in light of the scope, schedule and other limitations stated in the document and in the contract between Stantec and the Client. The opinions in the document are based on conditions and information existing at the time the document was published and do not take into account any subsequent changes. In preparing the document, Stantec did not verify information supplied to it by others. Any use which a third party makes of this document is the responsibility of such third party. Such third party agrees that Stantec shall not be responsible for costs or damages of any kind, if any, suffered by it or any other third party as a result of decisions made or actions taken based on this document. Prepared by (signature) Michael R. Chelminski, P.E. Reviewed by (signature) Gordon E. Clark Reviewed by (signature) Abigail N. Dempsey, P.E. Independent Review by (signature) Rick E. Schultz, P.E. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM i Table of Contents EXECUTIVE SUMMARY .......................................................................................................... IV 1 INTRODUCTION .............................................................................................................1 1.1 PROJECT GOALS AND OBJECTIVES ...........................................................................1 1.2 SITE VISIT AND BACKGROUND INFORMATION ..........................................................2 1.2.1 Site Visit ......................................................................................................... 3 2 PROJECT AREA ............................................................................................................5 2.1 CHARTPAK DAM ............................................................................................................5 2.2 PROJECT REACH OF MILL RIVER ................................................................................6 2.2.1 Tributary Watershed ....................................................................................... 6 2.2.2 Longitudinal Profile Survey ............................................................................. 7 2.2.3 Upstream Reach ............................................................................................ 9 2.2.4 Downstream Reach ...................................................................................... 10 2.2.5 FEMA Information ........................................................................................ 12 2.3 CHARTPAK DAM IMPOUNDMENT ..............................................................................12 2.3.1 Impoundment Characteristics ....................................................................... 12 2.3.2 Impoundment Sediment ............................................................................... 13 2.4 ADJACENT AREAS ......................................................................................................16 2.4.1 Historical References ................................................................................... 16 2.4.2 Upstream and Downstream Infrastructure .................................................... 16 2.4.3 Natural Resources ....................................................................................... 20 2.4.4 Public Access ............................................................................................... 21 2.4.5 Abutting Parcels ........................................................................................... 21 3 HYDRAULIC MODELING .............................................................................................21 3.1 MODEL DEVELOPMENT ..............................................................................................21 3.1.1 Hydrology ..................................................................................................... 21 3.1.2 Hydraulic Model ........................................................................................... 22 3.2 MODEL RESULTS ........................................................................................................25 3.3 DAM REMOVAL HYDRAULIC CRITERIA .....................................................................27 4 DAM REMOVAL OPPORTUNITIES AND CONSTRAINTS ..........................................28 4.1 DAM SAFETY ...............................................................................................................28 4.2 PUBLIC SAFETY ..........................................................................................................28 4.3 CONSTRUCTION ACCESS AND STAGING .................................................................28 4.4 RECREATIONAL OPPORTUNITIES .............................................................................29 4.5 NATURAL RESOURCES ..............................................................................................29 4.6 SEDIMENT MANAGEMENT .........................................................................................29 4.6.1 Sediment Management Approaches ............................................................ 30 4.6.2 Sediment Management at Chartpak Dam..................................................... 32 4.7 ADJACENT INFRASTRUCTURE ..................................................................................33 4.8 HISTORIC RESOURCES ..............................................................................................34 SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM ii 5 PRELIMINARY DAM REMOVAL APPROACH .............................................................35 5.1 OVERVIEW ...................................................................................................................35 5.2 PRELIMINARY APPROACH .........................................................................................35 5.2.1 Construction Access and Staging ................................................................. 36 5.2.2 Water and Sediment Management ............................................................... 37 5.2.3 Dam Removal Extents.................................................................................. 38 5.3 PRELIMINARY CONSTRUCTION SEQUENCING ........................................................38 6 ENVIRONMENTAL PERMITTING ................................................................................41 7 DISCUSSION ON ADDITIONAL RECOMMENDED DATA COLLECTION ...................42 7.1 SEDIMENT STUDY .......................................................................................................42 7.2 INTEGRATED FLUVIAL GEOMORPHIC, HYDRAULIC MODELING, AND SEDIMENT TRANSPORT STUDY ................................................................................42 7.3 EVALUATION OF BEAVER BROOK ARCH ..................................................................43 7.4 PROPERTY OWNERSHIP ............................................................................................43 7.5 HISTORICAL RESOURCES INVESTIGATION .............................................................43 8 CONCEPTUAL PROJECT OPC AND SCHEDULE ......................................................43 8.1 DISCUSSION OF OPC AND OPCC ..............................................................................44 LIST OF TABLES Table 1. Summary of bathymetric data collected on March 30, 2022; reference Figures B1.a and B1.b in Appendix B for locations of these data points. ...................................8 Table 2. Dams on the Mill River Downstream from Chartpak Dam ............................................11 Table 3. Summary of estimated sediment volumes in the impoundment ...................................15 Table 4. Sediment Sample Locations and Depths .....................................................................15 Table 5. Peak-flow hydrologic statistics .....................................................................................22 Table 6. Conceptual OPC and Schedule for Removal of Chartpak Dam ...................................45 LIST OF FIGURES Figure 1. Image from the Sanborn Fire Insurance Map for Northampton, Massachusetts, dated July 1902; Dam is located in the upper left corner of the image (see arrow) .........................................................................................................................18 Figure 2. Hydraulic Model Domains (existing and proposed conditions) ....................................24 Figure 3. Hydraulic Model profiles of simulated water surface elevations for existing and proposed conditions. ...................................................................................................25 Figure 4. Hydraulic Model Simulation Results ...........................................................................26 Figure 5. Amethyst Brook approximately 200 ft downstream from Bartlett Rod Shop Company Dam before, during, and after dam removal construction (October – December 2012). ........................................................................................................31 SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM iii LIST OF APPENDICES APPENDIX A SITE PHOTOGRAPHS .............................................................................. A.1 APPENDIX B FIGURES ................................................................................................... B.1 APPENDIX C SEDIMENT ANALYSIS SUMMARY TABLE AND DOCUMENTATION ..................................................................................................... C.1 APPENDIX D HEC-RAS PROFILE SUMMARY TABLE .................................................. D.1 APPENDIX E OPCC FOR REMOVAL OF CHARTPAK DAM .......................................... E.1 SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM iv Executive Summary This report documents a preliminary assessment and preliminary design for removal of Chartpak Dam (National Inventory of Dams [NID] #MA00758, State Dam ID #2-8-214-11) on the Mill River in the village of Leeds in the City of Northampton, Hampshire County, Massachusetts (Project). In coordination with the City of Northampton, the dam owner expressed interest in exploring removal of the dam and the City of Northampton coordinated with the Massachusetts Department of Fish & Game, Division of Ecological Restoration (DER) to perform a preliminary dam removal study. DER subsequently contracted with Stantec Consulting Services Inc. (Stantec) to perform a preliminary assessment and prepare preliminary design materials for removal of Chartpak Dam. The dam is located approximately 500 ft upstream of the Mulberry Street Bridge on the Mill River near the Leeds Village Center and approximately 10 miles upstream from the confluence of the Mill River and the Connecticut River Oxbow. The dam is privately owned by Massachusetts Realty Corporation. The dam was built as part of a former mill but is no longer used for manufacturing. The primary identified opportunities associated with removal of Chartpak Dam are elimination of responsibilities associated ownership of the dam, improved public safety, and improved recreational opportunities along the Mill River upstream from the dam. Chartpak Dam was constructed as part of a former mill complex adjacent to the dam but is no longer used for commercial or industrial purposes. The dam was not designed for downstream flood protection and is not operated or maintained for this purpose. The primary identified constraint to removal of the dam is the relatively large volume of accumulated sediment upstream from the dam. This study estimated the readily mobile volume of accumulated sediment upstream from Chartpak Dam as approximately 35,000 CY and that this volume is approximately 60% of the estimated total volume of sediment. The estimated volume of readily mobile sediment is large relative to the expected assimilative capacity in the downstream reach of the Mill River. It is therefore expected that removal of Chartpak Dam with instream sediment management (i.e., allowing sediment to naturally remobilize) or failure of the dam would result in substantial aggradation of sediment in the downstream reach of the Mill River and consequent increases in water surface elevations. The opinion of probable cost (OPC) for removal of Chartpak Dam presented in Table 6 of this report is $4,560,000. The OPC includes professional services (design and construction) and construction as represented by an opinion of probable construction cost (OPCC) of $3,930,000 with a range of -30% to +50%. The OPCC includes an estimated cost of $3,120,000 for active sediment management. The estimated cost for active sediment management is approximately 80% of the total OPCC and approximately 76% of the total OPC. The OPCC without active sediment management is $810,000 and is considered by Stantec to be within the range of expected costs for similar dam removal projects in New England. Based on the information presented in the preceding paragraph, it is apparent the expected costs for active sediment management dominate the OPCC for removal of Chartpak Dam. Additional studies and analyses are recommended to evaluate potential approaches to reduce expected costs for sediment management. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Introduction 1 1 INTRODUCTION This report documents a preliminary assessment and preliminary design for removal of Chartpak Dam1 (National Inventory of Dams [NID] #MA00758, State Dam ID #2-8-214-11) on the Mill River in the village of Leeds in the City of Northampton, Massachusetts (Project). The dam is privately owned by Massachusetts Realty Corporation. The dam was built as part of a former mill but is no longer used for manufacturing. Approximate coordinates of the dam are: 42.335406° N, 72.700428° W. In coordination with the City of Northampton, the dam owner expressed interest in exploring removal of the dam and the City of Northampton coordinated with the Massachusetts Department of Fish & Game, Division of Ecological Restoration (DER) to perform a preliminary dam removal study. DER subsequently contracted with Stantec Consulting Services Inc. (Stantec) to perform a preliminary assessment and prepare preliminary design materials for removal of Chartpak Dam. Appendix A contains representative photographs of the Project site. Appendix B contains existing conditions figures (Figure B1.a and B1.b) at the Project site as well as a preliminary proposed conditions plan (Figure B2) for removal. Appendix C contains a summary table of sediment analysis results and the laboratory report. Appendix D contains a profile summary table with the hydraulic modeling results in tabular format for existing and post-dam removal conditions. Appendix E contains a table with additional information on opinions of probable cost for construction. This report is not a dam inspection/evaluation report and is intended solely for use in evaluating the potential for removal of Chartpak Dam. This report includes information and inferences by Stantec based on information provided by others; Stantec has relied on and is not responsible for verifying or validating information provided by others. 1.1 PROJECT GOALS AND OBJECTIVES The primary Project goals and objectives include: 1) Improved public safety and eliminating required dam maintenance; 2) Improved recreational opportunities associated with the Mill River adjacent to Chartpak Dam; 3) Restoring connectivity of aquatic habitat and fluvial processes (e.g., biotic and abiotic fluxes) in the Mill River at Chartpak Dam; and 1 Chartpak Dam is also referred to as “Orange Dam” (e.g., Emergency Preparedness Plan in the 2019 Phase 1 Inspection/Evaluation Report) and “Top Dam” (e.g., Leeds Mill River Tour Walking Map prepared by the Mill River Greenway Initiative). SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Introduction 2 4) Restoring aquatic habitat in the impounded reach of the Mill River upstream from Chartpak Dam. The dam is located approximately 500 feet (ft) upstream from where the Mulberry Street Bridge crosses the Mill River and the Mass Central2 Rail Trail parallels the east (left3) side of the river in the Project area. The proximity of the rail trail to the Mill River adjacent to Chartpak Dam contributes to substantial recreational use of the river in the Project area. While the dam is located on posted private land, public access along the rail trail provides ready access to the dam and the height of the dam and absence of fencing or railings represent a fall hazard and entrainment and entrapment hazards associated with the outlet conduit. Removal of Chartpak Dam could improve public safety at the dam by reducing or eliminating fall hazards. In addition, dam removal could also support the improvement of recreational opportunities along the adjacent reaches of the Mill River within the Project area. Based on information presented in the 2019 Phase I Inspection/Evaluation Report (reference Section 1.2), the dam has an Intermediate Size classification and a Significant Hazard Potential (Class II) classification in accordance with Massachusetts Department of Conservation and Recreation (DCR) Office of Dam Safety (ODS) dam safety rules and regulations in 302 CMR 10.00 as amended by Chapter 330 of the Acts of 2002. Removal of the dam would eliminate safety hazards and maintenance requirements associated with the dam. Chartpak Dam limits sediment transport into the downstream reach of the river and is a barrier to upstream fish passage. Removal of the dam would restore sediment transport and opportunities for upstream fish passage at the dam. The normal pool impoundment extends approximately 700 ft upstream from the dam and is relatively homogeneous with typical depths of water of 1 to 2 ft and a sandy bottom without a defined channel. Removal of the dam is expected to result in substantial increases in heterogeneity and complexity in the channel and therefore improve aquatic habitat and recreational opportunities. 1.2 SITE VISIT AND BACKGROUND INFORMATION Information used in the preparation of this report included observations and surveys during a site visit on Wednesday, March 30, 2022, background information provided by DER, and readily available public information obtained by Stantec. Relevant information on Chartpak Dam and the adjacent reach of the Mill River that was reviewed in the preparation of this report includes: 1. The “Phase I Inspection Report” for Chartpak Dam (NID #MA00758) dated December 1979, prepared by the U.S. Army Corps of Engineers (USACE) as part of the National Dam Inspection Program (1979 Phase I Report) 2 This rail trail is also referred to as the “Norwottuck Branch Rail Trail” and other names. 3 Directionals “left” and “right” are based on an observer facing downstream. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Introduction 3 2. The “Chartpak Dam Inspection/Evaluation Report” for Chartpak Dam dated February 8, 2019, prepared by O’Reilly Talbot & Okun Associates, Inc. (2019 Phase I Report4) 3. Site and topographic survey performed by Heritage Surveys, Inc. on September 19, 2008, and provided to Stantec in March of 2022 (2008 Survey Plan) 4. Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) Nos. 2501670001A, Effective April 3, 1978 (FEMA FIRM panel) 5. Historical data and maps obtained through the Mill River Greenway Initiative website accessed at < https://millrivergreenway.org/ > in February of 2022 6. The Northampton River Swimming Assessment & Design Recommendations dated August 23, 2021, prepared by Wright Ostermier Landscape Architects for the City of Northampton Planning & Sustainability Department 7. Surficial geology information from the US Geological Survey Easthampton Quadrangle compiled by Janet R. Stone and Mary L. DiGiacomo-Cohen dated 2018 8. Information obtained online from the Massachusetts Energy and Environmental Affairs Waste Site & Reportable Releases Information data portal in March 2022 9. Information obtained from the Massachusetts Cultural Resource Information System (MACRIS) online data server in February 2022 for the “Leeds Village” section in Northampton, Massachusetts 10. Information obtained from the Sanborn Fire Insurance Map from Northampton, Hampshire County, Massachusetts, created by the Sanborn Map Company in July 1902 Information obtained during the site visit is provided in the following section. 1.2.1 Site Visit Stantec visited the Project site on Wednesday, March 30, 2022, with representatives from the City of Northampton, DER, and the Massachusetts In-Lieu Fee Program (ILFP). Representatives and students from the University of Massachusetts Amherst attended the site visit but are not listed as they are not participants in the Project. The site visit began at approximately 8:00 AM and concluded at approximately 4:30 PM. Representatives of the City of Northampton who participated in the site visit included: 4 The format of the 2019 Phase I Report is not consistent with the DCR ODS Phase I Inspection/Evaluation Template. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Introduction 4 • Sarah LaValley (Conservation/Preservation Planner) Representatives of DER and ILFP who participated in the site visit included: • Nick Wildman (DER, Ecological Restoration Specialist) • Carrie Banks (DER, Stream Restoration Continuity Planner) • Elisabeth Cianciola (ILFP; Aquatic Mitigation Specialist) Representatives of Stantec who participated in the site visit included: • Michael Chelminski (Stantec, Principal) • Gordon Clark (Stantec, Civil Designer) Areas observed by Stantec during the site visit included Chartpak Dam, the associated impoundment, and the downstream and upstream reaches of the Mill River. Areas adjacent to Chartpak Dam were observed from the upland areas along the right and left sides of the Mill River and by wading in the river upstream and downstream from the dam. The reach of the Mill River downstream from the dam was primarily observed by wading in the river between the dam and the Mulberry Street Bridge approximately 500 ft downstream from the dam. Observations were also performed facing upstream and downstream from the Mulberry Street Bridge deck. The reach of the Mill River upstream from the dam was observed by wading in and walking along the river and walking on the Mass Central Rail Trail between the dam and the confluence of Beaver Brook approximately 1,950 ft upstream from the dam. Information obtained by Stantec during the site visit included: 1. Representative photographs of the Project area (Appendix A) 2. Bathymetric and sediment probe data measurements in the dam impoundment and the adjacent reaches of the Mill River using a graduated survey rod 3. Sediment sample locations in the Mill River upstream and downstream from the dam Locations where the bathymetric, sediment probe, and sediment sample data were collected and documented using a Global Navigation Satellite System (GNSS)-enabled Global Positioning System (GPS) receiver. These locations are presented in the figures in Appendix B and are discussed in Section 2 of this report. Observations and information obtained during the site visit are described in subsequent sections of this report. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Project Area 5 2 PROJECT AREA This section presents information on the Project area obtained during the site visit and readily available information obtained by Stantec. See Figure B1.a and Figure B1.b in Appendix B for the existing conditions basemap and profiles, respectively. 2.1 CHARTPAK DAM Information on Chartpak Dam in this section is based on information presented in the 1979 Phase I Report and the 2019 Phase I Report as well as observations and data collected by Stantec during the March 30, 2022, site visit. Chartpak Dam (National ID: MA00758; State ID 2-8-214-11) is located within Hampshire County in the village of Leeds in the City of Northampton, Massachusetts. The dam is located approximately 500 ft upstream of the Mulberry Street Bridge on the Mill River near the Leeds Village Center and approximately 10 miles upstream from the confluence of the Mill River and the Connecticut River Oxbow. The 2019 Phase I Report states that the dam was built in the “mid to late 1800s”. The 2019 Phase I Inspection Report states that the dam has an Intermediate Size classification and a Significant Hazard Potential (Class II) classification in accordance with Massachusetts Department of Conservation and Recreation (DCR) Office of Dam Safety (ODS) dam safety rules and regulations in 302 CMR 10.00 as amended by Chapter 330 of the Acts of 2002 and that the dam is in “Satisfactory” condition. The dam is constructed of dry-laid, cut-stone masonry, is a run-of-river type structure with uncontrolled primary and secondary spillways, an uncontrolled outlet conduit, and a low-level sluiceway. The reported structural and hydraulic heights of the dam in Dam Safety Inspection Checklist in the 2019 Phase I Report are 31 ft and 20 ft, respectively. The “Overall Length (ft)” on the same reference reports “Primary 95 ft, Secondary 75 ft” and is apparently a reference to the primary and secondary spillways. The 1979 Phase I Report lists the “Dimensions of Dam” length as 220 ft; this value appears to be the correct length of the dam based on a preliminary review of aerial photographs by Stantec. The primary spillway appears to be constructed of dry-laid, cut-stone masonry, is approximately 95 ft long and varies in elevation along the crest due to deterioration of the stone masonry spillway cap. The downstream face of the primary spillway is near-vertical. Some of the primary spillway appears to be founded on bedrock based on observations of the downstream side of the dam. The secondary spillway is located to the left of the primary spillway, is approximately 75 ft long, and appears to be constructed of dry-laid, cut-stone stone masonry with a layer of concrete on the crest and upstream face. The upstream and downstream faces of the secondary spillway appear to be battered at steep angles. The transition between the left side of the primary spillway and the right side of the secondary spillway is irregular and appears that some of the masonry has been displaced. The left side of the secondary spillway SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Project Area 6 abuts the Mass Central Rail Trail and a stone masonry retaining wall (Upper Left Retaining Walls) that extends downstream from the dam along the west side of the rail trail. The right spillway abutment is formed by a raised stone masonry section of the dam that overlies bedrock on the right side of the river downstream from the dam and transitions into the right abutment of the dam in a forested area adjacent to the right bank of the river. The 4.5-ft-diameter outlet conduit is located in the raised stone masonry section of the dam and appears to be part of a former water withdrawal system. The outlet conduit is uncontrolled and the inlet invert is approximately 2.5 ft lower than the primary spillway crest. The low-level sluiceway is located under the right side of the primary spillway to the left of the bedrock outcrop on which the right side of the dam appears to be founded. The 2019 Phase I Report states that the low-level sluiceway (“low level sluice gate”) is 2 ft wide, 3.5 ft tall, that its outlet invert is approximately 15 ft below the crest of the primary spillway, and that it is not operable. Observations during the site visit suggest that sediment has accumulated to a depth of approximately 12 ft above the outlet invert of the low-level sluiceway. Battered wooden boards were observed along the upstream side of the spillway in the vicinity of the low-level sluiceway during the site visit. 2.2 PROJECT REACH OF MILL RIVER This section includes information and data collected in the Project reach of the Mill River adjacent to Chartpak Dam during the site visit and obtained from readily available public data sources. The Project reach of the Mill River is approximately 2,450 ft long and is defined in this report as the portion of the Mill River between the Mulberry Street Bridge approximately 500 ft downstream from the dam to the confluence of Beaver Brook with the Mill River approximately 1,950 ft upstream from the dam. Information on the Project reach of the Mill River is presented before information on the Chartpak Dam impoundment to provide context for impacts resulting from the dam. 2.2.1 Tributary Watershed Information about the tributary watershed of the Mill River at Chartpak Dam was obtained from the U.S. Geological Survey (USGS) StreamStats online tool. The tributary watershed at the dam is reported by StreamStats as 36.4 square miles, the percentage of wetlands and waterbodies is 5.16 percent (%), and the mean basin slope computed from a 10-meter Digital Elevation Model is 12.8%. Forest cover is reported as 78% and developed land and impervious areas are reported as 6.11% and 0.87%, respectively. The bankfull width and discharge from StreamStats are 68.6 ft and 198 cubic feet per second (cfs), respectively. The reported bankfull width is in reasonable agreement with conditions observed during the site visit but does not reflect potential confinement of the channel by bedrock. The median annual flow is reported as 37.4 cfs. For reference, the reported flow at USGS Station No. 01171500, which is SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Project Area 7 approximately 4 miles downstream from Chartpak Dam, was reported as 110 cfs at noon on the day of the site visit (March 30, 2022). 2.2.2 Longitudinal Profile Survey A longitudinal profile survey was performed along the Mill River between the Mulberry Street Bridge and the confluence of Beaver Brook to providing information on hydraulic and fluvial geomorphic characteristics of the river. This survey was performed using a GNSS-enabled GPS receiver to obtain horizontal coordinate data and an optical autolevel and graduated survey rod to collect vertical measurements. The survey was initiated in the river adjacent to the upstream side of the Mulberry Street Bridge and carried upstream to the confluence of Beaver Brook by re-sectioning the optical autolevel. Survey measurement locations were located with the GNSS-enable GPS and elevation measurements were rectified to an approximate reference elevation using information presented on the 2008 Survey Plan. Data collected as part of the longitudinal profile survey and locations of sediment samples collected as part of this study are provided in Table 1. The longitudinal profile survey data are presented from downstream to upstream and grouped by general location (i.e., downstream from the dam, in the normal pool impoundment, and upstream from the normal pool impoundment). Figures B1.a and B1.b in Appendix B present plan and profile views of the longitudinal profile survey data. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Project Area 8 Table 1. Summary of bathymetric data collected on March 30, 2022; reference Figures B1.a and B1.b in Appendix B for locations of these data points. Location ID Northing (ft) Easting (ft) Elevation (ft, NAVD88) WSEL (ft, NAVD88) Depth of Water (ft) Description Downstream from Chartpak Dam 1 2956351.3 331601.3 327.53 329.03 1.5 BR - Upstream of Mulberry Street Bridge 2 2956418.2 331652.4 327.52 329.02 1.5 DS01 - Downstream of Riffle and 8" Pipe 3 2956473.4 331667.0 329.53 331.03 1.5 DS02 - Upstream of Riffle 4 2956577.8 331661.6 329.95 332.05 2.1 DS03 5 2956616.6 331672.3 329.33 332.13 2.8 DS04 - Pool 6 2956756.4 331723.9 331.55 332.35 0.8 DS05 - Downstream of Rock Dam Chartpak Dam Normal Pool Impoundment 7 2956912.9 331712.1 349.05 351.25 2.2 US01 - Sand 8 2957018.3 331701.8 349.66 351.26 1.6 US02 - Sand 9 2957162.8 331666.6 349.96 351.36 1.4 US03 10 2957335.5 331644.7 348.86 351.26 2.4 US04 11 2957449.1 331622.3 348.74 351.24 2.5 US05 12 2957594.1 331650.2 349.09 351.49 2.4 US06 Mill River Upstream from Chartpak Dam Normal Pool Impoundment 13 2957714.0 331668.6 349.25 351.95 2.7 US07 14 2957783.7 331753.2 342.78 351.98 9.2 US08 - Downstream of Bedrock Pool 15 2957954.2 331790.4 349.15 352.17 3.02 US09 16 2958001.2 331754.3 351.63 352.63 1 US10 - Upstream of Riffle 17 2958159.4 331710.0 348.63 352.73 4.1 US11 18 2958299.7 331611.0 353.04 354.44 1.4 US12 - Upstream of Riffle 19 2958522.0 331595.6 351.99 354.99 3 US13 20 2958672.8 331606.7 354.21 356.21 2 US14 Sediment Sample Locations 21 2956706.8 331744.8 - - - CD-Sed-Samp-03; "CHARTPAK-3" 22 2956872.6 331735.9 - - - CD-Sed-Samp-02; 1.5 ft Below Top of Sediment; "CHARTPAK-2" 23 2957421.8 331643.5 - - - CD-Sed-Samp-01; 1.0 ft Below Top of Sediment; "CHARTPAK-1" SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Project Area 9 2.2.3 Upstream Reach The upstream section of the Project reach of the Mill River is from Chartpak Dam to the confluence of Beaver Brook approximately 1,950 upstream from the dam. Observations during the site visit suggest that the upstream Project reach has three general subreaches, including: 1. The normal pool impoundment (“Impoundment”) subreach that extends from the primary spillway to approximately 700 ft upstream from the dam 2. The approximately 700-ft-long “Transitional” subreach that extends from approximately 700 ft upstream to approximately 1,200 ft upstream from the dam 3. The approximately 550-ft-long “Upstream” subreach that from approximately 1,200 ft to the confluence of Beaver Brook approximately 1,950 ft upstream from the dam 2.2.3.1 Impoundment Subreach The Impoundment subreach is identified as the normal pool impoundment that extends approximately 700 ft upstream from the dam. This subreach includes the wetted channel of the Mill River and a floodplain forest between the left side of the channel and the Mass Central Rail Trail to left of the wetted channel. The primary factor for identifying this subreach is that it is geomorphically distinct from the upstream subreaches and is expected to contain the majority of the accumulated sediment upstream from Chartpak Dam. The Impoundment subreach is characterized by a relatively straight channel with sandy surficial sediments, normal-flow wetted widths of approximately 80 ft at the dam to approximately 45 ft at the upstream end of this subreach, and an estimated bankfull width of approximately 90 ft. The channel cross section is generally planer (flat) with characteristic (typical) depths of 1 to 2 ft and a maximum estimated depth of approximately 3 ft during normal flows. Sediment probing in the Impoundment subreach during the site visit identified that sandy material was present to depths of approximately 4 ft. It is suspected that some of the accumulated sandy material is subject to ready remobilization during high-flow events. Reference Section 2.3.2 for additional information on the Impoundment subreach, including other observed characteristics and estimated volumes of accumulated sediment. 2.2.3.2 Transitional Subreach The Transitional subreach is from the upstream limit of the Impoundment subreach and extends approximately 700 ft upstream to the vicinity of where bedrock outcrops were observed on the left bank, in the channel, and approximately 50 ft to the left of the left edge of the wetted channel during the site visit. Characteristic features of this subreach are presence of apparent bedrock and gravel, cobble, and boulder point bars and riffles. Sediment in this subreach is consolidated and manual probing during the site visit did not break through the surficial armor layer. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Project Area 10 The noted presence of gravel and cobbles in the Transitional subreach suggest that coarser sediment (e.g., gravel, cobble) accumulates (aggrades) in this subreach during higher-flow conditions. The general morphology of this reach from downstream to upstream is riffle/run-pool-riffle-run. The downstream riffle/run includes a point bar on the left side of the channel at the downstream end of this subreach. This feature is identified as a riffle/run as it transitions from a riffle where it leaves the upstream pool and transitions to a run at the upstream limit of the Impoundment subreach. The pool upstream from the riffle is relatively deep (measured depth of approximately 9 ft adjacent to a bedrock outcrop) with bedrock along the left side of the channel and a gravel- and cobble-dominated point bar on the right side of the pool. The riffle upstream from the pool is dominated by cobbles and boulders. The run at the upstream end of this subreach is relatively deep (measured depth of approximately 4 ft) and confined by bedrock on the right side of the channel, in the channel, and approximately 50 ft to the left of the left side of the channel. While observations suggest that Chartpak Dam has resulted in aggradation of sediment in and upstream from this subreach, the presence of bedrock in and adjacent to the channel appears to suggest confinement of the pre-dam channel horizontal alignment. 2.2.3.3 Upstream Subreach The upstream subreach is from the upstream limit of the Transitional subreach to the confluence of Beaver Brook with the Mill River. The general morphology of this subreach includes a cobble-and boulder- dominated riffle that transitions into the run at the upstream limit of the Transitional subreach, a pool in the middle of this subreach, and a boulder-dominated riffle at the upstream end of the subreach adjacent to the confluence of Beaver Brook. Surficial substrates in this subreach are dominated by cobbles and boulders and create a surficial armor layer. Bedrock was observed in the upstream end of the pool and in the riffle at the upstream end of this subreach approximately 1,900 ft upstream from the dam adjacent to the confluence of Beaver Brook. Similar to the Transitional subreach, observations during the site visit suggest that Chartpak Dam has resulted in some aggradation of sediment in this subreach and that the horizontal alignment of the channel is confined by bedrock. In addition, observed bedrock in the channel at the upstream end of this subreach and in the run at the upstream limit of the Transitional subreach suggests that incision (vertical degradation) of this subreach would be constrained by bedrock. 2.2.4 Downstream Reach The approximately 500-ft-long downstream reach of the Mill River between Chartpak Dam and the Mulberry Street Bridge was observed during the site visit and is included in the longitudinal profile survey (reference Table 1 and Figure B1.b in Appendix B). The channel of the Mill River is confined by bedrock along both sides of the channel for approximately 100 ft immediately downstream from the left side of the primary spillway and for approximately 50 ft downstream SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Project Area 11 from the right side of the dam. In addition, bedrock protrudes from the channel at the base of the primary spillway. Approximately 100 ft downstream from the left side of the primary spillway, the bedrock along the left side of the channel transitions to an approximately 10-ft-high, stone masonry retaining wall that extends downstream to the Mulberry Street Bridge (Lower Left Retaining Wall). A stone masonry retaining wall with an approximate height of 15 to 20 ft is located along the right side of the river downstream from the dam (Right Retaining Wall). This retaining wall begins approximately 150 ft downstream from the dam and extends downstream to the Mulberry Street Bridge. Surficial substrates in the reach of the Mill River between Chartpak Dam and the Mulberry Street Bridge are dominated by cobbles and boulders that are consolidated and manual probing during the site visit did not break through the surficial armor layer. Dams are a dominant feature in the Mill River downstream from the Mulberry Street Bridge. Table 2 summarizes information on dam along the downstream reach of the Mill River based on information developed by DCR ODS. Table 2. Dams on the Mill River Downstream from Chartpak Dam NID Name Distance DS (mi.) City Hazard Class Owner MA01254 Button Shop Dam #1 0.34 Northampton Significant Private MA01255 Button Shop Dam #2 0.34 Northampton Significant Private MA00756 Cooks Dam 0.65 Northampton Significant City of Northampton MA00759 Vistron Dam 2.9 Northampton Significant Private MA00755 Mill River Dam 4.2 Northampton Non-Jurisdictional Private MA00754 Paradise Pond Dam 6.2 Northampton High Private MA01010 Mill River Dam 7.1 Northampton Significant City of Northampton Approximately 100 ft downstream of the Mulberry Street Bridge there are remnants of a partially-breached dam (not identified in Table 2) that extends into the left side of the channel at the upstream limit of the normal pool backwater from the Button Shop #1 Dam (NID #MA01254) and Button Shop 2 Dam (NID #MA01255). Review of historical aerials suggests that this dam appears to have been breached or removed between 1971 and 1995. There do not appear to be upstream fish passage structures at the downstream dams and the Project reach of the Mill River does not appear to be accessible to anadromous fish in the Connecticut River. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Project Area 12 2.2.5 FEMA Information The Project reach of the Mill River is depicted on the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) Panel 0001 A for Northampton, Massachusetts (Community No. 250167, Effective Date April 3, 1978). The FIRM panel depicts a dam at the location of Chartpak Dam and an increase in the water surface elevation of 19 ft upstream from the dam for the 100-year flood. The depicted extents of the 100-year flood boundary upstream from the dam include depict substantial flooding along River Road to the right (west) of the Mill River between approximately 500 ft upstream from the dam and the confluence of Beaver Brook with the Mill River. A FEMA Flood Insurance Study was not available for review as part of this study. 2.3 CHARTPAK DAM IMPOUNDMENT The section presents information on the Chartpak Dam normal pool impoundment (identified as the Impoundment subreach in Section 2.2.3), which extends approximately 700 ft upstream from the dam. The following sections present additional information on observed characteristics and estimated volumes of accumulated sediment in the normal pool impoundment. 2.3.1 Impoundment Characteristics The 2019 Phase I Report reports the length, surface area, and storage volume of the normal pool impoundment as 2,000 ft, 7 acres, and 6 acre-ft, respectively. Observations during the site visit suggest that the normal pool impoundment extends approximately 700 ft upstream from the dam to the vicinity of a point bar on the left side of the channel confines the river along the right bank where a riffle/run discharges to the normal pool impoundment. As described in Section 2.2.3.1, the normal pool impoundment is characterized by a relatively straight channel with sandy surficial sediments, normal-flow wetted widths of approximately 80 ft at the dam to approximately 45 ft at the upstream end of this subreach, and an estimated bankfull width of approximately 90 ft. In general, the impoundment is linear with a length approximately 10-times greater than its width. The channel cross section is generally planer (flat) with characteristic (typical) depths of 1 to 2 ft and a maximum estimated depth of approximately 3 ft during normal flows. The estimated surface area of the impoundment based on a characteristic width of 60 ft is therefore approximately 1 acre. Based on observations during the site visit, the characteristic (e.g., average) depth of the normal pool impoundment is approximately 2 ft and the normal pool storage volume is therefore estimated as approximately 2 acre-ft. Factors that may contribute to the differences in the estimated length, area, and storage volume of the normal pool impoundment may include deterioration and resulting lowering of the primary spillway crest elevation and accumulation of sediment in the river channel in the upstream area of the impoundment. During high-flow conditions, the overtopping of the left channel bank is expected to result in inundation of the floodplain forest between the left bank of the channel and the Mass Central Rail Trail. The right bank of SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Project Area 13 the channel is relatively steep and discharge through the floodplain forest are expected to increase the wetted width of the river by two to three times during high-flow conditions. 2.3.2 Impoundment Sediment This section presents information on sediment composition, estimated volumes, and quality analyses based on observations during the site visit and subsequent analyses. 2.3.2.1 Sediment Composition Observations during the site visit indicate that surficial sediments in the normal pool impoundment vary spatially but are dominated by sand-size sediments within the area approximately 600 ft upstream from the dam. The dominant surficial substrates transition to gravel and cobble material in the vicinity of the point bar along the left side of the channel further upstream in the impoundment. Surficial sediments in the riffle/run that extends approximately 100 ft upstream to the upstream limit of the normal pool impoundment (i.e., Impoundment Reach) include gravel, cobbles and boulders. Reference Section 2.2.3 for additional information on surficial sediments in the Project reach of the Mill River upstream from Chartpak Dam. Observations during the site visit and review of aerial photographs suggest that the right bank of the river along the normal pool impoundment is composed of native material and not accumulated sediment. The floodplain forest between the left bank of the normal impoundment and the Mass Central Rail Trail appears to be formed, at least in part, by accumulated sediment upstream from the secondary spillway at Chartpak Dam. Based on observations during the site visit and experience with other, similar projects, it is expected that that deeper accumulated sediment includes larger material, including gravels, cobbles, and boulders. 2.3.2.2 Sediment Volumes Estimated volumes of total and readily mobile accumulated sediment were developed using information obtained during the site visit, readily available information (e.g., aerial photographs), and experience based on other dam removal projects. Observations during the site visit suggest that there are two general zones of accumulated sediment upstream from Chartpak Dam: 1. From the dam to approximately 850 ft upstream from the dam 2. More than 850 ft upstream from the dam The boundary between the two sediment zones is in the relatively deep pool near the downstream limit of the Transitional subreach (reference Section 2.2.3.2). The basis for selecting this location is the observed presence of bedrock along the left side of the pool, the assumption that bedrock is present at relatively shallow (e.g., less than 10 ft) depths elsewhere in this pool, and that active sediment management (e.g., dredging) may not be feasible upstream from this location as part of dam removal (reference Section 4.6). SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Project Area 14 Accumulated sediment within approximately 850 ft of the dam has visible impacts on the morphology of the river and the adjacent floodplains, including the previously noted floodplain forest area between the left side of the channel and the Mass Central Rail Trail. Accumulated sediment in this area has resulted in substantial changing in the morphology of the river compared to observed conditions further upstream and downstream from the dam. These factors include the relatively straight and homogeneous channel for approximately 700 ft upstream from the dam (i.e., Impoundment subreach), dominance of fine sediment (i.e., sand), absence of bedrock and larger substrate (e.g., cobbles, boulders), and the generally flat floodplain forest area. While it is expected that Chartpak Dam has resulted in accumulation of sediment further upstream in the Mill River, it is expected that the majority of the accumulated sediment is within 850 ft upstream from the dam between the right bank of the existing channel and the Mass Central Rail Trail. The total volume of accumulated sediment in within 850 ft upstream from Chartpak Dam was estimated based on a characteristic width of 200 ft between the right bank of the existing channel and the Norwottuck Rail Trail. This characteristic length is shorter than the measured lengths to account for pre-dam side slopes. The maximum depth of sediment was estimated as 18 ft based the longitudinal profile survey performed as part of this study. The estimated total volume of accumulated sediment within 850 ft upstream from the dam was developed as the product of the length (850 ft), characteristic width (200 ft), and the average depth based on a linear slope extending upstream from the dam to the existing bottom of the river 850 ft upstream (i.e., 18 ft/2 = 9 ft). The estimated total volume of accumulated sediment is therefore approximately 60,000 cubic yards (CY). Estimated volumes of readily mobile sediment were developed to inform 1) the volume of accumulated sediment that would be expected to remobilize following removal or failure of Chartpak Dam and 2) the volume of accumulated sediment that would need to be actively managed (e.g., removed as part of dam removal construction to reduce downstream impacts as part of dam removal. The estimated volume of readily mobile sediment is material that is expected to be mobilized with the near-term (i.e., one year) after failure or removal of the dam. The estimate developed here is based on failure or removal of the primary spillway of Chartpak Dam and does not consider potential mobilization of accumulated sediment along the left side of the dam upstream from the secondary spillway. The estimated of the volume of readily mobile sediment were developed using a LiDAR-derived existing conditions terrain model and grading a synthetic trapezoidal channel with a bottom width of 50 ft and side slopes of 1.5:1 (horizontal:vertical [H:V]) extending approximately 1,400 ft upstream from the dam to the vicinity of the upstream end of the pool in the Transitional subreach. The difference in elevation along the synthetic channel is approximately 22 ft and the average slope is therefore 0.0155 (~64 horizontal to 1 vertical [65H:1V]). The estimated volume of material in the synthetic channel is approximately 37,300 CY, including inundated areas. The estimated volume of readily mobile sediment based on this estimate with a correction to remove volume occupied by water is 35,000 CY, which is approximately 60% of the estimated total volume of accumulated sediment presented in this report. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Project Area 15 The estimated volumes of sediment are summarized in Table 3. Note that the accumulated sediment in the Mill River upstream from Chartpak Dam appears to be well consolidated and the volume estimates presented in Table 3 do not include estimates for consolidated volumes based on dewatered sediment. Table 3. Summary of estimated sediment volumes in the impoundment Description Volume Estimate (CY) Total Accumulated Sediment 60,000 Readily Mobile Sediment 35,000 2.3.2.3 Sediment Quality Analysis Stantec collected three sediment samples, including two upstream and one downstream of the dam during the March 30, 2022, site visit for laboratory analyses. The sediment samples were collected using a manual bucket auger and the sample locations were documented using a GPS. Table 3 presents the sediment sample locations and depth of water, depth to the bottom of the sample collection, the depth of sediment, and the sample identifier. Table 4. Sediment Sample Locations and Depths Location ID Northing (ft) Easting (ft) Depth of Water (ft) Depth of Sediment Sample (ft) Identifier 23 2957421.8 331643.5 2 1.0 CD-Sed-Samp-01 (CHARTPAK-1) 1.0 ft below top of sediment; in normal-pool impoundment 22 2956872.6 331735.9 2 1.5 CD-Sed-Samp-02 (CHARTPAK-2) 1.5 ft below top of sediment; in normal-pool impoundment 21 2956706.8 331744.8 0 0.5 CD-Sed-Samp-03 (CHARTPAK-3) collected from exposed sediment bar Sediment samples were analyzed by Alpha Analytical, a Massachusetts-certified testing laboratory for a broad range of analytes and are identified as “Lab No. 2216587”. Sediment samples were analyzed by Alpha Analytical for metals, volatile organic compounds (VOCs), polycyclic aromatic hydrocarbons (PAHs), polychlorinated biphenyls (PCBs [by congener]), extractable petroleum hydrocarbons (EPHs), DDT, DDE, DDD, Aldrin, Endrin, Dieldrin, total organic carbon, and grain size. Stantec entered the results of the laboratory analyses into a spreadsheet template provided by DER that included ecological and human exposure threshold criteria and Massachusetts Contingency Plan Method 1 Standards criteria for soil and groundwater (S-1, S-2, GW-1) exposure thresholds and used conditional SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Project Area 16 formatting to compare the laboratory results with criteria provided by DER in the spreadsheet template. “Undetected” compounds based on the reported laboratory results were not compared to the threshold criteria. This comparison used the freshwater ecological threshold criteria in based on the sample locations being in freshwater. This comparison identified some exceedances of ecological Threshold Effects Concentrations (TECs) for metals (lead and zinc), PAHs, pesticides, and EPHs. This comparison also identified some exceedance of ecological Probable Effects Concentrations (PECs) for PAHs, pesticides, and EPHs in Sample ID CHARTPAK-2. No exceedances of the S1, S2, or GW-1 thresholds were reported. The results of the sediment sample analyses indicated some variation in exceedances between the sample results. Sample IDs CHARTPAK-1 CHARTPAK-3 had the same reported exceedances of TECs for PAHs (2 each) and pesticides (2 each) whereas Sample ID CHARTPAK-2 had multiple exceedances of metals, PAHs, pesticides, and EPHs. Sample IDs CHARTPAK-1 and CHARTPAK-3 were obtained from relatively shallow sediments while Sample ID CHARTPAK-2 was obtained from slightly deeper sediment. Based on the apparent differences in reported results from the three sediment samples, it is expected that deeper accumulated sediments may have higher concentrations of contaminants. The results of the sediment sample analysis are presented in the DER “Standard Analyses for Dam Removal Projects” summary table in Appendix C. This appendix also includes the laboratory results and documentation received from Alpha Analytical. 2.4 ADJACENT AREAS This section presents information on identified features adjacent to the dam and impoundment based on observations during the site visit and review of readily available information. 2.4.1 Historical References Preliminary information on potential historical resources associated with or adjacent to Chartpak Dam was obtained from the Massachusetts Cultural Resource Information System (MACRIS). Review of preliminary information obtained from MACRIS did not identify information (e.g., inventory forms) indicating that the dam or immediately adjacent features are historical resources. Information obtained from MACRIS identified that the Beaver Brook Arch (Massachusetts Historical Commission # NTH.900) is a historical resource. Beaver Brook Arch is the existing bridge for the Mass Central Rail Trail over Beaver Brook at its confluence with the Mill River approximately 1,950 ft upstream from Chartpak Dam. 2.4.2 Upstream and Downstream Infrastructure The following section contains information related to upstream and downstream infrastructure relevant to the removal of Chartpak Dam. Information noted in this section is based on readily available public data and observations from the site visit. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Project Area 17 2.4.2.1 Retaining Walls Prominent stone masonry retaining walls are located along the Mill River downstream from Chartpak Dam to the Mulberry Street Bridge. The Right Retaining Wall is approximately 15 ft to 20 ft high and begins approximately 150 ft downstream from the dam and extends approximately 350 ft downstream to the bridge. The Lower Left Retaining Wall and its upstream end abuts bedrock approximately 100 ft downstream from the left side of the primary spillway. This retaining wall forms the left side of the normal channel of the Mill River, is approximately 10 ft high, and extends approximately 400 ft downstream to the Mulberry Street Bridge. The Upper Left Retaining Wall is located along the west side of the Mass Central Rail Trail and extends downstream from the left side of the secondary spillway of Chartpak Dam. This retaining wall is approximately 20 ft high at its intersection with the secondary spillway and extends approximately 200 south (downstream) from the dam. 2.4.2.2 Remnant Mill Structures Remnants of mill structures are located on the relatively flat plateau between the Lower Left Retaining Wall and the Upper Left Retaining Wall along the left side of the Mill River downstream from Chartpak Dam. Observed remnants include concrete and stone masonry structures. The noted remnants appear to be depicted on the July 1902 Sanborn Fire Insurance Map that is discussed in the following section. 2.4.2.3 Sanborn Fire Insurance Maps The July 1902 Sanborn Fire Insurance Map (Figure 1) of the area adjacent to Chartpak Dam was reviewed as in the preparation of this report. Figure 1 depicts the location and extent of the old Nonotuck Silk Co. and associated buildings, including structures where mill remnants were observed during the site visit as described in Section 2.4.2.2. The map depicts a building identified as “paint shop” adjacent to the right abutment of the dam and other buildings along the right side of the river downstream from these dam that are no longer present based on observations during the site visit. The map does not depict other infrastructure directly adjacent to the dam. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Project Area 18 Figure 1. Image from the Sanborn Fire Insurance Map for Northampton, Massachusetts, dated July 1902; Dam is located in the upper left corner of the image (see arrow) SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Project Area 19 2.4.2.4 Mulberry Street Bridge Mulberry Street Bridge is located approximately 500 ft downstream of Chartpak Dam. Mulberry Street Bridge is single-span structure with vertical, cast-in-place concrete abutments that transition into the upstream stone masonry retaining walls. The bridge deck superstructure is supported with steel girders. The bridge appears to have been built in 1991 according to the Massachusetts Department of Transportation GIS bridge layer. 2.4.2.5 Beaver Brook Arch Bridge The Beaver Brook Arch is located on the Mass Central Rail Trail approximately 1,950 ft upstream from Chartpak Dam and spans Beaver Brook immediately upstream from its confluence with the Mill River. This bridge appears to be constructed of dry-laid stone masonry. 2.4.2.6 River Road River Road runs parallel along the west side of Mill Brook in the reach upstream from the dam. The road alignment follows the valley bottom and serves to confine the natural planform movement of Mill River. Approximately 0.7 miles upstream from Chartpak Dam there appears to have been hard armoring (riprap) placed along the right bank to reduce potential for erosion of the east side of River Road. 2.4.2.7 River Road Bridge River Road Bridge is located approximately 0.9 miles upstream of Chartpak Dam. Preliminary review of information for the preparation of this study suggests that the River Road Bridge is upstream from the hydraulic and fluvial geomorphic influence of Chartpak Dam. 2.4.2.8 Northampton Flood Control System The Northampton Flood Control System (NFCS) was constructed by the Army Corps of Engineers (USACE) between March 1939 and June 1941. The NFCS was designed to protect a large portion of the City of Northampton against flooding from the Connecticut River and the Mill River and included realigning the reach of the Mill River downstream (east) from Smith College to the south and away from downtown Northampton. The NFCS does not appear to influence hydraulic conditions in the Mill River adjacent to Chartpak Dam. 2.4.2.9 Waste Sites and Reported Releases Review of the MassDEP online database did not identify reported contaminant releases in the vicinity of Chartpak Dam. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Project Area 20 2.4.3 Natural Resources The Project reach of the Mill River, as described in Section 2.2, is bounded to the left (east) of the river by the Mass Central Rail Trail and to the right (west) by River Road. The proximity of the road and rail trail, and historical development, including Chartpak Dam, have resulted in alteration of land and appear to have impacted natural resources. The Project reach of the Mill River is mapped as a Coldwater Fisheries Resource by the Massachusetts Division of Fisheries and Wildlife and is therefore considered to be valuable habitat for cold water fish species. However, Chartpak Dam is a barrier to upstream fish passage and is therefore considered to adversely impact Coldwater Fisheries Resources in the Project reach of the Mill River. The U.S. Fish and Wildlife Service National Wetlands Inventory (NWI) mapping of the study area identifies the Project reach as “Riverine”. Based on observations during the site visit, riverine habitat in the approximately 600-ft reach of the Mill River immediately upstream from the dam (the Impoundment subreach) is degraded and provides low-value habitat due to accumulated sediment. Two areas of NWI Freshwater Emergent wetlands are depicted along the Mill River adjacent to the dam, including 1) along the left side of the channel downstream from the dam and 2) adjacent to the right side of the river approximately 600 ft upstream from the dam. The downstream wetland appears to be on a point bar between the left edge of the channel and the Lower Left Retaining Wall on the left side of the river. The upstream wetland is located between the right bank of the river and River Road and appears to receive water from an adjacent wetland located along the west side of river road. This wetland area does not appear to be hydrologically connected to the Mill River during normal flows in the river. Publicly available Massachusetts Department of Environmental Protection (MassDEP) wetlands data identifies “Wooded Marsh” wetlands in the same locations as the NWI Freshwater Emergent Wetlands. Observations during the site visit suggest that the floodplain forest between the left side of the Impoundment subreach and the Mass Central Rail Trail may have areas of wetlands. Delineation of wetlands in areas of identified direct impacts should be performed as part of future design and permitting. Publicly available Massachusetts Natural Heritage and Endangered Species Program (NHESP) data identifies Priority Habitats of Rare Species (PH 2084) along and upstream and downstream from the Project reach of the Mill River. The extent of this priority habitat appears to terminate approximately 4.25 miles upstream of Chartpak Dam. Information presented in “Freshwater Mussels and the Connecticut River Watershed” by Ethan Nadeau (Nadeau, 2008) indicates that the Mill River subwatershed in Northampton has one of the highest mapped diversity of mussel species relative to other subwatersheds in the Connecticut River watershed. Freshwater mussels are one of the most endangered groups of animals on Earth (Nadeau, 2008) and of the 12 species of freshwater mussels that occur in the Connecticut River watershed, eight are listed by one or more states as endangered, threatened, or special concern. The dwarf wedgemussel (Alasmidonta heterodon) is one of the most endangered species in the Connecticut River watershed and have been documented in the Mill River. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Hydraulic Modeling 21 2.4.4 Public Access The Norwottuck Branch Rail Trail provides public access adjacent to the left side of the Mill River adjacent to Chartpak Dam. While land adjacent to the dam appears to be privately owned and a path to the edge of the river immediately upstream from the secondary spillway is gated with a chain and posted, Stantec understands that trespassing by recreational users occurs. Stantec understands that the Mill River adjacent to Chartpak Dam is used for recreation (e.g., swimming) during warm weather and that the dam owner and others are aware of potential safety issues (e.g., fall hazards) associated with the dam and adjacent retaining walls and entrainment and entrapment in the outlet conduit. 2.4.5 Abutting Parcels Preliminary review of online parcel mappings adjacent to Chartpak Dam was obtained from the Commonwealth of Massachusetts MassMapper online tool. Two parcels are located adjacent to the right side of the dam between the river and River Road and appear to comprise the location of the existing Chartpak building, parking lot and adjacent land. One of these parcels extends across the river to the west side of the Mass Central Rail Trail and includes the dam. Other parcels to the left of the river include 1) a linear parcel along the alignment of the rail trail and 2) a parcel that appears to include the land with mill remnants between the Upper Left Retaining Wall and the Lower Left Retaining Wall. 3 HYDRAULIC MODELING Stantec developed a preliminary, one-dimensional, steady-state numerical hydraulic model (Model) of the Project reach of the Mill River to evaluate and compare existing and proposed hydraulic conditions in the Mill River adjacent to Chartpak Dam. 3.1 MODEL DEVELOPMENT This section presents descriptions of the Model development, including hydrologic inputs (i.e., discharges), development of the existing and proposed conditions geometries, input parameters, and boundary conditions. 3.1.1 Hydrology Hydrologic statistics for the use as inflow boundary conditions in the Model were developed using 1) analysis of daily average flow data obtained from USGS Station No. 01171500 and 2) peak-flow regression equations in StreamStats. A median annual flow statistic of 42 cfs was developed using daily average flow data from the USGS station, which is located on the Mill River downstream from Chartpak Dam and linearly scaled the median annual flow statistic based on drainage area. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Hydraulic Modeling 22 Peak-flow statistics were obtained from Massachusetts state-wide peak flow regression equations5 as reported in StreamStats and are summarized in Table 5. StreamStats statistics were used for the peak flow hydraulic analyses since they were similar to peak-flow statistics developed from data obtained from the downstream USGS gage station. Use of the StreamStats statistics is considered to be appropriate for this preliminary-level analysis. Table 5. Peak-flow hydrologic statistics Annual Exceedance Probability (%) 50 20 10 4 2 1 0.5 0.2 Return Interval (years) 2 5 10 25 50 100 200 500 Discharge (cfs) 981 1,620 2,130 2,880 3,510 4,180 4,930 6,000 3.1.2 Hydraulic Model The Model was developed using the U.S. Army Corps of Engineers (USACE) HEC-RAS (ver. 6.1.0) software system. Geometric data for the Model was obtained from a digital terrain model (DTM) developed from digital terrain data for the area adjacent to Chartpak Dam obtained from the 2008 Survey Plan. Digital terrain data for areas further upstream and downstream from the dam was obtained from the 2015 LiDAR dataset accessed through the MassGIS online data portal. Based on comparison of elevation data in the compiled DTM and survey data collected during the site visit, the DTM appears to be reasonable for the preliminary hydraulic analysis for this study. The Model domain extends approximately 3,180 ft upstream and 860 ft downstream from Chartpak Dam and the lateral extents include the wetted extents of the maximum modeled flow (the 500-year return- interval peak flow). Chartpak Dam was incorporated into the existing conditions as an inline structure. The 4.5-ft-diameter outlet conduit was not included in the Model dam geometry as it does not appear to be maintained and accumulated debris was observed on the inlet during the site visit. The Mulberry Street Bridge and the breached dam downstream from the dam were not included in the Model due to insufficient geometric information on these structures. The Manning’s “n” values of 0.035 for the channel with 0.08 for the overbanks were applied to cross sections in the Model domain. Flows and friction slopes were applied as upstream boundary conditions and a friction slope of 0.005 was applied as the downstream boundary condition. Model simulations were performed for existing and proposed conditions with the median annual flow and the eight high-flow discharges presented in Table 5 with mixed computations flow regime to allow for subcritical and supercritical flow and transitions between these flow regimes. 5 Zarriello, P.J.,2017, Magnitude of flood flows at selected annual exceedance probabilities for streams in Massachusetts: U.S. Geological Survey Scientific Investigations Report 2016–5156, 99 p. (https://dx.doi.org/10.3133/sir20165156) SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Hydraulic Modeling 23 The proposed conditions Model geometry included 1) removal of the primary spillway between the right side of the secondary spillway and the right abutment of the dam and 2) grading a trapezoidal channel in the existing conditions DTM. The trapezoidal proposed conditions channel has a bottom width of 50 ft, side slopes of 1.5H:1V, and extends approximately 1,400 ft upstream from the dam to the vicinity of the upstream end of the pool in the Transitional subreach. Annotated figures of the existing and proposed conditions Models are provided in Figure 2. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Hydraulic Modeling 24 Existing Conditions Model Proposed Conditions Model Figure 2. Hydraulic Model Domains (existing and proposed conditions) SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Hydraulic Modeling 25 3.2 MODEL RESULTS Figure 3 presents water surface elevation profiles for the median annual discharge and the 100- and 500- year peak flows for existing and proposed conditions. The model simulation results in this figure depict that the preliminary design for removal of Chartpak Dam, which includes removal of the primary spillway and right side of the dam, would reduce water surface elevations upstream from the dam and have little effect on water surface elevations downstream from the dam. For the median annual discharge, the upstream water surface elevations for existing and proposed conditions converge approximately 1,400 ft upstream from the dam at the approximate upstream limit of the preliminary starter channel that would be constructed as part of sediment removal. For the 100- and 500-year peak flows, the upstream water surface elevations for existing and proposed conditions converge approximately 1,900 ft upstream from the dam in the vicinity of the Beaver Brook Arch bridge. Figure 3. Hydraulic Model profiles of simulated water surface elevations for existing and proposed conditions. The profile summary table for simulated hydraulic parameters across each inflow for existing and proposed conditions is presented in Appendix D. Figure 4 presents plan depictions of the Model results for the median annual discharge and the 100-year peak flow for existing and proposed conditions. Note the difference between existing and proposed conditions in these figures are limited for the median annual discharge (i.e., no significant difference between existing and proposed in inundation boundaries) but that differences for the 100-year peak flow are pronounced for approximately 1,400 ft upstream from the dam. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Hydraulic Modeling 26 The results of the preliminary hydraulic model simulations suggest that Chartpak Dam could be removed without adversely impacting the adjacent FEMA floodplain. Additional hydrologic and hydraulic analyses are recommended as part of future Project studies. Median Annual Discharge 100-Year Peak Flow Figure 4. Hydraulic Model Simulation Results SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Hydraulic Modeling 27 3.3 DAM REMOVAL HYDRAULIC CRITERIA The following hydraulic criteria are required to be met to qualify as a dam removal project in Massachusetts: 1. ODS: Remnants of the dam proposed to remain will not form an impoundment of more than 6 ft in depth or 15-acre-feet in volume, as required by definition of a non-jurisdictional structure, during the spillway design flood. 2. MassDEP: Remnants of the dam proposed to remain will not impound water during the 500-year storm (criterion used to assess eligibility for “ecological restoration project” status during as part of the wetland protection act regulatory review. 3. FEMA: The proposed dam removal conditions will not result in a rise in water surface elevations. The Model results indicate that depths of flow in the Mill River downstream from Chartpak Dam for the simulated 100-year storm are approximately 9 ft and it is expected that the water depths upstream of the dam following removal would be similar and therefore greater than the 6-ft depth ODS hydraulic criteria. The Model simulation results for the proposed condition indicate that depths of water upstream from the dam would be similar to natural riverine conditions in the Mill River upstream from the former impoundment and downstream from the dam and that additional water is not impounded for the evaluated dam removal condition. Therefore, the preliminary Model results indicate that the proposed dam removal geometry appears to satisfy ODS criteria for a non-jurisdictional structure. Ambient, natural riverine flow speeds in the Mill River downstream from the dam, which is assumed to be an appropriate reference reach due to the lack of hydraulic influence of the dam, range from approximately 7 to 10 ft per second (fps) for the 500-year storm. Under the proposed dam removal conditions, preliminary modeling results suggest the flow speeds upstream of the dam are greater than 10 fps and downstream are approximately 7 to 10 fps. Therefore, remnants of the dam proposed to remain do not appear to result in impounding of water during the 500-year storm and appear to satisfy the primary hydraulic criteria associated with MassDEP’s dam removal ecological restoration project criteria. The preliminary Model results also indicate that the proposed dam removal geometry would not result in an increase in adjacent water surface elevations relative to existing conditions. Therefore, the proposed dam removal geometry appears to satisfy FEMA hydraulic criteria. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Dam Removal Opportunities and Constraints 28 4 DAM REMOVAL OPPORTUNITIES AND CONSTRAINTS Chartpak Dam was constructed as part of a former mill complex adjacent to the dam but is no longer used for commercial or industrial purposes. The dam was not designed for downstream flood protection and is not operated or maintained for this purpose. The primary identified opportunities associated with removal of Chartpak Dam are elimination of responsibilities associated ownership of the dam, improved public safety, improved recreational opportunities along the Mill River upstream from the dam, and could potentially facilitate transfer of land adjacent to the dam to the City of Northampton. The primary identified constraint to removal of the dam is the relatively large volume of accumulated sediment upstream from the dam. Additionally, aesthetic concerns raised by abutters to dam impoundments and impoundment-focused recreational uses are typical for dam removals. These issues were not identified as primary constraints to removal of Chartpak Dam, however, based on the paucity of abutters and limited aesthetic appeal of the impoundment relative to the adjacent reaches of the Mill River. The following sections presents identified opportunities and constraints for removal of Chartpak Dam. 4.1 DAM SAFETY Chartpak Dam is a Significant Hazard Potential (Class II) classification in accordance with DCR dam safety rules and regulations. Removal of the dam would eliminate costs and liabilities associated with ownership and maintenance of the dam. Removal of the dam would also eliminate risks to downstream areas associated with dam failure. 4.2 PUBLIC SAFETY Removal of Chartpak Dam would eliminate public safety risks associated with failure of the dam and could eliminate or reduce public safety risks associated with other dam-related hazards, such as fall hazards and entrainment in the sluiceway. 4.3 CONSTRUCTION ACCESS AND STAGING Construction access and staging are necessities for dam removal construction. Potential access routes to the vicinity of Chartpak Dam are present on both sides of the Mill River adjacent to the dam, including 1) access along the Mass Central Rail Trail along the left side of the river and 2) access from land between the right side of the river and River Road. The Mass Central Rail Trail could be used for construction access from Mulberry Street but is not suitable for large-scale construction due to poor visibility along Mulberry Street at the intersection of the trail. In SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Dam Removal Opportunities and Constraints 29 addition, use of the rail trail for primary construction access would prevent or substantially limit public use of the rail trail during construction. Chartpak Dam is located on a parcel of land that extends to the rail trail along the left side of the river and to River Road on the right site of the river. There are existing, paved parking areas along River Road on this parcel north of the existing Chartpak, Inc. buildings that could be used for construction staging and the southern end of this parking area is within 300 ft of the right side of the dam. The suggested approach for construction access and staging is to have the primary construction staging area in the parking lot along River Road and to construct access roads to the dam from the parking area. Construction equipment access to the downstream side of the dam would likely be required for construction and is expected to require some access to and along the Mass Central Rail Trail. One potential constraint is property ownership in the parcel immediately downstream of the dam to the left of the river, which appears to be privately owned. There may be opportunity to access the dam by constructing an access ramp along the downstream side of the secondary spillway. Additional discussion on construction access and sequencing is provided in Section 5 of this report. 4.4 RECREATIONAL OPPORTUNITIES Removal of Chartpak Dam could support restoration of more natural conditions along the channel of the Mill River upstream from the dam and thereby foster improved recreational opportunities (e.g., swimming) in the Mill River adjacent to the Mass Central Rail Trail in the village of Leeds. Improved recreational opportunities are therefore identified as a primary opportunity associated with removal of Chartpak Dam given the existing recreational uses along the Project reach of the Mill River. A contributing factor associated with improved recreational opportunities is the potential transfer of land along the Mill River that is currently owned by the dam owner to the City of Northampton as part of a dam removal project. 4.5 NATURAL RESOURCES Chartpak Dam has fragmented the Project reach of the Mill River by altering fluvial process and aquatic and riparian habitat and movement of animals within and between these habitats. Removal of the dam would restore transport of sediment and nutrients in the Mill River and restore aquatic and riparian habitat and connectivity between these habitats, including opportunities for volitional upstream fish passage. 4.6 SEDIMENT MANAGEMENT This section presents general information on sediment management that are used for dam removal projects in New England and identified opportunities and constraints for sediment management as part of removal of Chartpak Dam. The following sections present a general description of sediment management SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Dam Removal Opportunities and Constraints 30 approaches that are frequently used for dam removals in Massachusetts and discussing of sediment management for removal of Chartpak Dam. 4.6.1 Sediment Management Approaches Factors that are typically addressed as part of sediment management as part of design and permitting for removal of dams in Massachusetts include the volume, composition, and quality of accumulated sediment. General approaches to sediment management as part of dam removal projects are active (e.g., dredging) sediment management, “instream” sediment management, and hybrid approaches that use elements of active and instream sediment management. Active sediment management incorporates repositioning and removal of sediment and typically requires substantial additional construction effort and costs relative to instream sediment management due to the need to handle sediment as part of dam removal construction. Repositioning accumulated sediment within a dam impoundment is a management approach that can reduce costs for active sediment management but is contingent on having relatively low-energy areas where repositioned sediment can be placed. Instream, or “passive”, sediment management is based on allowing accumulated sediment to naturally remobilize as part of dam removal construction. Primary considerations for instream sediment management are 1) the presence of environmental contaminants in the sediment, 2) the assimilative capacity of the downstream reach of the project waterway, and 3) impacts to downstream natural resources and infrastructure. Elevated concentrations of environmental contaminants in accumulated sediment can limit or prevent use of instream sediment management. Primary factors that are considered when evaluating instream sediment management where elevated contaminant concentrations are identified are 1) the concentrations of contaminants relative to applicable contaminant criteria, 2) whether elevated contaminant concentrations are present in the downstream, and 3) the volume of sediment, and therefore contaminants, that would be released. Assimilative capacity refers to the capacity of the downstream reach of a river to accommodate the volume of sediment that would be remobilized following dam removal, including potential aggradation of sediment in the downstream channel that could result in higher water surface elevations during floods and reduction in open area and conveyance through bridges and culverts. Assimilative capacity is also relevant when considering instream sediment management with elevated concentrations of environmental contaminants. The magnitude of potential impacts to downstream natural resources and infrastructure is the ultimate criterion for instream sediment management and can result in adverse biological and physical impacts. Potential biological impacts can result from release of sediment with contaminants, elevated turbidity, and other factors. Potential physical impacts can result from alteration of habitat, such as sand increasing embedment of coarse substrate reducing habitat for macroinvertebrates and fish spawning, and aggradation of the waterway channel resulting in higher flood water surface elevations. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Dam Removal Opportunities and Constraints 31 Hybrid approaches that include elements of passive and active sediment management are commonly used for dam removal projects in Massachusetts and may be practical necessities. For example, removal or repositioning of sediment may be necessary to access parts of a dam as part of dam removal construction even when instream sediment management is the approved sediment management approach. Active repositioning of sediment can be integrated with instream sediment management to reduce near- term remobilization of sediment as part of dam removal. Removal of Bartlett Rod Shop Company Dam on Amethyst Brook in Pelham, Massachusetts in 2012 included repositioning of approximately 4,000 CY of sediment within the former impoundment to reduce short-term impacts to the downstream reach of Amethyst Brook. A primary objective of that project was to restore sediment delivery into the downstream reach of the brook to improve spawning habitat for anadromous sea lamprey (Petromyzon marinus). Figure 5 is a time series of photographs facing upstream from approximately 200 ft downstream from the dam prior to and during construction in late 2012 and after construction in 2013. Sea lamprey were observed spawning in this reach of Amethyst Brook in June 2013. Figure 5. Amethyst Brook approximately 200 ft downstream from Bartlett Rod Shop Company Dam before, during, and after dam removal construction (October – December 2012). Another example of a hybrid sediment management approach was removal of Elm Street Dam at head-of- tide on the Jones River in Kingston, MA in 2019. This project included passive sediment management for SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Dam Removal Opportunities and Constraints 32 natural remobilization of approximately 3,000 CY of sediment with dredging and offsite disposal of approximately 300 CY of accumulated sediment under the Elm Street Bridge located approximately 10 ft upstream from the dam spillway. Primary factors that resulted in implementation of passive sediment management for the Elm Street Dam removal project included relatively low concentrations of contaminants and receipt of permits for instream sediment management. Conversely, removal of multiple dams on Town Brook in Plymouth, MA, such as removal of Holmes Dam in 2020, included active sediment management approaches to address elevated contaminant concentrations in the accumulated sediment. Upper Roberts Meadow Dam on Roberts Meadow Brook in Northampton was removed in 2018 using instream sediment management with staged removal of the dam to allow for consolidation of sediment during dam removal construction. Roberts Meadow Brook is a tributary to the Mill River and its confluence is along the right side of the river just downstream from the Mulberry Street Bridge and the dam was located approximately 2 miles southwest of Chartpak Dam. The immediate downstream reach of Roberts Meadow Brook was largely undeveloped and sediment that was mobilized during and after removal of the dam was allowed to accumulate in the Roberts Meadow Reservoir and did not adversely impact the Mill River. Apparent factors that contributed to the applicability of instream sediment management for removal of Upper Roberts Meadow Dam were 1) that Roberts Meadow Brook had been channelized along the north side of Reservoir Road and therefore had good sediment transport capacity and 2) that sediment was allowed to accumulate in the downstream reservoir. 4.6.2 Sediment Management at Chartpak Dam Sediment management is identified as a primary constraint to removal of Chartpak Dam due to the volume of accumulated sediment relative to the apparent assimilative capacity of the downstream reach of the Mill River. This identified constraint is based on 1) the relatively large volume of accumulated sediment relative to the expected assimilative capacity of the downstream reach of the Mill River and 2) expected costs for active sediment management. Note that the results of the sediment sampling presented in Section 2.3.2.3 indicate that contaminant concentrations obtained from sampled collected in the impoundment were not substantially greater than from the sample collected downstream from the dam but that sediments that are sequestered deeper in the impoundment could have higher contaminant concentrations. The estimated volume of readily mobile sediment upstream from Chartpak Dam is approximately 35,000 CY (reference Section 2.3.2.2) and is approximately 60% of the estimated total volume of sediment. This is a relatively large volume of sediment given that the downstream reach of the Mill River between the dam and Mulberry Street Bridge approximately 500 ft downstream is confined by the Lower Left Retaining Wall and the Right Retaining Wall between the dam the bridge. Other downstream infrastructure, including the breached dam just downstream from the bridge and the Button Shot No. 1 and No. 2 dams approximately 2,000 ft downstream from Chartpak Dam, would reduce dispersal of sediment into the downstream reach of the Mill River. It is therefore expected that removal of Chartpak Dam with instream sediment management or failure of the dam would result in substantial aggradation of remobilized sediment in the channel of the Mill River and consequent increases in water surface elevations. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Dam Removal Opportunities and Constraints 33 Based on the identified constraints to instream sediment management, active sediment management is suggested as a prudent and appropriate approach for sediment management for removal of Chartpak Dam. Removal of all sediment in the historical channel upstream from Chartpak Dam is not considered to be possible, however, and the suggested sediment management approach is therefore a hybrid approach incorporating active and instream sediment management. The objective of this approach is to remove a sufficient volume of accumulated sediment to reduce the risk of adverse impacts to the downstream reach of the river. The suggested approach is to construct a “starter channel” through accumulated sediment for approximately 700 ft upstream from the dam (i.e., to the upstream limit of the Impoundment subreach/downstream limit of the Transitional subreach). The estimated volume of sediment that would need to be removed for this scenario would be approximately 75% of the total volume of readily mobile sediment and is therefore approximately 26,000 CY. It is estimated that at least 10,000 CY of sediment from the former impoundment would subsequently be remobilized downstream from the upstream limit of construction. Potential impacts of this approach would need to be evaluated prior to identification of a sediment management as part of dam removal design and permitting. Repositioning of sediment into areas adjacent to the Mill River does not appear to be feasible due to the proximity of the Mass Central Rail Trail adjacent to the left side of the river and River Road adjacent to the right side of the river. The floodplain forest between the left side of the river in the Impoundment subreach and the Mass Central Rail Trail would need to be cleared of trees if it were to be used as a sediment placement area and removal of trees would be visually unappealing from the rail trail and could result in subsequent erosion of repositioned sediment into the river. Land between the Impoundment subreach and River Road appears to also have mature forest and poor suitability for repositioned sediment. It is therefore suggested that sediment that is actively managed should be brought to an offsite location. Active sediment management with removal and offsite disposal or reuse and limited instream sediment management is the suggested sediment management approach for removal of Chartpak Dam. While the expected cost to remove the estimated volume of sediment for active management (~26,000 CY) is substantial, associated costs should be considered in light of the Project goals and objectives, including elimination of risks from dam failure and consequent downstream release of accumulated sediment. Reference Section 8 for information related to an opinion of probable cost for removal of Chartpak dam. 4.7 ADJACENT INFRASTRUCTURE Infrastructure that is dependent on Chartpak Dam was not identified as part of this study and potential impacts to infrastructure from removal of the dam is not identified as a constraint to dam removal except as described with regard to instream sediment management. It is not anticipated that dam removal would have an impact on Mulberry Street Bridge. The basis for this is that Chartpak Dam is a run-of-river type structure, does not serve to provide flood attenuation and storage, is not regulated as a flood control structure, and the existing retaining walls upstream from the bridge would continue to confine the channel immediately upstream from the bridge. Therefore, it is not expected that removal of the dam would alter hydraulic conditions at this bridge. However, based on the large volume of SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Dam Removal Opportunities and Constraints 34 accumulated sediment in the Chartpak Dam impoundment, it is possible, that failure of the dam or dam removal without sediment management could result in aggradation of sediment in the downstream channel and consequent increases in water surface elevations. It is not anticipated that dam removal would have an impact on Beaver Brook Arch Bridge, River Road, or River Road Bridge. The basis for this is that it appears as though the bedrock in the channel at the Transitional subreach would limit upstream head-cutting and erosion of the channel and would not impact the vertical channel alignment in the vicinity of these upstream infrastructure. 4.8 HISTORIC RESOURCES Disturbance of historic resources can be a constraint to dam removal and represent an additional cost for dam removal planning, design and permitting, and construction. As described in Section 2.4.1, Beaver Brook Arch is identified was identified in MACRIS as a historic resource in the study area. It is recommended that subsequent dam removal planning and design further evaluate whether removal of Chartpak Dam would adversely impact Beaver Brook Arch. While it is suspected that Beaver Brook Arch is upstream from expected changes to the channel of the Mill River that could result following removal of Chartpak Dam, review of historical design materials for this bridge (if available) and subsurface investigations (e.g., borings) to evaluate whether the bridge is founded on bedrock are recommended. Chartpak Dam is a good example of a stone masonry dam and is more than 50 years old, which is a criterion that is sometimes used for designation of historic resource. However, the dam is not identified in MACRIS and is a typical example of stone masonry dams and other structures. Note that the construction of Chartpak Dam appears to be similar to that of Upper Roberts Meadow Dam. Similarly, the mill remnants downstream from the left side of the dam are more than 50 years old but typical of remnant mill structures in New England. Coordination with historic resource agencies is recommended as subsequent efforts to advance the Project. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Preliminary Dam Removal Approach 35 5 PRELIMINARY DAM REMOVAL APPROACH The following sections present a brief overview of a preliminary dam removal approach and construction sequencing for the removal of Chartpak Dam. 5.1 OVERVIEW Dam removal projects typically require identification and evaluation of opportunities and constraints. Physical conditions that are often evaluated include impacts to natural resources (e.g., wetlands), sediment quality and quantity and associated management needs, adjacent infrastructure, and historical resources. Social factors also arise as part of the dam removal project process and are typically associated with perceptions associated with expected alteration of dam impoundments from lentic (e.g., ponds, lakes) to lotic (e.g., rivers, streams) conditions. Mitigation of physical impacts, such as installation of scour countermeasures at impacted bridges and culverts, may be identified as necessary as part of a given dam removal project. Similarly, accommodation of social concerns may also be identified as appropriate, such as construction of trails and installation of signage for documentation or pre-dam removal conditions. The primary identified opportunities associated with removal of Chartpak Dam are elimination of responsibilities associated ownership of the dam, improved public safety, and improved recreational opportunities along the Mill River upstream from the dam. The primary identified constraint to removal of the dam is the relatively large volume of accumulated sediment upstream from the dam. Removal of the Chartpak Dam can achieve the identified dam removal opportunities and the conceptual dam removal approach therefore includes items that are intended to address the identified Project objectives while accommodating the primary identified constraint (i.e., sediment management). 5.2 PRELIMINARY APPROACH This section presents a preliminary approach for removal of Chartpak Dam. The primary elements of this preliminary approach are 1) removal of sufficient elements of the dam to meet the dam removal criteria presented in Section 3.3 and 2) a hybrid sediment management approach that is primarily based on active sediment management. The preliminary dam removal approach is to 1) remove approximately 26,000 CY of sediment upstream to approximately 700 ft upstream from the dam and 2) remove the primary spillway between the right side of the secondary spillway and the right abutment of the dam. The following sections present the preliminary approach for removal of Chartpak Dam. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Preliminary Dam Removal Approach 36 5.2.1 Construction Access and Staging The suggested primary construction staging area is the existing parking areas located along the east side of River Road to limit restrictions on use of the Mass Central Rail Trail during dam removal construction. The noted parking area appears to provide good access and egress to River Road and is within a few hundred feet of the right side of the Mill River and Chartpak Dam. Temporary construction access roads would need to be constructed between the primary construction staging area, Chartpak Dam, and the Mill River. The suggested approach is to have at least two construction access roads, with one providing access to the dam and the other providing access to the upstream end of the parcel that is owned by the owner of Chartpak Dam. Access along the downstream access road would be focused on dam removal and water management and access along the upstream road would be focused on water and sediment management (reference Figure B2 in Appendix B for location of access roads). It is expected that construction access to the left side of the dam adjacent to the secondary spillway and to the base of the dam would be needed for dam removal. Potential access routes to the left side of the dam would include either crossing the river upstream from the dam or along the Mass Central Rail Trail from Mulberry Street. Both of these construction access approaches are considered feasible as part of this preliminary design. Access to the downstream side of the dam is generally more constrained than the upstream side of the dam due to the steep slopes and retaining walls. Access for construction equipment to the downstream side of Chartpak Dam from the right side does not appear to be feasible due to steep slopes on the right side of the dam. Access to the downstream side of the dam from the left side of the river appears to be feasible along existing grades approximately 150 ft downstream from the left side of the dam or through the secondary spillway. Access from approximately 150 ft downstream from the dam would, however, require access across a privately owned parcel. A potential alternative approach is to remove the top of the secondary spillway adjacent to its intersection with the Upper Left Retaining Wall and construct and access ramp to the base of the dam by placing material into the plunge pool at the base of the secondary spillway. The ground elevation immediately upstream from the secondary spillway is approximately 17 ft above the elevation of ground at the base of the secondary spillway and a construction access ramp constructed along the length of the secondary spillway may therefore be suitable for construction equipment to access the downstream side of the dam. Fill material for construction of a construction access ramp at this location could be obtained from accumulated sediment in the impoundment or material removed from the dam. Fill placed along the downstream side of the secondary spillway could remain in place following construction to reduce or eliminate fall hazards associated with the secondary spillway. In additional, a potential recreational amenity would be to augment the fill by placing stone masonry blocks removed from the primary spillway to create a public space along the river. For example, cut stone masonry from the dam could be placed to create a series of steps and benches along the downstream side of the secondary spillway with a southwest exposure to capture the afternoon sun. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Preliminary Dam Removal Approach 37 5.2.2 Water and Sediment Management Water and sediment management are necessarily coupled for dam removal and require appropriate consideration as part of the design and permitting process and implementation during construction. As described in Section 4.6.2, the suggested sediment management approach includes active management of approximately 26,000 CY of accumulated sediment to approximately 700 upstream from Chartpak Dam and an allowance for approximately 10,000 CY of sediment that would subsequently be remobilized downstream from the upstream limit of construction. The preliminary approach for this hybrid sediment management approach is to use terrestrial excavation equipment (e.g., excavators) to construct a “starter channel” for approximately 700 ft upstream from the dam and to dispose of the excavated material offsite. While some material could potentially be reused onsite, such as for fill downstream from the secondary spillway, it is expected that most of the material would need to be taken to an offsite disposal facility. The suggested approach for water management is to facilitate excavation of sediment by bypassing lower- flow discharges through the approximately 700-ft-long work area using a temporary water diversion conduit(s) and a temporary cofferdam at the upstream limit of work. A temporary water diversion conduit could be discharged over the crest of the dam or through a lowered section of the low-level sluiceway. Use of the low-level sluiceway would require work to reactivate it because the upstream end is embedded in sediment and there doesn’t appear to be a gate operator. Removal of a section of the top course of stone masonry blocks from the crest of the dam would likely be easier and could facilitate iterative lowering of the spillway crest and the temporary water diversion conduit as work progresses for removal of sediment and the dam. The size of a temporary diversion water diversion conduit and coffer dam would need to be evaluated as part of subsequent design. To facilitate construction access from the right side of the impoundment, a temporary water diversion conduit could be trenched into existing sediment. An alternative water management alignment is to route a temporary water diversion conduit through the floodplain forest along the west side of the Mass Central Rail Trail upstream from the secondary spillway. This approach would require a breach in the secondary spillway and would need to be evaluated as part of dam removal design. It is not expected that this approach would require substantial adjacent tree clearing. Note that the upstream limit of work appears to be upstream from land owned by the dam owner and coordination with and approval by current landowners on both sides of the river would be necessary for access and construction. The suggested sequence of water and sediment management is to remove most of the upstream sediment prior to removal of most of the primary spillway. The basis for this approach is to limit remobilization and transport of sediment into the downstream reach of the river during high-flow events that exceed the capacity of the temporary water diversion conduit during construction. Regardless of the selected water management approach, the approach must include contingencies for high-flow conditions that exceed the capacity of the construction-phase temporary water diversion system. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Preliminary Dam Removal Approach 38 Active removal of accumulated sediment would be facilitated by dewatering and reestablishing the function of the low-level sluiceway could be used to facilitate sediment dewatering. If the low-level sluiceway is reestablished for dam removal construction, it is expected that a screen or filter system would need to be installed to facilitate dewater of upstream sediments without sluicing sediment or clogging the low-level sluiceway. This water and sediment management approach assumes that sediment would be excavated and placed in off-road haul trucks and transported to the primary construction staging area for loading into on-road haul trucks for offsite disposal or beneficial reuse. 5.2.3 Dam Removal Extents Following removal of most of the sediment targeted for active management, the primary spillway would be breached. The suggested breach would include removal of the left side of the primary spillway adjacent to the right side of the secondary spillway to the right side of the primary spillway adjacent to the right abutment of the dam. Removal of ancillary structures adjacent to the right side of the dam is also recommended. Note that any modifications to the dam during construction could compromise the integrity of the dam and increase the risk of dam failure. Any proposed modifications of the dam would need to be approved by an engineer for compliance with ODS dam safety rules and regulations. In general, no substantial modifications to the dam, such as breaching of the secondary spillway for access to the downstream side of the dam, should be performed before the primary spillway can be removed to reduce the potential for failure of the dam during construction. 5.3 PRELIMINARY CONSTRUCTION SEQUENCING This section presents a preliminary construction approach for removal of the primary spillway of Chartpak Dam as described in the preliminary dam removal approach presented in Section 5.2, including the preliminary construction-phase water and sediment management approach. This sequence is based on a temporary water diversion conduit through the impoundment but is representative of an approach with a conduit routed through the floodplain forest upstream from the secondary spillway. The following list presents the sequence of the preliminary construction and water management approach. Note that Phases 1, 2 and 3 begin and end with a description of water management associated with these phases. 1) Construction Mobilization a. Prepare primary staging area. b. Construct access roads on left side of impoundment. c. Construct preliminary access routes across impoundment. d. Construction access roads on right side of impoundment. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Preliminary Dam Removal Approach 39 2) Phase 1: Installation of Temporary Water Management System a. Flow in the Mill River is through the impoundment and over the primary spillway. b. Install temporary water diversion conduit(s) from upstream limit of work to dam. c. Perform minor modifications to the primary spillway (if needed and possible) to accommodate water diversion conduit. d. Install a temporary cofferdam at upstream limit of work. e. Initiate commissioning of the temporary water management system (diversion of flow into the conduit and discharge over the primary spillway). f. Reestablish the low-level sluiceway (if possible) to facilitate dewatering of accumulated sediment. g. Flow remains diverted through the temporary water diversion conduits from the upstream temporary cofferdam and discharged downstream from the dam. 3) Phase 2: Active Sediment Management a. Flow is diverted through the temporary water diversion conduits from the upstream temporary cofferdam and discharged downstream from the dam. b. Actively manage sediment in the Impoundment subreach. i. Excavate sediment and haul to primary staging area. ii. Haul sediment to offsite location for disposal or beneficial reuse. c. Remove elements of the dam above the elevation of the primary spillway right of the primary spillway and in the adjacent upland area. d. This phase may include construction of a river channel elements in the work area if that is part of the designed and permitted work. e. This phase may include incremental lowering of the primary spillway if that is part of the designed and permitted sequence of work. f. Flow remains diverted through the temporary water diversion conduits from the upstream temporary cofferdam and discharged downstream from the dam. 4) Phase 3: Primary Spillway Removal a. Flow is diverted through the temporary water diversion conduits from the upstream temporary cofferdam and discharged downstream from the dam. b. Incrementally remove (lower) the primary spillway. c. Construct access to the downstream side of the spillway (if needed). d. Complete removal of primary spillway. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Preliminary Dam Removal Approach 40 e. Restore disturbed areas along the banks of the Impoundment subreach. f. Remove upstream temporary cofferdam to establish flow into the Impoundment subreach (note that removal of the upstream temporary cofferdam could potentially be performed with access along the Mass Central Rail Trail to avoid having the cross the channel in the work area). g. Flow is through the Project reach of the Mill River. 5) Phase 4: Site Restoration, Cleanup, and Demobilization. a. Restore site, including decommissioning of temporary access roads and final grading. b. Perform site cleanup. c. Demobilize. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Environmental Permitting 41 6 ENVIRONMENTAL PERMITTING It is anticipated that environmental regulatory review and permitting requirements for this Project would be similar to those encountered as a part of other small dam removal projects in Massachusetts and will include local, state, and federal regulatory coordination and permits. Early coordination with the Northampton Conservation Commission during the stakeholder outreach process, as well as pre-application coordination with other local, state, and federal environmental regulators, is recommended to facilitate an efficient regulatory review process. Anticipated regulatory coordination, review, and permit requirements include: 1. Expanded Environmental Notification Form under Massachusetts Environmental Protection Act 2. Water Quality Certification from MassDEP 3. Notice of Intent under the Massachusetts Wetlands Protection Act and the City of Northampton Wetlands By-Law 4. Authorization under Category II of the General Permit from the U.S. Army Corps of Engineers 5. Chapter 253 Permit from the Massachusetts DCR ODS would be required for dam removal 6. Chapter 91 Waterways authorization. It was not determined whether the Project site is located in an area that is within the jurisdiction of the Massachusetts Public Waterfront Act (Chapter 91). Potential requirement for a Chapter 91 License and/or Permit for this Project would need to be evaluated during the design and permitting process Additional permits or authorizations may be required based on Project development and coordination with environmental regulators. Potential additional permits and authorizations are not included in the opinion of probable cost (OPC) provided in this report (reference Section 8) may include: 1. Massachusetts Endangered Species Act Coordination: If the Project is determined to have the potential to impact state-listed species, additional coordination (e.g., including development of a Habitat Management Plan) may be required. As described in Section 2.4.3, a cursory review of the NHESP indicates that the Project reach along the Mill River, including the location of Chartpak Dam, is listed as priority habitat by the NHESP (PH 2084). 2. Additional Municipal Review and/or Permits: Additional municipal permits or reviews may be identified based on a review of municipal ordinances and related coordination with the City of Northampton. 3. Review by the Massachusetts Historical Commission. 4. Compliance with Section 106 of the National Historic Preservation Act. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Discussion on Additional Recommended Data Collection 42 7 DISCUSSION ON ADDITIONAL RECOMMENDED DATA COLLECTION This section presents additional data collection and study needs based on the preliminary information presented in this report. Note that subsequent studies for removal of the dam may identify other study needs. The primary identified constraint to removal of Chartpak Dam is sediment management and further evaluation of sediment management approaches and alternatives is recommended. Other potential constraints include property ownership adjacent to the dam in the Project area and potential impacts to the Beaver Brook Arch. An additional recommendation that is provided here is to foster communication and collaboration between the dam owner and the City of Northampton to develop a comprehensive plan that identifies roles and responsibilities for dam removal planning, design and permitting, and construction along with potential land transfers that could occur as part of the Project. 7.1 SEDIMENT STUDY Based on the relatively large volume of impounded sediment upstream from Chartpak Dam, additional study is recommended to better quantify the volume and composition of impounded sediment. Based on the expectation that sediments upstream from the dam may be vertically stratified, it is recommended that borings be performed along the impoundment to provide information that can be used to evaluate subsurface conditions, including the potential presence of bedrock. 7.2 INTEGRATED FLUVIAL GEOMORPHIC, HYDRAULIC MODELING, AND SEDIMENT TRANSPORT STUDY Based on the relatively large volume of accumulated sediment, uncertainty regarding the upstream limit of effects from Chartpak Dam, and potential impacts to downstream resources from sediment release, it is recommended that an integrated study be performed that addresses fluvial geomorphic, hydraulic and sediment transport conditions for design and permitting for Chartpak Dam. The suggested study approach is to develop a detailed hydraulic model of the Mill River upstream and downstream from Chartpak Dam and use this model along with information obtained from field studies to evaluate potential changes in the morphology, sediment transport, and water surface elevations in the Project reach of the Mill River as part of dam removal. Based on the results of the sediment analyses (reference Section 2.3.2.3) and experience with other dam removal projects in Massachusetts, it is not expected that fate-and-transport studies would be necessary to evaluate potential impacts from existing contaminants in accumulated sediment in the dam impoundment. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Conceptual Project OPC and Schedule 43 7.3 EVALUATION OF BEAVER BROOK ARCH It is recommended that the Beaver Brook Arch be studied to obtain information regarding potential impacts to this bridge following removal of Chartpak Dam. This study could potentially follow the recommended “Integrated Fluvial Geomorphic, Hydraulic Modeling, and Sediment Transport Study” and may include geotechnical boring information to inform the condition and type of the bridge foundation. 7.4 PROPERTY OWNERSHIP It is recommended that that property owners along the Project reach of the Mill River in proximity to the dam be identified. This information could be used to identify opportunities for construction access and to address potential concerns regarding potential direct and indirect impacts to private properties as part of the Project. 7.5 HISTORICAL RESOURCES INVESTIGATION Preliminary evaluation described in this report did not identify any inventoried historical significance related to Chartpak Dam and adjacent areas. However, given the age and construction of the dam, a historical resource evaluation is recommended prior to dam removal. Note that Chartpak Dam appears to be of similar construction to Upper Robert Meadows Pond Dam, which was removed in the summer of 2018. 8 CONCEPTUAL PROJECT OPC AND SCHEDULE This section presents a conceptual, order-of-magnitude opinion of probable cost (OPC) for design and permitting and an opinion of probable construction costs (OPCC) for removal of Chartpak Dam as described in Section 5. The OPC is presented in Table 6, was prepared for planning purposes, and is commensurate with the preliminary design phase of the Project. The OPC does not include costs for external project management or for legal guidance or associated costs that may arise as part of the dam removal process. Phase 4 of the OPC includes items for “Construction-Phase Professional Services – Office” and “Construction-Phase Professional Services – Field”. The former item is for office services by the engineer, such as review of submittals, review and responses to requests for information, and construction close-out documentation. The latter item is for the engineer or their representative to be onsite during project construction for a period of four months (~16 weeks). The OPC for design and permitting and the OPCC construction for removal of Chartpak Dam in Table 6 are provided in Appendix E. For planning purposes Table 6 includes an order of magnitude probable cost with a range of -30% to +50% of the OPC to reflect the uncertainties inherent to this stage of Project planning, which is consistent with the American Society for Testing and Materials (ASTM) E 2516-11 general guidance for accuracy ranges SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Conceptual Project OPC and Schedule 44 for a Class 5 feasibility level estimate. Multiple additional factors may influence the actual costs of the alternative presented in this report, and the results of further studies, coordination, and design development may substantively affect the cost of the Project. DER and its Project partners may consider adding contingencies to reflect uncertainty commensurate with the early planning phases of a project and the assumptions and exclusions identified above. The schedule presented in Table 6 reflects a relative timeline based on the start date of the Project. The quarters do not necessarily reflect actual quarters of the calendar year. 8.1 DISCUSSION OF OPC AND OPCC The OPC presented in Table 6 is $4,560,000 including professional services (design and construction) and construction as represented by the OPCC with a range of -30% to +50%. The OPCC in the OPC is $3,930,000 and includes an estimated cost of $3,120,000 for active sediment management as part of construction. The estimated cost for active sediment management is approximately 80% of the total OPCC and approximately 76% of the total OPC. The OPCC without active sediment management is $810,000 and is considered by Stantec to be within the range of expected costs for similar dam removal projects in New England. Based on the information presented in the preceding paragraph, it is apparent the expected costs for active sediment management dominate the OPCC for removal of Chartpak Dam. Additional studies and analyses regarding potentially appropriate sediment management approaches are therefore recommended if removal of Chartpak Dam is further pursued. SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Conceptual Project OPC and Schedule 45 Table 6. Conceptual OPC and Schedule for Removal of Chartpak Dam 1 2 3 4 1 2 3 4 1 2 3 4 Coordination, Design, and Permitting* Construction Project Management Project Management $15,000 Wetland Delineation/Wildlife Assessment $10,000 Topographic Survey $10,000 Sediment Investigations $20,000 $35,000 Preliminary Evaluation of Beaver Brook Arch Bridge $5,000 Construction Access Review and Evaluation $10,000 Preliminary Historical Resources Investigation $10,000 Conceptual Sediment Management Plan $10,000 Conceptual (30%) Design Plan $20,000 Conceptual Basis of Design Report $30,000 Stakeholder Outreach and Coordination $5,000 $180,000 Project Management $11,000 Regulatory Agency Preliminary Coordination $10,000 Preliminary Sediment Management Plan $15,000 Basis of Design Report $15,000 Draft Preliminary-Level (60%) Design $50,000 Preliminary-Level (60%) Design $20,000 $121,000 Project Management $14,000 Environmental Permitting $100,000 Final Dam Removal Design $40,000 $154,000 Phase 4: Construction $30,000 $3,930,000 Construction-Phase Professional Services - Office $80,000 Construction-Phase Professional Services - Field $64,000 Phase 4 Subtotal:$4,104,000 Subtotals:$455,000 $4,104,000 Total (Rounded):$4,560,000 Minimum / Maximum Probable Cost Range:$3,190,000 - $6,840,000 Phase 3 Subtotal: Bidding Support Construction *Note: Actual costs for coordination, design, and permitting can vary substantially depending on multiple factors. The OPC presented here is based on Stantec's experience with similar projects. Phase 1: Feasibility Study and Conceptual Design Integrated Fluvial Geomorphic, Hydraulic Modeling, and Sediment Transport Study Phase 1 Subtotal: Phase 2: Preliminary Design Phase 2 Subtotal: Phase 3: Permitting and Design Work Item Year/Quarter Opinion of Probable CostsYear 1 Year 2 Year 3 APPENDICES SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Appendix A Site Photographs A.1 Appendix A SITE PHOTOGRAPHS SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Appendix A Site Photographs A.2 Photo 1. Primary spillway and outlet works; note location of the low-level sluiceway Photo 2. Right dam abutment, outlet conduit, and right side of spillway SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Appendix A Site Photographs A.3 Photo 3: Spillway and secondary spillway (background on right side of photo; see arrow) from right bank Photo 4. Spillway (left side of photo) and secondary spillway (right side of photo) SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Appendix A Site Photographs A.4 Photo 5. Downstream face of secondary spillway (note spillway in background) Photo 6. Downstream face of secondary spillway (left side of photo) and Upper Left Retaining Wall (right side of photo) SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Appendix A Site Photographs A.5 Photo 7. Secondary spillway crest (flow in background is from right to left) Photo 8. Right abutment with primary and secondary spillways in background (flow is from left to right) SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Appendix A Site Photographs A.6 Photo 9. Primary spillway from left side of spillway Photo 10. Primary spillway from right side of spillway SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Appendix A Site Photographs A.7 Photo 11. Upstream side of outlet conduit Photo 12. Right spillway abutment overlying outlet conduit (flow is from right to left) SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Appendix A Site Photographs A.8 Photo 13. Chartpak dam (background) facing upstream from Mulberry Street Bridge Photo 14. Mill River with dam remnants facing downstream from Mulberry Street Bridge SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Appendix A Site Photographs A.9 Photo 15. Lower Left Retaining Wall along left side of Mill River upstream from Mulberry Street Bridge Photo 16. Right Retaining Wall along right side of Mill River between Chartpak Dam and Mulberry Street Bridge (facing downstream) SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Appendix A Site Photographs A.10 Photo 17. Bedrock along left bank of Mill River downstream from Chartpak Dam Photo 18. Transition of bedrock to Lower Left Retaining Wall along left side of Mill River downstream from Chartpak Dam SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Appendix A Site Photographs A.11 Photo 19. Lower Left Retaining Wall along left side of Mill River downstream from Chartpak Dam Photo 20. Upper Left Retaining Wall (left side of photo) and mill remnants on floodplain bench downstream from secondary spillway (facing downstream) SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Appendix A Site Photographs A.12 Photo 21. Chartpak Dam impoundment (facing upstream) Photo 22. Left bank and floodplain forest upstream from Chartpak Dam (flow is from left to right) SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Appendix A Site Photographs A.13 Photo 23. Point Bar along left side of Mill River ~700 ft upstream from Chartpak Dam (facing downstream) Photo 24. Pool upstream from point bar on left side of Mill River (facing upstream) SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Appendix A Site Photographs A.14 Photo 25. Bedrock outcrop approximately 1,450 ft upstream from Chartpak Dam (flow is from right to left) Photo 26. Mill River ~ 1,600 ft upstream from Chartpak Dam (facing downstream) SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Appendix A Site Photographs A.15 Photo 27. Beaver Brook Arch Bridge at confluence of Beaver Brook and Mill River (flow is from left to right) Photo 28. Mill River upstream from Beaver Brook confluence (facing upstream) SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Appendix B Figures B.1 Appendix B FIGURES FLOWFLOWProject No.Scale Revision Drawing No.Sheet TitleClient/ProjectClient/Project LogoPermit/Seal IssuedRevision Consultant Copyright Reserved By Appd YYYY.MM.DDByAppdYYYY.MM.DD Dsgn.Chkd.YYYY.MM.DDDwn. The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay. The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden. of PRELIMINARY NOT FOR CONSTRUCTION Not for permits, pricing or other official purposes. This document has not been completed or checked and is for general information or comment only. File Name: 02327_CHARTPAK-EX ORIGINAL SHEET - ANSI D\\us0289-ppfss01\shared_projects\195602327\03_data\gis_cad\cad\drawing\leeds-chartpak\sheet\02327_chartpak-ex2022.06.27 10:10:49 AMTel: www.stantec.com Stantec Consulting Services Inc. 136 West Street Suite 203 Northampton MA 01060-3711 (413) 584-4776 A B C 1 2 3 4 5 Massachusetts Division of Ecological Restoration Site Reconnaissance and Conceptual Design For Dam Removal - Chartpak Dam Leeds, Massachusetts 195602327.200 32022.05.03 N N 0 Original Draft GEC MRC 2022.05.03 B1.a Existing Conditions - Basemap 0 As Shown 1GECMRC/GEC RES Project No.Scale Revision Drawing No.Sheet TitleClient/ProjectClient/Project LogoPermit/Seal IssuedRevision Consultant Copyright Reserved By Appd YYYY.MM.DDByAppdYYYY.MM.DD Dsgn.Chkd.YYYY.MM.DDDwn. The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay. The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden. of PRELIMINARY NOT FOR CONSTRUCTION Not for permits, pricing or other official purposes. This document has not been completed or checked and is for general information or comment only. File Name: 02327_CHARTPAK-EX ORIGINAL SHEET - ANSI D\\us0289-ppfss01\shared_projects\195602327\03_data\gis_cad\cad\drawing\leeds-chartpak\sheet\02327_chartpak-ex2022.06.27 10:11:06 AMTel: www.stantec.com Stantec Consulting Services Inc. 136 West Street Suite 203 Northampton MA 01060-3711 (413) 584-4776 A B C 1 2 3 4 5 Massachusetts Division of Ecological Restoration Site Reconnaissance and Conceptual Design For Dam Removal - Chartpak Dam Leeds, Massachusetts 195602327.200 32022.05.030Original Draft GEC MRC 2022.05.03 B1.b Existing Conditions - Longitudinal Profile 0 As Shown 2GECMRC/GEC RES FLOWProject No.Scale Revision Drawing No.Sheet TitleClient/ProjectClient/Project LogoPermit/Seal IssuedRevision Consultant Copyright Reserved By Appd YYYY.MM.DDByAppdYYYY.MM.DD Dsgn.Chkd.YYYY.MM.DDDwn. The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay. The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden. of PRELIMINARY NOT FOR CONSTRUCTION Not for permits, pricing or other official purposes. This document has not been completed or checked and is for general information or comment only. File Name: 02327_CHARTPAK-PROP ORIGINAL SHEET - ANSI D\\us0289-ppfss01\shared_projects\195602327\03_data\gis_cad\cad\drawing\leeds-chartpak\sheet\02327_chartpak-prop2022.06.27 10:11:20 AMTel: www.stantec.com Stantec Consulting Services Inc. 136 West Street Suite 203 Northampton MA 01060-3711 (413) 584-4776 A B C 1 2 3 4 5 Massachusetts Division of Ecological Restoration Site Reconnaissance and Conceptual Design For Dam Removal - Chartpak Dam Leeds, Massachusetts 195602327.200 32022.05.03 N 0 Original Draft GEC MRC 2022.05.03 B2 Proposed Conditions 0 As Shown 3GECMRC/GEC RES SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Appendix C Sediment Analysis Summary Table and Documentation C.1 Appendix C SEDIMENT ANALYSIS SUMMARY TABLE AND DOCUMENTATION DER Sediment Results SpreadsheetChartpak Dam1 of 4Standard Analyses for Dam Removal Projects (adjust if due dilligence suggests additional pollutant risks)Method 1 Soil Standards (MCP)Parameters UnitsDirect Contact Direct Contact Direct Contact(for comparison)CHARTPAK‐1CHARTPAK‐2CHARTPAK‐3Impound. Impound. DownstrmTEC/TELPEC/PELTEL PEL Method 2 (S‐1) Method 2 (S‐2) Method 2 (S‐3) S‐1 / GW‐1 Min  Max  Mean Metals, Total [mg/kg or ppm]Antimony, Totalmg/kg (ppm)1.015 1.16 1.011.01 1.16 1.06Arsenic (ppm) mg/kg (ppm) 9.79 33.00 7.24 41.60 20 20 50 200.3170.79 0.8320.32 0.83 0.65Beryllium, Totalmg/kg (ppm)0.19035 0.2177 0.189150.19 0.22 0.20Cadmium (ppm) mg/kg (ppm) 0.99 4.98 0.68 4.20 70 100 100 700.12690.60210.12610.13 0.60 0.29Chromium (TOTAL)(ppm) mg/kg (ppm) 43.40 111.00 52.30 160.00 100 200 200 1006.51 12.6 10.76.51 12.60 9.94     Chromium III (ppm) mg/kg (ppm) 1,000 3,000 5,000 1,000Not Reported Not Reported Not Reported     Chromium VI (Hexavalent) (ppm) mg/kg (ppm) 100 200 200 100Not Reported Not Reported Not ReportedCopper (ppm) mg/kg (ppm) 31.60 149.00 18.70 108.0038.9 252 51.838.90 252.00 114.23Lead (ppm) mg/kg (ppm) 35.60 128.00 30.24 112.00 200 600 600 20011.7 45.4 1411.70 45.40 23.70Mercury (ppm) mg/kg (ppm) 0.18 1.06 0.13 0.70 20 30 30 200.0485 0.057 0.04850.05 0.06 0.05Nickel (ppm) mg/kg (ppm) 22.70 48.60 15.90 42.80 600 1,000 1,000 6006.55 13.4 10.36.55 13.40 10.08Selenium, Totalmg/kg (ppm)1.27 1.45 1.261.26 1.45 1.33Silver, Totalmg/kg (ppm)0.317 0.363 0.3150.32 0.36 0.33Thallium, Totalmg/kg (ppm)0.2538 0.29025 0.25220.25 0.29 0.27Zinc (ppm) mg/kg (ppm) 121.00 459.00 124.00 271.00 1,000 3,000 5,000 1,00029.4 360 3529.40 360.00 141.47PAHs (ug/kg or ppb)Acenaphthene ug/kg (ppb)7897 89 1,000,000 3,000,000 5,000,000 4,0002.551432.52.50 143.00 49.35Acenaphthylene ug/kg (ppb)6 1286 128 1,000,000 3,000,000 5,000,000 1,00011.7 50.7 21.211.70 50.70 27.87Anthracene ug/kg (ppb) 57 845 47 245 1,000,000 3,000,000 5,000,000 1,000,00010.2 550 16.410.20 550.00 192.20Benz[a]anthracene ug/kg (ppb) 108 1,050 75 693 7,000 40,000 300,000 7,00041.3 672 98.241.30 672.00 270.50Benzo[a]pyrene ug/kg (ppb) 150 1,450 89 763 2,000 7,000 30,000 2,00040.5 539 87.740.50 539.00 222.40Benzo[b]fluoranthene ug/kg (ppb) 70,000 400,000 3,000,000 7,00038.2 582 89.838.20 582.00 236.67Benzo[g,h,i]perylene ug/kg (ppb) 1,000,000 3,000,000 5,000,000 1,000,00026.8 320 54.126.80 320.00 133.63Benzo[k]fluoranthene ug/kg (ppb) 70,000 400,000 3,000,000 70,00028.6 348 67.628.60 348.00 148.07Chrysene ug/kg (ppb) 166 1,290 108 846 70,000 400,000 3,000,000 70,00038.8 570 90.938.80 570.00 233.23Dibenz[a,h]anthracene ug/kg (ppb) 331356 135 700 4,000 30,000 7005.58 81.5 13.45.58 81.50 33.49Fluoranthene ug/kg (ppb) 423 2,230 113 1,494 1,000,000 3,000,000 5,000,000 1,000,00079.7 1640 19979.70 1640.00 639.57Fluorene ug/kg (ppb) 77 536 21 144 1,000,000 3,000,000 5,000,000 1,000,0005.6 315 6.855.60 315.00 109.15Indeno[1,2,3‐cd]pyrene ug/kg (ppb) 7,000 40,000 300,000 7,00025.3 311 53.525.30 311.00 129.93Naphthalene ug/kg (ppb) 176 561 35 391 500,000 1,000,000 3,000,000 4,0007.54 58 14.77.54 58.00 26.75Phenanthrene ug/kg (ppb) 204 1,170 87 544 500,000 1,000,000 3,000,000 10,00045.2 1790 68.445.20 1790.00 634.53Pyrene ug/kg (ppb)195 1,520 1531,398500,000 1,000,000 3,000,000 1,000,00076.9 1170 17276.90 1170.00 472.97Total PAHs (ppb) ug/kg (ppb)1,610 22,800 1,68416,770484.47 9140.20 1056.25484.47 9140.20 3560.31PCBs (mg/kg or ppm)Total PCBs (ppm) mg/kg (ppm)0.06 0.68 0.020.18144 10.011 0.013 0.0110.011 0.013 0.012Pesticides (ug/kg)Sum DDD (ppb) ug/kg (ppb) 4.88 28.00 1.22 7.81 8,000 40,000 60,000 8,0001.02 1.175 1.011.010 1.175 1.068Sum DDE (ppb) ug/kg (ppb) 3.16 31.30 2.07 374.00 6,000 30,000 60,000 6,0001.02 1.175 1.011.010 1.175 1.068Sum DDT (ppb) ug/kg (ppb) 4.16 62.90 1.19 4.77 6,000 30,000 60,000 6,0001.91 2.205 1.8951.895 2.205 2.003Total DDTs (ppb) ug/kg (ppb)5.28 572.00 3.8951.703.950 4.555 3.9153.915 4.555 4.140Ecological Thresholds (aquatic) Human Exposure Thresholds (upland/floodplain)Dam Impoundment SamplesValues on this worksheet were copied from the corresponding "MA‐LLAND" worksheets obtained from the Alpha Analytical "ADEx" system.  Reference the reporting received from Alpha Analytical for actual values.Summary Calculations ‐ CHARTPAKFreshwater Marine DER Sediment Results SpreadsheetChartpak Dam2 of 4Standard Analyses for Dam Removal Projects (adjust if due dilligence suggests additional pollutant risks)Method 1 Soil Standards (MCP)Ecological Thresholds (aquatic) Human Exposure Thresholds (upland/floodplain)Dam Impoundment SamplesValues on this worksheet were copied from the corresponding "MA‐LLAND" worksheets obtained from the Alpha Analytical "ADEx" system.  Reference the reporting received from Alpha Analytical for actual values.Summary Calculations ‐ CHARTPAKChlordane (ppb) ug/kg (ppb) 3.24 17.60 2.26 4.79 5,000 30,000 60,000 5,0008.5 9.8 8.48.400 9.800 8.900Dieldrin (ppb) ug/kg (ppb) 1.90 61.80 0.72 4.30 80 500 3,000 800.635 0.735 0.630.630 0.735 0.667Endrin (ppb) ug/kg (ppb) 2.22 207.00 10,000 20,000 20,000 10,0000.424 0.4905 0.4210.421 0.491 0.445gamma‐BHC (Lindane) (ppb) ug/kg (ppb) 2.37 4.99 0.32 0.990.339 0.3925 0.3370.337 0.393 0.356Heptachlor epoxide (ppb) ug/kg (ppb)2.47 16.002.74100 900 1,000 1001.91 2.205 1.8951.895 2.205 2.003EPH (mg/kg or ppm)C9‐C18 Aliphatic Hydrocarbons (ppm) mg/kg (ppm)12.8 11.2 13.21,000 3,000 5,000 1,0004.04 4.925 4.064.040 4.925 4.342C19‐C36 Aliphatic Hydrocarbons (ppm) mg/kg (ppm)12.8 11.2 13.23,000 5,000 5,000 3,0004.04254.064.040 25.000 11.033C11‐C22 Aromatic Hydrocarbons (ppm) mg/kg (ppm)16.5 12.2 16.71,000 3,000 5,000 1,0004.0422.84.064.040 22.800 10.300Physical CharacteristicsTotal Organic Carbon (%) %2.67 3.49 3.980.254 1.2 0.2440.244 1.200 0.566Solids, Total (added to list)%78.3 66.1 77.566.100 78.300 73.967Percent Water (%) %Not Reported Not Reported Not ReportedSieve No. 4 (% passing) % passing8.1 13.3 1.81.800 13.300 7.733Sieve No. 10 (% passing) % passing18.1 40.8 40.618.100 40.800 33.167Sieve No. 40 (% passing) % passing69.8 32.4 55.232.400 69.800 52.467Sieve No. 60 (% passing) % passing2.7 9.2 2.22.200 9.200 4.700Sieve No. 200 (% passing) % passing1.3 4.3 0.20.200 4.300 1.933Volatile Organic Compounds (VOCs)Acetone (ppm) mg/kg (ppb) 500 1,000 3,000 6.00.008 0.009 0.0080.008 0.009 0.008Tertiary‐Amyl Methyl Ether (TAME) mg/kg (ppb)Not Reported Not Reported Not ReportedBenzene mg/kg (ppb) 40 200 1,000 2.00.000155 0.000185 0.0001650.000 0.000 0.000Bromobenzene mg/kg (ppb)0.0006 0.00075 0.000650.001 0.001 0.001Bromochloromethane mg/kg (ppb)0.0006 0.00075 0.000650.001 0.001 0.001Bromodichloromethane mg/kg (ppb) 30 100 500 0.10.000155 0.000185 0.0001650.000 0.000 0.000Bromoform mg/kg (ppb) 300 1,000 3,000 0.10.00125 0.0015 0.00130.001 0.002 0.001Bromomethane mg/kg (ppb) 90 600 600 0.50.0006 0.00075 0.000650.001 0.001 0.001Butylbenzene, sec‐2 (sec‐Butylbenezene)mg/kg (ppb)0.00031 0.00037 0.000330.000 0.000 0.000Butylbenzene, n‐2 (n‐Butylbenzene)mg/kg (ppb)0.00031 0.00037 0.000330.000 0.000 0.000Butylbenzene, tert‐2 (tert‐Butylbenzene)mg/kg (ppb)0.0006 0.00075 0.000650.001 0.001 0.001Carbon Disulfide mg/kg (ppb)0.0031 0.0037 0.00330.003 0.004 0.003Carbon Tetrachloride mg/kg (ppb) 30 100 1000 10.00.00031 0.00037 0.000330.000 0.000 0.000Chlorobenzene mg/kg (ppb) 500 1000 3000 1.00.000155 0.000185 0.0001650.000 0.000 0.000Chlorodibromomethane mg/kg (ppb)Not Reported Not Reported Not ReportedChloroethane mg/kg (ppb)0.0006 0.00075 0.000650.001 0.001 0.001Chloroform mg/kg (ppb) 500 1000 1000 0.40.000465 0.00055 0.0004950.000 0.001 0.001Chloromethane mg/kg (ppb)0.00125 0.0015 0.00130.001 0.002 0.001Chlorotoluene, 2‐ (o‐Chlorotoluene)mg/kg (ppb)0.0006 0.00075 0.000650.001 0.001 0.001Chlorotoluene, 4‐ (p‐Chlorotoluene)mg/kg (ppb)0.0006 0.00075 0.000650.001 0.001 0.0011,2‐Dibromo‐3‐chloropropane PP mg/kg (ppb)0.00095 0.0011 0.0010.001 0.001 0.001Dibromoethane, 1,2‐ (EDB) mg/kg (ppb)0.00031 0.00037 0.000330.000 0.000 0.000Dibromomethane mg/kg (ppb)0.0006 0.00075 0.000650.001 0.001 0.001 DER Sediment Results SpreadsheetChartpak Dam3 of 4Standard Analyses for Dam Removal Projects (adjust if due dilligence suggests additional pollutant risks)Method 1 Soil Standards (MCP)Ecological Thresholds (aquatic) Human Exposure Thresholds (upland/floodplain)Dam Impoundment SamplesValues on this worksheet were copied from the corresponding "MA‐LLAND" worksheets obtained from the Alpha Analytical "ADEx" system.  Reference the reporting received from Alpha Analytical for actual values.Summary Calculations ‐ CHARTPAKDichlorobenzene, 1,3‐ (m‐DCB) mg/kg (ppb) 100 500 500 3.00.0006 0.00075 0.000650.001 0.001 0.001Dichlorobenzene, 1,2‐ (o‐DCB) mg/kg (ppb) 1000 3000 5000 9.00.0006 0.00075 0.000650.001 0.001 0.001Dichlorobenzene, 1,4‐ (p‐DCB) mg/kg (ppb) 80 400 3000 0.70.0006 0.00075 0.000650.001 0.001 0.001Dichlorodifluoromethane (Freon 12) mg/kg (ppb)0.0031 0.0037 0.00330.003 0.004 0.003Dichloroethane, 1,1‐ (75‐34‐3)mg/kg (ppb) 500 1000 3000 0.40.00031 0.00037 0.000330.000 0.000 0.000Dichloroethane, 1,2‐mg/kg (ppb) 20 100 900 0.10.00031 0.00037 0.000330.000 0.000 0.000Dichloroethylene, 1,1‐mg/kg (ppb) 500 1000 3000 3.0Not Reported Not Reported Not ReportedDichloroethylene, cis‐1,2 mg/kg (ppb) 100 500 500 0.3Not Reported Not Reported Not ReportedDichloroethylene, trans‐1,2 mg/kg (ppb) 500 1000 3000 1.0Not Reported Not Reported Not ReportedDichloropropane, 1,2‐mg/kg (ppb) 30 100 1000 0.10.00031 0.00037 0.000330.000 0.000 0.000Dichloropropane, 1,3‐mg/kg (ppb)0.0006 0.00075 0.000650.001 0.001 0.001Dichloropropane, 2,2‐mg/kg (ppb)0.0006 0.00075 0.000650.001 0.001 0.001Dichloropropene, 1,1‐ mg/kg (ppb)0.000155 0.000185 0.0001650.000 0.000 0.000Dichloropropene, cis‐1,3‐3 (cis‐1,3‐Dichloropromg/kg (ppb)0.000155 0.000185 0.0001650.000 0.000 0.000Dichloropropene, trans‐1,3‐ 3 (trans‐1,3‐Dichlomg/kg (ppb)0.00031 0.00037 0.000330.000 0.000 0.000Diethyl Ether OXY mg/kg (ppb)0.0006 0.00075 0.000650.001 0.001 0.001Diisopropyl Ether (DIPE) OXY mg/kg (ppb)0.0006 0.00075 0.000650.001 0.001 0.001Dioxane, 1,4‐ PP, 1mg/kg (ppb) 20 90 500 0.20.025 0.0295 0.02650.025 0.030 0.027Ethyl Tertiary Butyl Ether (ETBE) OXY mg/kg (ppb)Not Reported Not Reported Not ReportedEthylbenzene mg/kg (ppb) 500 1000 3000 40.00.00031 0.00037 0.000330.000 0.000 0.000Hexachlorobutadiene mg/kg (ppb) 30 100 100 30.00.00125 0.0015 0.00130.001 0.002 0.001Hexanone (MNBK), 2‐ PP (2‐Hexanone)mg/kg (ppb)0.0031 0.0037 0.00330.003 0.004 0.003Isopropylbenzene (Cumene)2 (Isopropylbenzenmg/kg (ppb)0.00031 0.00037 0.000330.000 0.000 0.000Isopropyltoluene, p‐2 (p‐Isopropyltoluene)mg/kg (ppb)0.00031 0.00037 0.000330.000 0.000 0.000Methyl Ethyl Ketone (MEK) PP mg/kg (ppb) 500 1000 3000 4.00.0031 0.0037 0.00330.003 0.004 0.003Methyl Isobutyl Ketone (MIBK) PP mg/kg (ppb) 500 1000 3000 0.40.0031 0.0037 0.00330.003 0.004 0.003Methyl Tertiary Butyl Ether (MTBE) OXY mg/kg (ppb) 100 500 500 0.10.0006 0.00075 0.000650.001 0.001 0.001Methylene Chloride mg/kg (ppb)0.00155 0.00185 0.001650.002 0.002 0.002Naphthalene mg/kg (ppb) 500 1000 3000 4.00.00125 0.0015 0.00130.001 0.002 0.001Propylbenzene, n‐2 (n‐Propylbenzene)mg/kg (ppb)0.00031 0.00037 0.000330.000 0.000 0.000Styrene mg/kg (ppb) 70 300 3000 3.00.00031 0.00037 0.000330.000 0.000 0.000Tetrachloroethane, 1,1,1,2‐mg/kg (ppb) 80 400 500 0.10.000155 0.000185 0.0001650.000 0.000 0.000Tetrachloroethane, 1,1,2,2‐mg/kg (ppb) 10 50 400 0.0050.000155 0.000185 0.0001650.000 0.000 0.000Tetrachloroethylene mg/kg (ppb) 30 200 1000 1.0Not Reported Not Reported Not ReportedTetrahydrofuran (THF) mg/kg (ppb)0.00125 0.0015 0.00130.001 0.002 0.001Toluene mg/kg (ppb) 500 1000 3000 30.00.00031 0.00037 0.000330.000 0.000 0.000Trichlorobenzene, 1,2,4‐   mg/kg (ppb)2.00.0006 0.00075 0.000650.001 0.001 0.001Trichlorobenzene, 1,2,3‐mg/kg (ppb)0.0006 0.00075 0.000650.001 0.001 0.001Trichloroethane, 1,1,1‐mg/kg (ppb) 500 1000 3000 30.00.000155 0.000185 0.0001650.000 0.000 0.000Trichloroethane, 1,1,2‐mg/kg (ppb) 40 200 500 0.10.00031 0.00037 0.000330.000 0.000 0.000Trichloroethylene (TCE) mg/kg (ppb) 30 60 60 0.3Not Reported Not Reported Not ReportedTrichlorofluoromethane  (Freon 11) mg/kg (ppb)0.00125 0.0015 0.00130.001 0.002 0.001Trichloropropane, 1,2,3‐mg/kg (ppb)0.0006 0.00075 0.000650.001 0.001 0.001Trimethylbenzene, 1,2,4‐2 (1,2,4‐Trimethylbenmg/kg (ppb)0.0006 0.00075 0.000650.001 0.001 0.001Trimethylbenzene, 1,3,5‐2 (1,3,5‐Trimethylbenmg/kg (ppb)0.0006 0.00075 0.000650.001 0.001 0.001 DER Sediment Results SpreadsheetChartpak Dam4 of 4Standard Analyses for Dam Removal Projects (adjust if due dilligence suggests additional pollutant risks)Method 1 Soil Standards (MCP)Ecological Thresholds (aquatic) Human Exposure Thresholds (upland/floodplain)Dam Impoundment SamplesValues on this worksheet were copied from the corresponding "MA‐LLAND" worksheets obtained from the Alpha Analytical "ADEx" system.  