21-1206 Infirmary Updated Pricing SetPROJECT INFORMATIONBUILDING AUTHORITY: City of Northampton, MABUILDING CODE: Massachusetts State Building Code -780 CMR, 9th EditionZONING:URC DistrictHEIGHT LIMIT:50'SETBACKS:FRONT:10'SIDE:10'REAR:20'OTHER DEVELOPMENT PARAMETERS: OVERLAY DISTRICTS:Elm Street/Round Hill Historic DistrictLOT SIZE:1.1 AcresBUILDING FOOTPRINT:4500 sfBUILDING SQUARE FOOTAGE:9000sfLOT COVERAGE:10%BUILDING HEIGHT:ACTUAL: 24'-1" +/-MAX:50'ARCHITECT:OPAL 137 High StreetBelfast, ME 04915207 338 1566 TEL207 338 1249 FAXwww.opalarch.usARCHITECTURE / RESEARCH / DESIGN137 High Street Belfast ME 04915t: 207 338 1566 www.opalarch.usREVISIONS:DATE & DESCRIPTION:CURRENT ISSUE:PAST ISSUES:DATE & DESCRIPTION:SHEET NO. AND NAME:PROJECT NOPROJECT NAMEPROJECT ADDRESS1ABUILDING GRID LINESWINDOW SYMBOLROOM NO.REFERENCE LETTERDOOR SYMBOL1.1.8ROOM NO.REFERENCE NO.REVISION NO.3REVISION CLOUDMATCH LINESHEET NO.A3.2THE SHADEDPORTION IS THESIDE CONSIDEREDROOM NAMEROOM NO.FLOOR LEVELROOM LABELLiving Room1.2SECTIONSECTION NO.4A4.4SHEET NO.AREA REFERENCEDETAIL NO.SHEET NO.5A9.2DETAILEXTERIOR ELEVATIONA3.2 2 ELEVATION NO.SHEET NO.DIMENSION STRINGINTERIOR ELEVATION1234ELEVATION NO. (TYPICAL)SHEET NO.A6.10CEILING HEIGHT8'-0"CEILING HEIGHTWORK POINT OR CONTROL POINTNORTH ARROWARCHITECTURAL NORTHTRUE NORTHCL& And< Angle@ At Centerline Diameter or Round Perpendicular# Number(E) ExistingAB Anchor BoltA/C Air ConditioningA.C. Asphaltic ConcreteACT Acoustical TileACOUS AcousticalADJ AdjustableA.F.F. Above Finish FloorALT Alter or AlternateALUM AluminumANOD AnodizedA.P. Access PanelAPPROX ApproximateARCH ArchitecturalASPH AsphaltBD BoardBITUM BituminousBLDG BuildingBLK BlockBLKG BlockingBM BeamBOT BottomBR BedroomBSMT BasementB.U.R. Built Up RoofingCAB CabinetCARP CarpetC.B. Catch BasinCEM CementCER CeramicC.I. Cast IronCLG CeilingCLO ClosetCLR ClearCMU Concrete Masonry UnitCNTR CounterCOL ColumnCONC ConcreteCONN ConnectionCONST ConstructionF.O.C. Face of ConcreteF.O.F. Face of FinishF.O.M. Face of MasonryF.O.S. Face of StudFPRF FireproofFR FrameFS Full SizeFT Foot, FeetFTG FootingFURR Furring, FurredFUT FutureGA GaugeGALV GalvinizedG.B. Grab BarG.I. Galvanized IronGL Glass, GlazingGND GroundGR GradeGYP GypsumH HighH.B. Hose BibH.C. Hollow CoreHCP HandicappedHDWR HardwareHDWD HardwoodH.M. Hollow MetalHORIZ HorizontalHR HourHT HeightHVAC Heating, Ventilation and Air ConditioningH.W. Hot WaterI.D. Inside DiameterINCL IncludingINSUL InsulationINT InteriorJAN JanitorJST JoistJT JointKIT KitchenLAM LaminateLAV LavatoryL.F. Lineal FootL.H. Left HandL.R. Living RoomLT LightLVR LouverR RiserRAD RadiusR.D. Roof DrainREF ReferenceREFR RefrigeratorREINF Reinforced or ReinforcingREQ RequiredRESIL ResilientREV RevisedRFG RoofingR.H. Right HandRM RoomR.O. Rough OpeningRWD RedwoodS SouthS.C. Solid CoreSCHED ScheduleSECT SectionSEP Separation, SeparateSH ShelfSHR ShowerSHT SheetSIM SimilarSLDG SidingSPEC SpecificationSQ SquareS.S. Stainless SteelSSK Service SinkSTD StandardSTL