23D-160 (7) " DEPT. OF BUILDING INSPECTIONS <`
, "':., BUILDING D �� >
art . 212 Main Street 4'
Northampton, MA 01060 PERMIT4
23D - 160 VALIDATION
DATE March 3, 19 86 PERMIT NO. 77
APPLICANT Angela Fitzgerald ADDRESS 147 Maple wood Terr. Owner
(NO.) (STREET) (CONTR'S LICENSE)
PERMIT TO New Building (_1 STORY Garage/Tractor Shed NUMBER OF
DWELLING UNITS
(TYPE OF IMPROVEMENT) NO. (PROPOSED USE)
147 Maplewood Terr. ZONING URB
AT (LOCATION) DISTRICT
(NO.) (STREET)
BETWEEN AND
(CROSS STREET) (CROSS STREET)
LOT
SUBDIVISION LOT BLOCK SIZE
BUILDING IS TO BE 12 FT. WIDE BY 20 FT. LONG BY FT. IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION
TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION
(TYPE)
REMARKS: permit is for the construction of a garage/storage shed
VOLUMEESTIMATED COST 1 FEE
AREA OR 240 sq. ft. $
PERMIT $ 12.00
(CUBIC/SQUARE FEET)
Alwyn & Angela Fitzgerald , �9 r
ADDRESS OWNER
147 Maplewood 1'err. , Northamtpon, Mass. 01060 BYILoIa'�'d �.,,24:.:. c.-
WHITE - FILE COPY . GREEN - FIELD COPY • CANARY - APPLICANT COPY • PINK - ASSESSORS COPY pr NtXP
U
0'4- :4' CITY OF NORTHAMPTON
VIII. ZONING PLAN EXAMINERS NOTES 9� `_— li. MASSACHUSETTS
r/
i ".itn-
$-O' . I. 'r..l OFFICE of the INSPECTOR of BUILDINGS
• -or,', ,• 0
DISTRICT > •�;;" 3
= � Page 17 Plot _'.'_ APPLICATION FOR
USE ZONING PERMIT AND
INSPECTOR
BUILDING PERMIT
FRONT YARD
z
' IMPORTANT — Applicant to complete all items in sections: 1, II, Ill, IV, and IX. O
SIDE YARD SIDE YARD I. AT (LOCATION) I4 �1 /`� II0�� �'e�e.//r / ;Z ZONING
DISTR CT._ d
REAR YARD LOCATION (No.) // (STREET) �? J "--1
OF BETWEEN H /Al /! GL I / AND !� L !/l
BUILDING (CROSS STREET) (CROSS STREET)
NOTES .. LOT
SUBDIVISION ,---r— LOT BLOCK SIZE
Vt
II. TYPE AND COST OF BUILDING — All applicants complete Parts A — D —1
M
A. TYPE OF IMPROVEMENT D. PROPOSED USE - For"Wrecking" most recent use m
m
-4
1 IQ New building Residential Nonresidential
2 I I Addition(I/ residential, enter number 12 He One family 18 _I Amusement, recreational
of new housing units added, if any,
in Part D, 13) 13 I I Two or more family - Enter 19 Church, other religious
IX. SITE OR PLOT PLAN - For Applicant Use -
number of units- - - -0. 20 Industrial
- 3 I I Alteration (See 2 above)
.ee : : . 14 I I Transient hotel, motel, 21 Parking garage
II 4 I I Repair, replacement or dormitory - Enter number
• _ ..•i I I ofunits - . . 22 Service station, repair garage
: a =■ _ ,-.■•1 5 Wrecking (1/multi/amity residential,
_ "°•GX.
.. enter number ofunits in buildingin 23 Hospital, institutional
• .■. c ••.fsfiif. i:�•'' Part D, 13) 15 L Garage P
.■. : _ _ n::,1 6 `� Moving (relocation) 16 Li Carport an 24 Office, bank, professional
C�!'v/' 25 Public utility
Meese.N• ■■::::: : ...'1 '•^'• - 1 •■• 11 7 r—i Foundation only 17 �I Other - SpeciJy ��
i U• J.NO'Aw•
'ae..NOf■ue•'. : ' ?i L' 26 School, library, other educational
.■ : 01011 "SNP SOUS Oa
NNf\=■ tor■ ■N■.. :.■t new. B. OWNERSHIP / 27 Stores, mercantile
,, 1
:N..... i : • '� - -"'••••"-' 28 Tanks, towers
WOOS 11 8 Li Private (individual, corporation,
: I"AMA' _ _ "1.i1" nonprofit institution, etc.) Specify
_ 29 Other - S eci
MI .I\o1
■■u 9 HI Public (Federal, State, or
-n.,i. 1 local government)
: 11.e.r•.r •N.f.e.•.•■■N■N: 1 ..\1•e 11.
11N■:.1NI NN_I■N■..N•■•■■ I la/ee.
