Loading...
23D-119 (3) Z31>-ll 9_ o o Massachusetts Electric Company&Nantucket Electric Company(d/b/a National Grid) M.D.P.U. 1248 Certificate of Completion for Simplified Process Interconnections Installation Information: ❑ Check if owner-installed Interconnecting Customer: DORCAS BROOKS Contact Person: Mailing Address: 188 Federal Street City: Northampton State: MA Zip Code: 01062 Telephone (Daytime): 413-348-7875 (Evening): Facsimile Number: E-Mail Address: db@joneswhitsett.com Address of Facility(if different from above): Electrical Contractor's Name (if appropriate): Valley Solar Mailing Address: PO BOX 60627 City: Florence State: MA Zip Code: 01062 Telephone(Daytime): 413-584-8844 (Evening): Facsimile Number: E-Mail Address: Info@valleysolar.solar �(, eYnal t b 1231zz License number: 21134A Date of approval to install Facility granted by National Grid: 3/22/2022 Application ID number: 00417185 Inspection: The system has been installed and inspected in compliance with the local Building/Electrical Code of (City/County): Signed (Loc lectric Wring Inspector, or attach signed electrical inspection): Name (printed): c6coAr- PA4 lt, Date: - 4-a- License#: `'/Q (Q,( As a condition of interconnection you are required to send/e-mail a copy of this form along with a copy of the signed electrical permit to National Grid: National Grid Attn: Distributed Generation 40 Sylvan Rd Waltham,MA 02451 E-mail: distributed.generationa,nationalgrid.com Massachusetts:http://www.nationalgridus.com/masselectric/home/energyeff/distributed generation.asp Nantucket:http://www.nationalgridus.com/nantucket/home/energveff/distributed generation.asp Page I of 1