SteelSTOR StorageSTRUCT StructrualSUSP SuspendedSW SwitchSYM SymmetricalSYS SystemT TreadT.B. Towel BarT&G Tongue and GrooveT.O.C. Top of CurbT.O.D. Top of DrainTEL TelephoneTEMP Tempered, TemperatureTER TerrazzoTHK Thick, ThicknessTHR ThresholdTOIL ToiletT.O.P. Top of PavementT.O.S. Top of SlabCONT ContinuousCONTR ContractorCORR CorridorC.T. Ceramic TileCTR CenterCTSK CountersunkC.W. Cold WaterD Deep, DepthDBL DoubleDET DetailD.F. Drinking FountainDIA DiameterDIM DimensionDISP DispenserDN DownD.O. Door OpeningDR DoorDS DownspoutD.S.P. Dry StandpipeDWG DrawingDWR DrawerE EastEA EachEJ Expansion JointEL ElevationELEC ElectricalELEV ElevationEMER EmergencyENCL EnclosureE.O.S. Edge of SlabEQ EqualEQUIP EquipmentE.W. Each WayE.W.C. Electric Water CoolerEXIST ExistingEXP ExpansionEXPO ExposedEXT ExteriorF.A. Fire AlarmF.D. Floor DrainFDN FoundationF.E. Fire ExtinguisherF.E.C. Fire Extinguisher CabF.G. Finish GradeF.H.C. Fire Hose CabinetFIN FinishFLASH FlashingFLR FloorFLUOR FluorescentMATL MaterialMAX MaximumM.B. Machine BallMECH MechanicalMEMB MembraneMET MetalMFR ManufactureMH ManholeMIN MinimumMIR MirrorMISC MiscellaneousM.O. Masonry OpeningM.R. Moisture ResistantMTD MountedMUL MullionN NorthN.I.C. Not in ContractNO NumberNOM NominalN.S. No ScaleN.T.S. Not to ScaleO/ OverOA OverallOBSC ObscureO.C. On CenterO.D. Outside DiameterO.F.D. Overflow DrainOFF OfficeO.H. OverhangOVHD OverheadOPNG OpeningOPP OppositePC PieceP.D. Planter DrainPL PlateP.L. Property LinePLMG PlumbingPLAM Plastic LaminatePLAS PlasterPLYWD PlywoodPR PairPT PaintP.T.D. Paper Towel DispenserPTN PartitionQ.T. Quarry TileT.P.D. Toilet Paper DispenserT.S. Top of SteelTV TelevisionT.O.W. Top of WallTYP TypicalUNF UnfinishedU.O.N. Unless Otherwise NotedUR UrinalVERT VerticalVEST VestibuleV.I.F. Verifiy in FieldVOL VolumeW WestW/ WithW.H. Water HeaterW/O WithoutW.C. Water ClosetWD WoodWP WaterproofWPM Waterproof MembraneWSCT WainscotW.S.P. Wet StandpipeWT Weight7ABBREVIATIONS6SYMBOLS5PROJECT DIRECTORY1.1-A3RENDERINGINDICATES AIRSEALING BOUNDARY2DRAWING LIST1SITE LOCATIONNOT TO SCALE4PROJECT INFORMATIONHINCKLEYJAMESINFIRMARY1828TITLE SHEETA0.036 ROUND HILL RDNORTHAMPTON, MA10/28/21UPDATED PRICINGSET3/30/21 -PRICING SETSHEET LISTSheet Number Sheet NameA0.0 TITLE SHEETA0.1 GENERAL NOTES, SCHEDULESA1.1 LEVEL 1 DEMOLITION PLAN - PHASE 1A2.1 LEVEL 1 FLOOR PLAN - PHASE 1A2.4 LEVEL 1 REFLECTED CEILING PLAN - PHASE 1A3.1 ELEVATIONS - PHASE 1A4.1 BUILDING SECTIONS - PHASE 1A9.1 ASSEMBLY DETAILS - PHASE 1A9.2 WINDOW OPENING DETAILS - PHASE 1A9.4 BUILDING ENVELOPE DETAILS - PHASE 136 ROUND HILL RD36 ROUND HILL RD12/06/21 1 UPDATEDPRICINGSET1