Reference the reporting received from Alpha Analytical for actual values.Summary Calculations ‐ CHARTPAKVinyl Chloride mg/kg (ppb) 1 7 60 0.90.00031 0.00037 0.000330.000 0.000 0.000Xylenes mg/kg (ppb) 500 1000 3000 400.00.00031 0.00037 0.000330.000 0.000 0.0006) Stantec entered laboratory results into the MassDER template spreadsheet to provide insight for the preliminary reporting prepared by Stantec and is not intended to inform further studies. Stantec is not responsible for any errors or omissions in this spreadsheet as part of other studies. Reference the laboratory data provided to MassDER by Stantec for any subsequent analyses or studies.Data and Conditional Formatting Reference (Stantec, June 26, 2021)1) Reference Row 3, Columns C, D, G, H, I and K for conditional formatting colors and patterns.2) Sediment samples were collected in freshwater and conditional formatting was only applied to Freshwater Ecological Thresholds (aquatic).3) Conditional formatting was not applied to undetected values (green font per MassDER instructions).4) Conditional formatting was not applied where criteria values were not provided by MassDER.5) Conditional formatting was applied by Stantec to provide insight for the preliminary reporting prepared by Stantec and is not intended to inform further studies. L2216587 Stantec 195602327 MASS DEP FY 2022 RECON Client: Project Name: Project Number: 05/02/22 Eight Walkup Drive, Westborough, MA 01581-1019 Lab Number: Report Date: 508-898-9220 (Fax) 508-898-9193 800-624-9220 - www.alphalab.com 136 West Street Suite 203 Michael ChelminskiATTN: ANALYTICAL REPORT Certifications & Approvals: MA (M-MA086), NH NELAP (2064), CT (PH-0574), IL (200077), ME (MA00086), MD (348), NJ (MA935), NY (11148), NC (25700/666), PA (68-03671), RI (LAO00065), TX (T104704476), VT (VT-0935), VA (460195), USDA (Permit #P330-17-00196). Northampton, MA 01060 (413) 387-4514Phone: The original project report/data package is held by Alpha Analytical. This report/data package is paginated and should be reproduced only in its entirety. Alpha Analytical holds no responsibility for results and/or data that are not consistent with the original. Serial_No:05022219:37 Page 1 of 87 L2216587-01 L2216587-02 L2216587-03 Alpha Sample ID CHARTPAK-3 CHARTPAK-2 CHARTPAK-1 Client ID LEEDS, NORTHAMPTON, MA LEEDS, NORTHAMPTON, MA LEEDS, NORTHAMPTON, MA Sample Location MASS DEP FY 2022 RECON 195602327 Project Name: Project Number: Lab Number: Report Date: L2216587 05/02/22 03/30/22 14:45 03/30/22 15:15 03/30/22 15:40 Collection Date/TimeMatrix Receive Date SEDIMENT SEDIMENT SEDIMENT 03/31/22 03/31/22 03/31/22 Serial_No:05022219:37 Page 2 of 87 Project Name: Project Number: Lab Number: Report Date: Were all samples received in a condition consistent with those described on the Chain-of- Custody, properly preserved (including temperature) in the field or laboratory, and prepared/analyzed within method holding times? Were the analytical method(s) and all associated QC requirements specified in the selected CAM protocol(s) followed? Were all required corrective actions and analytical response actions specified in the selected CAM protocol(s) implemented for all identified performance standard non-conformances? Does the laboratory report comply with all the reporting requirements specified in CAM VII A, "Quality Assurance and Quality Control Guidelines for the Acquisition and Reporting of Analytical Data?" VPH, EPH, and APH Methods only: Was each method conducted without significant modification(s)? (Refer to the individual method(s) for a list of significant modifications). APH and TO-15 Methods only: Was the complete analyte list reported for each method? Were all applicable CAM protocol QC and performance standard non-conformances identified and evaluated in a laboratory narrative (including all "No" responses to Questions A through E)? YES NO YES YES YES N/A YES A B C D E a. E b. F MADEP MCP Response Action Analytical Report Certification L2216587MASS DEP FY 2022 RECON 195602327 Were the reporting limits at or below all CAM reporting limits specified in the selected CAM protocol(s)? Were all QC performance standards specified in the CAM protocol(s) achieved? Were results reported for the complete analyte list specified in the selected CAM protocol(s)? NO NO NO G H I A response to questions G, H and I is required for "Presumptive Certainty" status This form provides certifications for all samples performed by MCP methods. Please refer to the Sample Results and Container Information sections of this report for specification of MCP methods used for each analysis. The following questions pertain only to MCP Analytical Methods. An affirmative response to questions A through F is required for "Presumptive Certainty" status For any questions answered "No", please refer to the case narrative section on the following page(s). 05/02/22 Please note that sample matrix information is located in the Sample Results section of this report. Serial_No:05022219:37 Page 3 of 87 MASS DEP FY 2022 RECON 195602327 Project Name: Project Number: Lab Number: Report Date: L2216587 05/02/22 Case Narrative The samples were received in accordance with the Chain of Custody and no significant deviations were encountered during the preparation or analysis unless otherwise noted. Sample Receipt, Container Information, and the Chain of Custody are located at the back of the report. Results contained within this report relate only to the samples submitted under this Alpha Lab Number and meet NELAP requirements for all NELAP accredited parameters unless otherwise noted in the following narrative. The data presented in this report is organized by parameter (i.e. VOC, SVOC, etc.). Sample specific Quality Control data (i.e. Surrogate Spike Recovery) is reported at the end of the target analyte list for each individual sample, followed by the Laboratory Batch Quality Control at the end of each parameter. Tentatively Identified Compounds (TICs), if requested, are reported for compounds identified to be present and are not part of the method/program Target Compound List, even if only a subset of the TCL are being reported. If a sample was re-analyzed or re-extracted due to a required quality control corrective action and if both sets of data are reported, the Laboratory ID of the re-analysis or re-extraction is designated with an "R" or "RE", respectively. When multiple Batch Quality Control elements are reported (e.g. more than one LCS), the associated samples for each element are noted in the grey shaded header line of each data table. Any Laboratory Batch, Sample Specific % recovery or RPD value that is outside the listed Acceptance Criteria is bolded in the report. In reference to questions H (CAM) or 4 (RCP) when "NO" is checked, the performance criteria for CAM and RCP methods allow for some quality control failures to occur and still be within method compliance. In these instances, the specific failure is not narrated but noted in the associated QC Outlier Summary Report, located directly after the Case Narrative. QC information is also incorporated in the Data Usability Assessment table (Format 11) of our Data Merger tool, where it can be reviewed in conjunction with the sample result, associated regulatory criteria and any associated data usability implications. Soil/sediments, solids and tissues are reported on a dry weight basis unless otherwise noted. Definitions of all data qualifiers and acronyms used in this report are provided in the Glossary located at the back of the report. HOLD POLICY - For samples submitted on hold, Alpha's policy is to hold samples (with the exception of Air canisters) free of charge for 21 calendar days from the date the project is completed. After 21 calendar days, we will dispose of all samples submitted including those put on hold unless you have contacted your Alpha Project Manager and made arrangements for Alpha to continue to hold the samples. Air canisters will be disposed after 3 business days from the date the project is completed. Please contact Project Management at 800-624-9220 with any questions. Serial_No:05022219:37 Page 4 of 87 Case Narrative (continued) MASS DEP FY 2022 RECON 195602327 Project Name: Project Number: Lab Number: Report Date: L2216587 05/02/22 MCP Related Narratives Sample Receipt The analyses performed were specified by the client. In reference to question H: A Matrix Spike was not submitted for the analysis of Total Metals. Volatile Organics In reference to question H: L2216587-01 through -03: Initial Calibration did not meet: Lowest Calibration Standard Minimum Response Factor: cis-1,2-dichloroethene (0.1759), bromochloromethane (0.0787), trichloroethene (0.1673), 1,2-dichloropropane (0.1710), bromodichloromethane (0.2093), cis-1,3-dichloropropene (0.2035),trans-1,3-dichloropropene (0.2051), 1,1,2-trichloroethane (0.1068), chlorodibromomethane (0.1824) Average Response Factor: bromochloromethane, trichloroethene, bromodichloromethane, cis-1,3- dichloropropene, trans-1,3-dichloropropene, 1,1,2-trichloroethane Verification: dichlorodifluoromethane (141%), chloromethane (133%) L2216587-01 through -03: The associated continuing calibration standard is outside the acceptance criteria for several compounds; however, it is within overall method allowances. Associated results are considered to be biased high if the %D is negative and biased low if the %D is positive. A copy of the continuing calibration standard is included as an addendum to this report. PAHs/PCB Congeners by GC/MS In reference to question B: At the client's request, the analytical method specified in the CAM protocol was not followed. Serial_No:05022219:37 Page 5 of 87 Case Narrative (continued) MASS DEP FY 2022 RECON 195602327 Project Name: Project Number: Lab Number: Report Date: L2216587 05/02/22 EPH In reference to question I: All samples were analyzed for a subset of MCP analytes per client request. Total Metals In reference to question G: L2216587-01, -02, and -03: One or more of the target analytes did not achieve the requested CAM reporting limits. In reference to question I: All samples were analyzed for a subset of MCP analytes per client request. Non-MCP Related Narratives Grain Size Analysis The WG1630720-2 Laboratory Duplicate RPDs for % total gravel (121%), % coarse sand (26%), % medium sand (21%), % fine sand (25%), and % total fines (50%), performed on L2216587-03, are outside the acceptance criteria. The elevated RPDs have been attributed to the non-homogeneous nature of the native sample. I, the undersigned, attest under the pains and penalties of perjury that, to the best of my knowledge and belief and based upon my personal inquiry of those responsible for providing the information contained in this analytical report, such information is accurate and complete. This certificate of analysis is not complete unless this page accompanies any and all pages of this report. Authorized Signature: Title: Technical Director/Representative Date: 05/02/22 Serial_No:05022219:37 Page 6 of 87 MASS DEP FY 2022 RECON 195602327 Project Name: Project Number: L2216587Lab Number: Report Date: QC OUTLIER SUMMARY REPORT 05/02/22 Method Client ID (Native ID)Lab ID Parameter QC Type Recovery/RPD (%) QC Limits (%) Data Quality Assessment Associated Samples Grain Size Analysis - Mansfield Lab WG1630720-2 WG1630720-2 WG1630720-2 WG1630720-2 WG1630720-2 Batch QC (L2216587-03) Batch QC (L2216587-03) Batch QC (L2216587-03) Batch QC (L2216587-03) Batch QC (L2216587-03) D6913/D7928 D6913/D7928 D6913/D7928 D6913/D7928 D6913/D7928 % Total Gravel % Coarse Sand % Medium Sand % Fine Sand % Total Fines Duplicate Duplicate Duplicate Duplicate Duplicate 121 26 21 25 50 20 20 20 20 20 01-03 01-03 01-03 01-03 01-03 non-directional bias non-directional bias non-directional bias non-directional bias non-directional bias Serial_No:05022219:37 Page 7 of 87 ORGANICS Serial_No:05022219:37 Page 8 of 87 VOLATILES Serial_No:05022219:37 Page 9 of 87 FF Methylene chloride 1,1-Dichloroethane Chloroform Carbon tetrachloride 1,2-Dichloropropane Dibromochloromethane 1,1,2-Trichloroethane Tetrachloroethene Chlorobenzene Trichlorofluoromethane 1,2-Dichloroethane 1,1,1-Trichloroethane Bromodichloromethane trans-1,3-Dichloropropene cis-1,3-Dichloropropene 1,3-Dichloropropene, Total 1,1-Dichloropropene Bromoform 1,1,2,2-Tetrachloroethane Benzene Toluene Ethylbenzene Chloromethane Bromomethane Vinyl chloride Chloroethane 1,1-Dichloroethene trans-1,2-Dichloroethene Parameter Result Dilution Factor ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Qualifier Units RL MCP Volatile Organics by EPA 5035 Low - Westborough Lab SAMPLE RESULTS Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 3.3 0.66 0.99 0.66 0.66 0.66 0.66 0.33 0.33 2.6 0.66 0.33 0.33 0.66 0.33 0.33 0.33 2.6 0.33 0.33 0.66 0.66 2.6 1.3 0.66 1.3 0.66 0.99 05/02/22 CHARTPAK-3Client ID: 03/30/22 14:45Date Collected: 03/31/22Date Received: LEEDS, NORTHAMPTON, MASample Location: L2216587-01Lab ID: Field Prep:Not Specified Matrix:Sediment Analytical Method: Analytical Date: Analyst: 141,8260D 04/11/22 09:42 JC 78%Percent Solids: MDL -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- Sample Depth: Serial_No:05022219:37 Page 10 of 87 Trichloroethene 1,2-Dichlorobenzene 1,3-Dichlorobenzene 1,4-Dichlorobenzene Methyl tert butyl ether p/m-Xylene o-Xylene Xylenes, Total cis-1,2-Dichloroethene 1,2-Dichloroethene, Total Dibromomethane 1,2,3-Trichloropropane Styrene Dichlorodifluoromethane Acetone Carbon disulfide Methyl ethyl ketone Methyl isobutyl ketone 2-Hexanone Bromochloromethane Tetrahydrofuran 2,2-Dichloropropane 1,2-Dibromoethane 1,3-Dichloropropane 1,1,1,2-Tetrachloroethane Bromobenzene n-Butylbenzene sec-Butylbenzene tert-Butylbenzene o-Chlorotoluene p-Chlorotoluene 1,2-Dibromo-3-chloropropane Hexachlorobutadiene Isopropylbenzene p-Isopropyltoluene Naphthalene n-Propylbenzene Parameter Result Dilution Factor ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Qualifier Units RL MCP Volatile Organics by EPA 5035 Low - Westborough Lab SAMPLE RESULTS Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 0.33 1.3 1.3 1.3 1.3 1.3 0.66 0.66 0.66 0.66 1.3 1.3 0.66 6.6 16 6.6 6.6 6.6 6.6 1.3 2.6 1.3 0.66 1.3 0.33 1.3 0.66 0.66 1.3 1.3 1.3 2.0 2.6 0.66 0.66 2.6 0.66 05/02/22 CHARTPAK-3Client ID: 03/30/22 14:45Date Collected: 03/31/22Date Received: LEEDS, NORTHAMPTON, MASample Location: L2216587-01Lab ID: Field Prep:Not Specified MDL -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- Sample Depth: Serial_No:05022219:37 Page 11 of 87 1,2,3-Trichlorobenzene 1,2,4-Trichlorobenzene 1,3,5-Trimethylbenzene 1,2,4-Trimethylbenzene Diethyl ether Diisopropyl Ether Ethyl-Tert-Butyl-Ether Tertiary-Amyl Methyl Ether 1,4-Dioxane Parameter Result Dilution Factor ND ND ND ND ND ND ND ND ND ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg 1 1 1 1 1 1 1 1 1 Qualifier Units RL MCP Volatile Organics by EPA 5035 Low - Westborough Lab SAMPLE RESULTS Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 1.3 1.3 1.3 1.3 1.3 1.3 1.3 1.3 53 1,2-Dichloroethane-d4 Toluene-d8 4-Bromofluorobenzene Dibromofluoromethane 109 104 100 110 70-130 70-130 70-130 70-130 Acceptance CriteriaSurrogate % Recovery Qualifier 05/02/22 CHARTPAK-3Client ID: 03/30/22 14:45Date Collected: 03/31/22Date Received: LEEDS, NORTHAMPTON, MASample Location: L2216587-01Lab ID: Field Prep:Not Specified MDL -- -- -- -- -- -- -- -- -- Sample Depth: Serial_No:05022219:37 Page 12 of 87 Methylene chloride 1,1-Dichloroethane Chloroform Carbon tetrachloride 1,2-Dichloropropane Dibromochloromethane 1,1,2-Trichloroethane Tetrachloroethene Chlorobenzene Trichlorofluoromethane 1,2-Dichloroethane 1,1,1-Trichloroethane Bromodichloromethane trans-1,3-Dichloropropene cis-1,3-Dichloropropene 1,3-Dichloropropene, Total 1,1-Dichloropropene Bromoform 1,1,2,2-Tetrachloroethane Benzene Toluene Ethylbenzene Chloromethane Bromomethane Vinyl chloride Chloroethane 1,1-Dichloroethene trans-1,2-Dichloroethene Parameter Result Dilution Factor ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Qualifier Units RL MCP Volatile Organics by EPA 5035 Low - Westborough Lab SAMPLE RESULTS Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 3.7 0.74 1.1 0.74 0.74 0.74 0.74 0.37 0.37 3.0 0.74 0.37 0.37 0.74 0.37 0.37 0.37 3.0 0.37 0.37 0.74 0.74 3.0 1.5 0.74 1.5 0.74 1.1 05/02/22 CHARTPAK-2Client ID: 03/30/22 15:15Date Collected: 03/31/22Date Received: LEEDS, NORTHAMPTON, MASample Location: L2216587-02Lab ID: Field Prep:Not Specified Matrix:Sediment Analytical Method: Analytical Date: Analyst: 141,8260D 04/11/22 10:09 JC 66%Percent Solids: MDL -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- Sample Depth: Serial_No:05022219:37 Page 13 of 87 Trichloroethene 1,2-Dichlorobenzene 1,3-Dichlorobenzene 1,4-Dichlorobenzene Methyl tert butyl ether p/m-Xylene o-Xylene Xylenes, Total cis-1,2-Dichloroethene 1,2-Dichloroethene, Total Dibromomethane 1,2,3-Trichloropropane Styrene Dichlorodifluoromethane Acetone Carbon disulfide Methyl ethyl ketone Methyl isobutyl ketone 2-Hexanone Bromochloromethane Tetrahydrofuran 2,2-Dichloropropane 1,2-Dibromoethane 1,3-Dichloropropane 1,1,1,2-Tetrachloroethane Bromobenzene n-Butylbenzene sec-Butylbenzene tert-Butylbenzene o-Chlorotoluene p-Chlorotoluene 1,2-Dibromo-3-chloropropane Hexachlorobutadiene Isopropylbenzene p-Isopropyltoluene Naphthalene n-Propylbenzene Parameter Result Dilution Factor ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Qualifier Units RL MCP Volatile Organics by EPA 5035 Low - Westborough Lab SAMPLE RESULTS Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 0.37 1.5 1.5 1.5 1.5 1.5 0.74 0.74 0.74 0.74 1.5 1.5 0.74 7.4 18 7.4 7.4 7.4 7.4 1.5 3.0 1.5 0.74 1.5 0.37 1.5 0.74 0.74 1.5 1.5 1.5 2.2 3.0 0.74 0.74 3.0 0.74 05/02/22 CHARTPAK-2Client ID: 03/30/22 15:15Date Collected: 03/31/22Date Received: LEEDS, NORTHAMPTON, MASample Location: L2216587-02Lab ID: Field Prep:Not Specified MDL -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- Sample Depth: Serial_No:05022219:37 Page 14 of 87 1,2,3-Trichlorobenzene 1,2,4-Trichlorobenzene 1,3,5-Trimethylbenzene 1,2,4-Trimethylbenzene Diethyl ether Diisopropyl Ether Ethyl-Tert-Butyl-Ether Tertiary-Amyl Methyl Ether 1,4-Dioxane Parameter Result Dilution Factor ND ND ND ND ND ND ND ND ND ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg 1 1 1 1 1 1 1 1 1 Qualifier Units RL MCP Volatile Organics by EPA 5035 Low - Westborough Lab SAMPLE RESULTS Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 59 1,2-Dichloroethane-d4 Toluene-d8 4-Bromofluorobenzene Dibromofluoromethane 110 109 109 111 70-130 70-130 70-130 70-130 Acceptance CriteriaSurrogate % Recovery Qualifier 05/02/22 CHARTPAK-2Client ID: 03/30/22 15:15Date Collected: 03/31/22Date Received: LEEDS, NORTHAMPTON, MASample Location: L2216587-02Lab ID: Field Prep:Not Specified MDL -- -- -- -- -- -- -- -- -- Sample Depth: Serial_No:05022219:37 Page 15 of 87 Methylene chloride 1,1-Dichloroethane Chloroform Carbon tetrachloride 1,2-Dichloropropane Dibromochloromethane 1,1,2-Trichloroethane Tetrachloroethene Chlorobenzene Trichlorofluoromethane 1,2-Dichloroethane 1,1,1-Trichloroethane Bromodichloromethane trans-1,3-Dichloropropene cis-1,3-Dichloropropene 1,3-Dichloropropene, Total 1,1-Dichloropropene Bromoform 1,1,2,2-Tetrachloroethane Benzene Toluene Ethylbenzene Chloromethane Bromomethane Vinyl chloride Chloroethane 1,1-Dichloroethene trans-1,2-Dichloroethene Parameter Result Dilution Factor ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Qualifier Units RL MCP Volatile Organics by EPA 5035 Low - Westborough Lab SAMPLE RESULTS Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 3.1 0.62 0.93 0.62 0.62 0.62 0.62 0.31 0.31 2.5 0.62 0.31 0.31 0.62 0.31 0.31 0.31 2.5 0.31 0.31 0.62 0.62 2.5 1.2 0.62 1.2 0.62 0.93 05/02/22 CHARTPAK-1Client ID: 03/30/22 15:40Date Collected: 03/31/22Date Received: LEEDS, NORTHAMPTON, MASample Location: L2216587-03Lab ID: Field Prep:Not Specified Matrix:Sediment Analytical Method: Analytical Date: Analyst: 141,8260D 04/11/22 10:36 JC 78%Percent Solids: MDL -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- Sample Depth: Serial_No:05022219:37 Page 16 of 87 Trichloroethene 1,2-Dichlorobenzene 1,3-Dichlorobenzene 1,4-Dichlorobenzene Methyl tert butyl ether p/m-Xylene o-Xylene Xylenes, Total cis-1,2-Dichloroethene 1,2-Dichloroethene, Total Dibromomethane 1,2,3-Trichloropropane Styrene Dichlorodifluoromethane Acetone Carbon disulfide Methyl ethyl ketone Methyl isobutyl ketone 2-Hexanone Bromochloromethane Tetrahydrofuran 2,2-Dichloropropane 1,2-Dibromoethane 1,3-Dichloropropane 1,1,1,2-Tetrachloroethane Bromobenzene n-Butylbenzene sec-Butylbenzene tert-Butylbenzene o-Chlorotoluene p-Chlorotoluene 1,2-Dibromo-3-chloropropane Hexachlorobutadiene Isopropylbenzene p-Isopropyltoluene Naphthalene n-Propylbenzene Parameter Result Dilution Factor ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Qualifier Units RL MCP Volatile Organics by EPA 5035 Low - Westborough Lab SAMPLE RESULTS Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 0.31 1.2 1.2 1.2 1.2 1.2 0.62 0.62 0.62 0.62 1.2 1.2 0.62 6.2 16 6.2 6.2 6.2 6.2 1.2 2.5 1.2 0.62 1.2 0.31 1.2 0.62 0.62 1.2 1.2 1.2 1.9 2.5 0.62 0.62 2.5 0.62 05/02/22 CHARTPAK-1Client ID: 03/30/22 15:40Date Collected: 03/31/22Date Received: LEEDS, NORTHAMPTON, MASample Location: L2216587-03Lab ID: Field Prep:Not Specified MDL -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- Sample Depth: Serial_No:05022219:37 Page 17 of 87 1,2,3-Trichlorobenzene 1,2,4-Trichlorobenzene 1,3,5-Trimethylbenzene 1,2,4-Trimethylbenzene Diethyl ether Diisopropyl Ether Ethyl-Tert-Butyl-Ether Tertiary-Amyl Methyl Ether 1,4-Dioxane Parameter Result Dilution Factor ND ND ND ND ND ND ND ND ND ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg 1 1 1 1 1 1 1 1 1 Qualifier Units RL MCP Volatile Organics by EPA 5035 Low - Westborough Lab SAMPLE RESULTS Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 50 1,2-Dichloroethane-d4 Toluene-d8 4-Bromofluorobenzene Dibromofluoromethane 112 105 98 111 70-130 70-130 70-130 70-130 Acceptance CriteriaSurrogate % Recovery Qualifier 05/02/22 CHARTPAK-1Client ID: 03/30/22 15:40Date Collected: 03/31/22Date Received: LEEDS, NORTHAMPTON, MASample Location: L2216587-03Lab ID: Field Prep:Not Specified MDL -- -- -- -- -- -- -- -- -- Sample Depth: Serial_No:05022219:37 Page 18 of 87 Method Blank Analysis Batch Quality Control Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 04/11/22 09:16 141,8260DAnalytical Method: Analytical Date: 05/02/22 Analyst:MKS Methylene chloride 1,1-Dichloroethane Chloroform Carbon tetrachloride 1,2-Dichloropropane Dibromochloromethane 1,1,2-Trichloroethane Tetrachloroethene Chlorobenzene Trichlorofluoromethane 1,2-Dichloroethane 1,1,1-Trichloroethane Bromodichloromethane trans-1,3-Dichloropropene cis-1,3-Dichloropropene 1,3-Dichloropropene, Total 1,1-Dichloropropene Bromoform 1,1,2,2-Tetrachloroethane Benzene Toluene Ethylbenzene Chloromethane Bromomethane Vinyl chloride Chloroethane 1,1-Dichloroethene trans-1,2-Dichloroethene Trichloroethene Parameter Result ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND RL 5.0 1.0 1.5 1.0 1.0 1.0 1.0 0.50 0.50 4.0 1.0 0.50 0.50 1.0 0.50 0.50 0.50 4.0 0.50 0.50 1.0 1.0 4.0 2.0 1.0 2.0 1.0 1.5 0.50 ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg UnitsQualifier MCP Volatile Organics by EPA 5035 Low - Westborough Lab for sample(s): 01-03 Batch: WG1626692-5 MDL -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- Serial_No:05022219:37 Page 19 of 87 Method Blank Analysis Batch Quality Control Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 04/11/22 09:16 141,8260DAnalytical Method: Analytical Date: 05/02/22 Analyst:MKS 1,2-Dichlorobenzene 1,3-Dichlorobenzene 1,4-Dichlorobenzene Methyl tert butyl ether p/m-Xylene o-Xylene Xylenes, Total cis-1,2-Dichloroethene 1,2-Dichloroethene, Total Dibromomethane 1,2,3-Trichloropropane Styrene Dichlorodifluoromethane Acetone Carbon disulfide Methyl ethyl ketone Methyl isobutyl ketone 2-Hexanone Bromochloromethane Tetrahydrofuran 2,2-Dichloropropane 1,2-Dibromoethane 1,3-Dichloropropane 1,1,1,2-Tetrachloroethane Bromobenzene n-Butylbenzene sec-Butylbenzene tert-Butylbenzene o-Chlorotoluene Parameter Result ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND RL 2.0 2.0 2.0 2.0 2.0 1.0 1.0 1.0 1.0 2.0 2.0 1.0 10 25 10 10 10 10 2.0 4.0 2.0 1.0 2.0 0.50 2.0 1.0 1.0 2.0 2.0 ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg UnitsQualifier MCP Volatile Organics by EPA 5035 Low - Westborough Lab for sample(s): 01-03 Batch: WG1626692-5 MDL -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- Serial_No:05022219:37 Page 20 of 87 Method Blank Analysis Batch Quality Control Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 04/11/22 09:16 141,8260DAnalytical Method: Analytical Date: 05/02/22 Analyst:MKS p-Chlorotoluene 1,2-Dibromo-3-chloropropane Hexachlorobutadiene Isopropylbenzene p-Isopropyltoluene Naphthalene n-Propylbenzene 1,2,3-Trichlorobenzene 1,2,4-Trichlorobenzene 1,3,5-Trimethylbenzene 1,2,4-Trimethylbenzene Diethyl ether Diisopropyl Ether Ethyl-Tert-Butyl-Ether Tertiary-Amyl Methyl Ether 1,4-Dioxane Parameter Result ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND RL 2.0 3.0 4.0 1.0 1.0 4.0 1.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 80 ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg UnitsQualifier MCP Volatile Organics by EPA 5035 Low - Westborough Lab for sample(s): 01-03 Batch: WG1626692-5 1,2-Dichloroethane-d4 Toluene-d8 4-Bromofluorobenzene Dibromofluoromethane 112 104 98 107 70-130 70-130 70-130 70-130 Surrogate %Recovery Qualifier Acceptance Criteria MDL -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- Serial_No:05022219:37 Page 21 of 87 Methylene chloride 1,1-Dichloroethane Chloroform Carbon tetrachloride 1,2-Dichloropropane Dibromochloromethane 1,1,2-Trichloroethane Tetrachloroethene Chlorobenzene Trichlorofluoromethane 1,2-Dichloroethane 1,1,1-Trichloroethane Bromodichloromethane trans-1,3-Dichloropropene cis-1,3-Dichloropropene 1,1-Dichloropropene Bromoform 1,1,2,2-Tetrachloroethane Benzene Toluene Ethylbenzene Chloromethane Bromomethane 79 88 86 100 85 98 88 106 93 98 83 98 90 95 96 98 100 85 91 92 96 76 90 80 90 94 104 88 105 93 110 97 102 89 101 97 101 101 101 104 90 92 95 100 76 91 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 1 2 9 4 3 7 6 4 4 4 7 3 7 6 5 3 4 6 1 3 4 0 1 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 Parameter LCS %Recovery LCSD %Recovery %Recovery Limits RPD RPD Limits MCP Volatile Organics by EPA 5035 Low - Westborough Lab Associated sample(s): 01-03 Batch: WG1626692-3 WG1626692-4 Lab Control Sample Analysis Batch Quality ControlProject Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 05/02/22 Qual Qual Qual Serial_No:05022219:37 Page 22 of 87 Vinyl chloride Chloroethane 1,1-Dichloroethene trans-1,2-Dichloroethene Trichloroethene 1,2-Dichlorobenzene 1,3-Dichlorobenzene 1,4-Dichlorobenzene Methyl tert butyl ether p/m-Xylene o-Xylene cis-1,2-Dichloroethene Dibromomethane 1,2,3-Trichloropropane Styrene Dichlorodifluoromethane Acetone Carbon disulfide Methyl ethyl ketone Methyl isobutyl ketone 2-Hexanone Bromochloromethane Tetrahydrofuran 87 97 96 94 95 95 97 94 88 101 99 91 86 83 100 77 85 86 83 74 73 92 71 88 97 99 95 97 96 98 96 94 106 104 94 92 88 105 78 79 86 85 81 83 96 79 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 1 0 3 1 2 1 1 2 7 5 5 3 7 6 5 1 7 0 2 9 13 4 11 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 Parameter LCS %Recovery LCSD %Recovery %Recovery Limits RPD RPD Limits MCP Volatile Organics by EPA 5035 Low - Westborough Lab Associated sample(s): 01-03 Batch: WG1626692-3 WG1626692-4 Lab Control Sample Analysis Batch Quality ControlProject Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 05/02/22 Qual Qual Qual Serial_No:05022219:37 Page 23 of 87 2,2-Dichloropropane 1,2-Dibromoethane 1,3-Dichloropropane 1,1,1,2-Tetrachloroethane Bromobenzene n-Butylbenzene sec-Butylbenzene tert-Butylbenzene o-Chlorotoluene p-Chlorotoluene 1,2-Dibromo-3-chloropropane Hexachlorobutadiene Isopropylbenzene p-Isopropyltoluene Naphthalene n-Propylbenzene 1,2,3-Trichlorobenzene 1,2,4-Trichlorobenzene 1,3,5-Trimethylbenzene 1,2,4-Trimethylbenzene Diethyl ether Diisopropyl Ether Ethyl-Tert-Butyl-Ether 100 81 88 100 98 100 102 104 95 96 79 110 104 106 95 99 97 102 102 100 89 85 90 104 87 94 106 98 101 102 105 96 98 85 111 104 107 99 100 101 104 103 102 97 87 95 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 70-130 4 7 7 6 0 1 0 1 1 2 7 1 0 1 4 1 4 2 1 2 9 2 5 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 Parameter LCS %Recovery LCSD %Recovery %Recovery Limits RPD RPD Limits MCP Volatile Organics by EPA 5035 Low - Westborough Lab Associated sample(s): 01-03 Batch: WG1626692-3 WG1626692-4 Lab Control Sample Analysis Batch Quality ControlProject Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 05/02/22 Qual Qual Qual Serial_No:05022219:37 Page 24 of 87 Tertiary-Amyl Methyl Ether 1,4-Dioxane 91 83 97 91 70-130 70-130 6 9 20 20 Parameter LCS %Recovery LCSD %Recovery %Recovery Limits RPD RPD Limits MCP Volatile Organics by EPA 5035 Low - Westborough Lab Associated sample(s): 01-03 Batch: WG1626692-3 WG1626692-4 Lab Control Sample Analysis Batch Quality ControlProject Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 1,2-Dichloroethane-d4 Toluene-d8 4-Bromofluorobenzene Dibromofluoromethane 100 106 106 100 70-130 70-130 70-130 70-130 103 107 104 101 Surrogate Qual%Recovery Qual%Recovery LCS LCSD 05/02/22 Acceptance Criteria Qual Qual Qual Serial_No:05022219:37 Page 25 of 87 SEMIVOLATILES Serial_No:05022219:37 Page 26 of 87 FF Naphthalene 2-Methylnaphthalene Acenaphthylene Acenaphthene Fluorene Phenanthrene Anthracene Fluoranthene Pyrene Benz(a)anthracene Chrysene Benzo(b)fluoranthene Benzo(k)fluoranthene Benzo(a)pyrene Indeno(1,2,3-cd)Pyrene Dibenz(a,h)anthracene Benzo(ghi)perylene Cl2-BZ#8 Cl3-BZ#18 Cl3-BZ#28 Cl4-BZ#44 Cl4-BZ#49 Cl4-BZ#52 Cl4-BZ#66 Cl5-BZ#87 Cl5-BZ#101 Cl5-BZ#105 Cl5-BZ#118 Parameter Result Dilution Factor 14.7 ND 21.2 ND 6.85 68.4 16.4 199 172 98.2 90.9 89.8 67.6 87.7 53.5 13.4 54.1 ND ND ND ND ND ND ND ND ND ND ND ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Qualifier Units RL PAHs/PCB Congeners by GC/MS - Mansfield Lab SAMPLE RESULTS Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 05/02/22 CHARTPAK-3Client ID: 03/30/22 14:45Date Collected: 03/31/22Date Received: LEEDS, NORTHAMPTON, MASample Location: L2216587-01Lab ID: Field Prep:Not Specified Matrix:Sediment Extraction Method: Cleanup Method: Analytical Method: Analytical Date: Analyst: 105,8270D-SIM/680(M) 04/19/22 17:45 GP EPA 3570 EPA 3630 Extraction Date:04/07/22 17:20 Cleanup Date:04/14/22 78%Percent Solids: MDL -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- Sample Depth: Serial_No:05022219:37 Page 27 of 87 Cl6-BZ#128 Cl6-BZ#138 Cl6-BZ#153 Cl7-BZ#170 Cl7-BZ#180 Cl7-BZ#183 Cl7-BZ#184 Cl7-BZ#187 Cl8-BZ#195 Cl9-BZ#206 Cl10-BZ#209 Parameter Result Dilution Factor ND ND ND ND ND ND ND ND ND ND ND ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg 1 1 1 1 1 1 1 1 1 1 1 Qualifier Units RL PAHs/PCB Congeners by GC/MS - Mansfield Lab SAMPLE RESULTS Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 2-Methylnaphthalene-d10 Pyrene-d10 Benzo(b)fluoranthene-d12 DBOB BZ 198 74 90 77 103 89 30-150 30-150 30-150 50-125 50-125 Acceptance CriteriaSurrogate % Recovery Qualifier 05/02/22 CHARTPAK-3Client ID: 03/30/22 14:45Date Collected: 03/31/22Date Received: LEEDS, NORTHAMPTON, MASample Location: L2216587-01Lab ID: Field Prep:Not Specified MDL -- -- -- -- -- -- -- -- -- -- -- Sample Depth: Serial_No:05022219:37 Page 28 of 87 Naphthalene 2-Methylnaphthalene Acenaphthylene Acenaphthene Fluorene Phenanthrene Anthracene Fluoranthene Pyrene Benz(a)anthracene Chrysene Benzo(b)fluoranthene Benzo(k)fluoranthene Benzo(a)pyrene Indeno(1,2,3-cd)Pyrene Dibenz(a,h)anthracene Benzo(ghi)perylene Cl2-BZ#8 Cl3-BZ#18 Cl3-BZ#28 Cl4-BZ#44 Cl4-BZ#49 Cl4-BZ#52 Cl4-BZ#66 Cl5-BZ#87 Cl5-BZ#101 Cl5-BZ#105 Cl5-BZ#118 Parameter Result E E Dilution Factor 58.0 42.9 50.7 143 315 1790 550 1640 1170 672 570 582 348 539 311 81.5 320 ND ND ND ND ND ND ND ND ND ND ND ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Qualifier Units RL PAHs/PCB Congeners by GC/MS - Mansfield Lab SAMPLE RESULTS Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 5.95 5.95 5.95 5.95 5.95 5.95 5.95 5.95 5.95 5.95 5.95 5.95 5.95 5.95 5.95 5.95 5.95 0.595 0.595 0.595 0.595 0.595 0.595 0.595 0.595 0.595 0.595 0.595 05/02/22 CHARTPAK-2Client ID: 03/30/22 15:15Date Collected: 03/31/22Date Received: LEEDS, NORTHAMPTON, MASample Location: L2216587-02Lab ID: Field Prep:Not Specified Matrix:Sediment Extraction Method: Cleanup Method: Analytical Method: Analytical Date: Analyst: 105,8270D-SIM/680(M) 04/19/22 18:17 GP EPA 3570 EPA 3630 Extraction Date:04/07/22 17:20 Cleanup Date:04/14/22 66%Percent Solids: MDL -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- Sample Depth: Serial_No:05022219:37 Page 29 of 87 Cl6-BZ#128 Cl6-BZ#138 Cl6-BZ#153 Cl7-BZ#170 Cl7-BZ#180 Cl7-BZ#183 Cl7-BZ#184 Cl7-BZ#187 Cl8-BZ#195 Cl9-BZ#206 Cl10-BZ#209 Parameter Result Dilution Factor ND ND ND ND ND ND ND ND ND ND ND ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg 1 1 1 1 1 1 1 1 1 1 1 Qualifier Units RL PAHs/PCB Congeners by GC/MS - Mansfield Lab SAMPLE RESULTS Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 0.595 0.595 0.595 0.595 0.595 0.595 0.595 0.595 0.595 0.595 0.595 2-Methylnaphthalene-d10 Pyrene-d10 Benzo(b)fluoranthene-d12 DBOB BZ 198 65 75 67 87 78 30-150 30-150 30-150 50-125 50-125 Acceptance CriteriaSurrogate % Recovery Qualifier 05/02/22 CHARTPAK-2Client ID: 03/30/22 15:15Date Collected: 03/31/22Date Received: LEEDS, NORTHAMPTON, MASample Location: L2216587-02Lab ID: Field Prep:Not Specified MDL -- -- -- -- -- -- -- -- -- -- -- Sample Depth: Serial_No:05022219:37 Page 30 of 87 Phenanthrene Fluoranthene Parameter Result Dilution Factor 1780 1660 ug/kg ug/kg 2 2 Qualifier Units RL PAHs/PCB Congeners by GC/MS - Mansfield Lab SAMPLE RESULTS Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 11.9 11.9 2-Methylnaphthalene-d10 Pyrene-d10 Benzo(b)fluoranthene-d12 DBOB BZ 198 64 77 67 87 83 30-150 30-150 30-150 50-125 50-125 Acceptance CriteriaSurrogate % Recovery Qualifier 05/02/22 CHARTPAK-2Client ID: 03/30/22 15:15Date Collected: 03/31/22Date Received: LEEDS, NORTHAMPTON, MASample Location: L2216587-02Lab ID: Field Prep:Not Specified D Matrix:Sediment Extraction Method: Cleanup Method: Analytical Method: Analytical Date: Analyst: 105,8270D-SIM/680(M) 04/20/22 23:34 GP EPA 3570 EPA 3630 Extraction Date:04/07/22 17:20 Cleanup Date:04/14/22 66%Percent Solids: MDL -- -- Sample Depth: Serial_No:05022219:37 Page 31 of 87 Naphthalene 2-Methylnaphthalene Acenaphthylene Acenaphthene Fluorene Phenanthrene Anthracene Fluoranthene Pyrene Benz(a)anthracene Chrysene Benzo(b)fluoranthene Benzo(k)fluoranthene Benzo(a)pyrene Indeno(1,2,3-cd)Pyrene Dibenz(a,h)anthracene Benzo(ghi)perylene Cl2-BZ#8 Cl3-BZ#18 Cl3-BZ#28 Cl4-BZ#44 Cl4-BZ#49 Cl4-BZ#52 Cl4-BZ#66 Cl5-BZ#87 Cl5-BZ#101 Cl5-BZ#105 Cl5-BZ#118 Parameter Result Dilution Factor 7.54 ND 11.7 ND 5.60 45.2 10.2 79.7 76.9 41.3 38.8 38.2 28.6 40.5 25.3 5.58 26.8 ND ND ND ND ND ND ND ND ND ND ND ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Qualifier Units RL PAHs/PCB Congeners by GC/MS - Mansfield Lab SAMPLE RESULTS Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 5.10 5.10 5.10 5.10 5.10 5.10 5.10 5.10 5.10 5.10 5.10 5.10 5.10 5.10 5.10 5.10 5.10 0.510 0.510 0.510 0.510 0.510 0.510 0.510 0.510 0.510 0.510 0.510 05/02/22 CHARTPAK-1Client ID: 03/30/22 15:40Date Collected: 03/31/22Date Received: LEEDS, NORTHAMPTON, MASample Location: L2216587-03Lab ID: Field Prep:Not Specified Matrix:Sediment Extraction Method: Cleanup Method: Analytical Method: Analytical Date: Analyst: 105,8270D-SIM/680(M) 04/19/22 18:49 GP EPA 3570 EPA 3630 Extraction Date:04/07/22 17:20 Cleanup Date:04/14/22 78%Percent Solids: MDL -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- Sample Depth: Serial_No:05022219:37 Page 32 of 87 Cl6-BZ#128 Cl6-BZ#138 Cl6-BZ#153 Cl7-BZ#170 Cl7-BZ#180 Cl7-BZ#183 Cl7-BZ#184 Cl7-BZ#187 Cl8-BZ#195 Cl9-BZ#206 Cl10-BZ#209 Parameter Result Dilution Factor ND ND ND ND ND ND ND ND ND ND ND ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg 1 1 1 1 1 1 1 1 1 1 1 Qualifier Units RL PAHs/PCB Congeners by GC/MS - Mansfield Lab SAMPLE RESULTS Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 0.510 0.510 0.510 0.510 0.510 0.510 0.510 0.510 0.510 0.510 0.510 2-Methylnaphthalene-d10 Pyrene-d10 Benzo(b)fluoranthene-d12 DBOB BZ 198 69 85 75 105 86 30-150 30-150 30-150 50-125 50-125 Acceptance CriteriaSurrogate % Recovery Qualifier 05/02/22 CHARTPAK-1Client ID: 03/30/22 15:40Date Collected: 03/31/22Date Received: LEEDS, NORTHAMPTON, MASample Location: L2216587-03Lab ID: Field Prep:Not Specified MDL -- -- -- -- -- -- -- -- -- -- -- Sample Depth: Serial_No:05022219:37 Page 33 of 87 Method Blank Analysis Batch Quality Control Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 04/19/22 09:20 105,8270D-SIM/680(M)Analytical Method: Analytical Date: Extraction Method: Cleanup Method: EPA 3570 EPA 3630 Extraction Date:04/07/22 17:20 05/02/22 Analyst:GP Naphthalene 2-Methylnaphthalene Acenaphthylene Acenaphthene