�f t■■f11•.■.,:..- /■■' .•"' C. COST (Omit cents) Nonresidential - Describe in detail proposed use of buildings, e.g., food
•: ■■.II■.e/..'■.e I'•./ _-rime•■■.....1•.1' _�
If.11 _ '.•••^.••�-�'.-[••\� / processing plant, machine shop, laundry building at hospital, elementary
••••,, .°•••"'••'-1'"''••••'' ' /7 school, secondaryschool, college, parochial school, parkinggarage for,
r .•■Nu :::�i Iu1•.b,r..= 10. Cost of improvement $ ll_��`'' 9 9 9
I :, t z department store, rental office building, office building at industrial plant.
a::•.•ANN•••.••: I. I I 1 To be installed but not included If use of existing building is being changed, enter proposed use.
_•••••■•■:■• . II : ' in the above cost _
MCI'.. 1 a. Electrical
.... I...r.r_� •r.. 1
::::::a:■■■maw MOM SIMf\■: ii� i I,...: :1 1 ■• ��
:•••::a.... a MO. [ - A al 011
■• b. Plumbing
um.
::::::N.: _ '••••u.s.. . I s ��. c. Heating,
---
in:: •�.: = i::::i,a. r = i air conditioning
Nu• 1 r..\.. it•'f'•1.I _ ,[ f
•• he SO SO II
.■f..11.r 1..1/\'1f.r. y d. Other (elevator, etc.)
: : II ,.
uN NuufN\Nf:a:::::::_::::: ^a•� • ___:___:-� _�� 11. TOTAL COST OF IMPROVEMENT $ { _ V�)
_ l::::: : '••••`••••_ __ III. SELECTED CHARACTERISTICS OF BUILDING — For new buildings and additions, complete Parts E — L;
:: :.••\ ........a... •=':':
ia::.i...i =_:�::: :\...r,' : : -.; r.:N=:S:G:i• for wrecking, complete only Part J, for all others skip to IV.
:sa: • : :■■ef:fe■: : : : :::••■1 E. PRINCIPAL TYPE OF FRAME G. TYPE OF SEWAGE DISPOSAL J. DIMENSIONS
_\••_•_ • .ur -- 48. Number of stories
•• ••••:f•: CIO/ 1a.e.\ •.,
..■'._.. 30I Masonry (wall bearing) 40 I Public or private company
:,...e'. : :.: • 49. Totalsquare
a■=•N■N\NNNNN uo••lNr:.a■N[i1'•..4!E"•'' ": :: IMP"- ANOr}[ -'••'.a_• '� = 31 Wood frame 41 I Private (septic tank, etc.) all floors, based on floor area,
C'
s:•..■::::::::: a:�:; :,Al:rla:;: \r s,. .■.. ■e O:
as:: iii:•Is riTI�.1:u. 1 1■if., _ : _ __ _ : 32 Structural steel dimensions
I'•'''" H. TYPE OF WATER SUPPLY
:::: 4• •ii" ':�Z!"--"::. : : = 33 I I Reinforced concrete
a•! __ is w[: : : 50. Total land area, sq. ft.
:a::::s:::::::::a•....es\e....._.:Ci=•i'•,•=:•: :::a■::::::: : :: :: s 34 I I Other - Specify 42 I I Public or private company _
:a•:.• a WITH:: : o■ :• "MUM: =N:: 43 Li Private (well, cistern) K. NUMBER OF OFF-STREET
'=.i.=e.•..sse.•____::._ia�•• 4:aa:a:::::::::::a:■•• .ula•:ssN= : s.■ •:.•..•..f•■N=.a..:::::::::L s• : PARKING SPACES
•••. a: s:s:: : •
:ass•sssas:;: 116P9 .''ii.■'ii . ...s.•.•=...■..■..■.::s::sii i:::::s:: sss::::::s::ff
: ::::::a: a.,aaa $aaaa■s:aaaa�ss s '■■a.:2.. !US ss•s:::. N■. .•..•N.. 51. Enclosed
i� i'a is • •Np= ■a: . ■■•ess..: • .•N==■.�._ ....: ::_.�:_:■_ = F. PRINCIPAL TYPE OF HEATING FUEL I. TYPE OF MECHANICAL
ii �i a •:••aa•'iaaaii•a •• •• i::::::::�:`�• . a • : s..sshs■�• ::: S.:: ::::_�zr:••.•••. •. N■■■.:::s::sss:::•:•::e
:• • ■ fa. • • aa�i: • ■ N N N • a ■ ■.. NN a:•as•s::m■:: :Nf: 35 I Gas Will there be central air 52. Outdoors
as :s::•asses � �?sssaasass:•ss••aaas�:a••:as:•••• :. .:ssma�a:�asas•sass:a •: s .. a •••
::• : •: :• • • N • ..■ N ■ N• N a conditionin �
aaa■•aa S aa-aaaN ::. s:�� :�� $::�;:.iiisiiii::�i•:�• •• • u •:: ai NaN:N■•:n : Q=:• __='=:=71•= 36 I I OiI g
�a : : : ::■ .■ ■• •■ L. RESIDENTIAL BUILDINGS ONLY
s: sasaas:as •s1ass:.sa 11s'• 11sssa: •sss::a=s:::!!:••sa:s : s :■ :s. :rs1,•sslsasss11:_;_u_1_s1111z1ss1l g::::sas....s •.... pit �/
ii ■.aaaas::a�::::N•• • • • • •aa .•:■N: y 44 Yes 45 /S No
: f: :. • N ....• • •: s s sss s es... 'N Y 53. Number of bedrooms