GENERAL NOTES:1. ALL CONSTRUCTION TO ADHERE TO IBC 20152. ALL PLUMBING TO ADHERE TO LOCAL JURISDICTIONAL GOVERNING CODE3. ALL ELECTRICAL WORK TO ADHERE TO LOCAL JURISDICTIONAL GOVERNING CODE4. ALL MECHANICAL WORK TO ADHERE TO LOCAL JURISDICTIONAL GOVERNING CODE5. UPON NOTIFICATION FROM THE ARCHITECT OF LOCAL BUILDING DEPARTMENT APPROVAL, UNLESS OTHERWISE AGREED UPON, IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE AND MAINTAIN ALL BUILDING, PLUMBING, AND ELECTRICAL PERMITS6. THE CONTRACTOR SHALL MAINTAIN ACCESSIBILITY FOR INSPECTION BY THE LOCAL BUILDING OFFICIALS AS REQUIRED AT ALL TIMES; THE CONTRACTOR SHALL COORDINATE ROUTINE SITE INSPECTIONS AS PER THE GOVERNING BUILDING CODE WITH THE LOCAL MUNICIPALITY7. THE CONTRACTOR SHALL NOTIFY, IN WRITING, THE ARCHITECT AND OWNER OF INSPECTIONS, SCHEDULED OR UNSCHEDULED 8. CONTRACTOR TO THOROUGHLY REVIEW THE CONTRACT DOCUMENTS AND SPECIFICATIONS FOR INCONSISTENCIES WITH SITE CONDITIONS; CONTRACTOR TO NOTIFY ARCHITECT IN WRITING AND REVIEW ANY INCONSISTENCIES WITH ARCHITECT PRIOR TO PROCEEDING WITH THE WORK 9. INCONSISTENCIES WITH SITE CONDITIONS DO NOT ABSOLVE THE CONTRACTOR OF THE OBLIGATION TO ADHERE TO THE CONTRACT DOCUMENTS, BOTH DRAWINGS AND SPECIFICATIONS10. INCONSISTENCIES BETWEEN THE DRAWINGS AND SPECIFICATIONS DO NOT OBSOLVE THE CONTRACTOR OF THE OBLIGATION TO ADHERE TO THE STANDARDS OUTLINED; ALL INCONSISTENCIES SHALL BE PRESENTED TO THE ARCHITECT IN WRITING PRIOR TO PROCEEDING WITH THE WORK11. MEANS AND METHODS SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR UNLESS OTHERWISE AGREED UPON WITH THE OWNER AND ARCHITECT12. THE CONTRACTOR SHALL MAINTAIN ADEQUATE SITE SUPERVISION AND OVERSIGHT OF SITE OPERATION13. CONTRACTOR SHALL PROVIDE, ERECT AND MAINTAIN ALL TEMPORARY BARRIERS AND GUARDS, AND ALL TEMPORARY SHORING AND BRACING AS REQUIRED BY ALL CITY AND STATE REGULATIONS14. CONTRACTOR SHALL PROVIDE ADEQUATE WEATHER PROTECTION FOR THE BUILDING AND ITS CONTENTS DURING THE COURSE OF WORK15. IF REQUIRED, CONTRACTOR TO PROVIDE TEMPORARY POWER POLE AND METER FOR THE DURATION OF THE WORK; CONTRACTOR TO MAINTAIN TEMPORARY LIGHT AS REQUIRED FOR THE DURATION OF THE WORK16. CONTRACTOR SHALL PROVIDE TEMPORARY SANITARY FACILITIES AS TO LEAST IMPACT NEIGHBORS AND AS DIRECTED BY CITY REGULATIONS17. WHEN REQUIRED, THE CONTRACTOR SHALL TAKE CARE TO MAINTAIN SAFE AND CODE COMPLIANT CONDITIONS FOR TENANTS OCCUPY THE SITE OR BUILDING DURING ANY PERIOD OF CONSTRUCTION; UNLESS AGREED UPON BY THE OWNER IN WRITING, CONSTRUCTION OF THE WORK SHALL NOT INHIBIT ACCESS TO OCCUPIED PORTIONS OF THE SITE OR BUILDING18. THE OWNER SHALL MAINTAIN THE RIGHT TO ACCESS THE SITE AND BUILDING AS REQUIREDARCHITECTURE / RESEARCH / DESIGN137 High Street Belfast ME 04915t: 207 338 1566 www.opalarch.usREVISIONS:DATE & DESCRIPTION:CURRENT ISSUE:PAST ISSUES:DATE & DESCRIPTION:SHEET NO. AND NAME:PROJECT NOPROJECT NAMEPROJECT ADDRESSHINCKLEYJAMESINFIRMARY1828GENERAL NOTES,SCHEDULESA0.136 ROUND HILL RDNORTHAMPTON, MA10/28/21UPDATED PRICINGSET3/30/21 -PRICING SETDOOR SCHEDULEMARK TYPE DESCRIPTION MANUFACTURER WIDTH HEIGHT THICKNESS FINISHHARDWAREGROUPACCESSORIESInterior1.4.1 A 45 Min Rated Hollow Metal Door and Frame Steelcraft or approved eq. 3' - 0" 6' - 8" 1 3/4" Paint; Color TBD 1PRICING ALTERNATE: IN LIEU OF NEW NON-FIRE RATED DOORS, (TYPE E) OWNER WILL CONSIDER REUSING DOORS, FRAMES AND HARDWARE SALVAGED FROM DEMOLITION -COORDINATE ACTUAL DOOR AND FRAME SIZE WITH NEW PARTITION WALL FRAMINGDOOR HARDWARE SCHEDULEHARDWAREGROUPHARDWARE DESCRIPTION MANUFACTURERHANDLEMODELLOCK/LATCH BACKSETHARDWAREFINISHHINGES/TRACK ACCESSORIES1 Inner Entry Lock, Mortise Schlage 06 L9050 2-3/4" US32D US32D 4x4 Five Knuckle Hinge (Ives or sim.)12/06/21 1 UPDATEDPRICINGSET11