Fluorene Phenanthrene Anthracene Fluoranthene Pyrene Benz(a)anthracene Chrysene Benzo(b)fluoranthene Benzo(k)fluoranthene Benzo(a)pyrene Indeno(1,2,3-cd)Pyrene Dibenz(a,h)anthracene Benzo(ghi)perylene Cl2-BZ#8 Cl3-BZ#18 Cl3-BZ#28 Cl4-BZ#44 Cl4-BZ#49 Cl4-BZ#52 Cl4-BZ#66 Cl5-BZ#87 Cl5-BZ#101 Cl5-BZ#105 Cl5-BZ#118 Cl6-BZ#128 Parameter Result ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND RL 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg UnitsQualifier PAHs/PCB Congeners by GC/MS - Mansfield Lab for sample(s): 01-03 Batch: WG1624848-1 Cleanup Date:04/14/22 MDL -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- Serial_No:05022219:37 Page 34 of 87 Method Blank Analysis Batch Quality Control Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 04/19/22 09:20 105,8270D-SIM/680(M)Analytical Method: Analytical Date: Extraction Method: Cleanup Method: EPA 3570 EPA 3630 Extraction Date:04/07/22 17:20 05/02/22 Analyst:GP Cl6-BZ#138 Cl6-BZ#153 Cl7-BZ#170 Cl7-BZ#180 Cl7-BZ#183 Cl7-BZ#184 Cl7-BZ#187 Cl8-BZ#195 Cl9-BZ#206 Cl10-BZ#209 Parameter Result ND ND ND ND ND ND ND ND ND ND RL 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 0.400 ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg UnitsQualifier PAHs/PCB Congeners by GC/MS - Mansfield Lab for sample(s): 01-03 Batch: WG1624848-1 2-Methylnaphthalene-d10 Pyrene-d10 Benzo(b)fluoranthene-d12 DBOB BZ 198 77 84 88 104 84 30-150 30-150 30-150 50-125 50-125 Surrogate %Recovery Qualifier Acceptance Criteria Cleanup Date:04/14/22 MDL -- -- -- -- -- -- -- -- -- -- Serial_No:05022219:37 Page 35 of 87 Naphthalene Acenaphthylene Acenaphthene Fluorene Phenanthrene Anthracene Fluoranthene Pyrene Benz(a)anthracene Chrysene Benzo(b)fluoranthene Benzo(k)fluoranthene Benzo(a)pyrene Indeno(1,2,3-cd)Pyrene Dibenz(a,h)anthracene Benzo(ghi)perylene Cl2-BZ#8 Cl3-BZ#18 Cl3-BZ#28 Cl4-BZ#44 Cl4-BZ#49 Cl4-BZ#52 Cl4-BZ#66 77 78 80 82 86 78 86 86 91 79 92 81 79 90 88 96 89 82 87 91 76 92 82 82 81 82 84 87 79 86 86 93 78 96 81 80 92 89 98 91 83 88 92 81 87 81 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 6 4 2 2 1 1 0 0 2 1 4 0 1 2 1 2 2 1 1 1 6 6 1 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 50 50 50 50 50 50 50 Parameter LCS %Recovery LCSD %Recovery %Recovery Limits RPD RPD Limits PAHs/PCB Congeners by GC/MS - Mansfield Lab Associated sample(s): 01-03 Batch: WG1624848-2 WG1624848-3 Lab Control Sample Analysis Batch Quality ControlProject Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 05/02/22 Qual Qual Qual Serial_No:05022219:37 Page 36 of 87 Cl5-BZ#87 Cl5-BZ#101 Cl5-BZ#105 Cl5-BZ#118 Cl6-BZ#128 Cl6-BZ#138 Cl6-BZ#153 Cl7-BZ#170 Cl7-BZ#180 Cl7-BZ#183 Cl7-BZ#184 Cl7-BZ#187 Cl8-BZ#195 Cl9-BZ#206 Cl10-BZ#209 84 87 86 86 86 88 92 88 89 83 91 85 95 94 95 84 84 85 86 86 88 91 87 88 83 87 84 95 94 94 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 0 4 1 0 0 0 1 1 1 0 4 1 0 0 1 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 Parameter LCS %Recovery LCSD %Recovery %Recovery Limits RPD RPD Limits PAHs/PCB Congeners by GC/MS - Mansfield Lab Associated sample(s): 01-03 Batch: WG1624848-2 WG1624848-3 Lab Control Sample Analysis Batch Quality ControlProject Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 2-Methylnaphthalene-d10 Pyrene-d10 Benzo(b)fluoranthene-d12 DBOB BZ 198 74 92 87 101 96 30-150 30-150 30-150 50-125 50-125 77 91 87 99 94 Surrogate Qual%Recovery Qual%Recovery LCS LCSD 05/02/22 Acceptance Criteria Qual Qual Qual Serial_No:05022219:37 Page 37 of 87 PETROLEUM HYDROCARBONS Serial_No:05022219:37 Page 38 of 87 FF C9-C18 Aliphatics C19-C36 Aliphatics C11-C22 Aromatics C11-C22 Aromatics, Adjusted Parameter Result Dilution Factor ND ND ND ND mg/kg mg/kg mg/kg mg/kg 1 1 1 1 Qualifier Units RL Extractable Petroleum Hydrocarbons - Westborough Lab SAMPLE RESULTS Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 8.12 8.12 8.12 8.12 Chloro-Octadecane o-Terphenyl 2-Fluorobiphenyl 2-Bromonaphthalene 66 67 71 72 40-140 40-140 40-140 40-140 Acceptance CriteriaSurrogate % Recovery Qualifier Condition of sample received: Sample Temperature upon receipt: Sample Extraction method: Satisfactory Received on Ice Extracted Per the Method Quality Control Information 05/02/22 CHARTPAK-3Client ID: 03/30/22 14:45Date Collected: 03/31/22Date Received: Matrix:Sediment LEEDS, NORTHAMPTON, MASample Location: L2216587-01Lab ID: Field Prep: Extraction Method: Cleanup Method1: Analytical Method: Analytical Date: Analyst: 135,EPH-19-2.1 04/07/22 20:20 MEO Not Specified EPA 3546 EPH-19-2.1 Extraction Date:04/06/22 01:12 Cleanup Date1:04/07/22 Percent Solids: 78% MDL -- -- -- -- Sample Depth: Serial_No:05022219:37 Page 39 of 87 FF C9-C18 Aliphatics C19-C36 Aliphatics C11-C22 Aromatics C11-C22 Aromatics, Adjusted Parameter Result Dilution Factor ND 25.0 22.8 22.1 mg/kg mg/kg mg/kg mg/kg 1 1 1 1 Qualifier Units RL Extractable Petroleum Hydrocarbons - Westborough Lab SAMPLE RESULTS Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 9.85 9.85 9.85 9.85 Chloro-Octadecane o-Terphenyl 2-Fluorobiphenyl 2-Bromonaphthalene 58 64 72 72 40-140 40-140 40-140 40-140 Acceptance CriteriaSurrogate % Recovery Qualifier Condition of sample received: Sample Temperature upon receipt: Sample Extraction method: Satisfactory Received on Ice Extracted Per the Method Quality Control Information 05/02/22 CHARTPAK-2Client ID: 03/30/22 15:15Date Collected: 03/31/22Date Received: Matrix:Sediment LEEDS, NORTHAMPTON, MASample Location: L2216587-02Lab ID: Field Prep: Extraction Method: Cleanup Method1: Analytical Method: Analytical Date: Analyst: 135,EPH-19-2.1 04/07/22 20:55 MEO Not Specified EPA 3546 EPH-19-2.1 Extraction Date:04/06/22 01:12 Cleanup Date1:04/07/22 Percent Solids: 66% MDL -- -- -- -- Sample Depth: Serial_No:05022219:37 Page 40 of 87 FF C9-C18 Aliphatics C19-C36 Aliphatics C11-C22 Aromatics C11-C22 Aromatics, Adjusted Parameter Result Dilution Factor ND ND ND ND mg/kg mg/kg mg/kg mg/kg 1 1 1 1 Qualifier Units RL Extractable Petroleum Hydrocarbons - Westborough Lab SAMPLE RESULTS Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 8.08 8.08 8.08 8.08 Chloro-Octadecane o-Terphenyl 2-Fluorobiphenyl 2-Bromonaphthalene 61 60 67 68 40-140 40-140 40-140 40-140 Acceptance CriteriaSurrogate % Recovery Qualifier Condition of sample received: Sample Temperature upon receipt: Sample Extraction method: Satisfactory Received on Ice Extracted Per the Method Quality Control Information 05/02/22 CHARTPAK-1Client ID: 03/30/22 15:40Date Collected: 03/31/22Date Received: Matrix:Sediment LEEDS, NORTHAMPTON, MASample Location: L2216587-03Lab ID: Field Prep: Extraction Method: Cleanup Method1: Analytical Method: Analytical Date: Analyst: 135,EPH-19-2.1 04/07/22 21:30 MEO Not Specified EPA 3546 EPH-19-2.1 Extraction Date:04/06/22 01:12 Cleanup Date1:04/07/22 Percent Solids: 78% MDL -- -- -- -- Sample Depth: Serial_No:05022219:37 Page 41 of 87 Method Blank Analysis Batch Quality Control Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 04/07/22 18:35 135,EPH-19-2.1Analytical Method: Analytical Date: Extraction Method: Cleanup Method: EPA 3546 EPH-19-2.1 Extraction Date:04/06/22 01:12 05/02/22 Analyst:MEO C9-C18 Aliphatics C19-C36 Aliphatics C11-C22 Aromatics C11-C22 Aromatics, Adjusted Parameter Result ND ND ND ND RL 6.46 6.46 6.46 6.46 mg/kg mg/kg mg/kg mg/kg UnitsQualifier Extractable Petroleum Hydrocarbons - Westborough Lab for sample(s): 01-03 Batch: WG1623886-1 Chloro-Octadecane o-Terphenyl 2-Fluorobiphenyl 2-Bromonaphthalene 56 58 69 72 40-140 40-140 40-140 40-140 Surrogate %Recovery Qualifier Acceptance Criteria Cleanup Date:04/07/22 MDL -- -- -- -- Serial_No:05022219:37 Page 42 of 87 C9-C18 Aliphatics C19-C36 Aliphatics C11-C22 Aromatics Naphthalene 2-Methylnaphthalene Acenaphthylene Acenaphthene Fluorene Phenanthrene Anthracene Fluoranthene Pyrene Benzo(a)anthracene Chrysene Benzo(b)fluoranthene Benzo(k)fluoranthene Benzo(a)pyrene Indeno(1,2,3-cd)Pyrene Dibenzo(a,h)anthracene Benzo(ghi)perylene 59 68 62 51 55 55 58 60 61 61 60 62 62 61 60 58 61 59 60 56 59 71 68 52 56 58 62 66 68 68 68 70 69 68 68 65 68 67 68 64 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 0 4 9 2 2 5 7 10 11 11 13 12 11 11 13 11 11 13 13 13 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 Parameter LCS %Recovery LCSD %Recovery %Recovery Limits RPD RPD Limits Extractable Petroleum Hydrocarbons - Westborough Lab Associated sample(s): 01-03 Batch: WG1623886-2 WG1623886-3 Lab Control Sample Analysis Batch Quality ControlProject Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 05/02/22 Qual Qual Qual Serial_No:05022219:37 Page 43 of 87 Parameter LCS %Recovery LCSD %Recovery %Recovery Limits RPD RPD Limits Extractable Petroleum Hydrocarbons - Westborough Lab Associated sample(s): 01-03 Batch: WG1623886-2 WG1623886-3 Lab Control Sample Analysis Batch Quality ControlProject Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 Chloro-Octadecane o-Terphenyl 2-Fluorobiphenyl 2-Bromonaphthalene % Naphthalene Breakthrough % 2-Methylnaphthalene Breakthrough 56 57 69 70 0 0 40-140 40-140 40-140 40-140 58 62 71 71 0 0 Surrogate Qual%Recovery Qual%Recovery LCS LCSD 05/02/22 Acceptance Criteria Qual Qual Qual Serial_No:05022219:37 Page 44 of 87 PESTICIDES Serial_No:05022219:37 Page 45 of 87 FF Delta-BHC Lindane Alpha-BHC Beta-BHC Heptachlor Aldrin Heptachlor epoxide Endrin Endrin ketone Dieldrin 4,4'-DDE 4,4'-DDD 4,4'-DDT Endosulfan I Endosulfan II Endosulfan sulfate Methoxychlor Chlordane Hexachlorobenzene Parameter Result Dilution Factor ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Qualifier Units RL MCP Organochlorine Pesticides - Westborough Lab SAMPLE RESULTS Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 2.02 0.674 0.842 2.02 1.01 2.02 3.79 0.842 2.02 1.26 2.02 2.02 3.79 2.02 2.02 0.842 3.79 16.8 2.02 2,4,5,6-Tetrachloro-m-xylene Decachlorobiphenyl 2,4,5,6-Tetrachloro-m-xylene Decachlorobiphenyl 50 78 49 61 30-150 30-150 30-150 30-150 Acceptance Criteria A A B B Surrogate % Recovery Qualifier Column 05/02/22 CHARTPAK-3Client ID: 03/30/22 14:45Date Collected: 03/31/22Date Received: LEEDS, NORTHAMPTON, MASample Location: L2216587-01Lab ID: Field Prep:Not Specified Matrix:Sediment Extraction Method: Cleanup Method: Analytical Method: Analytical Date: Analyst: 97,8081B 04/10/22 22:33 JAW EPA 3546 EPA 3620B Extraction Date:04/09/22 11:41 Cleanup Date:04/10/22 78%Percent Solids: MDL -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- A A A A A A A A A A A A A A A A A A A Column Sample Depth: Serial_No:05022219:37 Page 46 of 87 Delta-BHC Lindane Alpha-BHC Beta-BHC Heptachlor Aldrin Heptachlor epoxide Endrin Endrin ketone Dieldrin 4,4'-DDE 4,4'-DDD 4,4'-DDT Endosulfan I Endosulfan II Endosulfan sulfate Methoxychlor Chlordane Hexachlorobenzene Parameter Result Dilution Factor ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Qualifier Units RL MCP Organochlorine Pesticides - Westborough Lab SAMPLE RESULTS Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 2.35 0.785 0.981 2.35 1.18 2.35 4.41 0.981 2.35 1.47 2.35 2.35 4.41 2.35 2.35 0.981 4.41 19.6 2.35 2,4,5,6-Tetrachloro-m-xylene Decachlorobiphenyl 2,4,5,6-Tetrachloro-m-xylene Decachlorobiphenyl 56 62 48 63 30-150 30-150 30-150 30-150 Acceptance Criteria A A B B Surrogate % Recovery Qualifier Column 05/02/22 CHARTPAK-2Client ID: 03/30/22 15:15Date Collected: 03/31/22Date Received: LEEDS, NORTHAMPTON, MASample Location: L2216587-02Lab ID: Field Prep:Not Specified Matrix:Sediment Extraction Method: Cleanup Method: Analytical Method: Analytical Date: Analyst: 97,8081B 04/10/22 22:44 JAW EPA 3546 EPA 3620B Extraction Date:04/09/22 11:41 Cleanup Date:04/10/22 66%Percent Solids: MDL -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- A A A A A A A A A A A A A A A A A A A Column Sample Depth: Serial_No:05022219:37 Page 47 of 87 Delta-BHC Lindane Alpha-BHC Beta-BHC Heptachlor Aldrin Heptachlor epoxide Endrin Endrin ketone Dieldrin 4,4'-DDE 4,4'-DDD 4,4'-DDT Endosulfan I Endosulfan II Endosulfan sulfate Methoxychlor Chlordane Hexachlorobenzene Parameter Result Dilution Factor ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Qualifier Units RL MCP Organochlorine Pesticides - Westborough Lab SAMPLE RESULTS Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 2.04 0.678 0.848 2.04 1.02 2.04 3.82 0.848 2.04 1.27 2.04 2.04 3.82 2.04 2.04 0.848 3.82 17.0 2.04 2,4,5,6-Tetrachloro-m-xylene Decachlorobiphenyl 2,4,5,6-Tetrachloro-m-xylene Decachlorobiphenyl 54 84 53 67 30-150 30-150 30-150 30-150 Acceptance Criteria A A B B Surrogate % Recovery Qualifier Column 05/02/22 CHARTPAK-1Client ID: 03/30/22 15:40Date Collected: 03/31/22Date Received: LEEDS, NORTHAMPTON, MASample Location: L2216587-03Lab ID: Field Prep:Not Specified Matrix:Sediment Extraction Method: Cleanup Method: Analytical Method: Analytical Date: Analyst: 97,8081B 04/10/22 22:55 JAW EPA 3546 EPA 3620B Extraction Date:04/09/22 11:41 Cleanup Date:04/10/22 78%Percent Solids: MDL -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- A A A A A A A A A A A A A A A A A A A Column Sample Depth: Serial_No:05022219:37 Page 48 of 87 Method Blank Analysis Batch Quality Control Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 04/10/22 19:50 97,8081BAnalytical Method: Analytical Date: Extraction Method: Cleanup Method: EPA 3546 EPA 3620B Extraction Date:04/09/22 11:41 05/02/22 Analyst:JAW Delta-BHC Lindane Alpha-BHC Beta-BHC Heptachlor Aldrin Heptachlor epoxide Endrin Endrin ketone Dieldrin 4,4'-DDE 4,4'-DDD 4,4'-DDT Endosulfan I Endosulfan II Endosulfan sulfate Methoxychlor Chlordane Hexachlorobenzene Parameter Result ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND RL 1.57 0.525 0.656 1.57 0.787 1.57 2.95 0.656 1.57 0.984 1.57 1.57 2.95 1.57 1.57 0.656 2.95 13.1 1.57 ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg ug/kg UnitsQualifier MCP Organochlorine Pesticides - Westborough Lab for sample(s): 01-03 Batch: WG1625449-1 2,4,5,6-Tetrachloro-m-xylene Decachlorobiphenyl 2,4,5,6-Tetrachloro-m-xylene Decachlorobiphenyl 47 76 47 70 30-150 30-150 30-150 30-150 Surrogate %Recovery Qualifier Column Acceptance Criteria Cleanup Date:04/10/22 MDL -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- Column A A A A A A A A A A A A A A A A A A A A A B B Serial_No:05022219:37 Page 49 of 87 Delta-BHC Lindane Alpha-BHC Beta-BHC Heptachlor Aldrin Heptachlor epoxide Endrin Endrin ketone Dieldrin 4,4'-DDE 4,4'-DDD 4,4'-DDT Endosulfan I Endosulfan II Endosulfan sulfate Methoxychlor Hexachlorobenzene 53 58 60 52 63 60 48 59 57 62 58 62 65 57 57 42 63 53 52 57 58 51 59 56 55 59 61 61 57 62 64 56 58 46 64 52 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 40-140 2 2 3 2 7 7 14 0 7 2 2 0 2 2 2 9 2 2 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 Parameter LCS %Recovery LCSD %Recovery %Recovery Limits RPD RPD Limits MCP Organochlorine Pesticides - Westborough Lab Associated sample(s): 01-03 Batch: WG1625449-2 WG1625449-3 Lab Control Sample Analysis Batch Quality ControlProject Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 05/02/22 Qual Qual Qual Column A A A A A A A A A A A A A A A A A A Serial_No:05022219:37 Page 50 of 87 Parameter LCS %Recovery LCSD %Recovery %Recovery Limits RPD RPD Limits MCP Organochlorine Pesticides - Westborough Lab Associated sample(s): 01-03 Batch: WG1625449-2 WG1625449-3 Lab Control Sample Analysis Batch Quality ControlProject Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 2,4,5,6-Tetrachloro-m-xylene Decachlorobiphenyl 2,4,5,6-Tetrachloro-m-xylene Decachlorobiphenyl 54 87 53 79 30-150 30-150 30-150 30-150 A A B B 52 84 52 76 Surrogate Qual Column%Recovery Qual%Recovery LCS LCSD 05/02/22 Acceptance Criteria Qual Qual Qual Serial_No:05022219:37 Page 51 of 87 METALS Serial_No:05022219:37 Page 52 of 87 FF Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 05/02/22 SAMPLE RESULTS CHARTPAK-3Client ID: 03/30/22 14:45Date Collected: 03/31/22Date Received: Matrix:Sediment LEEDS, NORTHAMPTON, MASample Location: L2216587-01Lab ID: Field Prep:Not Specified Parameter Result Dilution FactorQualifierUnitsRL Date Analyzed Analytical Method Analyst Date Prepared MCP Total Metals - Mansfield Lab Antimony, Total Arsenic, Total Beryllium, Total Cadmium, Total Chromium, Total Copper, Total Lead, Total Mercury, Total Nickel, Total Selenium, Total Silver, Total Thallium, Total Zinc, Total ND 0.832 ND ND 10.7 51.8 14.0 ND 10.3 ND ND ND 35.0 mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg 10 10 10 10 10 10 10 1 10 10 10 10 10 2.02 0.630 0.3783 0.2522 2.52 2.52 0.757 0.097 1.26 2.52 0.630 0.5044 12.6 04/26/22 16:04 04/26/22 16:04 04/26/22 16:04 04/26/22 16:04 04/26/22 16:04 04/26/22 16:04 04/26/22 16:04 04/27/22 10:22 04/26/22 16:04 04/26/22 16:04 04/26/22 16:04 04/26/22 16:04 04/26/22 16:04 97,6020B 97,6020B 97,6020B 97,6020B 97,6020B 97,6020B 97,6020B 97,7471B 97,6020B 97,6020B 97,6020B 97,6020B 97,6020B SV SV SV SV SV SV SV DMB SV SV SV SV SV 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:55 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 EPA 3050B EPA 3050B EPA 3050B EPA 3050B EPA 3050B EPA 3050B EPA 3050B EPA 7471B EPA 3050B EPA 3050B EPA 3050B EPA 3050B EPA 3050B Prep Method Percent Solids: 78% MDL -- -- -- -- -- -- -- -- -- -- -- -- -- Sample Depth: Serial_No:05022219:37 Page 53 of 87 Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 05/02/22 SAMPLE RESULTS CHARTPAK-2Client ID: 03/30/22 15:15Date Collected: 03/31/22Date Received: Matrix:Sediment LEEDS, NORTHAMPTON, MASample Location: L2216587-02Lab ID: Field Prep:Not Specified Parameter Result Dilution FactorQualifierUnitsRL Date Analyzed Analytical Method Analyst Date Prepared MCP Total Metals - Mansfield Lab Antimony, Total Arsenic, Total Beryllium, Total Cadmium, Total Chromium, Total Copper, Total Lead, Total Mercury, Total Nickel, Total Selenium, Total Silver, Total Thallium, Total Zinc, Total ND 0.790 ND 0.6021 12.6 252 45.4 ND 13.4 ND ND ND 360 mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg 10 10 10 10 10 10 10 1 10 10 10 10 10 2.32 0.726 0.4354 0.2903 2.90 2.90 0.871 0.114 1.45 2.90 0.726 0.5805 14.5 04/26/22 16:09 04/26/22 16:09 04/26/22 16:09 04/26/22 16:09 04/26/22 16:09 04/26/22 16:09 04/26/22 16:09 04/27/22 10:25 04/26/22 16:09 04/26/22 16:09 04/26/22 16:09 04/26/22 16:09 04/26/22 16:09 97,6020B 97,6020B 97,6020B 97,6020B 97,6020B 97,6020B 97,6020B 97,7471B 97,6020B 97,6020B 97,6020B 97,6020B 97,6020B SV SV SV SV SV SV SV DMB SV SV SV SV SV 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:55 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 EPA 3050B EPA 3050B EPA 3050B EPA 3050B EPA 3050B EPA 3050B EPA 3050B EPA 7471B EPA 3050B EPA 3050B EPA 3050B EPA 3050B EPA 3050B Prep Method Percent Solids: 66% MDL -- -- -- -- -- -- -- -- -- -- -- -- -- Sample Depth: Serial_No:05022219:37 Page 54 of 87 Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 05/02/22 SAMPLE RESULTS CHARTPAK-1Client ID: 03/30/22 15:40Date Collected: 03/31/22Date Received: Matrix:Sediment LEEDS, NORTHAMPTON, MASample Location: L2216587-03Lab ID: Field Prep:Not Specified Parameter Result Dilution FactorQualifierUnitsRL Date Analyzed Analytical Method Analyst Date Prepared MCP Total Metals - Mansfield Lab Antimony, Total Arsenic, Total Beryllium, Total Cadmium, Total Chromium, Total Copper, Total Lead, Total Mercury, Total Nickel, Total Selenium, Total Silver, Total Thallium, Total Zinc, Total ND ND ND ND 6.51 38.9 11.7 ND 6.55 ND ND ND 29.4 mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg 10 10 10 10 10 10 10 1 10 10 10 10 10 2.03 0.634 0.3807 0.2538 2.54 2.54 0.761 0.097 1.27 2.54 0.634 0.5076 12.7 04/26/22 16:14 04/26/22 16:14 04/26/22 16:14 04/26/22 16:14 04/26/22 16:14 04/26/22 16:14 04/26/22 16:14 04/27/22 10:28 04/26/22 16:14 04/26/22 16:14 04/26/22 16:14 04/26/22 16:14 04/26/22 16:14 97,6020B 97,6020B 97,6020B 97,6020B 97,6020B 97,6020B 97,6020B 97,7471B 97,6020B 97,6020B 97,6020B 97,6020B 97,6020B SV SV SV SV SV SV SV DMB SV SV SV SV SV 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:55 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 EPA 3050B EPA 3050B EPA 3050B EPA 3050B EPA 3050B EPA 3050B EPA 3050B EPA 7471B EPA 3050B EPA 3050B EPA 3050B EPA 3050B EPA 3050B Prep Method Percent Solids: 78% MDL -- -- -- -- -- -- -- -- -- -- -- -- -- Sample Depth: Serial_No:05022219:37 Page 55 of 87 FF Parameter Parameter Result Result Dilution Factor Dilution Factor Qualifier Qualifier Units Units RL RL Method Blank Analysis Batch Quality Control Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 Date Analyzed Date Analyzed Analytical Method Analytical Method Analyst Analyst Date Prepared Date Prepared 05/02/22 Antimony, Total Arsenic, Total Beryllium, Total Cadmium, Total Chromium, Total Copper, Total Lead, Total Nickel, Total Selenium, Total Silver, Total Thallium, Total Zinc, Total Mercury, Total ND ND ND ND ND ND ND ND ND ND ND ND ND mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg 10 10 10 10 10 10 10 10 10 10 10 10 1 1.60 0.500 0.3000 0.2000 2.00 2.00 0.600 1.00 2.00 0.500 0.4000 10.0 0.083 04/26/22 15:45 04/26/22 15:45 04/26/22 15:45 04/26/22 15:45 04/26/22 15:45 04/26/22 15:45 04/26/22 15:45 04/26/22 15:45 04/26/22 15:45 04/26/22 15:45 04/26/22 15:45 04/26/22 15:45 04/27/22 10:12 97,6020B 97,6020B 97,6020B 97,6020B 97,6020B 97,6020B 97,6020B 97,6020B 97,6020B 97,6020B 97,6020B 97,6020B 97,7471B SV SV SV SV SV SV SV SV SV SV SV SV DMB 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:34 04/26/22 11:55 MCP Total Metals - Mansfield Lab for sample(s): 01-03 Batch: WG1630887-1 MCP Total Metals - Mansfield Lab for sample(s): 01-03 Batch: WG1630889-1 EPA 3050B EPA 7471B Digestion Method: Digestion Method: Prep Information Prep Information MDL MDL -- -- -- -- -- -- -- -- -- -- -- -- -- Serial_No:05022219:37 Page 56 of 87 Antimony, Total Arsenic, Total Beryllium, Total Cadmium, Total Chromium, Total Copper, Total Lead, Total Nickel, Total Selenium, Total Silver, Total Thallium, Total Zinc, Total Mercury, Total 167 91 95 94 92 86 94 95 98 96 89 82 85 163 88 96 94 89 84 90 92 93 92 92 79 87 20-250 70-130 75-125 75-125 70-130 75-125 72-128 70-130 66-134 70-131 70-130 70-130 60-140 2 3 1 0 3 2 4 3 5 4 3 4 2 30 30 30 30 30 30 30 30 30 30 30 30 30 Parameter LCS %Recovery LCSD %Recovery %Recovery Limits RPD RPD Limits MCP Total Metals - Mansfield Lab Associated sample(s): 01-03 Batch: WG1630887-2 WG1630887-3 SRM Lot Number: D113-540 MCP Total Metals - Mansfield Lab Associated sample(s): 01-03 Batch: WG1630889-2 WG1630889-3 SRM Lot Number: D113-540 Lab Control Sample Analysis Batch Quality ControlProject Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 05/02/22 Qual Qual Qual Serial_No:05022219:37 Page 57 of 87 INORGANICS & MISCELLANEOUS Serial_No:05022219:37 Page 58 of 87 FF CHARTPAK-3Client ID: 03/30/22 14:45Date Collected: 03/31/22Date Received: Parameter Result Dilution Factor Matrix:Sediment LEEDS, NORTHAMPTON, MASample Location: L2216587-01Lab ID: Qualifier Units RL SAMPLE RESULTS Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 Field Prep: Date Analyzed Analytical Method Analyst Not Specified Total Organic Carbon - Mansfield Lab Grain Size Analysis - Mansfield Lab General Chemistry - Mansfield Lab Total Organic Carbon (Rep1) Total Organic Carbon (Rep2) Total Organic Carbon (Average) % Total Gravel % Coarse Sand % Medium Sand % Fine Sand % Total Fines Solids, Total 0.253 0.235 0.244 0.200 1.80 55.2 40.6 2.20 77.5 % % % % % % % % % 1 1 1 1 1 1 1 1 1 0.010 0.010 0.010 0.100 0.100 0.100 0.100 0.100 0.100 04/27/22 19:33 04/27/22 19:33 04/27/22 19:33 04/25/22 12:12 04/25/22 12:12 04/25/22 12:12 04/25/22 12:12 04/25/22 12:12 04/01/22 09:50 1,9060A 1,9060A 1,9060A 12,D6913/D7928 12,D6913/D7928 12,D6913/D7928 12,D6913/D7928 12,D6913/D7928 121,2540G SP SP SP SK SK SK SK SK NG Date Prepared - - - - - - - - - 05/02/22 MDL -- -- -- NA NA NA NA NA -- Sample Depth: Serial_No:05022219:37 Page 59 of 87 FF CHARTPAK-2Client ID: 03/30/22 15:15Date Collected: 03/31/22Date Received: Parameter Result Dilution Factor Matrix:Sediment LEEDS, NORTHAMPTON, MASample Location: L2216587-02Lab ID: Qualifier Units RL SAMPLE RESULTS Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 Field Prep: Date Analyzed Analytical Method Analyst Not Specified Total Organic Carbon - Mansfield Lab Grain Size Analysis - Mansfield Lab General Chemistry - Mansfield Lab Total Organic Carbon (Rep1) Total Organic Carbon (Rep2) Total Organic Carbon (Average) % Total Gravel % Coarse Sand % Medium Sand % Fine Sand % Total Fines Solids, Total 1.37 1.04 1.20 4.30 13.3 32.4 40.8 9.20 66.1 % % % % % % % % % 1 1 1 1 1 1 1 1 1 0.010 0.010 0.010 0.100 0.100 0.100 0.100 0.100 0.100 04/27/22 19:33 04/27/22 19:33 04/27/22 19:33 04/25/22 12:12 04/25/22 12:12 04/25/22 12:12 04/25/22 12:12 04/25/22 12:12 04/01/22 09:50 1,9060A 1,9060A 1,9060A 12,D6913/D7928 12,D6913/D7928 12,D6913/D7928 12,D6913/D7928 12,D6913/D7928 121,2540G SP SP SP SK SK SK SK SK NG Date Prepared - - - - - - - - - 05/02/22 MDL -- -- -- NA NA NA NA NA -- Sample Depth: Serial_No:05022219:37 Page 60 of 87 FF CHARTPAK-1Client ID: 03/30/22 15:40Date Collected: 03/31/22Date Received: Parameter Result Dilution Factor Matrix:Sediment LEEDS, NORTHAMPTON, MASample Location: L2216587-03Lab ID: Qualifier Units RL SAMPLE RESULTS Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 Field Prep: Date Analyzed Analytical Method Analyst Not Specified Total Organic Carbon - Mansfield Lab Grain Size Analysis - Mansfield Lab General Chemistry - Mansfield Lab Total Organic Carbon (Rep1) Total Organic Carbon (Rep2) Total Organic Carbon (Average) % Total Gravel % Coarse Sand % Medium Sand % Fine Sand % Total Fines Solids, Total 0.292 0.216 0.254 1.30 8.10 69.8 18.1 2.70 78.3 % % % % % % % % % 1 1 1 1 1 1 1 1 1 0.010 0.010 0.010 0.100 0.100 0.100 0.100 0.100 0.100 04/27/22 19:33 04/27/22 19:33 04/27/22 19:33 04/25/22 12:12 04/25/22 12:12 04/25/22 12:12 04/25/22 12:12 04/25/22 12:12 04/01/22 09:50 1,9060A 1,9060A 1,9060A 12,D6913/D7928 12,D6913/D7928 12,D6913/D7928 12,D6913/D7928 12,D6913/D7928 121,2540G SP SP SP SK SK SK SK SK NG Date Prepared - - - - - - - - - 05/02/22 MDL -- -- -- NA NA NA NA NA -- Sample Depth: Serial_No:05022219:37 Page 61 of 87 FF Parameter Result Dilution FactorQualifierUnitsRL Method Blank Analysis Batch Quality Control Project Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 Date Analyzed Analytical Method Analyst Date Prepared 05/02/22 Total Organic Carbon (Rep1) Total Organic Carbon (Rep2) Total Organic Carbon (Average) ND ND ND % % % 1 1 1 0.010 0.010 0.010 04/27/22 19:33 04/27/22 19:33 04/27/22 19:33 1,9060A 1,9060A 1,9060A SP SP SP - - - Total Organic Carbon - Mansfield Lab for sample(s): 01-03 Batch: WG1631824-1 MDL -- -- -- Serial_No:05022219:37 Page 62 of 87 Total Organic Carbon (Rep1) Total Organic Carbon (Rep2) Total Organic Carbon (Average) 98 95 96 - - - 75-125 75-125 75-125 - - - 25 25 25 Parameter LCS %Recovery LCSD %Recovery %Recovery Limits RPD RPD Limits Total Organic Carbon - Mansfield Lab Associated sample(s): 01-03 Batch: WG1631824-2 Lab Control Sample Analysis Batch Quality ControlProject Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 05/02/22 Qual Qual Qual Serial_No:05022219:37 Page 63 of 87 Total Organic Carbon (Rep1) Total Organic Carbon (Rep2) 0.253 0.235 0.883 1.09 103 103 - - - - 75-125 75-125 - - 25 25 Parameter Native Sample MS Found MS %Recovery MSD Found MSD %Recovery Recovery Limits RPD RPD Limits Total Organic Carbon - Mansfield Lab Associated sample(s): 01-03 QC Batch ID: WG1631824-4 QC Sample: L2216587-01 Client ID: CHARTPAK-3 0.613 0.828 MS Added Matrix Spike Analysis Batch Quality ControlProject Name: Project Number: Lab Number: Report Date: MASS DEP FY 2022 RECON 195602327 L2216587 05/02/22 Qual Qual Qual Serial_No:05022219:37 Page 64 of 87 % Total Gravel % Coarse Sand % Medium Sand % Fine Sand % Total Fines Total Organic Carbon (Rep1) Total Organic Carbon (Rep2) Total Organic Carbon (Average) 1.30 8.10 69.8 18.1 2.70 0.253 0.235 0.244 5.30 10.5 56.4 23.3 4.50 0.250 0.197 0.224 % % % % % % % % 121 26 21 25 50 1 18 9 20 20 20 20 20 25 25 25 Units RPDParameterNative Sample Duplicate Sample RPD Limits Grain Size Analysis - Mansfield Lab Associated sample(s): 01-03 QC Batch ID: WG1630720-2 QC Sample: L2216587-03 Client ID: CHARTPAK-1 Total Organic Carbon - Mansfield Lab Associated sample(s): 01-03 QC Batch ID: WG1631824-3 QC Sample: L2216587-01 Client ID: CHARTPAK-3 MASS DEP FY 2022 RECON 195602327 Project Name: Project Number: L2216587Lab Number: Report Date: Lab Duplicate Analysis Batch Quality Control 05/02/22 Qual Q Q Q Q Q Serial_No:05022219:37 Page 65 of 87 *Values in parentheses indicate holding time in days L2216587-01A L2216587-01B L2216587-01C L2216587-01D L2216587-01E L2216587-01F L2216587-01G L2216587-01H L2216587-01I L2216587-02A L2216587-02B L2216587-02C L2216587-02D L2216587-02E L2216587-02F L2216587-02G Vial MeOH preserved Vial water preserved Vial water preserved Plastic 2oz unpreserved for TS Plastic 2oz unpreserved for TS Plastic 8oz unpreserved for Grain Size Glass 250ml/8oz unpreserved Glass 250ml/8oz unpreserved Glass 250ml/8oz unpreserved Vial MeOH preserved Vial water preserved Vial water preserved Plastic 2oz unpreserved for TS Plastic 2oz unpreserved for TS Plastic 8oz unpreserved for Grain Size Glass 250ml/8oz unpreserved A A A A A A A A A A A A A A A A NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 4.9 4.9 4.9 4.9 4.9 4.9 4.9 4.9 4.9 4.9 4.9 4.9 4.9 4.9 4.9 4.9 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent A Absent Cooler Custody Seal Cooler Information MASS DEP FY 2022 RECON 195602327 MCP-8260HLW-21(14) MCP-8260HLW-21(14) MCP-8260HLW-21(14) A2-TS(7) A2-TS(7) A2-HYDRO-TFINE(),A2-HYDRO-FSAND(),A2- HYDRO-MSAND(),A2-HYDRO-TGRAVEL(),A2- HYDRO-CSAND() A2-TOC-9060-2REPS(28),A2- PAH/PCBCONG(14) A2-CR-MCP6020T-10(180),A2-AS- MCP6020T-10(180),A2-CD-MCP6020T- 10(180),A2-ZN-MCP6020T-10(180),A2-AG- MCP6020T-10(180),A2-BE-MCP6020T- 10(180),A2-SB-MCP6020T-10(180),A2- HGPREP-AF(28),A2-HG-MCP7471T- 10(28),A2-NI-MCP6020T-10(180),A2-CU- MCP6020T-10(180),A2-SE-MCP6020T- 10(180),A2-PREP-3050:2T(180),A2-TL- MCP6020T-10(180),A2-PB-MCP6020T-10(180) MCP-8081-10(14),EPH-20(14) MCP-8260HLW-21(14) MCP-8260HLW-21(14) MCP-8260HLW-21(14) A2-TS(7) A2-TS(7) A2-HYDRO-TFINE(),A2-HYDRO-FSAND(),A2- HYDRO-MSAND(),A2-HYDRO-TGRAVEL(),A2- HYDRO-CSAND() A2-TOC-9060-2REPS(28),A2- PAH/PCBCONG(14) Project Name: Project Number: L2216587Lab Number: Report Date: Sample Receipt and Container Information Container ID Container Type Cooler Temp deg C Pres Seal Container Information Analysis(*) 05/02/22 Were project specific reporting limits specified?YES 31-MAR-22 15:41 31-MAR-22 15:41 31-MAR-22 15:41 31-MAR-22 15:41 Frozen Date/Time Final pH Initial pH Serial_No:05022219:37 Page 66 of 87 *Values in parentheses indicate holding time in days L2216587-02H L2216587-02I L2216587-03A L2216587-03B L2216587-03C L2216587-03D L2216587-03E L2216587-03F L2216587-03G L2216587-03H L2216587-03I Glass 250ml/8oz unpreserved Glass 250ml/8oz unpreserved Vial MeOH preserved Vial water preserved Vial water preserved Plastic 2oz unpreserved for TS Plastic 2oz unpreserved for TS Plastic 8oz unpreserved for Grain Size Glass 250ml/8oz unpreserved Glass 250ml/8oz unpreserved Glass 250ml/8oz unpreserved A A A A A A A A A A A NA NA NA NA NA NA NA NA NA NA NA 4.9 4.9 4.9 4.9 4.9 4.9 4.9 4.9 4.9 4.9 4.9 Y Y Y Y Y Y Y Y Y Y Y Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent Absent MASS DEP FY 2022 RECON 195602327 A2-CR-MCP6020T-10(180),A2-AG- MCP6020T-10(180),A2-AS-MCP6020T- 10(180),A2-ZN-MCP6020T-10(180),A2-CD- MCP6020T-10(180),A2-BE-MCP6020T- 10(180),A2-SB-MCP6020T-10(180),A2-HG- MCP7471T-10(28),A2-HGPREP-AF(28),A2-NI- MCP6020T-10(180),A2-SE-MCP6020T- 10(180),A2-CU-MCP6020T-10(180),A2-PREP- 3050:2T(180),A2-PB-MCP6020T-10(180),A2- TL-MCP6020T-10(180) MCP-8081-10(14),EPH-20(14) MCP-8260HLW-21(14) MCP-8260HLW-21(14) MCP-8260HLW-21(14) A2-TS(7) A2-TS(7) A2-HYDRO-TFINE(),A2-HYDRO-FSAND(),A2- HYDRO-MSAND(),A2-HYDRO-TGRAVEL(),A2- HYDRO-CSAND() A2-TOC-9060-2REPS(28),A2- PAH/PCBCONG(14) A2-CR-MCP6020T-10(180),A2-AG- MCP6020T-10(180),A2-ZN-MCP6020T- 10(180),A2-AS-MCP6020T-10(180),A2-CD- MCP6020T-10(180),A2-BE-MCP6020T- 10(180),A2-SB-MCP6020T-10(180),A2- HGPREP-AF(28),A2-HG-MCP7471T- 10(28),A2-NI-MCP6020T-10(180),A2-CU- MCP6020T-10(180),A2-SE-MCP6020T- 10(180),A2-PB-MCP6020T-10(180),A2-PREP- 3050:2T(180),A2-TL-MCP6020T-10(180) MCP-8081-10(14),EPH-20(14) Project Name: Project Number: L2216587Lab Number: Report Date: Container ID Container Type Cooler Temp deg C Pres Seal Container Information Analysis(*) 05/02/22 31-MAR-22 15:41 31-MAR-22 15:41 Frozen Date/Time Final pH Initial pH Serial_No:05022219:37 Page 67 of 87 Report Format:Data Usability Report GLOSSARY Project Name: Project Number: Lab Number: Report Date: L2216587MASS DEP FY 2022 RECON 195602327 05/02/22 Acronyms DL EDL EMPC EPA LCS LCSD LFB LOD LOQ MDL MS MSD NA NC NDPA/DPA NI NP NR RL RPD SRM STLP TEF TEQ TIC Detection Limit: This value represents the level to which target analyte concentrations are reported as estimated values, when those target analyte concentrations are quantified below the limit of quantitation (LOQ). The DL includes any adjustments from dilutions, concentrations or moisture content, where applicable. (DoD report formats only.) Estimated Detection Limit: This value represents the level to which target analyte concentrations are reported as estimated values, when those target analyte concentrations are quantified below the reporting limit (RL). The EDL includes any adjustments from dilutions, concentrations or moisture content, where applicable. The use of EDLs is specific to the analysis of PAHs using Solid-Phase Microextraction (SPME). Estimated Maximum Possible Concentration: The concentration that results from the signal present at the retention time of an analyte when the ions meet all of the identification criteria except the ion abundance ratio criteria. An EMPC is a worst-case estimate of the concentration. Environmental Protection Agency. Laboratory Control Sample: A sample matrix, free from the analytes of interest, spiked with verified known amounts of analytes or a material containing known and verified amounts of analytes. Laboratory Control Sample Duplicate: Refer to LCS. Laboratory Fortified Blank: A sample matrix, free from the analytes of interest, spiked with verified known amounts of analytes or a material containing known and verified amounts of analytes. Limit of Detection: This value represents the level to which a target analyte can reliably be detected for a specific analyte in a specific matrix by a specific method. The LOD includes any adjustments from dilutions, concentrations or moisture content, where applicable. (DoD report formats only.) Limit of Quantitation: The value at which an instrument can accurately measure an analyte at a specific concentration. The LOQ includes any adjustments from dilutions, concentrations or moisture content, where applicable. (DoD report formats only.) Limit of Quantitation: The value at which an instrument can accurately measure an analyte at a specific concentration. The LOQ includes any adjustments from dilutions, concentrations or moisture content, where applicable. (DoD report formats only.) Method Detection Limit: This value represents the level to which target analyte concentrations are reported as estimated values, when those target analyte concentrations are quantified below the reporting limit (RL). The MDL includes any adjustments from dilutions, concentrations or moisture content, where applicable. Matrix Spike Sample: A sample prepared by adding a known mass of target analyte to a specified amount of matrix sample for which an independent estimate of target analyte concentration is available. For Method 332.0, the spike recovery is calculated using the native concentration, including estimated values. Matrix Spike Sample Duplicate: Refer to MS. Not Applicable. Not Calculated: Term is utilized when one or more of the results utilized in the calculation are non-detect