Loading...
Cutlery DEP FNN 246-0761.pdf5/24/22, 10:54 AM City of Northampton Mail - MassDEP NOI File Number https://mail.google.com/mail/u/0/?ik=fec0f72d97&view=pt&search=all&permthid=thread-f%3A1732100458395984803%7Cmsg-f%3A17321008908494…1/2 Sarah LaValley <slavalley@northamptonma.gov> MassDEP NOI File Number 1 message WERO_NOI@massmail.state.ma.us <WERO_NOI@massmail.state.ma.us>Fri, May 6, 2022 at 2:02 PM To: js474256@gmail.com, jsurette@epsilonassociates.com Cc: wero_noi@state.ma.us, slavalley@northamptonma.gov COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF ENERGY & ENVIRONMENTAL AFFAIRS DEPARTMENT OF ENVIRONMENTAL PROTECTION WESTERN REGIONAL OFFICE 436 DWIGHT STREET, SPRINGFIELD, MA 01103 413-784-1100 Date: 05/06/2022 Municipality NORTHAMPTON RE: NOTIFICATION OF WETLANDS PROTECTION ACT FILE NUMBER The Department of Environmental Protection has received a Notice of Intent filed in accordance with the Wetlands Protection Act (M.G.L. c. 131, §40): Applicant CUTLERY BUILDING ASSOCIATES Address 360 RIVERSIDE DRIVE,NORTHAMPTON MA Locus 360 RIVERSIDE DRIVE , NORTHAMPTON MA Owner ALAN VERSON Address 360 RIVERSIDE DRIVE, LAKE PLEASANT MA 01347 This project has been assigned the following file # : WE 246-0761 ISSUANCE OF A FILE NUMBER INDICATES ONLY COMPLETENESS OF SUBMITTAL, NOT APPROVAL OF APPLICATION Although a file # is being issued, please note the following: [1] The Commission should confirm parcel ID and street numbering listed on the WPA Form 3 as it is different than what MassGIS data shows. The Commission should also confirm the lat/long. [2] The Commission needs to wait to close the public hearing until NHESP has issued its determination. [3] The WPA Form 3 indicates that the proposed project will take place on one parcel; however, the USGS topographic map indicates that the project will take place on three parcels. Please clarify and ensure that all property owners have signed the WPA Form 3. [4] Timber mats in the Mill River should be secured to prevent movement downstream during a flood event. [5] There is no Buffer Zone to Isolated Vegetated Wetlands under the Wetlands Protection Act. [6] The Applicant did not determine if Isolated Land Subject to Flooding is present in the location of the Isolated Vegetated Wetland. [7] The Mill River is considered a Cold Water Fishery Resource. Preventing sediment from entering the water and maintaining and/or increasing shading of the water column is important to protecting this valuable resource. [8] Notice of Intent (NOI) numbers (246-0546, 246-0593, and 246-0734) have been issued for the same project locus. The Conservation Commission should be mindful of the Multiple Notice of Intent Filings for the Same or Similar Projects on the Same Property (DWW Policy 88-3) (aka the “dual notices policy”). Please see the following link for additional details: https://www.mass.gov/guides/wetlands-program-policy-88-3-multiple-filings. If the work areas of the current project and the referenced prior OOCs do not overlap, the Commission may not have concerns having dual notices. Should the projects overlap, the Commission may wish to consider issuing COCs for the original OOCs and 5/24/22, 10:54 AM City of Northampton Mail - MassDEP NOI File Number https://mail.google.com/mail/u/0/?ik=fec0f72d97&view=pt&search=all&permthid=thread-f%3A1732100458395984803%7Cmsg-f%3A17321008908494…2/2 subsequently issuing a OOC for the proposed project. [9] A Chapter 91 license may be required. Application and transmittal forms are available on the MassDEP website http://www.mass.gov/eea/agencies/massdep/water/approvals/wetlands-and-waterways-forms.html#2. For additional information, contact MassDEP Waterways Program by email at dep.waterways@mass.gov or visit https://www.mass.gov/waterways-program-chapter-91. [10] The Limited Project Provisions require the Applicant to the extent possible to meet the performance standards for each Resource Area. The Applicant should address the performance standards for each wetland resource area impacted and indicate which performance standards the project cannot meet. The Applicant should indicate which Performance Standards they are requesting Limited Project Status for and how they have attempted to meet those Standards. [11] The Applicant should provide information regarding the justification for extending the existing retaining wall and soft-armoring alternatives considered for Bank stabilization. In addition, the Applicant should provide information regarding the justification for additional retaining walls in the Riverfront Area. [12] The Applicant has indicated their intention to submit revised plans. The Department reserves the right to review these plans and submit additional comments. Regards, for MassDEP, (413)-755-2154 Mary.Grover