UPUPUPAABBCCDD1122334455667788991010EEDEMOLISH ALL ELECTRIC WIRING, CONDUIT, EQUIPMENT AND DEVICES IN THIS AREA4.44.4DEMOLISH EXISTING METAL SOFFIT PANELSDEMOLISH EXISTING METAL SOFFIT PANELSDEMOLISH EXISTING METAL SOFFIT PANELSDEMOLISH EXISTING METAL SOFFIT PANELSDEMOLISH EXISTING MECHANICAL EQUIPMENTREMOVE PORTIONS OF EXISTING WALLS TO PERMIT NEW CONTINUOUS ENVELOPE IMPROVEMENTS PER WALL TYPES NOTED ON FLOOR PLANS REMOVE PORTIONS OF EXISTING WALLS TO PERMIT NEW CONTINUOUS ENVELOPE IMPROVEMENTS PER WALL TYPES NOTED ON FLOOR PLANSREMOVE PORTIONS OF EXISTING WALLS TO PERMIT NEW CONTINUOUS ENVELOPE IMPROVEMENTS PER WALL TYPES NOTEDNOTE: PROVIDE PRICING ALTERNATE TO EVALUATE EXISTING METAL SOFFIT PANELS FOR REUSE IN PLACENOTE: PROVIDE PRICING ALTERNATE TO EVALUATE EXISTING METAL SOFFIT PANELS FOR REUSE IN PLACENOTE: PROVIDE PRICING ALTERNATE TO EVALUATE EXISTING METAL SOFFIT PANELS FOR REUSE IN PLACENOTE: PROVIDE PRICING ALTERNATE TO EVALUATE EXISTING METAL SOFFIT PANELS FOR REUSE IN PLACE11DEMOLITION NOTES:1. DASHED LINES ON DEMO PLANS REPRESENT ITEMS TO BE REMOVED2. CONFIRM EXTENT OF DEMOLITION / EXISTING TO REMAIN WITH OWNER ON SITE PRIOR TO DEMOLITION; CHANGES FROM PLANS, IF ANY, TO BE MADE VIA CHANGE ORDER3. SOME ITEMS INDICATED TO BE REMOVED MAY BE REUSED OR SALVAGED; CONFIRM ITEMS TO BE RETAINED WITH OWNER; CHANGES FROM PLANS, IF ANY, TO BE MADE VIA CHANGE ORDER4. PROTECT ALL ELEMENTS TO REMAIN FROM DAMAGE5. SOFFIT FINISH AND/OR FRAMING DEMOLITION AND REPLACEMENT, IF REQUIRED, TO BE BY ALLOWANCE; UPON EVALUATION, CONTRACTOR TO REVIEW EXTENT OF WORK WITH OWNER AND ARCHITECT PRIOR TO PROCEEDING WITH THE WORK111WALL LEGEND:NEW WALL -SEE WALL TYPESEXISTING WALL TO REMAINWALL OR BUILDING ELEMENT TO BE DEMOLISHEDARCHITECTURE / RESEARCH / DESIGN137 High Street Belfast ME 04915t: 207 338 1566 www.opalarch.usREVISIONS:DATE & DESCRIPTION:CURRENT ISSUE:PAST ISSUES:DATE & DESCRIPTION:SHEET NO. AND NAME:PROJECT NOPROJECT NAMEPROJECT ADDRESSHINCKLEYJAMESINFIRMARY1828LEVEL 1 DEMOLITIONPLAN -PHASE 1A1.136 ROUND HILL RDNORTHAMPTON, MA10/28/21UPDATED PRICINGSET3/30/21 -PRICING SET1/4" = 1'-0"1LEVEL 1 DEMOLITION PLAN12/06/21 1 UPDATEDPRICINGSET