at the parameter's reporting unit. N-Nitrosodiphenylamine/Diphenylamine. Not Ignitable. Non-Plastic: Term is utilized for the analysis of Atterberg Limits in soil. No Results: Term is utilized when 'No Target Compounds Requested' is reported for the analysis of Volatile or Semivolatile Organic TIC only requests. Reporting Limit: The value at which an instrument can accurately measure an analyte at a specific concentration. The RL includes any adjustments from dilutions, concentrations or moisture content, where applicable. Relative Percent Difference: The results from matrix and/or matrix spike duplicates are primarily designed to assess the precision of analytical results in a given matrix and are expressed as relative percent difference (RPD). Values which are less than five times the reporting limit for any individual parameter are evaluated by utilizing the absolute difference between the values; although the RPD value will be provided in the report. Standard Reference Material: A reference sample of a known or certified value that is of the same or similar matrix as the associated field samples. Semi-dynamic Tank Leaching Procedure per EPA Method 1315. Toxic Equivalency Factors: The values assigned to each dioxin and furan to evaluate their toxicity relative to 2,3,7,8-TCDD. Toxic Equivalent: The measure of a sample's toxicity derived by multiplying each dioxin and furan by its corresponding TEF and then summing the resulting values. Tentatively Identified Compound: A compound that has been identified to be present and is not part of the target compound list (TCL) for the method and/or program. All TICs are qualitatively identified and reported as estimated concentrations. - - - - - - - - - - - - - - - - - - - - - - - - - Serial_No:05022219:37 Page 68 of 87 Report Format:Data Usability Report Project Name: Project Number: Lab Number: Report Date: L2216587MASS DEP FY 2022 RECON 195602327 05/02/22 Terms Analytical Method: Both the document from which the method originates and the analytical reference method. (Example: EPA 8260B is shown as 1,8260B.) The codes for the reference method documents are provided in the References section of the Addendum. Difference: With respect to Total Oxidizable Precursor (TOP) Assay analysis, the difference is defined as the Post-Treatment value minus the Pre-Treatment value. Final pH: As it pertains to Sample Receipt & Container Information section of the report, Final pH reflects pH of container determined after adjustment at the laboratory, if applicable. If no adjustment required, value reflects Initial pH. Frozen Date/Time: With respect to Volatile Organics in soil, Frozen Date/Time reflects the date/time at which associated Reagent Water- preserved vials were initially frozen. Note: If frozen date/time is beyond 48 hours from sample collection, value will be reflected in 'bold'. Initial pH: As it pertains to Sample Receipt & Container Information section of the report, Initial pH reflects pH of container determined upon receipt, if applicable. PAH Total: With respect to Alkylated PAH analyses, the 'PAHs, Total' result is defined as the summation of results for all or a subset of the following compounds: Naphthalene, C1-C4 Naphthalenes, 2-Methylnaphthalene, 1-Methylnaphthalene, Biphenyl, Acenaphthylene, Acenaphthene, Fluorene, C1-C3 Fluorenes, Phenanthrene, C1-C4 Phenanthrenes/Anthracenes, Anthracene, Fluoranthene, Pyrene, C1-C4 Fluoranthenes/Pyrenes, Benz(a)anthracene, Chrysene, C1-C4 Chrysenes, Benzo(b)fluoranthene, Benzo(j)+(k)fluoranthene, Benzo(e)pyrene, Benzo(a)pyrene, Perylene, Indeno(1,2,3-cd)pyrene, Dibenz(ah)+(ac)anthracene, Benzo(g,h,i)perylene. If a 'Total' result is requested, the results of its individual components will also be reported. PFAS Total: With respect to PFAS analyses, the 'PFAS, Total (5)' result is defined as the summation of results for: PFHpA, PFHxS, PFOA, PFNA and PFOS. In addition, the 'PFAS, Total (6)' result is defined as the summation of results for: PFHpA, PFHxS, PFOA, PFNA, PFDA and PFOS. For MassDEP DW compliance analysis only, the 'PFAS, Total (6)' result is defined as the summation of results at or above the RL. Note: If a 'Total' result is requested, the results of its individual components will also be reported. The target compound Chlordane (CAS No. 57-74-9) is reported for GC ECD analyses. Per EPA,this compound "refers to a mixture of chlordane isomers, other chlorinated hydrocarbons and numerous other components." (Reference: USEPA Toxicological Review of Chlordane, In Support of Summary Information on the Integrated Risk Information System (IRIS), December 1997.) Total: With respect to Organic analyses, a 'Total' result is defined as the summation of results for individual isomers or Aroclors. If a 'Total' result is requested, the results of its individual components will also be reported. This is applicable to 'Total' results for methods 8260, 8081 and 8082. Data Qualifiers A B C D E F G H I J M ND NJ - - - - - - - - - - - - - Spectra identified as "Aldol Condensates" are byproducts of the extraction/concentration procedures when acetone is introduced in the process. The analyte was detected above the reporting limit in the associated method blank. Flag only applies to associated field samples that have detectable concentrations of the analyte at less than ten times (10x) the concentration found in the blank. For MCP-related projects, flag only applies to associated field samples that have detectable concentrations of the analyte at less than ten times (10x) the concentration found in the blank. For DOD-related projects, flag only applies to associated field samples that have detectable concentrations of the analyte at less than ten times (10x) the concentration found in the blank AND the analyte was detected above one-half the reporting limit (or above the reporting limit for common lab contaminants) in the associated method blank. For NJ- Air-related projects, flag only applies to associated field samples that have detectable concentrations of the analyte above the reporting limit. For NJ-related projects (excluding Air), flag only applies to associated field samples that have detectable concentrations of the analyte, which was detected above the reporting limit in the associated method blank or above five times the reporting limit for common lab contaminants (Phthalates, Acetone, Methylene Chloride, 2-Butanone). Co-elution: The target analyte co-elutes with a known lab standard (i.e. surrogate, internal standards, etc.) for co-extracted analyses. Concentration of analyte was quantified from diluted analysis. Flag only applies to field samples that have detectable concentrations of the analyte. Concentration of analyte exceeds the range of the calibration curve and/or linear range of the instrument. The ratio of quantifier ion response to qualifier ion response falls outside of the laboratory criteria. Results are considered to be an estimated maximum concentration. The concentration may be biased high due to matrix interferences (i.e, co-elution) with non-target compound(s). The result should be considered estimated. The analysis of pH was performed beyond the regulatory-required holding time of 15 minutes from the time of sample collection. The lower value for the two columns has been reported due to obvious interference. Estimated value. This represents an estimated concentration for Tentatively Identified Compounds (TICs). Reporting Limit (RL) exceeds the MCP CAM Reporting Limit for this analyte. Not detected at the reporting limit (RL) for the sample. Presumptive evidence of compound. This represents an estimated concentration for Tentatively Identified Compounds (TICs), where 1 The reference for this analyte should be considered modified since this analyte is absent from the target analyte list of the original method. - Footnotes Serial_No:05022219:37 Page 69 of 87 Report Format:Data Usability Report Project Name: Project Number: Lab Number: Report Date: L2216587MASS DEP FY 2022 RECON 195602327 05/02/22 Data Qualifiers P Q R RE S V Z - - - - - - - the identification is based on a mass spectral library search. The RPD between the results for the two columns exceeds the method-specified criteria. The quality control sample exceeds the associated acceptance criteria. For DOD-related projects, LCS and/or Continuing Calibration Standard exceedences are also qualified on all associated sample results. Note: This flag is not applicable for matrix spike recoveries when the sample concentration is greater than 4x the spike added or for batch duplicate RPD when the sample concentrations are less than 5x the RL. (Metals only.) Analytical results are from sample re-analysis. Analytical results are from sample re-extraction. Analytical results are from modified screening analysis. The surrogate associated with this target analyte has a recovery outside the QC acceptance limits. (Applicable to MassDEP DW Compliance samples only.) The batch matrix spike and/or duplicate associated with this target analyte has a recovery/RPD outside the QC acceptance limits. (Applicable to MassDEP DW Compliance samples only.) Serial_No:05022219:37 Page 70 of 87 Alpha Analytical performs services with reasonable care and diligence normal to the analytical testing laboratory industry. In the event of an error, the sole and exclusive responsibility of Alpha Analytical shall be to re-perform the work at it's own expense. In no event shall Alpha Analytical be held liable for any incidental, consequential or special damages, including but not limited to, damages in any way connected with the use of, interpretation of, information or analysis provided by Alpha Analytical. We strongly urge our clients to comply with EPA protocol regarding sample volume, preservation, cooling, containers, sampling procedures, holding time and splitting of samples in the field. LIMITATION OF LIABILITIES 1 12 97 105 121 135 141 Test Methods for Evaluating Solid Waste: Physical/Chemical Methods. EPA SW-846. Third Edition. Updates I - VI, 2018. Annual Book of ASTM Standards. (American Society for Testing and Materials) ASTM International. EPA Test Methods (SW-846) with QC Requirements & Performance Standards for the Analysis of EPA SW-846 Methods under the Massachusetts Contingency Plan, WSC- CAM-IIA, IIB, IIIA, IIIB, IIIC, IIID, VA, VB, VC, VIA, VIB, VIIIA and VIIIB, July 2010. Test Methods for Evaluating Solid Waste: Physical/Chemical Methods. EPA SW-846. Third Edition. Updates I - IIIA, 1997 in conjunction with NOAA Technical Memorandum NMFS-NWFSC-59: Extraction, Cleanup and GC/MS Analysis of Sediments and Tissues for Organic Contaminants, March 2004 and the Determination of Pesticides and PCBs in Water and Oil/Sediment by GC/MS: Method 680, EPA 01A0005295, November 1985. Standard Methods for the Examination of Water and Wastewater. APHA-AWWA-WEF. Standard Methods Online. Method for the Determination of Extractable Petroleum Hydrocarbons (EPH), MassDEP, December 2019, Revision 2.1 with QC Requirements & Performance Standards for the Analysis of EPH under the Massachusetts Contingency Plan, WSC-CAM-IVB, March 1, 2020. EPA Test Methods (SW-846) with QC Requirements & Performance Standards for the Analysis of EPA SW-846 Methods under the Massachusetts Contingency Plan, WSC- CAM-IIA and IIB, November 2021. Project Name: Project Number: Lab Number: Report Date: L2216587MASS DEP FY 2022 RECON 195602327 REFERENCES 05/02/22 Serial_No:05022219:37 Page 71 of 87 ASTM D6913/D7928 GRAIN SIZE ANALYSIS Serial_No:05022219:37 Page 72 of 87 LL PL D85 D60 D50 D30 D15 D10 Cc Cu Material Description USCS AASHTO Project No.Client:Remarks: Project: Source of Sample: CHARTPAK-1 Sample Number: L2216587-03 Alpha Analytical Mansfield, MA Figure 1.6749 0.9690 0.7999 0.5334 0.3521 0.2828 1.04 3.43 SPPERCENT FINER0 10 20 30 40 50 60 70 80 90 100 GRAIN SIZE - mm. 0.0010.010.1110100 % +3"Coarse % Gravel Fine Coarse Medium % Sand Fine Silt % Fines Clay 0.0 0.5 0.8 8.1 69.8 18.1 2.76 in.3 in.2 in.1½ in.1 in.¾ in.½ in.3/8 in.#4#10#20#30#40#60#100#140#200Particle Size Distribution Report Serial_No:05022219:37 Page 73 of 87 Alpha Analytical GRAIN SIZE DISTRIBUTION TEST DATA 5/2/2022 Location:CHARTPAK-1 Sample Number:L2216587-03 USCS Classification: SP Sieve Test Data Post #200 Wash Test Weights (grams): Dry Sample and Tare = 30.13 Tare Wt. = 0.00 Minus #200 from wash = 0.0% Dry Sample and Tare (grams) Tare (grams) Sieve Opening Size Weight Retained (grams) Sieve Weight (grams) Percent Finer 30.13 0.00 3"0.00 0.00 100.0 #4 0.39 0.00 98.7 #10 2.44 0.00 90.6 #40 21.02 0.00 20.8 #60 3.90 0.00 7.9 #200 1.58 0.00 2.7 Fractional Components Cobbles 0.0 Gravel Coarse 0.5 Fine 0.8 Total 1.3 Sand Coarse 8.1 Medium 69.8 Fine 18.1 Total 96.0 Fines Silt Clay Total 2.7 D5 0.1285 D10 0.2828 D15 0.3521 D20 0.4148 D30 0.5334 D40 0.6582 D50 0.7999 D60 0.9690 D80 1.4736 D85 1.6749 D90 1.9560 D95 2.4685 Fineness Modulus 2.86 Cu 3.43 Cc 1.04 Serial_No:05022219:37 Page 74 of 87 LL PL D85 D60 D50 D30 D15 D10 Cc Cu Material Description USCS AASHTO Project No.Client:Remarks: Project: Source of Sample: CHARTPAK-1 Sample Number: WG1630720-2 Alpha Analytical Mansfield, MA Figure 2.0693 0.9514 0.7427 0.4508 0.2865 0.1889 1.13 5.04 SPPERCENT FINER0 10 20 30 40 50 60 70 80 90 100 GRAIN SIZE - mm. 0.0010.010.1110100 % +3"Coarse % Gravel Fine Coarse Medium % Sand Fine Silt % Fines Clay 0.0 2.6 2.7 10.5 56.4 23.3 4.56 in.3 in.2 in.1½ in.1 in.¾ in.½ in.3/8 in.#4#10#20#30#40#60#100#140#200Particle Size Distribution Report Serial_No:05022219:37 Page 75 of 87 Alpha Analytical GRAIN SIZE DISTRIBUTION TEST DATA 5/2/2022 Location:CHARTPAK-1 Sample Number:WG1630720-2 USCS Classification: SP Sieve Test Data Post #200 Wash Test Weights (grams): Dry Sample and Tare = 26.15 Tare Wt. = 0.00 Minus #200 from wash = 0.0% Dry Sample and Tare (grams) Tare (grams) Sieve Opening Size Weight Retained (grams) Sieve Weight (grams) Percent Finer 26.15 0.00 3"0.00 0.00 100.0 #4 1.38 0.00 94.7 #10 2.74 0.00 84.2 #40 14.76 0.00 27.8 #60 4.22 0.00 11.7 #200 1.87 0.00 4.5 Fractional Components Cobbles 0.0 Gravel Coarse 2.6 Fine 2.7 Total 5.3 Sand Coarse 10.5 Medium 56.4 Fine 23.3 Total 90.2 Fines Silt Clay Total 4.5 D5 0.0814 D10 0.1889 D15 0.2865 D20 0.3393 D30 0.4508 D40 0.5815 D50 0.7427 D60 0.9514 D80 1.6934 D85 2.0693 D90 2.7667 D95 5.4956 Fineness Modulus 2.91 Cu 5.04 Cc 1.13 Serial_No:05022219:37 Page 76 of 87 LL PL D85 D60 D50 D30 D15 D10 Cc Cu Material Description USCS AASHTO Project No.Client:Remarks: Project: Source of Sample: CHARTPAK-2 Sample Number: L2216587-02 Alpha Analytical Mansfield, MA Figure 2.2967 0.7058 0.4250 0.1551 0.0911 0.0770 0.44 9.17PERCENT FINER0 10 20 30 40 50 60 70 80 90 100 GRAIN SIZE - mm. 0.0010.010.1110100 % +3"Coarse % Gravel Fine Coarse Medium % Sand Fine Silt % Fines Clay 0.0 2.2 2.1 13.3 32.4 40.8 9.26 in.3 in.2 in.1½ in.1 in.¾ in.½ in.3/8 in.#4#10#20#30#40#60#100#140#200Particle Size Distribution Report Serial_No:05022219:37 Page 77 of 87 Alpha Analytical GRAIN SIZE DISTRIBUTION TEST DATA 5/2/2022 Location:CHARTPAK-2 Sample Number:L2216587-02 Sieve Test Data Post #200 Wash Test Weights (grams): Dry Sample and Tare = 67.20 Tare Wt. = 0.00 Minus #200 from wash = 0.0% Dry Sample and Tare (grams) Tare (grams) Sieve Opening Size Weight Retained (grams) Sieve Weight (grams) Percent Finer 67.20 0.00 3"0.00 0.00 100.0 #4 2.90 0.00 95.7 #10 8.92 0.00 82.4 #40 21.78 0.00 50.0 #60 6.09 0.00 40.9 #200 21.32 0.00 9.2 Fractional Components Cobbles 0.0 Gravel Coarse 2.2 Fine 2.1 Total 4.3 Sand Coarse 13.3 Medium 32.4 Fine 40.8 Total 86.5 Fines Silt Clay Total 9.2 D5 D10 0.0770 D15 0.0911 D20 0.1080 D30 0.1551 D40 0.2384 D50 0.4250 D60 0.7058 D80 1.7709 D85 2.2967 D90 3.0954 D95 4.4739 Fineness Modulus 2.24 Cu 9.17 Cc 0.44 Serial_No:05022219:37 Page 78 of 87 LL PL D85 D60 D50 D30 D15 D10 Cc Cu Material Description USCS AASHTO Project No.Client:Remarks: Project: Source of Sample: CHARTPAK-3 Sample Number: L2216587-01 Alpha Analytical Mansfield, MA Figure 1.1437 0.6087 0.4925 0.3283 0.2265 0.1872 0.95 3.25 SPPERCENT FINER0 10 20 30 40 50 60 70 80 90 100 GRAIN SIZE - mm. 0.0010.010.1110100 % +3"Coarse % Gravel Fine Coarse Medium % Sand Fine Silt % Fines Clay 0.0 0.1 0.1 1.8 55.2 40.6 2.26 in.3 in.2 in.1½ in.1 in.¾ in.½ in.3/8 in.#4#10#20#30#40#60#100#140#200Particle Size Distribution Report Serial_No:05022219:37 Page 79 of 87 Alpha Analytical GRAIN SIZE DISTRIBUTION TEST DATA 5/2/2022 Location:CHARTPAK-3 Sample Number:L2216587-01 USCS Classification: SP Sieve Test Data Post #200 Wash Test Weights (grams): Dry Sample and Tare = 82.84 Tare Wt. = 0.00 Minus #200 from wash = 0.0% Dry Sample and Tare (grams) Tare (grams) Sieve Opening Size Weight Retained (grams) Sieve Weight (grams) Percent Finer 82.84 0.00 3"0.00 0.00 100.0 #4 0.18 0.00 99.8 #10 1.51 0.00 98.0 #40 45.73 0.00 42.8 #60 20.23 0.00 18.3 #200 13.35 0.00 2.2 Fractional Components Cobbles 0.0 Gravel Coarse 0.1 Fine 0.1 Total 0.2 Sand Coarse 1.8 Medium 55.2 Fine 40.6 Total 97.6 Fines Silt Clay Total 2.2 D5 0.1361 D10 0.1872 D15 0.2265 D20 0.2613 D30 0.3283 D40 0.4022 D50 0.4925 D60 0.6087 D80 0.9879 D85 1.1437 D90 1.3536 D95 1.6732 Fineness Modulus 2.25 Cu 3.25 Cc 0.95 Serial_No:05022219:37 Page 80 of 87 Alpha Analytical, Inc.ID No.:17873 Facility: Company-wide Revision 19 Department: Quality Assurance Published Date: 4/2/2021 1:14:23 PM Title: Certificate/Approval Program Summary Page 1 of 1 Document Type: Form Pre-Qualtrax Document ID: 08-113 Certification Information The following analytes are not included in our Primary NELAP Scope of Accreditation: Westborough Facility EPA 624/624.1: m/p-xylene, o-xylene, Naphthalene EPA 625/625.1: alpha-Terpineol EPA 8260C/8260D: NPW: 1,2,4,5-Tetramethylbenzene; 4-Ethyltoluene, Azobenzene; SCM: Iodomethane (methyl iodide), 1,2,4,5-Tetramethylbenzene; 4-Ethyltoluene. EPA 8270D/8270E: NPW: Dimethylnaphthalene,1,4-Diphenylhydrazine, alpha-Terpineol; SCM: Dimethylnaphthalene,1,4-Diphenylhydrazine. SM4500: NPW: Amenable Cyanide; SCM: Total Phosphorus, TKN, NO2, NO3. Mansfield Facility SM 2540D: TSS EPA 8082A: NPW: PCB: 1, 5, 31, 87,101, 110, 141, 151, 153, 180, 183, 187. EPA TO-15: Halothane, 2,4,4-Trimethyl-2-pentene, 2,4,4-Trimethyl-1-pentene, Thiophene, 2-Methylthiophene, 3-Methylthiophene, 2-Ethylthiophene, 1,2,3-Trimethylbenzene, Indan, Indene, 1,2,4,5-Tetramethylbenzene, Benzothiophene, 1-Methylnaphthalene. Biological Tissue Matrix: EPA 3050B The following analytes are included in our Massachusetts DEP Scope of Accreditation Westborough Facility: Drinking Water EPA 300.0: Chloride, Nitrate-N, Fluoride, Sulfate; EPA 353.2: Nitrate-N, Nitrite-N; SM4500NO3-F: Nitrate-N, Nitrite-N; SM4500F-C, SM4500CN-CE, EPA 180.1, SM2130B, SM4500Cl-D, SM2320B, SM2540C, SM4500H-B, SM4500NO2-B EPA 332: Perchlorate; EPA 524.2: THMs and VOCs; EPA 504.1: EDB, DBCP. Microbiology: SM9215B; SM9223-P/A, SM9223B-Colilert-QT,SM9222D. Non-Potable Water SM4500H,B, EPA 120.1, SM2510B, SM2540C, SM2320B, SM4500CL-E, SM4500F-BC, SM4500NH3-BH: Ammonia-N and Kjeldahl-N, EPA 350.1: Ammonia-N, LACHAT 10-107-06-1-B: Ammonia-N, EPA 351.1, SM4500NO3-F, EPA 353.2: Nitrate-N, SM4500P-E, SM4500P-B, E, SM4500SO4-E, SM5220D, EPA 410.4, SM5210B, SM5310C, SM4500CL-D, EPA 1664, EPA 420.1, SM4500-CN-CE, SM2540D, EPA 300: Chloride, Sulfate, Nitrate. EPA 624.1: Volatile Halocarbons & Aromatics, EPA 608.3: Chlordane, Toxaphene, Aldrin, alpha-BHC, beta-BHC, gamma-BHC, delta-BHC, Dieldrin, DDD, DDE, DDT, Endosulfan I, Endosulfan II, Endosulfan sulfate, Endrin, Endrin Aldehyde, Heptachlor, Heptachlor Epoxide, PCBs EPA 625.1: SVOC (Acid/Base/Neutral Extractables), EPA 600/4-81-045: PCB-Oil. Microbiology: SM9223B-Colilert-QT; Enterolert-QT, SM9221E, EPA 1600, EPA 1603, SM9222D. Mansfield Facility: Drinking Water EPA 200.7: Al, Ba, Cd, Cr, Cu, Fe, Mn, Ni, Na, Ag, Ca, Zn. EPA 200.8: Al, Sb, As, Ba, Be, Cd, Cr, Cu, Pb, Mn, Ni, Se, Ag, TL, Zn. EPA 245.1 Hg. EPA 522, EPA 537.1. Non-Potable Water EPA 200.7: Al, Sb, As, Be, Cd, Ca, Cr, Co, Cu, Fe, Pb, Mg, Mn, Mo, Ni, K, Se, Ag, Na, Sr, TL, Ti, V, Zn. EPA 200.8: Al, Sb, As, Be, Cd, Cr, Cu, Fe, Pb, Mn, Ni, K, Se, Ag, Na, TL, Zn. EPA 245.1 Hg. SM2340B For a complete listing of analytes and methods, please contact your Alpha Project Manager. Serial_No:05022219:37 Page 81 of 87 Serial_No:05022219:37 Page 82 of 87 Method Blank SummaryMethod Blank Summary Form 4Form 4 VolatilesVolatiles Client : Stantec Lab Number : L2216587 Project Name : MASS DEP FY 2022 RECON Project Number : 195602327 Lab Sample ID : WG1626692-5 Lab File ID :V17220411A05 Instrument ID : VOA117 Matrix : SOIL Analysis Date : 04/11/22 09:16 Client Sample No. Lab Sample ID Analysis Date WG1626692-3LCS WG1626692-3 04/11/22 07:30 WG1626692-4LCSD WG1626692-4 04/11/22 07:57 CHARTPAK-3 L2216587-01 04/11/22 09:42 CHARTPAK-2 L2216587-02 04/11/22 10:09 CHARTPAK-1 L2216587-03 04/11/22 10:36 Serial_No:05022219:37 Page 83 of 87 Calibration Verification SummaryCalibration Verification Summary Form 7Form 7 VolatilesVolatiles Client : Stantec Lab Number : L2216587 Project Name : MASS DEP FY 2022 RECON Project Number : 195602327 Instrument ID : VOA117 Calibration Date : 04/11/22 07:30 Lab File ID : V17220411A01 Init. Calib. Date(s) : 03/22/22 03/22/22 Sample No : WG1626692-2 Init. Calib. Times : 20:28 23:58 Channel : Compound Ave. RRF RRF Min RRF %D Max %D Area% Dev(min) Fluorobenzene 1 1 - 0 20 114 0 Dichlorodifluoromethane 0.212 0.163 - 23.1* 20 88 0 Chloromethane 0.333 0.252 - 24.3* 20 87 0 Vinyl chloride 0.204 0.177 - 13.2 20 98 0 Bromomethane 0.115 0.103 - 10.4 20 110 0 Chloroethane 0.103 0.099 - 3.9 20 107 0 Trichlorofluoromethane 0.288 0.282 - 2.1 20 112 0 Ethyl ether 0.067 0.06 - 10.4 20 100 0 1,1-Dichloroethene 0.159 0.153 - 3.8 20 109 0 Carbon disulfide 0.497 0.425 - 14.5 20 105 0 Freon-113 0.17 0.169 - 0.6 20 113 0 Acrolein 0.021 0.017 - 19 20 94 0 Methylene chloride 0.204 0.161 - 21.1* 20 98 0 Acetone 40 33.863 - 15.3 20 107 0 trans-1,2-Dichloroethene 0.183 0.173 - 5.5 20 104 0 Methyl acetate 0.121 0.089 - 26.4* 20 86 0 Methyl tert-butyl ether 0.418 0.368 - 12 20 96 0 tert-Butyl alcohol 0.015 0.012 - 20 20 91 0 Diisopropyl ether 0.768 0.65 - 15.4 20 90 0 1,1-Dichloroethane 0.382 0.335 - 12.3 20 98 0 Halothane 0.14 0.136 - 2.9 20 108 0 Acrylonitrile 0.053 0.043 - 18.9 20 86 0 Ethyl tert-butyl ether 0.606 0.547 - 9.7 20 95 0 Vinyl acetate 0.399 0.337 - 15.5 20 87 0 cis-1,2-Dichloroethene 0.2 0.182* - 9 20 99 0 2,2-Dichloropropane 0.284 0.285 - -0.4 20 112 0 Bromochloromethane 0.09 0.083* - 7.8 20 99 -.01 Cyclohexane 0.395 0.37 - 6.3 20 105 -.01 Chloroform 0.356 0.307 - 13.8 20 95 -.01 Ethyl acetate 0.156 0.121 - 22.4* 20 88 0 Carbon tetrachloride 0.286 0.286 - 0 20 113 0 Tetrahydrofuran 40 28.406 - 29* 20 82 0 Dibromofluoromethane 0.264 0.264 - 0 20 115 0 1,1,1-Trichloroethane 0.298 0.293 - 1.7 20 110 0 2-Butanone 0.068 0.057 - 16.2 20 98 0 1,1-Dichloropropene 0.232 0.228 - 1.7 20 107 0 Benzene 0.686 0.626 - 8.7 20 99 0 tert-Amyl methyl ether 0.403 0.366 - 9.2 20 97 0 1,2-Dichloroethane-d4 0.268 0.269 - -0.4 20 116 0 1,2-Dichloroethane 0.264 0.219 - 17 20 94 0 Methyl cyclohexane 0.293 0.292 - 0.3 20 110 0 Trichloroethene 0.19 0.181* - 4.7 20 104 0 Dibromomethane 0.096 0.082 - 14.6 20 94 0 * Value outside of QC limits. Serial_No:05022219:37 Page 84 of 87 Calibration Verification SummaryCalibration Verification Summary Form 7Form 7 VolatilesVolatiles Client : Stantec Lab Number : L2216587 Project Name : MASS DEP FY 2022 RECON Project Number : 195602327 Instrument ID : VOA117 Calibration Date : 04/11/22 07:30 Lab File ID : V17220411A01 Init. Calib. Date(s) : 03/22/22 03/22/22 Sample No : WG1626692-2 Init. Calib. Times : 20:28 23:58 Channel : Compound Ave. RRF RRF Min RRF %D Max %D Area% Dev(min) 1,2-Dichloropropane 0.206 0.176 - 14.6 20 93 0 2-Chloroethyl vinyl ether 0.1 0.078 - 22* 20 96 -.01 Bromodichloromethane 0.243 0.219* - 9.9 20 96 0 1,4-Dioxane 2000 1659.907 - 17 20 100 0 cis-1,3-Dichloropropene 0.256 0.247* - 3.5 20 98 0 Chlorobenzene-d5 1 1 - 0 20 112 0 Toluene-d8 1.205 1.283 - -6.5 20 117 0 Toluene 0.58 0.531 - 8.4 20 103 0 4-Methyl-2-pentanone 40 29.591 - 26* 20 93 -.01 Tetrachloroethene 0.24 0.255 - -6.3 20 113 0 trans-1,3-Dichloropropene 0.289 0.275* - 4.8 20 97 0 Ethyl methacrylate 0.202 0.171 - 15.3 20 93 -.01 1,1,2-Trichloroethane 0.135 0.118* - 12.6 20 92 0 Chlorodibromomethane 0.217 0.213 - 1.8 20 98 -.01 1,3-Dichloropropane 0.284 0.249 - 12.3 20 93 -.01 1,2-Dibromoethane 40 32.548 - 18.6 20 95 0 2-Hexanone 0.132 0.097 - 26.5* 20 86 0 Chlorobenzene 0.645 0.599 - 7.1 20 99 -.01 Ethylbenzene 1.072 1.029 - 4 20 102 0 1,1,1,2-Tetrachloroethane 0.229 0.229 - 0 20 101 0 p/m Xylene 0.394 0.399 - -1.3 20 102 0 o Xylene 0.377 0.373 - 1.1 20 100 0 Styrene 0.601 0.599 - 0.3 20 99 0 1,4-Dichlorobenzene-d4 1 1 - 0 20 110 0 Bromoform 0.227 0.226 - 0.4 20 102 0 Isopropylbenzene 2.012 2.088 - -3.8 20 106 0 4-Bromofluorobenzene 0.817 0.865 - -5.9 20 115 0 Bromobenzene 0.505 0.494 - 2.2 20 101 0 n-Propylbenzene 2.363 2.343 - 0.8 20 103 0 1,4-Dichlorobutane 0.712 0.591 - 17 20 87 0 1,1,2,2-Tetrachloroethane 0.348 0.297 - 14.7 20 89 0 4-Ethyltoluene 1.958 1.979 - -1.1 20 105 0 2-Chlorotoluene 1.412 1.336 - 5.4 20 100 0 1,3,5-Trimethylbenzene 1.681 1.708 - -1.6 20 104 0 1,2,3-Trichloropropane 0.29 0.242 - 16.6 20 90 0 trans-1,4-Dichloro-2-buten 0.14 0.117 - 16.4 20 88 0 4-Chlorotoluene 1.464 1.404 - 4.1 20 101 0 tert-Butylbenzene 1.516 1.582 - -4.4 20 106 0 1,2,4-Trimethylbenzene 1.689 1.698 - -0.5 20 103 0 sec-Butylbenzene 2.22 2.261 - -1.8 20 104 0 p-Isopropyltoluene 1.922 2.033 - -5.8 20 107 0 1,3-Dichlorobenzene 1.019 0.986 - 3.2 20 103 0 1,4-Dichlorobenzene 1.038 0.971 - 6.5 20 101 0 * Value outside of QC limits. Serial_No:05022219:37 Page 85 of 87 Calibration Verification SummaryCalibration Verification Summary Form 7Form 7 VolatilesVolatiles Client : Stantec Lab Number : L2216587 Project Name : MASS DEP FY 2022 RECON Project Number : 195602327 Instrument ID : VOA117 Calibration Date : 04/11/22 07:30 Lab File ID : V17220411A01 Init. Calib. Date(s) : 03/22/22 03/22/22 Sample No : WG1626692-2 Init. Calib. Times : 20:28 23:58 Channel : Compound Ave. RRF RRF Min RRF %D Max %D Area% Dev(min) p-Diethylbenzene 1.133 1.208 - -6.6 20 108 0 n-Butylbenzene 1.709 1.716 - -0.4 20 104 0 1,2-Dichlorobenzene 0.945 0.894 - 5.4 20 100 0 1,2,4,5-Tetramethylbenzene 1.898 1.934 - -1.9 20 105 0 1,2-Dibromo-3-chloropropan 40 31.478 - 21.3* 20 98 0 1,3,5-Trichlorobenzene 0.756 0.795 - -5.2 20 110 0 Hexachlorobutadiene 0.38 0.418 - -10 20 115 0 1,2,4-Trichlorobenzene 0.684 0.699 - -2.2 20 107 0 Naphthalene 1.385 1.31 - 5.4 20 96 0 1,2,3-Trichlorobenzene 0.626 0.61 - 2.6 20 103 0 * Value outside of QC limits. Serial_No:05022219:37 Page 86 of 87 Performance Evaluation Mixture SummaryPerformance Evaluation Mixture Summary Form 15Form 15 PesticidesPesticides Client : Stantec Lab Number : L2216587 Project Name : MASS DEP FY 2022 RECON Project Number : 195602327 Instrument ID : PEST10 Analysis Date : 04/10/22 18:36 PEM Standard : R1554584-1 Column 1 : RTX-5 Column 2 : RTX-CLPPesticides2 Parameter Signal 1 Signal 2 4,4'-DDE 433283.63404 265201.05658 Endrin 231036345.39202 168950984.93394 4,4'-DDD 820796.91461 858817.0506 4,4'-DDT 384811115.17203 259425055.97588 Endrin Aldehyde 301401.5649 386387.72904 Endrin Ketone 779010.35133 615298.36419 Parameter %Breakdown 1 %Breakdown 2 Endrin 0.465 0.589 DDT 0.325 0.431 Serial_No:05022219:37 Page 87 of 87 SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Appendix D HEC-RAS Profile Summary Table D.1 Appendix D HEC-RAS PROFILE SUMMARY TABLE Reach River Sta Profile Plan Q Total Min Ch El W.S. Elev Crit W.S.E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl Hydr Depth (cfs)(ft)(ft)(ft)(ft)(ft/ft)(ft/s)(sq ft)(ft) (ft) Reach 1 4145 Median Annual ExistDam_ss 42 366.83 367.57 367.57 367.72 0.026513 3.16 13.31 43.08 1 0.31 Reach 1 4145 Median Annual Prop-SS-M2 42 366.83 367.57 367.57 367.72 0.026513 3.16 13.31 43.08 1 0.31 Reach 1 4145 2-Year RI ExistDam_ss 981 366.83 369.17 369.17 369.96 0.01838 7.16 137.02 87.99 1.01 1.56 Reach 1 4145 2-Year RI Prop-SS-M2 981 366.83 369.17 369.17 369.96 0.018391 7.16 136.99 87.99 1.01 1.56 Reach 1 4145 5-Year RI ExistDam_ss 1620 366.83 369.8 369.8 370.89 0.017164 8.35 194.03 91.1 1.01 2.13 Reach 1 4145 5-Year RI Prop-SS-M2 1620 366.83 369.8 369.8 370.89 0.017176 8.35 193.99 91.1 1.01 2.13 Reach 1 4145 10-Year RI ExistDam_ss 2130 366.83 370.26 370.26 371.52 0.016374 9.03 235.91 93.16 1 2.53 Reach 1 4145 10-Year RI Prop-SS-M2 2130 366.83 370.26 370.26 371.52 0.01634 9.02 236.07 93.17 1 2.53 Reach 1 4145 25-Year RI ExistDam_ss 2880 366.83 371.06 370.82 372.38 0.012867 9.24 311.78 96.28 0.9 3.24 Reach 1 4145 25-Year RI Prop-SS-M2 2880 366.83 371 370.83 372.37 0.013618 9.41 305.91 96.07 0.93 3.18 Reach 1 4145 50-Year RI ExistDam_ss 3510 366.83 371.8 373.1 0.010332 9.14 384.02 98.51 0.81 3.9 Reach 1 4145 50-Year RI Prop-SS-M2 3510 366.83 371.7 371.28 373.07 0.011213 9.39 373.85 98.21 0.85 3.81 Reach 1 4145 100-Year RI ExistDam_ss 4180 366.83 372.52 373.83 0.008762 9.19 455.64 100.6 0.76 4.53 Reach 1 4145 100-Year RI Prop-SS-M2 4180 366.83 372.37 371.71 373.77 0.009644 9.49 441.09 100.15 0.79 4.4 Reach 1 4145 200-Year RI ExistDam_ss 4930 366.83 373.28 374.62 0.007651 9.28 533.06 102.78 0.71 5.19 Reach 1 4145 200-Year RI Prop-SS-M2 4930 366.83 373.11 372.17 374.54 0.008446 9.59 515.5 102.29 0.75 5.04 Reach 1 4145 500-Year RI ExistDam_ss 6000 366.83 374.3 375.69 0.006617 9.44 639.72 105.42 0.67 6.07 Reach 1 4145 500-Year RI Prop-SS-M2 6000 366.83 374.21 372.77 375.64 0.006915 9.58 630.17 105.21 0.68 5.99 Reach 1 3465 Median Annual ExistDam_ss 42 358.82 359.73 359.76 0.001873 1.4 29.97 41.61 0.29 0.72 Reach 1 3465 Median Annual Prop-SS-M2 42 358.82 359.73 359.3 359.76 0.001875 1.4 29.96 41.61 0.29 0.72 Reach 1 3465 2-Year RI ExistDam_ss 981 358.82 363.02 363.45 0.003385 5.25 192.6 57.07 0.49 3.37 Reach 1 3465 2-Year RI Prop-SS-M2 981 358.82 363.02 361.56 363.45 0.003386 5.25 192.58 57.07 0.49 3.37 Reach 1 3465 5-Year RI ExistDam_ss 1620 358.82 363.9 364.63 0.004407 6.91 244.13 60.98 0.59 4 Reach 1 3465 5-Year RI Prop-SS-M2 1620 358.82 363.89 362.52 364.62 0.004429 6.92 243.73 60.94 0.59 4 Reach 1 3465 10-Year RI ExistDam_ss 2130 358.82 364.43 365.41 0.00518 8.01 278.28 66.65 0.67 4.18 Reach 1 3465 10-Year RI Prop-SS-M2 2130 358.82 364.46 363.19 365.43 0.005085 7.96 280.07 66.76 0.67 4.2 Reach 1 3465 25-Year RI ExistDam_ss 2880 358.82 365.04 364.08 366.41 0.006385 9.48 319.37 68.81 0.75 4.64 Reach 1 3465 25-Year RI Prop-SS-M2 2880 358.82 365.14 366.45 0.006015 9.29 326.08 69.09 0.73 4.72 Reach 1 3465 50-Year RI ExistDam_ss 3510 358.82 365.47 364.77 367.18 0.007337 10.59 349.32 70.13 0.82 4.98 Reach 1 3465 50-Year RI Prop-SS-M2 3510 358.82 365.63 364.77 367.24 0.006721 10.28 360.21 70.63 0.78 5.1 Reach 1 3465 100-Year RI ExistDam_ss 4180 358.82 365.87 365.38 367.95 0.008315 11.69 377.87 71.44 0.87 5.29 Reach 1 3465 100-Year RI Prop-SS-M2 4180 358.82 366.1 365.38 368.01 0.007388 11.22 393.89 72.16 0.83 5.46 Reach 1 3465 200-Year RI ExistDam_ss 4930 358.82 366.29 365.99 368.78 0.009321 12.8 407.65 72.78 0.93 5.6 Reach 1 3465 200-Year RI Prop-SS-M2 4930 358.82 366.57 365.99 368.83 0.008106 12.2 428.2 73.64 0.87 5.81 Reach 1 3465 500-Year RI ExistDam_ss 6000 358.82 366.83 366.83 369.9 0.010604 14.23 447.37 74.35 1 6.02 Reach 1 3465 500-Year RI Prop-SS-M2 6000 358.82 366.97 366.83 369.91 0.009906 13.9 458.24 74.73 0.97 6.13 Reach 1 2888 Median Annual ExistDam_ss 42 356.31 356.88 356.88 357.07 0.024937 3.55 11.84 30.7 1.01 0.39 Reach 1 2888 Median Annual Prop-SS-M2 42 356.31 356.88 356.88 357.07 0.024937 3.55 11.84 30.7 1.01 0.39 Reach 1 2888 2-Year RI ExistDam_ss 981 356.31 358.97 358.97 359.74 0.016253 7.03 139.51 92.53 1.01 1.51 Reach 1 2888 2-Year RI Prop-SS-M2 981 356.31 358.97 358.97 359.74 0.016241 7.03 139.55 92.56 1.01 1.51 Reach 1 2888 5-Year RI ExistDam_ss 1620 356.31 359.7 359.6 360.61 0.01252 7.67 211.31 100.92 0.93 2.09 Reach 1 2888 5-Year RI Prop-SS-M2 1620 356.31 359.71 359.6 360.61 0.012383 7.64 212.05 100.96 0.93 2.1 Reach 1 2888 10-Year RI ExistDam_ss 2130 356.31 360.2 360 361.22 0.010886 8.12 262.35 103.23 0.9 2.54 Reach River Sta Profile Plan Q Total Min Ch El W.S. Elev Crit W.S.E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl Hydr Depth (cfs)(ft)(ft)(ft)(ft)(ft/ft)(ft/s)(sq ft)(ft) (ft) Reach 1 2888 10-Year RI Prop-SS-M2 2130 356.31 360.17 360.02 361.22 0.011294 8.21 259.33 103.11 0.91 2.52 Reach 1 2888 25-Year RI ExistDam_ss 2880 356.31 360.94 362.06 0.008708 8.47 339.9 105.62 0.83 3.22 Reach 1 2888 25-Year RI Prop-SS-M2 2880 356.31 360.8 360.56 362.02 0.009994 8.85 325.5 105.19 0.89 3.09 Reach 1 2888 50-Year RI ExistDam_ss 3510 356.31 361.55 362.72 0.007579 8.67 404.95 109.28 0.79 3.71 Reach 1 2888 50-Year RI Prop-SS-M2 3510 356.31 361.32 360.97 362.64 0.00919 9.24 379.7 107.62 0.87 3.53 Reach 1 2888 100-Year RI ExistDam_ss 4180 356.31 362.19 363.38 0.00674 8.75 477.54 116.05 0.76 4.12 Reach 1 2888 100-Year RI Prop-SS-M2 4180 356.31 361.86 363.26 0.008607 9.51 439.52 113.45 0.85 3.87 Reach 1 2888 200-Year RI ExistDam_ss 4930 356.31 362.91 364.09 0.00609 8.69 567.46 129.1 0.73 4.4 Reach 1 2888 200-Year RI Prop-SS-M2 4930 356.31 362.48 363.92 0.008071 9.63 512.14 123.54 0.83 4.15 Reach 1 2888 500-Year RI ExistDam_ss 6000 356.31 363.8 365 0.005091 8.78 683.4 133.23 0.68 5.13 Reach 1 2888 500-Year RI Prop-SS-M2 6000 356.31 363.34 364.78 0.00676 9.63 623.11 131.11 0.78 4.75 Reach 1 2736 Median Annual ExistDam_ss 42 354.94 355.65 355.67 0.002239 1.33 31.54 58.36 0.32 0.54 Reach 1 2736 Median Annual Prop-SS-M2 42 354.94 355.59 355.34 355.62 0.003253 1.5 28.08 57.76 0.38 0.49 Reach 1 2736 2-Year RI ExistDam_ss 981 354.94 357.84 358.28 0.005448 5.32 184.44 82.88 0.63 2.23 Reach 1 2736 2-Year RI Prop-SS-M2 981 354.94 357.83 357.14 358.28 0.005493 5.34 183.87 82.75 0.63 2.22 Reach 1 2736 5-Year RI ExistDam_ss 1620 354.94 358.82 359.36 0.005013 5.89 275.09 99.65 0.62 2.76 Reach 1 2736 5-Year RI Prop-SS-M2 1620 354.94 358.72 359.3 0.005623 6.12 264.79 98.75 0.66 2.68 Reach 1 2736 10-Year RI ExistDam_ss 2130 354.94 359.52 360.11 0.004285 6.13 347.25 105.03 0.59 3.31 Reach 1 2736 10-Year RI Prop-SS-M2 2130 354.94 359.3 359.97 0.005291 6.57 323.96 103.48 0.66 3.13 Reach 1 2736 25-Year RI ExistDam_ss 2880 354.94 360.46 361.1 0.003662 6.42 448.53 112.39 0.57 3.99 Reach 1 2736 25-Year RI Prop-SS-M2 2880 354.94 360.09 360.87 0.004849 7.06 408.12 109.64 0.64 3.72 Reach 1 2736 50-Year RI ExistDam_ss 3510 354.94 361.16 361.85 0.003277 6.63 529.43 116.09 0.55 4.56 Reach 1 2736 50-Year RI Prop-SS-M2 3510 354.94 360.71 361.55 0.004502 7.35 477.39 113.89 0.63 4.19 Reach 1 2736 100-Year RI ExistDam_ss 4180 354.94 361.86 362.58 0.003003 6.84 611.27 119.63 0.53 5.11 Reach 1 2736 100-Year RI Prop-SS-M2 4180 354.94 361.33 362.23 0.004161 7.62 548.84 116.86 0.62 4.7 Reach 1 2736 200-Year RI ExistDam_ss 4930 354.94 362.59 363.36 0.002833 7.04 701.09 130.12 0.53 5.39 Reach 1 2736 200-Year RI Prop-SS-M2 4930 354.94 362 362.95 0.003854 7.85 627.89 120.37 0.61 5.22 Reach 1 2736 500-Year RI ExistDam_ss 6000 354.94 363.52 364.34 0.002627 7.31 835.79 159.39 0.51 5.24 Reach 1 2736 500-Year RI Prop-SS-M2 6000 354.94 362.92 363.93 0.003532 8.08 745.96 141.14 0.59 5.29 Reach 1 2507 Median Annual ExistDam_ss 42 353.64 354.24 354.24 354.45 0.023877 3.65 11.49 27.58 1 0.42 Reach 1 2507 Median Annual Prop-SS-M2 42 353.64 354.42 354.52 0.007813 2.54 16.52 29.5 0.6 0.56 Reach 1 2507 2-Year RI ExistDam_ss 981 353.64 357.02 357.3 0.003174 4.24 231.16 96.66 0.48 2.39 Reach 1 2507 2-Year RI Prop-SS-M2 981 353.64 356.86 357.18 0.003939 4.54 215.9 95.87 0.53 2.25 Reach 1 2507 5-Year RI ExistDam_ss 1620 353.64 358.2 358.53 0.002379 4.63 349.61 102.71 0.44 3.4 Reach 1 2507 5-Year RI Prop-SS-M2 1620 353.64 357.88 358.29 0.003244 5.11 316.89 101.53 0.51 3.12 Reach 1 2507 10-Year RI ExistDam_ss 2130 353.64 359.01 359.38 0.002092 4.91 433.73 105.67 0.43 4.1 Reach 1 2507 10-Year RI Prop-SS-M2 2130 353.64 358.53 359.01 0.003067 5.55 383.8 103.93 0.51 3.69 Reach 1 2507 