• .• • • ■.\NN MN N ■.. • M •• •• • • • N■.■ •■ ■■■ • N!ii`��` ���gii.s:sssa:.=r:.Sm::.pus�r•.s if.,ie.�asf�.■�1sgs . .s �•■j .•.as :a. .. ■:� s`aa'S"'�ass .. •. � �: m• s sss s N= ...... .. ....N. Li
.�1* p.•' ■..�� a !i'al..iii a■■s�:•`.s:•.Yis•i. .•N.�:I..• : :■■.:.:H. fs.a :a■.. :e■N N•N • •• ■. •ee ••• 38 Coal
l�Smul: :isli:::: : :e :s::::::�i1t::::1•t1�ommorat.1a:::::::'�::=i�1;iiu:: rg:•j••;�1�! :Z:::s::i::a::::•■:i : : : 39I I Other - Specify Will there be an elevator? Full
54. Number of
46 I I Yes 47 IX! No bathrooms
/�. Portia(
P INt,II P
IV. IDENTIFICATION — To be completed by all applicants
Nome Mailing address — Number, street, city, and State ZIP code Tel. No.
1. g( -- N fi ON6-ez,4 /4.) 1.61 ace. CvGd n ?terL S NOTES and Data — (For deportment use)
Owner or
L.o...e F 1 < 2..6t= 4(-0 O /I/9 5 3 e 5-2Builder's
2. ,dexpz,
License No. G !� ✓ V �jLQfL
Contractor
3.
Architect or }
Engineer / �� JO.ae
I hereby certify that the proposed work is authorized by the owner of record and that I have been authorized by the owner to
make this application as his authorized agent and we agree to conform to all applicable laws of this jurisdiction.
Signature of applicant Address Application date
tits . c� cY /y7 99 2<y d 7e e. 073/d}Z
DO NOT WRITE BELOW THIS LINE
V. PLAN REVIEW RECORD — For office use
Plans Review Required Check Plan Review Date Plans Date Plans ByNotes
q Fee Started By Approved
BUILDING $
PLUMBING $
MECHANICAL $
ELECTRICAL $
OTHER $
VI. ADDITIONAL PERMITS REQUIRED OR OTHER JURISDICTION APPROVALS
Date Date
Permit or Approval Check Obtained Number By Permit or Approval Check Obtained Number By
BOILER PLUMBING
CURB OR SIDEWALK CUT ROOFING
•
ELEVATOR SEWER
ELECTRICAL SIGN OR BILLBOARD FURNACE STREET GRADES
GRADING USE OF PUBLIC AREAS
OIL BURNER WRECKING
OTHER OTHER
VII. VALIDATION
Building FOR DEPARTMENT USE ONLY
Permit number
Building. Use Group
Permit issued ` , \Q.�.�.�k. - / 19 �4n
Building
Fire Grading
Permit Fee $ t
Live Loading
Certificate of Occupancy $ Occupancy Load
Approved by:
Drain Tile t1,0 /a/1
eik
Plan Review Fee $
TITLE
CITY OF N O R T H A M P T O N, MASS.
February 20, 19 86
THE BOARD OF PUBLIC WORKS
The undersigned respectfully petition your honorable body for
permission to install a driveway at 147 Maplewood terrace. Fifteen (15)
maximum width at the street line. Gutter drainage not to be disturbed.
Driveway surface to be paved if the grade of the proposed driveway
excceds 3% or more. All drainage shall be directed off the driveway
surface to adjacent land not on the existing roadway.
,
By: 0
A.L. Fitzgerald
)4g3nplcwood Tcrracc
Proposed Location �-�
Inspected by:
Richard Stone
Gravel Base
Grade Inspected by:
Final Approveal:
Paul 0. Hadsel
THE BOARD OF PUBLIC WORKS
Voted that petition be granted.
Paul 0. Hadsel, Director of Publid Works
(Subject to Attached Condition 1&2)
Conditions: Driveway Permit
In lieu of plan approved by City Engineer
I agree to the following added conditions:
1) I will contact the Department of Public Works and have
an inspector check and approve the graded gravel base
prior to paving to insure compliance with slope and
location;
2) I further agree that if in the inspections any of the
permit conditions are not met that I will at no expense
to the City remove and replace the driveway as directed
by the City Engineer.
By:
etiti ner
NOTE: The Public Works Department recommends that you provide a
plan showing the proposed driveway with grades and location
in the future to avoid possible expense which you will incur
by not getting approval of actual plans in advance.