UPUPUPGENERAL NOTES -FLOOR PLANS:1. ALL CONSTRUCTION TO ADHERE TO APPLICABLE LOCAL BUILDING CODE, TYP.2. ALL DIMENSIONS ARE TO FACE OF STRUCTURE (F.O.S.), UNLESS OTHERWISE NOTED 3. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS, AND REVIEW WITH ARCHITECT FOR APPROVAL PRIOR TO PROCEEDING WITH CONSTRUCTION4. ANY INCONSISTENCIES OR UNFORESEEN CONDITIONS TO BE REVIEWED BY THE ARCHITECT FOR APPROVAL PRIOR TO PROCEEDING WITH CONSTRUCTION5. ALL DOORS AND WINDOWS DIMENSIONED TO CENTERLINE OF CLEAR OPENING. 6. CONTRACTOR SHALL PROVIDE ADEQUATE WEATHER PROTECTION FOR THE BUILDING AND ITS CONTENTS DURING THE COURSE OF WORK, AS REQUIRED7. CONTRACTOR SHALL PROVIDE TEMPORARY SANITARY FACILITIES AS TO REDUCE IMPACT AND AS DIRECTED BY OWNER.8. SOFFIT FINISH AND/OR FRAMING DEMOLITION AND REPLACEMENT, IF REQUIRED, TO BE BY ALLOWANCE; UPON EVALUATION, CONTRACTOR TO REVIEW EXTENT OF WORK WITH OWNER AND ARCHITECT PRIOR TO PROCEEDING WITH THE WORK1A3.11A3.13A3.14A3.12AABBCCDD1122334455667788991010ENTRY/STAIR1.1GALLERY1.2W1bW1bW1aW2W1b12' - 0"12' - 0"12' - 0"12' - 0"12' - 0"12' - 0"12' - 0"12' - 0"12' - 0"108' - 0"16' - 0"8' - 0"16' - 0"40' - 0"2A4.13A4.14A4.11A4.1A9.23A9.2401010202020202020202020202020202020202APARTMENT 11.3APARTMENT 21.4EEERV SUPPLY GRILLEERV EXHAUST GRILLE3' - 0"3' - 0"4.44.41.4.1EXISTING WALLS & DOORS TO REMAIN, TYP -CONFIRM EXTENT OF DEMOLITION/EXISTING TO REMAIN WITH OWNER ON SITE PRIOR TO DEMOLITION; CHANGES FROM WORK SHOWN, IF ANY, TO BE MADE VIA CHANGE ORDEREXISTING WALLS & DOORS TO REMAIN, TYP -CONFIRM EXTENT OF DEMOLITION / EXISTING TO REMAIN WITH OWNER ON SITE PRIOR TO DEMOLITION; CHANGES FROM WORK SHOWN, IF ANY, TO BE MADE VIA CHANGE ORDEREXISTING WALLS & DOORS TO REMAIN, TYP -CONFIRM EXTENT OF DEMOLITION / EXISTING TO REMAIN WITH OWNER ON SITE PRIOR TO DEMOLITION; CHANGES FROM WORK SHOWN, IF ANY, TO BE MADE VIA CHANGE ORDEREXISTING WALLS & DOORS TO REMAIN, TYP -CONFIRM EXTENT OF DEMOLITION / EXISTING TO REMAIN WITH OWNER ON SITE PRIOR TO DEMOLITION; CHANGES FROM WORK SHOWN, IF ANY, TO BE MADE VIA CHANGE ORDER111111WALL LEGEND:NEW WALL -SEE WALL TYPESEXISTING WALL TO REMAINWALL OR BUILDING ELEMENT TO BE DEMOLISHEDMEP SCOPE, PHASE 1:MECHANICAL:1. EXISTING BOILER, WATER HEATER AND OIL TANK TO REMAIN2. EXISTING HYDRONIC PIPING SERVING APARTMENT 1 TO REMAIN 3. PROTECT ALL ELEMENTS TO REMAIN FROM DAMAGE4. FINAL LOCATION OF HYDRONIC HEATERS, ERV UNITS AND DIFFUSERS, HEAT PUMP UNITS, AND OTHER MECHANICAL EQUIPMENT AND ACCESSORIES TO BE DETERMINED IN PHASE 2ELECTRICAL:1. DEMOLISH ALL ELECTRIC WIRING, CONDUIT, EQUIPMENT AND DEVICES AT LEVEL 1 IN AREA INDICATED ON A1.12. FINAL LOCATION OF LIGHT FIXTURES, RECEPTACLES, DEVICES, AND OTHER ELECTRICAL EQUIPMENT TO BE DETERMINED IN PHASE 2 PLUMBING:1. EXISTING PLUMBING FIXTURES MAY BE RETAINED FOR REUSE -CONFIRM W/ OWNER2. FINAL LOCATION OF PLUMBING FIXTURES TO BE DETERMINED IN PHASE 2FIRE PROTECTION:1. FINAL LAYOUT OF SPRINKLER PIPING TO BE DETERMINED IN PHASE 21ARCHITECTURE / RESEARCH / DESIGN137 High Street Belfast ME 04915t: 207 338 1566 www.opalarch.usREVISIONS:DATE & DESCRIPTION:CURRENT ISSUE:PAST ISSUES:DATE & DESCRIPTION:SHEET NO. AND NAME:PROJECT NOPROJECT NAMEPROJECT ADDRESSHINCKLEYJAMESINFIRMARY1828LEVEL 1 FLOOR PLAN -PHASE 1A2.136 ROUND HILL RDNORTHAMPTON, MA10/28/21UPDATED PRICINGSET3/30/21 -PRICING SET1/4" = 1'-0"1LEVEL 1 FLOOR PLAN - PHASE 1KEY NUMBER KEY TEXTKEYNOTE LEGEND01 EXISTING WINDOW - REINSTALL PER TYPICAL WINDOW DETAILS02 NEW WINDOW FURNISHED BY OWNER - INSTALL PER TYPICAL WINDOW DETAILS12/06/21 1 UPDATEDPRICINGSET