25-Year RI ExistDam_ss 2880 353.64 360 360.44 0.001929 5.33 540.64 109.23 0.42 4.95 Reach 1 2507 25-Year RI Prop-SS-M2 2880 353.64 359.39 359.96 0.002896 6.07 474.28 107.06 0.51 4.43 Reach 1 2507 50-Year RI ExistDam_ss 3510 353.64 360.74 361.23 0.00186 5.64 622.35 111.97 0.42 5.56 Reach 1 2507 50-Year RI Prop-SS-M2 3510 353.64 360.05 360.69 0.00278 6.43 545.95 109.4 0.51 4.99 Reach 1 2507 100-Year RI ExistDam_ss 4180 353.64 361.45 362 0.001821 5.94 703.3 114.89 0.42 6.12 Reach 1 2507 100-Year RI Prop-SS-M2 4180 353.64 360.71 361.42 0.002687 6.76 618.6 111.84 0.51 5.53 Reach River Sta Profile Plan Q Total Min Ch El W.S. Elev Crit W.S.E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl Hydr Depth (cfs)(ft)(ft)(ft)(ft)(ft/ft)(ft/s)(sq ft)(ft) (ft) Reach 1 2507 200-Year RI ExistDam_ss 4930 353.64 362.19 362.8 0.001806 6.25 789.39 118.79 0.43 6.65 Reach 1 2507 200-Year RI Prop-SS-M2 4930 353.64 361.41 362.18 0.002593 7.06 697.86 114.65 0.5 6.09 Reach 1 2507 500-Year RI ExistDam_ss 6000 353.64 363.11 363.8 0.001868 6.66 901.52 126.49 0.44 7.13 Reach 1 2507 500-Year RI Prop-SS-M2 6000 353.64 362.35 363.21 0.002492 7.42 808.86 119.69 0.5 6.76 Reach 1 2357 Median Annual ExistDam_ss 42 352.34 353.19 353.22 0.001548 1.33 31.52 43.96 0.28 0.72 Reach 1 2357 Median Annual Prop-SS-M2 42 352.34 352.82 352.76 352.94 0.015051 2.69 15.61 41.97 0.78 0.37 Reach 1 2357 2-Year RI ExistDam_ss 981 352.34 356.49 356.83 0.003036 4.65 210.98 72.78 0.48 2.9 Reach 1 2357 2-Year RI Prop-SS-M2 981 352.34 354.96 354.94 356.09 0.014011 8.53 114.98 50.53 1 2.28 Reach 1 2357 5-Year RI ExistDam_ss 1620 352.34 357.69 358.14 0.002757 5.38 301.37 77.04 0.48 3.91 Reach 1 2357 5-Year RI Prop-SS-M2 1620 352.34 356.02 356.02 357.31 0.013747 9.11 177.8 69.58 1 2.56 Reach 1 2357 10-Year RI ExistDam_ss 2130 352.34 358.48 359.01 0.002679 5.87 362.73 78.92 0.48 4.6 Reach 1 2357 10-Year RI Prop-SS-M2 2130 352.34 356.57 356.57 358.07 0.013166 9.81 217.04 73.35 1.01 2.96 Reach 1 2357 25-Year RI ExistDam_ss 2880 352.34 359.4 360.08 0.002753 6.6 436.41 80.57 0.5 5.42 Reach 1 2357 25-Year RI Prop-SS-M2 2880 352.34 357.26 357.26 359.05 0.012523 10.73 268.45 76.04 1.01 3.53 Reach 1 2357 50-Year RI ExistDam_ss 3510 352.34 360.07 360.86 0.002843 7.15 490.71 81.68 0.51 6.01 Reach 1 2357 50-Year RI Prop-SS-M2 3510 352.34 357.77 357.77 359.79 0.012091 11.4 308 77.24 1.01 3.99 Reach 1 2357 100-Year RI ExistDam_ss 4180 352.34 360.7 361.62 0.002954 7.7 542.72 82.65 0.53 6.57 Reach 1 2357 100-Year RI Prop-SS-M2 4180 352.34 358.31 358.31 360.53 0.011592 11.97 349.32 78.52 1 4.45 Reach 1 2357 200-Year RI ExistDam_ss 4930 352.34 361.34 362.4 0.003084 8.27 595.84 83.61 0.55 7.13 Reach 1 2357 200-Year RI Prop-SS-M2 4930 352.34 358.84 358.84 361.3 0.011302 12.59 391.69 79.66 1 4.92 Reach 1 2357 500-Year RI ExistDam_ss 6000 352.34 362.08 363.37 0.003373 9.12 657.97 84.72 0.58 7.77 Reach 1 2357 500-Year RI Prop-SS-M2 6000 352.34 359.54 359.54 362.33 0.011019 13.39 447.95 80.81 1 5.54 Reach 1 2149 Median Annual ExistDam_ss 42 351.88 352.98 352.99 0.000776 0.78 53.54 81.74 0.17 0.65 Reach 1 2149 Median Annual Prop-SS-M2 42 349.51 349.92 349.82 350 0.01324 2.21 19.01 51.38 0.64 0.37 Reach 1 2149 2-Year RI ExistDam_ss 981 351.88 356.22 356.35 0.001423 2.92 335.79 91.76 0.27 3.66 Reach 1 2149 2-Year RI Prop-SS-M2 981 349.51 351.93 351.77 352.84 0.016923 7.65 128.31 57.5 0.9 2.23 Reach 1 2149 5-Year RI ExistDam_ss 1620 351.88 357.4 357.61 0.001792 3.62 447.82 97.06 0.3 4.61 Reach 1 2149 5-Year RI Prop-SS-M2 1620 349.51 352.95 352.85 354.02 0.017621 8.3 195.28 82.99 0.95 2.35 Reach 1 2149 10-Year RI ExistDam_ss 2130 351.88 358.19 358.45 0.001992 4.05 526.3 102.92 0.31 5.11 Reach 1 2149 10-Year RI Prop-SS-M2 2130 349.51 353.49 353.34 354.7 0.016182 8.81 241.89 86.84 0.93 2.79 Reach 1 2149 25-Year RI ExistDam_ss 2880 351.88 359.14 359.48 0.002089 4.63 625.45 106.08 0.33 5.9 Reach 1 2149 25-Year RI Prop-SS-M2 2880 349.51 354.25 353.97 355.61 0.014512 9.33 308.62 89.1 0.88 3.46 Reach 1 2149 50-Year RI ExistDam_ss 3510 351.88 359.83 360.23 0.00218 5.08 699.01 108.16 0.34 6.46 Reach 1 2149 50-Year RI Prop-SS-M2 3510 349.51 354.85 354.43 356.31 0.013142 9.7 362.28 90.82 0.85 3.99 Reach 1 2149 100-Year RI ExistDam_ss 4180 351.88 360.48 360.95 0.002282 5.52 769.89 111.59 0.35 6.9 Reach 1 2149 100-Year RI Prop-SS-M2 4180 349.51 355.47 354.89 357.02 0.012007 10 419.22 92.74 0.82 4.52 Reach 1 2149 200-Year RI ExistDam_ss 4930 351.88 361.14 361.69 0.002389 5.97 850 128.35 0.37 6.62 Reach 1 2149 200-Year RI Prop-SS-M2 4930 349.51 356.17 355.35 357.79 0.01104 10.22 484.77 95.44 0.79 5.08 Reach 1 2149 500-Year RI ExistDam_ss 6000 351.88 361.9 362.57 0.002605 6.61 954.12 144.31 0.39 6.61 Reach 1 2149 500-Year RI Prop-SS-M2 6000 349.51 357.15 356.03 358.83 0.010223 10.43 580.6 100.45 0.75 5.78 Reach 1 1967 Median Annual ExistDam_ss 42 351.91 352.72 352.75 0.002559 1.54 27.21 44.5 0.35 0.61 Reach 1 1967 Median Annual Prop-SS-M2 42 346.67 347 346.96 347.11 0.019144 2.67 15.72 51.04 0.85 0.31 Reach River Sta Profile Plan Q Total Min Ch El W.S. Elev Crit W.S.E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl Hydr Depth (cfs)(ft)(ft)(ft)(ft)(ft/ft)(ft/s)(sq ft)(ft) (ft) Reach 1 1967 2-Year RI ExistDam_ss 981 351.91 355.3 355.84 0.005782 5.91 165.93 66.03 0.66 2.51 Reach 1 1967 2-Year RI Prop-SS-M2 981 346.67 348.91 348.91 349.97 0.014516 8.24 118.99 56.8 1 2.09 Reach 1 1967 5-Year RI ExistDam_ss 1620 351.91 356.23 357.01 0.005885 7.06 229.5 70.54 0.69 3.25 Reach 1 1967 5-Year RI Prop-SS-M2 1620 346.67 349.76 349.76 351.2 0.013292 9.61 168.52 59.37 1.01 2.84 Reach 1 1967 10-Year RI ExistDam_ss 2130 351.91 356.86 357.79 0.006085 7.73 275.54 75.6 0.71 3.64 Reach 1 1967 10-Year RI Prop-SS-M2 2130 346.67 350.36 350.36 352.05 0.012673 10.43 204.25 61.15 1.01 3.34 Reach 1 1967 25-Year RI ExistDam_ss 2880 351.91 357.68 358.8 0.005997 8.46 343.22 93.67 0.72 3.66 Reach 1 1967 25-Year RI Prop-SS-M2 2880 346.67 351.16 351.16 353.15 0.011883 11.34 254.03 63.56 1 4 Reach 1 1967 50-Year RI ExistDam_ss 3510 351.91 358.28 359.53 0.005755 8.99 405.06 115.7 0.72 3.5 Reach 1 1967 50-Year RI Prop-SS-M2 3510 346.67 351.75 351.75 353.99 0.011518 12 292.46 65.35 1 4.48 Reach 1 1967 100-Year RI ExistDam_ss 4180 351.91 358.88 357.87 360.25 0.005472 9.45 478.72 135.64 0.72 3.53 Reach 1 1967 100-Year RI Prop-SS-M2 4180 346.67 352.34 352.34 354.81 0.011224 12.62 331.33 67.12 1 4.94 Reach 1 1967 200-Year RI ExistDam_ss 4930 351.91 359.47 358.47 360.97 0.005249 9.93 576.59 198.2 0.72 2.91 Reach 1 1967 200-Year RI Prop-SS-M2 4930 346.67 352.94 352.94 355.67 0.011027 13.24 372.26 68.93 1 5.4 Reach 1 1967 500-Year RI ExistDam_ss 6000 351.91 360.33 359.09 361.86 0.004656 10.22 754.19 213.91 0.69 3.53 Reach 1 1967 500-Year RI Prop-SS-M2 6000 346.67 353.75 353.75 356.79 0.010703 13.98 429.33 71.38 1 6.02 Reach 1 1861 Median Annual ExistDam_ss 42 351.62 352.26 352.31 0.008557 1.78 24.68 81.06 0.57 0.3 Reach 1 1861 Median Annual Prop-SS-M2 42 345.13 345.5 345.58 0.011313 2.28 18.42 51.1 0.67 0.36 Reach 1 1861 2-Year RI ExistDam_ss 981 351.62 355.29 355.47 0.001379 3.41 312.43 102.37 0.33 3.05 Reach 1 1861 2-Year RI Prop-SS-M2 981 345.13 347.35 347.36 348.42 0.014781 8.3 118.23 56.67 1.01 2.09 Reach 1 1861 5-Year RI ExistDam_ss 1620 351.62 356.3 356.57 0.001527 4.26 417.39 106.08 0.37 3.93 Reach 1 1861 5-Year RI Prop-SS-M2 1620 345.13 348.07 348.22 349.67 0.015738 10.16 159.52 58.82 1.09 2.71 Reach 1 1861 10-Year RI ExistDam_ss 2130 351.62 356.98 357.32 0.001615 4.8 489.81 108.83 0.39 4.5 Reach 1 1861 10-Year RI Prop-SS-M2 2130 345.13 348.57 348.81 350.53 0.015885 11.23 189.71 60.34 1.12 3.14 Reach 1 1861 25-Year RI ExistDam_ss 2880 351.62 357.84 358.28 0.001719 5.47 599.73 139.11 0.41 4.31 Reach 1 1861 25-Year RI Prop-SS-M2 2880 345.13 349.23 349.59 351.67 0.016009 12.51 230.26 62.33 1.15 3.69 Reach 1 1861 50-Year RI ExistDam_ss 3510 351.62 358.48 359 0.001794 5.93 692.24 150.89 0.42 4.59 Reach 1 1861 50-Year RI Prop-SS-M2 3510 345.13 349.76 350.21 352.52 0.015827 13.34 263.16 63.89 1.16 4.12 Reach 1 1861 100-Year RI ExistDam_ss 4180 351.62 359.11 359.7 0.001875 6.37 795.1 180.06 0.44 4.42 Reach 1 1861 100-Year RI Prop-SS-M2 4180 345.13 350.27 350.8 353.36 0.015691 14.11 296.22 65.43 1.17 4.53 Reach 1 1861 200-Year RI ExistDam_ss 4930 351.62 359.75 360.4 0.001918 6.74 915.26 193.78 0.45 4.72 Reach 1 1861 200-Year RI Prop-SS-M2 4930 345.13 350.81 351.39 354.23 0.015472 14.84 332.16 67.06 1.18 4.95 Reach 1 1861 500-Year RI ExistDam_ss 6000 351.62 360.59 361.32 0.00192 7.17 1107.29 271.09 0.45 4.08 Reach 1 1861 500-Year RI Prop-SS-M2 6000 345.13 351.53 352.44 355.38 0.015019 15.73 381.55 69.24 1.18 5.51 Reach 1 1743 Median Annual ExistDam_ss 42 350.91 351.81 351.85 0.002189 1.58 26.56 37.13 0.33 0.72 Reach 1 1743 Median Annual Prop-SS-M2 42 343.31 343.62 343.6 343.74 0.02203 2.79 15.06 51 0.9 0.3 Reach 1 1743 2-Year RI ExistDam_ss 981 350.91 354.96 355.23 0.00293 4.2 238.54 102.26 0.47 2.33 Reach 1 1743 2-Year RI Prop-SS-M2 981 343.31 345.5 345.55 346.61 0.015673 8.45 116.14 56.65 1.04 2.05 Reach 1 1743 5-Year RI ExistDam_ss 1620 350.91 355.96 356.33 0.002614 4.92 343.82 115.15 0.46 2.99 Reach 1 1743 5-Year RI Prop-SS-M2 1620 343.31 346.32 346.41 347.84 0.014629 9.91 163.42 59.11 1.05 2.76 Reach 1 1743 10-Year RI ExistDam_ss 2130 350.91 356.63 357.07 0.002496 5.38 427.23 131.74 0.46 3.24 Reach 1 1743 10-Year RI Prop-SS-M2 2130 343.31 346.86 347 348.7 0.014467 10.89 195.67 60.74 1.07 3.22 Reach 1 1743 25-Year RI ExistDam_ss 2880 350.91 357.53 358.03 0.00249 5.81 589.03 245.1 0.47 2.4 Reach River Sta Profile Plan Q Total Min Ch El W.S. Elev Crit W.S.E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl Hydr Depth (cfs)(ft)(ft)(ft)(ft)(ft/ft)(ft/s)(sq ft)(ft) (ft) Reach 1 1743 25-Year RI Prop-SS-M2 2880 343.31 347.55 347.78 349.81 0.014394 12.07 238.56 62.83 1.09 3.8 Reach 1 1743 50-Year RI ExistDam_ss 3510 350.91 358.26 358.74 0.002509 5.82 805.43 341.62 0.47 2.36 Reach 1 1743 50-Year RI Prop-SS-M2 3510 343.31 348.03 348.39 350.67 0.014781 13.03 269.32 64.29 1.12 4.19 Reach 1 1743 100-Year RI ExistDam_ss 4180 350.91 358.97 359.42 0.002015 5.74 1076.65 439.83 0.44 2.45 Reach 1 1743 100-Year RI Prop-SS-M2 4180 343.31 348.54 348.98 351.51 0.014765 13.82 302.44 65.82 1.14 4.6 Reach 1 1743 200-Year RI ExistDam_ss 4930 350.91 359.71 360.12 0.001618 5.6 1407.65 455.24 0.4 3.09 Reach 1 1743 200-Year RI Prop-SS-M2 4930 343.31 349.05 349.58 352.39 0.014991 14.68 335.87 67.33 1.16 4.99 Reach 1 1743 500-Year RI ExistDam_ss 6000 350.91 360.66 361.02 0.00129 5.5 1846.33 487.83 0.36 3.78 Reach 1 1743 500-Year RI Prop-SS-M2 6000 343.31 349.69 350.39 353.57 0.015394 15.8 379.76 69.27 1.19 5.48 Reach 1 1590 Median Annual ExistDam_ss 42 350.51 351.69 351.7 0.000479 0.89 47.22 50.13 0.16 0.94 Reach 1 1590 Median Annual Prop-SS-M2 42 340.96 341.35 341.43 0.010938 2.26 18.62 51.21 0.66 0.36 Reach 1 1590 2-Year RI ExistDam_ss 981 350.51 354.74 354.88 0.001466 3.06 344.36 139.52 0.33 2.47 Reach 1 1590 2-Year RI Prop-SS-M2 981 340.96 343.19 343.21 344.26 0.0149 8.31 118 56.74 1.02 2.08 Reach 1 1590 5-Year RI ExistDam_ss 1620 350.51 355.81 356 0.001275 3.56 505.16 157.54 0.33 3.21 Reach 1 1590 5-Year RI Prop-SS-M2 1620 340.96 343.9 344.06 345.51 0.015814 10.17 159.37 58.89 1.09 2.71 Reach 1 1590 10-Year RI ExistDam_ss 2130 350.51 356.53 356.75 0.001201 3.87 619.14 168.67 0.33 3.67 Reach 1 1590 10-Year RI Prop-SS-M2 2130 340.96 344.42 344.65 346.37 0.015824 11.21 190.05 60.44 1.11 3.14 Reach 1 1590 25-Year RI ExistDam_ss 2880 350.51 357.45 357.71 0.001137 4.25 799.48 229 0.33 3.49 Reach 1 1590 25-Year RI Prop-SS-M2 2880 340.96 345.1 345.44 347.5 0.015731 12.43 231.7 62.48 1.14 3.71 Reach 1 1590 50-Year RI ExistDam_ss 3510 350.51 358.15 358.44 0.001098 4.52 968.28 252.31 0.33 3.84 Reach 1 1590 50-Year RI Prop-SS-M2 3510 340.96 345.62 346.05 348.35 0.015506 13.24 265.08 64.06 1.15 4.14 Reach 1 1590 100-Year RI ExistDam_ss 4180 350.51 358.85 359.17 0.00105 4.73 1150.15 260.71 0.33 4.41 Reach 1 1590 100-Year RI Prop-SS-M2 4180 340.96 346.13 346.63 349.19 0.015461 14.04 297.82 65.58 1.16 4.54 Reach 1 1590 200-Year RI ExistDam_ss 4930 350.51 359.57 359.9 0.000993 4.91 1339.27 264.25 0.32 5.07 Reach 1 1590 200-Year RI Prop-SS-M2 4930 340.96 346.66 347.23 350.07 0.015372 14.8 333.02 67.18 1.17 4.96 Reach 1 1590 500-Year RI ExistDam_ss 6000 350.51 360.5 360.85 0.000946 5.15 1585.94 268.32 0.32 5.91 Reach 1 1590 500-Year RI Prop-SS-M2 6000 340.96 347.36 348.05 351.22 0.015247 15.75 380.94 69.29 1.18 5.5 Reach 1 1481 Median Annual ExistDam_ss 42 350.5 351.64 351.65 0.00045 0.82 51.89 63.38 0.15 0.82 Reach 1 1481 Median Annual Prop-SS-M2 42 339.27 339.58 339.57 339.71 0.024535 2.88 14.59 51.07 0.95 0.29 Reach 1 1481 2-Year RI ExistDam_ss 981 350.5 354.48 354.7 0.001637 3.94 294.47 103.26 0.37 2.85 Reach 1 1481 2-Year RI Prop-SS-M2 981 339.27 341.45 341.51 342.59 0.015805 8.58 115.07 56.68 1.05 2.03 Reach 1 1481 5-Year RI ExistDam_ss 1620 350.5 355.48 355.82 0.001883 4.92 413.79 137.34 0.41 3.01 Reach 1 1481 5-Year RI Prop-SS-M2 1620 339.27 342.25 342.38 343.85 0.014721 10.16 161.77 59.11 1.06 2.74 Reach 1 1481 10-Year RI ExistDam_ss 2130 350.5 356.15 356.57 0.001965 5.47 509.77 150.2 0.43 3.39 Reach 1 1481 10-Year RI Prop-SS-M2 2130 339.27 342.79 342.97 344.73 0.014492 11.2 193.89 60.72 1.08 3.19 Reach 1 1481 25-Year RI ExistDam_ss 2880 350.5 357.03 357.53 0.002028 6.09 651.77 170.73 0.44 3.82 Reach 1 1481 25-Year RI Prop-SS-M2 2880 339.27 343.5 343.77 345.88 0.014144 12.42 237.83 62.86 1.1 3.78 Reach 1 1481 50-Year RI ExistDam_ss 3510 350.5 357.69 358.25 0.002063 6.52 772.47 189.76 0.45 4.07 Reach 1 1481 50-Year RI Prop-SS-M2 3510 339.27 344.05 344.39 346.76 0.01389 13.28 272.53 64.5 1.11 4.22 Reach 1 1481 100-Year RI ExistDam_ss 4180 350.5 358.36 358.98 0.002068 6.89 908.79 215.95 0.46 4.21 Reach 1 1481 100-Year RI Prop-SS-M2 4180 339.27 344.61 344.99 347.62 0.013414 13.98 309.64 66.21 1.11 4.68 Reach 1 1481 200-Year RI ExistDam_ss 4930 350.5 359.05 359.72 0.002072 7.24 1067.16 241.66 0.47 4.42 Reach 1 1481 200-Year RI Prop-SS-M2 4930 339.27 345.25 345.63 348.51 0.01269 14.57 352.37 68.13 1.1 5.17 Reach River Sta Profile Plan Q Total Min Ch El W.S. Elev Crit W.S.E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl Hydr Depth (cfs)(ft)(ft)(ft)(ft)(ft/ft)(ft/s)(sq ft)(ft) (ft) Reach 1 1481 500-Year RI ExistDam_ss 6000 350.5 359.98 360.68 0.001978 7.5 1303.95 258.36 0.46 5.05 Reach 1 1481 500-Year RI Prop-SS-M2 6000 339.27 346.1 346.47 349.69 0.011917 15.3 411.22 70.68 1.08 5.82 Reach 1 1303 Median Annual ExistDam_ss 42 350.7 351.52 351.53 0.001107 0.9 46.6 73.82 0.2 0.63 Reach 1 1303 Median Annual Prop-SS-M2 42 336.44 336.86 336.94 0.010614 2.23 18.83 51.52 0.65 0.37 Reach 1 1303 2-Year RI ExistDam_ss 981 350.7 354.12 354.33 0.002724 3.7 270.9 102.15 0.37 2.65 Reach 1 1303 2-Year RI Prop-SS-M2 981 336.44 338.65 338.71 339.76 0.015951 8.48 115.74 56.94 1.05 2.03 Reach 1 1303 5-Year RI ExistDam_ss 1620 350.7 355.09 355.39 0.002985 4.5 372.25 109.47 0.4 3.4 Reach 1 1303 5-Year RI Prop-SS-M2 1620 336.44 339.32 339.56 341.03 0.01702 10.46 155.05 58.99 1.13 2.63 Reach 1 1303 10-Year RI ExistDam_ss 2130 350.7 355.76 356.12 0.00308 4.95 455.44 134.19 0.41 3.39 Reach 1 1303 10-Year RI Prop-SS-M2 2130 336.44 339.81 340.14 341.9 0.017136 11.62 183.87 60.46 1.16 3.04 Reach 1 1303 25-Year RI ExistDam_ss 2880 350.7 356.65 357.06 0.003117 5.44 587.14 161.43 0.41 3.64 Reach 1 1303 25-Year RI Prop-SS-M2 2880 336.44 340.42 340.93 343.07 0.017415 13.07 221.75 62.33 1.2 3.56 Reach 1 1303 50-Year RI ExistDam_ss 3510 350.7 357.33 357.77 0.003092 5.71 701.53 174.13 0.41 4.03 Reach 1 1303 50-Year RI Prop-SS-M2 3510 336.44 340.9 341.54 343.96 0.017474 14.07 251.64 63.76 1.22 3.95 Reach 1 1303 100-Year RI ExistDam_ss 4180 350.7 358.03 358.49 0.003023 5.9 829.48 189.16 0.4 4.39 Reach 1 1303 100-Year RI Prop-SS-M2 4180 336.44 341.36 342.12 344.85 0.017605 15.03 281.2 65.15 1.25 4.32 Reach 1 1303 200-Year RI ExistDam_ss 4930 350.7 358.74 359.22 0.003018 6.09 970.99 222.5 0.4 4.36 Reach 1 1303 200-Year RI Prop-SS-M2 4930 336.44 341.83 342.75 345.78 0.017797 16.01 312.16 66.58 1.27 4.69 Reach 1 1303 500-Year RI ExistDam_ss 6000 350.7 359.71 360.2 0.002798 6.26 1209.51 253.91 0.39 4.76 Reach 1 1303 500-Year RI Prop-SS-M2 6000 336.44 342.45 343.58 347.01 0.017964 17.22 354.23 68.47 1.3 5.17 Reach 1 1165 Median Annual ExistDam_ss 42 350.51 351.36 351.38 0.001141 0.95 46.01 85.91 0.23 0.54 Reach 1 1165 Median Annual Prop-SS-M2 42 334.19 334.56 334.56 334.69 0.02745 2.95 14.25 52.35 1 0.27 Reach 1 1165 2-Year RI ExistDam_ss 981 350.51 353.79 354 0.002086 3.68 279.14 107.36 0.4 2.6 Reach 1 1165 2-Year RI Prop-SS-M2 981 334.19 336.39 336.47 337.52 0.01647 8.5 115.44 58.02 1.06 1.99 Reach 1 1165 5-Year RI ExistDam_ss 1620 350.51 354.75 355.05 0.002071 4.44 384.19 118.59 0.42 3.24 Reach 1 1165 5-Year RI Prop-SS-M2 1620 334.19 337.17 337.31 338.73 0.015566 10.02 161.68 60.44 1.08 2.68 Reach 1 1165 10-Year RI ExistDam_ss 2130 350.51 355.41 355.77 0.002042 4.88 469.08 136.37 0.43 3.44 Reach 1 1165 10-Year RI Prop-SS-M2 2130 334.19 337.67 337.9 339.58 0.015704 11.08 192.26 61.98 1.11 3.1 Reach 1 1165 25-Year RI ExistDam_ss 2880 350.51 356.29 356.72 0.001985 5.38 595.24 150.91 0.43 3.94 Reach 1 1165 25-Year RI Prop-SS-M2 2880 334.19 338.31 338.65 340.7 0.015845 12.41 232.2 63.94 1.14 3.63 Reach 1 1165 50-Year RI ExistDam_ss 3510 350.51 356.95 357.44 0.0019 5.73 702.14 171.88 0.43 4.08 Reach 1 1165 50-Year RI Prop-SS-M2 3510 334.19 338.77 339.23 341.57 0.016028 13.41 262.33 65.38 1.17 4.01 Reach 1 1165 100-Year RI ExistDam_ss 4180 350.51 357.61 358.16 0.001847 6.1 831.64 220.47 0.43 3.77 Reach 1 1165 100-Year RI Prop-SS-M2 4180 334.19 339.24 339.82 342.42 0.016086 14.32 293.17 66.83 1.19 4.39 Reach 1 1165 200-Year RI ExistDam_ss 4930 350.51 358.34 358.91 0.001688 6.28 993.06 224.84 0.42 4.42 Reach 1 1165 200-Year RI Prop-SS-M2 4930 334.19 339.72 340.41 343.33 0.01619 15.24 325.67 68.31 1.21 4.77 Reach 1 1165 500-Year RI ExistDam_ss 6000 350.51 359.32 359.91 0.001504 6.48 1225.12 258.78 0.41 4.73 Reach 1 1165 500-Year RI Prop-SS-M2 6000 334.19 340.36 341.24 344.53 0.016316 16.41 369.61 70.27 1.23 5.26 Reach 1 1004 Median Annual ExistDam_ss 42 349.6 351.33 350.18 351.33 0.000101 0.41 103.66 86.8 0.07 1.19 Reach 1 1004 Median Annual Prop-SS-M2 42 331.68 332.65 332.02 332.67 0.000536 0.89 47.2 53.36 0.17 0.88 Reach 1 1004 2-Year RI ExistDam_ss 981 349.6 353.47 351.73 353.63 0.002289 3.23 304.07 96.87 0.32 3.14 Reach 1 1004 2-Year RI Prop-SS-M2 981 331.68 335.46 333.95 335.8 0.003259 4.69 209.03 61.9 0.45 3.38 Reach River Sta Profile Plan Q Total Min Ch El W.S. Elev Crit W.S.E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl Hydr Depth (cfs)(ft)(ft)(ft)(ft)(ft/ft)(ft/s)(sq ft)(ft) (ft) Reach 1 1004 5-Year RI ExistDam_ss 1620 349.6 354.39 352.34 354.65 0.00286 4.12 393.44 98.78 0.36 3.98 Reach 1 1004 5-Year RI Prop-SS-M2 1620 331.68 336.29 334.81 336.89 0.004712 6.2 261.42 64.43 0.54 4.06 Reach 1 1004 10-Year RI ExistDam_ss 2130 349.6 355.02 352.77 355.36 0.00317 4.66 456.83 100.19 0.38 4.56 Reach 1 1004 10-Year RI Prop-SS-M2 2130 331.68 336.84 335.4 337.64 0.005674 7.16 297.49 66.11 0.6 4.5 Reach 1 1004 25-Year RI ExistDam_ss 2880 349.6 355.87 353.35 356.31 0.003441 5.29 561.76 165.94 0.4 3.39 Reach 1 1004 25-Year RI Prop-SS-M2 2880 331.68 337.56 336.17 338.64 0.006854 8.34 345.52 68.28 0.65 5.06 Reach 1 1004 50-Year RI ExistDam_ss 3510 349.6 356.55 353.78 357.04 0.003404 5.62 679.38 179.89 0.41 3.78 Reach 1 1004 50-Year RI Prop-SS-M2 3510 331.68 338.11 336.76 339.41 0.007655 9.16 383.35 69.95 0.69 5.48 Reach 1 1004 100-Year RI ExistDam_ss 4180 349.6 357.25 354.2 357.76 0.003285 5.86 808.3 189.68 0.4 4.26 Reach 1 1004 100-Year RI Prop-SS-M2 4180 331.68 338.63 337.35 340.17 0.008421 9.93 420.81 71.56 0.72 5.88 Reach 1 1004 200-Year RI ExistDam_ss 4930 349.6 358 354.67 358.53 0.003205 6.03 957.33 227.72 0.4 4.2 Reach 1 1004 200-Year RI Prop-SS-M2 4930 331.68 339.19 337.96 340.97 0.00915 10.69 460.99 73.24 0.75 6.29 Reach 1 1004 500-Year RI ExistDam_ss 6000 349.6 359.04 355.28 359.56 0.002967 6.12 1214.21 269.09 0.38 4.51 Reach 1 1004 500-Year RI Prop-SS-M2 6000 331.68 339.91 338.79 342.03 0.009617 11.67 514.64 75.44 0.78 6.82 Reach 1 956 Inl Struct Reach 1 902 Median Annual ExistDam_ss 42 329.48 332.67 332.67 0.00007 0.44 96.1 69.9 0.07 1.37 Reach 1 902 Median Annual Prop-SS-M2 42 329.48 332.65 332.65 0.000028 0.32 132.35 77.49 0.04 1.71 Reach 1 902 2-Year RI ExistDam_ss 981 329.48 335.54 335.68 0.000876 2.97 330.53 87.79 0.27 3.77 Reach 1 902 2-Year RI Prop-SS-M2 981 329.48 335.5 335.61 0.000606 2.66 369.21 87.7 0.23 4.21 Reach 1 902 5-Year RI ExistDam_ss 1620 329.48 336.4 336.65 0.001272 3.98 407 89.91 0.33 4.53 Reach 1 902 5-Year RI Prop-SS-M2 1620 329.48 336.38 336.59 0.000929 3.62 447.36 89.87 0.29 4.98 Reach 1 902 10-Year RI ExistDam_ss 2130 329.48 336.98 337.31 0.00157 4.64 459.46 91.28 0.36 5.03 Reach 1 902 10-Year RI Prop-SS-M2 2130 329.48 336.98 337.26 0.001178 4.25 501.08 91.28 0.32 5.49 Reach 1 902 25-Year RI ExistDam_ss 2880 329.48 337.73 338.2 0.001954 5.44 529.19 93.2 0.4 5.68 Reach 1 902 25-Year RI Prop-SS-M2 2880 329.48 337.75 338.14 0.001508 5.03 572.59 93.25 0.36 6.14 Reach 1 902 50-Year RI ExistDam_ss 3510 329.48 338.32 338.88 0.002223 6.01 583.94 94.64 0.43 6.17 Reach 1 902 50-Year RI Prop-SS-M2 3510 329.48 338.35 338.83 0.001745 5.58 628.82 94.72 0.38 6.64 Reach 1 902 100-Year RI ExistDam_ss 4180 329.48 338.89 339.56 0.002475 6.54 638.75 96.17 0.45 6.64 Reach 1 902 100-Year RI Prop-SS-M2 4180 329.48 338.94 339.52 0.001974 6.1 684.94 96.3 0.4 7.11 Reach 1 902 200-Year RI ExistDam_ss 4930 329.48 339.49 340.27 0.002729 7.07 697.05 97.94 0.47 7.12 Reach 1 902 200-Year RI Prop-SS-M2 4930 329.48 339.55 340.23 0.002205 6.62 744.72 98.11 0.42 7.59 Reach 1 902 500-Year RI ExistDam_ss 6000 329.48 340.29 341.22 0.003055 7.73 776.35 100.58 0.49 7.72 Reach 1 902 500-Year RI Prop-SS-M2 6000 329.48 340.37 341.19 0.002512 7.26 825.91 100.88 0.45 8.19 Reach 1 753 Median Annual ExistDam_ss 42 331.94 332.59 332.64 0.004438 1.78 23.64 47.34 0.44 0.5 Reach 1 753 Median Annual Prop-SS-M2 42 331.94 332.59 332.64 0.004438 1.78 23.64 47.34 0.44 0.5 Reach 1 753 2-Year RI ExistDam_ss 981 331.94 335.02 335.38 0.006137 4.81 204.03 115.39 0.64 1.77 Reach 1 753 2-Year RI Prop-SS-M2 981 331.94 335.02 335.38 0.006137 4.81 204.03 115.39 0.64 1.77 Reach 1 753 5-Year RI ExistDam_ss 1620 331.94 335.84 336.3 0.004741 5.41 299.37 116.83 0.59 2.56 Reach 1 753 5-Year RI Prop-SS-M2 1620 331.94 335.84 336.3 0.004741 5.41 299.37 116.83 0.59 2.56 Reach 1 753 10-Year RI ExistDam_ss 2130 331.94 336.4 336.93 0.004291 5.85 364.74 117.57 0.58 3.1 Reach 1 753 10-Year RI Prop-SS-M2 2130 331.94 336.4 336.93 0.004291 5.85 364.74 117.57 0.58 3.1 Reach 1 753 25-Year RI ExistDam_ss 2880 331.94 337.15 337.78 0.003849 6.37 453.71 118.6 0.57 3.83 Reach River Sta Profile Plan Q Total Min Ch El W.S. Elev Crit W.S.E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl Hydr Depth (cfs)(ft)(ft)(ft)(ft)(ft/ft)(ft/s)(sq ft)(ft) (ft) Reach 1 753 25-Year RI Prop-SS-M2 2880 331.94 337.15 337.78 0.003849 6.37 453.71 118.6 0.57 3.83 Reach 1 753 50-Year RI ExistDam_ss 3510 331.94 337.75 338.45 0.003551 6.71 525.37 119.46 0.56 4.4 Reach 1 753 50-Year RI Prop-SS-M2 3510 331.94 337.75 338.45 0.003551 6.71 525.37 119.46 0.56 4.4 Reach 1 753 100-Year RI ExistDam_ss 4180 331.94 338.35 339.12 0.003323 7.03 597.4 120.3 0.55 4.97 Reach 1 753 100-Year RI Prop-SS-M2 4180 331.94 338.35 339.12 0.003323 7.03 597.4 120.3 0.55 4.97 Reach 1 753 200-Year RI ExistDam_ss 4930 331.94 338.99 339.83 0.003137 7.37 673.71 121.14 0.55 5.56 Reach 1 753 200-Year RI Prop-SS-M2 4930 331.94 338.99 339.83 0.003137 7.37 673.71 121.14 0.55 5.56 Reach 1 753 500-Year RI ExistDam_ss 6000 331.94 339.83 340.77 0.002946 7.79 776.39 122.27 0.54 6.35 Reach 1 753 500-Year RI Prop-SS-M2 6000 331.94 339.83 340.77 0.002946 7.79 776.4 122.27 0.54 6.35 Reach 1 678 Median Annual ExistDam_ss 42 331.45 332.19 332.23 0.006696 1.62 25.87 52.86 0.41 0.49 Reach 1 678 Median Annual Prop-SS-M2 42 331.45 332.19 332.23 0.006696 1.62 25.87 52.86 0.41 0.49 Reach 1 678 2-Year RI ExistDam_ss 981 331.45 334.38 334.8 0.009592 5.23 187.43 95.45 0.66 1.96 Reach 1 678 2-Year RI Prop-SS-M2 981 331.45 334.38 334.8 0.009592 5.23 187.43 95.45 0.66 1.96 Reach 1 678 5-Year RI ExistDam_ss 1620 331.45 335.36 335.85 0.007493 5.61 288.71 111.98 0.62 2.58 Reach 1 678 5-Year RI Prop-SS-M2 1620 331.45 335.36 335.85 0.007493 5.61 288.71 111.98 0.62 2.58 Reach 1 678 10-Year RI ExistDam_ss 2130 331.45 336 336.53 0.006711 5.83 365.39 124.95 0.6 2.92 Reach 1 678 10-Year RI Prop-SS-M2 2130 331.45 336 336.53 0.006711 5.83 365.39 124.95 0.6 2.92 Reach 1 678 25-Year RI ExistDam_ss 2880 331.45 336.85 337.43 0.005453 6.11 471.46 126.82 0.56 3.72 Reach 1 678 25-Year RI Prop-SS-M2 2880 331.45 336.85 337.43 0.005454 6.11 471.45 126.82 0.56 3.72 Reach 1 678 50-Year RI ExistDam_ss 3510 331.45 337.5 338.12 0.004843 6.33 554.57 127.91 0.54 4.34 Reach 1 678 50-Year RI Prop-SS-M2 3510 331.45 337.5 338.12 0.004844 6.33 554.56 127.91 0.54 4.34 Reach 1 678 100-Year RI ExistDam_ss 4180 331.45 338.14 338.81 0.004443 6.57 636.41 128.57 0.52 4.95 Reach 1 678 100-Year RI Prop-SS-M2 4180 331.45 338.14 338.81 0.004443 6.57 636.41 128.57 0.52 4.95 Reach 1 678 200-Year RI ExistDam_ss 4930 331.45 338.8 339.52 0.004158 6.83 721.85 129.26 0.51 5.58 Reach 1 678 200-Year RI Prop-SS-M2 4930 331.45 338.8 339.52 0.004158 6.83 721.85 129.26 0.51 5.58 Reach 1 678 500-Year RI ExistDam_ss 6000 331.45 339.68 340.48 0.003901 7.18 835.58 130.23 0.5 6.42 Reach 1 678 500-Year RI Prop-SS-M2 6000 331.45 339.68 340.48 0.003901 7.18 835.59 130.23 0.5 6.42 Reach 1 610 Median Annual ExistDam_ss 42 330.84 331.27 331.27 331.42 0.027469 3.08 13.64 47.02 1.01 0.29 Reach 1 610 Median Annual Prop-SS-M2 42 330.84 331.27 331.27 331.42 0.027469 3.08 13.64 47.02 1.01 0.29 Reach 1 610 2-Year RI ExistDam_ss 981 330.84 334.11 334.41 0.0033 4.44 220.85 88.36 0.5 2.5 Reach 1 610 2-Year RI Prop-SS-M2 981 330.84 334.11 334.41 0.0033 4.44 220.85 88.36 0.5 2.5 Reach 1 610 5-Year RI ExistDam_ss 1620 330.84 335.1 335.5 0.00333 5.12 316.49 102.67 0.51 3.08 Reach 1 610 5-Year RI Prop-SS-M2 1620 330.84 335.1 335.5 0.00333 5.12 316.49 102.67 0.51 3.08 Reach 1 610 10-Year RI ExistDam_ss 2130 330.84 335.74 336.22 0.00316 5.56 383.15 105.17 0.51 3.64 Reach 1 610 10-Year RI Prop-SS-M2 2130 330.84 335.74 336.22 0.00316 5.56 383.15 105.17 0.51 3.64 Reach 1 610 25-Year RI ExistDam_ss 2880 330.84 336.58 337.16 0.002972 6.09 473.24 107.77 0.51 4.39 Reach 1 610 25-Year RI Prop-SS-M2 2880 330.84 336.58 337.16 0.002972 6.09 473.24 107.77 0.51 4.39 Reach 1 610 50-Year RI ExistDam_ss 3510 330.84 337.22 337.87 0.002866 6.47 542.15 108.93 0.51 4.98 Reach 1 610 50-Year RI Prop-SS-M2 3510 330.84 337.22 337.87 0.002866 6.47 542.16 108.93 0.51 4.98 Reach 1 610 100-Year RI ExistDam_ss 4180 330.84 337.83 338.56 0.002801 6.86 609.53 109.8 0.51 5.55 Reach 1 610 100-Year RI Prop-SS-M2 4180 330.84 337.83 338.56 0.002801 6.86 609.53 109.8 0.51 5.55 Reach 1 610 200-Year RI ExistDam_ss 4930 330.84 338.47 339.29 0.00276 7.25 679.62 110.62 0.52 6.14 Reach 1 610 200-Year RI Prop-SS-M2 4930 330.84 338.47 339.29 0.002759 7.25 679.62 110.62 0.52 6.14 Reach River Sta Profile Plan Q Total Min Ch El W.S. Elev Crit W.S.E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl Hydr Depth (cfs)(ft)(ft)(ft)(ft)(ft/ft)(ft/s)(sq ft)(ft) (ft) Reach 1 610 500-Year RI ExistDam_ss 6000 330.84 339.31 340.24 0.002727 7.76 772.72 111.69 0.52 6.92 Reach 1 610 500-Year RI Prop-SS-M2 6000 330.84 339.31 340.24 0.002727 7.76 772.73 111.69 0.52 6.92 Reach 1 552 Median Annual ExistDam_ss 42 329.62 330.35 330.48 0.009698 2.89 14.51 25.07 0.67 0.58 Reach 1 552 Median Annual Prop-SS-M2 42 329.62 330.35 330.2 330.48 0.009698 2.89 14.51 25.07 0.67 0.58 Reach 1 552 2-Year RI ExistDam_ss 981 329.62 333.62 334.13 0.006556 5.74 170.86 77.96 0.68 2.19 Reach 1 552 2-Year RI Prop-SS-M2 981 329.62 333.62 334.13 0.006556 5.74 170.86 77.96 0.68 2.19 Reach 1 552 5-Year RI ExistDam_ss 1620 329.62 334.59 335.23 0.00567 6.4 253.29 87.95 0.66 2.88 Reach 1 552 5-Year RI Prop-SS-M2 1620 329.62 334.59 335.23 0.00567 6.4 253.29 87.95 0.66 2.88 Reach 1 552 10-Year RI ExistDam_ss 2130 329.62 335.21 335.96 0.005263 6.91 308.43 89.89 0.66 3.43 Reach 1 552 10-Year RI Prop-SS-M2 2130 329.62 335.21 335.96 0.005263 6.91 308.43 89.89 0.66 3.43 Reach 1 552 25-Year RI ExistDam_ss 2880 329.62 336.02 336.9 0.004915 7.54 381.75 92.02 0.65 4.15 Reach 1 552 25-Year RI Prop-SS-M2 2880 329.62 336.02 336.9 0.004915 7.54 381.75 92.02 0.65 4.15 Reach 1 552 50-Year RI ExistDam_ss 3510 329.62 336.62 337.62 0.004776 8.03 437.12 93.5 0.65 4.68 Reach 1 552 50-Year RI Prop-SS-M2 3510 329.62 336.62 337.62 0.004776 8.03 437.13 93.5 0.65 4.68 Reach 1 552 100-Year RI ExistDam_ss 4180 329.62 337.19 338.31 0.004719 8.52 490.77 94.83 0.66 5.18 Reach 1 552 100-Year RI Prop-SS-M2 4180 329.62 337.19 338.31 0.004719 8.52 490.77 94.83 0.66 5.18 Reach 1 552 200-Year RI ExistDam_ss 4930 329.62 337.77 339.03 0.004702 9.02 546.34 96.14 0.67 5.68 Reach 1 552 200-Year RI Prop-SS-M2 4930 329.62 337.77 339.03 0.004701 9.02 546.34 96.14 0.67 5.68 Reach 1 552 500-Year RI ExistDam_ss 6000 329.62 338.53 339.99 0.004704 9.67 620.46 97.95 0.68 6.33 Reach 1 552 500-Year RI Prop-SS-M2 6000 329.62 338.53 339.99 0.004704 9.67 620.47 97.95 0.68 6.33 Reach 1 469 Median Annual ExistDam_ss 42 329.31 330.06 330.09 0.002408 1.52 27.57 43.89 0.34 0.63 Reach 1 469 Median Annual Prop-SS-M2 42 329.31 330.06 330.09 0.002408 1.52 27.57 43.89 0.34 0.63 Reach 1 469 2-Year RI ExistDam_ss 981 329.31 333.24 333.59 0.005337 4.79 204.61 76.95 0.52 2.66 Reach 1 469 2-Year RI Prop-SS-M2 981 329.31 333.24 333.59 0.005337 4.79 204.61 76.95 0.52 2.66 Reach 1 469 5-Year RI ExistDam_ss 1620 329.31 334.23 334.72 0.005712 5.61 288.64 87.89 0.55 3.28 Reach 1 469 5-Year RI Prop-SS-M2 1620 329.31 334.23 334.72 0.005712 5.61 288.64 87.89 0.55 3.28 Reach 1 469 10-Year RI ExistDam_ss 2130 329.31 334.86 335.45 0.005858 6.17 345.23 90.41 0.56 3.82 Reach 1 469 10-Year RI Prop-SS-M2 2130 329.31 334.86 335.45 0.005858 6.17 345.23 90.41 0.56 3.82 Reach 1 469 25-Year RI ExistDam_ss 2880 329.31 335.68 336.41 0.006036 6.85 420.44 93.47 0.57 4.5 Reach 1 469 25-Year RI Prop-SS-M2 2880 329.31 335.68 336.41 0.006036 6.85 420.44 93.47 0.57 4.5 Reach 1 469 50-Year RI ExistDam_ss 3510 329.31 336.28 337.12 0.006144 7.35 477.6 95.18 0.58 5.02 Reach 1 469 50-Year RI Prop-SS-M2 3510 329.31 336.28 337.12 0.006144 7.35 477.61 95.18 0.58 5.02 Reach 1 469 100-Year RI ExistDam_ss 4180 329.31 336.86 337.82 0.006238 7.85 532.56 96.16 0.59 5.54 Reach 1 469 100-Year RI Prop-SS-M2 4180 329.31 336.86 337.82 0.006238 7.85 532.56 96.16 0.59 5.54 Reach 1 469 200-Year RI ExistDam_ss 4930 329.31 337.44 338.53 0.006383 8.37 588.82 96.97 0.6 6.07 Reach 1 469 200-Year RI Prop-SS-M2 4930 329.31 337.44 338.53 0.006383 8.37 588.82 96.97 0.6 6.07 Reach 1 469 500-Year RI ExistDam_ss 6000 329.31 338.2 339.47 0.006589 9.05 662.83 97.83 0.61 6.78 Reach 1 469 500-Year RI Prop-SS-M2 6000 329.31 338.2 339.47 0.006589 9.05 662.85 97.83 0.61 6.78 Reach 1 405 Median Annual ExistDam_ss 42 329.03 329.44 329.44 329.61 0.102953 3.33 12.62 37.14 1.01 0.34 Reach 1 405 Median Annual Prop-SS-M2 42 329.03 329.44 329.44 329.61 0.102953 3.33 12.62 37.14 1.01 0.34 Reach 1 405 2-Year RI ExistDam_ss 981 329.03 331.76 331.76 332.75 0.049572 7.99 122.72 62.63 1.01 1.96 Reach 1 405 2-Year RI Prop-SS-M2 981 329.03 331.76 331.76 332.75 0.049572 7.99 122.72 62.63 1.01 1.96 Reach River Sta Profile Plan Q Total Min Ch El W.S. Elev Crit W.S.E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl Hydr Depth (cfs)(ft)(ft)(ft)(ft)(ft/ft)(ft/s)(sq ft)(ft) (ft) Reach 1 405 5-Year RI ExistDam_ss 1620 329.03 332.62 332.62 333.86 0.042187 8.91 181.73 73.61 1 2.47 Reach 1 405 5-Year RI Prop-SS-M2 1620 329.03 332.62 332.62 333.86 0.042187 8.91 181.73 73.61 1 2.47 Reach 1 405 10-Year RI ExistDam_ss 2130 329.03 333.14 333.14 334.58 0.040185 9.62 221.44 78.04 1.01 2.84 Reach 1 405 10-Year RI Prop-SS-M2 2130 329.03 333.14 333.14 334.58 0.04018 9.62 221.45 78.04 1.01 2.84 Reach 1 405 25-Year RI ExistDam_ss 2880 329.03 333.81 333.81 335.52 0.038105 10.48 274.7 81.6 1.01 3.37 Reach 1 405 25-Year RI Prop-SS-M2 2880 329.03 333.81 333.81 335.52 0.038098 10.48 274.71 81.6 1.01 3.37 Reach 1 405 50-Year RI ExistDam_ss 3510 329.03 334.32 334.32 336.22 0.03662 11.06 317.47 84.72 1.01 3.75 Reach 1 405 50-Year RI Prop-SS-M2 3510 329.03 334.32 334.32 336.22 0.036628 11.06 317.44 84.71 1.01 3.75 Reach 1 405 100-Year RI ExistDam_ss 4180 329.03 334.84 334.84 336.91 0.035244 11.56 361.67 88.35 1.01 4.09 Reach 1 405 100-Year RI Prop-SS-M2 4180 329.03 334.84 334.84 336.91 0.035244 11.56 361.66 88.34 1.01 4.09 Reach 1 405 200-Year RI ExistDam_ss 4930 329.03 335.37 335.37 337.62 0.033915 12.03 409.68 92.12 1.01 4.45 Reach 1 405 200-Year RI Prop-SS-M2 4930 329.03 335.37 335.37 337.62 0.033919 12.03 409.66 92.12 1.01 4.45 Reach 1 405 500-Year RI ExistDam_ss 6000 329.03 336.02 336.02 338.54 0.032693 12.75 470.6 94.68 1.01 4.97 Reach 1 405 500-Year RI Prop-SS-M2 6000 329.03 336.02 336.02 338.54 0.0327 12.75 470.57 94.68 1.01 4.97 Reach 1 99 Median Annual ExistDam_ss 42 324.56 325.05 324.86 325.1 0.005005 1.81 23.2 49.44 0.47 0.47 Reach 1 99 Median Annual Prop-SS-M2 42 324.56 325.05 324.86 325.1 0.005005 1.81 23.2 49.44 0.47 0.47 Reach 1 99 2-Year RI ExistDam_ss 981 324.56 327.59 326.78 328.05 0.005 5.45 180.02 72.64 0.61 2.48 Reach 1 99 2-Year RI Prop-SS-M2 981 324.56 327.59 326.78 328.05 0.005 5.45 180.02 72.64 0.61 2.48 Reach 1 99 5-Year RI ExistDam_ss 1620 324.56 328.68 327.61 329.2 0.005001 5.75 281.59 104.82 0.62 2.69 Reach 1 99 5-Year RI Prop-SS-M2 1620 324.56 328.68 327.61 329.2 0.005001 5.75 281.59 104.82 0.62 2.69 Reach 1 99 10-Year RI ExistDam_ss 2130 324.56 329.18 328.28 329.81 0.005003 6.37 334.45 106.7 0.63 3.13 Reach 1 99 10-Year RI Prop-SS-M2 2130 324.56 329.18 328.28 329.81 0.005003 6.37 334.45 106.7 0.63 3.13 Reach 1 99 25-Year RI ExistDam_ss 2880 324.56 329.83 328.84 330.62 0.005001 7.12 404.4 108.71 0.65 3.72 Reach 1 99 25-Year RI Prop-SS-M2 2880 324.56 329.83 328.86 330.62 0.005001 7.12 404.4 108.71 0.65 3.72 Reach 1 99 50-Year RI ExistDam_ss 3510 324.56 330.32 329.27 331.23 0.005009 7.66 458.23 110.32 0.66 4.15 Reach 1 99 50-Year RI Prop-SS-M2 3510 324.56 330.32 329.28 331.23 0.005009 7.66 458.24 110.32 0.66 4.15 Reach 1 99 100-Year RI ExistDam_ss 4180 324.56 330.82 329.69 331.85 0.005004 8.15 513.09 112.36 0.67 4.57 Reach 1 99 100-Year RI Prop-SS-M2 4180 324.56 330.82 329.69 331.85 0.005004 8.15 513.1 112.36 0.67 4.57 Reach 1 99 200-Year RI ExistDam_ss 4930 324.56 331.33 330.12 332.49 0.005003 8.63 571.58 114.69 0.68 4.98 Reach 1 99 200-Year RI Prop-SS-M2 4930 324.56 331.33 330.12 332.49 0.005003 8.63 571.58 114.69 0.68 4.98 Reach 1 99 500-Year RI ExistDam_ss 6000 324.56 332.02 330.7 333.34 0.005001 9.21 651.73 118.31 0.69 5.51 Reach 1 99 500-Year RI Prop-SS-M2 6000 324.56 332.02 330.7 333.34 0.005001 9.21 651.73 118.31 0.69 5.51 SITE RECONNAISSANCE AND PRELIMINARY DESIGN FOR DAM REMOVAL – CHARTPAK DAM Appendix E OPCC For Removal of Chartpak Dam E.1 Appendix E OPCC FOR REMOVAL OF CHARTPAK DAM Table E.1. Opinion of Probable Construction Cost; ASTM E 2516-11 Estimate Class 5 Order of Magnitude. Item Units Quantity Unit OPC Cost Extended OPC Cost Notes Mobilization/Demobilization Each 1 $360,000 $360,000 10% of Direct Construction Water Management Each 1 $150,000 $150,000 Allowance; segregation barriers (e.g., sandbag coffer dams, turbidity curtains) Sediment Management CY 26,000 $120 $3,120,000 Allowance for active sediment management including excavation and hauling offsite Demolish Primary Spillway and Outlet Works CY 722 $200 $150,000 130 wide ft x 10 ft long x 20 ft high (est) Final Channel Grading Each 1 $50,000 $50,000 Allowance; Area Uncertain Repair/Restoration of Access/Staging Each 1 $50,000 $50,000 Allowance; Removal of temporary access roads Miscellaneous Work & Cleanup Each 1 $50,000 $50,000 Allowance $3,930,000Total Direct Construction