AABBCCDD1122334455667788991010NEW METAL PANEL SOFFIT TO MATCHEXISTINGNEW METAL PANEL SOFFIT TO MATCHEXISTINGNEW METAL PANEL SOFFIT TO MATCHEXISTINGNEW METAL PANEL SOFFIT TO MATCHEXISTING2A4.13A4.14A4.11A4.1EE4.44.4ERV SUPPLY GRILLEERV EXHAUST GRILLENOTE: PROVIDE PRICING ALTERNATE TO EVALUATE EXISTING METAL SOFFIT PANELS FOR REUSE IN PLACENOTE: PROVIDE PRICING ALTERNATE TO EVALUATE EXISTING METAL SOFFIT PANELS FOR REUSE IN PLACENOTE: PROVIDE PRICING ALTERNATE TO EVALUATE EXISTING METAL SOFFIT PANELS FOR REUSE IN PLACENOTE: PROVIDE PRICING ALTERNATE TO EVALUATE EXISTING METAL SOFFIT PANELS FOR REUSE IN PLACEARCHITECTURE / RESEARCH / DESIGN137 High Street Belfast ME 04915t: 207 338 1566 www.opalarch.usREVISIONS:DATE & DESCRIPTION:CURRENT ISSUE:PAST ISSUES:DATE & DESCRIPTION:SHEET NO. AND NAME:PROJECT NOPROJECT NAMEPROJECT ADDRESSHINCKLEYJAMESINFIRMARY1828LEVEL 1 REFLECTEDCEILING PLAN -PHASE1A2.436 ROUND HILL RDNORTHAMPTON, MA10/28/21UPDATED PRICINGSET3/30/21 -PRICING SET1/4" = 1'-0"1LEVEL 1 REFLECTED CEILING PLAN
0' -0"Level 1 Slab11' -0"B.O. Roof Deck13' -0 1/2"Max Building Height12345678910020202020202024.4110' -0"Level 1 Slab11' -0"B.O. Roof Deck13' -0 1/2"Max Building Height12345678910-11' -0 1/2"Existing Basement Slab-10' -5 1/2"Elevated Basement Slab01010202020202020202ERV SUPPLY GRILLEERV EXHAUST GRILLE4.410' -0"Level 1 Slab11' -0"B.O. Roof Deck13' -0 1/2"Max Building HeightABCDE0' -0"Level 1 Slab11' -0"B.O. Roof Deck13' -0 1/2"Max Building HeightABCD-11' -0 1/2"Existing Basement Slab-10' -5 1/2"Elevated Basement Slab0202E1ARCHITECTURE / RESEARCH / DESIGN137 High Street Belfast ME 04915t: 207 338 1566 www.opalarch.usREVISIONS:DATE & DESCRIPTION:CURRENT ISSUE:PAST ISSUES:DATE & DESCRIPTION:SHEET NO. AND NAME:PROJECT NOPROJECT NAMEPROJECT ADDRESSHINCKLEYJAMESINFIRMARY1828ELEVATIONS -PHASE 1A3.136 ROUND HILL RDNORTHAMPTON, MA10/28/21UPDATED PRICINGSET3/30/21 -PRICING SET3/16" = 1'-0"1East Elevation3/16" = 1'-0"2West Elevation3/16" = 1'-0"3North Elevation3/16" = 1'-0"4South ElevationKEY NUMBER KEY TEXTKEYNOTE LEGEND01 EXISTING WINDOW - REINSTALL PER TYPICAL WINDOW DETAILS02 NEW WINDOW FURNISHED BY OWNER - INSTALL PER TYPICAL WINDOW DETAILS12/06/21 1 UPDATEDPRICINGSET
0' -0"Level 1 Slab11' -0"B.O. Roof Deck-14' -0"T.O. Footing13' -0 1/2"Max Building HeightABCD-11' -0 1/2"Existing Basement SlabA9.41A9.42-10' -5 1/2"Elevated Basement SlabStorage0.7APARTMENT 21.4E10' -0"Level 1 Slab11' -0"B.O. Roof Deck-14' -0"T.O. Footing13' -0 1/2"Max Building HeightABCD-11' -0 1/2"Existing Basement Slab-10' -5 1/2"Elevated Basement SlabMechanical &Work Room0.5Basement Stair0.1ENTRY/STAIR1.1GALLERY1.2A9.21A9.22E110' -0"Level 1 Slab11' -0"B.O. Roof Deck-14' -0"T.O. Footing13' -0 1/2"Max Building Height12345678910-11' -0 1/2"Existing Basement Slab-10' -5 1/2"Elevated Basement SlabGALLERY1.2Basement Stair0.1Garage0.2Utility Room0.3APARTMENT 11.3APARTMENT 21.44.410' -0"Level 1 Slab11' -0"B.O. Roof Deck-14' -0"T.O. Footing13' -0 1/2"Max Building Height12345678910-11' -0 1/2"Existing Basement Slab-10' -5 1/2"Elevated Basement SlabStorage0.7Basement Stair0.1ENTRY/STAIR1.1A9.44A9.44SIMAPARTMENT 11.3APARTMENT 21.44.41ARCHITECTURE / RESEARCH / DESIGN137 High Street Belfast ME 04915t: 207 338 1566 www.opalarch.usREVISIONS:DATE & DESCRIPTION:CURRENT ISSUE:PAST ISSUES:DATE & DESCRIPTION:SHEET NO. AND NAME:PROJECT NOPROJECT NAMEPROJECT ADDRESSHINCKLEYJAMESINFIRMARY1828BUILDING SECTIONS -PHASE 1A4.136 ROUND HILL RDNORTHAMPTON, MA10/28/21UPDATED PRICINGSET3/30/21 -PRICING SET3/16" = 1'-0"1TYPICAL CROSS SECTION - PHASE 13/16" = 1'-0"2CROSS SECTION AT ENTRY - PHASE 13/16" = 1'-0"3LONGITUDINAL SECTION AT HALL - PHASE 13/16" = 1'-0"4LONGITUDINAL SECTION AT STAIR - PHASE 112/06/21 1 UPDATEDPRICINGSET
EXISTING BRICK WALLDENSE PACK CELLULOSE INSULATIONINTERIOREXTERIORINTELLO PLUS SMART VAPOR RETARDERAIR SEALING TAPE -TESCON VANA ORAPPROVED EQ.EXISTING CMULIQUID APPLIED AIR BARRIER -PRO CLIMAVISCONN11 1/2"3-5/8" METAL FRAMING19 1/2"2"2 3/8" +/-2" CLOSED CELL SPRAY FOAM FLASH COAT-USE HONEYWELL SOLSTICE BLOWINGAGENT OR APPROVED EQDENSE PACK CELLULOSE INSULATIONINTELLO PLUS SMART VAPOR RETARDERINTERIOREXTERIOREXISTING METAL CLADDING PANELEXISTING METAL FRAMINGEXISTING INSULATIONAIR SEALING TAPE -TESCON VANA ORAPPROVED EQ.1DENSE-PACK CELLULOSE INSULATION5/8" TYPE X GYPSUM BOARD7-1/4" METAL FRAMING5/8" TYPE X GYPSUM BOARD7 1/4"1HR RATED WALL PER UL U305 (16" O.C.) OR UL U314 (24" O.C.)5/8" TYPE X GYPSUM BOARD3-5/8" METAL FRAMING5/8" TYPE X GYPSUM BOARD3 5/8"1HR RATED WALL PER UL U305 (16" O.C.) OR UL U314 (24" O.C.)ARCHITECTURE / RESEARCH / DESIGN137 High Street Belfast ME 04915t: 207 338 1566 www.opalarch.usREVISIONS:DATE & DESCRIPTION:CURRENT ISSUE:PAST ISSUES:DATE & DESCRIPTION:SHEET NO. AND NAME:PROJECT NOPROJECT NAMEPROJECT ADDRESSHINCKLEYJAMESINFIRMARY1828ASSEMBLY DETAILS -PHASE 1A9.136 ROUND HILL RDNORTHAMPTON, MA10/28/21UPDATED PRICINGSET3/30/21 -PRICING SET3" = 1'-0"4W1a ASSEMBLY - EXTERIOR WALL AT EXISTING CONCRETE/BRICK3" = 1'-0"5W1b ASSEMBLY - EXTERIOR WALL AT EXISTING METAL PANEL WALL3" = 1'-0"6W2 ASSEMBLY - INTERIOR 1 HR RATED INSULATED WALL3" = 1'-0"7W3 ASSEMBLY - GARAGE PARTITION WALL12/06/21 1 UPDATEDPRICINGSET111
PAINTED METAL FLASHINGWITH HEMMED EDGES -MATCH COLOR OF EXISTING METAL CLADDING PANELAIR SEALING TAPEZIP SHEATHINGSPRAY FOAM INSULATIONWINDOW UNITZIP SHEATHINGAIR SEALING TAPE -TESCON VANA ORAPPROVED EQ.INTELLO PLUS SMART VAPOR RETARDERAIR SEALING TAPEEXISTING METAL CLADDING PANELWALL ASSEMBLY PER PLAN6"SEALANTGRID1WINDOW UNITSPRAY FOAM INSULATIONSELF-ADHERED FLEXIBLE FLASHINGZIP SHEATHINGAIR SEALING TAPE -TESCON VANA ORAPPROVED EQ.INTELLO PLUS SMART VAPOR RETARDEREXISTING METAL CLADDING PANEL6"WALL ASSEMBLY PER PLANSELF-ADHERED FLEXIBLE FLASHINGPAINTED METAL FLASHING WITH HEMMED EDGES -MATCH COLOR OF EXISTING METAL CLADDING PANELGRID1AIR SEALING TAPEZIP SHEATHINGSPRAY FOAM INSULATIONWINDOW UNITZIP SHEATHINGAIR SEALING TAPE -TESCON VANA ORAPPROVED EQ.INTELLO PLUS SMART VAPOR RETARDERAIR SEALING TAPEEXISTING METAL CLADDING PANELWALL ASSEMBLY PER PLAN6"PAINTED METAL FLASHING WITH HEMMED EDGES -MATCH COLOR OF EXISTING METAL CLADDING PANELSEALANTGRID1PAINTED METAL FLASHING WITH HEMMED EDGES -MATCH COLOR OF EXISTING METAL CLADDING PANELAIR SEALING TAPEZIP SHEATHINGSPRAY FOAM INSULATIONWINDOW UNITZIP SHEATHINGAIR SEALING TAPEEXISTING STEEL COLUMNAIR SEALING TAPE -TESCON VANA ORAPPROVED EQ.INTELLO PLUS SMART VAPOR RETARDERLIGHT GAUGE METAL ANGLE NAILERLIGHT GAUGE METAL ANGLE NAILERGRIDSPRAY FOAM INSULATION11ARCHITECTURE / RESEARCH / DESIGN137 High Street Belfast ME 04915t: 207 338 1566 www.opalarch.usREVISIONS:DATE & DESCRIPTION:CURRENT ISSUE:PAST ISSUES:DATE & DESCRIPTION:SHEET NO. AND NAME:PROJECT NOPROJECT NAMEPROJECT ADDRESSHINCKLEYJAMESINFIRMARY1828WINDOW OPENINGDETAILS -PHASE 1A9.236 ROUND HILL RDNORTHAMPTON, MA10/28/21UPDATED PRICINGSET3/30/21 -PRICING SET3" = 1'-0"1WINDOW HEAD AT EXISTING METAL PANEL WALL3" = 1'-0"2WINDOW SILL AT EXISTING METAL PANEL WALL3" = 1'-0"3WINDOW JAMB AT EXISTING METAL PANEL WALL3" = 1'-0"4WINDOW JAMB AT COLUMN12/06/21 1 UPDATEDPRICINGSET
0' -0"Level 1 SlabEXISTING STEEL COLUMNEXISTING STEEL WALL PANEL SYSTEM, SEALED WITH AIR SEALING TAPE AT INTERIOR FACEDENSE PACK CELLULOSE INSULATION2" CLOSED CELL SPRAY FOAM FLASH COAT-USE HONEYWELL SOLSTICE BLOWINGAGENT OR APPROVED EQEXISTING CONCRETE FLOOR SLAB11 1/2"INTELLO PLUS SMART VAPOR RETARDER3-5/8" METAL FRAMING1LOW-PERM SEALANT111' -0"B.O. Roof DeckEXISTING STEEL COLUMNEXISTING STEEL WALL PANEL SYSTEM, SEALED WITH AIR SEALING TAPE AT INTERIOR FACENEW PLYWOOD SOFFIT PANEL EXISTING ROOF MEMBRANEEXISTING ROOF INSULATIONEXISTING STEEL DECKINGEXISTING STEEL JOISTINTELLO PLUS SMART VAPOR RETARDEREXISTING STEEL GIRDER -ENCAPSULATE WITH SPRAY FOAMDENSE PACK CELLULOSE INSULATION2" CLOSED CELL SPRAY FOAM FLASH COAT-USE HONEYWELL SOLSTICE BLOWINGAGENT OR APPROVED EQMETAL SOFFIT PANEL TO MATCH EXISTINGAIR SEALING TAPE -TESCON VANA ORAPPROVED EQ.11 1/2"3-5/8" METAL FRAMINGNOTE: PROVIDE PRICING ALTERNATE TO EVALUATE EXISTING METAL SOFFIT PANELS FOR REUSE IN PLACE10' -0"Level 1 Slab10EXISTING BRICK CLADDINGEXISTING CONCRETE WALLDENSE PACK CELLULOSE INSULATIONEXISTING CONCRETE FLOOR SLABEXISTING STEEL JOISTINTELLO PLUS SMART VAPOR RETARDEREXISTING CMULIQUID APPLIED AIR BARRIER -PRO CLIMAVISCONN11 1/2"1ARCHITECTURE / RESEARCH / DESIGN137 High Street Belfast ME 04915t: 207 338 1566 www.opalarch.usREVISIONS:DATE & DESCRIPTION:CURRENT ISSUE:PAST ISSUES:DATE & DESCRIPTION:SHEET NO. AND NAME:PROJECT NOPROJECT NAMEPROJECT ADDRESSHINCKLEYJAMESINFIRMARY1828BUILDING ENVELOPEDETAILS -PHASE 1A9.436 ROUND HILL RDNORTHAMPTON, MA10/28/21UPDATED PRICINGSET3/30/21 -PRICING SET1 1/2" = 1'-0"2EXTERIOR METAL PANEL WALL AT FIRST FLOOR SLAB1 1/2" = 1'-0"1EXTERIOR WALL AT ROOF1 1/2" = 1'-0"4EXTERIOR CONCRETE/BRICK WALL AT FIRST FLOOR SLAB12/06/21 1 UPDATEDPRICINGSET